<iati-activities version="2.03" generated-datetime="2026-09-30T10:54:42"><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P006449</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ceara Integrated Water Resources Management Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(a)  Increase the sustainable water supply for multiple uses, improve the efficiency of Ceara's integrated water resources management system and decrease vulnerability of poor populations to cyclical drought through: (i) improvements in the institutional, legal and administrative managerial frameworks with emphasis on participatory management mechanisms; (ii) the rehabilitation and new construction of the hydraulic infrastructure aimed at the integrated management of river basins; (iii) the development and consolidation of sustainable cost recovery, management, operation and maintenance systems for the hydraulic infrastructure; and (iv) the integration of environmental policies with water management policies. The main performance indicators are: (i) the percentage increase in the volume of bulk water supplied by COGERH, the states water resources management company; (ii) the increased reliability of water supply and resistance against droughts; (iii) the implementation of new and/or improved water resources management, operation and maintenance tools; (iv) increase in the number of users with enhanced reliable access to quality water; and (v) the percentage of recovery for fixed and variable costs of providing water.b. Stimulate multiple use, efficient and shared management of Ceara's water resources. The project would support the following actions: (i) organization and strengthening of river basin committees and water user associations; (ii) implementation and propagation of more effective water use and management technologies; and (iii) education, information and training of the general public and water users aimed at efficient water use, demand management and the reduction of waste. The main performance indicators are: (i) the increase in the number of river basin committees and water user associations, including the number of people participating in these entities; (ii) the decrease of the physical waste of water and the increased productivity in the economic sectors which use water as a production input; (iii) the percentage of billed water services v/s collections of bills.c. Promote the improved management of soil and vegetation in tributary watersheds to enhance water conservation, minimize erosion and maximize natural water storage mechanisms, through the adequate management of critical micro-basins and groundwater resources. The project would foster the hydro-environmental recovery of selected micro-basins in the state by increasing the vegetated area, controlling run-off, minimizing erosion, increasing water retention times, increasing groundwater recharge, developing aquifer management plans and recharge zone protection plans, improving the local infrastructure and production methods; and by evaluating new technologies. The main performance indicators are: (i) hectares of rehabilitated watershed vegetation, (ii) number of micro-basins stabilized, (iii) measured runoff hydrographs as a function of time and volume for specific microbasins, (iv) measurement of volumetric erosion in key microbasins and sedimentation change in key catchments, (v) number of recharge protection zones established, (vi) number of aquifer and groundwater management plans developed.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Ceara Integrated Water Resource Management Project, will increase a sustainable water supply for multiple uses, and improve the efficiency of the State of Ceara's integrated water resources management system, thus decreasing the vulnerability of poor populations to cyclical drought. It will further promote soil and vegetation management in tributary watersheds, to enhance water conservation, in turn, minimizing erosion. Natural water storage mechanisms will be maximized, through adequate management of critical micro-basins, and groundwater resources. The project components include: 1) Management practices, to improve institutional, legal, and administrative frameworks, emphasizing participatory management mechanisms. This includes construction of hydraulic infrastructures for an integrated management of river-basins, through a sustainable cost recovery development. 2) Increase in the network of strategic reservoirs, integration of river basins, and, rehabilitation of existing hydraulic infrastructure, which includes construction works, and projects, to mitigate environmental impacts, and environmental policies will be integrated with water management policies, to increase the volume of water supplied by the State's water management company. 3) The natural resource management component, will foster a micro watershed management pilot, and, a groundwater management study.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="1999-09-02"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2000-01-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2011-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2011-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Erwin De Nys</narrative></person-name><telephone>+1-202-473-1000</telephone><email>edenys@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386357" />
            <name><narrative>Rio Timonha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.93028 -41.272499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388725" />
            <name><narrative>Riacho São Gonçalo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1666698 -40.533329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389385" />
            <name><narrative>Santana do Cariri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.1796799 -39.784512</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390433" />
            <name><narrative>Riacho do Meio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.0999999 -39.066669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391418" />
            <name><narrative>Porteiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5950899 -39.074429</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394188" />
            <name><narrative>Rio Mundaú</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.1874001 -39.40554</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394754" />
            <name><narrative>Missão Velha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.2370701 -39.111961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395448" />
            <name><narrative>Maranguape</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.99581 -38.729691</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396018" />
            <name><narrative>Macaoca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.7694402 -39.479721</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396655" />
            <name><narrative>Riacho Lagoa Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.53333 -38.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397146" />
            <name><narrative>Juazeiro do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.1466899 -39.246971</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397572" />
            <name><narrative>Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6382098 -39.240372</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397668" />
            <name><narrative>Rio Jaguaribe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1647801 -40.309311</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397909" />
            <name><narrative>Itapipoca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.4944401 -39.578609</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399415" />
            <name><narrative>Fortaleza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.7172201 -38.54306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401544" />
            <name><narrative>Crato</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.14714 -39.471321</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401727" />
            <name><narrative>Rio Coreaú</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.89556 -40.83778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Estado do Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402447" />
            <name><narrative>Rio Catu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.9000001 -38.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403145" />
            <name><narrative>Capistrano</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.4622998 -38.920719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405952" />
            <name><narrative>Serra de BaturitE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.2041898 -38.939152</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406132" />
            <name><narrative>Rio Barrigas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.0666699 -39.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406144" />
            <name><narrative>Barrento</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.31056 -39.514999</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406441" />
            <name><narrative>Barbalha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.4360399 -39.35273</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407234" />
            <name><narrative>Serra da Aratanha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.98333 -38.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407247" />
            <name><narrative>Chapada do Araripe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.3873801 -40.216061</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319727" />
            <name><narrative>Lagoa do Mato</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9553499 -43.63105</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320043" />
            <name><narrative>Aratuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.4189801 -39.04818</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320050" />
            <name><narrative>Caridade</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.2010002 -39.141491</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320062" />
            <name><narrative>Fortaleza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.7227099 -38.524651</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320089" />
            <name><narrative>Palmácia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.1296401 -38.842579</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324294" />
            <name><narrative>Itapiúna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.6191802 -38.931301</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324296" />
            <name><narrative>Madalena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.8762202 -39.475868</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324298" />
            <name><narrative>Nova Olinda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.08567 -39.671951</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="3" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="3" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="19" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="63" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="86.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="33" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="34" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2000-01-01"/>
<period-end iso-date="2000-01-31"/>
<value currency="USD" value-date="2000-01-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-02-01"/>
<period-end iso-date="2000-02-29"/>
<value currency="USD" value-date="2000-02-29">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-03-01"/>
<period-end iso-date="2000-03-31"/>
<value currency="USD" value-date="2000-03-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-04-01"/>
<period-end iso-date="2000-04-30"/>
<value currency="USD" value-date="2000-04-30">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-05-01"/>
<period-end iso-date="2000-05-31"/>
<value currency="USD" value-date="2000-05-31">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-06-01"/>
<period-end iso-date="2000-06-30"/>
<value currency="USD" value-date="2000-06-30">1600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-07-01"/>
<period-end iso-date="2000-07-31"/>
<value currency="USD" value-date="2000-07-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-08-01"/>
<period-end iso-date="2000-08-31"/>
<value currency="USD" value-date="2000-08-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-09-01"/>
<period-end iso-date="2000-09-30"/>
<value currency="USD" value-date="2000-09-30">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-10-01"/>
<period-end iso-date="2000-10-31"/>
<value currency="USD" value-date="2000-10-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-11-01"/>
<period-end iso-date="2000-11-30"/>
<value currency="USD" value-date="2000-11-30">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2000-12-01"/>
<period-end iso-date="2000-12-31"/>
<value currency="USD" value-date="2000-12-31">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-01-01"/>
<period-end iso-date="2001-01-31"/>
<value currency="USD" value-date="2001-01-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-02-01"/>
<period-end iso-date="2001-02-28"/>
<value currency="USD" value-date="2001-02-28">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-03-01"/>
<period-end iso-date="2001-03-31"/>
<value currency="USD" value-date="2001-03-31">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-04-01"/>
<period-end iso-date="2001-04-30"/>
<value currency="USD" value-date="2001-04-30">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-05-01"/>
<period-end iso-date="2001-05-31"/>
<value currency="USD" value-date="2001-05-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-06-01"/>
<period-end iso-date="2001-06-30"/>
<value currency="USD" value-date="2001-06-30">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-07-01"/>
<period-end iso-date="2001-07-31"/>
<value currency="USD" value-date="2001-07-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-08-01"/>
<period-end iso-date="2001-08-31"/>
<value currency="USD" value-date="2001-08-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-09-01"/>
<period-end iso-date="2001-09-30"/>
<value currency="USD" value-date="2001-09-30">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-10-01"/>
<period-end iso-date="2001-10-31"/>
<value currency="USD" value-date="2001-10-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-11-01"/>
<period-end iso-date="2001-11-30"/>
<value currency="USD" value-date="2001-11-30">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2001-12-01"/>
<period-end iso-date="2001-12-31"/>
<value currency="USD" value-date="2001-12-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-01-01"/>
<period-end iso-date="2002-01-31"/>
<value currency="USD" value-date="2002-01-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-02-01"/>
<period-end iso-date="2002-02-28"/>
<value currency="USD" value-date="2002-02-28">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-03-01"/>
<period-end iso-date="2002-03-31"/>
<value currency="USD" value-date="2002-03-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-04-01"/>
<period-end iso-date="2002-04-30"/>
<value currency="USD" value-date="2002-04-30">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-05-01"/>
<period-end iso-date="2002-05-31"/>
<value currency="USD" value-date="2002-05-31">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-06-01"/>
<period-end iso-date="2002-06-30"/>
<value currency="USD" value-date="2002-06-30">2175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-07-01"/>
<period-end iso-date="2002-07-31"/>
<value currency="USD" value-date="2002-07-31">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-08-01"/>
<period-end iso-date="2002-08-31"/>
<value currency="USD" value-date="2002-08-31">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-09-01"/>
<period-end iso-date="2002-09-30"/>
<value currency="USD" value-date="2002-09-30">2341666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-10-01"/>
<period-end iso-date="2002-10-31"/>
<value currency="USD" value-date="2002-10-31">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-11-01"/>
<period-end iso-date="2002-11-30"/>
<value currency="USD" value-date="2002-11-30">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2002-12-01"/>
<period-end iso-date="2002-12-31"/>
<value currency="USD" value-date="2002-12-31">2341666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-01-01"/>
<period-end iso-date="2003-01-31"/>
<value currency="USD" value-date="2003-01-31">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-02-01"/>
<period-end iso-date="2003-02-28"/>
<value currency="USD" value-date="2003-02-28">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-03-01"/>
<period-end iso-date="2003-03-31"/>
<value currency="USD" value-date="2003-03-31">2341666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-04-01"/>
<period-end iso-date="2003-04-30"/>
<value currency="USD" value-date="2003-04-30">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">2341666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">2341666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">2875000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-01-01"/>
<period-end iso-date="2000-01-31"/>
<value currency="USD" value-date="2000-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-02-01"/>
<period-end iso-date="2000-02-29"/>
<value currency="USD" value-date="2000-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-03-01"/>
<period-end iso-date="2000-03-31"/>
<value currency="USD" value-date="2000-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-04-01"/>
<period-end iso-date="2000-04-30"/>
<value currency="USD" value-date="2000-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-05-01"/>
<period-end iso-date="2000-05-31"/>
<value currency="USD" value-date="2000-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-06-01"/>
<period-end iso-date="2000-06-30"/>
<value currency="USD" value-date="2000-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-07-01"/>
<period-end iso-date="2000-07-31"/>
<value currency="USD" value-date="2000-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-08-01"/>
<period-end iso-date="2000-08-31"/>
<value currency="USD" value-date="2000-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-09-01"/>
<period-end iso-date="2000-09-30"/>
<value currency="USD" value-date="2000-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-10-01"/>
<period-end iso-date="2000-10-31"/>
<value currency="USD" value-date="2000-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-11-01"/>
<period-end iso-date="2000-11-30"/>
<value currency="USD" value-date="2000-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2000-12-01"/>
<period-end iso-date="2000-12-31"/>
<value currency="USD" value-date="2000-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-01-01"/>
<period-end iso-date="2001-01-31"/>
<value currency="USD" value-date="2001-01-31">2191666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-02-01"/>
<period-end iso-date="2001-02-28"/>
<value currency="USD" value-date="2001-02-28">2191666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-03-01"/>
<period-end iso-date="2001-03-31"/>
<value currency="USD" value-date="2001-03-31">2191666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-04-01"/>
<period-end iso-date="2001-04-30"/>
<value currency="USD" value-date="2001-04-30">2191666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-05-01"/>
<period-end iso-date="2001-05-31"/>
<value currency="USD" value-date="2001-05-31">2191666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-06-01"/>
<period-end iso-date="2001-06-30"/>
<value currency="USD" value-date="2001-06-30">2191666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-07-01"/>
<period-end iso-date="2001-07-31"/>
<value currency="USD" value-date="2001-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-08-01"/>
<period-end iso-date="2001-08-31"/>
<value currency="USD" value-date="2001-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-09-01"/>
<period-end iso-date="2001-09-30"/>
<value currency="USD" value-date="2001-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-10-01"/>
<period-end iso-date="2001-10-31"/>
<value currency="USD" value-date="2001-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-11-01"/>
<period-end iso-date="2001-11-30"/>
<value currency="USD" value-date="2001-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2001-12-01"/>
<period-end iso-date="2001-12-31"/>
<value currency="USD" value-date="2001-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-01-01"/>
<period-end iso-date="2002-01-31"/>
<value currency="USD" value-date="2002-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-02-01"/>
<period-end iso-date="2002-02-28"/>
<value currency="USD" value-date="2002-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-03-01"/>
<period-end iso-date="2002-03-31"/>
<value currency="USD" value-date="2002-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-04-01"/>
<period-end iso-date="2002-04-30"/>
<value currency="USD" value-date="2002-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-05-01"/>
<period-end iso-date="2002-05-31"/>
<value currency="USD" value-date="2002-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-06-01"/>
<period-end iso-date="2002-06-30"/>
<value currency="USD" value-date="2002-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-07-01"/>
<period-end iso-date="2002-07-31"/>
<value currency="USD" value-date="2002-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-08-01"/>
<period-end iso-date="2002-08-31"/>
<value currency="USD" value-date="2002-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-09-01"/>
<period-end iso-date="2002-09-30"/>
<value currency="USD" value-date="2002-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-10-01"/>
<period-end iso-date="2002-10-31"/>
<value currency="USD" value-date="2002-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-11-01"/>
<period-end iso-date="2002-11-30"/>
<value currency="USD" value-date="2002-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2002-12-01"/>
<period-end iso-date="2002-12-31"/>
<value currency="USD" value-date="2002-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-01-01"/>
<period-end iso-date="2003-01-31"/>
<value currency="USD" value-date="2003-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-02-01"/>
<period-end iso-date="2003-02-28"/>
<value currency="USD" value-date="2003-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-03-01"/>
<period-end iso-date="2003-03-31"/>
<value currency="USD" value-date="2003-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-04-01"/>
<period-end iso-date="2003-04-30"/>
<value currency="USD" value-date="2003-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-05-01"/>
<period-end iso-date="2003-05-31"/>
<value currency="USD" value-date="2003-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-06-01"/>
<period-end iso-date="2003-06-30"/>
<value currency="USD" value-date="2003-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-07-01"/>
<period-end iso-date="2003-07-31"/>
<value currency="USD" value-date="2003-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-08-01"/>
<period-end iso-date="2003-08-31"/>
<value currency="USD" value-date="2003-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-09-01"/>
<period-end iso-date="2003-09-30"/>
<value currency="USD" value-date="2003-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-10-01"/>
<period-end iso-date="2003-10-31"/>
<value currency="USD" value-date="2003-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-11-01"/>
<period-end iso-date="2003-11-30"/>
<value currency="USD" value-date="2003-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2003-12-01"/>
<period-end iso-date="2003-12-31"/>
<value currency="USD" value-date="2003-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-01-01"/>
<period-end iso-date="2004-01-31"/>
<value currency="USD" value-date="2004-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-02-01"/>
<period-end iso-date="2004-02-29"/>
<value currency="USD" value-date="2004-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-03-01"/>
<period-end iso-date="2004-03-31"/>
<value currency="USD" value-date="2004-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-04-01"/>
<period-end iso-date="2004-04-30"/>
<value currency="USD" value-date="2004-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-05-01"/>
<period-end iso-date="2004-05-31"/>
<value currency="USD" value-date="2004-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-06-01"/>
<period-end iso-date="2004-06-30"/>
<value currency="USD" value-date="2004-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-07-01"/>
<period-end iso-date="2004-07-31"/>
<value currency="USD" value-date="2004-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-08-01"/>
<period-end iso-date="2004-08-31"/>
<value currency="USD" value-date="2004-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-09-01"/>
<period-end iso-date="2004-09-30"/>
<value currency="USD" value-date="2004-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-10-01"/>
<period-end iso-date="2004-10-31"/>
<value currency="USD" value-date="2004-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-11-01"/>
<period-end iso-date="2004-11-30"/>
<value currency="USD" value-date="2004-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2004-12-01"/>
<period-end iso-date="2004-12-31"/>
<value currency="USD" value-date="2004-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-01-01"/>
<period-end iso-date="2005-01-31"/>
<value currency="USD" value-date="2005-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-02-01"/>
<period-end iso-date="2005-02-28"/>
<value currency="USD" value-date="2005-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-03-01"/>
<period-end iso-date="2005-03-31"/>
<value currency="USD" value-date="2005-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-04-01"/>
<period-end iso-date="2005-04-30"/>
<value currency="USD" value-date="2005-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-05-01"/>
<period-end iso-date="2005-05-31"/>
<value currency="USD" value-date="2005-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-06-01"/>
<period-end iso-date="2005-06-30"/>
<value currency="USD" value-date="2005-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-07-01"/>
<period-end iso-date="2005-07-31"/>
<value currency="USD" value-date="2005-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P006449"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P006449?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P006449"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and Implementation of the Water Tariffs Strategy.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No strategy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Strategy developed and implemented">

</target>
<actual value="Strategy developed and implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional Strengthening of the State Water Resources Agencies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 agency"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="3 agencies">

</target>
<actual value="3 agencies">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of River Basin Committees.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="3 committees"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="11 committees">

</target>
<actual value="10 committees">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="12.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carry out geo-hydrological, socio-economic and institutional studies for groundwater management in two selcted zones.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="4 studies">

</target>
<actual value="3 studies">
<comment><narrative>
Under the Additional Financing, COGERH has finalized the study and modeling of two aquifers of  Apodi and Cariri Region and isworking on further studies.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and Implementation of the Water Tariffs Strategy.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No strategy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Strategy developed and implemented">

</target>
<actual value="Strategy developed and implemented">
<comment><narrative>
The Strategy was developed under the Original Project and is being implemented at different paces for each segment of water user.
Under the Additional Financing, it's expected the preparation of study to calculate the water charges for the irrigation sector.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of River Basin Committees.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="3 committees"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="11 committees">

</target>
<actual value="10 committees">
<comment><narrative>
The following committees were installed: Curu, Baixo Jaguaribe, Mdio Jaguaribe, Alto Jaguaribe, Banabui, Salgado, Metropolitana,Acara, Litoral, and Corea. Arrangements for the installation of the committee for Poti-Longa federal basin are being carried outby the National Water Agency (ANA). In November 2010, the State of Ceara hosted the State River Basins Committees Meeting and the12th National River Basins Committees Meeting.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional Strengthening of the State Water Resources Agencies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 agency"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="3 agencies">

</target>
<actual value="3 agencies">
<comment><narrative>
Under the AF there are several activities scheduled and under implementation to further strengthen the water management institutions
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Efficiency in water licensing implementation.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="5.00"><comment><narrative>Formula: Licensed Volume for irrigation sector / estimated volume used by irrigation users x 100</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Target refers to irrigation sector only.
</narrative></comment>
</target>
<actual value="17.00">
<comment><narrative>
The Regularization of Use Plan will be developed under the AF for the basins of Metropolitanas, Corea and Parnaba. It will alsocomplement the basins of Mdio, Baixo e Alto Jaguaribe, Banabui, and Salgado
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in public participation for water resources management.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="11.00"><comment><narrative>Value in number of management commissions.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="44.00">

</target>
<actual value="34.00">
<comment><narrative>
There are 31 managing commissions formed until June 2011. There are 10 more to be formed before December 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of reservoirs monitored by COGERH.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="128.00"><comment><narrative>Value in number of dams. Up to 2008 COGERH monitored 128 dams.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="140.00">

</target>
<actual value="136.00">
<comment><narrative>
Umari and Riacho da Serra were added in 2011. With the completion of the Project activities, four new reservoirs will be added in2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of new management tools to improve the efficiency of Ceara's Integrated Water Resources Management System, suchas permit and tariff policies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="Weak integrated management system presenting fragile institutions and policies a nd lack of coordination among them."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Well-integrated and efficient management system presenting consolidated institut ions and policies and effective of coordination among them.">

</target>
<actual value="Well-integrated and efficient management system presenting consolidated institut ions and policies and effective of coordination among them.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="12.00">

</target>
<actual value="12.00">
<comment><narrative>
First phase of the Canal
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Efficiency in water licensing implementation.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="5.00"><comment><narrative>Formula: Licensed Volume for irrigation sector / estimated volume used by irrigation users x 100</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="50.00">
<comment><narrative>
Target refers to irrigation sector only.
</narrative></comment>
</target>
<actual value="17.00">
<comment><narrative>
Value refers to irrigation sector only. COGERH is preparing a plan for regularization of use of several state river basins A planfor 3 other basins is being prepared with the support of ANA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of new management tools to improve the efficiency of Ceara's Integrated Water Resources Management System, suchas permit and tariff policies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="Weak integrated management system presenting fragile institutions and policies a nd lack of coordination among them."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Well-integrated and efficient management system presenting consolidated institut ions and policies and effective of coordinationamong them.">

</target>
<actual value="Well-integrated and efficient management system presenting consolidated institutions and policies">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rehabilitation of hydraulic infrastructure in operation.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 dam rehabilitated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="29 dams rehabilitated">

</target>
<actual value="23 dams rehabilitated">
<comment><narrative>
Six new dams will be rehabilitated under the Additional Financing. The procurement process is underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rehabilitation of hydraulic infrastructure in operation.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 dam rehabilitated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="29 dams rehabilitated">

</target>
<actual value="29 dams rehabilitated">
<comment><narrative>
Six dams are being rehabilitated (at final stage) by COGERH during the Additional Financing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the levels of guarantee of water supply.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="10,333 million m3 (total water storage)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="10,772 million m3 (total water storage)">

</target>
<actual value="10 649 289.05 m3 (total water storage)">
<comment><narrative>
Of the dams planned for the AF, only Umar has been finished.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutional Strengthening of the State Water Resources Agencies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 agency"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="3 agencies">

</target>
<actual value="3 agencies">
<comment><narrative>
Under the AF, several activities were implemented to further strengthen the water management institutions, inclusion a mastersdegree course for the agencies' staff.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion and Implementation of the Operations and Maintenance Plan.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No O&amp;M Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Plan completed and implemented">

</target>
<actual value="Plan completed and implemented">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the levels of guarantee of water supply.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="10,333 million m3 (total water storage)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="10,772 million m3 (total water storage)">

</target>
<actual value="11,800 million m3 (total water
storage)">
<comment><narrative>
Out of the dams planned for the AF, Umari and Jenipapeiro have been completed by the closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in public participation for water resources management.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="44.00">

</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carry out geo-hydrological, socio-economic and institutional studies for groundwater management in two selcted zones.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="4 studies">

</target>
<actual value="Under the Additional Financing, COGERH has finalized the study and modeling of two aquifers of Apodi and Cariri Region.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of Water Users Associations.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="30 Water Users Associations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="150 Water Users Associations">

</target>
<actual value="83 Water Users Associations">
<comment><narrative>
Reservoir managing commissions are being created in the state as an alternative to committees
considering that the dynamics ofwater in the state concentrate around the reservoirs instead of
following the river basin approach.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal (Serra do Felix - second phase of the Canal)
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="9.00">

</target>
<actual value="9.00">
<comment><narrative>
Second phase of the Canal only (Serra do Felix)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of River Basin Committees.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="3 committees"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="11 committees">

</target>
<actual value="10 commitees">
<comment><narrative>
The following basin committees were installed: Curu, Baixo Jaguaribe, Mdio Jaguaribe, Alto Jaguaribe, Banabui, Salgado,Metropolitana, Acara, Litoral, and Corea.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="12.00">

</target>
<actual value="12.00">
<comment><narrative>
First phase of the Canal only - (Curral Velho reservoir)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water charging index.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="10.00"><comment><narrative>Formula: volume collected / estimated volume used by users x 100
(47,320,067 / 458, 144,770 x 100)</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="37.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in public participation for water resources management.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="11.00"><comment><narrative>Value in number of management commissions.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="44.00">

</target>
<actual value="34.00">
<comment><narrative>
There are 31 managing commissions formed until June 2011. There are 10 more being formed until December 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of new management tools to improve the efficiency of Ceara's Integrated Water Resources Management System, suchas permit and tariff policies.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="Weak integrated management system presenting fragile institutions and policies a nd lack of coordination among them."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Well-integrated and efficient management system presenting consolidated institut ions and policies and effective of coordinationamong them.">

</target>
<actual value="Well-integrated and efficient management system presenting consolidated institut ions and policies and effective of coordinationamong them.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rehabilitation of hydraulic infrastructure in operation.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 dam rehabilitated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="29 dams rehabilitated">

</target>
<actual value="29 dams rehabilitated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal (Serra do Felix - second phase of the Canal)
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="9.00">

</target>
<actual value="9.00">
<comment><narrative>
Second phase only.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal (Serra do Felix - second phase of the Canal)
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="9.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the volume of bulk water distributed by COGERH and in the recovery margin/level of fixed and variable costs of the integrated system.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="Water Flow: 6.92 m3/s; Cost recovery: O&amp;M - 70%; Sanitation - 0%; Irrigation - 0%; Industry - 0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Water flow: 20.52 m3/s; Cost recovery: O&amp;M - 100%; Sanitation - 100%; Irrigation - 6%; Industry - 100%">

</target>
<actual value="Water Flow: 20.30 m3/s; Cost recovery: O&amp;M - 70%; Sanitation - 99%; Irrigation - 4%; Industry - 100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Carry out geo-hydrological, socio-economic and institutional studies for groundwater management in two selcted zones.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="0 study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="4 studies">

</target>
<actual value="Under the Additional Financing, COGERH has finalized the study and modeling of two aquifers of  Apodi and Cariri Region.">
<comment><narrative>
COGERH is also working on qualitative and quantitative analysis of Campo de Dunas aquifer.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease in the physical waste of water and increase in use efficiency through new technologies and the increase in productivity ofsectors that use water as a raw material.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="30% waste water"><comment><narrative>Reduction of losses in pipelines operated by COGERH</narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="25% waste water">
<comment><narrative>
Target is being revised by the client.
</narrative></comment>
</target>
<actual value="30%">
<comment><narrative>
Target under review
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="6.60">

</target>
<actual value="6.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and Implementation of the Water Tariffs Strategy.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No strategy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Strategy developed and implemented">

</target>
<actual value="Strategy developed and implemented">
<comment><narrative>
The Strategy was developed under the Original Project and is being implemented at different paces for each segment of water user.
With its own resources, COGERH will prepare a study to calculate the water charges for the irrigation sector.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of reservoirs monitored by COGERH.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="128.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="140.00">

</target>
<actual value="136.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="6.60">
<comment><narrative>
Total delivery of three phases will be 27.6 m3/s
</narrative></comment>
</target>
<actual value="6.60">
<comment><narrative>
Third phase only - Pacajus dam
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion and Implementation of the Operations and Maintenance Plan.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No O&amp;M Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Plan completed and implemented">

</target>
<actual value="Plan completed and implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of Water Users Associations.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="30 Water Users Associations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="150 Water Users Associations">

</target>
<actual value="83 Water Users Associations">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of reservoirs monitored by COGERH.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="128.00"><comment><narrative>Value in number of dams. Up to 2008 COGERH monitored 128 dams.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="140.00">

</target>
<actual value="143.00">
<comment><narrative>
Umari and Riacho da Serra were added on 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in the levels of guarantee of water supply.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="10,333 million m3 (total water storage)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="10,772 million m3 (total water storage)">

</target>
<actual value="11,800 million m3 (total waterstorage)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefited from Project pipeline systems.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="3119897.00">

</target>
<actual value="3.32">
<comment><narrative>
It includes Fortaleza and the metropolitan area, benefited by the integration canal
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of Water Users Associations.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="30 Water Users Associations"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="150 Water Users Associations">

</target>
<actual value="">
<comment><narrative>
Reservoir managing commissions are being created in the state as an alternative to committees considering that the dynamics ofwater in the state concentrate around the reservoirs instead of following the river basin approach.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Efficiency in water licensing implementation.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="50.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water delivered through the Integration Canal
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="6.60">
<comment><narrative>
Total delivery of three phases will be 27.6 m3/s
</narrative></comment>
</target>
<actual value="6.60">
<comment><narrative>
Third phase of the Canal only - (Pacajus reservoir) Total delivery of three phases are 27.6 m3/s.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water charging index.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="10.00"><comment><narrative>Formula: volume collected / estimated volume used by users x 100
(47,320,067 / 458, 144,770 x 100)</narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="37.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bulk water charging index.
</narrative></title>
<baseline year="2009" iso-date="2009-11-25" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-25" />
<period-end iso-date="2011-12-31" />
<target value="37.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion and Implementation of the Operations and Maintenance Plan.
</narrative></title>
<baseline year="1999" iso-date="1999-11-10" value="No O&amp;M Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1999-11-10" />
<period-end iso-date="2011-12-31" />
<target value="Plan completed and implemented">

</target>
<actual value="Plan completed and implemented">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P006553</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR APL Integrated Water Management In Metropolitan Sao Paulo</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The overall objectives of the APL are (i) to protect and maintain the quality and reliability of MRSP's water resources and potable water sources; (ii) to improve the quality of life of the poor populations residing in key targeted urban river basins in MRSP; and (iii) to strengthen institutional capacity and improve metropolitan management and coordination in MRSP in water resources management, water pollution control, land-use policy and basic service provision.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000031"><narrative>SABESP</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000031"><narrative>SABESP</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000032"><narrative>SSRH</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2002-05-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-07-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juliana Menezes Garrido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarrido@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003446537" />
            <name><narrative>Rio Tietê</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.66667 -51.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative> Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="23" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="23" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="23" xml:lang="en"/><sector vocabulary="1" code="41030" percentage="11" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="9" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="37" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="9" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="27" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="9" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="23" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="23" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="7" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="7" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="37" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="6" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="23" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="6" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1890000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">4000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">4000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">4000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2613333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2613333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2613333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2613333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2613333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2613333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2616666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2520000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1253333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1253333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">496666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">496666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">496666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">496666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">496666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">253333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">253333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">256666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">256666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">256666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">116666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">120000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2017-03-30"/>
<value currency="USD" value-date="2017-03-30">10467050.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2017-03-30"/>
<value currency="USD" value-date="2017-03-30">10467050.46</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">4000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">20820000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-20724366</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-8713809</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1848876</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">250000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">10000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4491609</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">2998701</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">2576109</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">3174137</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1602653</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">6124990</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">50000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">52050</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">5645870</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">2522081</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">50000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2551183</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">2000034</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1720518</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1677625</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">57272</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">6237515</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2287249</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">50000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">150000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">150000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">300000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">10078662</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1946628</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">130000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">3272882</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-13687</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">100000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">14802771</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">2230971</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">286000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1754101</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1601399</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">25000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">71000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">9738504</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-20876</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-10000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-1239</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-7453</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-28191</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-58407</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-52050</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-153</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-87594</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-432</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-239</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-80254</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-594</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-85230</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-798</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-511</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-95695</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-1018</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-99147</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-456</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1709</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-131254</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-483</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-2826</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-593</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-210927</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-4913</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-337595</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-723</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-8341</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-894</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-592591</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-14387</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1012</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-694940</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-17468</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-994</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-808776</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-18421</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1194429</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1389</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-27146</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1308055</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1469</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-29431</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1520</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1390390</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-26780</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1043954</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1192</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-19750</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-444210</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-611</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-8539</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-405</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-239607</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-4638</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-206257</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-374</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-4337</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-347</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-183623</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-4467</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-719</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-536213</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-21400</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-87</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1708802</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-37828</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1844353</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-43001</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1977070</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-43564</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1907100</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-41910</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1565967</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-34055</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1428841</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-32985</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1219244</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-27465</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-11200</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-17320</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-23560</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-28459</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-32799</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-43588</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1913</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-76507</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3039830</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-45293</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-32"><narrative>SSRH</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P006553"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P006553?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P006553"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume(mass) of BOD pollution load removed by treatment plant under the project
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="2949.00">

</target>
<actual value="2502.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydrodynamic monitoring models of reservoirs developed.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDPAs prepared / revised for each sub-basin
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in water production capacity due to project interventions
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="157680000.00">

</target>
<actual value="31536000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Citizenship Center established
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Macro metropolis water resources master plan revised and improved, including specific technical studies for key interventions.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement process for solid waste collection equipment concluded and equipment in use
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas restored or re/afforested (ha)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="213.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies developed to improve institutional capacity for water resources planning.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies for monitoring the water quality of key water sources sub-basins (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in water production capacity due to project interventions
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="157680000.00">

</target>
<actual value="31536000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies developed to improve institutional capacity for water resources planning.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement process for solid waste collection equipment concluded and equipment in use
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation facilities under the project (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="50700.00">

</target>
<actual value="27650.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Areas restored or re/afforested (ha)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="213.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydrodynamic monitoring models of reservoirs developed.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDPAs prepared / revised for each sub-basin
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="10.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDPA  Plan for Environmental Development and Protection  in  Alto Tiete Basin prepared
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water source  under the project (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="1500000.00">

</target>
<actual value="1500000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Parks and free public areas urbanized implemented
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-09-30" />
<target value="170.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Macro metropolis water resources master plan revised and improved, including specific technical studies for key interventions.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Seminars or Workshops carried out to discuss Water Resources Management and Planning aspects of MRSP.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Industrial and municipal waste disposal capacity created under the project
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="46000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water source  under the project (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="1500000.00">

</target>
<actual value="1500000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Citizenship Center established
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies for monitoring the water quality of key water sources sub-basins (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="3.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDPA  Plan for Environmental Development and Protection  in  Alto Tiete Basin prepared
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Seminars or Workshops carried out to discuss Water Resources Management and Planning aspects of MRSP.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume(mass) of BOD pollution load removed by treatment plant under the project
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="2949.00">

</target>
<actual value="2502.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Parks and free public areas urbanized implemented
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-09-30" />
<target value="170.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Industrial and municipal waste disposal capacity created under the project
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="46000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation facilities under the project (number)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2017-03-30" />
<target value="50700.00">

</target>
<actual value="28700.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P081436</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia Poor Urban Areas Integrated Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Projects development objective is to reduce urban poverty in a sustainable manner, targeting the poorest and most vulnerable sections of Salvador and strategic cities of the state of Bahia with access to basic services and improved housing and social support services. This development objective is aligned with the Millennium Development Goals MDGs (especially Goal 7, Target 11) in line with the growing number of governments around the world that are launching comprehensive slum upgrading programs, setting development targets, undertaking reforms to prevent the growth of new slums, and leveraging public and private resources to improve the lives of slum dwellers.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Bahia Poor Urban Areas Development Project is to reduce urban poverty in a sustainable manner, targeting the poorest and most vulnerable sections of Salvador, and of strategic cities of the state of Bahia, including access to basic services, improved housing, and social support services, aligned with the Millennium Development Goals (MDGs), in line with the growing number of governments worldwide, currently launching comprehensive slum upgrading programs, setting development targets, undertaking reforms to prevent the growth of new slums, and leveraging public, and private resources to improve the lives of slum dwellers. The project major component - Urban Infrastructure Delivery - will finance priority infrastructure investments, focused on poor communities. Financing under this component will: a) provide basic services to the poor, i.e., urban drainage, roads, street paving, water supply and sewage, solid waste management, housing replacement, and others, and, b) support macro-level infrastructure investments, necessary to integrate upgraded settlements into the urban fabric. The second component - Social Services Delivery - will finance social investments, such as strengthening local community based organizations (CBOs), and improved incomes through training, as well as needed facilities, such as day-care and basic health care units, to complement investments in community infrastructure. Finally, the Institutional Strengthening, Studies and Project Management component will finance a variety of capacity building activities to participating municipalities, providing tools to enable better management, and planning on the process of urban poverty reduction projects; a number of studies, necessary to underpin Project implementation, and project management, which should include monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2004-05-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-12-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alessandra Campanaro</narrative></person-name><telephone>+1-202-473-1000</telephone><email>acampanaro@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397154" />
            <name><narrative> Juazeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.4116697 -40.498611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450554" />
            <name><narrative> Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97111 -38.51083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460949" />
            <name><narrative> Itabuna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.78556 -39.280281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461408" />
            <name><narrative> IlhEus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.79364 -39.03949</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320840" />
            <name><narrative> Feira de Santana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.23366 -39.065632</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321074" />
            <name><narrative> Teixeira de Freitas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.313101 -39.925732</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="12" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="13" xml:lang="en"/><sector vocabulary="1" code="16030" percentage="22" xml:lang="en"/><sector vocabulary="1" code="16062" percentage="14" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YH" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Housing Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="50" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="9" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="17" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="17" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="9" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="33" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="16" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="33" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="9" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="17" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="9" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">954428.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">954428.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1407333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1407333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1668166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1668166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">475750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">954428.57</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">954428.58</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1407333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1407333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1668166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1668166.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">475750.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P081436"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P081436?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P081436"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
C3. Number of community meetings held
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="558.00">

</target>
<actual value="720.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B2. Number of direct beneficiaries of social activities of the Project
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="12812.00">

</target>
<actual value="14080.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A3. Number of households removed from high risk areas or unhealthy conditions
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="983.00">

</target>
<actual value="1332.00">
<comment><narrative>
1332 of households were taken out of risk areas and resettled in a different location; 293 remained in place through technicalinterventions that eliminated risky conditions. Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B1. Installation of Local Technical Offices
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="4.00">

</target>
<actual value="4.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
C2. Percent implementation of tools for Project management
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="100.00">

</target>
<actual value="100.00">
<comment><narrative>
The Municipal GIS / database was implemented. Info as provided by the Borrower's Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B5. Number of social organizations strengthened by the Project
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="72.00">

</target>
<actual value="119.00">
<comment><narrative>
Shown as less than prior results reported due to errors in data reporting not taken into account in previous ISRs. Clientcorrectedthe error and reported accurate data at last supervision mission.
Info as provided by the Borrowers Monitoring Report.Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
A2. Percentage of households in high risk areas or unhealthy conditions resettled
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative>Universe of 1638 households as defined at PAD preparation</narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="60.00">

</target>
<actual value="81.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved infrastructure and social services: Increase in the percentage of households within 250 meters of paved roads
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="60.00">

</target>
<actual value="0.00">
<comment><narrative>
UGP to provide information by November 2013 in advance of the preparation of the ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B3. Number of beneficiaries attending socio-professional training activities
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="600.00">

</target>
<actual value="904.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
B4. Number of young people (ages 11-29) directly benefitting from social activities of the Project
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="420.00">

</target>
<actual value="467.00">
<comment><narrative>
Info as provided by the Borrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A1. Number of households with improved housing conditions (new, improved, indemnities)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="2000.00">

</target>
<actual value="1009.00">
<comment><narrative>
Calculated by adding new units built, improved units, and monitored indemnizations (not including pure cash transfers). Forbreakdown of units by project area, please refer to the attached UGP reports on results indicators. Info as provided by theBorrowers Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
C1. Number of O&amp;M plans prepared by target municipalities
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="4.00">

</target>
<actual value="0.00">
<comment><narrative>
The management plan for Anchieta Ave (in Feira de Santana) is complete and only pending signature by the Mayor. Info as providedbythe Borrower's Monitoring Report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the index of satisfaction with basic sanitation conditions in the intervention areas (baseline 2010)
</narrative></title>
<baseline year="2012" iso-date="2012-06-01" value="31.26"><comment><narrative>Baseline was revised based on surveys conducted in June 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-01" />
<period-end iso-date="2013-10-31" />
<target value="25.00">
<comment><narrative>
25% increase above the baseline.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Surveys of a sample community from same baseline group to be conducted in November 2013 in advance of the preparation of the ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved infrastructure and social services: Increase in the percentage of households with access to sanitation networks (availability of sanitation services)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="35.00">

</target>
<actual value="0.00">
<comment><narrative>
UGP to provide information by November 2013 in advance of the preparation of the ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved infrastructure and social services: Increase in the percentage of households within a 1 km radius of social equipments (improved park, public plaza, soccer fields, community center)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="30.00">

</target>
<actual value="0.00">
<comment><narrative>
UGP to provide information by November 2013 in advance of the preparation of the ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A4. Number of households with secure ownership of their home (able to be benefited with land regularization - habilitado)
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="2500.00">

</target>
<actual value="419.00">
<comment><narrative>
Borrower only included households with completed units with finalized land titles. The reported results do not reflect land titlesto be issued upon completion of housing units past the closing date, or those still in processing. By April 2014, the indicatorvalue is expected to reach 2,081. For breakdown of units by project area, please refer to the attached UGP reports on resultsindicators. Info as provided by the Borrower's Monitoring Report. Legal instruments (CDRUs) still to be issued.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the index of satisfaction with the provision of new social equipments in the intervention areas (baseline 2010)
</narrative></title>
<baseline year="2012" iso-date="2012-06-01" value="2.28"><comment><narrative>Baseline was provided based on surveys conducted in June 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-01" />
<period-end iso-date="2013-10-31" />
<target value="25.00">
<comment><narrative>
25% increase above the baseline.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Surveys of a sample community to be conducted in November 2013 in advance of the preparation of the ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A5. Number of households benefiting from urban infrastructure interventions
</narrative></title>
<baseline year="2006" iso-date="2006-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-01" />
<period-end iso-date="2013-10-31" />
<target value="6332.00">

</target>
<actual value="1093.00">
<comment><narrative>
Borrower only included households with completed units with finalized land titles. The reported results do not reflect land titlesto be issued upon completion of housing units past the closing date, or those still in processing. By April 2014, the indicatorvalue is expected to reach 2,081. For breakdown of units by project area, please refer to the attached UGP reports on resultsindicators. Info as provided by the Borrower's Monitoring Report. Legal instruments (CDRUs) still to be issued.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P082651</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR APL 1 Para Integrated Rural Dev</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is to build conditions in which the rural poor of Para can increase their incomes in a sustainable and secure environment.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Brazil Para Integrated Rural Development Project (phase one of the Para Rural program) is to build conditions in which the rural poor of Para can increase their incomes in a sustainable and secure environment.  The project components are: component A - productive investments, which will provide matching grants for small and medium-scale investments to eligible producer associations located in areas zoned for consolidation; component B - territorial development, with environmental management and land administration subcomponents; component C - policy development, which will support development of a Strategic Environmental Assessment (SEA) for the State, focusing on key sectors identified as important to the State's development such as tourism, mining and forestry; and component D - project management, with coordination, communication, and monitoring and learning subcomponents.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2004-09-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-12-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marianne Grosclaude</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mgrosclaude@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393129" />
            <name><narrative>Estado do Pará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4 -53</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14021" percentage="6" xml:lang="en"/><sector vocabulary="1" code="14031" percentage="6" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="44" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="31" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="25" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="75" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="13" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="24" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="13" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">24890382.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">24890382.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2006-12-31"/><value value-date="2006-12-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-22275558</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-2614825</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-12-31"/><value value-date="2007-12-31">150000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">3707545</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">1916477</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">3024498</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">2491869</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">4443859</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4189011</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">157984</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">7965326</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2090555</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">4261417</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">942501</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-231424</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-12-31"/><value value-date="2007-12-31">-150000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-40979</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-56783</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-51396</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-35237</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-19995</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-33655</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-36646</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-46602</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-71513</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-76115</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-66571</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-61786</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-49441</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-46438</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-55942</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-63463</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-83303</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-116601</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-146069</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-156813</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-159572</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-228802</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-231639</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-192225</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-126083</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-41316</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-14310</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-9692</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-8902</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-48574</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-81038</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-42935</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-830800</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-830800</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-1200411</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-1200411</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-1200411</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-1310583</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1599921</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1586292</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1555613</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-434"><narrative>Secretaria Especial de Desenvolvimento Econômico e Incentivo à Produção - SEDIP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P082651"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P082651?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P082651"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management strengthened in strategic areas (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="3.00">
<comment><narrative>
Completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of families with land title initiated and finalized
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="parcels registered = zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="39,000 parcels registered">

</target>
<actual value="39,000 parcels registered and 426 titling processses finalized">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented accountable and effective management system for project that track disbursements and results
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No MIS"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="90%">
<comment><narrative>
Consultancy contracted and system almost completed /operational. Will be reassessed in the next mission
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Steering Committee Formed and organized productive projects launched with project support (PY01)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ZEE and related policies adopted and in effect by EOP.
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="3.3% of the state area zoned"><comment><narrative>Core Indicator</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100% of state area zoned">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="Completed">
<comment><narrative>
EEZ Law approved by State Assembly.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Forest management strengthened in strategic areas (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of 3 studies to strengthen water resources system (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and learning capacity in place
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No M&amp;E system"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="50%">
<comment><narrative>
Documents and information still need to be inserted into the system
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of associations strengthened in financial management and accounting
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="49">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Staffing and technical capacity in place to implement state environmental policies PY02
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value=""><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="0%">
<comment><narrative>
Both trainings to complete this indicators are underway
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity in place to assure development of ZEE in PY02
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="21.12%">
<comment><narrative>
3 planned training for this activities are being executed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Staffing, and technical capacity in place to implement State land administration policies PY06
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Limited capacity"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-12-31" />
<target value="100%">

</target>
<actual value="38%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented accountable and effective management system for project that track disbursements and results
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No MIS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="90%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies on three priority value-chains carried out
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="3.00">
<comment><narrative>
Three studies were delivered and reviewed. Consultants are making final adjustments.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Completion of 3 studies to strengthen water resources system (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="0.00">
<comment><narrative>
First study is 34% executed, second study is not yet implemented, and third study is cancelled
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Associations submitting proposals
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New indicator</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="139.00">

</target>
<actual value="139.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ADLs Trained and deployed (PY01)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="13.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ITERPA's legal framework revised
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Outdated framework"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of beneficiary families whose real incomes from productive activities are raised by at least 30% (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Participant families with incomes above poverty line = zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="2,108 families">

</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ITERPA's legal framework revised
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Outdated framework"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Steering Committee Formed and organized productive projects launched with project support (PY01)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CAR implemented in priority municipalities
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3000.00">

</target>
<actual value="4686.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPCAD 2010-2012 reviewed and PPCAD 2013-2015 elaborated
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="0.00">

</target>
<actual value="0.00">
<comment><narrative>
This activities are 30% executed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Para Rural evaluated (final evaluation)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="0">
<comment><narrative>
Activities is not yet due
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ADLs Trained and deployed (PY01)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="13.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Established social communication strategy with program participants, affected peoples and civil society (outputs)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Incipient Communication System"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="100%">
<comment><narrative>
Web page designed and online
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Established social communication strategy with program participants, affected peoples and civil society (outputs)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Incipient Communication System"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Land-use categories and their function/status with general and specific guidelines developed and adopted
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Categories not regulated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CAR implemented in priority municipalities
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative>New</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3000.00">

</target>
<actual value="3000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Approved Subprojects
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="49">

</target>
<actual value="49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Approved Subprojects
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative>Subprojects Executed</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="49">

</target>
<actual value="44">
<comment><narrative>
The target was revised as part of the project restructuring
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mechanisms for non-judicial conflict resolution in place and tested
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0 mechanisms in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="50%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of families with land title initiated and finalized
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="parcels registered = zero"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="39,000 parcels registered">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="39,000 parcels registered and 290 titling processses finalized">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Land-use categories and their function/status with general and specific guidelines developed and adopted
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Categories not regulated"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100%">
<comment><narrative>
Completed as part of the ZEE.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ZEE and related policies adopted and in effect by EOP.
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="3.3% of the state area zoned"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100% of state area zoned">

</target>
<actual value="Completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity in place to assure development of ZEE in PY02
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="83%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Staffing, and technical capacity in place to implement State land administration policies PY06
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Limited capacity"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-12-31" />
<target value="100%">

</target>
<actual value="38%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Field teams for Cadaster contracted and deployed in field PY01
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0 teams"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="4 teams">

</target>
<actual value="Two firms contracted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Para Rural evaluated (final evaluation)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal Framework Revised and Adopted
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Outdated framework for environmental management"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="63.46%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural poverty assessment carried out in PY5
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No poverty monitoring"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State ZEE map completed to a scale of at least 1:250,000 based on ZEE methodology
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Municipality of Moju"><comment><narrative>Continue</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="535,000 hectares">
<comment><narrative>
Achieved
</narrative></comment>
</target>
<actual value="100% for State ZEE and 38% for indigenous lands">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Staffing and technical capacity in place to implement state environmental policies PY02
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="70%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Field teams for Cadaster contracted and deployed in field PY01
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0 teams"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="4 teams">

</target>
<actual value="4 teams">
<comment><narrative>
Completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PPCAD 2010-2012 reviewed and PPCAD 2013-2015 elaborated
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="0.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Legal Framework Revised and Adopted
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Outdated framework for environmental management"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="100%">

</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mechanisms for non-judicial conflict resolution in place and tested
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0 mechanisms in place"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="100%">
<comment><narrative>
Completed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State ZEE map completed to a scale of at least 1:250,000 based on ZEE methodology
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Municipality of Moju"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2013-06-30" />
<target value="535,000 hectares">

</target>
<actual value="100% for State ZEE and 54% for indigenous lands">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and learning capacity in place
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No M&amp;E system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="50%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural poverty assessment carried out in PY5
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="No poverty monitoring"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="100%">

</target>
<actual value="55%">
<comment><narrative>
Report were revised and consultants are making final adjustments
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies on three priority value-chains carried out
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of beneficiary families whose real incomes from productive activities are raised by at least 30% (EOP)
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="Participant families with incomes above poverty line = zero"><comment><narrative>Revised</narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="2,108 families">

</target>
<actual value="">
<comment><narrative>
Actions agreed to collect data and work on estimate are undergoing.  Will be assessed in the field survey
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of associations strengthened in financial management and accounting
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="49">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Associations submitting proposals
</narrative></title>
<baseline year="2005" iso-date="2005-10-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-24" />
<period-end iso-date="2014-12-31" />
<target value="139.00">

</target>
<actual value="139.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P088716</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>QUALISUS-REDE Brazil Health Network Formation and Quality Improvement Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(a) 	Improve the quality and efficiency of SUS# Regional Health Care Networks (RHCN) with emphasis on secondary-level health care, specialty, diagnostic and emergency centers, and logistical systems serving the Project#s targeted regions and populations.(b)	Improve the effectiveness of the SUS# RHCNs delivery system to prevent, detect and treat priority health conditions in the Project#s targeted regions and populations.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the First Phase of the Adaptable Program Loan for the Health Network Formation and Quality Improvement Project for Brazil are to: i) improve the quality and efficiency of the Unified Health System (SUS)' Regional Health Care Networks (RHCN) with the emphasis on secondary-level health care, specialty, diagnostic and emergency centers, and logistical systems serving the project's targeted regions and populations; and ii) improve the effectiveness of the SUS' RHCNs delivery systems to prevent, detect, and treat priority health conditions in the project's targeted regions and populations. There are three components to the project. The first component of the project is development of regional health care networks and strengthening of health care facilities. This component supports two related categories of activities. The first involves the development and implementation of regional and organized arrangements for coordinated or integrated care - (RHCNs). The second consists of upgrading, quality enhancement, organizational reform, and strengthening of management practices in facilities within the RHCNs. The second component of the project is systems development for performance enhancement. This component supports the creation of an enabling institutional and systems environment to support the implementation of RHCNs, improve quality and care management, promote alternative payment systems, and strengthen monitoring and evaluation capacity. This component will have a national focus and will be implemented directly by the Ministry of Health (MOH). The third component of the project is project management. This component aims at strengthening the MOH to implement and supervise the project implementation and results. It will finance a group of fulltime consultants that will support the MOH's staff to carry out procurement, financial management and administrative tasks associated to the project's daily implementation. It will also finance facility upgrading (rehabilitation, office furniture, and computer equipment), consulting and non-consulting services such as printing, training and travel expenses.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000666"><narrative>Government of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-36000"><narrative>Ministry of Health</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-07-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-01-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ezau Pontes</narrative></person-name><telephone>+1-202-473-1000</telephone><email>epontes@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390290" />
            <name><narrative>Rio Grande do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.75 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393129" />
            <name><narrative>Pará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4 -53</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395443" />
            <name><narrative>Maranhão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407762" />
            <name><narrative>Amapá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1 -52</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5833302 -36.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447799" />
            <name><narrative>Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451189" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.25 -42.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Paraná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Distrito Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463930" />
            <name><narrative>Espirito Santo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20 -40.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924825" />
            <name><narrative>Rondônia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 -63</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2066666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2066666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2066666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">4133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">4133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">4133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">6200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">6200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">6200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">8333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">5133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">5133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">5133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">7366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">7366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">7366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">7666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">7666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">7666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1733333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1733333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">3466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">3466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">3466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">5200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">5200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">5200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">6800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">6800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">6800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">10633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">10633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">10633333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">4633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">4633333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">4633333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">151866313.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">151866313.29</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">235000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-65000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-87206525</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">195504</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">144708</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">587500</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">7000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">9000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">3300000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">3900000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">7500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">5900000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">6600000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">7600000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1200000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-734630</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1426054</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-9633340</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-587500</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">-3173</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-1604</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-15386</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-33170</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-31627</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-22248</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-46516</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-81357</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-108282</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-160780</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-247210</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-406062</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-424898</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-562816</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-611730</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-718693</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-967362</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1080936</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-870359</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-705629</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-223769</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-167737</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-143106</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-181465</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-913311</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1418407</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1540106</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1567737</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1458020</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1212177</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1153559</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-969429</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-777750</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-1191870</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-1591230</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-1910730</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1920804</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1675109</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-665"><narrative>Ministry of Health</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P088716"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P088716?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P088716"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with at least 80% of mobile emergency care coverage
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="67.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National legislation defining new parameters, guidelines and instruments for structuring and developing RHCNs published by the MOH
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No legislation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Legislation Published">

</target>
<actual value="Legislation Published">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with electronic medical records in Primary Health Care (ESUS-AB) implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of professionals in the priority health regions trained in using the National Pharmaceutical Management System  (HORUS)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions that implemented new governance mechanisms to support regional coordination and collaboration(regional management committees, Inter-regional base contracts or in
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of analytical studies to support the development of RHCNs performed
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of rapid test for diagnosing Syphilis in pregnant women and sex partners implemented in the priority health regions
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of architects and engineers trained in parameters and technical criteria for construction and renovation of hospital units
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with 85% of municipalities that implemented a pharmaceutical management system
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of professionals in the priority health regions trained in using the National Pharmaceutical Management System  (HORUS)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with patient transportation system for elective outpatient procedures implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="60.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National policy on RHCN with focus on Maternal Care and Emergency Care published by the MOH
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No Policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Policy Published">

</target>
<actual value="Policy Published">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National policy on RHCN with focus on Maternal Care and Emergency Care published by the MOH
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No Policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Policy Published">

</target>
<actual value="Policy Published">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with electronic medical records in Primary Health Care (ESUS-AB) implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health professionals in the priority health regions trained in medical equipment management
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="500.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions that implemented new governance mechanisms to support regional coordination and collaboration(regional management committees, Inter-regional base contracts or in
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with 70% of primary care teams certified by external evaluation of the Improvement of Care and Quality Program (PMAQ)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="88.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of rapid test for diagnosing Syphilis in pregnant women and sex partners implemented in the priority health regions
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with technological and technical infrastructure to implement a regional referral and counter-referral system
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="70.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with at least 80% of mobile emergency care coverage
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="67.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National legislation defining new parameters, guidelines and instruments for structuring and developing RHCNs published by the MOH
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No legislation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Legislation Published">

</target>
<actual value="Legislation Published">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of health professionals in the priority health regions trained in medical equipment management
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="500.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with 85% of municipalities that implemented a pharmaceutical management system
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with 70% of primary care teams certified by external evaluation of the Improvement of Care and Quality Program (PMAQ)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="88.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with technological and technical infrastructure to implement a regional referral and counter-referral system
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="70.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of analytical studies to support the development of RHCNs performed
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority health regions with patient transportation system for elective outpatient procedures implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="60.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of architects and engineers trained in parameters and technical criteria for construction and renovation of hospital units
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of hospitals with Hospital Cost Management System (APURASUS) implemented in the priority health regions
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of hospitals with Hospital Cost Management System (APURASUS) implemented in the priority health regions
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P088966</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the project are to (i) modernize and improve the management capacity of Teresina Municipal Government in the financial, urban, environmental, service-delivery, and economic development fields; and (ii) improve the quality of life of the low-income population of the Lagoas do Norte region of the city.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Teresina Enhancing Municipal Governance and Quality of Life Project for Brazil's objectives are to (i) modernize and improve the management capacity of Teresina Municipal Government (PMT) in the financial, urban, environmental, service-delivery, and economic development fields; and (ii) improve the quality of life of the low-income population of the Lagoas do Norte region of the city. The project was divided into the following three components: (i) municipal management modernization, city development, and project management; (ii) integrated urban-environmental development in Lagoas do Norte; and (iii) social and economic development in Lagoas do Norte. The project's first component includes activities to: (i) consolidate PMT's recent efforts to improve its financial and budget management processes and capacity; (ii) improve service delivery, with a focus on water supply and sanitation and education (for the former by bringing PMT into compliance with the new federal WSS law; for the latter through the development and implementation of a new education policy and strategy for the city); (iii) improve urban and environmental management capacity and processes; (iv) lead the process and dialogue of the city's local economic and social development vision and strategy; and (v) project management support. The project's second component encompasses the undertaking of urban-environmental improvement interventions in the Lagoas do Norte region of the city, including: water supply, wastewater collection and treatment, macro and micro-drainage, recuperation of the natural environmental, urban upgrading, rehabilitation and implementation of parks and leisure spaces, local road network improvements, resettlement of beneficiary families from areas of risk, and implementing housing improvements. The project's third component comprises social and economic development interventions in the Lagoas do Norte region, including: strengthening community associations and groups, provision of improved social services (health, education services), environmental education, employment and wealth creation programs, and community mobilization and participation for works interventions.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000682"><narrative>Municipality of Teresina</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000683"><narrative>Municipality of Teresina</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2005-01-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-04-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-04-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marie-Laure Lajaunie</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mlajaunie@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386496" />
            <name><narrative> Teresina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.08917 -42.801941</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391329" />
            <name><narrative>Poti Velho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.03333 -42.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="16050" percentage="5" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="95" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YH" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Housing Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="8" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="24" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="18" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="25" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="3" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="4" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="4" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">43333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">43333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">43333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-04-15"/>
<value currency="USD" value-date="2022-04-15">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2022-04-15"/>
<value currency="USD" value-date="2022-04-15">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">31130000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">88000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-836</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-67215103</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">-67229</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">77825</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">584356</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">1786808</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">40778</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">156107</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">530159</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">1429955</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1164019</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">688397</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1319942</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">2594251</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">1248190</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2226797</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">2126761</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2949143</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">2200396</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1308152</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2103818</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1086559</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">419921</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">2219073</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">481273</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">1909372</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">389586</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">88363</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">220000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">933126</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1085103</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-836</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">625371</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">715344</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">2261030</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">2235767</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1208327</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">364363</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">2307442</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">682924</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1780525</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">1270426</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1299112</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">667565</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">395837</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">361901</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">404460</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">794990</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">145831</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">1491262</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-465810</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-77825</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-4548</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">-5593</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-15435</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-5795</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-11517</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-11608</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-17883</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-44437</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-70577</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-57203</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-56327</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-48655</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-52149</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-57813</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-74738</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-220000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-125571</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-89681</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-152629</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-129442</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-180070</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-147166</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-189912</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-183418</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-241853</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-250148</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-303556</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-297319</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-319602</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-342149</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-245381</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-332754</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-188859</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-232634</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-36516</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-194814</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-25863</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-194914</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-18664</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-199041</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-50929</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-440787</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-9610</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-288854</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-14630</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-567490</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-410318</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-671441</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-449130</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-693498</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-424101</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-685115</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-371102</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-578843</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-307992</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-575378</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-279977</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-498880</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-560801</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-642475</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-653518</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-713433</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-779893</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-791036</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-793633</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-793633</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-18819</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-19759</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-106254</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-103909</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-155863</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-155863</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-207817</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-207817</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-207817</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-793607</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-207817</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-683"><narrative>Municipality of Teresina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P088966"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P088966?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P088966"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Of the planned 58km of non-rural roads, only 28% (16.28km) were completed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.28">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual attendance levels of events in the Teatro do Boi
</narrative></title>
<baseline year="2013" iso-date="2013-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="5026.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded. The average number of attendants in the last five years is 5,026, against the target of 5,000. This average took into account a 0 attendance in 2020 due to the COVID-19 restrictions. Without the 2020  attendances, the average is at 6,283.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvements to municipal management implemented
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. The following improvements to municipal management were implemented: i. Management Information system for administrative, financial, and human resource management ii. Internal control systems iii. Unified system for management of human resources iv. Electronic receipts system (to facilitate collecting of tax revenues&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the collection efficiency of municipal renevues as a result of activities implemented under the project
</narrative></title>
<baseline year="2005" iso-date="2005-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-30" />
<period-end iso-date="2021-12-15" />
<target value="50.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. This indicator was introduced as part of project restructuring in 2013, with a baseline of 2005 municipal revenues. Byproject closure computed&amp;nbsp;revenue collections&amp;nbsp;(tax and primary revenues, excluding transfers and extraordinary revenues) indicated a 437 percent real growth from the baseline, against 50 percent goal revised during the 2016 project restructuring as part of the additional financing.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="437.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Restructuring Plan for the Municipal Environmental Secretariat developed and priority actions implemented
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. The restructuring plan for the municipal environmental secretariat was developed and outlined priority actions, mostly implemented by the project closure (office and field equipment upgrading, ToRs for polluting activities and administrative restructuring of the secretariat) , except for the expansion of the secretariat offices and the establishment of software for operational procedures.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Plan developed. Priority actions implemented.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New household sewer connections constructed under the project
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. Of the planned 14,000 connections, 8,848 were constructed by PMT under the Project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8484.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal revenue spent on staff costs
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded. By the project closure, staff cost was estimated at 47.30 percent of the total expenses of Teresina Municipality, exceeding the target for reduction in staff costs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="47.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender aspects mainstreamed into the Municipal Violence Prevention Plan
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. The strategy was developed and integrated gender-related issues, as per the Bank social safeguards team assessment.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation facilities under the proj.
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="9500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. Of the planned 60,000 people to be provided with improved sanitation facilities, only 38% (22636) were achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="22636.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="92000.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. By Project Closure, there were&amp;nbsp;71,784 people (out of 92,000) directly benefited from various urban upgrading, drainage, water and sanitation, and environmental restoration improvements under the Project in the neighborhoods of S&amp;atilde;o Joaquim, Poti Velho, Olarias Mocambinho, Matadouro, Nova Brasilia, Parque Alvorada and Vila S&amp;atilde;o Francisco.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="71784.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in protected and recovered areas for leisure and collective use in the Project Area (m2/habitant)
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="1.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. By project closure, 3.31 m2 per inhabitant were&amp;nbsp;protected and recovered areas for leisure and collective use in the Lagoas do Norte. This represents a 66 percent achievement.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in the pollution levels of the lagoons in the Project Area (measured by dissolved oxygen levels)
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="DO: 0.2 (mg/l)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="5mg/l">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. Target refers to measurements in Lagoons&amp;nbsp;Cabrinha, Lourival, and Pantanal as defined during the AF preparation.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.4 (mg/l)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of socio-environmental activities implemented in the projects area of intervention, including schools
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded. A cumulative 225 social activities were developed, exceeding the target. These include sports events, fairs, summer camps, community cultural events and music shows.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="225.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve the municipality's aggregate PEFA score
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="C+"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="B">
<comment><narrative>
&lt;p&amp;gt;Achieved. The computation of the aggregate PEFA score at Project Closure for Teresina PMT&amp;nbsp;is B. There was an advance in themanagement of PMT from 2005 onwards since the average value reached at that time was C+. Despite the decrease in the budget predictability (in part due to the context of the COVID19 pandemic) and inspection and external auditing arrangements indicators, PMT has significantly improved in transparency, Public Financial Management aspects, including budget and revenue management, and accounting framework.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="B">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of families benefiting from upgrading/improvements to their current households
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="1900-01-01"/>
<target value="668">
<comment><narrative>
&lt;p&amp;gt;Exceeded. By Project closure 766 households had benefitted from several house improvements, including toilet facilities,&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="766">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families living in at risk of environmental protection areas in the Lagoas do Norte Region resettled to new housing
</narrative></title>
<baseline year="2009" iso-date="2009-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-01-01" />
<period-end iso-date="2021-12-31" />
<target value="2699.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was originally included as an intermediate indicator in the RF and moved to PDO indicator as part of the AF in 2016. A total of 1056 households (out of 2699) at risk or environmental preservation in areas 1, 2, and 3, were resettled as part of the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1056.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Municipal compliance with federal WSS law:- preparation of WSS plan- creation/strengthening of regulating body- formalizationof service delivery contractual arrangement
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="No compliance with federal WSS law"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2018-07-13" />
<target value="Yes">
<comment><narrative>
&lt;p&amp;gt;Achieved. The project was expected to support PMT&amp;nbsp;in establishing a service delivery framework compliant with the Federal Water Supply and Sanitation Law, with a specific focus on developing the municipal water and sanitation plan, operationalizing the regulatory entity, and ensuring a service provision contract consistent with federal law.&amp;nbsp;By January 2013, the restructuring and capacity-building plan for regulation had been completed and was under implementation. The service delivery contract between the PMT and Piaui Water and Sanitation Company (AGESPISA)&amp;nbsp;had been signed. With the development of the Drainage Plan and the WSS Plan, the indicator was assessed as achieved in October 2013.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Municipal drainage master plan completed and operationalized
</narrative></title>
<baseline year="2008" iso-date="2008-03-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-03-27" />
<period-end iso-date="2021-12-31" />
<target value="Master Plan Completed and Legislation Adopted">
<comment><narrative>
&lt;p&amp;gt;Achieved. An Urban Drainage Master Plan was developed prior to the 2013 restructuring and is being used by the PMT as the guiding instrument for urban drainage interventions in the city, including procedures for land allocation and use, and construction norms.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Plan completed and legislation adopted">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P089011</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Municipal APL1: Uberaba</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Not applicable.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Uberaba Agua Viva Project is to promote better living conditions for all residents of the municipality through the promotion of integrated urban sanitation, environmental preservation, and expanded parks, recreational and cultural opportunities. There are 3 key components to the project: 1) Environmental Sanitation Investments, which includes waste water collection and treatment, urban drainage and water supply; 2) Environmental and Cultural Preservation and Recovery, which consists of natural resource preservation, environmental recovery, extending public recreational opportunities, expansion; and 3) Municipal Planning and Management which will improve the capacity of municipal government with a focus on governance of the municipal water company, environmental education, and strengthen the municipal environmental secretariat of research and tourist opportunities associated with the municipality's rich fossil deposits.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-01-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-03-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juliana Menezes Garrido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarrido@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445836" />
            <name><narrative>Rio Uberaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.85815 -48.338589</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445839" />
            <name><narrative>Uberaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.748329 -47.931938</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321898" />
            <name><narrative>Uberaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.54826 -47.941441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321916" />
            <name><narrative>Verissimo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.59178 -48.358929</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321284" />
            <name><narrative>Conceição das Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.95627 -48.305099</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="15" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="41" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="30" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="41040" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="10" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="43" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="29" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="14" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="14" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">90000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">90000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">90000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">90000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1238237.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1238237.30</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089011"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089011?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089011"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in water losses
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="36.00">

</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in the number of visitors to the Parque das Lajes
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="&amp;gt;15,000">

</target>
<actual value="16,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate water supply will be guaranteed while maintaining Uberaba River flow at minimum levels required under environmental legislation
</narrative></title>
<baseline year="2008" iso-date="2008-07-30" value="490 l/s"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-07-30" />
<period-end iso-date="2012-12-31" />
<target value="2/3 of Q7,10 = 490 l/s without rationing">

</target>
<actual value="Adequate water supply has been guaranteed however Uberaba River flow has not been maintained at minimum levels required underenvironmental legislation during the drought season.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project implementation goals are met (financial, physical, procurement, etc.)
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="All goals achieved">

</target>
<actual value="80 percent">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in the property values in the area of influence of the project
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="Ave. = R$37,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="R$37,000+16% (due to works)">

</target>
<actual value="Survey will be carried out by the firm that will evaluate the project results.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Citizen understanding of environmental problems and satisfaction with environmental services (WS&amp;S, drainage, parks)
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="Focus Group/Survey Summary"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="Focus Group/ Survey Repeats">

</target>
<actual value="New survey will be carried out for the project evaluation report.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Occurrence of flooding in the city center in comparison with intensity of rains
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="Flooding with rain TR=2 years"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="TR=25">

</target>
<actual value="Micro and macro drainage systems are under way, but the works executed so far could be sufficient to achieve the end target">
<comment><narrative>
Micro and macro drainage systems are under way, but the works executed so far could be sufficient to achieve the end target.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of city environmental licensing applications that are processed by the Municipality as opposed to the State.
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="60 percent">

</target>
<actual value="92 percent
(350 out of 380 requests)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management plan for a portion of the env. protection area (APA) of the Uberaba River is elaborated and main recovery actions are executed
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="No existing plan, 0 hectares of area recovered"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="Plan prepared and 1,500 hectares is recovered">

</target>
<actual value="Emergency plan prepared. ToR for the complete Plan was prepared.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Population reached by the Environmental Education &amp; Social Communication Programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-12-31" />
<target value="all">

</target>
<actual value="all">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water Quality Index of Uberaba River is improved
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="2005: WQI Medium and Class IV"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="WQI Good, Class III">

</target>
<actual value="Uberaba WWTP is operating, but collectors will be concluded on December, 2014.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of wastewater collected that is treated.  Note:Wastewater collection coverage in the city is 99%.
</narrative></title>
<baseline year="2005" iso-date="2005-10-11" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-10-11" />
<period-end iso-date="2012-12-31" />
<target value="75.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P089013</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Recife Urban Development and Social Inclusion (CAPIBARIBE MELHOR)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve the well-being of the low-income population living in the Capibaribe River Basin area of the city and the fiscal, urban and environmental management capacity of the Recife Municipal Government.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Brazil Recife Urban Development and Social Inclusion Project is to support the upgrading of slums in the Capibaribe River Basin and promote the integrated and sustainable development of the region. The project includes the following components: institutional development, to include (i) fiscal management and adjustment; (ii) environmental and urban management; and (iii) scaling-up capacity. The second component is for the integrated urban territorial development, this will include investments that are aimed at improving the quality of urban spaces along the margins of the river through the development of new or the rehabilitation of existing, infrastructure with the aim of improving the quality of life of the area's poor population. Finally, the third component is for environmental, social, and economic development of the territory. This component will focus on activities designed to provide incentives for the participatory social and economic development of these communities and at the same time raise awareness of the natural environment of the region and the behaviors that are conducive to its protection. To that end, this component will include two sub-components: (i) job and income generation assistance; and (ii) environmental and hygiene education.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-01-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-12-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marcos T. Abicalil</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388320" />
            <name><narrative>Morro de São Mateus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6499996 -40.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389424" />
            <name><narrative>Santana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3500004 -37.450001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392997" />
            <name><narrative>Parnamirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.09056 -39.578331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397407" />
            <name><narrative>Jenipapo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.96667 -36.116669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407442" />
            <name><narrative>Apipucos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.03333 -34.933331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320570" />
            <name><narrative>Recife</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0117502 -34.952911</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006955600" />
            <name><narrative>Casa Forte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0336504 -34.918968</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389273" />
            <name><narrative>Santa Rosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6999998 -37.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387367" />
            <name><narrative>Sitio Tôrre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6500001 -40.216671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007628447" />
            <name><narrative>Macaxeira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0117197 -34.929989</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007628445" />
            <name><narrative>Rua Arlindo Gouveia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0570097 -34.904148</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="12261" percentage="1" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="1" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="12" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="2" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="12" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="52" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="10" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="29" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="14" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">263333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">263333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">263333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">846666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">846666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">846666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">846666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">846666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">266666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">263333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">263333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">263333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">533333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">533333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">533333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">533333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">533333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">846666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">846666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">846666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">846666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">846666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">766666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">766666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">766666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">13150442.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">13150442.96</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089013"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089013?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089013"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Municipality's urban management capacity is enhanced, as evidenced by 40% rise in number of ZEIS and in the municipality's overall expenditures in urban upgrading over the life of the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="5 ZEIS"><comment><narrative>Data made available through the Projects Progress Report (amendment / Dec, 2011).</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-01" />
<target value="40%">
<comment><narrative>
END TARGET NOT ACHIEVED.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
No new ZEIS created. Recife has actually 66 ZEIS since before the project approval.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of clients of the job center reporting concrete benefits from it
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="20% of year's clients">
<comment><narrative>
TARGET LIKEY TO BE ACHIEVED.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Upon restructuring, this indicator may be slightly revised to reflect only the actual investments made by the Project. Job centercompleted in early 2013. Results to be reported at the completion report.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Personnel expenditures to net current revenue (PE/NCR)
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="46%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="&lt;45%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="42.88">
<comment><narrative>
Data from Recife 2012 Fiscal Management Report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Municipality's environmental management capacity is enhanced, as evidenced by the establishment of 4 ZEPAs with managment frameworks in place
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="4">
<comment><narrative>
END TARGET ACHIEVED
</narrative></comment>
</target>
<actual value="4">
<comment><narrative>
END TARGET ACHIEVED
There are 4 regulated ZEPAs in Recife: Parque das Capivaras, Aude Apipucos, Iputinga/Apipucos, and Ilha doZeca. This indicator was going to be dropped in the  restructuring which was not completed.  The indicator is not representative ofthe results linked to the PDO.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of residents receiving vocational training
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="20% annual increase">
<comment><narrative>
TARGET WILL NOT BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="0">
<comment><narrative>
Indicator would have been revised if a restructuring was approved. Social work is on early stage of implementation and will not becompleted at project closing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of target population (2,000 catadores) reporting benefits of recycling triage centers
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="80%">
<comment><narrative>
TARGET WILL NOT BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="0">
<comment><narrative>
This indicator would have been dropped if the project was restructured as this investment would not be financed under therestructured. As a result, TAGET WILL NOT BE ACHIEVED at project closing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved fiscal performance of the municipality: Current account savings (R$ millions)
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="128">
<comment><narrative>
Target met
</narrative></comment>
</target>
<actual value="306.8">
<comment><narrative>
Data from Recife 2012 Fiscal Management Report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of people benefiting from environmental education
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="20% annual increase">
<comment><narrative>
TARGET UNLIKELY TO BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Results to be reported upon the implementation of the Projects investments under the social work being carried out in early stage.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved fiscal performance of the municipality: Primary Balance
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="&amp;gt;0">
<comment><narrative>
Target met
</narrative></comment>
</target>
<actual value="268.3">
<comment><narrative>
Data from Recife June 2013 Budget Balance Report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Property values of poorest housing increases by 20% due to project investments
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="R$12,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="R$14,400">
<comment><narrative>
Target is unlikely to be met.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
TARGET UNLIKELY TO BE MET. AT project closing date no investments in sanitation and housing started, investments in drainage,urbanroads and parks are under way but not completed. This may affecct expected increase in houses value. Assessment to be done atthe Project completion report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-01" />
<target value="0.00">
<comment><narrative>
TARGET WILL NOT BE ACHIEVED at project closing
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
END TARGET WILL NOT BE ACHIEVED.
Works for integrated sanitation to be contracted under fully counterpart financing. This componentwould have been dropped if the project was restructured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Net consolidated debt to net current revenue (NCD/NCR) is maintained at less than 40%
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="28%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="&lt;40%">
<comment><narrative>
target met
</narrative></comment>
</target>
<actual value="5.1">
<comment><narrative>
Data from Recife 2012 Fiscal Management Report
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of environmental education program participants who recall at least three key messages conveyed by the program
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="+50%">
<comment><narrative>
TARGET UNLIKELY TO BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Results to be reported upon the implementation of the Projects investments under the social work being carried out in early stage.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Population living in areas of flood risk
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="30%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="20%">
<comment><narrative>
END TARGET WILL NOT BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="30%">
<comment><narrative>
END TARGET WILL NOT BE ACHIEVED at project closing date, since drainage works are still ongoing. I 2013 about 200 people would beresettled from flood areas.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Resettled ZEIS households with legal land tenure
</narrative></title>
<baseline year="2007" iso-date="2007-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-10-10" />
<period-end iso-date="2013-06-01" />
<target value="100%">
<comment><narrative>
TARGET WILL NO BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
TARGET WILL NO BE ACHIEVED at project closing.
Implementation of the RAP is in early stage, constructions of houses have not yetstarted.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of population reporting satisfaction/improvements in:
Water supply
Sanitation
Access/Mobility
Drainage
Parks
Environment
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="No baseline available at this point."><comment><narrative>Pre investment household survey to be carried out, as part of the social work consultancy (on preparation and to be nearlyprocured).</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-01" />
<target value="Water supply:+10% Sanitation:+15% Access/Mobility:+8% Drainage:+10% Parks:+25% Environment:+15%">
<comment><narrative>
Target is unlikely to be met.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
TARGET UNLIKELY TO BE MET. AT project closing date no investments in sanitation and housing started, investments in drainage, urbanroads and parks are under way but not completed. Assessment to be done at the Project completion report. So far 85,000 m2 of parkshave been created and 28,000 m2 rehabilitated, and about 200 people have been resettled from flood areas.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2013-06-01" />
<target value="0.00">
<comment><narrative>
TARGET WILL NOT BE ACHIEVED at project closing.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
END TARGET WILL NOT BE ACHIEVED.
Works for integrated sanitation to be contracted under fully counterpart financing. This componentwould have been dropped if the project was restructured.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P089440</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brasilia Environmentally Sustainable Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project's Development Objective is to reduce regional inequalities and ensure quality water resources to meet the growing needs of the Federal District and the Brasilia Metropolitan Region, through environmental planning and management activities, integrated with poverty reduction interventions and environmental rehabilitation in the most critical river basins.  Specifically, the expected outcomes of the project are: (a) improved water quality of the Vicente Pires and Descoberto Rivers; (b) improved living conditions in targeted low-income settlements by providing integrated urban environmental services; and (c) strengthened technical and institutional capacity, contributing to development of the Brasilia metropolitan region.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Brasilia Environmentally Sustainable Project will meet the growing needs of the Federal District and the Brasilia Metropolitan Region to reduce regional inequalities and ensure quality water resources. The project consists of the following components: Component 1) will support institutional strengthening and technical assistance for the enhancement of the technical and institutional environment. Component 2) will reduce poverty and promote social inclusion in localities presenting critical social conditions, coupled with actions to abate water resource pollution loads. Component 3) will execute activities that will abate water resource pollution loads and improve the quality of life in the communities of Aguas Lindas and Vicente Pires, as well as protect the Brasflia National Park through solid waste disposal activities. Component 4) will support the appropriate technical, administrative and financial management conditions to ensure an effective project implementation and achievement of its development objectives.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-05-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2005-08-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2011-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2011-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sameh Naguib Wahba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>swahba@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407358" />
            <name><narrative>Rio Araguaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.3735199 -48.702049</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455046" />
            <name><narrative>Lago do Paranoá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.78945 -47.81456</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Estado de Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460148" />
            <name><narrative>Januária</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.48866 -44.359879</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469055" />
            <name><narrative>Parque Nacional de Brasilia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.833328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469058" />
            <name><narrative>Brasilia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.77972 -47.929722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469437" />
            <name><narrative>Bom Jesus da Lapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.255 -43.41806</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Estado de Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319182" />
            <name><narrative>São FElix do Araguaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.4423 -52.13916</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319395" />
            <name><narrative>Conceição do Araguaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1543303 -49.6035</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319472" />
            <name><narrative>São Geraldo do Araguaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.2136002 -48.717209</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319475" />
            <name><narrative>São João do Araguaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.4429998 -48.749321</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320923" />
            <name><narrative>Juazeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.3967896 -40.23381</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321013" />
            <name><narrative>Remanso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5411501 -42.36956</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323913" />
            <name><narrative>Aruanã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.8102 -50.945011</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323909" />
            <name><narrative>Aragarças</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.94743 -52.080688</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323895" />
            <name><narrative>Águas Lindas de Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.76613 -48.28611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323805" />
            <name><narrative>Barra do Garças</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.3477 -52.48365</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319513" />
            <name><narrative>Araguacema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9135199 -49.409149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323260" />
            <name><narrative>Santa Terezinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.669609 -50.013401</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323182" />
            <name><narrative>Luiz Alves</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-26.73625 -48.885311</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="35" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="35" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="5" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="10" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="7" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="7" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="5" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="14" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="5" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="5" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="10" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="29" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000334" percentage="7" xml:lang="en"><narrative>Housing Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">960716.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">960716.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1441075.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">480358.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">480358.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">480358.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">480358.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">480358.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-08-01"/>
<period-end iso-date="2005-08-31"/>
<value currency="USD" value-date="2005-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">960716.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">960716.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">960716.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">960716.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">960716.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">960716.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1441075.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">480358.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">480358.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">480358.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">480358.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">480358.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">480358.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">12922752.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">12922752.77</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089440"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089440?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089440"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="26,150.00">

</target>
<actual value="26,150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.2 Vicente Pires: # households connected to sewerage systems.
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0 households connected."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-12-31" />
<target value="5,700 households connected.">

</target>
<actual value="Works under way.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New planning support instruments adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="4.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SLU restructuring proposal adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No proposal"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Proposal completed and adopted">

</target>
<actual value="Under development">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="26150.00">

</target>
<actual value="26150.00">
<comment><narrative>
Works  completed / 7067 sewer connections performed. This CSI indicator was added in lieu of the previous customized one -Population connected to sewerage system in Vila Estrutural.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SLU restructuring proposal adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No proposal"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Proposal completed and adopted">

</target>
<actual value="Under development">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of scavengers benefiting from GDF-supported recycling program
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="800.00">

</target>
<actual value="0.00">
<comment><narrative>
Not yet started.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental remediation activities of the unused areas of Joquei landfill launched
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No remediation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="1/3 of landfill remediated">

</target>
<actual value="No activity will take place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental remediation activities of the unused areas of Joquei landfill launched
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No remediation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="1/3 of landfill remediated">

</target>
<actual value="No remediation.">
<comment><narrative>
Landfill still partially used because the bid process for the new landfill is delayed. Activity dropped from project by 06/2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved living conditions in Vila Estrutural by providing integrated urban environmental services measured by improvement in the sub-indicators of the area Social Environmental Indicator (ISA) and by
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative>Set of 14 indicators.  Report prepared.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="70.00">
<comment><narrative>
% improvement in the indicator compared to baseline

70% of families satisfied with Program results.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
3 of 14 sub-indicators improved. Some data unavailable to report composite indicator. No results to be reported so far. GDF isconducting final survey with results expected 02/15/2012 with the final Progress Report and Assessment. They will be reflected inthe ICR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ADASA strategic plan endorsed
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Plan completed and endorsed">

</target>
<actual value="Selection process under way.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental remediation activities of the unused areas of Joquei landfill launched
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No remediation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="1/3 of landfill remediated">

</target>
<actual value="No remediation.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of additional educational and community facilities in Vila Estrutural
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="All planned facilities completed">

</target>
<actual value="All but one planned facilities completed, initially unplanned facilities added and completed.">
<comment><narrative>
GDF has delivered new facilities such as community restaurants, police station, daycare center, schools using own resources.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New planning support instruments adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="4.00">
<comment><narrative>
4 instruments adopted
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Instruments are being developed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water quality of the Vicente Pires River improved and/or maintained to Class 2
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="Not Class 2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Class 2">

</target>
<actual value="No results so far.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New planning support instruments adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="4.00">
<comment><narrative>
4 instruments adopted
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
3 instruments are at advanced dev stages: Economic-Ecologic Zoning, License Improvement, SS Regularization
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement process of the new sanitary landfill of the GDF finished
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No process"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Completed">

</target>
<actual value="Not started yet.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of additional educational and community facilities in Vila Estrutural
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="All planned facilities completed">

</target>
<actual value="One Community Center, two Social Assistance Centers completed.">
<comment><narrative>
GDF has delivered new facilities such as community restaurants, police station, daycare center, schools using own resources.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ADASA strategic plan endorsed
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Plan completed and endorsed">

</target>
<actual value="No plan (not started).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="58.00">

</target>
<actual value="56.90">
<comment><narrative>
Works almost completed. This indicator was added in lieu of the previous customized one - Percent of population with access topaved roads, stormwater drainage system in Vila Estrutural - as suggested by OPCS.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.2 Vicente Pires: # households connected to sewerage systems.
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0 households connected."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-12-31" />
<target value="5,700 households connected.">

</target>
<actual value="0 households connected">
<comment><narrative>
Works underway. Collection system advanced but STP and lifting stations delayed. Expected for conclusion 12/2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
ADASA strategic plan endorsed
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Plan completed and endorsed">

</target>
<actual value="No plan (not started).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of additional educational and community facilities in Vila Estrutural
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="All planned facilities completed">

</target>
<actual value="All but one planned facilities completed, initially unplanned facilities added and completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of population with access to paved roads, stormwater drainage system in Vila Estrutural
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="100.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="58.00">

</target>
<actual value="56.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water quality of the Vicente Pires River improved and/or maintained to Class 2
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="Not Class 2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Class 2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population connected to sewerage system
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="100.00">

</target>
<actual value="0.00">
<comment><narrative>
Works under way almost completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3.2 Vicente Pires: # households connected to sewerage systems.
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0 households connected."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-12-31" />
<target value="5,700 households connected.">

</target>
<actual value="0 households connected">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved living conditions in Vila Estrutural by providing integrated urban environmental services measured by improvement in the sub-indicators of the area Social Environmental Indicator (ISA) and by
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water quality of the Vicente Pires River improved and/or maintained to Class 2
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="Not Class 2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Class 2">

</target>
<actual value="No results so far.">
<comment><narrative>
Although CAESB performs constant monitoring of the quality of the water, so far there are no results to be reported as a result ofthe Project, since the works in Vicente Pires are not completed and will not be until Dec 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of scavengers benefiting from GDF-supported recycling program
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of scavengers benefiting from GDF-supported recycling program
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="800.00">

</target>
<actual value="0.00">
<comment><narrative>
Not yet started.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement process of the new sanitary landfill of the GDF finished
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No process"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Completed">

</target>
<actual value="Process launched but not yet completed.">
<comment><narrative>
Concession bid process initiated 3 times without satisfactory conclusion. GDF decided to build a public landfill. Detailed designsand bid docs preparation underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improved living conditions in Vila Estrutural by providing integrated urban environmental services measured by improvement in the sub-indicators of the area Social Environmental Indicator (ISA) and by
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="0.00"><comment><narrative>Set of 46 indicators.  Report prepared.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="70.00">
<comment><narrative>
% improvement in the indicator compared to baseline

70% of families satisfied with Program results.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
3 of 46 sub-indicators improved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SLU restructuring proposal adopted by the GDF
</narrative></title>
<baseline year="2010" iso-date="2010-12-17" value="No proposal"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-17" />
<period-end iso-date="2012-12-31" />
<target value="Proposal completed and adopted">

</target>
<actual value="Selection process under way.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Procurement process of the new sanitary landfill of the GDF finished
</narrative></title>
<baseline year="2006" iso-date="2006-05-24" value="No process"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-24" />
<period-end iso-date="2012-03-31" />
<target value="Completed">

</target>
<actual value="Process launched but not yet completed.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P089929</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Rio Grande do Norte Integrated Water Resources Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The higher level objective of the project is to promote economic, social, and environmentally sustainable development through the implementation of an integrated water resources management system. Mostly by focusing on institutional strengthening and rehabilitation of key bulk water infrastructure, the proposed project will seek to consolidate this system, which the state has often overlooked in the past in favor of larger infrastructure investments. The specific project development objective is to implement an integrated water resources management system that will support more environmentally sustainable use of water resources while also increasing access of poor families to reliable potable water and decreasing operational and maintenance costs of water allocation and distribution systems.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Brazil Rio Grande do Norte Integrated Water Resources Management project is to promote economic, social, and environmentally sustainable development through the implementation of an integrated water resources management system. Mostly by focusing on institutional strengthening and rehabilitation of key bulk water infrastructure, the proposed project will seek to consolidate this system, which the state has often overlooked in the past in favor of larger infrastructure investments. The project has four components with the first being to improve the state's water resource management (WRM) capabilities and develop adequate WRM instruments. The second component involves natural resources conservation and protection which will support the preservation of water quality; improve efficiency in water use by reducing water losses in state-owned public water supply infrastructure, improving water conservation in agricultural and industrial activities, and generating water-saving technologies, including using treated wastewater; and promote the adoption of sustainable agricultural practices on irrigated lands. The third component is to enhance the state's water management capabilities and to improve general water availability by providing technical and financial assistance. Finally, the fourth component is project management which will be responsible for overall project execution and the Monitoring and Evaluation System, as well as communications and dissemination, and preparation of the concept document for a possible second-phase project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000715"><narrative>State of Rio Grande do Norte</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000715"><narrative>State of Rio Grande do Norte</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000716"><narrative>Secretariat of Environment and Water Resources</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-05-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2007-09-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paula Pedreira de Freitas de Oliveir</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pfreitas@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390290" />
            <name><narrative>Estado do Rio Grande do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.75 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391335" />
            <name><narrative>Rio Potengi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.7979002 -35.261719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391887" />
            <name><narrative>Rio Pitimbu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9333301 -35.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391952" />
            <name><narrative>Rio Piranhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9333301 -48.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392004" />
            <name><narrative>Piquiri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.0902801 -37.191391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394023" />
            <name><narrative>Natal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.7950001 -35.209438</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405200" />
            <name><narrative>Lagoa do Bonfim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.0500002 -35.200001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407436" />
            <name><narrative>Rio Apodi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.0500002 -38.200001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003466033" />
            <name><narrative>Rio da Cobra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.16667 -41.150002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319033" />
            <name><narrative>Carnaúba dos Dantas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.5616202 -36.52903</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319034" />
            <name><narrative>Equador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.88585 -36.661739</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319036" />
            <name><narrative>Jucurutu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.0329599 -36.969391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320113" />
            <name><narrative>Acari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.3854699 -36.63908</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320123" />
            <name><narrative>Augusto Severo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.90516 -37.301208</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320128" />
            <name><narrative>Bodó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9338999 -36.39716</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320131" />
            <name><narrative>Caicó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.4471302 -37.04776</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320137" />
            <name><narrative>Cerro Corá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.0012999 -36.339272</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320140" />
            <name><narrative>Cruzeta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.32021 -36.847252</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320141" />
            <name><narrative>Currais Novos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.2139902 -36.484001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320148" />
            <name><narrative>Florânia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1528702 -36.800579</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320158" />
            <name><narrative>Ipueira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.7803798 -37.149712</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320166" />
            <name><narrative>Jardim de Piranhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.2709799 -37.245548</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320167" />
            <name><narrative>Jardim do Seridó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.5641999 -36.82555</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320174" />
            <name><narrative>Lagoa Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1101999 -36.54607</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320192" />
            <name><narrative>Ouro Branco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.6560102 -36.914551</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320195" />
            <name><narrative>Parelhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.7290101 -36.608269</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320220" />
            <name><narrative>Santana do Matos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9345002 -36.713341</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320221" />
            <name><narrative>Santana do Seridó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.75207 -36.765991</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320225" />
            <name><narrative>São Fernando</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.2972598 -37.13895</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320228" />
            <name><narrative>São João do Sabugi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.6964998 -37.154331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320231" />
            <name><narrative>São JosE do Seridó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.5025101 -36.85104</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320240" />
            <name><narrative>Serra Negra do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.5759802 -37.39418</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320249" />
            <name><narrative>Tenente Laurentino Cruz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1484499 -36.722401</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320251" />
            <name><narrative>Timbaúba dos Batistas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.4826198 -37.23278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320252" />
            <name><narrative>Triunfo Potiguar</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.9435601 -37.139938</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324240" />
            <name><narrative>São Vicente</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.2238002 -36.65694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="43" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="25" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="25" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="47.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="25" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="50" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="50" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="50" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">10056640.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">10056640.11</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2007-09-30"/><value value-date="2007-09-30">35900000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-10056640</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">89750</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">1869077</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">164740</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">999943</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">1573065</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">1097394</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">849487</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">6833845</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">1247349</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">620732</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1142498</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">615069</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1090729</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1191128</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">655225</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">1176528</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2133925</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">438116</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">496401</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">728200</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">606409</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">330059</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-106311</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">-89750</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-706</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-36899</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-15847</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-10261</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-20659</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-31622</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-35711</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-55293</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-65239</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-50678</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-47737</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-42008</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-38696</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-38577</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-44876</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-59271</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-83234</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-105236</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-113496</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-116276</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-168095</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-171457</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-142929</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-95095</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-31900</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-11172</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-7784</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-7446</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-43371</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-81502</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-57908</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-30712</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-205</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-590797</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-636497</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-707629</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-787945</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-938571</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-983147</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-1050011</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1061803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1036307</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-716"><narrative>Secretariat of Environment and Water Resources</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089929"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P089929?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P089929"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnosis of the State Water Resources Plan revised.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Existing state water resources plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Diagnosis revised">

</target>
<actual value="Diagnosis report prepared by the consulting firm was not approved by SEMARH.">
<comment><narrative>
Consulting firm performance was poor. The contract was canceled and no product was approved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water resources monitoring and information network.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Network weak with few available information"><comment><narrative>Indicator slightly revised during Project restructuring in August 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Fully operational network.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Fully operational netork.">
<comment><narrative>
Network operational - 33 posts purchased and 15 installed. 18 to be installed by SEMARH until November. The network wasrestructured in partnership with the National Water Agency (ANA).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River Basin Committees created and strengthened.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of small desalinization units rehabilitated and being used
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="60">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="127">
<comment><narrative>
127 desalinization units belonging from SEMARH and other state institutions have been rehabilitated benefiting more than 20,000families.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State water resources legislation revised
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Existing legislation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Legislation revised and adopted.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Legislation revised and approved by the State Assembly.">
<comment><narrative>
Few progress made in terms of adopting the new legislation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers who benefited from hidroenvironmental works at Cobra River Basin.
</narrative></title>
<baseline year="2007" iso-date="2007-03-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-03-29" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water resources monitoring and information network.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Network weak with few available information"><comment><narrative>Indicator slightly revised during Project restructuring in August 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Fully operational network.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="33 posts being purchased and installed by the Project">
<comment><narrative>
The network is being restructured in partnership with the National Water Agency (ANA).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of SEMARH and IGARN Strategic Planning, in accordance with the approved legislation.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Strategic planning in preparation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Strategic planning implemented">

</target>
<actual value="SEMARH and IGARN worked on a first draft of the regulation of their newly approved law but these regulation have not been approvedby the Governor yet. In accordance with the approved legislation, a few functions have been transferred from SEMARH to IGARN.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Plan of Cruzeta irrigation perimeter prepared with participation of APICRUZ and being implemented.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="No Plan."><comment><narrative>Indicator was revised during Project restructuring in August 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Plan prepared and being implemented.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Plan under preparation by SEMARH, completion expected by January 2015.">
<comment><narrative>
Plan completion depends on current discussions with DNOCS and ANA about the management of the reservoir.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of families using improved water supply systems
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="3,000">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="2,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dissemination Plan completed and Public Communication Actions implemented
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="1">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Dissemination plan prepared. Several publications are being printed and others are under production.">
<comment><narrative>
The project website is operational and updated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of monitoring posts operating
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="50">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="33 posts being purchased and installed by the Project">
<comment><narrative>
With the support of the National Water Agency, another 17 posts have been installed in the State.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access to reliable potable water
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Incremental indicator. Baseline zero."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="3,000 additional families">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="2,670 additional families - 12,925 people.">
<comment><narrative>
29 systems implemented by the Project are under operation. 4 systems are not operating due to either lack of water resources orproblems in construction.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of small desalinization units rehabilitated and being used
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="60">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="127">
<comment><narrative>
127 desalinization units belonging from SEMARH and other state institutions have been rehabilitated benefiting more than 20,000families.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of technical and financial reports submitted on time
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="semesterly and quarterly">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="All technical and financial reports are submiteed on time.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers who benefited from hidroenvironmental works at Cobra River Basin.
</narrative></title>
<baseline year="2007" iso-date="2007-03-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-03-29" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="75.00">
<comment><narrative>
Indirectly, 3,167 inhabitants in 7 municipalities were benefited by the activities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monsenhor Expedito pipeline and distribution systems water losses controlled, macro and micro-measured.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="No control, macro or micro-measurement"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="System controlled macro and micro-measured">

</target>
<actual value="System macro and micro-measured. 25,000 micrometers purchased and installed. 132 macrometers purchased, to be completely installedby CAERN by January 2015.">
<comment><narrative>
The activities financed by the Project were part of the Company's strategy for loss control. Other activities were carried out bythe Company in this system and others.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of communities with water and sanitation systems adequately sustained
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="33">
<comment><narrative>
33 systems will benefit 14,599 people or 3,591 families.

Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="26">
<comment><narrative>
26 water supply systems in rural communities improved, constructed and rehabilitated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="33.00">
<comment><narrative>
33 systems will benefit 14,599 people or 3,591 families.

Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="26.00">
<comment><narrative>
26 water supply systems in rural communities improved, constructed and rehabilitated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Access to reliable potable water
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Incremental indicator. Baseline zero."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="3,000 additional families">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="2,500 families">
<comment><narrative>
Additional rural water supply systems are under implementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State water resources legislation revised
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Existing legislation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Legislation revised and adopted.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Legislation revised and approved by the State Assembly.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved community water points constructed or rehabilitated under the project
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="33.00">
<comment><narrative>
33 systems will benefit 14,599 people or 3,591 families.

Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="29.00">
<comment><narrative>
29 systems benefited 12,925 people or 2,670 additional families. 4 systems are not operating due to either lack of water resourcesor problems in construction.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of communities with water and sanitation systems adequately sustained
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="33">
<comment><narrative>
33 systems will benefit 14,599 people or 3,591 families.

Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="29">
<comment><narrative>
29 benefiting 12,925 people or 2,670 families.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Management Plan of Cruzeta irrigation perimeter prepared with participation of APICRUZ and being implemented.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="No Plan."><comment><narrative>Indicator was revised during Project restructuring in August 2012.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Plan prepared and being implemented.">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="Plan under preparation.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dissemination Plan completed and Public Communication Actions implemented
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="1">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="1">
<comment><narrative>
Dissemination Plan completed. Several publications prepared used for dissemination of Project activities. The project website isoperational and updated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of SEMARH and IGARN Strategic Planning, in accordance with the approved legislation.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Strategic planning in preparation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Strategic planning implemented">

</target>
<actual value="SEMARH and IGARN are working on the regulation of the law.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Diagnosis of the State Water Resources Plan revised.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="Existing state water resources plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="Diagnosis revised">

</target>
<actual value="Diagnosis report being revised.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River Basin Committees created and strengthened.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0.00"><comment><narrative>Incremental indicator. Baseline is zero.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monsenhor Expedito pipeline and distribution systems water losses controlled, macro and micro-measured.
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="No control, macro or micro-measurement"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="System controlled macro and micro-measured">

</target>
<actual value="25,000 micrometers - 11,396 installed - and 56 macro meters purchased - 6 installed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of monitoring posts operating
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="50">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="32 posts operating">
<comment><narrative>
Including 17 installed by ANA. 15 posts purchased by the Project installed. The remaining 18 are being installed by SEMARH untilNovember.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of families using improved water supply systems
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-09-30" />
<target value="3,000">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="2,670">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of technical and financial reports submitted on time
</narrative></title>
<baseline year="2007" iso-date="2007-11-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-11-29" />
<period-end iso-date="2014-09-30" />
<target value="semesterly and quarterly">
<comment><narrative>
Indicator remains the same. End target date revised only.
</narrative></comment>
</target>
<actual value="All technical and financial reports submitted on time.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P092990</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR - Road Transport Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project's ultimate development objective is to stimulate higher economic growth by increasing effectiveness in the use of the federal road infrastructure. The objective is to be achieved through (a) support to the first phase of the Federal Road Maintenance and Rehabilitation Program, and (b) a  comprehensive program of institutional strengthening activities to improve efficiency and sustainability of road transport investment programs.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Brazil Road Transport Project's ultimate development objective is to stimulate higher economic growth by increasing effectiveness in the use of the federal road infrastructure. The project is expected to: 1) improve the quality of public expenditures in the road sector, by (a) expanding the use of output-based contracts, and (b) streamlining procedures and strengthening capacity in the National Department for Transport Infrastructure to manage contracts, including revision of design, procurement, contract award and supervision, as well as payments; 2) support the Government in pursuing policy discussions with respect to the progressive decentralization of the federal road network to states and of the management of portions of the road network to the private sector; and 3) promote an adequate allocation of resources to increase the efficiency and sustainability of the Federal Road Maintenance and Rehabilitation Program to improve the road network condition to economically-optimized levels. The objective is to be achieved through two project components: (1) support to the first phase of the Federal Road Maintenance and Rehabilitation Program; and (2) a comprehensive program of institutional strengthening activities to improve efficiency and sustainability of road transport investment programs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-06-02"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-06-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-05-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-05-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eric R. Lancelot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>elancelot@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445679" />
            <name><narrative>Uruguaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.754721 -57.088329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450083" />
            <name><narrative>Santa Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.68417 -53.806938</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Estado do Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451136" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.07811 -52.35014</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451138" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.035 -52.09861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454242" />
            <name><narrative>Pelotas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.499769 -52.357681</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Estado de Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Estado de Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320199" />
            <name><narrative>Santa Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.8453102 -35.719952</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323695" />
            <name><narrative>Uruguaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.827971 -56.63224</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324118" />
            <name><narrative>BagE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.263941 -53.971272</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="23" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="77" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="77.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="14" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="29" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="29" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000211" percentage="14" xml:lang="en"><narrative>Investment and Business Climate</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="29" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="43" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">38333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">38333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">12333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">12333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">12333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">12333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">12333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">15333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">15333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">15333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">15333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">15166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">15166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">15166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">4500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">4750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">4750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">4750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">38333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">38333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">38333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">12333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">12333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">12333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">12333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">12333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">12333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2013-05-30"/>
<value currency="USD" value-date="2013-05-30">68009925.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2013-05-30"/>
<value currency="USD" value-date="2013-05-30">68009925.63</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P092990"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P092990?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P092990"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% increase in use of road transport infrastructure on selected itineraries (as measured in veh.-km.increase relatively to 2005 levels) (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="5%">

</target>
<actual value="Not yet assessed">
<comment><narrative>
Traffic data from 2010 and 2011 assessment not yet made available
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of road users travelling on paved roads in good conditions
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="25%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="50%">

</target>
<actual value="Not yet assessed">
<comment><narrative>
According to the road condition survey undertaken in 2011, paved roads in good conditions accounted for 74% of the federalnetwork.Traffic data from 2010 and 2011 assessment not yet made available
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in payment processing period in DNIT (days)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="22">

</target>
<actual value="33">
<comment><narrative>
No improvement observed so far compared to last year (33), but the number of contracts has increased (total contracts in 2011 is710 for 57,000km, compared to 673 for about 50,000km in 2010)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in payment processing period in DNIT (days)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="22">

</target>
<actual value="22">
<comment><narrative>
Target met. Assessment based on the payment data in 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% reduction in average land transport freight rates on selected itineraries (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0%"><comment><narrative>From SIFRECA national surveys.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="3%">

</target>
<actual value="11.06%">
<comment><narrative>
Target met. Due to data availability, the evaluation relied on slightly adapted itineraries.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in ANTT's organizational structuring process
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="Regional offices structured">

</target>
<actual value="6 regional offices were created">
<comment><narrative>
Target met. Several studies to improve organization and structure in preparation or underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Progress in ANTT's organizational structuring process
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="Regional offices structured">

</target>
<actual value="Met the target: 6 regional offices were opened. Management system has been consolidated.">
<comment><narrative>
Several studies to improve organization and structure in preparation or underway.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate annual &quot;available&quot; budgets for the Program (R$ million)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="1,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="&amp;gt;700">

</target>
<actual value="8,150">
<comment><narrative>
With the implementation of the PAC, the Client has largely exceeded Project objective
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Minimum number of major expenditure programs for which STN defined indicators to measure cost-efficiency (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="4">

</target>
<actual value="24">
<comment><narrative>
Target met. STN has developed monitoring tools to assess national investment Programs efficiency.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Minimum number of major expenditure programs for which STN defined indicators to measure cost-efficiency (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="4">

</target>
<actual value="Met">
<comment><narrative>
STN has developed monitoring tools to assess national investment Programs efficiency
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% increase in use of road transport infrastructure on selected itineraries (as measured in veh.-km.increase relatively to 2005 levels) (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="5%">

</target>
<actual value="24%">
<comment><narrative>
Target met. Assessment based on the traffic data in 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate annual &quot;available&quot; budgets for the Program (R$ million)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="1,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="&amp;gt;700">

</target>
<actual value="8,115">
<comment><narrative>
Target met. With the implementation of the PAC, the Client has largely exceeded Project objective.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of road users travelling on paved roads in good conditions
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="25%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="50%">

</target>
<actual value="75%">
<comment><narrative>
Target met. Assessment based on road condition survey and traffic count data undertaken in 2011.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% reduction in average land transport freight rates on selected itineraries (cumulative)
</narrative></title>
<baseline year="2006" iso-date="2006-06-06" value="0%"><comment><narrative>From SIFRECA national surveys.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-06-06" />
<period-end iso-date="2013-05-30" />
<target value="3%">

</target>
<actual value="Not yet assessed">
<comment><narrative>
Database source changed. New assessment ongoing.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P094199</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program development objective is to strengthen the capacity of the municipalities of Bage, Pelotas, Rio Grande, Santa Maria and Uruguaiana to provide selected infrastructure services and employment opportunities for their population]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the First Phase of Rio Grande do Sul Integrated Municipal Infrastructure Project of Brazil is to strengthen the capacity of the municipalities of Bage, Pelotas, Rio Grande, Santa Maria and Uruguaiana to provide selected infrastructure services and employment opportunities for their population. The Program has been organized into three components: Component 1 - Municipal Strengthening. The purpose of this component is to finance activities related to improving municipal capacity to plan, appraise, finance, implement, monitor and evaluate infrastructure and local economic development investments. Component  2 - Income and Employment Generation. This component will support municipal initiatives to generate income and employment opportunities, in addition to improving the quality of jobs in both in urban and rural areas. Component 3: Infrastructure Service Improvements. This component's objective will be to assist the municipalities improve their ability to provide infrastructure services in an efficient, environmentally sound and sustainable manner. The specific investments were also prioritized for their effects on: improving access to services by the poor, contributing to the municipal growth agenda and/or for environmental benefits. The following infrastructure investments are included in this component: (i) Rehabilitation or pavement of existing urban streets and rural roads; (ii) Water supply, sanitation and drainage systems in urban and rural areas; (iii) Treatment and final disposal of solid waste, waste recycling centers and support to waste packers; and (iv) Urban upgrading, housing and social improvements in poor neighborhoods, and areas of environmental risk.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2006-06-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-01-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juliana Menezes Garrido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarrido@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0000178256" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.16667 34.349998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445679" />
            <name><narrative>Uruguaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.754721 -57.088329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450083" />
            <name><narrative>Santa Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.68417 -53.806938</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451136" />
            <name><narrative>Pelotas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.07811 -52.35014</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451138" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.035 -52.09861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454242" />
            <name><narrative>Pelotas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.499769 -52.357681</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454244" />
            <name><narrative>Pelotas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.77194 -52.342499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471196" />
            <name><narrative>Bage</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.33139 -54.106941</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320199" />
            <name><narrative>Santa Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.8453102 -35.719952</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323695" />
            <name><narrative>Uruguaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.827971 -56.63224</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324118" />
            <name><narrative>BagE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.263941 -53.971272</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="9" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="81" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="66.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="10" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="7" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="7" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="29" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="7" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="4" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="10" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="14" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="14" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="7" xml:lang="en"><narrative>MSME Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">723333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">723333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">723333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1223333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1223333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1223333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">885000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1155000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1016666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1016666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1016666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1016666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1016666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1025833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1025833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1025833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1025833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1025833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">407500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">650000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">723333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">723333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">723333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1223333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1223333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1223333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">885000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1155000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1016666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1016666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1016666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1016666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1016666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1025833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1025833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1025833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1025833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1025833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">407500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094199"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P094199?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094199"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of beneficiaries of training and/or technical assistance(cluster firms and street vendors, rural producers, innovative firms, and incubated firms)
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="500 - cluster firms and street vendors
60 rural producers
5 innovative firms
10 incubated firms">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of beneficiaries of training and/or technical assistance(cluster firms and street vendors, rural producers, innovative firms, and incubated firms)
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="500 - cluster firms and street vendors
60 rural producers
5 innovative firms
10 incubated firms">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="60 rural producers and 500 street vendors.">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of good practices or innovations replicated from other municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0 - Pelotas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="At least 3 good practice or innovations replicated - Pelotas">

</target>
<actual value="3">
<comment><narrative>
Pelotas numbers.

The practices include: (i) Popular commercial facility housing 500 beneficiaries, which was implemented via PPP;(ii) rural producers association, which benefited from Projects investment in productive infrastructure / packing house; and (iii)Technology Park  a business plan was developed and the Municipality was undergoing final negotiation with partners for itsimplementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of infrastructure improvements in urban transport as a percentage of target attained: roads rehabilitated; roads maintained; substituted, rehabilitated or duplicated bridges
</narrative></title>
<baseline year="2007" iso-date="2007-06-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-27" />
<period-end iso-date="2012-12-31" />
<target value="55 km of roads rehabilitated;
1,200 km of roads maintained; 
12 substituted, rehabilitated or duplicated bridges">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of citizens satisfied with quicker and more user-friendly access to client services provided by the municipality
</narrative></title>
<baseline year="2006" iso-date="2006-05-31" value="68.9%"><comment><narrative>Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-31" />
<period-end iso-date="2012-12-31" />
<target value="85% - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers from a survey conducted on March-2012 post 74.80% satisfaction / approval of the public administration.
Nospecificsurveys were carried out by the Projects closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of properties cadastred in automated information systems
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="57,000 (Pelotas target)">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers. They refer both to the GIS and to land property database (57,000).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal staff trained
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="1,000 - Pelotas target">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of Bank Support: Enabling Environment  - Microfinance
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-12-31" />
<target value="150000.00">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The Project hasnt provided direct USD support to microfinances.

However, TA was delivered throughout the implementation ofPelotas project. The Municipal Secretary of Economic Development has developed a microfinance program in partnership with Caixa,Banrisul and Banco do Brasil. 

By the end of 2012, 3,547 micro entrepreneurs were assisted, with a total USD 7,684,730.00.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of urban improvements and environmental recovery as a percentage of target attained: m2 of green areas recovered
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="3,700 m2 of green area">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of annual work program delivered on time
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="90.00">
<comment><narrative>
Pelotas target.
</narrative></comment>
</target>
<actual value="90.00">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of urban improvements and environmental recovery as a percentage of target attained: m2 of green areas recovered
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="3,700 m2 of green area">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="1 urban park with 3,700 m2 of green area.">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of properties cadastred in automated information systems
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="57,000 (Pelotas target)">

</target>
<actual value="127,042">
<comment><narrative>
Pelotas numbers. They refer both to the GIS and to land property database (57,000).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of water infrastructure improvements in absolute numbers; number of new piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="20 km of water network;
600 household connections">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of citizens satisfied with quicker and more user-friendly access to client services provided by the municipality
</narrative></title>
<baseline year="2006" iso-date="2006-05-31" value="68.9%"><comment><narrative>Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-31" />
<period-end iso-date="2012-12-31" />
<target value="85% - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers from a survey conducted on March-2012 post 74.80% satisfaction / approval of the public administration.
Nospecificsurveys were carried out by the Projects closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of productive infrastructure installed
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="Packing House, Commercial Center and Technological Park">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Pelotas numbers. They account for 1 Packing House and 1 Commercial Center.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0.00"><comment><narrative>Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="2000.00">
<comment><narrative>
Pelotas numbers
</narrative></comment>
</target>
<actual value="2400.00">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0.00"><comment><narrative>Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="2000.00">
<comment><narrative>
Pelotas numbers
</narrative></comment>
</target>
<actual value="2400.00">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of urban citizens satisfied with the quality of infrastructure services
</narrative></title>
<baseline year="2006" iso-date="2006-05-01" value="64.90"><comment><narrative>64.9% - Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-01" />
<period-end iso-date="2012-12-31" />
<target value="75.00">
<comment><narrative>
75% - Pelotas numbers
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Pelotas numbers from Sept-2009 posted 81.50% satisfaction.

A survey conducted on March-2012 for Pelotas showed 68.8% ofsatisfaction with paving services and public spaces conservation.

No specific surveys were carried out by the Projects closingdate.

Information presented in the Borrowers Independent Assessment demonstrated that objectives related to the improvement ofthe infrastructure services were fully reached.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of productive infrastructure installed
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="Packing House, Commercial Center and Technological Park">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="2">
<comment><narrative>
Pelotas numbers. They account for 1 Packing House and 1 Commercial Center.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in percentage of the density of vehicles in selected avenues benefitted by the project
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="reduction of 20% - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers from 2009 post a reduction of -42%. No specific surveys were carried out by the Projects closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of infrastructure improvements in urban transport as a percentage of target attained: roads rehabilitated; roads maintained; substituted, rehabilitated or duplicated bridges
</narrative></title>
<baseline year="2007" iso-date="2007-06-27" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-27" />
<period-end iso-date="2012-12-31" />
<target value="55 km of roads rehabilitated;
1,200 km of roads maintained; 
12 substituted, rehabilitated or duplicated bridges">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="152 streets paved (81.7 Km); 1200 Km of rural roads maintained; 12 bridges constructed and/or rehabilitated; 20 Km of water supplynetwork; 522 water connections.">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Physical progress of water infrastructure improvements in absolute numbers; number of new piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="20 km of water network;
600 household connections">
<comment><narrative>
Pelotas targets.
</narrative></comment>
</target>
<actual value="20 Km of water supply network; 522 water connections.">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal projects institutionalizing improved evaluation, social and environmental management processes in the municipalgovernment
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="3 - Pelotas numbers.">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers. They refer to: (i) the adoption, by the Municipality, of a methodology to supervise works; (ii) theinstitutionalization of the Urban Landscape Catalogue; and (iii) the fact that the PMU, initially created to only deal with theProject management, has been confirmed by the Municipality as a central project development / supervising unit.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of urban citizens satisfied with the quality of infrastructure services
</narrative></title>
<baseline year="2006" iso-date="2006-05-01" value="64.90"><comment><narrative>64.9% - Pelotas numbers</narrative></comment></baseline>
<period>
<period-start iso-date="2006-05-01" />
<period-end iso-date="2012-12-31" />
<target value="75.00">
<comment><narrative>
75% - Pelotas numbers
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
Pelotas numbers from Sept-2009 posted 81.50% satisfaction.

A survey conducted on March-2012 for Pelotas showed 68.8% ofsatisfaction with paving services and public spaces conservation.

No specific surveys were carried out by the Projects closingdate.

Information presented in the Borrowers Independent Assessment demonstrated that objectives related to the improvement ofthe infrastructure services were fully reached.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage increase in formal firms
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0 - Pelotas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="15% yearly - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
Among the 560 beneficiaries of the Popular Comercial Facility supported by the Project, formality increased from50% to 70%.
Pelotas has also implemented a fast business licensing system (alvara expresso).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of Bank Support: Enabling Environment  - Microfinance
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-12-31" />
<target value="150000.00">
<comment><narrative>
Pelotas targets
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The Project hasnt provided direct USD support to microfinances.

However, TA was delivered throughout the implementation ofPelotas project. The Municipal Secretary of Economic Development has developed a microfinance program in partnership with Caixa,Banrisul and Banco do Brasil. 

By the end of 2012, 3,547 micro entrepreneurs were assisted, with a total USD 7,684,730.00.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in percentage of the density of vehicles in selected avenues benefitted by the project
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="reduction of 20% - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers from 2009 post a reduction of -42%. No specific surveys were carried out by the Projects closing date.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of annual work program delivered on time
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="90.00">
<comment><narrative>
Pelotas target.
</narrative></comment>
</target>
<actual value="90.00">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage increase in formal firms
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0 - Pelotas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="15% yearly - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers.
Among the 560 beneficiaries of the Popular Comercial Facility supported by the Project, formality increased from50% to 70%.
Pelotas has also implemented a fast business licensing system (alvara expresso).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of good practices or innovations replicated from other municipalities
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0 - Pelotas"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="At least 3 good practice or innovations replicated - Pelotas">

</target>
<actual value="">
<comment><narrative>
Pelotas numbers.

The practices include: (i) Popular commercial facility housing 500 beneficiaries, which was implemented via PPP;(ii) rural producers association, which benefited from Projects investment in productive infrastructure / packing house; and (iii)Technology Park  a business plan was developed and the Municipality was undergoing final negotiation with partners for itsimplementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal staff trained
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="1,000 - Pelotas target">

</target>
<actual value="2,052">
<comment><narrative>
Pelotas numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of municipal projects institutionalizing improved evaluation, social and environmental management processes in the municipalgovernment
</narrative></title>
<baseline year="2007" iso-date="2007-06-26" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-26" />
<period-end iso-date="2012-12-31" />
<target value="3 - Pelotas numbers.">

</target>
<actual value="3">
<comment><narrative>
Pelotas numbers. They refer to: (i) the adoption, by the Municipality, of a methodology to supervise works; (ii) theinstitutionalization of the Urban Landscape Catalogue; and (iii) the fact that the PMU, initially created to only deal with theProject management, has been confirmed by the Municipality as a central project development / supervising unit.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P094315</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Municipal APL: Sao Luis Enhancing Municipal Governance and Quality of Life Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the São Luis Enhancing Municipal Governance and Quality of Life Project is to improve public service in the Bacanga Basin of São Luis Municipality, and enhance the capacity of the city government in promoting local economic development and municipal management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sao Luis Enhancing Municipal Governance and Quality of Life Project for Brazil is to improve public service in the Bacanga Basin of Sao Luis Municipality, and enhance the capacity of the city government in promoting local economic development and municipal management. There are three components to the project. The first component concerns local economic development and municipal management strengthening. This component will support the development of a local economic development and competitiveness strategy, capacity building for job and income generation, technical assistance for financial enhancement, and technical assistance for project implementation. The second component concerns sanitation and water improvements. This component aims to improve the storm water drainage, sewerage, and water supply systems as well as develop and pilot solid waste management measures in the targeted areas of the Bacanga Basin. The third component concerns urban and environmental improvements. The component will support informal area upgrading and resettlement, rehabilitation of the Bacanga Dam, and municipal environmental management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-06-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-07-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-10-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-10-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Emanuela Monteiro</narrative></person-name><telephone>+1-202-473-1000</telephone><email>emonteiro@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388368" />
            <name><narrative>São Luis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.5297201 -44.30278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003411334" />
            <name><narrative>Barra de Bacanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.78333 -44.566669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319805" />
            <name><narrative>São Luis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.6494901 -44.304409</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="3" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="2" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="49" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="11" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="2" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="58.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="7" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="5" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="29" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="72" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="5" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="7" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="7" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="29" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="5" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="7" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">29700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">29700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">29700.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">6666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">6666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">6666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">26666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">26666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">26666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">446666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">446666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">446666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2470300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2470300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2470300.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-10-30"/>
<value currency="USD" value-date="2015-10-30">12252528.39</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-10-30"/>
<value currency="USD" value-date="2015-10-30">12252528.39</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-07-31"/><value value-date="2008-07-31">35640000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-12285032</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-03-31"/><value value-date="2008-03-31">32504</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">89100</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">2062687</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">5653</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">702532</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1198629</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">717427</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">1135944</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">849164</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1277436</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">713159</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">1765106</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">464417</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">621542</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">528083</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">700472</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">903471</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1038082</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">470280</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">513721</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">377722</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">882340</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">773266</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">931318</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">505307</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">368349</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">794834</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">289427</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1315426</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">511489</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">933850</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-85264</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">-89100</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-702</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-20460</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-6167</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-7369</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-6784</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-9499</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-26481</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-46276</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-42134</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-36243</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-32597</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-30811</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-34103</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-44093</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-71240</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-103603</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-135945</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-153493</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-165203</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-252147</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-273831</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-246069</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-176846</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-64462</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-25336</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-20016</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-22299</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-157777</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-383745</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-397396</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-410200</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-395449</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-318608</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-307559</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-254028</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-295458</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-323237</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-341590</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-377898</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-420384</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-481673</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-479736</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-934"><narrative>Secretaria Municipal de Projetos Especiais SEMPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094315"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P094315?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P094315"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="77551.00">

</target>
<actual value="1720.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increases in percent of sewage collected and treated in the targeted area
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Collected: 39%, treated: 4%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Collected: 80%, treated: 41%">

</target>
<actual value="Collected: 39%, treated: 4%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and implementation of actions for strengthening the Borrowers procurement system
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="Actions from the Strategy implemented">

</target>
<actual value="Actions from the Strategy implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target popln with use or ownership rights recorded as a result of the project
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intervention area flooded in 5 year rain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intervention area flooded in 5 year rain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sewage treated
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="41.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sewage collected
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="80.00">

</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families threatened with flooding from regular tidal movements of  the Bacanga Lake in project targeted area be relocated to the satisfaction of residents
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="100%">

</target>
<actual value="18% (108 families voluntarily resettled in the housing units of Pianco VII and VII of an estimated total of 595).">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families threatened with flooding from regular tidal movements of  the Bacanga Lake in project targeted area be relocated to the satisfaction of residents
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="100%">

</target>
<actual value="18% (108 families voluntarily resettled in the housing units of Pianco VII and VII of an estimated total of 595).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and implementation of actions for strengthening the Borrowers procurement system
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="Actions from the Strategy implemented">

</target>
<actual value="Actions from the Strategy implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro-enterprises assisted in Project area (cumulative)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="540.00">

</target>
<actual value="540.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Target popln with use or ownership rights recorded as a result of the project
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="3000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Satisfaction of the population that was resettled
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="Survey conducted &amp; Results satisfactory">

</target>
<actual value="Surveys not yet conducted.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of the local economic development strategy, and budget allocated to undertake main actions from the strategy
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Forum of Sustainability Development in Sao Luis"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Main actions from the strategy implemented">

</target>
<actual value="Activities under the LED strategy were developed: (i) a database with policy and decision making socioeconomic support information;(ii) a capacity building plan for the municipal staff; and (iii) a municipal program for institutional supply and acquisition.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project targeted areas acquire macro drainage capacity to handle an intense storm every 25 years and micro drainage capacity for a storm every 5 years
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No capacity"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Capacity exists">

</target>
<actual value="Capacity improved: Macro drainage works in the Coroado area were completed; macro drainage works in Bicas areas are underway(progress at 92%); rehabilitation of the Bacanga dam not yet conducted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Micro-enterprises assisted in Project area (cumulative)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="540.00">

</target>
<actual value="540.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sewage collected
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="39.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="80.00">

</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="62.00">

</target>
<actual value="4.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="73840.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased consumer satisfaction with water, sanitation, drainage, and urban services
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No survey conducted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Survey conducted, and aggregate population satisfaction level improved compared to previous survey">

</target>
<actual value="One survey conducted (baseline). The procurement process for the intermediate and final surveys faced delays, and were notconducted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public space (green areas, urban parks etc.) created as a result of the project
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="83585.50">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="62.00">

</target>
<actual value="5.42">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bacanga Dam floodgates completely repaired and operated effectively
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Floodgates operating inadequately"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Bacanga dam repaired and floodgates properly operated">

</target>
<actual value="Floodgates operating inadequately">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of a competitiveness enhancement plan for one economic cluster, and implementation of recommended short-term actions from the plan by the end of project
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Competitiveness enhancement plan for the tourism cluster developed and short term actions from the plan implemented">

</target>
<actual value="Competitiveness enhancement plan for the tourism cluster developed and short term actions from the plan implemented.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intervention area flooded in 25 year rain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
People trained in Project area
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="676">

</target>
<actual value="676">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Satisfaction of the population that was resettled
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="Survey conducted &amp; Results satisfactory">

</target>
<actual value="Surveys not yet conducted.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bacanga Dam floodgates completely repaired and operated effectively
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Floodgates operating inadequately"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Bacanga dam repaired and floodgates properly operated">

</target>
<actual value="Floodgates operating inadequately">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project targeted areas acquire macro drainage capacity to handle an intense storm every 25 years and micro drainage capacity for a storm every 5 years
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No capacity"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Capacity exists">

</target>
<actual value="Capacity improved: Macro drainage works in the Coroado area were completed; macro drainage works in Bicas areas are underway(progress at 99%); rehabilitation of the Bacanga dam not yet conducted.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased consumer satisfaction with water, sanitation, drainage, and urban services
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No survey conducted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Survey conducted, and aggregate population satisfaction level improved compared to previous survey">

</target>
<actual value="One survey conducted (baseline). The procurement process for the intermediate and final surveys faced delays, and were notconducted yet.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public space (green areas, urban parks etc.) created as a result of the project
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="83585.50">

</target>
<actual value="6057.24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sewage treated
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="41.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of a competitiveness enhancement plan for one economic cluster, and implementation of recommended short-term actions from the plan by the end of project
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Competitiveness enhancement plan for the tourism cluster developed and short term actions from the plan implemented">

</target>
<actual value="Competitiveness enhancement plan for the tourism cluster developed and short term actions from the plan implemented.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated water, drainage, sanitation and solid waste plan developed and adopted
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Plan approved and adopted">

</target>
<actual value="Integrated Municipal Sanitation Plan (WSS, drainage and solid waste) developed; public consultations held; Plan not yet submittedto approval at the legislative body">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated water, drainage, sanitation and solid waste plan developed and adopted
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Plan approved and adopted">

</target>
<actual value="Integrated Municipal Sanitation Plan (WSS, drainage and solid waste) developed; public consultations held; Plan not yet submittedto approval at the legislative body">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="77551.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families living in flood prone areas benefiting from improved drainage
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="4166.00">

</target>
<actual value="2083.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families living in flood prone areas benefiting from improved drainage
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="4166.00">

</target>
<actual value="2083.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of the local economic development strategy, and budget allocated to undertake main actions from the strategy
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Forum of Sustainability Development in Sao Luis"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Main actions from the strategy implemented">

</target>
<actual value="Activities under the LED strategy were developed: (i) a database with policy and decision making socioeconomic support information;(ii) a capacity building plan for the municipal staff; and (iii) a municipal program for institutional supply and acquisition.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increases in percent of sewage collected and treated in the targeted area
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="Collected: 39%, treated: 4%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="Collected: 80%, treated: 41%">

</target>
<actual value="Collected: 39%, treated: 4%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intervention area flooded in 25 year rain
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-10-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-10-30" />
<target value="73840.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
People trained in Project area
</narrative></title>
<baseline year="2008" iso-date="2008-10-01" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-01" />
<period-end iso-date="2015-10-30" />
<target value="676">

</target>
<actual value="676">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P095171</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Integrated Health and Water Management Project (SWAP)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (a) increase access to clean water, sanitation andbasic health care in at least 10 SelectedMunicipalities most affected by infectiousintestinal diseases (ID); and (b) improve Neonatal health care in 25 Selected Hospitalsusing a Barema indicator of quality and efficiency.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Integrated Health and Water Management Project for Brazil are to: (i) increase access to clean water, sanitation and basic health care in at least 10 selected municipalities most affected by infectious intestinal diseases (IDD), and (ii) improve neonatal health care in 25 selected hospitals using a Barema indicator of quality and efficiency. The project will have two components and a total project cost of US$60 million: component one for contributing to the reduction of the infant mortality rate; and component two for the institutional modernization of the health, water, and planning sectors. Most interventions have a joint inter-sectoral focus in order to produce synergies and impact. For component one, the project will aim to reduce post-neonatal mortality and morbidity due to diarrhea by increasing access to clean water, sanitation and basic healthcare in municipalities most affected by diarrhea; as well as interventions related to reduce neonatal mortality, supporting municipalities in the expansion and improvement of the quality and efficiency of the health care chain related to maternal and neonatal health care services, by introducing a state program for quality in neonatal health care (PRO-NASCER) in 25 selected state reference hospitals. Component two will provide support for strengthening the institutional capacity of the state's management, monitoring and evaluation in the water, health, and planning sectors.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0000993"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0000992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-10-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-11-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Pena De Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dpena@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="5" xml:lang="en"/><sector vocabulary="1" code="12262" percentage="37" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="5" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="53" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="4" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="43" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="1" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="20" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="43" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="52" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="52" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="1" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="23" xml:lang="en"><narrative>Child Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1111111.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1656103.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1656103.42</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">60000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-1541707</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-114396</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">150000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">11000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">3500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1600000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">2700000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">2400000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">5000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">2400000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3700000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">6300000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">140000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">144000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-75707</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-150000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-23601</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-51011</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-46787</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-44777</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-46223</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-67987</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-113312</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-169355</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-297647</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-441306</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-606836</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-901080</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-936769</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-931695</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-738929</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-520267</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-249826</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-245356</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-223161</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-665738</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1214944</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1421736</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1493681</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1442622</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1204380</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1147975</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-987481</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-111500</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-163010</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-215030</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-266530</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-380930</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-470180</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-603104</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-603846</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-603846</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-603846</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1209780</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1409285</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1409285</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1409285</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-992"><narrative>Secretaria da Fazenda do Estado da Bahia (Secretariat of Finance) - SEFAZ</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095171"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P095171?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095171"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Number of strategic agendas in the health sector that prioritize maternal and child health.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="5.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Percentage of annually investigated hospitalizations of children under five, due to intestinal infectious diseases, in 25 hospitals.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of simplified water supply systems constructed and operating in at least 10 selected municipalities and in areas of influence of the 25 hospitals with the highest IDD hospitalizations
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="215.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="435.00">

</target>
<actual value="417.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
13. Studies for restructuring of Riverine Riparian Forests Program elaborated and under implementation
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="4.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Number of River Basin Plans prepared and approved by the River Basin Committee including studies for classifying water bodies
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
8. Percentage of low-risk deliveries in the high complexity maternity hospitals Roberto Santos and Jose Maria Magalhaes
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="51.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="25.00">

</target>
<actual value="57.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
5. Percentage of coverage of first and second applied doses of oral vaccine against human rotavirus in children under 5
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="82.00">

</target>
<actual value="74.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of people served by simplified water supply systems, and  basic sanitation in at least 10 selected municipalities prioritized by the Project
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="29326.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="58326.00">

</target>
<actual value="45758.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
13. Studies for restructuring of Riverine Riparian Forests Program elaborated and under implementation
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3. Number of River Basin Plans prepared and approved by the River Basin Committee including studies for classifying water bodies
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="4.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2. Number of rural sanitary pilot modules built in at least 10 selected municipalities
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2015-12-31" />
<target value="1019.00">

</target>
<actual value="1119.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4. Number of Community Voluntary Agents Trained and operational
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="900.00">

</target>
<actual value="886.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of simplified water supply systems constructed and operating in at least 10 selected municipalities and in areas of influence of the 25 hospitals with the highest IDD hospitalizations
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="215.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="435.00">

</target>
<actual value="356.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Number of strategic agendas in the health sector that prioritize maternal and child health.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="5.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Population coverage by family health teams in the state of Bahia
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="53.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2016-10-31" />
<target value="68.00">

</target>
<actual value="72.05">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2. Number of rural sanitary pilot modules built in at least 10 selected municipalities
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2015-12-31" />
<target value="1019.00">

</target>
<actual value="924.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3. Percentage of the overall Barema indicators improved in all 25 reference hospitals.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="85.00">

</target>
<actual value="91.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3. Percentage of the overall Barema indicators improved in all 25 reference hospitals.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="85.00">

</target>
<actual value="82.83">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Percentage of annually investigated hospitalizations of children under five, due to intestinal infectious diseases, in 25 hospitals.
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="50.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Population coverage by family health teams in the state of Bahia
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="53.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2016-10-31" />
<target value="68.00">

</target>
<actual value="74.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Number of public officials certified in public management in the involved secretariats
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="100.00">

</target>
<actual value="250.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4. Number of  the 25 hospitals that have achieved at least 80% of the Barema indicators
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="18.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
8. Percentage of low-risk deliveries in the high complexity maternity hospitals Roberto Santos and Jose Maria Magalhaes
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="51.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="25.00">

</target>
<actual value="36.27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
12. Creation of a geographic information system (SIG) unit within CERB
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Number of public officials certified in public management in the involved secretariats
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="100.00">

</target>
<actual value="220.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Percentage of live births in the 25 selected hospitals in relation to the number of births in the State of Bahia
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="37.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="42.00">

</target>
<actual value="44.82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
12. Creation of a geographic information system (SIG) unit within CERB
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4. Number of Community Voluntary Agents Trained and operational
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="900.00">

</target>
<actual value="916.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
5. Percentage of coverage of first and second applied doses of oral vaccine against human rotavirus in children under 5
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="82.00">

</target>
<actual value="66.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4. Number of  the 25 hospitals that have achieved at least 80% of the Barema indicators
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="18.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Percentage of live births in the 25 selected hospitals in relation to the number of births in the State of Bahia
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="37.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="42.00">

</target>
<actual value="45.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
9. Percentage of hospital neonatal deaths occurring in the selected maternity hospitals investigated
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="80.00">

</target>
<actual value="62.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of people served by simplified water supply systems, and  basic sanitation in at least 10 selected municipalities prioritized by the Project
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="29326.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="58326.00">

</target>
<actual value="52333.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
9. Percentage of hospital neonatal deaths occurring in the selected maternity hospitals investigated
</narrative></title>
<baseline year="2010" iso-date="2010-11-02" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-02" />
<period-end iso-date="2017-10-31" />
<target value="80.00">

</target>
<actual value="87.20">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P095460</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia Integrated State Highway Management Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project's ultimate development objective is to increase effective use of the state road infrastructure, with an aim at stimulating higher economic growth.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project of Bahia Integrated State Highway Management for Brazil will increase effective use of the state road infrastructure, with an aim at stimulating higher economic growth. The project consists of the following components: Component 1: The state's road network management strategy focuses on improving transport conditions on the state's main transport corridors and on their feeders. Component 2: Will support: (a) government efforts in optimizing the role of transport services to help deconcentrate economic growth and provision of basic services, through determination of existing logistics bottlenecks and level/localization of repressed economic growth due to inadequate transport costs, integration of transport dimension in planning for education and health interventions, identification of public actions required to improve logistics' efficiency in the state, and definition of incentives to private sector to invest in logistics; (b) the consolidation and gradual implementation of the state's logistics program (PELTBAHIA), especially with respect to the monitoring of the program's impact in logistics' performance, strengthening of the state's regulatory framework, and capacity to model public-private partnerships; (c) the strengthening of the state road administration, with respect to the consolidation of its planning system, capacity improvements with respect to environmental/social impacts mitigation and works supervision, and modernization of information systems; (d) improvements in the road administration's technical capacity, to support municipalities in maintaining their road networks and in improving transport services to the poor, and (e) the preparation of works' engineering designs and supervision, as well as support to the road administration in coordinating the project's implementation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2007-07-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2006-11-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2013-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2013-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gregoire F. Gauthier</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ggauthier@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405376" />
            <name><narrative>Bom Despacho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.9333296 -39.933331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003444823" />
            <name><narrative>Xique Xique</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.82294 -42.728149</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003444914" />
            <name><narrative>Vitória da Conquista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.86611 -40.839439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450063" />
            <name><narrative>Santa Maria da Vitória</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.39472 -44.18861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450144" />
            <name><narrative>Santa Luzia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.76972 -43.851391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450554" />
            <name><narrative>Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97111 -38.51083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455903" />
            <name><narrative>Oliveira dos Brejinhos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.31694 -42.896111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458481" />
            <name><narrative>Livramento do Brumado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.65145 -41.845638</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460813" />
            <name><narrative>ItambE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.245 -40.624439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461013" />
            <name><narrative>Irecê</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.30417 -41.855831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461408" />
            <name><narrative>IlhEus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.79364 -39.03949</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003467577" />
            <name><narrative>Canavieiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.675 -38.94722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468893" />
            <name><narrative>Brumado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.20361 -41.665279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471094" />
            <name><narrative>Baixa Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.95972 -40.16806</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319087" />
            <name><narrative>Santa Maria da Vitória</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.26141 -44.377998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320985" />
            <name><narrative>Palmeiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.51485 -41.577068</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="10" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="87" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="6" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="13" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="20" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="13" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000014" percentage="20" xml:lang="en"><narrative>Trade</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="13" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="6" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="20" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="13" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="13" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="13" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">66666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">66666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2483333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">33333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">33333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">66666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">66666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">133333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">2333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">2333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">2333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">2333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">2333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">2333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095460"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P095460?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095460"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of regional offices (residencias) operating DERBA's information systems on-line (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="10">

</target>
<actual value="10">
<comment><narrative>
8 central information systems are accessible from DEBA regional offices
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State multimodal strategy defined
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No strategy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="Strategy defined">

</target>
<actual value="Startegy partially defined">
<comment><narrative>
(i) Bahia State airport plan, (ii) intermunicipal passenger transport, (iii) transport survey Salvador metropolitan area, (iv)waterborne transport regulation
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of feasibility studies for PPP (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No feasibility study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="4">

</target>
<actual value="3">
<comment><narrative>
Concession BA93, PPP road terminal Feira de Santana, PPP Ferry-boat
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of staff weeks of training for DERBA staff (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="200">

</target>
<actual value="0">
<comment><narrative>
No progress, as other institutional strengthening activities were prioritized. Training on the DERBA reform may come afterwards.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% decrease of average unit vehicle costs on selected itineraries (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="8.00">

</target>
<actual value="12.50">
<comment><narrative>
Target met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% reduction in average land transport freight rates on selected itineraries (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0% reduction"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="6% reduction">

</target>
<actual value="n.a.">
<comment><narrative>
The study that will monitor this indicator is on-going.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated road planning and management system operational
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="System not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="System operational">

</target>
<actual value="System not operational">
<comment><narrative>
Pavement Management System still under design. (surveys being finalized)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cumulative number of km of roads rehabilitated under result-based contracts
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="2000">

</target>
<actual value="1136">
<comment><narrative>
Corresponds to the km of the BA state highway network under CREMA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AGERBA's normative body, and analysis/supervision capacity consolidated
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No capacity consolidation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="Capacity consolidated">

</target>
<actual value="on-going">
<comment><narrative>
Study to consolidate the waterways transport regulation framework on-going.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data warehouse system for PELTBAHIA operational
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No data warehouse"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="Data warehouse operational">

</target>
<actual value="Datawarehouse not operational">
<comment><narrative>
PELTBahia contract signed in January 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AGERBA's normative body, and analysis/supervision capacity consolidated
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No capacity consolidation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="Capacity consolidated">

</target>
<actual value="Capacityconsolidated">
<comment><narrative>
Study to consolidate the waterways transport regulation framework completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated road planning and management system operational
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="System not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2010-12-31" />
<target value="System operational">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-referenced social and economic database in operation
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No database"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="Database in operation">

</target>
<actual value="Database in operation">
<comment><narrative>
Education and health georeferenced database in operation. Banco de dados and IDE-Bahia starting implementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of technical audits realized annually by the Quality Group
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="5 each year starting in year 2">

</target>
<actual value="6">
<comment><narrative>
6 audits carried out during the last two quarters of 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of staff weeks of training for AGERBA staff (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="100">

</target>
<actual value="0">
<comment><narrative>
The MBA course for AGERBA staff will not be organized.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Geo-referenced social and economic database in operation
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No database"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2010-12-31" />
<target value="Database in operation">

</target>
<actual value="">
<comment><narrative>
Bidding process for the database setup study on-going
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% increase in use of road transport infrastructure on selected itineraries (as measured in veh.-km. increase relatively to 2005 levels ) (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0% increase"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="12% increase">

</target>
<actual value="">
<comment><narrative>
The traffic surveys have been contracted out but results are not available yet.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
%  increase of State paved network extension under result-based contracts (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0% increase"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="18% increase">
<comment><narrative>
Target value based on 1200 km included in PREMAR is rather 13%
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Corresponds to the km of the BA state highway network under CREMA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of technical audits realized annually by the Quality Group
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="5 each year starting in year 2">

</target>
<actual value="">
<comment><narrative>
12 audits carried out in 2011
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of feasibility studies for PPP (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No feasibility study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="4">

</target>
<actual value="4">
<comment><narrative>
Target met. Concession BA93, PPP road terminal Feira de Santana, PPP Ferry-boat
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of network traffic traveling on paved roads in good conditions (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="50%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="80%">

</target>
<actual value="83%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Data warehouse system for PELTBAHIA operational
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No data warehouse"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2010-12-31" />
<target value="Data warehouse operational">

</target>
<actual value="">
<comment><narrative>
Bidding process to procure data warehouse on-going
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Plan under implementation to optimize logistics impacts on the development of Salvador Metropolitan Region
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2011-12-30" />
<target value="Plan developed">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State multimodal strategy defined
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No strategy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2011-12-30" />
<target value="Strategy defined">

</target>
<actual value="">
<comment><narrative>
Bidding process for the PELTBAHIA study on-going
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of network traffic traveling on paved roads in good conditions (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="50%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="80%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% increase in use of road transport infrastructure on selected itineraries (as measured in veh.-km. increase relatively to 2005 levels ) (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0% increase"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="12% increase">

</target>
<actual value="n.a.">
<comment><narrative>
The traffic surveys are on-going.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of staff weeks of training for DERBA staff (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="200">

</target>
<actual value="">
<comment><narrative>
No significant progress, as other institutional strengthening activities were prioritized.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% reduction in average land transport freight rates on selected itineraries (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0% reduction"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2012-12-31" />
<target value="6% reduction">

</target>
<actual value="">
<comment><narrative>
The study that will monitor this indicator is still in procurement phase.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of regional offices (residencias) operating DERBA's information systems on-line (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2010-12-31" />
<target value="10">

</target>
<actual value="">
<comment><narrative>
All DERBA regional offices access central information systems.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of staff weeks of training for AGERBA staff (cum.)
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="100">

</target>
<actual value="0">
<comment><narrative>
The MBA course for AGERBA staff will not be organized.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Plan under implementation to optimize logistics impacts on the development of Salvador Metropolitan Region
</narrative></title>
<baseline year="2006" iso-date="2006-01-02" value="No plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-01-02" />
<period-end iso-date="2013-09-30" />
<target value="Plan developed">

</target>
<actual value="No plan">
<comment><narrative>
Study that has been contracted out to elaborate this plan has failed and the proposed plan is not considered satisfactory.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P095626</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Family Health Extension Adaptable Lending</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the second phase APL are: (i) increase access to Family Health-based primary care in large, urban municipalities; (ii) raise the technical quality of and patient satisfaction with primary care; and (iii) improve the efficiency and effectiveness of Family Health service providers as well as the broader delivery system.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Family Health Extension Project for Brazil objectives are as follows: (i) increase access to Family Health-based primary care in large, urban municipalities; (ii) raise the technical quality of and patient satisfaction with primary care; and (iii) improve the efficiency and effectiveness of Family Health service providers as well as the broader delivery system. The project components are the following: (i) expansion and consolidation of family health care in municipalities. This component aims at scaling up and strengthening Family Health Program (PSF) capacity at municipal level. The strategic aim is to raise PSF population coverage from 34 to 37 percent in participating municipalities. Coverage extension activities will continue to focus on large urban areas, which are characterized by poorly integrated, traditional service delivery systems and large numbers of families living in poverty and confronting severe social risk; (ii) strengthening state capacity for supervision, monitoring and technical support of Family Health services. This component aims at strengthening state capacity to support municipalities extend coverage, improve technical quality, and manage service delivery; improve the supply, quality and stability of family health teams; and conduct supervision and monitoring as key functions of state health secretariats; and (iii) strengthening federal oversight of the Family Health Program. This component aims at strengthening PSF policy and technical support, and oversight capacity at federal level. This component will strengthen the capacity of the Ministry of Health to provide support to states and municipalities regarding the implementation of the Program. The project lessons learned at inception were: (i) PSF has great potential to improve the coverage and quality of basic care, as well as health outcomes; (ii) successful implementation of new primary care models depends on changes in underlying incentives; and (iii) given the dynamic nature of the Brazilian health system, it is important to allow for flexibility, but within an agreed framework that emphasizes results]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2006-11-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-04-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tania Dmytraczenko</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tdmytraczenko@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Estado do Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Estado de Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Estado do Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Estado do Parana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662560" />
            <name><narrative>Estado de Roraima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 -61.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Estado do Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="12110" percentage="19" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="81" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="57.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="23.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="17" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="83" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="33" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="17" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="17" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="17" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="33" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="33" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="17" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="33" xml:lang="en"><narrative>Child Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">41666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">41666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">41666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">41666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">41666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">41666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">41666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">41666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">1683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">1683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2850000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">48704527.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">48704527.28</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">83450000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-48704527</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">208625</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">13000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">4363670</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4220781</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1829918</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">2820664</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-2451414</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-5246772</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-208625</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-1404</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">-5758</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-324291</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-517453</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-643611</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-708485</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-771987</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-850479</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-890132</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-893102</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-874496</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-768200</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-681620</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-666473</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-651326</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-636179</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-621032</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-605885</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-590738</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-575590</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-560443</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-545296</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-530149</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-515002</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-499855</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-484708</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-469561</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-454414</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-439266</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-424119</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-408972</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-393825</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-378678</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-818873</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-849473</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-849473</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-849473</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-682134</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1034"><narrative>Ministry of Health – Department of Primary Care (Departamento de Atenção Básica - DAB)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095626"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P095626?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P095626"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease of infant mortality per 1000 births in participating municipalities.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="17.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2014-12-31" />
<target value="16.9">

</target>
<actual value="12.8">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of infants &lt; 1 with full vaccination regimen (DPT-H, polio, measles, tuberculosis) in participating municipalities (as agroup).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="100.8"><comment><narrative>related to the calculation method the  baseline exceeds 100%.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="95">

</target>
<actual value="92.8">
<comment><narrative>
Indicator has been achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment, at federal level, of a results-based management system that links project financing to states and municipalities.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="System developed and tested.">

</target>
<actual value="Implemented in 3,965 municipalities (in all states)">
<comment><narrative>
Indicator achieved. System implemented in 3,965 (all federal units).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of all PSF teams applied quality evaluation instrument and are ranked according to standard (AMQ system) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="7%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="15">

</target>
<actual value="55.7">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of municipalities with &lt;100,000 population in X% states participate in quality assessment program (AMQ) - participating states as a group.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50%">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of states establish performance agreements with at least X% municipalities with &lt;100,000 population in participating states (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="40%">

</target>
<actual value="ND">
<comment><narrative>
Information pending update from State Health Secretariats.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of PSF teams in a sample of municipalities using evidence-based clinical guidelines for hypertension and diabetes (basedon sample survey) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="15">

</target>
<actual value="47.4">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of states with monitoring and evaluation plans implemented and evaluated in participating states (as a group)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50%">

</target>
<actual value="52.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost accounting system (at federal level).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Study concluded and system developed.">

</target>
<actual value="ND">
<comment><narrative>
Studies on tripartite costs and spending on Primary health care are being carried out at the moment with collaboration of IPEA andDESID/ MS. Results are expected to be launched in June 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of pregnant women attended by PSF teams that have 7 or more pre-natal consultations in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="60%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="70">

</target>
<actual value="63.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of municipalities apply quality evaluation instrument in the areas of PSF management and coordination (AMQ parts 1 &amp; 2) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="10">

</target>
<actual value="88.6">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of total medical consultations referred from PSF to hospital specialty services in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="&lt;10%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="&lt;10">

</target>
<actual value="9.1">
<comment><narrative>
Indicator has been achieved and continues on track.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease of infant mortality per 1000 births in participating municipalities.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="17.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2014-12-31" />
<target value="16.9">

</target>
<actual value="12.7">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of infants &lt; 1 with full vaccination regimen (DPT-H, polio, measles, tuberculosis) in participating municipalities (as agroup).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="100.8"><comment><narrative>related to the calculation method the  baseline exceeds 100%.</narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="95">

</target>
<actual value="89.7">
<comment><narrative>
Indicator has been achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ratio of patients with hypertension followed by PSF teams to estimated number of patients w/ hypertension in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="35">

</target>
<actual value="26.7">
<comment><narrative>
Indicator was revised during restructuring. Results have shown some variation over the last years, probably related to thecalculation method.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities that implemented the Health Information System for Primary care (SIS-AB/ e-SUS-AB).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="70.00">

</target>
<actual value="0.00">
<comment><narrative>
Implementation of the new health information system was initiated in May 2013 and updated information will be available at a laterpoint in time.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of PSF teams in a sample of municipalities using evidence-based clinical guidelines for hypertension and diabetes (basedon sample survey) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="15">

</target>
<actual value="68.7">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of ESF implement results-based management system, including the signing of performance contracts.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="60%">

</target>
<actual value="ND">
<comment><narrative>
Indicator on track. Considering 184 PROESF municipalities (166 participate in the national program for Access and Qualityimprovement (PMAQ) with 5,601 family Health teams (ESF).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of pregnant women attended by PSF teams that have 7 or more pre-natal consultations in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="70">

</target>
<actual value="63.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of Primary Care Units (UBS) in participating municipalities that have a tele-health access point.
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2014-12-31" />
<target value="20.00">

</target>
<actual value="0.00">
<comment><narrative>
Target achieved. After Project restructuring 249 municipalities are eligible of which 3,243 have UBS in place. Out of these UBS648have tele-health access points, which represents roughly 20%. The MoH proses to aim for a target of 30 percent now.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of per capita contact with primary care providers in participating municipalities.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="1.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1.8">

</target>
<actual value="0.7">
<comment><narrative>
Data on this indicator has been rectified to take into account visits with all primary care providers as originally envisioned andnot just doctor visits.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inter-municipal cooperation plan implemented in each state to strengthen PSF, specifying activities in three areas: management, coordination, service Provision.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1 per State (20 states)">

</target>
<actual value="Communities of practice established www.atencaobasica.org.br">
<comment><narrative>
Has been achieved: The intermunicipal community of practice (cooperao Intermunicipial) has 6,821 registered users (regio sul:956; sudeste: 2,496; centro-oeste: 751; nordeste: 2,447 and norte:
 572).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of states with monitoring and evaluation plans implemented and evaluated in participating states (as a group)
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50%">

</target>
<actual value="52.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of PSF population coverage in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="33%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="37">

</target>
<actual value="41.9">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment, at federal level, of a results-based management system that links project financing to states and municipalities.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="System developed and tested.">

</target>
<actual value="ND">
<comment><narrative>
Indicator achieved. System implemented in 3,965 (all federal units).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost accounting system (at federal level).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Study concluded and system developed.">

</target>
<actual value="Study costs and tripartite spending on primary healthcare in partnership with IPEA and DESID/MS performed">
<comment><narrative>
Studies on tripartite costs and spending on Primary health care are being carried out at the moment with collaboration of IPEA andDESID/ MS. Results are expected to be launched in June 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of municipalities apply quality evaluation instrument in the areas of PSF management and coordination (AMQ parts 1 &amp; 2) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="10">

</target>
<actual value="97.4">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of all PSF teams applied quality evaluation instrument and are ranked according to standard (AMQ system) in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="7%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="15">

</target>
<actual value="92.5">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of total medical consultations referred from PSF to hospital specialty services in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="&lt;10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="&lt;10">

</target>
<actual value="10.1">
<comment><narrative>
Indicator has been achieved and continues on track.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ratio of patients with hypertension followed by PSF teams to estimated number of patients w/ hypertension in participating municipalities (as a group).
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="35%">

</target>
<actual value="60.85">
<comment><narrative>
Indicator was revised during restructuring. Results have shown some variation over the last years, probably related to thecalculation method.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of PSF population coverage in participating municipalities (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="37">

</target>
<actual value="41.9">
<comment><narrative>
Indicator has been achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of Primary Care Units (UBS) in participating municipalities that have a tele-health access point.
</narrative></title>
<baseline year="2005" iso-date="2005-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2005-12-31" />
<period-end iso-date="2014-12-31" />
<target value="20.00">

</target>
<actual value="0.00">
<comment><narrative>
Target achieved. After Project restructuring 249 municipalities are eligible of which 3,243 have UBS in place. Out of these UBS648have tele-health access points, which represents roughly 20%. The MoH proses to aim for a target of 30 percent now.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inter-municipal cooperation plan implemented in each state to strengthen PSF, specifying activities in three areas: management, coordination, service Provision.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1 per State (20 states)">

</target>
<actual value="ND">
<comment><narrative>
Has been achieved: The intermunicipal community of practice (cooperao Intermunicipial) has 6,821 registered users (regio sul:956; sudeste: 2,496; centro-oeste: 751; nordeste: 2,447 and norte:
 572).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of municipalities with &lt;100,000 population in X% states participate in quality assessment program (AMQ) - participating states as a group.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50%">

</target>
<actual value="100% (26) states, 94.5% of municipalities use the AMAQ">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of states establish performance agreements with at least X% municipalities with &lt;100,000 population in participating states (as a group).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="40%">

</target>
<actual value="100% (26) states with 100% of the municipalities with defined goals, and 73.4% joined the Pacto pela Sade 11/10">
<comment><narrative>
Information pending update from State Health Secretariats.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of municipalities that implemented the Health Information System for Primary care (SIS-AB/ e-SUS-AB).
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="70.00">

</target>
<actual value="0.00">
<comment><narrative>
Implementation of the new health information system was initiated in May 2013 and updated information will be available at a laterpoint in time.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of per capita contact with primary care providers in participating municipalities.
</narrative></title>
<baseline year="2003" iso-date="2003-12-31" value="1.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2003-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1.8">

</target>
<actual value="1.7">
<comment><narrative>
Data on this indicator has been rectified to take into account visits with all primary care providers as originally envisioned andnot just doctor visits.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of ESF implement results-based management system, including the signing of performance contracts.
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2014-12-31" />
<target value="60%">

</target>
<actual value="58.3% in the 1st cycle of PMAQ; 88.0% in the 2nd cycle">
<comment><narrative>
Indicator on track. Considering 184 PROESF municipalities (166 participate in the national program for Access and Qualityimprovement (PMAQ) with 5,601 family Health teams (ESF).
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P099369</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ceara Regional Economic Development: Cidades do Ceara</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to promote economic development, improve urban infrastructure, and enhance regional management capacity in the Central Cariri Region of Ceara, which includes the nine municipalities of Barbalha, Caririaçu, Crato, Farias Brito, Jardim, Juazeiro do Norte, Missão Velha, Nova Olinda, and Santana do Cariri.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Ceara Regional Economic Development Project (Cidades do Ceara - Cariri Central) for Brazil is to promote economic development, improve urban infrastructure, and enhance regional management capacity in the Central Cariri region of Ceara, which includes the nine municipalities of Barbalha, Caririagu, Crato, Farias Brito, Jardim, Juazeiro do Norte, Missao Velha, Nova Olinda, and Santana do Cariri. There are three components to the project. The first component is the infrastructure improvements. This component will comprises investments in infrastructure at the regional and municipal levels of Central Cariri to address critical infrastructure deficits, protect and restore the environment, and improve public services for local residents and tourists. Regional infrastructure includes transportation infrastructure to reduce congestion, increase mobility and access to the main tourism sites, and a regional sanitary landfill to provide an environmentally sound disposal site for solid wastes generated in the region. The second component is the cluster-based local economic development. This component will initially facilitate the growth of the tourism and footwear clusters in the Central Cariri Region to enhance their competitiveness through business environment improvement, technology upgrading, training and market outreach, and provision of infrastructure for cluster development. Finally, the third component is the regional management and institutional strengthening. This component will support promoting effective governance at the municipal, regional and state levels through activities in i) regional management; ii) municipal institutional strengthening; and iii) implementation support.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001264"><narrative>State of Ceara</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-01-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-02-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paul Procee</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pprocee@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389385" />
            <name><narrative>Santana do Cariri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.1796799 -39.784512</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394754" />
            <name><narrative>Missão Velha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.2370701 -39.111961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397147" />
            <name><narrative>Juazeiro do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.2130599 -39.315281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397572" />
            <name><narrative>Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6382098 -39.240372</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399415" />
            <name><narrative>Fortaleza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.7172201 -38.54306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003400496" />
            <name><narrative>Farias Brito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.88662 -39.534061</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401544" />
            <name><narrative>Crato</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.14714 -39.471321</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Estado do Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402882" />
            <name><narrative>Caririaçu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.0422201 -39.283611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406442" />
            <name><narrative>Barbalha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.31111 -39.304169</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324298" />
            <name><narrative>Nova Olinda</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.08567 -39.671951</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="25" xml:lang="en"/><sector vocabulary="1" code="31130" percentage="25" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="25" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="10" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="56" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="2" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="4" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="3" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="3" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="9" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="9" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="4" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="3" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="3" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="3" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="3" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="10" xml:lang="en"><narrative>MSME Finance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1383333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1383333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">46000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">347947</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">136112</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">167865</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">137333</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">60744</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">115000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">756444</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1168361</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">488451</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">1391466</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">2798949</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">543340</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1017211</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1948153</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1393830</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">329052</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">1126662</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">578893</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1451818</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">664170</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1729090</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2748229</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1598822</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1328698</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2779129</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1525247</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1650302</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">789325</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1909233</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1532686</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">459662</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">1799462</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">857712</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">1497875</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">463336</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1421154</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1386792</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">2288395</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">2431921</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">31131</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-115000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-5200</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-5771</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-5714</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-23866</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-63317</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-76336</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-77609</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-84656</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-93306</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-135626</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-189773</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-238579</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-344072</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-487768</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-526125</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-555821</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-778665</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-811619</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-786642</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-617676</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-437785</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-221737</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-208543</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-187952</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-430384</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-919549</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1008721</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1034560</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-984791</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-804947</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-750089</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-631968</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1531800</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1265"><narrative>Governo do Estado do Ceará - Secretaria das Cidades</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099369"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P099369?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099369"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project monitoring reports being generated and analyzed quarterly
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption of a new management model based on the Geopark Business Plan
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of regional consortium for landfill
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipal officials in the Cariri region benefiting from training financed by the project
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="450.00">

</target>
<actual value="478.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families removed from risk areas in Bairro Seminrio
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="80.00">

</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
# of meetings held by the Project Consultative Committee
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="20">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% reduction average morning  peak hour travel time between defined action points in central Juazeiro
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="2089"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="30%">

</target>
<actual value="0%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads constructed, non-rural
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="21.00">

</target>
<actual value="15.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="6.00">

</target>
<actual value="7.67">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of a Regional management model for the Central Cariri.
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="Regional management model not developed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="Regional management model operational">

</target>
<actual value="Consultative Committee established, with irregular meetings.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
UGP remaining adequately staffed
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of actions from the Integrated Sustainable Tourism Development Plan specified in the Annual Budget Law of the State or Municipalities
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2014-12-31" />
<target value="30%">

</target>
<actual value="0%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% increase in number of tourists that visit Cariri Central per month/year
</narrative></title>
<baseline year="2010" iso-date="2010-02-28" value="1,173,342"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-02-28" />
<period-end iso-date="2016-11-30" />
<target value="+20%">

</target>
<actual value="16.3%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of Sao Jose Seminary area improvement
</narrative></title>
<baseline year="2009" iso-date="2009-02-24" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-02-24" />
<period-end iso-date="2016-11-30" />
<target value="100%">

</target>
<actual value="94%">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P099469</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second National Environmental Project - Phase II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to contribute to strengthening environmental capacity in key Brazilian institutions.  This would be accomplished by enhancing the environmental management capacity of institutions at the Federal, State, Federal District and Municipal levels and by demonstrating the effectiveness of targeted subprojects focused on defined priorities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Second National Environmental Project (Second Phase) is to contribute to strengthening environmental capacity in key Brazilian institutions. This will be accomplished by enhancing the environmental management capacity of institutions at the federal, state, federal district, and municipal levels and by demonstrating the effectiveness of targeted subprojects focused on defined priorities. There are three components to the project, the first component being institutional development. This component has evolved from first phase. Given the growing challenges for environmental licensing at the federal, state, federal district and municipal levels, and growing demands for investments and infrastructure, environmental licensing has become an urgent and sometimes contentious issue for Ministry of Environment (MMA) to address and improve. In second phase, strengthening the capacity for environmental licensing at the federal, state and federal district levels will have greater emphasis. The second component is the integrated management of environmental assets. The principle behind the Environmental Assets (EA) component is to provide an incentive to, federal agencies, states and the federal district, through project partners to identify rank and address some of their most pressing environmental challenges, and provide support for adoption of integrated management sustainable practices. Finally, the third component is the coordination, dialogue, and communication. This component includes a small communications unit that will develop and implement a strategy to disseminate lessons learned from current and past project activities and help to build support and understanding for environmental programs among various stakeholder groups.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001276"><narrative>Ministry of Environment</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001275"><narrative>Ministry of Environment</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-01-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-09-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Christophe de Gouvello</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cdegouvello@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Estado do Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="15" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="9" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="76" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="45" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="33" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="17" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="17" xml:lang="en"><narrative>Water Resource Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">593333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">593333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">593333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">606666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">606666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">606666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">366666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">366666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">410000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">593333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">593333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">593333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">560000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">560000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">560000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">606666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">606666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">606666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">366666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">366666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">366666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">20566103.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">20566103.66</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">24300000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-20353351</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-175688</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-37064</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">60750</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">951660</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">1350000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1293229</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-208989</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-175688</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-37064</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">-60750</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-94</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-244</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-2750</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-2419</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-4426</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-5131</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-4435</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-3613</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-3135</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-2998</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-7090</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-9862</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-18222</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-21976</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-27148</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-28331</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-33052</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-44514</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-49770</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-40100</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-32532</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-10324</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-7745</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-6612</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-8392</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-42274</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-65711</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-71422</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-72781</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-67764</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-56406</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-53748</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-45232</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-30248</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-57788</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-84687</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-84687</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-84687</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-80046</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-75214</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1275"><narrative>Ministry of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099469"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P099469?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P099469"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States identify or update key environmental priorities.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States (and IBAMA) produce set of manuals, procedures and technical standards for the three most important productive typologies.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity for environmental management at federal, state, Federal District and municipal levels.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="Proposal for capacity building activities were prepared">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States and IBAMA have fully functional environmental licensing systems incorporating: (i) post-licensing monitoring; (ii) on site monitoring of productive activities; and (iii) computerized licensing
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States establish a working council for water resources.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States reduce the average time for issuance of preliminary licenses for the three most important typologies by at least 30%.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States develop and implement economic instruments through partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement an integrated solid waste management plan.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="8.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement an integrated solid waste management plan.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement and complete environmental assets (EA) partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="12.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States identify or update key environmental priorities.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States establish a working council for water resources.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement Environmental Licensing systems partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="23.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement (or strengthen) and operate Environmental Monitoring System partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States and IBAMA have fully functional environmental licensing systems incorporating: (i) post-licensing monitoring; (ii) on site monitoring of productive activities; and (iii) computerized licensing
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement an integrated solid waste management plan.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement and complete environmental assets (EA) partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement Environmental Licensing systems partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="23.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement (or strengthen) and operate Environmental Monitoring System partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental policy reforms among states participating in the program.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="No progress made">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States approve forestry legislation.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="18.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States have met eligibility criteria.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States and IBAMA have fully functional environmental licensing systems incorporating: (i) post-licensing monitoring; (ii) on site monitoring of productive activities; and (iii) computerized licensing
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement and complete environmental assets (EA) partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement (or strengthen) and operate Environmental Monitoring System partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental policy reforms among states participating in the program.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States (and IBAMA) produce set of manuals, procedures and technical standards for the three most important productive typologies.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement Environmental Licensing systems partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="23.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States (and IBAMA) produce set of manuals, procedures and technical standards for the three most important productive typologies.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="3.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States monitor EA partnerships performance, measure changes in environmental quality and disseminate results.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities engaged in Environmental Licensing fully capable with necessary institutional arrangements, equipment, computerized systems and trained staff.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States and IBAMA have fully functional environmental licensing systems incorporating: (i) post-licensing monitoring; (ii) on site monitoring of productive activities; and (iii) computerized licensing
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States have met eligibility criteria.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="15.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental policy reforms among states participating in the program.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement (or strengthen) and operate Environmental Monitoring System partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States identify or update key environmental priorities.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement and complete environmental assets (EA) partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States monitor EA partnerships performance, measure changes in environmental quality and disseminate results.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States identify or update key environmental priorities.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity for environmental management at federal, state, Federal District and municipal levels.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="Proposal for capacity building activities were prepared">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States establish a working council for water resources.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity for environmental management at federal, state, Federal District and municipal levels.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="Proposal for capacity building activities were prepared">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Environmental policy reforms among states participating in the program.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="No progress made">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States reduce the average time for issuance of preliminary licenses for the three most important typologies by at least 30%.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States reduce the average time for issuance of preliminary licenses for the three most important typologies by at least 30%.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States develop and implement economic instruments through partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States develop and implement economic instruments through partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States have met eligibility criteria.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement Environmental Licensing systems partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="23.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States monitor EA partnerships performance, measure changes in environmental quality and disseminate results.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States approve forestry legislation.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="18.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States approve forestry legislation.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="18.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased capacity for environmental management at federal, state, Federal District and municipal levels.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="Baseline study is being contracted by the Project."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="After baseline information is available, a target will be established">

</target>
<actual value="Proposal for capacity building activities were prepared">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities engaged in Environmental Licensing fully capable with necessary institutional arrangements, equipment, computerized systems and trained staff.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities engaged in Environmental Licensing fully capable with necessary institutional arrangements, equipment, computerized systems and trained staff.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities engaged in Environmental Licensing fully capable with necessary institutional arrangements, equipment, computerized systems and trained staff.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States approve forestry legislation.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="18.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States (and IBAMA) produce set of manuals, procedures and technical standards for the three most important productive typologies.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="10.00">

</target>
<actual value="3.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States have met eligibility criteria.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States reduce the average time for issuance of preliminary licenses for the three most important typologies by at least 30%.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States establish a working council for water resources.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States implement an integrated solid waste management plan.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="8.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States monitor EA partnerships performance, measure changes in environmental quality and disseminate results.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2016-06-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States develop and implement economic instruments through partnerships.
</narrative></title>
<baseline year="2009" iso-date="2009-09-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-09-22" />
<period-end iso-date="2015-09-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P101324</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Minas Gerais Partnership II SWAP</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(i) To help the State of Minas Gerais improve the efficiency and effectiveness of public resource use and allocation for economic and social development; (ii) to support the adoption of innovations in public management by the State; and (iii) to support the State in strengthening its results-based management system of monitoring and evaluation of results.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Minas Gerais Partnership (SWAP) Project for Brazil will support the Government of Minas Gerais in its efforts to implement the 'State for Results' program in order to improve quality and efficiency in the delivery of public goods and services, reinforcing the fiscal and macroeconomic advances made through previous reforms, with the overall objective of promoting economic growth and poverty reduction. The project are the two components: (i) the SWAP component that will disburse against Eligible Expenditure Programs (EEP) in five sectors; and (ii) a technical assistance component to support the operation objectives in the five priority sectors. The technical assistance (TA) component will disburse as in a traditional operation against Statements of Expenditures (SOEs). The EEPs to be supported by the project account for about 10 percent of total Government expenditure in 2008 (13 percent if constitutionally mandated transfers and debt payments are not considered) and Bank financing will support about 20 percent of EEP expenditures each year. The sectors to be supported through the Minas Gerais Development Partnership II (MGDP II) are those with significant impact on the enabling environment for public service delivery (public sector, private sector development) or are sectors that have considerable expenditure programs in which improvements in efficiency of resource use and allocation, innovation in public management and improved monitoring and evaluation (M&amp;E) can provide substantial gains (health, education, transport). Each of these sectors is a high priority for the Government. The Government is also keen to strengthen its approach to monitoring and evaluation of the State for Result Program. Through non-lending TA and through the loan, the Bank will support the development of: i) a household survey in order to provide information on outcomes at the household level to the Government; ii) quality assurance surveys as a means of verifying that the delivery of results in key areas is actually improving; iii) a series of impact evaluations in education, health and transport in order to assess results and provide feedback into the current program; and iv) guidance to the Government's team on revising indicators in line with the results of monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001436"><narrative>Goverment of minas Gerais</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-09-04"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-05-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Roland N. Clarke</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rclarke@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Estado de Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470127" />
            <name><narrative>Belo Horizonte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.92083 -43.937778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11220" percentage="14" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="71" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="1" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="12" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="3" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="13" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="3" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="3" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000115" percentage="3" xml:lang="en"><narrative>Subnational Fiscal Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="3" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="3" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="13" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="24" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000135" percentage="3" xml:lang="en"><narrative>Migration, Remittances and Diaspora Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="3" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000243" percentage="24" xml:lang="en"><narrative>MSME Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="3" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000223" percentage="3" xml:lang="en"><narrative>Youth Employment</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">45041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">45041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">45041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">45041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">45041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">25500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">10791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">10791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">10791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">10791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">10791666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">45041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">45041666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">45041666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">25500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">976000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">461000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-1437500</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1119873</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">2440000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">195000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">150500000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">156000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">234000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">659269</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">983879</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">106375000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">1004881</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">1138898</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">130232500</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">1542462</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">111693899</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">238767500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">960130</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">444177</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">652420</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">90562500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">477884</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">634897</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">907621</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">857838</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">2185000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">719674</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">570140</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">156250</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">551617</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">1215607</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">512319</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">127031</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">315980</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">629507</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">57551</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-433803</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">-2440000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">-4700513</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-5224050</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-2403402</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">-1152500</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-2127420</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-1940840</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-2397252</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-2847860</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-2403145</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-3315859</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-3141950</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-4204516</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-3838114</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-3997300</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-3191440</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-3499824</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-2421100</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-3304127</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-2020008</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-3241447</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-1832789</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-51</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-3188598</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-1785962</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-3405869</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-2182557</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-3694117</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-2644204</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-4603795</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-4306729</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-5201134</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-5768780</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-5577056</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-6267320</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-5428960</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-6669258</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-7198315</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-10401286</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-52</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-7473444</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-10716252</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-7658851</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-10473831</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-6141137</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-7718089</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-3495343</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-4728515</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2487216</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1071051</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2296940</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-941044</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2126967</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-705645</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3820627</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-5237862</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-8170110</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-14430560</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-10055487</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-16378189</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-10813185</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-17208416</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-10630997</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-16627219</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-9022811</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-13524687</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-8456276</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-12787827</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-7457756</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-10787108</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-20759552</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-20774530</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-9788629</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-52</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-9788681</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-20764879</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1435"><narrative>State Secretariat of Planning and Management (Secretaria de Estado do Planejamento e Gestão -SEPLAG)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101324"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P101324?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101324"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of students registered in state schools with expected reading level in the 3rd year of elementary school
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="65%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="78-80%">

</target>
<actual value="">
<comment><narrative>
Target met. Data for 2012 yet to be published.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Support systems of monitoring and evaluation
</narrative></title>
<baseline year="2008" iso-date="2008-09-30" value="Incipient monitoring and evaluation systems."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-09-30" />
<period-end iso-date="2011-12-31" />
<target value="Report discussing the use of the evidence provided by the impact evaluations in the elaboration of the 2012-2015 PPA.">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of new highway PPPs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="Expression of Interest Notices published for 5 additional highways lots">

</target>
<actual value="">
<comment><narrative>
Target already achieved. This indicator continues to measure other PPPs. Currently there are i) Highway MG-050, Soccer Stadium,Prison Complex and the UAI (Unidade de Atendimento Integrado)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registration in the Vocational Education Program (PEP)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative>This indicator was added to the ISR in early 2013, but has been monitored before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="25000.00">

</target>
<actual value="42626.00">
<comment><narrative>
This indicator was achieved in 2009.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time (in days) to start a business at Minas Facil in Belo Horizonte (one-stop shop)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="26 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="9 days">

</target>
<actual value="">
<comment><narrative>
Target met, but indicator is continued to be tracked. The time to start a business in BH is 6 days and in the rural areas it is 8days.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve poverty monitoring: completion of PAD-MG in 2009.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Analytical report on poverty in the &quot;Great North&quot; region completed.">

</target>
<actual value="">
<comment><narrative>
Target achieved and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Impact evaluation for the Vida Vida Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No impact evaluation system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Methodology for using DATASUS panel data with monitoring indicators for continued impact evaluation process developed and tested">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of hospitals of PROHOSP program formally assessed for accreditation by the National Accreditation Organization
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0% (123 hospitals in 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="75%">

</target>
<actual value="">
<comment><narrative>
Target met. Since 2011, 7 additional hospitals have been accredited in 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of municipalities in the state with paved access
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="83%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="96%">

</target>
<actual value="">
<comment><narrative>
Target achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expenditure on strategic projects as a share of total expenditure
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="8.35% (Despesa Empenhada) 6.97% (Despesa Liquidada)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="-">

</target>
<actual value="17,08%">
<comment><narrative>
Last established target was 9.5% for 2010.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost per Student Informational System (SICA) implemented and cost data posted on the web
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="System exists with information updated once a year."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Regular reports and analysis produced on evolution of costs per student.">

</target>
<actual value="">
<comment><narrative>
Achieved in previous year and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Interdisciplinary teams of indigenous health
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of live births from mothers with 7 or more pre-natal consultations
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="46.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="48.00">

</target>
<actual value="65.10">
<comment><narrative>
Data for 2010: 57.8%, 2009: 51.2%; 2008: 49.8%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Support systems of monitoring and evaluation
</narrative></title>
<baseline year="2008" iso-date="2008-09-30" value="Incipient monitoring and evaluation systems."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-09-30" />
<period-end iso-date="2011-12-31" />
<target value="Report discussing the use of the evidence provided by the impact evaluations in the elaboration of the 2012-2015 PPA.">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
percent of state paved roads network under results-based maintenance and rehabilitation contracts
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="11%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="42%">

</target>
<actual value="">
<comment><narrative>
Target not achieved and indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of results agreements (RAs considered for this indicator: SEF, SEPLAG, SEMAD, SECTES, SEE and SES)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4 RAs with results over 70 percent satisfactory."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="7 RAs with results over 70 percent.">

</target>
<actual value="6 RAs">
<comment><narrative>
SETOP and SEDVAN have been added to this indicator.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of live births from mothers with 7 or more pre-natal consultations
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="46.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="48.00">

</target>
<actual value="66.90">
<comment><narrative>
This is 2013 data. Data for 2012: 65.10; 2010: 57.8%, 2009: 51.2%; 2008: 49.8%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
percent of state paved roads network under results-based maintenance and rehabilitation contracts
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="11%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="42%">

</target>
<actual value="31.36">
<comment><narrative>
Target not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of live births from mothers with 7 or more pre-natal consultations
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="46.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="48.00">

</target>
<actual value="65.10">
<comment><narrative>
Data for 2010: 57.8%, 2009: 51.2%; 2008: 49.8%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of eletronic speed control equipments in operation
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="16 (2009)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90">

</target>
<actual value="240">
<comment><narrative>
Target already met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of cost data in hospitals with time series that indicate trends in costs at organizational level (hospital level) and at the departmental level
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No cost system in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Cost system developed and piloted in two hospitals.">

</target>
<actual value="Cost system developed.">
<comment><narrative>
Target achieved and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary schools in the Great North offering computer maintenance courses
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="59.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Gross operating Balance
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="11.00"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="14.00">

</target>
<actual value="7.91">
<comment><narrative>
The target for 2010 was 13% and the actual 14.95%; the Operation balance for 2011 was 13.12;
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified teachers in the Curso de Magisterio Indigena
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="137"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="212">

</target>
<actual value="">
<comment><narrative>
Target already achieved and indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new students enrolled in PEP courses in secondary vocational schools (non-cumulative)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="30000.00">

</target>
<actual value="30073.00">
<comment><narrative>
The target was achieved in 2010; in 2013, 30.073 new students were enrolled.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of personnel expenditure as a share of net current revenues of the MG government.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="59.43%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Consistent with PAF (60 percent or under)">

</target>
<actual value="65.1%">
<comment><narrative>
This DLI was not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Primary surplus
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="R$ 1,704 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Targets described in PAF for the 2010 fiscal year">

</target>
<actual value="">
<comment><narrative>
Target met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of new highway PPPs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="Expression of Interest Notices published for 5 additional highways lots">

</target>
<actual value="">
<comment><narrative>
Target already achieved. This indicator continues to measure other PPPs. Currently there are i) Highway MG-050, Soccer Stadium,Prison Complex and the UAI (Unidade de Atendimento Integrado)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intensive Monitoring of the Rural Poverty Reduxction Project
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of hospitals of PROHOSP program formally assessed for accreditation by the National Accreditation Organization
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0% (123 hospitals in 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="75%">

</target>
<actual value="">
<comment><narrative>
Target met. Since 2011, 7 additional hospitals have been accredited in 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Investment expenditure as a share of net current revenue
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.99%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="9.47%">

</target>
<actual value="">
<comment><narrative>
No data yet available for 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Primary surplus
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="R$ 1,704 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Targets described in PAF for the 2010 fiscal year">

</target>
<actual value="">
<comment><narrative>
Target met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve poverty monitoring: completion of PAD-MG in 2009.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Analytical report on poverty in the &quot;Great North&quot; region completed.">

</target>
<actual value="">
<comment><narrative>
Target achieved and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of hospitals of PROHOSP program formally assessed for accreditation by the National Accreditation Organization
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0% (123 hospitals in 2007)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="75%">

</target>
<actual value="">
<comment><narrative>
Target met. In 2013, six additional hospitals have been accredited.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time (in days) to start a business at Minas Facil in Belo Horizonte (one-stop shop)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="26 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="9 days">

</target>
<actual value="">
<comment><narrative>
Target met, but indicator is continued to be tracked. The time to start a business in BH is 6 days and in the rural areas it is 8days.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No system of electronic invoicing, management of civil contracts fragmented."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI, and in use">

</target>
<actual value="">
<comment><narrative>
Target achieved, indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expenditure on strategic projects as a share of total expenditure
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="8.35% (Despesa Empenhada) 6.97% (Despesa Liquidada)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="-">

</target>
<actual value="">
<comment><narrative>
Last established target was 9.5% for 2010.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Output-Outcome Reports
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="Strategic projoects under implementation and ongoing monitoring of output and outcome indicators"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="A report outlining the Government's priorities, strategies and performance indicators is prepared">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Technological Innovation Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="15">

</target>
<actual value="">
<comment><narrative>
Target was met, but indicator is continued to be measured. In 2013, two new Technological Innovation Centers have been established((i) Instituto Federal de Educao Cincia e Tecnologia de Minas Gerais  IFMG; (ii) Instituto Federal de Educao Cincia eTecnologia do Sudeste de Minas Gerais (NITTEC - Juiz de Fora)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Total Number of Test Items (cumulative) / (ii) Participation rate total number of schools that apply the test for the 9th gradeclassrooms in five subjects) (cumulative)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="(i) 24,633 (2008) / (ii) 500 State secondary schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2011-12-31" />
<target value="(i) 35,000 / (ii) 1000 State secondary schools">

</target>
<actual value="">
<comment><narrative>
Target already achieved in 2010, but indicator is continued to be measured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of 2nd stage Results Agreements
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="120 of these 12 agreements evaluated by March 31, 2009"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2011-04-30" />
<target value="At least 11 of these agreemnts evaluated fro compliance with 2010 targets by April 30, 2011">

</target>
<actual value="">
<comment><narrative>
The contracts are currently being evaluated and results will be available mid 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Interdisciplinary teams of indigenous health
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Output-Outcome Reports
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="Strategic projoects under implementation and ongoing monitoring of output and outcome indicators"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="A report outlining the Government's priorities, strategies and performance indicators is prepared">

</target>
<actual value="">
<comment><narrative>
No data for 2013 is available.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefited by the Rural Poverty Reduction Program starting in 2010
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16800.00">

</target>
<actual value="30100.00">
<comment><narrative>
Revised data - target already met, but indicator continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Support systems of monitoring and evaluation
</narrative></title>
<baseline year="2008" iso-date="2008-09-30" value="Incipient monitoring and evaluation systems."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-09-30" />
<period-end iso-date="2011-12-31" />
<target value="Report discussing the use of the evidence provided by the impact evaluations in the elaboration of the 2012-2015 PPA.">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average time for the concession of environmental licenses for activities with environmental impact in the state for classes 3 and 4
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="180 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90 days">

</target>
<actual value="58.94">
<comment><narrative>
Target already achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of personnel expenditure as a share of net current revenues of the MG government.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="59.43%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Consistent with PAF (60 percent or under)">

</target>
<actual value="Not achieved.">
<comment><narrative>
This DLI will not be achieved and the associated funds will be canceled at project closure.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average percantage delay of Pro-Acesso paving works concluded in the current year
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="37.90"><comment><narrative>Measured in weighted average</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="20.00">

</target>
<actual value="11.77">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement system of measurement and feedback - standardized student assessments for Portuguese and Mathematics
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="PROALFA and PROEB conducted at classes of 3rd, 5th, 9th grade of elementary school and the 3rd grade of high school. Action Planin80% of the schools.">

</target>
<actual value="">
<comment><narrative>
Dropped with AF.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Gross operating Balance
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="11.00"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="14.00">

</target>
<actual value="12.54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average percantage delay of Pro-Acesso paving works concluded in the current year
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="37.90"><comment><narrative>Measured in weighted average</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Expenditure on strategic projects as a share of total expenditure
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="8.35% (Despesa Empenhada) 6.97% (Despesa Liquidada)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="9.5%">

</target>
<actual value="">
<comment><narrative>
Data available in early 2014
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Investment expenditure as a share of net current revenue
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.99%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="9.47%">

</target>
<actual value="">
<comment><narrative>
No data yet available for 2012
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of cost data in hospitals with time series that indicate trends in costs at organizational level (hospital level) and at the departmental level
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No cost system in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Cost system developed and piloted in two hospitals.">

</target>
<actual value="">
<comment><narrative>
Target achieved and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefited by the Rural Poverty Reduction Program starting in 2010
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16800.00">

</target>
<actual value="26800.00">
<comment><narrative>
Revised data - target already met, but indicator continued to be monitored
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement system of measurement and feedback - standardized student assessments for Portuguese and Mathematics
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="PROALFA and PROEB conducted at classes of 3rd, 5th, 9th grade of elementary school and the 3rd grade of high school. Action Planin80% of the schools.">

</target>
<actual value="">
<comment><narrative>
Dropped with AF.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Investment expenditure as a share of net current revenue
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.99%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="9.47%">

</target>
<actual value="">
<comment><narrative>
No data yet available.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average percantage delay of Pro-Acesso paving works concluded in the current year
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="37.90"><comment><narrative>Measured in weighted average</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="20.00">

</target>
<actual value="11.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost per Student Informational System (SICA) implemented and cost data posted on the web
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="System exists with information updated once a year."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Regular reports and analysis produced on evolution of costs per student.">

</target>
<actual value="">
<comment><narrative>
Achieved in previous year and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intensive Monitoring of the Rural Poverty Reduxction Project
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefited by the Rural Poverty Reduction Program starting in 2010
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16800.00">

</target>
<actual value="26800.00">
<comment><narrative>
Revised data - target already met, but indicator continued to be monitored
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of new highway PPPs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="Expression of Interest Notices published for 5 additional highways lots">

</target>
<actual value="Data for 2013 will be available in early 2014.">
<comment><narrative>
Target already achieved. This indicator continues to measure other PPPs. Currently there are i) Highway MG-050, Soccer Stadium,Prison Complex and the UAI (Unidade de Atendimento Integrado)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of students registered in state schools with expected reading level in the 3rd year of elementary school
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="65%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="78-80%">

</target>
<actual value="">
<comment><narrative>
Target met.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of results agreements (RAs considered for this indicator: SEF, SEPLAG, SEMAD, SECTES, SEE and SES)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4 RAs with results over 70 percent satisfactory."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="7 RAs with results over 70 percent.">

</target>
<actual value="">
<comment><narrative>
SETOP and SEDVAN have been added to this indicator.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Impact evaluation for the Vida Vida Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No impact evaluation system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Methodology for using DATASUS panel data with monitoring indicators for continued impact evaluation process developed and tested">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Primary surplus
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="R$ 1,704 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Targets described in PAF for the 2010 fiscal year">

</target>
<actual value="">
<comment><narrative>
Target met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified job categories and/or re-certification processes
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="-">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified job categories and/or re-certification processes
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="-">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Intensive Monitoring of the Rural Poverty Reduxction Project
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new students enrolled in PEP courses in secondary vocational schools (non-cumulative)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="30000.00">

</target>
<actual value="41564.00">
<comment><narrative>
The target was achieved in 2010 but indicators continues to be monitored
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of municipalities in the state with paved access
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="83%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="96%">

</target>
<actual value="98.6">
<comment><narrative>
Target achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average time for the concession of environmental licenses for activities with environmental impact in the state for classes 3 and 4
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="180 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90 days">

</target>
<actual value="">
<comment><narrative>
Target already achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of students registered in state schools with expected reading level in the 3rd year of elementary school
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="65%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="78-80%">

</target>
<actual value="87.3">
<comment><narrative>
Data for 2012. Data for 2013 to be published
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Share of personnel expenditure as a share of net current revenues of the MG government.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="59.43%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Consistent with PAF (60 percent or under)">

</target>
<actual value="">
<comment><narrative>
This DLI will not be achieved and the associated funds will be canceled at project closure.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Technological Innovation Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="15">

</target>
<actual value="">
<comment><narrative>
Target was met, but indicator is continued to be measured. Two new Technological Innovation Centers have been established (NITec UFVJM e and NIT CETEC)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary schools in the Great North offering computer maintenance courses
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="59.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="0.00">
<comment><narrative>
A Resoluo 20.17/2011 extinguiu o Projeto de Formao Inicial  para o Trabalho - FIT, que contemplava os cursos de formao profissional de montagem e manuteno de computadores.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement system of measurement and feedback - standardized student assessments for Portuguese and Mathematics
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2010-12-31" />
<target value="PROALFA and PROEB conducted at classes of 3rd, 5th, 9th grade of elementary school and the 3rd grade of high school. Action Planin80% of the schools.">

</target>
<actual value="">
<comment><narrative>
Dropped with AF.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of 2nd stage Results Agreements
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="120 of these 12 agreements evaluated by March 31, 2009"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2011-04-30" />
<target value="At least 11 of these agreemnts evaluated fro compliance with 2010 targets by April 30, 2011">

</target>
<actual value="">
<comment><narrative>
The contracts are currently being evaluated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified teachers in the Curso de Magisterio Indigena
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="137"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="212">

</target>
<actual value="">
<comment><narrative>
Target already achieved and indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new students enrolled in PEP courses in secondary vocational schools (non-cumulative)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="30000.00">

</target>
<actual value="41564.00">
<comment><narrative>
The target was achieved in 2010 but indicators continues to be monitored
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of eletronic speed control equipments in operation
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="16 (2009)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90">

</target>
<actual value="">
<comment><narrative>
Target already met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
percent of state paved roads network under results-based maintenance and rehabilitation contracts
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="11%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2010-12-31" />
<target value="42%">

</target>
<actual value="">
<comment><narrative>
Target not achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Interdisciplinary teams of indigenous health
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="16.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minas Facil physical units
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="21.00"><comment><narrative>This indicator was added to the ISR only in March 2013, but has been tracked before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="29.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Successful implementation of results agreements (RAs considered for this indicator: SEF, SEPLAG, SEMAD, SECTES, SEE and SES)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4 RAs with results over 70 percent satisfactory."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="7 RAs with results over 70 percent.">

</target>
<actual value="">
<comment><narrative>
Indicator data not yet available for 2013
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve poverty monitoring: completion of PAD-MG in 2009.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2011-12-31" />
<target value="Analytical report on poverty in the &quot;Great North&quot; region completed.">

</target>
<actual value="">
<comment><narrative>
Target achieved and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Secondary schools in the Great North offering computer maintenance courses
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="59.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Total Number of Test Items (cumulative) / (ii) Participation rate total number of schools that apply the test for the 9th gradeclassrooms in five subjects) (cumulative)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="(i) 24,633 (2008) / (ii) 500 State secondary schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2011-12-31" />
<target value="(i) 35,000 / (ii) 1000 State secondary schools">

</target>
<actual value="">
<comment><narrative>
Target already achieved in 2010, but indicator is continued to be measured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No system of electronic invoicing, management of civil contracts fragmented."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI, and in use">

</target>
<actual value="">
<comment><narrative>
Target achieved, indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of Technological Innovation Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="15">

</target>
<actual value="Data for 2013 will be available in early 2014.">
<comment><narrative>
Target was met, but indicator is continued to be measured. Two new Technological Innovation Centers have been established (NITec UFVJM e and NIT CETEC)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of 2nd stage Results Agreements
</narrative></title>
<baseline year="2009" iso-date="2009-03-31" value="120 of these 12 agreements evaluated by March 31, 2009"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-03-31" />
<period-end iso-date="2011-04-30" />
<target value="At least 11 of these agreements evaluated for compliance with 2010 targets by April 30, 2011">

</target>
<actual value="">
<comment><narrative>
The contracts are currently being evaluated.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minas Facil physical units
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="21.00"><comment><narrative>This indicator was added to the ISR only in March 2013, but has been tracked before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="29.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registration in the Vocational Education Program (PEP)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative>This indicator was added to the ISR in early 2013, but has been monitored before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="25000.00">

</target>
<actual value="42626.00">
<comment><narrative>
This indicator was achieved in 2009.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified teachers in the Curso de Magisterio Indigena
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="137"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="212">

</target>
<actual value="">
<comment><narrative>
Target already achieved and indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registration in the Vocational Education Program (PEP)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="0.00"><comment><narrative>This indicator was added to the ISR in early 2013, but has been monitored before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2009-12-31" />
<target value="25000.00">

</target>
<actual value="42626.00">
<comment><narrative>
This indicator was achieved in 2009.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average time for the concession of environmental licenses for activities with environmental impact in the state for classes 3 and 4
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="180 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90 days">

</target>
<actual value="">
<comment><narrative>
Target already achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Gross operating Balance
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="11.00"><comment><narrative>This indicator was added to the ISR in March 2013. Before it had been tracked but not reported through the ISR.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="14.00">

</target>
<actual value="12.54">
<comment><narrative>
The target for 2010 was 13% and the actual 14.95%; the Operation balance for 2011 was 13.12;
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Minas Facil physical units
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="21.00"><comment><narrative>This indicator was added to the ISR only in March 2013, but has been tracked before.</narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="29.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Time (in days) to start a business at Minas Facil in Belo Horizonte (one-stop shop)
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="26 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="9 days">

</target>
<actual value="7">
<comment><narrative>
Target met, but indicator is continued to be tracked. The time to start a business in MG in 2013 was 7.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of municipalities in the state with paved access
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="83%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="96%">

</target>
<actual value="Data for 2013 will be available in early 2014.">
<comment><narrative>
Target achieved but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Impact evaluation for the Vida Vida Centers
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No impact evaluation system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Methodology for using DATASUS panel data with monitoring indicators for continued impact evaluation process developed and tested">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Existence of cost data in hospitals with time series that indicate trends in costs at organizational level (hospital level) and at the departmental level
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No cost system in place."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Cost system developed and piloted in two hospitals.">

</target>
<actual value="">
<comment><narrative>
Target achieved and not longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of eletronic speed control equipments in operation
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="16 (2009)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="90">

</target>
<actual value="">
<comment><narrative>
Target already met but continued to be monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cost per Student Informational System (SICA) implemented and cost data posted on the web
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="System exists with information updated once a year."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="Regular reports and analysis produced on evolution of costs per student.">

</target>
<actual value="Regular reports and analysis produced.">
<comment><narrative>
Achieved in previous year and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="No system of electronic invoicing, management of civil contracts fragmented."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="System of management of civil construction contracts developed and implemented, integrated with SIAD and SIAFI, and in use">

</target>
<actual value="">
<comment><narrative>
Target achieved, indicator no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Output-Outcome Reports
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="Strategic projoects under implementation and ongoing monitoring of output and outcome indicators"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2011-12-31" />
<target value="A report outlining the Government's priorities, strategies and performance indicators is prepared">

</target>
<actual value="">
<comment><narrative>
No data for 2012 is available.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
(i) Total Number of Test Items (cumulative) / (ii) Participation rate total number of schools that apply the test for the 9th gradeclassrooms in five subjects) (cumulative)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="(i) 24,633 (2008) / (ii) 500 State secondary schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2011-12-31" />
<target value="(i) 35,000 / (ii) 1000 State secondary schools">

</target>
<actual value="">
<comment><narrative>
Target already achieved in 2010, but indicator is continued to be measured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of certified job categories and/or re-certification processes
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2011-12-31" />
<target value="-">

</target>
<actual value="">
<comment><narrative>
Target met and no longer monitored.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P101504</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Second Bolsa Familia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to strengthen the BF Program's ability to achieve its objective of reducing poverty and inequality and promoting human capital development by improving schooling and health status of children and reducing incidence of malnutrition among the poor population. The proposed operation would achieve this objective by supporting: (a) the strengthening of the program's overall governance through enhanced basic program management functions and accountability, oversight and control functions, in three axes: the registry of beneficiaries (Cadastro Unico), management of benefits, and monitoring of conditionalities; (b) the consolidation of the program?s monitoring and evaluation system; and (c) the strengthening of linkages between Bolsa Familia beneficiaries with complementary actions beyond the program to promote graduation from poverty; these activities would be carried out through the National Commitment for Social Development strategy in the MDS.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Second Bolsa Familia Adaptable Program Loan Project for Brazil seeks to strengthen the Bolsa Familia (BF) program's ability to achieve its objective of reducing poverty and inequality and promoting human capital development by improving schooling and health status of children and reducing incidence of malnutrition among the poor population. There are six components to the project, the first component being conditional cash transfers. The objective of this component is to co-finance the provision of grants (the BF grants) to mothers or other designated family members to enable their families to access health, education and other services as provided in the BF program and the Operational Manual. The second component is the strengthening Cadastro Unico as the main targeting instrument for social programs. The third component is the institutional strengthening for the consolidation of the Bolsa Familia Program. The fourth component is the consolidation of the monitoring and evaluation system in the Ministry of Social Development. This component will provide support, training, technical assistance, equipment and selected incremental operating costs to consolidate Ministry of Social Development (MDS) capacity to monitor and evaluate social programs at federal and sub-national level and to strengthen its capacity. The fifth component is the supporting the National Commitment for Social Development (CNDS). This component will provide support, training, selected incremental operating costs, and technical assistance to MDS to make operational the CNDS. Finally, the sixth component is the operational support to the project implementation unit at the MDS.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001457"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001458"><narrative>Ministry of Social and Agrarian Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-09-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Claudia Regina Baddini Curralero</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390290" />
            <name><narrative>Rio Grande do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.75 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393129" />
            <name><narrative>Pará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4 -53</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395443" />
            <name><narrative>Maranhão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407762" />
            <name><narrative>Amapá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1 -52</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5833302 -36.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447799" />
            <name><narrative>Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451138" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.035 -52.09861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Paraná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Distrito Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463930" />
            <name><narrative>Espirito Santo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20 -40.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662560" />
            <name><narrative>Roraima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 -61.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924825" />
            <name><narrative>Rondônia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 -63</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="7" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="93" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="93.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="1" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="1" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="1" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="1" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="98" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="1" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000441" percentage="1" xml:lang="en"><narrative>Data production, accessibility and use</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="27" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="71" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">682500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">227500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">8065833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">8065833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">8065833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">8065833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">8065833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">8031666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">8031666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">8031666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">8031666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">8031666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">173333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">173333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">173333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">173333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">173333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">101666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">101666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">101666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">101666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">101666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">682500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">227500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">8065833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">8065833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">8065833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">8065833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">8065833.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">8031666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">8031666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">8031666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">8031666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">8031666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">173333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">173333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">173333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">173333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">173333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">101666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">101666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">101666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">101666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">101666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">133333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">133333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">133333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3839185.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3839185.58</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-3839186</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">900000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">14201208</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">27961283</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">26728043</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">28095643</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">29375233</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">27864088</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">29395552</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">4478950</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">650000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">384000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">641000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">840767</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">55000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">86500</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">195663</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">610000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">540625</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">105000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">420000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">1006650</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">343300</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-217691</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-2763</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-165497</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-511998</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-680185</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-809368</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-768400</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-804671</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-927334</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1099729</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1402081</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1708717</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1904830</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2009148</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2812333</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3019362</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2776724</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2126274</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1100835</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-732134</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-702285</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-701901</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-2253803</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3754749</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4234126</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4282687</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4132566</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3400865</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3304638</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2786371</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-3860315</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-3860315</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-3861459</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-3867469</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-3880706</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-3895039</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-3927424</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3935423</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3930240</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1458"><narrative>Ministry of Social and Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101504"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P101504?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101504"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average decentralized management index (IGD) increased
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-12-29" />
<target value="0.84">

</target>
<actual value="0.85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Baseline data for Criana Feliz program has been collected
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2017-06-30" />
<target value="0.25">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agreements signed with the States in the context of the BSM program
</narrative></title>
<baseline year="2012" iso-date="2012-01-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-01-20" />
<period-end iso-date="2017-06-30" />
<target value="27.00">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
In-house DPI procurement and FM capacity strengthened (staff hired and trained)
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-07-28" />
<target value="6">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiary families
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="12000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2018-01-31" />
<target value="14001339.00">

</target>
<actual value="12900000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Bolsa Familia children of age 0-3 that received house visits as part of the early childhood development program Criana Feliz
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2017-11-30" />
<target value="104000.00">

</target>
<actual value="200000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiary children of primary school age (6-15 years old) whose school attendance is being monitored by the program.
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="88.07"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-11-30" />
<target value="94.91">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of State Governments using Cadastro nico for the selection of beneficiaries for their state social programs.
</narrative></title>
<baseline year="2011" iso-date="2011-01-10" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-10" />
<period-end iso-date="2017-12-29" />
<target value="24.00">

</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of updated records in Cadastro nico version 7.0 by December 2017
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-12-29" />
<target value="99.74">

</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of households in the first quintile receiving transfers from Bolsa Familia Program
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2016-12-30" />
<target value="68.10">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2009" iso-date="2009-11-30" value="46800000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-11-30" />
<period-end iso-date="2018-01-31" />
<target value="44878209.00">

</target>
<actual value="43086000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children aged 0-6 and pregnant women in beneficiary families complying with heath conditionalities
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-06-30" />
<target value="75.21">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of youth (16-17 years old) whose school attendance is being monitored by the program.
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="75.89"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-11-30" />
<target value="84.81">

</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Monitoring and Evaluation System of MDS consolidated
</narrative></title>
<baseline year="2011" iso-date="2011-11-23" value="System not consolidated"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-11-23" />
<period-end iso-date="2017-12-29" />
<target value="consolidated">

</target>
<actual value="Consolidated M&amp;E System">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of updated registries in the last two years in Cadastro nico
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="74.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2017-12-29" />
<target value="79.62">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of direct beneficiares of the Bolsa Familia cash transfer who are women
</narrative></title>
<baseline year="2014" iso-date="2014-12-01" value="92.41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-01" />
<period-end iso-date="2017-12-29" />
<target value="90.12">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P101508</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rio de Janeiro Sustainable Rural Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to increase the adoption of integrated and sustainable farming systems approaches in specific areasof the Borrower's territory and help re-establish an agricultural productive environment in areas of the Serrana Region affected bythe January 2011 natural disaster, thus contributing to the higher-order objective of increasing small-scale farming productivity and competitiveness in those areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Rio de Janeiro Sustainable Rural Development Project is to increase the adoption of integrated and sustainable farming systems approaches in specific areas of the Brazil?s territory, thus contributing to the higher-order objective of increasing small-scale farming productivity and competitiveness in those areas.  The Project will support three components: 1. The Support to Small Farmer Production and Competitiveness component will provide assistance to rural beneficiaries to operate changes in rural production processes within a framework of market-driven agricultural development focused on sustainable and increased productivity of small farmers, value added and market linkages through: a) pre-investment activities; and b) investment activities.  2. The Institutional Frameworks component will improve the Borrower?s institutional frameworks supporting market-driven agricultural development by: a) strengthening rural institutions and coordination mechanisms; b) improving public and private financial support mechanisms; and c) undertaking participatory research. 3. The Project Coordination and Information Management component will support: a) the Borrower?s overall project management and coordination, monitoring and evaluation, as well as; b) dissemination of key sustainable rural development information under the Project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001459"><narrative>State of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-06-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-09-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maurizio Guadagni</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mguadagni@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451189" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.25 -42.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319198" />
            <name><narrative>Nova Iguaçu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.68627 -43.50597</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322003" />
            <name><narrative>Araruama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.67317 -42.275169</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322008" />
            <name><narrative>Bom Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.178711 -42.335152</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322010" />
            <name><narrative>Cabo Frio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.71726 -42.04221</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322011" />
            <name><narrative>Cachoeiras de Macacu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.4874 -42.71146</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322013" />
            <name><narrative>Carapebus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.224291 -41.61306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322015" />
            <name><narrative>Campos dos Goytacazes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.677441 -41.45533</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322017" />
            <name><narrative>Casimiro de Abreu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.482531 -42.144299</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322018" />
            <name><narrative>Cordeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.080971 -42.317471</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322019" />
            <name><narrative>Duque de Caxias</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.656811 -43.292858</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322021" />
            <name><narrative>Guapimirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.58914 -42.9753</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322023" />
            <name><narrative>Itaborai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.756001 -42.873241</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322024" />
            <name><narrative>Itaguai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.854549 -43.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322031" />
            <name><narrative>MacaE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.308041 -42.01215</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322032" />
            <name><narrative>Macuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.987949 -42.259529</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322033" />
            <name><narrative>MagE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.634899 -43.12056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322034" />
            <name><narrative>Mangaratiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.977831 -44.006229</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322037" />
            <name><narrative>Miguel Pereira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5163 -43.45752</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322042" />
            <name><narrative>Nova Friburgo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.33322 -42.495602</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322043" />
            <name><narrative>Paracambi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.61932 -43.735199</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322046" />
            <name><narrative>Paty do Alferes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.40748 -43.413601</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322047" />
            <name><narrative>Petrópolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.382191 -43.159088</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322049" />
            <name><narrative>Pirai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.66699 -43.894951</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322052" />
            <name><narrative>Quatis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.362289 -44.23217</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322054" />
            <name><narrative>Quissamã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.095739 -41.391369</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322056" />
            <name><narrative>Rio Bonito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.7439 -42.61916</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322057" />
            <name><narrative>Rio Claro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.77976 -44.077209</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322058" />
            <name><narrative>Rio das Flores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.161039 -43.57579</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322059" />
            <name><narrative>Rio das Ostras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.45451 -41.949242</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322061" />
            <name><narrative>Santa Maria Madalena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.957911 -41.909031</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322063" />
            <name><narrative>São Francisco de Itabapoana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.38002 -41.149052</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322064" />
            <name><narrative>São FidElis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.71632 -41.789131</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322065" />
            <name><narrative>São Gonçalo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.81555 -43.041119</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322069" />
            <name><narrative>São JosE do Vale do Rio Preto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.17062 -42.916512</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322071" />
            <name><narrative>São Sebastião do Alto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.86591 -42.095852</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322072" />
            <name><narrative>Sapucaia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.04085 -42.813919</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322073" />
            <name><narrative>Saquarema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.87006 -42.56163</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322074" />
            <name><narrative>SeropEdica</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.73876 -43.708549</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322075" />
            <name><narrative>Silva Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.545481 -42.349991</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322076" />
            <name><narrative>Sumidouro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.13179 -42.66127</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322077" />
            <name><narrative>Tanguá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.79184 -42.71941</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322078" />
            <name><narrative>Teresópolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.31349 -42.874142</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322081" />
            <name><narrative>Valença</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.2402 -43.878429</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322083" />
            <name><narrative>Vassouras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.359949 -43.598091</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324204" />
            <name><narrative>Carmo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.89966 -42.537601</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324205" />
            <name><narrative>Duas Barras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.072809 -42.52467</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324330" />
            <name><narrative>Cantagalo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.8843 -42.322201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31110" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="83" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="77.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="34" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="17" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="17" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="17" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="17" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="50" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="17" xml:lang="en"><narrative>Landscape Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">641666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">641666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">641666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">641666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">641666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">83333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">83333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-09-30"/><value value-date="2009-09-30">39500000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-764404</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-40000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-9481778</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">259471</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">73229</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">-55425</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">98750</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">2812623</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4013809</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">1022436</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1726867</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">2653456</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">1702966</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">2557047</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">1202396</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1135497</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2007762</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2717540</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1926163</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">420911</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">926066</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1373758</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">1785219</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">3483714</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2294504</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">3818384</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">1723794</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1002273</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">501278</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1400768</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">954888</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">959011</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1762156</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">774788</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">2698662</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">834348</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">943566</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">3019475</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1703560</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">8319322</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">6976507</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">3389078</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">5244942</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">2096920</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">4410422</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">858193</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">-98750</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-4478</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-7948</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-15175</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-44432</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-70799</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-68515</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-58490</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-56668</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-1876</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-57632</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-14074</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-69857</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-34273</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-93965</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-47441</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-121790</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-92256</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-208483</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-134139</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-282869</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-144346</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-315181</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-204641</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-337140</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-469736</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-507741</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-789449</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-527216</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-860022</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-517687</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-683885</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-390774</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-588297</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-254529</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-257353</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-88865</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-225180</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-86523</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-217947</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-74127</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-328957</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-338577</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1169539</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-660589</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1383255</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-774724</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1547657</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-808240</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1538810</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-770185</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1412431</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-627554</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1269803</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-591352</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1221717</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-498609</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-2597</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-76569</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-76569</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-209022</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-369013</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-497750</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-550554</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-672683</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-345187</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-733169</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-506782</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-840465</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-506782</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-885801</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-506782</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-925345</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-996803</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-254191</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1018746</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1460"><narrative>State Secretariat of Agriculture, Livestock, Fisheries, and Supply (SEAPPA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101508"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P101508?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P101508"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Microcatchment Development Plans (MDP) formulated and negotiated
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="370.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries trained in key project concept
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 119%. At appraisal, the target was projected for 42,000 beneficiaries. In 2011 the indicator was revised to include 2,000 affected by the natural disaster. As well, a new sub-indicator was added: Number of women beneficiary trained in key project concept with a target of 7,800 women beneficiaries trained. The inclusion of this indicator shows the importance of the inclusion of gender in this project as key stakeholders of development and income generation in agricultural activities. At closing, 59,651 beneficiaries were trained in key project concept.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="59651.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participatory research projects carried out in support of sustainable rural development
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 150%. The intermediate results indicator was formulated since the 2009 PAD and no more updates were necessary. The original target was 50 and the final result showed that 75 participatory research projects were carried out under the RNS.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new MDC established or strengthened
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 101%. At appraisal, the original intermediate results indicator was drafted as number of new MDCs and RDCs established and existing MDCs, MUDCs and RDCs strengthened (Under component 1) with a target of 200 new MCDs and 50 existing MCDs. With the 2011 restructuring, the new target for MCD was adjusted to 152 and for existing MCDs 48. The 2012 restructuring revised the indicator as follows: number of MDCs, MuDCs and RDCs established and strengthened, adjusting the target of MDCs to 366. At closing, results showd that 370 new MDCs were established or strengthened.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="370.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of small farmers included in (or with improved links to) at least one value-chain
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="2018-11-30" />
<target value="2600.00">

</target>
<actual value="3359.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of agricultural lands under improved production systems (Hectares)
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="2017-09-01" />
<target value="160000.00">

</target>
<actual value="223152.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 119%. At appraisal, the intermediate results indicator was not considered or included. With the 2017 restructuring, the indicator was incorporated with a target of 6,000 and a final result of 7,127. However, it should be noted that at appraisal, a PDO outcome indicator was created as Length (km) of tertiary roads restored and maintained with a target of 1,300 km. With the 2012 resructuring, the indicator was moved as intermediate results indicator under component 1, and later dropped. According with the 2014 ISR 10, archived November 08th, 2014, the indicator reached 3,389 km of tertiary roads restored and maintained.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7127.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E system established and effectively collecting and analyzing relevant information
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="GEF M&amp;E system established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%. During YR1, M&amp;amp;E system established. YR2 to closing, M&amp;amp;E was effectively operating.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="M&amp;E system properly operating">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of small farmers transitioned towards more productive farming systems
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Comments: Exceeded 106%. At appraisal, the indicator aimed that at least 50% of small farmers in targeted areas transitioned towards more productive farming systems (those that result in sustainably better agro-forestry, crop or livestock quality and yields), with an estimated overall number of small farmers in project focal areas and a target of 37,000. During the 2011 restructuring, the estimated overall number of small-farmers in project focal areas was decreased to 28,000. At closing, the target was 35,000 and the project reached 37,172 small farmers that transitioned to more productive farming systems. Under this indicator, a sub-indicator was created: number of female small farmers transitioned towards more productive farming systems. - This sub-indicator was not considerd with the 2009 PAD and even thought at closing the target of 6,000 female small farmers transitioning to more productive farming systems was not reached, the project had 88% of success for this sub-indicator. With the inclusion of gender indicators, the project highlighted the importance of women in agricultural productive systems as well as key actors of development and income generators.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="37172.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of emergency investment proposals financed
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2016-11-30" />
<target value="2300.00">

</target>
<actual value="2277.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A strategy and action plan (ISP) formulated to strengthen rural institutions in the State of Rio de Janeiro
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cooperation arrangements established to implement joint activities
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 250%. The strategy was formulated since the 2009 PAD, minor wording adjustments were made and no more updates were necessary. The original target was and at closing, the result showed 10 cooperation arrangements established to implement joint activities.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Microcatchment Development Plans (MDP) formulated and negotiated
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 101%. At appraisal, the original intermediate results indicator was stated as Number of MDPs, MuDPs, and RDPs formulated (or updated) and negotiated with stakeholders across all levels (Under component 1). With the 2012 restructuring moved under component 2. With the 2017 restructuring, the wording in the indicator was revised and updated to number of MDP formulated and negotiated. The original target was 366 and at closing the result showed that 370 MDPs were formulated and negotiated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="370.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MIS established and operating
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="GEF MIS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="MIS effectively operating">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PIU structure functionning across all levels
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="Decree to restructure existing GEF PIU"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="PIU operating">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of cooperation arrangements established to implement joint activities
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of stakeholders participating in development committees across all levels
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="1000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="3870.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of small farmer investment proposals financed with the participation of the ESS
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 263%. The original target was stated as 60 and the final result showed that 158 small farmer investment proposals were financed with the participation of the ESS&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="158.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of emergency investment proposals financed
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Substantial achievement: 99%. Not an original intermediate results indicator. Was introduced as new indicator with the 2011 restructuring due to the natural disaster that occurred that year. The target proposed was 2,300 with a final result of 2,277 emergency investment proposals financed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2277.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of investment proposals (subprojects) financed
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 160%. The strategy was formulated since the 2009 PAD and minor wording updates were performed. The target was also maintained from the beginning of the project by 36,200. At closing, the result showed that 38,221 investment proposals (subprojects) were financed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="38221.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with project services
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded 106%. This is not an original intermediate results indicator. It was incorporated with the 2017 restructuring with a target of 75 and a final result of 79.2.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="79.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of stakeholders participating in development committees across all levels
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="1000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Substantial achievement: 96.75%. At appraisal, this intermediate results indicators was drafted as number of stakeholders participating in development committees across local, municipal and regional levels with a target of 4000. During the 2017 restructuring, the indicator was revised and reworded as number of stakeholders participating in development committees across all levels. At closing, the results reached were 3,870.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3870.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
All resources related to emergency operations disbursed one year after disaster (US$)
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="2016-11-30" />
<target value="14000000.00">

</target>
<actual value="14000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
All resources related to emergency operations disbursed one year after disaster (US$)
</narrative></title>
<baseline year="2011" iso-date="2011-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-02-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%. Not an original intermediate results indicator. This indicator was incorporated with the 2011 restructuring due to the 2011 natural disaster. The target was 14,000,000 and the result showed that 14,000,000 were reached.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participatory research projects carried out in support of sustainable rural development
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E system established and effectively collecting and analyzing relevant information
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="GEF M&amp;E system established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="M&amp;E system properly operating">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PIU structure functionning across all levels
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="Decree to restructure existing GEF PIU"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="PIU operating">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
No. of small farmers included in (or with improved links to) at least one value-chain
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Comments: Exceeded 129%. The original PDO outcome indicator at appraisal was Improved market access by at least 10% of beneficiaries receiving investment support as measured by their inclusion in (or with improved links to) at least one value chain, revised with the 2011 restructuring and reworded as number of small farmers included in (or with improved links to) at least one value chain. Since 2009, the original target was 2,600 and at closing, the result was 3,359.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3359.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with project services
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="92.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new MDC established or strengthened
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="370.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MIS established and operating
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="GEF MIS"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="MIS effectively operating">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
A strategy and action plan (ISP) formulated to strengthen rural institutions in the State of Rio de Janeiro
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%. The strategy was formulated since the 2009 PAD and no more updates were necessary.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of investment proposals (subprojects) financed
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="2018-11-30" />
<target value="36200.00">

</target>
<actual value="38221.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of agricultural lands under improved production systems (Hectares)
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Comments: Exceeded 139%. Since appraisal, the target was set at 160,000. At closing the result showed an amount of 223,152 hectares.&amp;nbsp; Data are extracted from the SAFF (Sistema de Acompanhamento F&amp;iacute;sico e Financeiro), the number of PIDs and the average area of the benefited properties.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="223152.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
An economic sustainability system established
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="0.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
An economic sustainability system established
</narrative></title>
<baseline year="2010" iso-date="2010-10-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-10-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved 100%. Not an original intermediate results indicator. It was considered in the 2011 restructuring paper with the ESS design in year 2 and the ESS established in year 3.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P104752</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Paraiba Second Rural Poverty Reduction</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The COOPERAR II project would support the efforts of the Government of Paraiba to reduce the incidence of rural poverty by: (a) improving access to small-scale socioeconomic infrastructure and services; (b) raising incomes and capital assets through investments in productive activities and facilitating linkages between small producers and national and international markets; and (c) strengthening the capacity of Municipal Councils (MC) and Community Associations (CA) to raise funding and harmonize policies and institutional arrangements for delivery of public investments intended to benefit the rural poor. COOPERAR II is a Repeater ooperation, using the highly participatory, community-driven development approach which was piloted and proven successful under the recently-completed COOPERAR I project.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Paraiba Second Rural Poverty Reduction Projects (COOPERAR II) will support the Government of Paraiba's efforts to reduce the incidence of rural poverty by: (a) improving access to small-scale socioeconomic infrastructure and services; (b) raising incomes and capital assets through investments in productive activities while facilitating linkages between small producers and national and international markets; and (c) strengthening the capacity of Municipal Councils (MCs) and Community Associations (CAs) to raise funding and harmonize policies and institutional arrangements for delivery of public investments intended to benefit the rural poor. There are three components to the project. The first component of the project is community subprojects. This component will support through matching grants to CAs the implementation of about 800 sub-projects for small-scale socioeconomic infrastructure and services and productive and market-oriented investments. These investments are intended to address both income and non-income dimensions of rural poverty in Paraiba, improving the livelihoods and wellbeing of about 175,000 people in 900 communities and 222 municipalities. The second component of the project is institutional development. This component is executed by the State Technical Unit (STU), the project will finance: (a) technical assistance and training to support the mobilization and strengthening of CAs in their role of identifying, preparing, operating and maintaining subproject investments; (b) capacity-building for MCs to manage responsibilities defined in the Project Operational Manual, including assessment and supervision of CAs, participatory planning, financial management of community subprojects, and environmental management of small-scale community subprojects; (c) training and technical assistance for the STU's Regional Management Units (RMUs); (d) workshops and seminars for MCs and CAs to exchange experiences in project implementation, and to explain/facilitate integration of other Federal and State programs for poverty reduction. The third and final component of the project is project administration, supervision, monitoring and evaluation. This component will finance operational costs of project administration, supervision, monitoring, and impact evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2007-06-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-11-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>David Enrique Tuchschneider Hoffmann</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Estado da Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15129" percentage="10" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="90" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="28" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="7" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="29" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="7" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="7" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="29" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">416666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">416666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104752"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P104752?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104752"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Precentage of associations with Quilombola, indigenous people, or women in leadership positions
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, the Project demonstrated the capacity of the Northeast CDD model to both include and empowerwomen, contrary to the view that women participate but have no power. At Closing, of 222 Councils, 34 (15%) had female Presidentsand 67 (30%) had female Secretaries. Of 3,360 associations, 625 (19%) had female Presidents and 2,352 (70%) had other femaleofficeholders."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="No target set, for monitoring purposes only">

</target>
<actual value="133 community associations with female presidents (33% of subprojects). Nine subprojects in Quilombola communtiies and threesubprojects in Indigenous communities.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ratio of resources leveraged from other programs
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR of previous project, community associations and Municipal Councils decided the allocation of 88% of project funds andleveraged complementary, parallel funds in a 5:1 ratio."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="1:5">

</target>
<actual value="">
<comment><narrative>
R$14.5 million have thus far been leveraged from the State's Poverty Reduction Fund (FUNCEP) and BNDES for application in projectsubprojects in the context of Local Productive Arrangements (APLs in Portuguese).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive subprojects with commercial arrangements
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="No target set, for monitoring purposes only">

</target>
<actual value="100%, including institutional markets (e.g., PNAE, PAA), supermarkets, and farmers' markets.">
<comment><narrative>
A confirmed commercial arrangement is a prerequisite for productive subproject financing.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Productive subprojects represent 20% of investments
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, productive subprojects accounted for 4% of total subprojects financed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="20% of total investments">

</target>
<actual value="32%">
<comment><narrative>
Small ruminants, agriculture and fish farming comprise 80% of these productive subprojects.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive subprojects generating employment
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, some 2/3 of productive subprojects showed a strategic orientation to markets, including nationaland international (e.g., honey production, integrated dairy plants, fine craft items, tractors/equipment, grains processing, fish farming and flower farming). Women were 37% of the beneficiaries of productive subprojects."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="75%">

</target>
<actual value="The data currently being assessed on th productive subprojects will indicate job creation.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-02-28" />
<target value="30,000.00">

</target>
<actual value="33,400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Precentage of associations with Quilombola, indigenous people, or women in leadership positions
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, the Project demonstrated the capacity of the Northeast CDD model to both include and empower women, contrary to the view that women participate but have no power. At Closing, of 222 Councils, 34 (15%) had female Presidents and 67 (30%) had female Secretaries. Of 3,360 associations, 625 (19%) had female Presidents and 2,352 (70%) had other female officeholders."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="No target set, for monitoring purposes only">

</target>
<actual value="133 community associations with female presidents (33% of subprojects). Nine subprojects in Quilombola communtiies and three subprojects in Indigenous communities.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families benefitted with at least one subproject
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, 154,000 rural families had received benefits through subproject implemented via their respectivecommunity associations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="21,000">

</target>
<actual value="24,600">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive subprojects with commercial arrangements
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="No target set, for monitoring purposes only">

</target>
<actual value="100%, including institutional markets (e.g., PNAE, PAA), supermarkets, and farmers' markets.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive subprojects generating employment
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, some 2/3 of productive subprojects showed a strategic orientation to markets, includingnationaland international (e.g., honey production, integrated dairy plants, fine craft items, tractors/equipment, grainsprocessing, fish farming and flower farming).  Women were 37% of the beneficiaries of productive subprojects."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="75%">

</target>
<actual value="The data currently being assessed on th productive subprojects will indicate job creation.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ratio of resources leveraged from other programs
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR of previous project, community associations and Municipal Councils decided the allocation of 88% of project funds and leveraged complementary, parallel funds in a 5:1 ratio."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="1:5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of community subprojects financed
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="500">
<comment><narrative>
Reduced from 800 to 500 during the March 2012 supervision.
</narrative></comment>
</target>
<actual value="440">
<comment><narrative>
Benefiting some 24,800 families with water supply, cisterns and income-generating opportunities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of community subprojects financed
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="500">

</target>
<actual value="440">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative>Per ICR of previous project, 247,000 people benefited from improved water sources.</narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-02-28" />
<target value="30000.00">
<comment><narrative>
It is expected that some 7,250 families would benefit from access to improved water sources by end of project.
</narrative></comment>
</target>
<actual value="33400.00">
<comment><narrative>
80% of the 444 subprojects approved to date are infrastructure, the vast majority of which are for improved water sources. Another20% of subprojects are creating income opportunities for rural community associations.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Productive subprojects represent 20% of investments
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="At ICR for the previous operation, productive subprojects accounted for 4% of total subprojects financed."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="20% of total investments">

</target>
<actual value="32%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Assets by beneficiaries increase by 20%
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="Baseline data on on producers will be collected prior to each round of proposals for productive subproject investments (year 1 and 2 of the project). This will form the foundation for treatment and control groups in the context of evaluating impact."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="20% over baseline">

</target>
<actual value="Data are now being assessed on productive subprojects that have completed the first year of implemention. Results will be includedin the Borrower Completion Report, as confirmed during the August 2013 supervision mission.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Assets by beneficiaries increase by 20%
</narrative></title>
<baseline year="2008" iso-date="2008-12-01" value="Baseline data on on producers will be collected prior to each round of proposals for productive subproject investments (year 1 and2 of the project). This will form the foundation for treatment and control groups in the context of evaluating impact."><comment><narrative>Of 102 subprojects financed to date, some 25% are productive in nature.</narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-01" />
<period-end iso-date="2014-02-28" />
<target value="20% over baseline">

</target>
<actual value="Data are now being assessed on productive subprojects that have completed the first year of implemention.  Results will beincludedin the Borrower Completion Report, as confirmed during the August 2013 supervision mission.">
<comment><narrative>
For productive subprojects, asset accumulation will be assessed one year following subproject implementation.  COOPERAR is usinganevaluation instrument based on Investment, Technology, Organization and Management indicators (I.T.O.G. in Portuguese) that willserve as a source for both baseline and follow-up data for assessing asset accumulation.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P104995</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Santos Municipality</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to enhance the management capacity of the Santos Municipal Government for local economic development and to improve public services in the Northwest Zone of the Municipality of Santos.  The key indicators of the project include: (i) initiation of a plan to address constraints to local economic development by 2011; (ii) provision of urban services to households in slum areas; and (iii) rehabilitation and improvement of the existing macro-drainage system in the Northwest Zone with sufficient capacity to handle 25-year flood levels.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Santos Municipality Project for Brazil is to enhance the Borrower's capacity in local economic development and to improve public services in the Northwest Zone of the Municipality of Santos. The first component of the project is municipal management enhancement. This component aims to strengthen the technical capacity of the Municipality of Santos in local economic development. It includes two subcomponents that will benefit all city residents. Cost includes physical and cost contingencies. The second component of the project is revitalization of the Northwest Zone of Santos and adjacent hillside. This component focuses on an integrated package of physical and social investments related to urban environmental improvements in the Northwest Zone of Santos, with direct benefits to the 90,000 residents of the Northwest Zone, including about 2,400 households that will benefit from better living conditions through urban upgrading and resettlement. This component includes two subcomponents. Cost includes physical and cost contingencies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001678"><narrative>Municipality of Santos</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001678"><narrative>Municipality of Santos</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001677"><narrative>Santos Novos Tempos UGP</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-11-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-11-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juliana Menezes Garrido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarrido@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449433" />
            <name><narrative> Santos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.960831 -46.333611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11330" percentage="18" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16040" percentage="18" xml:lang="en"/><sector vocabulary="1" code="16065" percentage="18" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="18" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="5" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="5" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="40" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="20" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="5" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="20" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="5" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="5" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="5" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="5" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="5" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="5" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000712" percentage="40" xml:lang="en"><narrative>Services and Housing for the Poor</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="5" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">20457688.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">20457688.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">44000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-21227361</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">249410</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2008</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-01-31"/><value value-date="2009-01-31">93715</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-03-31"/><value value-date="2009-03-31">24590</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">243158</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">158798</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="TF"><narrative>Trust Funds</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">110000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">2406305</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">2243033</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2450140</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">1803223</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">2233539</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">2137848</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2700513</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">3534037</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2912419</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1976089</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-383429</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-1241130</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-109948</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-110000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-7364</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-7718</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-27590</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-27186</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-20455</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-23555</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-35774</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-47841</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-65261</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-82205</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-122020</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-153299</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-174380</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-172044</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-255432</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-273227</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-283510</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-214832</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-92307</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-50309</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-43787</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-39444</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-116643</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-376529</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-412534</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-449183</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-440786</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-368649</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-343226</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-299350</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-450621</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-490933</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-490819</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-456483</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-453979</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1677"><narrative>Santos Novos Tempos UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104995"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P104995?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P104995"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in percent of families living in flood-prone areas
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="2400.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="0.00">

</target>
<actual value="696.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="7200.00">

</target>
<actual value="2907.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of a modern land use plan based on best practices for city-port integration
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="No land use plan for city-port integration exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Land use plan for city-port integration completed">

</target>
<actual value="Feasibility studies for development of an initiative of City-Port Revitalization concluded in May 2013.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of plan to improve macro-processing routines for land cadastre
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="No plan to improve macro-processing routines for land cadastre exists"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Plan to improve macro-processing routines for land cadastre completed">

</target>
<actual value="GIS system implemented and operational.

Decree approved; committee contingency plan and monitoring carried out.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Fiber Optic Network Built (km)
</narrative></title>
<baseline year="2009" iso-date="2009-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-15" />
<period-end iso-date="2015-06-30" />
<target value="23.50">

</target>
<actual value="23.58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commencement of implementation of plan to address constrains to local economic development by 2011;
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="No LED plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Strategy
prepared and
discussed with
stakeholders
and Master
Plan
adjustments
made.">

</target>
<actual value="The Metropolitan Plan, although not included in the PAD, has assisted the client in local economic development planning. TheProject was never restructured and therefore this indicator was not formally redefined.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="7200.00">

</target>
<actual value="2907.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in percent of area affected by recurrent flooding
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 2, 400 additional households receiving 24-hour water supply services
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="2400.00">

</target>
<actual value="784.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 2, 400 additional households with sewage connections
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="2400.00">

</target>
<actual value="784.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in number of households benefiting from improved flood infrastructure
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="100%">

</target>
<actual value="0
 [Phase I Macrodrainage works contracted and in progress for just one canal. If finalized, works will have limited results (onlywhen it rains and there is no sea level rise)]">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and installation of Infovia network in the Northwest Zone
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="No Invfovia network in Northwest Zone"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Infovia network installed in Northwest Zone">

</target>
<actual value="Infovia network installed in Northwest Zone">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Preparation of a regional economic development study
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="No regional economic development study"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Strategy
prepared and
discussed with
stakeholders">

</target>
<actual value="The Metropolitan Plan, although not included in the PAD, has assisted the client in local economic development planning. TheProject was never restructured and therefore this indicator was not formally redefined.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
At least 2,400 households in slum areas of the Northwest Zone are provided with a comprehensive package of municipal services (including water and sanitation, street paving, drainage, public lightning
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="Slums in Northwest Zone are not provided with regular urban services"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="2,400 additional households in Northwest Zone receive urban services">

</target>
<actual value="696 +88 =784 households resettled and receiving integrated infrastructure.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a macro-drainage system that will solve flooding problem in the Northwest Zone and that has sufficient capacity tohandle 25-year flood levels.
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="2 years flood"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2015-06-30" />
<target value="25 years flood">

</target>
<actual value="Phase I Macrodrainage works contracted and in progress for just one canal. If finalized, works will have limited results (only whenit rains and there is no sea level rise)">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106038</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR  Sao Paulo Trains and Signalling</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed development objective is to: a) improve the level-of-service provided to the urban rail transport users in the São Paulo Metropolitan Region in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos(CPTM) and Lines 1, 2 and 3 of the São Paulo Metro Company (Metro); and b) continuethe strengthening of the transport management and policy framework in  the SPMR.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sao Paulo Trains and Signaling Project for Brazil are to a) improve the level of service provided to the urban rail transport users in the Sao Paulo Metropolitan Region (SPMR) in a safe and cost-efficient manner by increasing the peak-hour and off-peak carrying capacity of Lines A and F of the Companhia Paulista de Trens Metropolitanos (CPTM) and Lines 1, 2, and 3 of the Sao Paulo Metro Company (Metro); and b) continue the strengthening of the transport management and policy framework in the SPMR. There are two components to the project. The first component is the infrastructure and equipment. This component plan to acquire (i) forty trains (Electrical Multiple Units -EMUs) of eight cars each and accessories for the CPTM; (ii) seventeen trains of 6 cars each and accessories for the Metro; (iii) signaling , telecom and electrical related equipment and associated infrastructure for the CPTM; (iv) signaling and telecom equipment and associated infrastructure for the metro. This component accounts for about 97 percent of the total project cost, of which the train acquisition alone represents about 75 percent of the total project cost. The second component is the institutional and policy development which consists of : (a) consolidation of the Regional Transport Coordination Commission (CDTI); (b) updating of the integrated transport policy, land use, and air quality management strategy Integrated Urban Transport Project (PITU) to meet both transport and air quality targets and introduce sound cost-recovery, tariff, regulatory and subsidy policies; (c) preparation of an action plan to review the funding of the urban transport system in view of the adoption of the Bilhete-Unico-Integrado (BUI); and (d) project management and supervision. This component represents about 3 percent of the total project cost.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001752"><narrative>Secretaria dos Transportes Metropolitanos do Estado de Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2007-12-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-05-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Bianca Bianchi Alves</narrative></person-name><telephone>+1-202-473-1000</telephone><email>bbianchialves@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="2" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="98" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="99.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="100" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="100" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">13300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">9200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">9200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">9200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">14400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">16416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">16416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">16416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">16416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">16416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">16416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">34566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">34566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">34566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">34566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">34566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">34566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">6018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">6018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">6018333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">6018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">6018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">6018333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2093333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2093333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2093333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">133333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">133333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">36666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">36666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">9200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">9200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">9200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">14400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">14400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">14400000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">34566666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">34566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">34566666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">550000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">112910000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">84507835</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-09-30"/><value value-date="2008-09-30">6258877</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">4594841</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">66773172</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">5141869</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">7664241</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">11966610</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">29675680</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">17426346</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">2142934</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">6805422</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">0</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-07-31"/><value value-date="2010-07-31">23787815</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">57978851</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">13895770</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">103038154</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">9604995</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">35390538</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">18501388</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">2451528</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1477069</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">18941188</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">23170919</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">43547</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">27312907</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">0</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">7817590</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">43650</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">4252514</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">0</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">4482295</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">4385003</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">0</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">2475918</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">747049</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">35036</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">51478933</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">7076091</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1563429</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">0</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">-1375000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-549281</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-2841008</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-3274787</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-3810737</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-4869644</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-282275</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-509</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-6421790</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-204843</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-8495659</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-236793</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-8494400</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-308970</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-8506418</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-344224</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-8590934</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-413310</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-8593084</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-460198</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-8372833</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-415729</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-8227567</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-443206</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-8107943</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-513912</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-8571721</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-617492</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-8301853</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-799951</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-8057667</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-1002761</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-7813480</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-1056578</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-7569294</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-1120258</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-7325107</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-1389696</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-7080921</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-1620023</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-6836735</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-1679443</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-6592548</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-1318548</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-6348362</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1118698</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-6104176</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-480144</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-5859989</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-411800</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-5615803</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-390347</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5371617</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-576801</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-5127430</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2009579</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-4883244</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-2321760</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4639058</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2535606</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4394871</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2460123</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4150685</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2201741</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3906498</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1927782</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3662312</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1805256</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3418126</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-12075302</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-12075302</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-12076450</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-12430685</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-12454470</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2258200</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-13969380</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1753"><narrative>Companhia Paulista de Trens Metropolitanos (CPTM)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-1754"><narrative>Metro Company of Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106038"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106038?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106038"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2. Trains per peak-hour/off peak for Lines 1, 2 and 3 of Metro
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Line 1= 33/24, Line 2=24/16, Line 3=35/21"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="Line 1= 41/26, Line 2= 28/18, Line 3= 44/28">

</target>
<actual value="Line 1= 30/25, Line 2= 25/18, Line 3= 35/30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of Metro systems
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-12-31" />
<target value="100">

</target>
<actual value="75%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of Metro trains
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2011-12-30" />
<target value="100">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Travel time+waiting time in CPTM Line 7 (formerly Line A) -  LUZ to Francisco Morato (39 km) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Lines 7 and 12= 80 min, Line 11= 83 (2008)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="57 min">

</target>
<actual value="Lines 7 and 12= 62 min, Line 11= 62 min">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of Metro systems
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-12-31" />
<target value="100">

</target>
<actual value="30%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
11. Working Ratio METRO (with compens. of free/discount. tickets but without subsidy to cover deficit)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="0.99">

</target>
<actual value="0.94">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Working Ratio CPTM (with compens. of free/discount. tickets but without subsidy to cover deficit)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="0.99">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
6. Passengers/square meter on METRO Lines 1,2 AND 3
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="6.00">

</target>
<actual value="Line 1 = 5.1, Line 2 = 4.6, Line 3 = 7.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4. Travel time+waiting time in Metro Lines 1, 2 and 3 - S to Penha (9.5km)
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="29 minutes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="14">

</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% OF COMPLETION OF CPTM TRAINS
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-12-31" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
10. Number of users/day of household with less than 4 minimum salaries in METRO LINES 1+2+3
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="908,500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="1,231,090">

</target>
<actual value="1,145,600">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Travel time+waiting time in CPTM Line 7 (formerly Line A) -  LUZ to Francisco Morato (39 km) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Lines 7 and 12= 80 min, Line 11= 83 (2008)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="57 min">

</target>
<actual value="Lines 7 and 12= 75 min, Line 11= 59 min">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4. Travel time+waiting time in Metro Lines 1, 2 and 3 - S to Penha (9.5km)
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="29 minutes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="14">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
6. Passengers/square meter on METRO Lines 1,2 AND 3
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="6.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
11. Working Ratio METRO (with compens. of free/discount. tickets but without subsidy to cover deficit)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="0.99">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
5. Passengers/square meter CPTM Lines 7 and 12 (formerly Lines A and F) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-08-07" value="Line 7= 8.0, Line 11= 8.3 (2008), Line 12= 8.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-08-07" />
<period-end iso-date="2015-06-30" />
<target value="6.00">

</target>
<actual value="Line 7= 6.8, Line 11= 7.3, Line 12= 6.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
7. Incremental Demand/Day in CPTM Lines 7 and 12 (formerly Lines A and F) and 11
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Lines 7 and 12= 219341, Line 11= 273828">

</target>
<actual value="Lines 7 and 12= 343000, Line 11= 299754">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Incremental Demand/Day in METRO (Lines 1,2 and 3)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="921320.00">

</target>
<actual value="690427.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of CPTM systems
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-06-30" />
<target value="100">

</target>
<actual value="56%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% OF COMPLETION OF CPTM TRAINS
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-12-31" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of Metro trains
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2011-12-30" />
<target value="100">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of STM studies
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-06-30" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1. Trains per peak-hour/off peak Lines 7, 11 and 12 (formerly Lines A, E and F) and 11 of CPTM
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Line 7= 7.5/4. Line 11= 8.5/5 (2008), Line 12=7.5/4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="15/8">

</target>
<actual value="Line 7= 10/5, Line 11= 15/7.5, Line 12= 10/6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2. Trains per peak-hour/off peak for Lines 1, 2 and 3 of Metro
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Line 1= 33/24, Line 2=24/16, Line 3=35/21"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="Line 1= 41/26, Line 2= 28/18, Line 3= 44/28">

</target>
<actual value="Line 1= 30/25, Line 2= 25/18, Line 3= 35/30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
7. Incremental Demand/Day in CPTM Lines 7 and 12 (formerly Lines A and F) and 11
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Lines 7 and 12= 219341, Line 11= 273828">

</target>
<actual value="Lines 7 and 12= 221000, Line 11= 285000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Number of users/day of household with less than 4 minimum salaries in CPTM Lines 7 and 12 (formerly Lines A and F) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="Lines 7 and 12= 237000, Line 11= N/A"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Lines 7 and 12= 356590, Line 11= 531000">

</target>
<actual value="Lines 7 and 12= 377000, Line 11= 632000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Incremental Demand/Day in METRO (Lines 1,2 and 3)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="921320.00">

</target>
<actual value="710572">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
5. Passengers/square meter CPTM Lines 7 and 12 (formerly Lines A and F) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-08-07" value="Line 7= 8.0, Line 11= 8.3 (2008), Line 12= 8.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-08-07" />
<period-end iso-date="2015-06-30" />
<target value="6.00">

</target>
<actual value="Line 7= 8, Line 11= 7.2, Line 12= 6.4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Working Ratio CPTM (with compens. of free/discount. tickets but without subsidy to cover deficit)
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="0.99">

</target>
<actual value="1.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Number of users/day of household with less than 4 minimum salaries in CPTM Lines 7 and 12 (formerly Lines A and F) and Line 11
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="Lines 7 and 12= 237000, Line 11= N/A"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2015-06-30" />
<target value="Lines 7 and 12= 356590, Line 11= 531000">

</target>
<actual value="Lines 7 and 12= 359000, Line 11= 618000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1. Trains per peak-hour/off peak Lines 7, 11 and 12 (formerly Lines A, E and F) and 11 of CPTM
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="Line 7= 7.5/4. Line 11= 8.5/5 (2008), Line 12=7.5/4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2015-06-30" />
<target value="15/8">

</target>
<actual value="Line 7= 10/5, Line 11= 15/7.5, Line 12= 10/6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of STM studies
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-06-30" />
<target value="100%">

</target>
<actual value="100%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
% of completion of CPTM systems
</narrative></title>
<baseline year="2007" iso-date="2007-12-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-30" />
<period-end iso-date="2014-06-30" />
<target value="100">

</target>
<actual value="80%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
10. Number of users/day of household with less than 4 minimum salaries in METRO LINES 1+2+3
</narrative></title>
<baseline year="2007" iso-date="2007-06-30" value="908,500"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-06-30" />
<period-end iso-date="2013-06-30" />
<target value="1,231,090">

</target>
<actual value="1,369,000">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106208</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>PE SWAP Pernambuco Educ Results&amp; Account. (PERA)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objectives are to: (a) improve the quality, efficiency and equity of public education in Pernambuco; and (b) introduce management reforms that will lead to greater efficiency in the use of the Government of the State of Pernambuco's (GOP) public resources in the education sector.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Pernambuco Education Results and Accountability (PERA) Project for Brazil are to: (a) improve the quality, efficiency, and equity of public education in Pernambuco; and (b) introduce management reforms that will lead to greater efficiency in the use of the Government of the State of Pernambuco's (GOP's) public resources in the education sector, all through the carrying out of interventions in State Secretariat of Planning and Management, State Secretariat of Education (SSE) and State Secretariat of Administration (SAD). There are two components to the project. The first component of the project is improvement of basic education. This component is comprised of four sub-components: (i) Basic Standards Program; (ii) Literacy Program; (iii) Overage Correction Program; and (iv) Monitoring and Evaluation (M&amp;E). The Basic Standards Program aims at improving state schools' infrastructure, equipment and teacher availability and quality. The Literacy Program includes activities to ensure that children leave Fundamental Education knowing how to read. The Overage Correction Program is aimed at correcting age-grade distortion. Finally, the M&amp;E sub-component will support activities to evaluate student performance and provide feedback to schools and parents. The second component of the project is Public Sector Management (PSM) interventions. This component will support GOP's efforts to modernize its public sector through two sub-components: (i) general PSM interventions; and (ii) education sector management interventions. The first sub-component will put in place critical cross-cutting instruments that will benefit PSM, in general. A second PSM sub-component will further strengthen education management through sector-specific technical assistance.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001771"><narrative>State Secretariat of Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-06-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-04-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Michael Drabble</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mdrabble@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Estado de Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11110" percentage="1" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="99" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="95.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="17" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="17" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="34" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="17" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="34" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="17" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="34" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="17" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="34" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="68" xml:lang="en"><narrative>Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">23796666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">23796666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">23796666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">7536666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">7536666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">7536666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">23796666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">23796666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">23796666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">7536666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">7536666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">7536666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1467974.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1467974.08</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-04-30"/><value value-date="2009-04-30">154000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1467974</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">56155182</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">2138643</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">28330479</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">10096058</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">9333057</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">4316407</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">6701477</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">24016602</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2784557</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">2512844</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">6110840</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">359773</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-323893</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">-385000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-93534</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-142728</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-157442</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-227340</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-321553</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-432685</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-393722</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-349960</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-316785</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-285033</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-292543</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-357496</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-417469</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-623659</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-794823</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-832977</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-834635</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-1174719</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1131614</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1024053</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-705230</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-416103</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-127455</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-106798</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-17470</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-7319265</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-7640696</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-7660699</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-7660699</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-7660699</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-7639107</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-30559795</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1771"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106208"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106208?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106208"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage illiterate students in the lower fundamental education (grades 1 to 4) in the State system certified as literate by the end of the school year. [DLI #3]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="18916.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="7000.00">

</target>
<actual value="8443.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. and implementation of action plan for strengthening of FM, satisfactory to WB, resulting from application of PEFA Framework. (Implement. of the State e-fisico project manag. module) [DLI #11]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. E-FISCO projectmanagement module chosen as proxy for the implementation of PEFA recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-03-31" />
<target value="Results of E-fisco consultancy are evaluated and disseminated">

</target>
<actual value="Results of E-fisco consultancy are evaluated and disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the secondary education in the State system that are certified as having completed the education cycle by the end of the school year. [DLI #6]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="12000.00">

</target>
<actual value="14544.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SAEPE assessment is applied at grades 2, 4 and 8 in all State schools, and applied in an increasing share in municipal schools. [DLI #7]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in at least 80% of municipal schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in at least 90% of municipal schools">

</target>
<actual value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in 100% of municipal schools applied in 2014 school year.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the Quality of Public Education in Pernambuco. Performance in Mathematics at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="175.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="204.00">

</target>
<actual value="199.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. and implementation of action plan for strengthening of FM, satisfactory to WB, resulting from application of PEFA Framework. (Implement. of the State e-fisico project manag. module) [DLI #11]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. E-FISCO projectmanagement module chosen as proxy for the implementation of PEFA recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Results of E-fisco consultancy are evaluated and disseminated">

</target>
<actual value="Results of E-fisco consultancy are evaluated and disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Developt. &amp; monitoring of implement. of strategic plan &amp; derived plans for education, satisfactory WB, identifying activities &amp; hierarchy of mangt. indicators to be incorporated into budget (DL1 #10)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Debate of INDG findings, development and agreement on a fully funded, time-bound Strategy and Action Plan. Launch of someactivities. Agreement on hierarchy of indicators."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading ofaction plan including funding; (3) presentation and publication of results in meetings with the Governments Management Committee.">

</target>
<actual value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading ofaction plan including funding; (3) presentation and publication of results in meetings with the Governments Management Committee.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the quality of public education in Pernambuco.  Performance in Portuguese at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="167.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="187.00">

</target>
<actual value="187.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dissemination of SAEPE information on school performance to parents. [DLI #8]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="No assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="Dissemination of SAEPE 2013 results to parents in all State schools and 90% of municipal-level schools">

</target>
<actual value="Dissemination of SAEPE 2013 results to parents in all State schools and 100% of municipal-level schools">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development &amp; monitoring of Action Plan of measures to improve teaching practices and impediments to learning State schools, satisfactory to WB, in response to results of student assessments (DLI #9)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="40% of schools with PDE including remedial measures under implementation and being monitored"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="80% of schools with PDE including remedial measures under implementation and being monitored">

</target>
<actual value="100% of schools with PDE including remedial measures under implementation and being monitored">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. &amp; implement. of action plan for strengthening procur. function, including its manag., E-procur. syst. &amp; procur. proceduresthrough the web, resulting from applict. OECD indicators [DLI#12]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. Statese-procurement system is chosen as proxy for the implementation of OECDs DAC recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">

</target>
<actual value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dissemination of SAEPE information on school performance to parents. [DLI #8]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="No assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="Dissemination of SAEPE 2013 results to parents in all State schools and 90% of municipal-level schools">

</target>
<actual value="Dissemination of SAEPE 2014 results to parents in all State schools and 100% of municipal-level schools">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Achieve greater efficency in the use of GOP's public resources in the education sector. Percentage of SEE's personnel delivering education services in schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="83.00">

</target>
<actual value="88.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Developt. &amp; monitoring of implement. of strategic plan &amp; derived plans for education, satisfactory WB, identifying activities &amp; hierarchy of mangt. indicators to be incorporated into budget (DL1 #10)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Debate of INDG findings, development and agreement on a fully funded, time-bound Strategy and Action Plan. Launch of someactivities. Agreement on hierarchy of indicators."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-03-31" />
<target value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading ofaction plan including funding; (3) presentation and publication of results in meetings with the Governments Management Committee.">

</target>
<actual value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading ofaction plan including funding; (3) presentation and publication of results in meetings with the Governments Management Committee.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the lower fundamental education in the State system (grades 1 to 4) that are certified as acceleratedor promoted by the end of the school year. [DLI #4]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="8039.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="4600.00">

</target>
<actual value="4994.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the equity of public education in Pernambuco. Number of State system schools meeting basic standards (DLI #1)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="221.00">

</target>
<actual value="221.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development &amp; monitoring of Action Plan of measures to improve teaching practices and impediments to learning State schools, satisfactory to WB, in response to results of student assessments (DLI #9)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="40% of schools with PDE including remedial measures under implementation and being monitored"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="80% of schools with PDE including remedial measures under implementation and being monitored">

</target>
<actual value="100% of schools with PDE including remedial measures under implementation and being monitored">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Achieve greater efficency in the use of GOP's public resources in the education sector. Percentage of SEE's personnel delivering education services in schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="83.00">

</target>
<actual value="88.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in High Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="21.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="19.90">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="9.61">

</target>
<actual value="11.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of students in the State system certified as literate at the end of the first cycle of basic education. [DLI #2]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="65.00">

</target>
<actual value="84.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in High Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="21.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="19.90">

</target>
<actual value="12.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the equity of public education in Pernambuco. Number of State system schools meeting basic standards (DLI #1)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="221.00">

</target>
<actual value="221.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="9.61">

</target>
<actual value="11.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the lower fundamental education in the State system (grades 1 to 4) that are certified as acceleratedor promoted by the end of the school year. [DLI #4]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="8039.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="4600.00">

</target>
<actual value="4994.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Achieve greater efficency in the use of GOP's public resources in the education sector. Percentage of SEE's personnel delivering education services in schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="83.00">

</target>
<actual value="88.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="9.61">

</target>
<actual value="11.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the equity of public education in Pernambuco. Number of State system schools meeting basic standards (DLI #1)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="221.00">

</target>
<actual value="221.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the secondary education in the State system that are certified as having completed the education cycle by the end of the school year. [DLI #6]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="12,000.00">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="14,544.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage illiterate students in the lower fundamental education (grades 1 to 4) in the State system certified as literate by the end of the school year. [DLI #3]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="18916.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="7000.00">

</target>
<actual value="8433.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SAEPE assessment is applied at grades 2, 4 and 8 in all State schools, and applied in an increasing share in municipal schools. [DLI #7]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in at least 80% of municipal schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in at least 90% of municipal schools">

</target>
<actual value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all Stateschools and in 100% of municipal schools applied in 2013 and on-going for 2014 school year.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the Quality of Public Education in Pernambuco. Performance in Mathematics at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="175.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="204.00">
<comment><narrative>
Results for state schools in 2014
</narrative></comment>
</target>
<actual value="198.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage illiterate students in the lower fundamental education (grades 1 to 4) in the State system certified as literate by the end of the school year. [DLI #3]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="18,916.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="7,000.00">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="8,443.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the later years of fundamental education in the State system (grades 5 to 8), that are certified as accelerated or promoted by the end of the school year. [DLI #5]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="6,000.00">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="5,687.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Developt. &amp; monitoring of implement. of strategic plan &amp; derived plans for education, satisfactory WB, identifying activities &amp; hierarchy of mangt. indicators to be incorporated into budget (DL1 #10)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Debate of INDG findings, development and agreement on a fully funded, time-bound Strategy and Action Plan. Launch of some activities. Agreement on hierarchy of indicators."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading of action plan including funding; (3) presentation and publication of results in meetings with the Government's Management Committee.">
<comment><narrative>
Component 2

Activity completed
</narrative></comment>
</target>
<actual value="(1) Formal written review of education progress, including the implementation of the Action Plan of the PPE; (2) upgrading of action plan including funding; (3) presentation and publication of results in meetings with the Government's Management Committee.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the Quality of Public Education in Pernambuco. Performance in Mathematics at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="175.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="204.00">

</target>
<actual value="198.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the later years of fundamental education in the State system (grades 5 to 8), that are certified as accelerated or promoted by the end of the school year. [DLI #5]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="6000.00">

</target>
<actual value="5687.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dissemination of SAEPE information on school performance to parents. [DLI #8]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="No assessment"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="Dissemination of SAEPE 2013 results to parents in all State schools and 90% of municipal-level schools">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="Dissemination of SAEPE 2014 results to parents in all State schools and 100% of municipal-level schools">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the quality of public education in Pernambuco.  Performance in Portuguese at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="167.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="187.00">
<comment><narrative>
Results for state schools in 2014
</narrative></comment>
</target>
<actual value="188.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the lower fundamental education in the State system (grades 1 to 4) that are certified as acceleratedor promoted by the end of the school year. [DLI #4]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="8,039.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="4,600.00">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="4,994.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SAEPE assessment is applied at grades 2, 4 and 8 in all State schools, and applied in an increasing share in municipal schools. [DLI #7]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all State schools and in at least 80% of municipal schools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all State schools and in at least 90% of municipal schools">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="SAEPE-application on all students of 2nd, 4th and 8th grades of Fundamental Education and 3rd of Secondary education in all State schools and in 100% of municipal schools applied in 2014 school year.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. &amp; implement. of action plan for strengthening procur. function, including its manag., E-procur. syst. &amp; procur. proceduresthrough the web, resulting from applict. OECD indicators [DLI#12]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. State's e-procurement system is chosen as proxy for the implementation of OECD's DAC recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">
<comment><narrative>
Component 2

Activity completed
</narrative></comment>
</target>
<actual value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the later years of fundamental education in the State system (grades 5 to 8), that are certified as accelerated or promoted by the end of the school year. [DLI #5]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="6000.00">

</target>
<actual value="5671.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the quality of public education in Pernambuco.  Performance in Portuguese at the end of Low Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="167.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="187.00">

</target>
<actual value="188.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the efficiency of public education in Pernambuco. Repetition rates in High Fundamental Education
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="21.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="19.90">

</target>
<actual value="12.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. &amp; implement. of action plan for strengthening procur. function, including its manag., E-procur. syst. &amp; procur. proceduresthrough the web, resulting from applict. OECD indicators [DLI#12]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. Statese-procurement system is chosen as proxy for the implementation of OECDs DAC recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-03-31" />
<target value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">

</target>
<actual value="Integrated and computerized solution for public management, including procurement, bidding, assets and stocks is in place.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Develop. and implementation of action plan for strengthening of FM, satisfactory to WB, resulting from application of PEFA Framework. (Implement. of the State e-fisico project manag. module) [DLI #11]
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="Development of a fully costed, sequenced action plan with funding identified for implementing recommendations. E-FISCO project management module chosen as proxy for the implementation of PEFA recommendations."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="Results of E-fisco consultancy are evaluated and disseminated">
<comment><narrative>
Component 2

Activity completed
</narrative></comment>
</target>
<actual value="Results of E-fisco consultancy are evaluated and disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of overage students in the secondary education in the State system that are certified as having completed the education cycle by the end of the school year. [DLI #6]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="12000.00">

</target>
<actual value="14405.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of students in the State system certified as literate at the end of the first cycle of basic education. [DLI #2]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-03-31" />
<target value="65.00">

</target>
<actual value="86.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development &amp; monitoring of Action Plan of measures to improve teaching practices and impediments to learning State schools, satisfactory to WB, in response to results of student assessments (DLI #9)
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="40% of schools with PDE including remedial measures under implementation and being monitored"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="80% of schools with PDE including remedial measures under implementation and being monitored">
<comment><narrative>
Component 1
</narrative></comment>
</target>
<actual value="100% of schools with PDE including remedial measures under implementation and being monitored">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of students in the State system certified as literate at the end of the first cycle of basic education. [DLI #2]
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-06-30" />
<target value="65.00">
<comment><narrative>
Component 1

Data for 2014
</narrative></comment>
</target>
<actual value="84.60">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106390</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sao Paulo Metro Line 4 (PHASE 2)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective is to improve the quality of service provided to the urban transpo rt users in the area of influence of the new Line 4 stations and facilitate the integration between metro and bus at those stations.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Second Phase of the Sao Paulo Metro Fourth Line Project for Brazil are: (a) to improve the quality of service provided to the urban transport users in the area of influence of the new fourth line stations (Sao Paulo-Morumbi, Fradique Coutinho, Oscar Freire, Higiendpolis-Mackenzie, and Vila Sonia); and (b) to facilitate the integration between metro and bus at those stations. There are two components to the project, the first component being infrastructure and equipment. Provision of financing for: (i) construction of one new station (Vila Sonia) and its access tunnel of about 1.5 km extension; and (ii) construction of additional facilities at the Vila Sonia yard. This component represents approximately US$120 million in International Bank for Reconstruction and Development (IBRD) financing or about 92 percent of the loan. Finally, the second component is the technical assistance. Provision of technical assistance for: (1) the management oversight and supervision of the carrying out of part A of the project; and (2) the carrying out of specific studies or assessments required during the execution the project, including, inter alia, a study for estimating carbon emissions reduction due to the implementation of fourth line. This component represents approximately US$10 million in IBRD financing or about 8 percent of the loan.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001798"><narrative>Sao Paulo Secretariat of Metropolitan Transport</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001797"><narrative>SAO PAULO METRO</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-10-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-04"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Bianca Bianchi Alves</narrative></person-name><telephone>+1-202-473-1000</telephone><email>bbianchialves@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21030" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="99" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="0" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="99" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="0" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="0" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="0" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="0" xml:lang="en"><narrative>Air quality management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">683333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">683333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">3966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">5233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">5233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">5233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">5233333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">5233333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">683333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">683333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">130000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">325000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">7414000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">6600000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">1600000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">6500000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">7040000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">9100000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">4100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">17280768</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">17000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2591499</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">12602023</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">4346711</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-325000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-808</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-1190</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-1454</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-1669</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-62636</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-81405</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-99493</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-128887</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-205188</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-240104</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-292471</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-520365</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-745708</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-949419</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-1112513</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-1792354</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1836713</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1803872</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1389624</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-944081</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-399183</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-391089</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-348423</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1238299</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2337988</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2745711</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2882631</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2774080</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2300028</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2189349</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1877200</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-1283580</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-1344780</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-1704220</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-2066320</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-2231055</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-2599620</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2698291</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1797"><narrative>SAO PAULO METRO</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106390"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106390?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106390"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of  Vila Snia yard
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="100.00">

</target>
<actual value="66.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of existing stations (finalization)
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="100.00">

</target>
<actual value="38.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of Vila Snia Station
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="76.00">

</target>
<actual value="18.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative % of completion of Vila Snia Tunnel
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="77.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of  Vila Snia yard
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="100.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of Vila Snia Station
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="76.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Integration objective: Percentage of 5 new stations integrated with bus lines
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="91.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative % of completion of Vila Snia Tunnel
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="77.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of systems
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="73.00">

</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of existing stations (finalization)
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="100.00">

</target>
<actual value="78.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
cumulative % of completion of systems
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="73.00">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Integration objective: Percentage of 5 new stations integrated with bus lines
</narrative></title>
<baseline year="2009" iso-date="2009-12-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-21" />
<period-end iso-date="2018-02-28" />
<target value="91.00">

</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106663</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sao Paulo Feeder Roads Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to improve the efficiency of the paved municipal road network.  Efficiency will be improved as a result of improvements to the institutional framework used by the Borrower in four key areas to deliver adequate transport conditions to users (planning, environmental licensing, participation of private sector, and execution), combined with improvements in the condition of the paved municipal road network.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sao Paulo Feeder Roads Project in Brazil is to improve the efficiency of the paved municipal road network. There are two components to the project. The first component of the project is feeder road rehabilitation. This component will provide financing for eligible civil works contracts under phase three of the pro-vicinais program, as well as possibly, depending on borrower's requests, the timing of loan effectiveness and conclusion of civil works under phases one and phase two, for a few eligible civil works contracts under these phases. The second component of the project is institutional strengthening. The project will support, through provision of equipment, training and consulting services, and the Secretariat's objective to improve its capacity to provide incentives for accelerating the undertaking of investments defined as priority by the state in its 2008-2011 pluri-annual expenditure program. Activities to be financed include, inter alia: (i) the structuring and initial operation of a monitoring and evaluation system of investments of the State Investments Program; (ii) the definition of a methodology to identify and prioritize projects potentially attractive to the private sector; (iii) the preparation and structuring of projects with private sector participation; (iv) improvements to the Secretariat's capacity in obtaining external financing; and (v) the elaboration of a strategy for communication with key stakeholders under the State Investment Program.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001839"><narrative>Government of Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-12-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-07-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Satoshi Ogita</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sogita@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative> Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de Sao Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21012" percentage="7" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="93" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="100.000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">10216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">10216666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">10216666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">8333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">11666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">10216666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">10216666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">10216666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">6666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">8333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">8333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">8333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">11666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">11666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">11666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">10000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">10000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">10000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">3333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">166650000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">326775000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">30416625</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">25885863</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-02-28"/><value value-date="2010-02-28">26450540</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">28162314</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">28822310</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">14428381</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">816938</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">143646813</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">79459894</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">26560</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">35703599</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">50373556</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">5465078</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">1002959</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">750000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">2000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">10030449</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">2003418</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">31770</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">275716</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">3172220</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-416625</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-191900</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-816938</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-530437</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-403059</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-818698</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-394047</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-1239243</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-588855</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-1997988</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-650822</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-1963126</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-472170</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-1593594</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-405960</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-1443943</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-353131</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-1337015</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-325866</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-1312603</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-346361</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-1387705</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-438623</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-1611273</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-594440</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-2116249</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-846988</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-2407940</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1109396</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-2966053</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1267756</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-3163411</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1355762</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-3598120</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1997793</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-4633822</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2165970</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-5100475</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1970859</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-4213894</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1453478</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3514236</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-628426</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1475062</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-341291</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1224154</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-319158</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1110948</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-328713</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1259177</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1574685</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4364163</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2783480</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-6512174</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3164047</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-7039075</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3205401</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-7163810</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-3083596</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-6699370</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2505593</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-5643409</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2426783</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-5398976</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2020610</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-4599898</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-3269556</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-3269556</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3335538</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-6535500</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1840"><narrative>Departamento de Estradas de Rodagem do Estado de Sao Paulo (DER/SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106663"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106663?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106663"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of economic costs to users on municipal road network
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="4.25"><comment><narrative>R$ billion</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="5.17">
<comment><narrative>
in % reduction
</narrative></comment>
</target>
<actual value="6.64">
<comment><narrative>
in % reduction
-Expected value for 2011 was 3.2% as in PAD.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cumulated reduction of economic costs to users on municipal road network
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2015-06-30" />
<target value="5.70">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of road km rehabilitated as part of Pro-Vicinais Program (Kilometers, Custom Supplement)
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="2117.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="11900.00">

</target>
<actual value="11816.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agenda agreed of public and private sector actions to reduce logistics bottlenecks
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="Agenda agreed">

</target>
<actual value="Agenda agreed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of road users on paved municipal road network
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-06-30" />
<target value="75.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Evolution of condition of municipal paved road network
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="3025 km with IRI5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="83% with IRI5 (bad)">

</target>
<actual value="97.6% with IRI5 (bad)--">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Evolution of condition of municipal paved road network
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="3025 km with IRI5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="83% with IRI5 (bad)">

</target>
<actual value="">
<comment><narrative>
On the basis of a representative sample of 2057 km.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Private/external capital mobilized for financing state investment programs
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="R$11.6 billion"><comment><narrative>Over 2004-2007 period, 2003 prices</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2013-06-30" />
<target value="R$19.0 billion">
<comment><narrative>
Over 2008-2011 period in 2007 prices
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
Results of 2008-2011 period, at 2007 prices, expected by the first trimester 2014
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of engineering designs bid for road rehabilitation investments identified as priority by the PMS
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Private/external capital mobilized for financing state investment programs
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="R$11.6 billion"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2013-06-30" />
<target value="R$19.0 billion">

</target>
<actual value="R$35.36b">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase of engineering designs bid for road rehabilitation investments identified as priority by the PMS
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="0.00"><comment><narrative>Baseline-initial value to be determined following PMS data collection</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="70.00">
<comment><narrative>
in %
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
PMS still not in operation. Upon request from the DER, the PMS should be financed by the State
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Annual decrease of turn-around time for evaluation of environmental licensing requests
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="240.00"><comment><narrative>Baseline value is in days to evaluate requests</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="30.00">
<comment><narrative>
Baseline value is in days whereas values are in %, reason for the shape of the chart
</narrative></comment>
</target>
<actual value="12.00">
<comment><narrative>
In % of decrease of baseline value. Expected value was 5% in 2011 (as in PAD)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual decrease of turn-around time for evaluation of environmental licensing requests
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="0% (240 days)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="30.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agenda agreed of public and private sector actions to reduce logistics bottlenecks
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="Agenda agreed">

</target>
<actual value="">
<comment><narrative>
A number of strategic studies are ongoing, including SP railringroad, state logistics plan etc. and PPP in transport alreadyunderway
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction of road users on paved municipal road network
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="75.00">

</target>
<actual value="83.00">
<comment><narrative>
Based on the interview survey result on opinions on general conditions of municipal road network. The value is estimated asproportion of respondents answering good and fair.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2009" iso-date="2009-06-08" value="0.00"><comment><narrative>Core indicator incorporated in the ISR in compliance with corporate mandate.</narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-08" />
<period-end iso-date="2014-06-30" />
<target value="4315.00">
<comment><narrative>
In km. The target is the sum of the Proviciniais' third phase (3115 km) under parent project and the additional extension from theProvicinais' fourth phase  covered by the additional financing (1200 km).
</narrative></comment>
</target>
<actual value="4315.00">
<comment><narrative>
Target achieved. The full extension under the 3rd phase has been completed. The full extension under the 4th phase (3223 kmincluding 1,713 km eligible to Bank Additional financing) has also been completed.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106702</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Integrated Solid Waste Management and Carbon Finance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to improve the treatment and final disposal of municipal solid waste in Brazil while: (a) supporting (i) the closing of open dumps and the implementation of modern and environmentally safe landfills or alternatives to waste disposal; (ii) improved municipal solid waste management practices; (iii) reduction of poverty among waste pickers; and (iv) increased private sector participation in solid waste service provision; and (b) strengthening Caixa Economica Federal#s capacity to manage carbon finance projects.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Integrated Solid Waste Management and Carbon Finance Project for Brazil is to improve the treatment and final disposal of municipal solid waste while: (a) supporting (i) the closing of open dumps and the implementation of modern and environmentally safe landfills or alternatives to waste disposal; (ii) improved municipal solid waste management practices; (iii) reduction of poverty among waste pickers; and (iv) increased private sector participation in solid waste service provision; and (b) strengthening Caixa Economica Federal's capacity to manage carbon finance projects. The project has two components.  Component 1. Infrastructure investments in solid waste disposal and treatment: provide financing to public or private entities for infrastructure investments to improve final waste disposal and treatment within comprehensive solid waste management strategies reducing negative environmental and health impacts. Component 2. Technical assistance, institutional strengthening and project management: support the development of an integrated approach to solid waste management in Brazil by preparing regulatory, financial and technical guidelines to enable and encourage investments in the solid waste sector through the provision of: (a) technical assistance and capacity building for the preparation of solid waste management investments; (b) technical assistance to strengthen Caixa Economica Federal's institutional capacity to manage, supervise and monitor solid waste management investments; and (c) support to Caixa Economica Federal to insure proper management and supervision structures for project implementation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001853"><narrative>Caixa Economica Federal</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-09-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-11-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Catalina Marulanda</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cmarulanda@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Paraná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463930" />
            <name><narrative>Espirito Santo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20 -40.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14010" percentage="10" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="90" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="75" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="25" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="25" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="75" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="25" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="25" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="25" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="25" xml:lang="en"><narrative>Air quality management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">33275368.04</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">33275368.04</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">50000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-33275368</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">125000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">9400000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">2375000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1085000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1915000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">994650</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">829982</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-409</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-972</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-885</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-788</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-43440</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-84485</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-84367</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-91647</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-103334</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-144772</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-174134</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-186944</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-197710</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-278578</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-283050</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-275127</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-215978</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-152590</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-75538</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-70896</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-63658</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-150141</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-324025</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-355487</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-189342</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-4163</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-4163</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-4163</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-4163</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-432401</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-496170</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-496170</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-496170</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-556930</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-10888560</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1853"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106702"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106702?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106702"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in volume of waste disposed in environmentally sustainable sanitary landfills
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2011-11-17" />
<target value="4000.00">

</target>
<actual value="9000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of specific unit within Caixa that manages carbon finance initiatives
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Availability of tools for solid waste management and attract private sector participation in final disposal and treatment of municipal solid waste
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participating cities with regulatory framework and cost-recovery to adequately manage solid waste services
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number municipal solid waste projects with private financing
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="4.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adequate staffing and project management systems in place (financial, M&amp;E) and  timely reporting (Progress Reports, Audits)
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="4 Progress Reports
4 Audits">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon finance initiatives managed by Caixa.
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="6.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of open dumps closed and monitored
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="6.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Growth of Caixa's loan portfolio of project funds
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-09-30" />
<target value="10.00">

</target>
<actual value="862.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of commercial banks financing or co-financing municipal solid waste projects
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2015-09-30" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with investments targeting recycling and composting activities
</narrative></title>
<baseline year="2010" iso-date="2010-11-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-11-11" />
<period-end iso-date="2011-11-17" />
<target value="4.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106703</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Sao Paulo Water Recovery Project - REAGUA</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to increase clean water availability in the critical watersheds in the State of Sao Paulo.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sao Paulo Water Recovery Project (REAGUA) for Brazil is to increase clean water availability in the state of Sao Paulo's critical watersheds. There are three components to the project. The first component of the project is increase water availability. This component will finance activities aimed at increasing the quantity of available water in the targeted watersheds by controlling and reducing real water losses, promoting the rational use of water in public schools and reusing treated wastewater. The second component of the project is enhancing water quality. This component will finance activities aimed at improving the quality of water in the targeted watersheds by building new wastewater connections to new or existing networks, installing pipes and pumps to transport wastewater to new or existing treatment plants and constructing new or upgrading existing wastewater treatment plant. The third component of the project is project management and development of institutional and technical capabilities. This component will carry out activities aimed to increase the efficiency of the Borrower's water and sanitation sector by enhancing and consolidating its institutional, legal and regulatory framework and strengthening of its technical expertise.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001854"><narrative>State of Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-06-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-04"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-05-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-05-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Oscar Eduardo Alvarado Chacon</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003446537" />
            <name><narrative>Rio Tietê</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.66667 -51.583328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447398" />
            <name><narrative>Rio Sorocaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.981939 -47.806671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448013" />
            <name><narrative>Rio Sapucai-Mirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.883329 -47.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453641" />
            <name><narrative>Rio Piracicaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.6 -48.316669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456999" />
            <name><narrative>Rio Moji-Guaçu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.883329 -48.166672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003459459" />
            <name><narrative>Rio Jundiai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.533331 -46.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462140" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.66667 -46.700001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003467175" />
            <name><narrative>Rio Capivari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.33333 -48.533329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="14010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="30" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="62" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="65.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="22" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="22" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="66" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="22" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="22" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="33" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">458333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1041666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1665333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1665333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1665333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2017-05-30"/>
<value currency="USD" value-date="2017-05-30">26940924.82</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2017-05-30"/>
<value currency="USD" value-date="2017-05-30">26940924.82</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">64496000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-26940925</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">161240</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">250000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">474062</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">1263774</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">115128</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">664125</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">408369</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">220243</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1708739</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">928100</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">218348</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">1112925</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">3368875</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">3897265</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">1541928</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">1186772</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">2997730</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">932632</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1391784</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">685726</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">1792388</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">912413</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">690189</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">491779</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">772175</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">60682</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">32570</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">743036</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1058108</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">3185616</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">2011337</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">319892</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1329625</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">314193</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-94979</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-91714</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-161240</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-627</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-549</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-869</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-1353</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-3721</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-7520</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-11908</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-21310</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-45597</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-84778</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-148101</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-185126</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-274546</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-337627</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-382919</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-503397</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-558162</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-455754</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-375267</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-139899</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-111733</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-99182</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-117147</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-475880</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-724050</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-784729</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-799136</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-745744</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-624601</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-596290</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-505139</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-336662</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-477002</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-554175</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-598910</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-690999</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-779245</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-775004</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1855"><narrative>State Secretary for Water Resources and Sanitation (SSRH)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106703"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106703?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106703"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.2 Volume of reduced water consumption per year in housing units of social interest
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="700800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Volume of wastewater transported to and treated in a wastewater treatment plant.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="13172267.00">

</target>
<actual value="1461869.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cubic meters of recovered water
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="37952508.00">

</target>
<actual value="43773508.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cubic meters of recovered water
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="47966660.00">

</target>
<actual value="45514072.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.2 Volume of reduced water consumption per year in housing units of social interest
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="700800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Volume of recovered water per year from reduction in water losses
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="42783000.00">

</target>
<actual value="42799239.63">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Number of new active connections to the collection network
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="2346.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1 Volume of recovered water per year from reduction in water losses
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="30572331.00">

</target>
<actual value="43713975.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 Volume of reduced water consumption per year in selected public schools
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-06-30" />
<target value="147338.00">

</target>
<actual value="338229.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="8.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1 Number of new active connections to the collection network
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="2346.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2 Volume of wastewater transported to and treated in a wastewater treatment plant.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="6810000.00">

</target>
<actual value="772632.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.1 Wastewater volume transported and treated in the treatment plant and returned to the basin in accordance with environmental legislation
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="3513600.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2 Volume of reduced water consumption per year in selected public schools
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-06-30" />
<target value="147338.00">

</target>
<actual value="201636.85">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.1 Wastewater volume transported and treated in the treatment plant and returned to the basin in accordance with environmental legislation
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="3513600.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of other water service providers that the project is supporting
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2017-05-30" />
<target value="8.00">

</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P106768</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil - Rio de Janeiro Renovating and Strengthening Public Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to support the State of Rio de Janeiro to introduce performance-based management and information technologies to drive service delivery improvements in key public services, including secondary education and hospital care.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Rio de Janeiro Renovating and Strengthening Public Management (PRÓ-GESTÃO) Technical Assistance Project will support the Brazilian Government of Rio de Janeiro (GORJ) to introduce performance-based management and information technologies to drive service delivery improvements in key public services, including secondary education and hospital care.  The Project comprises three main components, each supported by an overall project management structure organized within the State Secretariat of Planning and Management (SEPLAG). The first component, Core Government Systems and Management Tools for Improved Performance and Efficiency, will finance a consultancy to support the identification of suitable performance indicators and the design of a GORJ version of an instrument for results-based management, as well as supporting the expansion of INTRAGOV.RJ though the acquisition of related information technology hardware.  The second component, Strengthening Education Management Capacity, Teacher Instructional Practice and Incentives for School Effectiveness will provide support to: (i) evaluate the impacts and cost effectiveness of strategic programs; (ii) evaluate school-level expenditures and performance, and establish school-level performance targets to improve school quality by translating test results into specific school improvement plans with monitorable targets; and (iii) develop effective in-service training courses for teachers at the Casa do Educador. The third component, Health Management and Information Systems, will finance: (i) the initial application of an accreditation system for the new Urgent Care Facilities (UPAs); (ii) the development of a cost-accounting system for UPAs; (iii) implementation of a new information system for medical supply-chain management; and (iv) a new monitoring system to improve the incentive effects of the Program to Support Municipal Hospitals (PAHI).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001866"><narrative>State of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-09-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-08-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Lorena Vinuela</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lvinuela@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451189" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.25 -42.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11110" percentage="27" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="30" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="43" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="5.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="14" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="14" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="14" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="28" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="14" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="29" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="30" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="30" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">15666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">15666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">15666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">3333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">3333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">3333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">403333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">403333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">403333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">6727052.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">6727052.12</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">18673000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-6727052</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">46683</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">164357</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">320055</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">477031</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">496253</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">898311</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">661507</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1984520</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1086027</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">330753</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">610973</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">1172208</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">2315273</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">521704</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">150805</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">614427</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">386594</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-291532</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-46683</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-130</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-167</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-224</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-1246</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-3708</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-8288</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-16274</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-18497</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-27363</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-39697</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-49006</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-70955</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-88184</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-97749</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-99840</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-138073</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-145725</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-130613</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-96319</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-45017</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-26965</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-24926</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-24449</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-89948</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-148185</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-161112</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-156079</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-143292</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-110972</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-101269</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-79085</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-185883</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-196202</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-328582</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-345955</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-351158</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-386894</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-386894</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-386894</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-375229</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1867"><narrative>Secreatriat of Finance (merged with the former Secretariat of Planning and Management, the original</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106768"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P106768?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P106768"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of public servants in strategic positions of the Secretariat of Education receiving performance evaluation
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="100.00">

</target>
<actual value="28.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of days to record debt owned by renters of State Government's properties
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="30.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of the State's properties regularized
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="363.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="2468.00">

</target>
<actual value="2955.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of State secretariats and agencies with signed results agreements
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="12.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of the State's properties regularized
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="363.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="2468.00">

</target>
<actual value="2955.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of false alerts issued by the Flooding Warning System
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-06-30" />
<target value="44.00">

</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Points improved in the Index of Educational Development of Rio de Janeiro (IDERJ) by the 30 percent worst performing schools
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="1.40">

</target>
<actual value="0.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public real estate properties with records registered and updated in System of Real Estate Management
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="728.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="3376.00">

</target>
<actual value="3911.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of working days to issue a reminder letter
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="90.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2017-06-30" />
<target value="5.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of working days to issue a reminder letter
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="90.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2017-06-30" />
<target value="5.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Points improved in the Index of Educational Development of Rio de Janeiro (IDERJ) by the 30 percent worst performing schools
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="1.40">

</target>
<actual value="0.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public real estate properties with records registered and updated in System of Real Estate Management
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="728.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="3376.00">

</target>
<actual value="3911.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of false alerts issued by the Flooding Warning System
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="56.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2017-06-30" />
<target value="44.00">

</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals participating of the Program PAH I with targets monitored through the System of Management of Indicators and Targets
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="70.00">

</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of days to record debt owned by renters of State Government's properties
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="30.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of unmet requests of the State Hospital &quot;Rocha Faria&quot; for hospital supplies
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of State secretariats and agencies with signed results agreements
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="12.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of public servants in strategic positions of the Secretariat of Education receiving performance evaluation
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="100.00">

</target>
<actual value="28.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of unmet requests of the State Hospital &quot;Rocha Faria&quot; for hospital supplies
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals participating of the Program PAH I with targets monitored through the System of Management of Indicators and Targets
</narrative></title>
<baseline year="2009" iso-date="2009-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-06-30" />
<period-end iso-date="2017-06-30" />
<target value="70.00">

</target>
<actual value="77.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P107146</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Acre Social and Economic Inclusion and Sustainable Development Project - PROACRE</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to contribute to the Borrower's efforts to promote social and economic inclusion of its rural and urban poor, including its poorest and most disadvantaged population living in isolated areas in the Borrower's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Acre Social and Economic Inclusion and Sustainable Development Project for Brazil development objective is to contribute to the Government of Acre's efforts to promote social and economic inclusion of the poorest/most disadvantaged populations living in both urban and isolated/remote rural areas of the state. There are five components to the project. The first component of the project is basic services for isolated communities. This component will support the provision of basic services in health, education and agricultural extension services, including technical and financial assistance, to Acre's dispersed and most isolated communities. The second component of the project is social and economic inclusion in rural areas. This component includes: (i) improving the quality of education and health services in 100 COPs (Pole Communities); and (ii) improving income levels of the population living in these communities by supporting selected production chains. This component will develop activities in COPs, the type of community targeted by the project that has relatively higher level of existing infrastructure and better access to markets. This component will also support professional training for workers of the agricultural and industrial sectors. The third component of the project is entrepreneurship for selected marginal urban communities. The objective of this component is to promote social inclusion of urban communities in areas of high socioeconomic and environmental vulnerability. These urban communities are those located in the bottoms of valleys, close to rivers and in urban marginal areas. In addition, the component will seek to foster entrepreneurship and promote economic empowerment through the promotion of community enterprises, and the expansion of vocational training for professionals and community members. The fourth component of the project is public policy and institutional strengthening. This component aims to:  (i) modernize State agencies with emphasis on those involved in Project implementation; (ii) foster decentralization of basic services in health and education, which are part of the responsibilities assigned to municipalities by the Brazilian constitution; and (iii) introduce results-based management strategies in selected sectors. The fifth and final component of the project is project management and information dissemination. This component will support overall project coordination and supervision and will help strengthen the effectiveness and quality of all project operations.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001904"><narrative>STATE OF ACRE</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0001904"><narrative>STATE OF ACRE</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0001906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-12-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-12-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Johannes Georges Pius Jansen</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662155" />
            <name><narrative>Sena Madureira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0634098 -68.672447</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Estado do Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319278" />
            <name><narrative>BrasilEia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.76771 -69.011414</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319281" />
            <name><narrative>Cruzeiro do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0159397 -72.929771</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319288" />
            <name><narrative>Rio Branco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.06989 -68.155319</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319291" />
            <name><narrative>Tarauacá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.65516 -71.423431</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324175" />
            <name><narrative>Feijó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9049597 -70.914886</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="1" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="37" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="41" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="21" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="1" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="13" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="13" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="26" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="25" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="13" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="13" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="13" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="25" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="13" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="24" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="13" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="13" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-3150844</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-6700279</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-3614188</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-50000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-15254618</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">300000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">15700000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">6076633</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">9427636</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">19944045</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">17073201</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">11555059</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">9675390</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">7134290</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">19962903</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">375000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">9658521</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">2768802</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">3609370</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">243061</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-6700279</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">888689</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-3614188</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">10244800</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">9571188</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">13353736</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">5143048</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1110834</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-02-28"/><value value-date="2009-02-28">-300000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-1919</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">-159489</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-109200</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-127824</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-218680</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-311219</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-438784</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-580116</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-546523</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-552721</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-503658</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-488176</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-556435</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-689021</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-375000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-754359</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1193</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-956747</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-123905</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-1130863</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-152876</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-1182151</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-342638</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-1127921</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-567688</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-1525356</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-889603</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1549155</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1200725</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1509952</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-999839</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1184748</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-827948</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-834008</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-447699</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-406226</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-323624</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-383830</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-300898</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-346574</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-358454</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-851427</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1320474</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1880461</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1980163</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2088702</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2140168</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2168454</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2175571</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2089013</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2029263</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1726259</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1701762</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1631486</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1623205</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1394154</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1376732</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-2781010</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-2781010</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-2781010</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-2781010</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1683986</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1683986</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-2035189</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-2035189</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-2178166</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-2178166</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2509697</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2145496</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-1906"><narrative>Secretaria de Estado de Planejamento e Gestão - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107146"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P107146?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107146"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural schools benefitting from the implementation of school subprojects
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="259.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 323 percent. Both the original project and the AF included rehabilitation of schools (original targets were respectively 200 and 134 schools).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="839.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in percentage of medical consultations for pregnant women from excluded populations (CAU, CAP) per year from 5% to 50%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="50.00">

</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Qualify 1,300 high school teachers and coordinators per year in urban state schools
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1,300.00">
<comment><narrative>
Actual values of this indicator have consistently exceeded target value. Previous actual value (2019) was 1,703. This number increased further in 2020 despite Covid-19.
</narrative></comment>
</target>
<actual value="1,900.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4,500 youth and adult ages 15 to 35 living in rural areas have attended literacy programs and 5,000 youth and adult benefiting from the provision of EJA 1st and 2nd segment programs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="11686.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of activities financed in the area of entrepreneurship development for excluded urban communities in operation
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of cultural spaces in the state established/renovated
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="9.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of maternal deaths adequately administered by place of residence
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="10.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 83 percent. This indicator was introduced under the Dec-2021 restructuring. It replaced the indicator &amp;ldquo;Reductionof neonatal mortality by place or residence from 11 in 2015 to 9 in 2021&amp;rdquo; introduced post Sep-2014 AF, aiming at to improve clarity and facilitate measurement. To improve the likelihood of meeting the end-of-project target, the latter was increased from 9 to 10 due to increase in maternal deaths caused by the Covid-19 and sifting prioritization of maternal health care to pregnancies involving Covid-19.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 80% of the 34 IP communities receiving Project support receiving capacity building for strategic subproject planning and management
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of pregnant women having at least 4 or more prenatal consultations in Rio Branco, Cruzeiro do Sul, and Sena Madureira from 40% in 2007 to 70% in last year of the project
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 16 percent. The indicator is from the original PAD and was replaced under the Sep-2014 AF by a similar indicator, &amp;ldquo;Increasing the number of pre-natal consultations from 4 to 7&amp;rdquo;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in percentage of medical consultations for pregnant women from excluded populations (CAU, CAP) per year from 5% to 50%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 92 percent. This indicator is from the original PAD. It was then replaced by another indicator (&amp;ldquo;Reduction of State&amp;rsquo;s C-Sections in Rio Branco&amp;rsquo;s maternity from 42 percent to 28 percent for low or regular risk pregnancies&amp;rdquo;), which in turn was replaced under the Dec-2021 restructuring by yet another indicator (&amp;ldquo;Increase in the proportion of live birthsof mothers with seven or more prenatal consultations from 42.98 percent to 65 percent in 2021&amp;rdquo;).&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improvement of the Basic Education Development Index (IDEB) of of State schools for final fundamentaI education from 4.7 in 2015 to 5.3 in 2021
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="3.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5.30">
<comment><narrative>
&lt;p&amp;gt;Achieved: 90 percent. *Index for year 2019, the 2021 index has not been published yet. This indicator used to be part of a composite indicator from the original PAD and AF that also measured the IDEB for early fundamental education. The indicator was measured every other year.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preschool care (4-5 years) for 2,000 children/year of Early Childhood in Rural Education (Asinha da Florestania)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1000.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 28 percent. This is one of two new indicators that replaced the Sep-2014 AF indicator &amp;ldquo;Increase in the net enrollment rate of fundamental education in rural areas from 92.1 percent in 2011 to 93 percent in 2017 through Escola Ativa Program, grades 1-5, and through Asas da Florestania Program, grades 6-9&amp;rdquo;. Mobility restrictions imposed by the State as a result of the Covid-19 pandemic negatively affected the level of achievement in 2020 and was likely to go so again in 2021, prompting a reduction in the end-of-project target value from 2,000 to 1,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="276.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement the Human Resources System and perform payroll auditing as people management instruments, increasing the efficiency of public spending
</narrative></title>
<baseline year="2016" iso-date="2016-01-01" value="No HR system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="system not in place">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
125 rural schools benefiting from the implementation of school subprojects.
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Serve 20,000 students in urban areas with the Quero Ler read program; (cumulative goal)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 99 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This indicator was introduced in 2016. It ceased to be monitored after 2018 when the actual achievement reached 99 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="19725.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
8,500 youth and adults ages 15 - 35 have attended literacy programs and 12,200 youth and adults benefiting from the provision of EJA 1st and 2nd segment programs in urban ZAPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="20,700.00">

</target>
<actual value="25,194.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25,000 families registered and cared for by the Social Assistance Reference Centers and other social and assistance services (housing, sanitation, health, education, job and income)
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 92 percent. This indicator iss from the original PAD. The monitoring of this indicator was discontinued after 2013&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="23000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban households served with domestic connection for treated water
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="4503.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 79 percent. This indicator was adjusted under the Dec-2021 restructuring. The previous version &amp;ldquo;Increase from 2200 to 3800 households with piped connections&amp;rdquo; was introduced under the Sep-2014 AF. In recognition of the different types of water supplied, this indicator was replaced by two separate&amp;nbsp;indicators, i.e., one for urban households&amp;nbsp;&amp;quot;Urban households served with domestic connection for treated water&amp;quot;, and another one for indigenous households&amp;nbsp;&amp;quot;Indigenous households served with domestic connection for water for human consumption&amp;quot;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1937.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improvement of the Basic Education Development Index (IDEB) of of State schools for final fundamentaI education from 4.7 in 2015 to 5.3 in 2021
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="4.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="4.80">
<comment><narrative>
As part of the next restructuring, the end value of this indicator will be reduced from 5.3 to 5.0 in view of the Covid-19 pandemic.&amp;nbsp;The value for 2020 will be known in early 2021.
</narrative></comment>
</target>
<actual value="4.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Integrated Environment Centers and Integrated Environmental Management Units strengthened
</narrative></title>
<baseline year="2021" iso-date="2021-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-01" />
<period-end iso-date="2021-12-31" />
<target value="6.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net enrollment ratio of fundamental education in urban areas from 93.1% in 2011 to 95% in 2017 from the implementation of a quality improvement package
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="93.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100 percent. This indicator was introduced under the Sep-2014 AF and reached its target in 2017, when its monitoring ceased.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households with piped sanitation connections
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="3101.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 0 percent. To improve clarity, this indicator was redefined under the Dec-2021 restructuring, replacing the original AF indicator &amp;ldquo;Increased from zero to 3300 households with piped sanitation connections&amp;rdquo;. The end target was revised in view of the partial loan cancellation and mobility restrictions induced by the Covid-19 pandemic. Given the significant reduction in especially Marechal and significant sunk cost already incurred by the Project, Acre State will need to provide sanitary connections post-project on its own account. Since the borrower was not able to fully implement the agreed contract to provide septic tanks to 900+ households in Marechal, this contract will also have to be completed post project closure on the borrower&amp;rsquo;s own account and its successful completion will need to be reported to the Bank.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11,200 students of fundamental cycle (grades 1-4), 7,000 students of fundamental cycle (grades 5-8) and 10,000 students of secondary cycle regularized in terms of age-grade distortion
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="27226.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased population in isolated areas with improved urban environment from 0 in 2013 to 19,470 people in 2021
</narrative></title>
<baseline year="2013" iso-date="2013-03-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-03-27" />
<period-end iso-date="2021-12-31" />
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator stems from the AF and is wrongly defined (2021 should be 2020 and 19,470 should be 13,300). Because of measurement difficulties it was replaced by an improved indicator &amp;quot;People who received at least one of the services related to drinking water, sanitation or micro-drainage&amp;quot;. This indicator should have been deleted but was inadvertently kept. It no longer has relevance.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16401.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
100 Community Development Agents (CDAs) trained and on duty
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 54 percent. This indicator is from the original PAD and was discontinued under the Sep-2014 AF because the CDAs were no longer a priority in the agro-forestry extension strategy.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="54.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Better Project Management, Monitoring and Information Systems
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
66,900 students of fundamental cycle (grades 1-4), 52,650 students of fundamental cycle (grades 5-8) and 35,000 students of secondary cycle benefiting from the implementation of a quality improvement
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="289274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
200 Community Development Plans (CDPs) developed and being implemented
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="200.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of EJA (teaching youth and adults program) teachers and coordinators in elementary schools and high schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="800.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of public roads with underground rainwater networks or channels (microdrainage)
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 66 percent. This indicator was introduced under the Dec-2021 restructuring. It replaced the AF indicator &amp;ldquo;Improved micro-drainage services benefiting 19,470 people&amp;rdquo;, which proved hard to measure (difficult to determine the exact number of beneficiaries).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5,300 new students enrolled in secondary education programs
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 117 percent. This indicator is from the original project. The related activity received no new funding under the Sep-2014 AF. After 2013 this indicator was no longer monitored.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6621.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Assess 93,000 students in the 3rd, 5th and 9th grade of elementary school and students in the 3rd grade of high school based on writing skills
</narrative></title>
<baseline year="2016" iso-date="2016-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of public roads with underground rainwater networks or channels (microdrainage)
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="7.95">

</target>
<actual value="5.24">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
200 sustainable family farming Demonstration Units (DUs) operational
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2020-03-31" />
<target value="200.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 5 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This indicator was introduced under the Dec-2021 restructuring. This indicator for isolated areas (CAUs and CAPs) was from the original PAD and reached 53 percent of its target value in 2013. It was replaced by another indicator under the Sep-2014 AF (&amp;ldquo;250 Demonstration Units receiving Project support operational&amp;rdquo;), which was in turn discontinued in 2018.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="209.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high school teachers and coordinators in urban state schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 38 percent by 2020. This indicator was introduced in 2016 and formalized in the Dec-2021 restructuring.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1105.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in data transfer capacity of Rio Branco public units connected to the network
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced in 2019 and included in the Dec-2021 restructuring. Unit of measurement is number of Gigabytes.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented accountable and effective management system for project that tracks disbursements and results
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
7,000 new children age 4 and 5 enrolled in ECD programs in COPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="7,000.00">

</target>
<actual value="12,571.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ratio of cervical cytopathological examinations in women aged 25-64 and the population of the same age group
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 40 percent. This indicator was introduced in 2016 and formalized in the Dec-2021 restructuring. It replaces and improves the definition of the indicator &amp;ldquo;Number of preventive cervical cancer services provided to women from 25 to 64 years old increased by 10 percent per year from 42,000 to 50,000&amp;rdquo;, which was introduced under the Sep-2014 AF. The final target of 0.75 has been defined by Acre&amp;rsquo;s health entity (SESACRE).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Training of at least 80% of staff at the central level of the participating Secretariats in programs for improving managerial capacity
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 125 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;The indicator is from the original PAD but discontinued &amp;nbsp;&amp;nbsp;under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of EJA (teaching youth and adults program) teachers and coordinators in elementary schools and high schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="800.00">

</target>
<actual value="800.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improvements in the Basic Education Development Index (IDEB) of State schools for early fundamentaI education from 5.5 in 2015 to 6.4 in 2021
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="3.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2021-12-31" />
<target value="6.40">
<comment><narrative>
&lt;p&amp;gt;Achieved: 96&amp;nbsp;percent&lt;strong&amp;gt;. &lt;/strong&amp;gt;*Index for year 2019, the 2021 index has not been published yet. This indicator usedto be part of a composite indicator from the original PAD and AF that also measured the IDEB for final fundamental education. The indicator is measured every other year.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of activities financed in the area of entrepreneurship development for excluded urban communities in operation
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced in 2020 and formalized under the Dec-2021 restructuring. It replaced the indicator &amp;ldquo;At least60 percent of business that received start-up equipment are still in operation at project closing&amp;rdquo;.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20,000 rural students participating in the Quero Ler Program.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 14 percent. This indicator was introduced in 2016 and discontinued in 2018 after having exceeded the target.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="22698.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Indigenous Land Management Plans (PGTIs) developed
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2021-12-31" />
<target value="29.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 59 percent. The Dec-2021 restructuring redefined this indicator, which was included in both the original project and the AF. The original definition of this indicator included both the development and implementation of 15 PGTIs. &amp;nbsp;Given delays inpreparing the PGTIs, the Dec-2021 restructuring dropped the implementation part of this this indicator and also moved it from Component 4 to Component 2.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26,000 new students in fundamental schools (grades 1-4) and 8,800 new students in fundamental schools (grades 5-8) benefiting from the implementation of a GESTAR I and II-like methodology
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2015-12-31" />
<target value="34,800.00">

</target>
<actual value="34,507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from river access
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="20,752.00">

</target>
<actual value="20,752.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
17,000 water filters (with chlorine treatment) distributed
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2010-12-31" />
<target value="8550.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 77 percent. This indicator for isolated areas (CAUs and CAPs) is from the original PAD. After reaching the 2011 target value, the indicator was dropped.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6599.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indigenous households served with domestic connection for water for human consumption
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 11 percent This indicator was included under the Dec-2021 restructuring, and resulted from the adjustments made on the indicator &amp;ldquo;Increase from 2200 to 3800 households with piped connections&amp;rdquo; introduced under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the percentage of surviving newborns with low weight at birth in Acres hospitals from 90% to 96%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="90.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was&amp;nbsp;deleted in&amp;nbsp;the December 2021 Restructuring but was unintentionally kept in the PDO indicator list in the portal.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
250 Demonstration Units receiving Project support operational
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="250.00">
<comment><narrative>
This indicator reached 210&amp;nbsp;in 2018 and was then closed
</narrative></comment>
</target>
<actual value="232.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of PSF coverage in Rio Branco, Cruzeiro do Sul and Sena Madureira from 42% in 2007 to 66% in 2014
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 32 percent. The indicator is from the original PAD and was replaced under the Sep-2014 AF by a set of two urban indicators to better reflect a new health delivery model in urban areas. The monitoring of this indicator was discontinued after 2013.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1,600 youth and adults ages 15 - 35 have attended literacy programs and 3,000 youth and adults living in COPs benefiting from the provision of EJA 1st and 2nd segment programs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="4,600.00">

</target>
<actual value="8,892.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the general ambulatory consultancies in excluded target population (CAU and CAP) from 7% to 67%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was&amp;nbsp;deleted in&amp;nbsp;the December 2021 Restructuring but was unintentionally kept in the PDO indicator list in the portal.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from river access
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="20752.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100%. This indicator was adjusted under the Dec-2021 restructuring to improve clarity and facilitate measurement. The previous version of the indicator in the AF was &amp;ldquo;Improved River access benefiting 38,500 people (total population of Marechal Thaumaturgo, Santa Rosa do Purus, and Jord&amp;atilde;o). The end-target was reduced in view of the decision of the Borrower to reduce the scope of the related investment.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20752.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
250 Demonstration Units receiving Project support operational
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2020-03-31" />
<target value="250.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 93 percent. Initiated under the original project, project activities towards this indicator ceased in 2018 with an achieved results of 210 units. However, the project&amp;rsquo;s strategy changed and demonstration units in isolated communities were no longer part of the revised strategy. Activities were discontinued to focus on the development of collective action and value chains in communities with higher potential to sustain these activities in the long term.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="232.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25,000 families registered and cared for by the Social Assistance Reference Centers and other social and assistance services (housing, sanitation, health, education, job and income)
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="25,000.00">

</target>
<actual value="19,500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 15 Indigenous Land Management Plans developed and being implemented
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 20 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This indicator is from the original PAD. The activity was continued under the Sep-2014 AF, which financed another 16 plans. However, the activity was slowed down and a new indicator was indicated that did not include the implementation part.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who received at least one of the services related to drinking water, sanitation or micro-drainage
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="19470.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 84 percent.&lt;strong&amp;gt;&amp;nbsp;&lt;/strong&amp;gt;This PDO indicator was formalized under the Dec-2021 restructuring. Given the realignment of several subprojects and the fact that municipalities receive multiple WSS investments, this indicator replaces the previous(but wrongly defined and inadvertently kept) AF indicator &amp;ldquo;Increased population in isolated areas with improved urban environment from 0 in 2013 to 19,470 in 2021&amp;rdquo;. The end-of-project target of 19,470 represented an increase of 6,170 people over and above the original AF target (13,300).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16401.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased storage capacity for critical state data in a secure environment
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="100.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subprojects financed in the area of commercialization of agricultural and forestry products (IPCs, PRA and production subprojects) in operation at project closing
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced under the Dec-2021 restructuring. It replaced the Sep-2014 AF indicator &amp;ldquo;At least 60 percentof communities receiving productive subprojects, with at least 15 percent increase in the sale value of production&amp;rdquo;. Project activities have shifted towards implementation of indigenous land management plans (which are internal coordination and territorial planning instruments) instead of the previous focus on production. This indicator is measured only once (after project closing).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net enrollment for 5,000 students/year (6th to 9th grade) - Programa Caminhos da educao do campo - elementary school final years (Asas da Florestania Program).
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 14 percent. This indicator was introduced under the Dec-2021 restructuring. It replaced was part of a set of three indicators introduced under the Sep-2014 AF, as follows: &amp;ldquo;Net enrollment rate of fundamental education in rural areas&amp;rdquo;, &amp;ldquo;Decrease the illiteracy rate in the population over 15 years old in rural areas&amp;rdquo;, and, &amp;ldquo;Net enrollment rate of secondary education in rural areas&amp;rdquo;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="34290.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 70% of project implementation by governmental institutions in compliance with planned activities, budget and timeline, as verified by SIM (Integrated Management System)
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100 percent. The indicator is from the original PAD and was fully achieved by 2013. It was no longer monitored under the AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints received that are answered
</narrative></title>
<baseline year="2020" iso-date="2020-01-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-22" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced under the Dec-2021 restructuring. The Project established a GRM only in 2020.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high school students benefiting from full-time school studies
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="2,800.00">

</target>
<actual value="3,400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
8,500 youth and adults ages 15 - 35 have attended literacy programs and 12,200 youth and adults benefiting from the provision of EJA 1st and 2nd segment programs in urban ZAPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="25798.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved micro-drainage services benefiting 19,470 urban inhabitants (urban population from the four municipalities)
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="13874.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 15 indigenous organizations (cooperatives and associations) implementing strategic planning and management
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 20 percent. This indicator is from the original PAD and was replaced under the Sep-2014 AF by a more ambitious indicator.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strengthen 10 Integrated Centers for Environment and Integrated Management Units.
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="10.00">
<comment><narrative>
This indicator is lagging given the target value of 5 centres for 2020.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased storage capacity for critical state data in a secure environment
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced in 2019 and included in the Dec-2021 restructuring. Percentage measures the proportion of data storage capacity that meets cybersecurity standards.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in data transfer capacity of Rio Branco public units connected to the network
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1.00">

</target>
<actual value="0.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvepayroll auditing as instrument to increasethe efficiency of public spending
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced under the Dec-2021 restructuring and represents a revised definition of the indicator &amp;ldquo;Implement the Human Resources System and perform payroll auditing as people management instruments, increasing the efficiency of public spending&amp;rdquo;, which was introduced in 2016. The HR management part was cancelled&amp;nbsp;due to unsuccessful procurement efforts (no qualified bidders) but the issue is being revisited under the Bank-financed ProGestao project of which Acre is part.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased data processing capacity in the state's enterprise systems infrastructure
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="8601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was introduced in March 2020 and included in &amp;nbsp;the Dec-2021 restructuring. Unit of measurement is number of IOPs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8601.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ratio of screening mammograms performed on women aged 50 to 69 years and population of the same age group
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.06"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 15 percent. This indicator was introduced in 2016 and formalized in the Dec-2021 restructuring. It replaced the indicator &amp;ldquo;Number of mammography performed in women from 40-69 years old, from 4,000 &amp;ndash; 5,200&amp;rdquo;, which was introduced under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.06">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Established social communication strategy with program participants, affected peoples and civil society
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator stems from the original PAD and continued under the Sep-2014 AF. Social communication strategy has been consistently implemented.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1,600 youth and adults ages 15 - 35 have attended literacy programs and 3,000 youth and adults living in COPs benefiting from the provision of EJA 1st and 2nd segment programs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="9071.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 60% of the productive subprojects financed by the project remain in operation at project closing
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People who received at least one of the services related to drinking water, sanitation or micro-drainage
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="19,470.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of 6th to 9th grade teachers and coordinators in urban state schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 130 percent by 2020. This indicator was introduced in 2016 and formalized in the Dec-2021 restructuring.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3446.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ratio of screening mammograms performed on women aged 50 to 69 years and population of the same age group
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.06"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="0.40">

</target>
<actual value="0.03">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of neonatal mortality by place of residence from 11 in 2015 to 9 in 2021
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="9.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Established social communication strategy with program participants, affected peoples and civil society
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of neonatal mortality by place of residence from 11 in 2015 to 9 in 2021.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ratio of cervical cytopathological examinations in women aged 25-64 and the population of the same age group
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="0.75">

</target>
<actual value="0.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
200 Community Development Plans (CDPs) developed and being implemented
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2014-12-31" />
<target value="200.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 53 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This indicator is from the original PAD. 200 CDPs were developed but only 91 where implemented. Under the Sep-2014 AF community development agencies were no longer a priority under the agro-forestry extension strategy, and the indicator was replaced by a new indicator &amp;ldquo;At least 60 percent of communities receiving productive subprojects with at least 15 percent increase in the sales value of their production&amp;rdquo;. Under the Dec-2021 restructuring, this Sep-2014 AF indicatorwas made part of a new indicator &amp;ldquo;Percentage of subprojects financed in the area of commercialization of agricultural and forestry products (IPCs, PRA and production subprojects) in operation at project closing&amp;rdquo;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="106.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
14,400 new students in fundamental schools (grades 5-8) and 9,600 new students enrolled in secondary education have received basic education through Asas da Florestania Program
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="25915.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve payroll auditing as instrument to increase the efficiency of public spending
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved Project Management, Monitoring and Information Systems
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high school students benefiting from full-time school studies
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 44 percent by 2020. This indicator was introduced in 2017 and formalized in the Dec-2021 restructuring. The goal was to enroll 2,800 students each year from 2017 onwards.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4036.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of paved public roads with curbs constructed
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="25.96">
<comment><narrative>
&lt;p&amp;gt;Achieved: 93%. This indicator was adjusted under the Dec-2021 restructuring to improve clarity and facilitate measurement. It replaced the indicator &amp;ldquo;30.2 kilometers of new pavement of urban roads&amp;rdquo; introduced under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="34.22">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Integrated Environment Centers and Integrated Management Units strengthened
</narrative></title>
<baseline year="2021" iso-date="2021-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100 percent. This indicator was introduced in 2020 and formalized in the Dec-2021 restructuring.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in data processing capacity in the infrastructure of the State's corporate systems
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="8,601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="96,331.00">

</target>
<actual value="8,601.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
14,400 new students in fundamental schools (grades 5-8) and 9,600 new students enrolled in secondary education have received basic education through Asas da Florestania Program.
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="24,000.00">

</target>
<actual value="12,242.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
7,200 new children age 4 and 5 enrolled in ECD programs in urban ZAPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 70 percent. The indicator is from the original PAD and reached 55 percent of its target in 2013 after which it was discontinued. It was replaced by another set of urban education indicators in the Sep-2014 AF to reflect the expansion of the access to the overall education system. &lt;strong&amp;gt;&amp;nbsp;&lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12254.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 60% of businesses that received start-up equipment are still in operation at project closing
</narrative></title>
<baseline year="2016" iso-date="2016-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">
<comment><narrative>
This indicator will be measured at project closing only.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase from 2,025, in 2013, to 4,503, in 2021, the number of households with piped treated water.
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="2025.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="3203.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11,200 students of fundamental cycle (grades 1-4), 7,000 students of fundamental cycle (grades 5-8) and 10,000 students of secondary cycle regularized in terms of age-grade distortion
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="28,200.00">

</target>
<actual value="27,226.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Serve 20,000 students in urban areas with the Quero Ler read program; (cumulative goal)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="20,000.00">
<comment><narrative>
This activity has been discontinued in 2018
</narrative></comment>
</target>
<actual value="19,725.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net enrollment for 6,000 High School Students/Year - Programa Caminhos da educação do campo - High School Program (Asas da Florestania Program)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="6,000.00">
<comment><narrative>
Actual value exceeds target value. Actual previous wrongly reported (was 5,112)
</narrative></comment>
</target>
<actual value="8,112.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of maternal deaths adequately administered by place of residence
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="10.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adoption of Results Based Management at agreements in education in, at least, 40% of the SMEs by 2014
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 250 percent. This indicator is&amp;nbsp;from the original PAD. It was discontinued under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Raise the data transfer capacity of Rio Branco public units connected to networks from 0.1 in 2019 to 1 gigabytes in 2021.
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="0.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2021-12-31" />
<target value="1.00">

</target>
<actual value="0.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Environmental Inspection operations (air, land and river) performed.
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
134 schools benefiting from the implementation of school subprojects
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adoption of Results Based Management at agreements in education in, at least, 40% of the SMEs by 2014
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="40.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved Project Management, Monitoring and Information Systems
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100 percent. This indicator was introduced under the Dec-2021 restructuring. The indicator replaced and improved the definition of two indicators &amp;ldquo;Implemented accountable and effective management system for project that tracks disbursement and results&amp;rdquo; and &amp;ldquo;Established social communication strategy with program participants, affected peoples and civil society&amp;rdquo;, which were part of the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reform 10 cultural spaces in the state
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2021-12-31" />
<target value="9.00">
<comment><narrative>
The end target of this indicator was reduced from 10 to 9.
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the ratio of cervical cytopathological examinations in women aged 25-64 and the population of the same age group from 0.58 in 2015 to 0.75 in 2021.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="58.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="75.00">
<comment><narrative>
The actual value of this indicator has decreased substantially due to the Covid-19 pandemic - from 51% in 2019 to 11% in 2020.
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban households served with domestic connection for treated water
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="2,025.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="4,503.00">

</target>
<actual value="4,013.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with support and extension services for productive inclusion activities
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in Infant Mortality Rate from 17.29 in 2015 to 12.85 in 2021
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="17.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="15.45">
<comment><narrative>
&lt;p&amp;gt;Target is to achieve a 10%&amp;nbsp;reduction (from 17.29 to 15.45&amp;nbsp; - definition of this indicator was not changed to reflect the adjusted target) but achievement is a 3.4% increase. This PDO indicator was formally introduced under the Dec-2021 restructuring.It was not part of the AF. However, it was informally introduced in 2016. The indicator is measured as number of deaths per thousand live births. It reached a value of 15.74&amp;nbsp;in 2019,15.64&amp;nbsp;in 2020 and 17.89 in 2021. This is mainly due to the COVID-19 pandemic and its negative impacts on poverty, coverage of universal screening programs, access and quality of pediatric care, among others.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17.89">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase data processing capacity in the state's enterprise systems infrastructure from 8,601 IOPs in 2019 to 96,331 IOPs in 2021.
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="8,601.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2021-12-31" />
<target value="96,331.00">

</target>
<actual value="8,601.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Benefit 2,800 high school students per year with full-time school studies
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="2,800.00">
<comment><narrative>
Previous value was 4,018 (2019)
</narrative></comment>
</target>
<actual value="3,400.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
7,000 new children age 4 and 5 enrolled in ECD programs in COPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 110 percent. This indicator is from the original PAD but received no new funding under the AF. It was discontinued in 2013 after the PMU stopped monitoring it.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14687.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Better Project Management, Monitoring and Information Systems
</narrative></title>
<baseline year="2014" iso-date="2014-01-01" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-01-01" />
<period-end iso-date="2021-12-31" />
<target value="5">
<comment><narrative>
This concerns the use of improved systems in public institutional management. The mission decided to adjust the end target value regarding the number of sub-systems to be installed and operationalized from 6 to 5. This value was achieved in 2020.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
60% of beneficiaries satisfied with Project support and extension services for productive inclusion activities
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator was replaced by a similar but better defined indicator (&amp;ldquo;Percentage of beneficiaries satisfied with support and extension services for productive inclusion activities&amp;rdquo; but inadvertently was never deleted from the system. It no longer has relevance.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Qualify 800 EJA I teachers and coordinators per year in elementary and high school EJA
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="800.00">
<comment><narrative>
Targets for 2020 and 2021&amp;nbsp;reduced from 1000 to 800 in view of Covid-19. Previous value (2019) was 864.
</narrative></comment>
</target>
<actual value="800.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with support and extension services for productive inclusion activities
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="">
<comment><narrative>
&lt;p&amp;gt;This PDO included in the Dec-2021 restructuring is a re-definition of the previous Intermediary indicator &amp;ldquo;60 percent of beneficiaries satisfied with Project support and extension services for productive inclusion activities&amp;rdquo;, which was introduced under the Sep-2014 AF where it replaced the PAD original Intermediary indicator &amp;ldquo;At least 30 percent of target population benefitting of income generating activities&amp;rdquo;. The reason for this replacement was that even though productive subprojects had been&amp;nbsp;initiated in 120 of the original 200 target communities (i.e., with PDCs) and in all 18 targeted indigenous communities, baseline and final measurement surveys were not conducted to measure impacts on income generation of the target population.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Indigenous Land Management Plans (PGTIs) developed and implemented
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="29.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
100 Community Development Agents (CDAs) trained and on duty
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="100.00">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the proportion of live births of mothers with seven or more prenatal consultations from 42.98% in 2015 to 65% in 2021.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="42.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="46.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 93 percent. This indicator was&amp;nbsp;part of a set of&amp;nbsp;new indicators that replaced the following composite set of Sep-2014 AF indicators: &amp;quot;Increased &amp;ldquo;successful&amp;rdquo; and &amp;ldquo;very successful&amp;rdquo; deliveries (&amp;ldquo;Parto bem sucedido&amp;rdquo; and &amp;ldquo;muito bem sucedido&amp;rdquo;) from 0% to 10% in selected maternities from Rio Branco and Jurua&amp;quot;; &amp;quot;Increase the percentage of medical consultations per year per total population of CAPs and COPs from 12% to 72%&amp;quot;; &amp;quot;Proportion of population registered in the family health program (mobile PSF and PACS) from 15% to 90%&amp;quot;; &amp;quot;Reduction of State&amp;rsquo;s C-Sections in Rio Branco&amp;rsquo;s maternity from 42% to 28% for low or regular risk pregnancies&amp;quot;; and &amp;quot;Number of health professionals and community agents trained with at least one certified health module in Primary Health Care on both health care lines: maternal/neonatal, and women&amp;rsquo;s cancer&amp;quot;.&lt;/p&amp;gt;

&lt;p&amp;gt;During 2020, Covid-19 has had significant adverse impacts on the public health system, including&amp;nbsp;suspension of routine activities in primary care units to prioritize cases of Covid-19 and decreased demand for non-Covid-19 related non-urgent health care services out of fear for Covid-19. This has led to a decrease in the live birthratio compared to previous years. The continuation of the Covid-19 pandemic in 2021 has substantially decreased the likelihood of meeting the original end-of-project target and thus instigated a decrease in the end-of-project target value for this indicator in the Dec 2021 restructuring.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of paved public roads with curbs constructed
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="23.29">

</target>
<actual value="23.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
200 sustainable family farming Demonstration Units (DUs) operational
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="200.00">

</target>
<actual value="106.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase access to information and eservices offered by the GoAc in 30% of the target communities (CAPs and COPS) by 2014
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 333 percent.. This indicator is from the original PAD but was discontinued under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural schools benefitting from the implementation of school subprojects
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="125.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in Infant Mortality Rate from 17.29 in 2015 to 15.45 in 2021
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="17.29"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="15.45">
<comment><narrative>
This indicator has seen a consistent decline as intended
</narrative></comment>
</target>
<actual value="14.61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 80% of the 34 IP communities receiving Project support receiving capacity building for strategic subproject planning and management
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2017-10-31" />
<target value="80.00">

</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26,000 new students in fundamental schools (grades 1-4) and 8,800 new students in fundamental schools (grades 5-8) benefiting from the implementation of a GESTAR I and II-like methodology
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="69120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase state-critical storage capacity in a secure environment from 40% to 100% by 2021
</narrative></title>
<baseline year="2019" iso-date="2019-01-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-01-01" />
<period-end iso-date="2021-12-31" />
<target value="100.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Preschool care (4-5 years) for 2,000 children/year of Early Childhood in Rural Education (Asinha da Florestania)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1,000.00">
<comment><narrative>
This indicator has decreased from 2890 in 2019 (actual previous wrongly reported) to 276 in 2020 (until Oct 31) due to the Covid-19 pandemic. During restructuring the end-of-project target value will be adjusted under the assumption that Covid-19 will continue to affect this indicator in 2021.
</narrative></comment>
</target>
<actual value="276.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maintain at least 95% satisfactory samples of PCCU collections, carried out by the Itinerant Health Program team.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="96.31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 5 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This is a new indicator introduced under the Dec-2021 restructuring to improve clarity andfacilitate measurement relative a set of previous original PAD and Sep-2014 AF indicators they replaced, i.e., &amp;ldquo;Increase the percentage of medical consultations per year per total population of CAPs and COPs from 12 percent to 72 percent&amp;rdquo;, &amp;ldquo;Increase in the percentage of PSF coverage in Rio Branco, Cruzeiro do Sul and Sena Madureira from 42 percent in 2007 to 66 percent in 2014&amp;rdquo;, &amp;ldquo;Proportion of population registered in the family health program (mobile PSF and PACS) from 15 percent to 90 percent&amp;rdquo; and &amp;ldquo;At least 50 percent of Maternal and patient&amp;rsquo;s homes have been certified&amp;rdquo;.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Schooling for 5,000 students/year (1st to 5th grade) in the Pathways of Field Education Program (Multigrade Classes).
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5,000.00">
<comment><narrative>
Current value exceeds target value for first time despite Covid-19. Previous value erroneously reported (3,482 in 2019)
</narrative></comment>
</target>
<actual value="8,645.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Maintain at least 95% satisfactory samples of PCCU collections, carried out by the Itinerant Health Program team.
</narrative></title>
<baseline year="2020" iso-date="2020-01-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-21" />
<period-end iso-date="2021-12-31" />
<target value="95.00">
<comment><narrative>
Actual values of this indicator have consistently exceeded 95% (which is the target value)
</narrative></comment>
</target>
<actual value="98.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
15,000 new children age 4 and 5 enrolled in ECD programs in rural areas and 30,000 new students in fundamental schools (grades 1-4) have received basic education through Escola Ativa Program
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="104643.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4,000 skilled and capable people to work in the services sectors (IT, business management, etc.), civil works, industry (clothing and food), commerce, arts and handcrafts and others
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 11 percent. This indicator iss from the original PAD. The monitoring of this indicator was discontinued after 2013.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4440.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 15 Indigenous Land Management Plans developed and being implemented
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
30.2 kilometers of new pavement of Urban Roads
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2021-12-31" />
<target value="30.20">

</target>
<actual value="21.52">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
15,000 new children age 4 and 5 enrolled in ECD programs in rural areas and 30,000 new students in fundamental schools (grades 1-4) have received basic education through Escola Ativa Program.
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-06-30" />
<target value="45,000.00">

</target>
<actual value="63,113.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Schooling for 5,000 students/year (1st to 5th grade) in the Pathways of Field Education Program (Multigrade Classes).
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 85 percent (average of 2016 &amp;ndash; 2021) This indicator was introduced under the Dec-2021 restructuring. It is one oftwo indicators that replaced the former AF indicator &amp;ldquo;Increase in the net enrollment rate of fundamental education in rural areas from 92.1 percent in 2011 to 93 percent in 2017 through Escola Ativa Program, grade 1-5, and through Asas da Florestania Program, grades 6-9&amp;rdquo;.&lt;strong&amp;gt; &lt;/strong&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4273.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net enrollment for 6,000 High School Students/Year - Programa Caminhos da educao do campo - High School Program (Asas da Florestania Program)
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 66 percent.&lt;strong&amp;gt; &lt;/strong&amp;gt;This indicator was introduced under the Dec-2021 restructuring. It replaced three indicators introduced under the 2014 AF, which were as follows: &amp;ldquo;Net enrollment rate of fundamental education in rural areas&amp;rdquo;, &amp;ldquo;Decrease the illiteracy rate in the population over 15 years old in rural areas&amp;rdquo;, and, &amp;ldquo;Net enrollment rate of secondary education in rural areas&amp;rdquo;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4108.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented accountable and effective management system for project that tracks disbursements and results
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improvements in the Basic Education Development Index (IDEB) of State schools for early fundamentaI education from 5.5 in 2015 to 6.4 in 2021
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="5.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="6.20">
<comment><narrative>
As part of the next restructuring, the end value of this&amp;nbsp;indicator will be reduced from 6.4 to 6.2 in view of the Covid-19 pandemic. The value for 2020 will be known in early 2021.
</narrative></comment>
</target>
<actual value="6.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Qualify 1,500 6th to 9th grade teachers and coordinators per year in urban state schools
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1,500.00">
<comment><narrative>
Actual values of this indicator have consistently met or exceeded target values. Previous actual value (2019) was 3,234. Decrease in 2020 due to Covid-19.
</narrative></comment>
</target>
<actual value="1,860.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 30 Indigenous Land Management Plans developed and being implemented.
</narrative></title>
<baseline year="2016" iso-date="2016-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-01" />
<period-end iso-date="2021-12-31" />
<target value="29.00">
<comment><narrative>
This end-of-project target value of this indicator has been revised&amp;nbsp;downwards from 30 to 29.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4,000 skilled and capable people to work in the services sectors (IT, business management, etc.), civil works, industry (clothing and food), commerce, arts and handcrafts and others
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="4,000.00">

</target>
<actual value="4,450.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
66,900 students of fundamental cycle (grades 1-4), 52,650 students of fundamental cycle (grades 5-8) and 35,000 students of secondary cycle benefiting from the implementation of a quality improvement
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="154,550.00">

</target>
<actual value="181,730.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net enrollment for 5,000 students/year (6th to 9th grade) - Programa Caminhos da educação do campo - elementary school final years (Asas da Florestania Program).
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5,000.00">
<comment><narrative>
Actual values have consistently exceeded target values since 2017. Previous number erroneously reported (6,268 in 2019)
</narrative></comment>
</target>
<actual value="11,507.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households with piped sanitation connections
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="3,031.00">

</target>
<actual value="222.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the percentage of people registered in PACS from 0 to 80%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="80.00">

</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20,000 rural students participating in the Quero Ler Program.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2018-12-31" />
<target value="20,000.00">
<comment><narrative>
This indicator exceeded its target in 2018 and was then closed
</narrative></comment>
</target>
<actual value="22,698.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality Program for the Forestry Sector agreed with and joined by at least 30% of the States enterprises
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 333 percent. This indicator is from the original PAD and was discontinued under the Sep-2014 AF.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Respond to 80% of complaints received.
</narrative></title>
<baseline year="2020" iso-date="2020-01-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-22" />
<period-end iso-date="2021-12-31" />
<target value="80.00">
<comment><narrative>
No complaints have been received yet. GRM only established in 2020.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least 15 indigenous organizations (cooperatives and associations) implementing strategic planning and management
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the percentage of surviving newborns with low weight at birth in Acre's hospitals from 90% to 96%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="90.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-06-30" />
<target value="96.00">

</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Refurbishment of 2 aerodrome runways meeting the standards of the National Civil Aviation Agency of Brazil (ANAC) in the municipalities of Marechal Thaumaturgo and Porto Walter
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subprojects financed in the area of commercialization of agricultural and forestry products (IPCs, PRA and production subprojects) in operation at project closing
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of PSF coverage in Rio Branco, Cruzeiro do Sul and Sena Madureira from 42% in 2007 to 66% in 2014
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="42.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2014-12-31" />
<target value="66.00">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
17,000 water filters (with chlorine treatment) distributed
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2011-06-30" />
<target value="17,000.00">

</target>
<actual value="17,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
134 schools benefiting from the implementation of school subprojects
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="134.00">

</target>
<actual value="483.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the percentage of people registered in PACS from 0 to 80%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase from 0, in 2013, to 3,486, in 2021, the number of households with piped sanitation connections
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2021-12-31" />
<target value="3,486.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the general ambulatory consultancies in excluded target population (CAU and CAP) from 7% to 67%
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-06-30" />
<target value="67.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high school teachers and coordinators in urban state schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1,300.00">

</target>
<actual value="1,900.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase access to information and eservices offered by the GoAc in 30% of the target communities (CAPs and COPS) by 2014
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2014-12-31" />
<target value="30.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the proportion of live births of mothers with seven or more prenatal consultations from 42.98% in 2015 to 65% in 2021.
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="42.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="46.00">
<comment><narrative>
This indicator decreased from 53.12 in 2019 (actual previous number wrongly reported) to 48.14 in 2020 due to Covid-19.&amp;nbsp;During restructuring the end-of-project target value will be adjusted under the assumption that Covid-19 will continue to affect this indicator in 2021.
</narrative></comment>
</target>
<actual value="47.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved river access benefiting 37,045 people (total population of Marechal Thaumaturgo, Santa Rosa do Purus and Jordão).
</narrative></title>
<baseline year="2017" iso-date="2017-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-03-31" />
<period-end iso-date="2021-12-31" />
<target value="37,045.00">

</target>
<actual value="20,752.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indigenous households served with domestic connection for water for human consumption
</narrative></title>
<baseline year="2016" iso-date="2016-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-03-31" />
<period-end iso-date="2021-12-31" />
<target value="59.00">

</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net enrollment ratio of fundamental education in urban areas from 93.1% in 2011 to 95% in 2017 from the implementation of a quality improvement package
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="93.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2017-12-31" />
<target value="95.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4,500 youth and adult ages 15 to 35 living in rural areas have attended literacy programs and 5,000 youth and adult benefiting from the provision of EJA 1st and 2nd segment programs.
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="9,500.00">

</target>
<actual value="10,962.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase from 2,025, in 2013, to 4,503, in 2021, the number of households with piped treated water.
</narrative></title>
<baseline year="2013" iso-date="2013-01-01" value="2,025.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-01" />
<period-end iso-date="2021-12-31" />
<target value="4,503.00">

</target>
<actual value="3,203.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5,300 new students enrolled in secondary education programs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="5,300.00">

</target>
<actual value="6,214.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints received that are answered
</narrative></title>
<baseline year="2020" iso-date="2020-07-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-29" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Training of at least 80% of staff at the central level of the participating Secretariats in programs for improving managerial capacity
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of 6th to 9th grade teachers and coordinators in urban state schools who received training
</narrative></title>
<baseline year="2015" iso-date="2015-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1,500.00">

</target>
<actual value="1,860.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
7,200 new children age 4 and 5 enrolled in ECD programs in urban ZAPs
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="7,200.00">

</target>
<actual value="3,963.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the ratio of screening mammograms performed on women aged 50 to 69 years and population of the same age group from 0.06 in 2015 to 0.4 in 2021.
</narrative></title>
<baseline year="2016" iso-date="2016-01-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-01-01" />
<period-end iso-date="2021-12-31" />
<target value="40.00">
<comment><narrative>
The actual value of this&amp;nbsp;indicator decreased substantially due to the Covid-19 pandemic - from 30% in 2019 to 2% in 2020.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Quality Program for the Forestry Sector agreed with and joined by at least 30% of the State's enterprises
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="30.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of pregnant women having at least 4 or more prenatal consultations in Rio Branco, Cruzeiro do Sul, and Sena Madureira from 40% in 2007 to 70% in last year of the project
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="40.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="70.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of cultural spaces in the state established/renovated
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2020-12-31" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 70% of project implementation by governmental institutions in compliance with planned activities, budget and timeline, as verified by SIM (Integrated Management System)
</narrative></title>
<baseline year="2008" iso-date="2008-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-01-01" />
<period-end iso-date="2013-12-31" />
<target value="70.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Environmental Inspection operations (air, land and river) performed.
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="35.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P107843</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Federal District Multisector Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed project development objectives (PDOs) are the following: i) improve public sector management and accountability by establishing results-based management practices and improving fiduciary oversight; and (ii) increase access, quality and efficiency of the education, health and public transport services (by modernizing the education system; modernizing, decentralizing and integrating various levels of health care; and strengthening the institutional and operational capacity of the public transport sector).]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Federal District Multisector Managament Project for Brazil are the following: (i) improve public sector management and accountability by establishing results-based management practices and improving fiduciary oversight; and (ii) increase access, quality, and efficiency of the education, health, and public transport services by modernizing the education system; modernizing, decentralizing and integrating various levels of health care; and strengthening the institutional and operational capacity of the public transport sector. There are two components to the project. The first component of the project is strengthening results-based management in the public sector. This component will contribute to the implementation of the program by supporting critical public sector management reforms targeting the education, health, and transport sectors. The second component of the project is building capacity in the public sector. This component will finance technical assistance and training to support the fulfillment of the project development objectives.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2009-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-04-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Pena De Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dpena@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Distrito Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="34" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="17" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="32" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="10" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="11" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="34" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="11" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="32" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="13" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="17" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="32" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">3653333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">3653333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">3653333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">3653333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">3653333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">2903333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2903333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1373333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1373333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1373333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1373333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1373333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">3653333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">3653333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">3653333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">3653333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">3653333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2903333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2903333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1373333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1373333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1373333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">103890050.47</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">103890050.47</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107843"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P107843?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P107843"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 40% population with Family Health Program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="7%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="40%">

</target>
<actual value="">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies issue annual performance reports.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="21">

</target>
<actual value="18">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase access to early childhood programs in low-income Regional Areas (RA) for children aged 4-5.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="77%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="90%">

</target>
<actual value="">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase access to early childhood programs in low-income Regional Areas (RA) for children aged 4-5.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="77%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="90%">

</target>
<actual value="68%">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease number of students with overage distortion rate in Basic Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="92,104"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="17,000">

</target>
<actual value="">
<comment><narrative>
Target not achieved, information provided not satisfactory.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies sign annual Results Agreements.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="26">

</target>
<actual value="26">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease the number of students with overage distortion rate in Secondary Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34,805"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="3,000">

</target>
<actual value="">
<comment><narrative>
Target not achieved, information provided not satisfactory.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title/>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies sign annual Results Agreements.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="26">

</target>
<actual value="">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comply with the PAF.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 80% pregnant women with at least 4 prenatal visits in Brazil, India, Paranoa, Riacho Fundo, and Samambaia.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="72%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="80%">

</target>
<actual value="87%
 Coverage above 80% in all locations.">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Execute at least 70% of the budget of each EEP.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="70%">

</target>
<actual value="">
<comment><narrative>
Target not achieved. Education 56%, Health 53%, Transport 55%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comply with the PAF.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 80% pregnant women with at least 4 prenatal visits in Brazil, India, Paranoa, Riacho Fundo, and Samambaia.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="72%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="80%">

</target>
<actual value="">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provide the Cartao de Saude to 50% of the population.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="50%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies sign annual Results Agreements.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="26">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS remotely monitors 10% of the fleet of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="10%">

</target>
<actual value="Not done">
<comment><narrative>
Target not achieved.  CCO not procured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title/>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Execute at least 70% of the budget of each EEP.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="70%">

</target>
<actual value="55%">
<comment><narrative>
Target not achieved. Education 56%, Health 53%, Transport 55%
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Comply with the PAF.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="Complies with PAF">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease number of students with overage distortion rate in Basic Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="92,104"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="17,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 40% population with Family Health Program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="7%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="40%">

</target>
<actual value="20%">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease the number of students with overage distortion rate in Secondary Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34,805"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase access to early childhood programs in low-income Regional Areas (RA) for children aged 4-5.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="77%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="90%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title/>
<baseline year="2008" iso-date="2008-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement full-time basic education activities in low-income areas of DF in 100 schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS controls operational and fare revenue data of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="DFTRANS has partial access to secondary operational &amp; fare revenue data"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="DFTRANS processes primary operational &amp; fare revenue data on a daily basis">

</target>
<actual value="">
<comment><narrative>
Target not achieved. Control of information by DFTRANS deemed not trustworthy. Sistema de Bilhetagem Automtico not done due tolack of capacity.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement full-time basic education activities in low-income areas of DF in 100 schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100">

</target>
<actual value="130 schools">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies issue annual performance reports.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="21">

</target>
<actual value="">
<comment><narrative>
Target not achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provide the Cartao de Saude to 50% of the population.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="50%">

</target>
<actual value="75%">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease the number of students with overage distortion rate in Secondary Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="34,805"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="3,000">

</target>
<actual value="number of students enrolled was 1,906">
<comment><narrative>
Target not achieved, information provided not satisfactory.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS remotely monitors 10% of the fleet of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="10%">

</target>
<actual value="">
<comment><narrative>
Target not achieved.  CCO not procured.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Secretariats/GDF agencies issue annual performance reports.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="21">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Decrease number of students with overage distortion rate in Basic Education.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="92,104"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="17,000">

</target>
<actual value="number of students enrolled was 9,233">
<comment><narrative>
Target not achieved, information provided not satisfactory.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS remotely monitors 10% of the fleet of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="10%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implement full-time basic education activities in low-income areas of DF in 100 schools.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="100">

</target>
<actual value="">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS controls operational and fare revenue data of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="DFTRANS has partial access to secondary operational &amp; fare revenue data"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="DFTRANS processes primary operational &amp; fare revenue data on a daily basis">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Execute at least 70% of the budget of each EEP.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="70%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provide the Cartao de Saude to 50% of the population.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="10%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="50%">

</target>
<actual value="">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
DFTRANS controls operational and fare revenue data of the basic bus service.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="DFTRANS has partial access to secondary operational &amp; fare revenue data"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="DFTRANS processes primary operational &amp; fare revenue data on a daily basis">

</target>
<actual value="Not done">
<comment><narrative>
Target not achieved. Control of information by DFTRANS deemed not trustworthy. Sistema de Bilhetagem Automtico not done due tolack of capacity.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 40% population with Family Health Program
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="7%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="40%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cover 80% pregnant women with at least 4 prenatal visits in Brazil, India, Paranoa, Riacho Fundo, and Samambaia.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="72%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2012-12-31" />
<target value="80%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P108443</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sao Paulo Sustainable Rural Development and Access to Markets</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to support the Borrower in improving access to markets for rural producers organizations in its territory and in improving its instruments and policies that contribute to environmental sustainability of family agriculture.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Sao Paulo Sustainable Rural Development and Access to Markets Project for Brazil is to support the state of Sao Paulo to increase the competitiveness of family agriculture in its territory while improving its environmental sustainability. There are three components to the project. The first component of the project is supporting small farmers' business initiatives. This component will provide support to small farmers' business initiatives through implementing small business investments and strengthening producers' organizations. The second component of the project is strengthening institutional and physical infrastructure. This component will support a set of public functions and investments that are critical to increasing the competitiveness and sustainability of family farming: (i) policy framework, market monitoring, and rural extension; (ii) rural infrastructure; and (iii) environmental sustainability. The third component of the project is project management. This component will deal with overall project management and fiduciary functions; monitoring and evaluation of impacts; implementation of environmental and social safeguards instruments; and dissemination and communication.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002020"><narrative>State of Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-10-23"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maurizio Guadagni</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mguadagni@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative> Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31120" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="48.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="23" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="13" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="73" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="13" xml:lang="en"><narrative>Finance for Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">1000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1333333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">78000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">195000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">88949</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">725427</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">40817</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">39529</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">296194</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1250932</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">240408</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">765880</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">444563</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">257389</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">481320</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">1791135</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">1873035</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">3837780</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">878117</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">1162067</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4533158</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">211067</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">403527</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1827285</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1257624</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1033800</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">1189479</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1038583</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">1895981</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">121962</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">853827</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1259450</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">2773048</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">2148426</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">1578605</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">655612</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">1479889</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">386229</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">7139905</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">626272</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">2194633</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">3168568</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">3513030</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">8974542</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">2670238</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">5328328</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">73922</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1037873</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">3837533</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">419064</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-195000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-701</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-664</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-5382</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-6166</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-11903</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-14209</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-24582</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-38463</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-62278</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-92611</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-159537</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-222346</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-344138</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-461861</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-734345</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1048580</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1206797</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-985383</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-811365</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-302477</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-241579</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-214444</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-253287</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1028915</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1565497</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1696698</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1727856</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1612421</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1350495</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1289287</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1092208</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-390326</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-519800</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-619465</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-710227</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-954140</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1165095</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-1550385</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1675468</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2021"><narrative>State Secretariat of Agriculture - Sao Paulo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2022"><narrative>State Secretariat of Environment - Sao Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P108443"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P108443?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P108443"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of rural roads with year-round usability following rehabilitation (critical spot improvement)
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="672.00">
<comment><narrative>
Exceeded: 102%  The above wording is an adjusted version (2015 restructuring) from the PAD original: &quot;Length of rural roads (critical sections) with year-round usability following rehabilitation and maintenance&quot;. The restructuring clarified the meaning of &quot;rehabilitation&quot; as &quot;critical spot improvement&quot;. Also, the 2015 Level 1 restructuring adjusted the original PAD target to 660 km.  The ISR incorrectly shows a target of  720 km with a lower achievement.
</narrative></comment>
</target>
<actual value="660.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of environmental subprojects
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="697.00">
<comment><narrative>
Exceeded:  102%  This indicator was added by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of environmental subprojects and PES programs registered in CAR
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="821.00">
<comment><narrative>
Achieved:  112.3%  This indicator was added by the 2015 restructuring and set a target of 1300.  SMA always maintained that this target of 1300 was impossible to achieve and an error.  The actual target agreed between the Bank and SMA was 731 because the number of beneficiaries was known at the time of restructuring but did not end up being reflected in the final, revised version of the RF.  The ICR therefore uses SMA's target of 761 to estimate the final result.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rural producers trained (environment)
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="1690.00">
<comment><narrative>
Exceeded: 211.3%  This indicator was added by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries of business initiatives registered in the CAR
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="13505.00">
<comment><narrative>
Exceeded:  317%  This was a new indicator added by the 2015 restructuring.  See explanation above in Comments Section for Indicator &quot;Number of families directly benefiting from the project&quot;.  CATI and SMA have reported that 100% of project beneficiary producers wre registered in the CAR and thus the number agreed as the final is measured against the target of 4,265.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of technical staff trained (environment)
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="1135.00">
<comment><narrative>
Exceeded:  103.2%  This indicator was added by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families directly benefiting from the project (Subcomponent 1.1)
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="16622.00">
<comment><narrative>
Exceeded:  234%   This indicator (Core) was introduced by the 2015 Level 1 restructuring. It represents the beneficiaries of Component 1.1 only (Business Initiatives and Community Subprojects).   Total direct beneficiaries of all investments under Component 1 were: 13,505 (Business Initiatives) and 3,117 (Community Subprojects).  (The lower number cited in the June 2018 ISR - 3 months before closing -  was updated based on CATI's field investigation and verification of who was actually a direct beneficiary).  The PAD estimated total direct beneficiaries under Component 1 as 22,000 in 300 organizations, an average of 73 members per organization.   The Bank misinterpreted data showing that organizations with Business Plans were much smaller at around 15-20 members and reduced the target to 7,108 under the Level 1 restructuring in 2015. The smaller size in fact, derived from project eligibility rules.  The 15-member minimum per organization sought to ensure an investment's operational viability, including sufficient raw materials.  It was also driven by CATI's lack of budget and time to prepare the required Individual Property Plans (PIP) for the wider cohort of an organizations members, which averaged closer to 60. CATI technicians opted not to include all direct beneficiaries, and prepared PIPs for the core minimum named on the proposal.  Post-closing, CATI's regional offices and casas de agricultura surveyed beneficiary organizations and updated the numbers of direct beneficiaries.  With the investments operational, it was found that members not named on the original proposal were active users of the financed infrastructure prompting CATI to re-estimate the numbers of direct beneficiaries, which turned out to be more than double the reduced target set by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities adopting new system for rural roads management
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="6.00">
<comment><narrative>
Under-achieved:  24%  This indicator was added by the 2015 restructuring.  The contracting of just the TORs for the planned road maintenance management systems took several years, as did preparation of the systems themselves. Implementation was slow and of limited scope.  See Main Text.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Surveys realized for baseline, second survey (mid-term) and third survey (final)
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="2.00">
<comment><narrative>
Under-achieved:  67%   This indicator was added by the 2015 restructuring.  The mid-term survey was not done (although a comprehensive MTR report was prepared), but as this would have been known to the Bank restructuring team in 2015 (the MTR was conducted in 2013) it is unclear why the target of 3 was retained. The real target should have been 2 by 2015.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural roads with year-round usability following maintenance
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="605.00">
<comment><narrative>
Under-achieved:  64%  This indicator was adjusted by the 2015 restructuring to specify/clarify &quot;maintenance&quot; as a separate activity from &quot;rehabilitation&quot;.  Note that the original target of 500 km covered both maintenance and rehabilitation. The revised 2015 targe was 950 km for year-round usability stemming from improved maintenance alone. Maintenance of tertiary rural roads is a municipal responsibility and faced many difficulties, discussed in the text but including: lack of Municipal counterpart funding capacity, technical expertise and appropriate well-maintained road equipment and machinery. Some municipalities were also averse to using Bank procurement rules and being perceived to have flouted Brazilian Procurement Law 8666. The revised target was over-ambitious.
</narrative></comment>
</target>
<actual value="950.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ethno-development plans elaborated
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="46.00">
<comment><narrative>
Substantial achievement: 94%   This was a new indicator added by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of environmental subprojects implemented
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="25.00">
<comment><narrative>
Exceeded:  104%   This indicator was added by the 2015 restructuring.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CATI staff trained in management and value-chains
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="599.00">
<comment><narrative>
Exceeded: 120%  This indicator was added by the Level 1 restructuring of 2015.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for payment for water or carbon services piloted
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="Y">
<comment><narrative>
Achieved: 100%   This indicator appears as worded in the PAD Results Framework with a yes/no target, and as monitored by ISRs.  However, it was adjusted by the 2015 Level1 Restructuring as a PDO Indicator measuring &quot;System for Payment for Environmental Services (PES) developed and adopted&quot; as an equivalent (clarified) version, but was not reported as such. The project financed three pilots (see PDO Indicator #2) of which two were very successful and are being replicated in Sao Paulo state.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of environmental policies and instruments developed, measured by (a) CAR approved and made available to producers and (b) 3 PES programs developed and adopted by rural producers
</narrative></title>
<baseline year="2015" iso-date="2015-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-09-15" />
<period-end iso-date="2018-09-28" />
<target value="4.00">
<comment><narrative>
Overall achievement (a)100% for Cadastro Ambiental Rural (CAR); and (b) 100% for Payment for Environmental Services (PES).  NOTE: The 2 indicators below are subsidiary to this indicator and no space is available for separate comment. Also, the target of 4 (policies and instruments) above covers one CAR and three PES.  Results are as follows: 

(i) CAR:  Some 339,127 family farmers - 100% of all farm properties with 4 fiscal modules or less (and 103% of SMA/CATI's informal target of 330,000 family farms) representing just under 6.0 million ha - were registered in the Cadastro Ambiental Rural (CAR, or Rural Environmental Registry) as a direct result of the project's efforts. This includes 100% of project beneficiary producers. The State, through investments in system design, installation and software, and a well-designed and executed campaign of reaching out to small farmers state-wide and ensuring that they could complete the extensive questionnaire, now has a customized database detailing the physical, environmental and land-use features of all family farm properties state-wide and can move on to Stage II environmental regularization activities. This was a major project contribution to enabling Sao Paulo's farmers to comply with the new Brazilian Forest Code (Lei Florestal, 12.651/2012) which imposes strict new requirements on all farmers to bring their properties into line through a multi-stage process of ensuring environmentally sustainable land use practices on all agricultural properties. Also, following passage of the law, registration in the CAR became a criterion for project participation, and a condition of eligibility for many government programs including credit. 

(ii) PES: Three Payments for Environmental Services (PES) pilot projects were developed and executed, of which two were fully adopted by producers within the life of the project. SMA contemplated a fourth pilot (not part of the project target) but was unable to clear legal and financial hurdles in time for project execution and it was subsequently incorporated in an IDB operation. The first Bank-supported pilot (Mina d'Agua) was a pioneering effort which experienced many problems and was not successful but it provided important lessons to its successors, fulfilling its role as a pilot. The CAP-RPPN and CAP-Mata Ciliares were successful and influential.  Further, beneficiary farmers have sustained the on-farm practices inculcated by the PES and are considered to have &quot;adopted&quot; PES.  These pilots have in turn, spawned two new PES projects in Sao Paulo: Mata Atlantica Connection Project (GEF US$6.0 million) and the PES-ASMF financed through the State Pollution Control Fund (FECOP). Government also authorized the financing of PES payments to producers from a portion of water use tariffs, ensuring sustainability. See Main Text Section II and Annex 7.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business initiatives with market viability identified and financed by the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="287.00">
<comment><narrative>
Exceeded: 107.5% This total does not include the 87 subprojects (originally termed &quot;business initiatives&quot; but later changed to &quot;subprojects&quot; as more appropriate to the type of activity and processes involved) of Traditional Communities, also financed under Component 1.
</narrative></comment>
</target>
<actual value="267.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of producer organizations trained in management and accounting
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="676.00">
<comment><narrative>
Substantial achievement: 81.3%  The original indicator (PAD) called for &quot;percentage&quot; of POs trained, but the indicator was adjusted to &quot;number&quot; by the 2015 Level 1 restructuring. The Unit of Measure designation is incorrect, but the Portals lifts this automaticaly  from the ISR which cannot be changed. Also, the target cannot be referring to the number of producer organizations as this number greatly exceeds the number of organizations which participated in the project.  It refers to &quot;participations&quot;, as one organization is likely to have participated in several training sessions/events.  According to the BCR (PLAN 2018), participants did not need to register using their identity card so the rate of repetition cannot be determined.
</narrative></comment>
</target>
<actual value="831.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of subprojects of traditional communities with market viability identified and financed by the project
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="87.00">
<comment><narrative>
Exceeded: 178% This indicator was adjusted by the 2015 restructuring to: (i)  specify that &quot;Traditional Communities&quot; were the beneficiaries; and (ii) the term &quot;Business Initiatives&quot; was changed to &quot;subprojects&quot; as more appropriate to the type of beneficiary and the social nature of the investments.  It should be noted that the original PAD target for total number of organizations participating under Component 1 was 300 and included Business Initiatives and Traditional Communities (indigenous and quilombola), i.e. 300 was not the target for the Traditional Communities alone (as shown above).
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Continued implementation of socio-environmental management plan
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="Y">
<comment><narrative>
Achieved:  100%   The Socio-Environmental Management Plans were continuously implemented by CATI and SMA  throughout, with close Bank oversight.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producer organizations trained on the operation of their business initiative
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="833.00">
<comment><narrative>
Exceeded:  136.8%  This was a new indicator added by the 2015 restructuring. As noted above, the target of 609 cannot refer to the number of organizations as it far exceeds the total participating in the project. It refers to number of &quot;participations&quot;, indicating that a single organization is likely to have received or participated in several training events/sessions.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of value-chain studies carried out
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="4.00">
<comment><narrative>
Achieved:  100%  This was a new indicator added by the 2015 restructuring.  The four studies completed covered fruit, grains, dairy and oils.  See Annex 6.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
System for developing, selecting, supporting and monitoring business proposals, operational
</narrative></title>
<baseline year="2010" iso-date="2010-05-25" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-05-25" />
<period-end iso-date="2018-09-28" />
<target value="Y">
<comment><narrative>
Achieved:  100%   CATI established an organized, well-defined system operating with criteria and standards for ensuring the quality of Business Proposals throughout their cycle.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in total sales value for participating organizations, by end of project
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2018-09-28" />
<target value="87.00">
<comment><narrative>
Exceeded: 1,088%  As a direct result of the project, participating producer organizations increased their sales by almost 11 times the target, as estimated by DIME's rigorous methodology: (i) large, random and geographically dispersed sample (144 Treatment Group (TG) organizations and 140 Control Group (CG) organizations); and, (ii) comparison with a baseline, and with a CG. Organizations that were not supported by the project fared poorly during the recent economic crisis in Brazil, losing almost half of their average sales value between 2012 and 2017. The difference in net annual revenue between the TG and CG organizations is US$152,000 per organization.  Comparing the sales of organization members suggests that this impact translates into improved sales outcomes at the household level.  Households linked to TG organizations showed average net annual revenues US$1,800 higher than CG households, sold more production overall and a larger share of their sales was handled through the organization at better prices. However, the lack of a household-level baseline prevents the claim that all this difference can be attributed to the project. See: Sao Paulo Development and Access to Markets project - Impact Evaluation Report, DIME/World Bank, November 2018.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P108654</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Pernambuco Sustainable Water</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is to improve sustainable water supply and sanitation services for the population residing in theCapibaribe river basin and MRR.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project development objective of the Pernambuco Sustainable Water Project for Brazil is to improve sustainable water supply and sanitation services for the population residing in the Capibaribe river basin and in the Metropolitan Region of Recife (MRR). There are three components to the project. The first component of the project is water sector management and institutional development. This component will contribute to the Government of Pernambuco (GoPE's) goal of long-term water security, through strengthening the sector's institutional and regulatory frameworks as well as the state's capacity for integrated sector planning, policy and management. The second component of the project is improving efficiency in the provision of eater supply and sanitation services. This component will be implemented by Pernambuco State Water Supply and Sanitation Company (COMPESA) to increase the company's operational and economic performance and improve its corporate governance and management. The third component of the project is water supply and sanitation service expansion. This component will support the GoPE and COMPESA in the implementation of activities aimed at: (i) increasing the volume of water supplied in the MRR and in the Capibaribe river basin, which will result in reduced population affected by intermittent supply, and (ii) expanding sewerage services in the main cities located upstream of the main water supply reservoirs in the Capibaribe river basin, reducing pollution loads and protecting water quality, and (iii) improving the state's capacity to leverage future investments, by reviewing and preparing plans and engineering designs for future priority water supply and sewerage systems to be implemented in the state.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002033"><narrative>State of Pernambuco</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002034"><narrative>State Government of Pernambuco</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2008-06-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-01-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jean-Martin Brault</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jbrault@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003384987" />
            <name><narrative>Vitória de Santo Antão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1180601 -35.291389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386264" />
            <name><narrative>Toritama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.00667 -36.056671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389926" />
            <name><narrative>Salgadinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0666704 -38.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Estado de Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392829" />
            <name><narrative>Paudalho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8966699 -35.179722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396277" />
            <name><narrative>Limoeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8747201 -35.450279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="14010" percentage="46" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="18" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="18" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="18" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="50" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="20" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="20" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="30" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="10" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="10" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="10" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">5666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">5666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">5666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">9333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">9333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">9333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">11333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">11333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">11333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">10806666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">10806666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">10806666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2020-03-30"/>
<value currency="USD" value-date="2020-03-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2020-03-30"/>
<value currency="USD" value-date="2020-03-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-01-31"/><value value-date="2010-01-31">190000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">475000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">600000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">4545129</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">30000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">26000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">30000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">9800000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">14377000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">11000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">12600000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">13832000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">21000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">770871</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">-475000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-2811</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-3892</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-17191</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-26992</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-148529</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-141481</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-125620</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-112827</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-136390</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-195182</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-233061</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-424989</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-626578</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-930499</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1189186</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1397288</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2184442</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2672409</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2733134</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2059452</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-994858</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-609413</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-579416</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-585664</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2221202</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3813320</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4311632</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4353409</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4189257</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3420688</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3311139</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2767282</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1957408</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2263795</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2512454</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2803674</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-3133091</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3502497</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-4025442</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-4066171</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-4123212</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-4162312</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-4202489</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-4240489</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4279989</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-4341809</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4379809</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4417886</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4457386</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-4518001</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-4557384</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-4595384</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2034"><narrative>State Government of Pernambuco</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2035"><narrative>State Secretariat of Planning and Management of Pernambuco - SEPLAG</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P108654"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P108654?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P108654"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of pollution load discharged by the municipalities targeted by the projects wastewater investments from 0,0 tons in 2008 to 2.949,78 tons of BOD/year in 2019
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2015-09-30" />
<target value="2939.78">
<comment><narrative>
&lt;p&amp;gt;The target on reduction of BOD pollution was closely achieved, reaching roughly 40 percent of the set target at restructuring and 37 percent of the target at appraisal. This was mainly because of major delays in construction works, limited achievement in number of connections and&amp;nbsp;limited volume of wastewater reaching the WWTPs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1164.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of engineering designs for water supply and for wastewater municipal systems
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2020-03-31" />
<target value="21.00">
<comment><narrative>
&lt;p&amp;gt;The target on engineering designs has been overachieved, with one additional design completed. The design have been submitted for COMPESA final approval prior to execution.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water losses in the areas targeted by the project's non-revenue water program are reduced from 975 l/connection/d in 2008 to 650l/connection/day in 2019.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="975.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-03-31" />
<target value="650.00">
<comment><narrative>
&lt;p&amp;gt;The target on water losses reduction was almost achieved, reaching&amp;nbsp;&amp;nbsp;87%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="691.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of residential connections to wastewater collection services from 8169 in 2008 to 52580 in 2019 in the municipalities of the Capibaribe river basin targeted by the project.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="8169.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2017-05-31" />
<target value="52580.00">
<comment><narrative>
&lt;p&amp;gt;The target on number of wastewater connections was underachieved,&amp;nbsp;reaching about 55 percent of the target at restructuring (which had been set at 52,580) and 87 percent of the target at appraisal. This was mainly because of the while the projects for connections have been completed, customers have not connected to the system.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="28769.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the percentage of population subject to water rationing in the MRR from 88% in 2008 to 35% in 2019
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="88.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2019-02-28" />
<target value="35.00">
<comment><narrative>
&lt;p&amp;gt;The target on reduction of population subject to water rationing was almost achieved, reaching 73%. This target was not fully achieved due to major delays in construction works that occurred during&amp;nbsp;the project implementation and&amp;nbsp;reduction in water availability in the project areas due to severe droughts.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="49.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
An additional 5.13 m3/s are supplied to the MRR from the Pirapama Water Supply System by the end of 2011.
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2015-09-30" />
<target value="5.13">
<comment><narrative>
&lt;p&amp;gt;The target on additional volume of water supply has been fully achieved, reaching 100%.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users committees for water reservoirs are implemented
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-09-07" />
<target value="11.00">
<comment><narrative>
&lt;p&amp;gt;The target on implementation of&amp;nbsp;users committees has been fully achieved, with all committees functioning and working closely to APAC.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State water regulatory agency (APAC) is fully operational.
</narrative></title>
<baseline year="2009" iso-date="2009-07-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-07-31" />
<period-end iso-date="2020-03-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target on establishment of APAC was fully achieved as the agency is currently operational and fulfilling the functions for which it has been established.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
COMPESAs index of cash flow sufficiency improves from 103.8% in2008 to &lt;105.0% in 2019.
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="103.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2020-03-31" />
<target value="105.00">
<comment><narrative>
&lt;p&amp;gt;The target on cash flow sufficiency of funds was almost fully achieved, reaching&amp;nbsp;97% of the revised target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="102.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water utilities that the project is supporting
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2019-10-31" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;The target on support of water utilities supported by the project&amp;nbsp;was fully achieved.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bulk water charges implemented
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2020-03-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;The target on implementation of bulk water charges has not been achieved, although the tariff studies and proposals have been completed and currently pending approval from the State Assembly.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P110614</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sergipe State Integrated Project: Rural Poverty</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[xThe project is an integral part of the Government of Sergipe's rural development with inclusion strategy. The project will (i) improve the rural poor's access to basic socioeconomic infrastructure, (ii) raise incomes and capital assets through investments in productive activities and increased linkages between small producers and markets, and (iii) strengthen the cross-sector integration of investments in rural areas through improved participatory planning and monitoring at the local, municipal and State levels.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project is an integral part of the Government of Sergipe's Rural Development with inclusion strategy for Brazil. The project will: (i) improve the rural poor's access to basic socioeconomic infrastructure; (ii) raise incomes and capital assets through investments in productive activities and increased linkages between small producers and markets; and (iii) strengthen the cross-sectoral integration of investments in rural areas through improved participatory planning and monitoring at the local, municipal and State levels. There are three components to the project. The first component of the project is community subprojects: matching grants to community associations to finance implementation of about 1,000 subprojects for socioeconomic infrastructure and services, and productive, market-oriented investments. The second component of the project is institutional development: supporting technical assistance, training and capacity-building for community associations, project Municipal Councils and the state technical unit. The third and final component of the project is project administration, supervision, monitoring and evaluation: financing the operational costs (excluding salaries) of project administration, supervision, monitoring, and impact evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2008-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2008-09-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2012-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2012-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maria de Fatima de Sousa Amazonas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mamazonas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391395" />
            <name><narrative>Porto da Folha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.9172201 -37.278332</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391609" />
            <name><narrative>Poço Redondo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.8050003 -37.684441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399051" />
            <name><narrative>Gararu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.9674997 -37.083328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403344" />
            <name><narrative>CanindE de São Francisco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.6599998 -37.78944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445818" />
            <name><narrative>Umbaúba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.38333 -37.65778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003446400" />
            <name><narrative>Tobias Barreto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.18389 -37.998329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447533" />
            <name><narrative>Siriri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.60389 -37.112782</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447561" />
            <name><narrative>Simão Dias</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.71163 -37.77142</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447799" />
            <name><narrative>Estado de Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449310" />
            <name><narrative>São Cristóvão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.01472 -37.20639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450119" />
            <name><narrative>Sào Luzia do Itanhi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.35111 -37.446201</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450710" />
            <name><narrative>Salgado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.03194 -37.474998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451305" />
            <name><narrative>Ribeirópolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.53944 -37.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451410" />
            <name><narrative>Riachuelo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72833 -37.187222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451476" />
            <name><narrative>Riachão do Dantas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.06889 -37.724998</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452233" />
            <name><narrative>Propriá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.21111 -36.840279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453300" />
            <name><narrative>Poço Verde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.70833 -38.183331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453599" />
            <name><narrative>Pirambu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.73778 -36.85611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453778" />
            <name><narrative>Pinhão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.56722 -37.722778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455637" />
            <name><narrative>Pacatuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.45333 -36.65139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456234" />
            <name><narrative>Nossa Senhora das Dores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.49167 -37.193329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456240" />
            <name><narrative>Nossa Senhora da Glória</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.21833 -37.42028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456325" />
            <name><narrative>Neópolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.32 -36.579441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456879" />
            <name><narrative>Monte Alegre de Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.02722 -37.562222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458093" />
            <name><narrative>Malhador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.65778 -37.304722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003459342" />
            <name><narrative>Lagarto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.91722 -37.650002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460127" />
            <name><narrative>Japoatã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.34667 -36.801109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460136" />
            <name><narrative>Japaratuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.59333 -36.940281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460962" />
            <name><narrative>Itabi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.12639 -37.103062</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460971" />
            <name><narrative>Itabaianinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.27389 -37.790001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460974" />
            <name><narrative>Itabaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.685 -37.425282</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461289" />
            <name><narrative>Indiaroba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.51917 -37.511669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461423" />
            <name><narrative>Ilha das Flores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.43639 -36.540001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462944" />
            <name><narrative>Frei Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.54944 -37.534439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463900" />
            <name><narrative>Estância</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.26833 -37.438332</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003465154" />
            <name><narrative>Cristinápolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.47556 -37.75528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003466941" />
            <name><narrative>Carira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.36083 -37.701111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003467319" />
            <name><narrative>Capela</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.50333 -37.05278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003467500" />
            <name><narrative>Canhoba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.13833 -36.984718</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468941" />
            <name><narrative>Brejo Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.42944 -36.46611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471872" />
            <name><narrative>Aracaju</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.91111 -37.071671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471902" />
            <name><narrative>Aquidabã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.28139 -37.018608</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317130" />
            <name><narrative>Feira Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.26417 -37.313061</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15126" percentage="3" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="2" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="95" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="29" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="7" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="64" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="29" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="7" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="28" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="7" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">466666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">466666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">166666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">250000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">833333.34</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">466666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">466666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2518880.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">2518880.62</value>
</budget>
<capital-spend percentage="100" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110614"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P110614?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P110614"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families benefited with at least one community subproject investment
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 benefited over 27,000 families. Aggregate at end-RPRP2 would thus be min. 52,000 families"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="Minimum 25,000 families (incremental)">

</target>
<actual value="8.316 families benefitted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community subprojects implemented
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 financed 1,030 community subprojects.  Aggregate total would thus be 2,030 subprojects by end-RPRP-2."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="Minimum 1,000 community subprojects (incremental)">

</target>
<actual value="153 subprojects financed">
<comment><narrative>
This target is under review and will be reduced to 500 subprojects
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of project financing for socio-economic infrastructure going to the 41 poorest rural municipalities (Area 1)
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="70% of project financing in Area 1 is for socio-economic infrastructure">

</target>
<actual value="117 out of 153 subprojects financed are in the Area 1 = 76%">
<comment><narrative>
Average of 52 families per subproject
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Eligible Quilombola communities benefited from project infrastructure investments
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="Minimum 50% of total Quilombolas by end-project">

</target>
<actual value="One community benefitted">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of project financing for socio-economic infrastructure going to the 41 poorest rural municipalities (Area 1)
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="70% of project financing in Area 1 is for socio-economic infrastructure">
<comment><narrative>
Will be updated under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="259 out of 350 subprojects are in the Area 1 = 74% 87% of project financing">
<comment><narrative>
Average of 47,38 families per subproject
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of project financing for socio-economic infrastructure going to the 41 poorest rural municipalities (Area 1)
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="70% of project financing in Area 1 is for socio-economic infrastructure">

</target>
<actual value="259 out of 350 subprojects are in the Area 1 = 74% 87% of project financing">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive investment subprojects led by women
</narrative></title>
<baseline year="2008" iso-date="2008-10-10" value="Zero"><comment><narrative>Zero</narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-10" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 35%">
<comment><narrative>
Will be updated under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="54%">
<comment><narrative>
8,902 benefited families led by women (54% of total)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2012-06-30" />
<target value="100.00">

</target>
<actual value="82.92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CONDEMs (project Municipal Councils) leverage resources from other State and Federal programs via integration activities
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 50% of CONDEMs will receive this leveraging by end-project">
<comment><narrative>
Will be measured under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="Not yet measured">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CONDEMs (project Municipal Councils) leverage resources from other State and Federal programs via integration activities
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 50% of CONDEMs will receive this leveraging by end-project">

</target>
<actual value="Not yet measured">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Eligible Quilombola communities benefited from project infrastructure investments
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 50% of total Quilombolas by end-project">
<comment><narrative>
Will be updated under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="11 Quilombolas communities benefitted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CONDEMs (project Municipal Councils) leverage resources from other State and Federal programs via integration activities
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="Minimum 50% of CONDEMs will receive this leveraging by end-project">

</target>
<actual value="Not yet measured">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in household incomes of project beneficiaries including special populations
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="30% increase">
<comment><narrative>
Will be measured under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="Not yet measured">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community subprojects implemented
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 financed 1,030 community subprojects.  Aggregate total would thus be 2,030 subprojects by end-RPRP-2."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 500 community subprojects (revised target)">
<comment><narrative>
Will be updated under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="350 subprojects financed (162 infrastructure; 142 productive and 40 social)">
<comment><narrative>
The project was restructured in December 2011, and this target was reduced to 500 subprojects.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families benefited with at least one community subproject investment
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 benefited over 27,000 families. Aggregate at end-RPRP2 would thus be min. 52,000 families"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 20,000 families (incremental)">
<comment><narrative>
Will be updated under the final study evaluation and included in the Borrower Completion Report (BCR)
</narrative></comment>
</target>
<actual value="16.583 families benefitted">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in household incomes of project beneficiaries including special populations
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2011-12-31" />
<target value="30% increase">

</target>
<actual value="Not yet measured">
<comment><narrative>
The Impact Evaluation will measure this indicator
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families benefited with at least one community subproject investment
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 benefited over 27,000 families. Aggregate at end-RPRP2 would thus be min. 52,000 families"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 20,000 families (incremental)">

</target>
<actual value="16.583 families benefitted">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of productive investment subprojects led by women
</narrative></title>
<baseline year="2008" iso-date="2008-10-10" value="Zero"><comment><narrative>Zero</narrative></comment></baseline>
<period>
<period-start iso-date="2008-10-10" />
<period-end iso-date="2011-12-31" />
<target value="Minimum 35%">

</target>
<actual value="32%">
<comment><narrative>
2.680 benefited families led by women
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in household incomes of project beneficiaries including special populations
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="30% increase">

</target>
<actual value="Not yet measured">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Community subprojects implemented
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="RPRP-1 financed 1,030 community subprojects. Aggregate total would thus be 2,030 subprojects by end-RPRP-2."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 500 community subprojects (revised target)">

</target>
<actual value="350 subprojects financed (162 infrastructure; 142 productive and 40 social)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Eligible Quilombola communities benefited from project infrastructure investments
</narrative></title>
<baseline year="2009" iso-date="2009-04-28" value="Zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-04-28" />
<period-end iso-date="2012-06-30" />
<target value="Minimum 50% of total Quilombolas by end-project">

</target>
<actual value="11 Quilombolas communities benefitted">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P111996</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Upgrading and Greening the Rio de Janeiro Urban Rail System</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(a) to improve the level of service provided to suburban rail transport users in the RJMR in a safe and cost-efficient manner; (b) to place the suburban rail transport system on a lower carbon growth path; and (c) to improve the transport management and policy framework in the Borrower's territory and in the RJMR.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Second Rio de Janeiro Mass Transit Project for Brazil is to: a) improve the level-of-service provided to the suburban rail transport users in Rio de Janeiro Metropolitan Region (RJMR) in a safe and cost-efficient manner; and b) to improve the transport management and policy framework in the RJMR. There are two components to the project, the first component being infrastructure and equipment. Acquisition of at least thirty trains Electric Multiple Unit (EMU) of four cars each and accessories for a total of at least 120 cars to be operated, on the lines of state agency in charge of the suburban railway system (CENTRAL), by the concessionaire under the terms of the concessionaire contract. This component represents about 97 percent of the total project cost. Finally, the second component is the institutional and policy development. Provision of technical assistance to Rio de Janeiro State Secretariat for Transport (SETRANS) for the carrying out of studies on policy development, including: (i) consolidating the Metropolitan Urban Transport Authority of Rio de Janeiro (AMTU-RJ) for the RJMR; (ii) updating the current integrated transport policy, land use and air quality management master plan (PDTU) for the RJMR to meet both transport and air quality targets and to introduce sound cost-recovery, tariff, regulatory, and subsidy policies; and (iii) supporting the adoption of integrated modal tariffs. Provision of technical assistance to CENTRAL for the management and supervision of the project, will include the acquisition and reception of the trains (EMU). This component represents about three percent of the total project cost.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002386"><narrative>State of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-04-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2009-07-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ana Waksberg Guerrini</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aguerrini@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative> Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322060" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.92008 -43.330688</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21012" percentage="3" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="97" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="100.000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="33" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="33" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="66" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="66" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="1" xml:lang="en"><narrative>Urban Planning</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">4090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">3220000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">10146666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">10146666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">10146666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">10146666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">10146666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">10146666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">10423333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">10423333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">10423333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">10423333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">10423333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">10423333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">63333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">63333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">63333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">63333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">63333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">63333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="1900-01-01"/>
<period-end iso-date="1900-01-01"/>
<value currency="USD" value-date="1900-01-01">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">211700000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">600000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-80655034</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-119388</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-72163495</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">529250</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">16840402</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">436946</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">498807</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">8940965</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">362692</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">338768</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">17118965</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">257322</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">2561900</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">436602</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">29983970</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">21447914</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">562924</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">15834239</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">24067797</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">8591615</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">10036673</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2259664</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">30135607</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">15065287</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">1015759</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">1113882</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">5723211</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">611856</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">452855</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">729438</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">7616765</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">4221910</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">14953722</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">1293264</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">662301</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">1047500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">361429</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">383130</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">8764980</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">26112366</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">38218797</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">8735136</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">515210</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">206705</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">9053122</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">555124</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">58583048</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">9621458</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">8780854</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">220567</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">31613384</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">10855377</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">938257</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">86420991</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">116760</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">118870</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">49370</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">7065407</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">5457876</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1673759</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">254354</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">1793658</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">2032499</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">6239588</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1298</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">11350</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1767033</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">14238403</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">10379338</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">9516360</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">796243</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">5526329</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">10725053</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">6003416</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1345243</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">65805</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2360761</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">873426</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">3353297</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">26517</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-108635</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">18782</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">20592968</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">776253</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">-529250</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">-1115</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-10-31"/><value value-date="2010-10-31">-50520</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">-69638</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">-102102</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">-210329</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-1500000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-509381</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">-595884</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-121823</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-471300</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-137084</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-423039</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-164416</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-396406</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-205477</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-425845</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-544987</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-552875</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1053118</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-689143</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1914497</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1103524</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-2713561</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1508881</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-3377054</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1702948</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-3871642</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-1855958</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-4382592</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-2849471</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-6268972</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-3007949</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-7037502</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-3058829</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-6521418</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-2371141</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-5090287</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1554936</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-2638139</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-545196</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1757542</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-533418</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1688876</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-458523</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1691418</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-2101232</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-5447242</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-4113195</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-9072694</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-4840924</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-11094976</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-5068238</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-11085928</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-4847777</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-10725421</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-3966109</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-8851139</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-3753661</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-8626076</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-3179010</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-7296301</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-496772</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-7496160</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-509269</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-8008236</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-789619</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-8227894</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1369540</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-8580549</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-2852979</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-8611875</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-4543046</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-8741584</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-5263131</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-8742199</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-5314444</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-8742199</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-5690017</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-8742199</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-5730933</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-8742199</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-5745668</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-8742199</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-5767853</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-8742693</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-5799499</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-5806773</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-5806773</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-5806773</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-5857635</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-5857635</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-9319662</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2387"><narrative>CENTRAL - Companhia Estadual de Engenharia de Transportes e Logistica</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P111996"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P111996?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P111996"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2a. Update/completion of studies (Original Loan)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100% PDTU">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1e. Cumulative % of completion of rehabilitation/modernization of metric gauge rolling stock
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2017-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mean Kilometer Between Failures
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2022-12-30" />
<target value="500.00">

</target>
<actual value="518.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Fare and Intermunicipal Bus Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2022-12-30" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1a. Trains in peak-hour (off peak) hour
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2022-12-30" />
<target value="-">
<comment><narrative>
The target has been revised in the last restructuring to conform with the maximum demand expected and the maximum train occupancy during the pandemic (about 60% of normal levels).&amp;nbsp;

The frequency of trains pre-pandemic was generally higher between branches but did not meet the previous target.&amp;nbsp;

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mean Kilometer Between Failures
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2022-12-30" />
<target value="500.00">
<comment><narrative>
This is an annual indicator (average of two semesters)&amp;nbsp;and 2022 will be reported when the semester ends.

Train failures can range from minor breakage up to serious operational disruptions, which affect the overall system&amp;rsquo;s reliability and generates disturbance to users. The inclusion of this indicator aims to measure the improvement in reliability provided by the new trains acquired by the project.

This indicator has been affected by the theft of copper cables because of the economic crisis. Nevertheless, it is 15.8 times&amp;nbsp;the baseline.&amp;nbsp;

???????Pre-pandemic levels were above the target:

2015 -&amp;nbsp;

2016 -

2017 -&amp;nbsp;

2018 -

2019 -
</narrative></comment>
</target>
<actual value="518.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time between selected stations
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator was previously a PDO Indicator and was moved to an&amp;nbsp;Intermediate Indicator. It continued&amp;nbsp;to be a relevantindicator to keep&amp;nbsp;track of, however it ceased to be relevant for measuring the&amp;nbsp;project&amp;nbsp;outcome given that operational speeds have been reduced to ensure safe operations of the newly acquired trains.&amp;nbsp;In addition, travel time is also dependent on integrated systems such as signaling and power supply, which the Project did not provide.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average passengers per square meter on Supervia Lines at peak hour
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="6.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1c. Working ratio supervia
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;In the last restructuring, the working ratio target has been reduced from 0.70 to 1.00 to reflect the decline in operational revenue due to COVID-19. A target of 1.00 still implies that operational revenue covers operational costs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2a. Update/completion of studies (Original Loan)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="PDTU"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2017-06-30" />
<target value="100% PDTU">

</target>
<actual value="100% PDTU">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Supervia stations with bicycle parking facilities
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="15.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="100.00">

</target>
<actual value="68.75">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mean Kilometer Between Failures
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator measured&amp;nbsp;the improvement in reliability provided by the new trains acquired by the project. This indicator has been affected by the theft of copper cables because of the economic crisis. Nevertheless, &lt;strong&amp;gt;it achieved 6.2 times higher than the baseline.&amp;nbsp;&lt;/strong&amp;gt;???????Pre-pandemic levels had also been above the target, reaching a MBKF of 625 in 2019.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="149.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
User satisfaction (overall)
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="5.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="6.70">

</target>
<actual value="6.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available Seat-Kilometers
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="12,968,193.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2022-12-30" />
<target value="16,900,000.00">
<comment><narrative>
This is an annual indicator (average of two semesters) and 2022 will be reported when the second semester ends.

ASK reflects additional capacity added with the new trains.&amp;nbsp;From the first half of 2020, the supply of seats was compromised by the pandemic, following the demand curve. The gradual resumption of the supply of seats was scheduled for Mar/22, however, it was postponed due to the degradation scenario generated by the theft of copper cables.

Pre-pandemic levels were considerably above the baeline and met the target:

2015 - 17,984,784,939

2016 - 19,263,540,712

2017 - 19,611,502,272

2018 - 19,355,016,196

2019 - 19,282,925,692

&amp;nbsp;
</narrative></comment>
</target>
<actual value="12,386,930,350.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1e. Cumulative % of completion of rehabilitation/modernization of metric gauge rolling stock
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2017-06-30" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1e. Cumulative % of completion of rehabilitation/modernization of metric gauge rolling stock
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy consumption per train-km (kWh)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="3.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2022-12-30" />
<target value="3.30">

</target>
<actual value="3.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of passengers per day from households earning less than 4 Minimum Salaries (MS)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
This is an annual indicator (average of two semesters) and 2022 will be reported when the semester ends.&amp;nbsp;
</narrative></comment>
</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
User satisfaction (overall)
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="5.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The acquisition&amp;nbsp;of new trains is expected to significantly increase the satisfaction of the users with the system. This indicator was included as an intermediate indicator due to the lack of a baseline before 2014 - only started to be measured at the same time the new trains were being put in operation.&lt;/p&amp;gt;

&lt;p&amp;gt;The user satisfaction survey was interrupted during the Covid-19 pandemic, and has resumed with a single survey done in 2022 before Project closing.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Fare and Intermunicipal Bus Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2022-12-30" />
<target value="100.00">
<comment><narrative>
Procurement processes for the two studies have not been started, but have been committed to by the GoRJ authorities. Expected delivery in Q2/2023.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available Seat-Kilometers
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="12968193.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;ASK reflects additional capacity added with the new trains.&amp;nbsp;From the first half of 2020, the supply of seats was compromised by the pandemic, following the demand curve. The gradual resumption of the supply of seats was scheduled for Mar/22, however, it was postponed due to the degradation scenario generated by the theft of copper cables. Pre-pandemic levels had&amp;nbsp;met the target, with an ASK of 19,282,925 million in 2019.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="12225873.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1c. Working ratio supervia
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="1.00">

</target>
<actual value="0.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Fare and Intermunicipal Bus Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Procurement processes for the two studies have not been started, but have been committed to by the GoRJ authorities. Expected delivery in 2023.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Reductions of) transport-related green house gas emissions in the Supervia area of influence (Ton CO2)
</narrative></title>
<baseline year="2011" iso-date="2011-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-22" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Client only provided data for the reference year 2012, with total emissions reduction estimated in 33,360 tCO2-eq based on network simulation results. However, this estimate could not be extrapolated to the closing date as it did not capture Covid-19 effects. The ICR performed&amp;nbsp;an independent calculation based on a World Bank emissions tool for rail projects, and obtained the reported indicator. Though it lies below target in 2022, the model forecasts the target to be met in 2031 and exceeded thereafter, thus consistent with PDO2 &amp;quot;placing the rail system on a low-carbon growth path&amp;quot;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17703.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Reductions of) transport-related green house gas emissions in the Supervia area of influence (Ton CO2)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="34,000.00">
<comment><narrative>
The reductions of transport-related greenhouse gas emissions in the SuperVia area of influence (Ton CO2 per year) have&amp;nbsp;been calculated for 2012 considering all project interventions. This reduction was extrapolated for 2019, the most recent year with reliable system-wide emissions simulation.
</narrative></comment>
</target>
<actual value="67,100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1b. Additional demand generated from project on SuperVia -passengers per day
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SuperVia stations with bus-rail fare integration
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2022-12-30" />
<target value="75.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;There were 5 studies completed to date (PELC- Logistics Master Plan, NMT business plan at stations, TOD, CIMU - study to design and implement a control center (CIMU),&amp;nbsp;and Socioeconomic Impact Evaluation), plus 1 study with 50% completion (Climate Change), out of a total of 8 studies; thus a proportional 68.75% completion was considered. Two studies (the Rail Sustainability Plan and th Level Crossings Diagnostic) have not been initiated, but are committed to by GoRJ authorities with expected deliveries in 2023 and 2024 respectively.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="68.75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 2a. Update/completion of studies (Original Loan)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="PDTU"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2017-06-30" />
<target value="100% PDTU">

</target>
<actual value="100% PDTU">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of passengers per day from households earning less than 4 Minimum Salaries (MS)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;This is an annual indicator (average of two semesters) and was last reported for reference year of 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Supervia stations with bicycle parking facilities
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;The target was changed in the last restructuring after the stations with bicycle storage facilities suspended their services because of issues with the service operator and low demand because of COVID-19. The Project had met the original target before the pandemic.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of passengers per day from households earning less than 4 Minimum Salaries (MS)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="80.00">

</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
(Reductions of) transport-related green house gas emissions in the Supervia area of influence (Ton CO2)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="34000.00">

</target>
<actual value="67100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1b. Additional demand generated from project on SuperVia -passengers per day
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="0.00">
<comment><narrative>
&lt;p&amp;gt;The target has been adjusted from 70,211 to 0. Demand has been severely affected by a series of exogenous impacts, first the economic crisis in the State of Rio de Janeiro since 2016 followed by COVID-19. This indicator was the highest in 2016, reaching 118,536 and thus&amp;nbsp;meeting the target, but demand has eroded since. In 2020 demand was below the baseline in 2009 and is only expected to bounce back in 2025.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1b. Additional demand generated from project on SuperVia -passengers per day
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="0.00">
<comment><narrative>
The target has been adjusted from 70,211 to 0. Demand has been severely affected by a series of exogenous impacts, first the economic crisis in the State of Rio de Janeiro since 2016 followed by COVID-19. This indicator was the highest in 2016 reaching 118,536 in 2016, meeting the target, but demand has eroded since. In 2020 demand was below the baseline in 2009 and is only expected to bouce back in 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available Seat-Kilometers
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="12968193.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2022-12-30" />
<target value="16900000.00">

</target>
<actual value="12386930350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Supervia stations with bicycle parking facilities
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="15.00">
<comment><narrative>
The target was changed in the last restructuring after the stations with bicycle storage facilities suspended their services because of issues with the service operator and low demand because of COVID-19. The Project met the target before the pandemic.
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy consumption per train-km (kWh)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="3.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2022-12-30" />
<target value="3.30">
<comment><narrative>
The indicator, included in the last restructuring,&amp;nbsp;measures energy efficiency from the new rolling stock acquisition, which would reduce the carbon emission per train-km and place the system on a lower carbon growth path.
</narrative></comment>
</target>
<actual value="3.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SuperVia stations with bus-rail fare integration
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2022-12-30" />
<target value="75.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average passengers per square meter on Supervia Lines at peak hour
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="6.00">
<comment><narrative>
This is an annual indicator (average of two semesters) and 2022 will be reported when the semester ends.&amp;nbsp;

Although ridership has decreased because of the pandemic, which could affect the average number of passengers per sq meter to meet the maximum train occupancy at the peak of isolation measures, pre-pandemic levels met the target (up to 6) and were below the baseline (8):&amp;nbsp;

2015: 7

2016: 6.5

2017: 6

2018: 6

2019: 6

&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average passengers per square meter on Supervia Lines at peak hour
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Having exceeded the target by achieving an average of&amp;nbsp;pax/m2 of 3, this indicator is considered to be artificially depressed due to pandemic-induced decreases in ridership. However, the indicator had already reached the target of 6 pax/m2 prior to the pandemic.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 2.b. Studies (Additional Finance) (% of Completion)
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="100.00">
<comment><narrative>
There were 5 studies completed to date (PELC- Logistics Master Plan, NMT business plan at stations, TOD, CIMU - study to design and implement a control center (CIMU),&amp;nbsp;and Socioeconomic Impact Evaluation), plus 1 study with 50% completion (Climate Change), out of a total of 8 studies; thus a proportional 68.75% completion was considered. Two studies (the Rail Sustainability Plan and th Level Crossings Diagnostic) have not been initiated, but are committed to by GoRJ authorities with expected deliveries in 2023 and 2024 respectively.
</narrative></comment>
</target>
<actual value="68.75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1d. Cumulative % of train manufacturing completion
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Component 1c. Working ratio supervia
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2022-12-30" />
<target value="1.00">
<comment><narrative>
In the last restructuring, the working ratio target has been reduced from 0.70 to 1.00 to reflect the decline in operational revenue due to COVID-19. A target of 1 still implies that operational revenue covers operational costs.
</narrative></comment>
</target>
<actual value="0.97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Component 1a. Trains in peak-hour (off peak) hour
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="---"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Targets have&amp;nbsp;been revised in the last restructuring to conform with the maximum demand expected and the maximum train occupancy during the pandemic (about 60% of normal levels).&amp;nbsp;The frequency of trains pre-pandemic used to be generally higher between branches but had not met original targets.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="---">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy consumption per train-km (kWh)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="3.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator, included in the last restructuring,&amp;nbsp;measures energy efficiency from the new rolling stock acquisition, which would reduce the carbon emission per train-km and place the system on a lower carbon growth path.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time between selected stations
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2021-12-31" />
<target value="0.00">
<comment><narrative>
The indicator was previously a PDO Indicator and was moved to an&amp;nbsp;Intermediate Indicator. It continues to be a relevant indicator to track, however it does not&amp;nbsp;measure&amp;nbsp;a project&amp;nbsp;outcome given that operational speeds have been reduced to ensure safe operations of the newly acquired trains.&amp;nbsp;In addition, travel time is also dependent on integrated systems such as signaling and power supply. No new Project activities are expected to have an impact on this indicator.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
User satisfaction (overall)
</narrative></title>
<baseline year="2014" iso-date="2014-06-30" value="5.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-06-30" />
<period-end iso-date="2022-12-30" />
<target value="6.70">
<comment><narrative>
The acquisition&amp;nbsp;of new trains is expected to significantly increase the satisfaction of the users with the system. This indicator was included as an intermediate indicator due to the lack of a baseline before 2014 - only started to be measured at the same time the new trains were being put in operation.

The user satisfaction survey was interrupted during the Covid-19 pandemicnd has not been resumed in time to supply the associated indicator.
</narrative></comment>
</target>
<actual value="6.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Component 1d. Cumulative % of train manufacturing completion
</narrative></title>
<baseline year="2008" iso-date="2008-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-30" />
<period-end iso-date="2019-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P112073</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Federal Integrated Water - Interaguas</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the Government of Brazil to improve the coordination and strengthen the capacity among key federal institutions in the water sector toward an integrated approach.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Federal Integrated Water Sector-Interaguas Project is to supports the Government of Brazil to improve the coordination and strengthen the capacity among key federal institutions in the water sector toward an integrated approach. There are five components to the project, the first component being water resources management. This component will reduce the disparities between the Borrowers's federal and states water management systems, and identify actions to mitigate and adapt to climate change. The second component is the water, irrigation, and disaster risk management. This component will provision support for institutional strengthening to improve water infrastructure, irrigation and Sistema Nacional de Defesa Civil (SINDEC) activities, and to raise the overall assessment capacity of strategic existing water infrastructure and disaster risk management capacity, including floods and droughts and other hazards. The third component is the water supply and sanitation. This component will provide support to the implementation of the Borrower's 2007 national sanitation law no. 11.445, the improvement of the quality of the provision of water supply and basic sanitation services and contribution to promote universal access to these services. The fourth component is the intersectoral coordination and integrated planning. This component will provide support to integrated planning; identify areas of mutual interest, overlap, or conflict in the sectoral plans which impact or depend upon water. Finally, the fifth component is the project management, monitoring, and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002398"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002398"><narrative>Ministry of Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002394"><narrative>ANA - National Water Agency</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-12-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-07-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-10-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-10-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paula Pedreira de Freitas de Oliveir</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pfreitas@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>











<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390290" />
            <name><narrative>Rio Grande do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.75 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393129" />
            <name><narrative>Pará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4 -53</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395443" />
            <name><narrative>Maranhão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407762" />
            <name><narrative>Amapá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1 -52</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5833302 -36.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447799" />
            <name><narrative>Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Paraná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Distrito Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463930" />
            <name><narrative>Espirito Santo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20 -40.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662560" />
            <name><narrative>Roraima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 -61.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924825" />
            <name><narrative>Rondônia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 -63</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="54" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="5" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="80" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="5" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="5" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="5" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="15" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="80" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="80" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="5" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="99" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="54" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">2.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">2.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">2.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">2.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">2.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">2.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">3.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">3.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">90934657.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">90934657.78</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">107332500</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-43549125</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-47385533</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">268331</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">3900000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">950000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1185000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">5297596</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">931817</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1359682</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">390000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">3520000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-3404584</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-268331</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-1965</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-12484</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-10147</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-9403</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-26814</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-30099</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-34376</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-51995</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-65423</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-125415</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-143093</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-184854</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-310884</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-320932</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-239128</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-186812</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-85246</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-65663</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-60388</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-63763</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-214008</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-343748</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-376370</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-383635</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-362676</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-304247</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-292959</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-249521</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-166067</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-274138</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-293519</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-330788</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-407172</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-407172</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-329829</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2394"><narrative>ANA - National Water Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2395"><narrative>Ministry of Environment</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2396"><narrative>Ministry of Cities</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2397"><narrative>Ministry of National Integration</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112073"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112073?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112073"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water resources planning instruments improved
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Metropolitan regions with water supply integrated planning developed
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="0">
<comment><narrative>
This indicator was added at restructuring. Target not achieved as, due to the large number of ongoing activities within ANA, it proved impossible to bid and elaborate the necessary studies during the project implementation period.

The following original indicator was dropped at restructuring: “Management models for WSS services and operation and maintenance of
water infrastructure defined and established in 10 systems properly regulated as reported by the relevant ministries”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Service providers, users of the Sanitation Integrated Management System  GSAN, benefitted by the Systems updating and revision
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-30" />
<target value="33.00">
<comment><narrative>
This indicator was added at restructuring. The target was exceeded by 24 percent.  The state and local government service providers benefitted in this regard are located in numerous states including Alagoas, Amazonas, Bahia, Maranhão, Mato Grosso, Paraiba, Pará,ernambuco, Piaui, Rio Grande do Norte, Rondônia, Roraima, Santa Catarina, São Paulo, with the largest number (15) situated in Santa Catarina. A complete list is available in the project files.

The following original indicator was dropped at restructuring: “Operaional manuals of federal WSS programs revised to incorporate
coordination with water resources management policy and plans”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Service providers, users of the Sanitation Integrated Management System  GSAN, benefitted by the Systems updating and revision
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="25.00">

</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Action strategies proposals prepared in the following themes: (i) reuse of treated effluents; and (ii) water supply in the surroundings of large water infrastructure works
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="2">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of Project amount executed in water sector integrated actions
</narrative></title>
<baseline year="2011" iso-date="2011-07-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-11" />
<period-end iso-date="2018-10-31" />
<target value="25.00">

</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PMUs coordination meetings (cumulative)
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="28.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water resources planning instruments improved
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="6.00">
<comment><narrative>
This indicator was added at restructuring. The target was fully achieved. More specifically, under the project the Ministry of Environment produced: (i) methodological roadmap to establish municipal environmental zoning; (ii) analysis of subsurface waters in the state of Paraná; and (iii) the Water Resource Management Plan for Goiás; and ANA produced: (iv) the National Water Security Plan; (v) National Sewage Atlas; and (vi) the Hydrogeological Evaluation of Karstic and Fissure-Karstic Aquifers in the São Francisco Hydrographic Region. 

The following original indicators were dropped at restructuring: “2,400 kilometers of rivers being regularly monitored for water quality though the National Water Quality Monitoring Program. (additional)”; and “Volume (8 billion m3 per year) of bulk water being invoiced (and 50% percentage paid of that volume) in the country, excluding power generation”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Interministerial Mgmt. Committee , at the Executive Sector Secretariats or Directors (ANA) level, established and functioning regularly with all institutions that participate in Interaguas.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Committee not established yet."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Committee established and functioning, meeting twice a year at the Executive Sector Secretariats or Directors (ANA) level.">

</target>
<actual value="Committee established and maintained over the life of the project, meeting on average every eight months.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulators supported by the Project represent 12 million WSS service users with access to services which are formally regulated according to Law 11.445
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="10 million WSS service users"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Regulators represent 36.2 million USS services users.">
<comment><narrative>
The following original indicator was revised at restructuring: “Regulators supported by the Project represent 10 million WSS service users with access to services, which are formally regulated according to Law 11.445”

Target exceeded by 201 percent.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for drought preparedness and response developed within MI
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="No Guidelines"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="developed">

</target>
<actual value="Not started">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports, financial management and audits of the program prepared
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="14.00">

</target>
<actual value="38.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
WSS service providers supported by the Project, which are implementing non-revenue water management and energy efficiency programs,supplying services to at least 12 million users
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="12 million users.">

</target>
<actual value="20 million users.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Resources Plan revised (second revision) and adopted.
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="First revision completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Second revision completed and adopted">
<comment><narrative>
This indicator was added at restructuring. The target was fully achieved as the planned second revision was completed and adopted.

The following original indicator was dropped at restructuring: “Information system established and functioning to monitor and evaluate the implementation of the National Water Resources Plan”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Guidelines for drought preparedness and response developed within MI
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="No Guidelines"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Not started">
<comment><narrative>
This indicator was added at restructuring. Target was not achieved. Non-delivery of this product was due to the same institutional disruptions mentioned above in relation to other activities that were to have been undertaken by the Ministry of National Integration (MI).
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated technical planning unit functioning.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Technical team with partial dedication."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Unit Functioning integrating other technical areas and established within the Ministry structure.">
<comment><narrative>
Target achieved. This action entailed establishment and functioning of the INTERAGUAS Project Management Unit (PMU) in the Ministry of National Integration (MI), which until February 2017 was officially linked to the Executive Secretariat and after that time to te Regional Development Secretariat (SDR) of this Ministry.
</narrative></comment>
</target>
<actual value="Unit Functioning integrating other technical areas and established within the Ministry structure.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Irrigation Plan prepared and completed
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="No Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Plan Completed">

</target>
<actual value="Not started">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical Hydraulic Infrastructure, Irrigation, Civil Defense and Regional Development manuals established.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="4">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical basins of special interest* to the countrys water resources management with qualitative and quantitative water balance finalized for improved water resources management.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="23.00">

</target>
<actual value="23.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Technical Staff in the areas of Hydraulic Infrastructure, Irrigation, Civil Defense and Regional Development have been trained
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="10.00">
<comment><narrative>
The following original Indicator was revised at restructuring: “Technical Staff in the areas of Hydraulic Infrastructure, Irrigation and Civil Defense have been trained”.

10 percent of the revised target achieved. It was not possible for MI to increase this total because of legal restrictions for the payment for training, per diems, and transport for civil servants within an international technical cooperation project, which were imposed as part of the budgetary restrictions in the federal public sector due to the persisting fiscal crisis.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The WSS National Info System (SINISA) implemented including all its subsectors (potable water supply, sanitation, solid waste, and drainage) and modules and functioning.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="SINISA functioning with WSS subsectors and operational module"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="The current WSS National Information System (SNIS) was improved, making improvements in the WSS and Solid Waste modules and implementing the urban drainage module. SNIS is now in compliance with the requirements of the National Basic Sanitation Law, comprising the 4 subsectors – water supply, sanitation, solid waste and drainage, the information is available on-line at: http://www.snis.gov.br/. In addition, MCid is developing SINISA to further upgrade the system. Some improvements were also funded by the Project.">
<comment><narrative>
Target fully achieved. Due to the improvements introduced under the project SNIS is now in compliance with the requirements of the National Basic Sanitation Law, comprising the 4 subsectors – water supply, sanitation, solid waste and drainage, the information is available on-line at: http://www.snis.gov.br/. In addition, MCid is developing SINISA to further upgrade the system.
</narrative></comment>
</target>
<actual value="SINISA functioning with WSS, Solid Waste, Urban Drainage subsectors and operational and institutional modules">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water resources management institutions supported by the Project
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="14.00">
<comment><narrative>
This indicator was added at restructuring. The target was achieved. The 14 institutions supported were the following: (i) at the federal level: MMMA, ANA, the National Water Council (CNRH), and the Geological Service of Brazil (CPRM); (ii) at the state level: the Secretariats and Departments in change of water resources management in Bahia, Goiás, Minas Gerais, Paraná, and São Paulo; and (iii the municipalities of Maceió, Alagoas; Imperatriz, Maranhão; Londrina, Paraná; Nova Friburgo, Rio de Janeiro; and Palmas, Tocantins. Those institutions were supported through different actions implemented.

The following two original indicators were dropped at restructuring: “13 state water agencies and 4 federal river basin water agencies that are properly functioning, applying the management instruments established by law (cumulative) and “13 Water agencies reasonably well staffed (cumulative)”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water resources management institutions supported by the Project
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="14.00">

</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Metropolitan regions with water supply integrated planning developed
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="6">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Actions Plan for Rehabilitation of Federal Dam Safety established and under implementation
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="no Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Plan established and under implementation">

</target>
<actual value="Plan completed but not under implementation.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of Project amount executed in water sector integrated actions
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="45.00">
<comment><narrative>
This indicator was added at restructuring. The target was exceeded by 80 percent. This reflects the greater share of actual project costs for integrated actions in the water sector. This percentage includes the actual budget for all products that were produced in an integrated manner under the project, more specifically all those in Component 4 plus the Water Resources Management Plan for the state of Goiás and Hydrogeological Evaluation of Karstic and Fissure-Karstic Aquifers in the São Francisco Hydrographic Region.  Th primary products of Component 4 were the National Sewage Atlas, the National Water Security Plan, the reuse study, the Ecological-Economic (MEE) Macro Zoning of the São Francisco River basin, the Piancó Branch study, the diagnostic studies for the National Wastewater Plan, and two studies (one on cost and the other on renewable energy) related to the Integrated Program for the São Francisco (PISF).

The following original indicator  was dropped at restructuring: “25 water sector activities and projects implemented by institutions participating in the Project included in the GoB's Multiyear Plan (PPA 2012-2015) following an integrated approach, as attested by an independent evaluation”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Water Resources Plan revised (second revision) and adopted.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="First revision completed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Second revision completed and adopted">

</target>
<actual value="Second revision completed and adopted">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ecological-Economic Macro Zoning of Sao Francisco River Basin completed
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A water portal with access to sector-specific information systems, studies, and analytical work is implemented and available to the public.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Not portal"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="A project website was created and is functioning housed by the National Water Agency including the main project results. The webpage is being updated to include links to the different water related systems and databases under the Ministries of Environment, Citiesand National Integration.">
<comment><narrative>
The following original indicator was revised at restructuring: “A water indicators portal connecting sector-specific information systems, studies, and analytical work is implemented and available to the public”.

The revised target was partially met at the time of project closing but as of April 1, 2019 still had not been completed. As of the present time, the website only contains basic project information and some project outputs.  See http://interaguas.ana.gov.br
</narrative></comment>
</target>
<actual value="Functioning and Available to the Public">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The WSS National Info System (SINISA) implemented including all its subsectors (potable water supply, sanitation, solid waste, and drainage) and modules and functioning.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="SINISA functioning with WSS subsectors and operational module"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="SINISA functioning with WSS, Solid Waste, Urban Drainage subsectors and operational and institutional modules">

</target>
<actual value="The current WSS National Information System (SNIS) was improved, making improvements in the WSS and Solid Waste modules andimplementing the urban drainage module. SNIS is now in compliance with the requirements of the National Basic Sanitation Law,comprising the 4 subsectors  water supply, sanitation, solid waste and drainage, the information is available on-line at:http://www.snis.gov.br/. In addition, MCid is developing SINISA to further upgrade the system. Some improvements were also fundedby the Project.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Seminars, workshops or technical meetings held (cumulative).
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="19">
<comment><narrative>
The following original indicator was revised at restructuring: “10 seminars and workshops held (cumulative)” and original target: “10 in 2016”

Revised target exceeded by 35.7 percent. A complete list of these events is available in the project files.
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural water and sanitation program improved including technology and management innovations
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Technologic and institutional proposals for rural Water and Sanitation elaborated">

</target>
<actual value="Not started">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National and/or regional planning instruments developed in an integrated manner
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="2 (National Sewage Atlas completed; and National Water Security Plan)">
<comment><narrative>
This indicator was added at restructuring. Target partially (33.3 percentage) achieved.  The National Sewage Atlas was completed by the time of project closing and the National Water Security Plan, which is a high priority of the new federal administration, wille launched in April 2019 as the flagship report of the new Government Administration.

The following three original indicators were dropped at restructuring: “A decentralized technical and operational structure established and functioning in the São Francisco rivr basin.” “The institutional coordination arrangement in the Araguaia-Tocantins river basin is functional and strengthened.” “100 staff trained in the two river basins.”
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National and/or regional planning instruments developed in an integrated manner
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="3">

</target>
<actual value="2 (National Sewage Atlas completed; and National Water Security Plan to be completed by January 2018)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of water utilities that the Project is supporting. (Core Indicator)
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="35">
<comment><narrative>
This indicator was added at restructuring. Target exceeded by 13.3 percent. In addition to the 32 state and municipal water and sanitation utilities mentioned in connection with the previous indicator, the WSS utility in Bahia was added from the water loss project and those in São Paulo and the Federal District from the reuse project.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Professional specialists, members of the National Water Resources System (SINGREH) trained*. (*Through training activities, courses, technical visits carried out by the Project).
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="91"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="120">

</target>
<actual value="651">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A water portal with access to sector-specific information systems, studies, and analytical work is implemented and available to thepublic.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Functioning and Available to the Public">

</target>
<actual value="A project website was created and is functioning housed by the National Water Agency including the main project results. Thewebpage is being updated to include links to the different water related systems and databases under the Ministries of Environment,Cities and National Integration, to be completed by end of December 2018: http://interaguas.ana.gov.br/Paginas/Docs.aspx.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated technical planning unit functioning.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Technical team with partial dedication."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Unit Functioning integrating other technical areas and established within the Ministry structure.">

</target>
<actual value="Unit Functioning integrating other technical areas and established within the Ministry structure.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies finalized contributing to improve the analysis of water rights concession
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="3.00">
<comment><narrative>
This indicator was added at restructuring. The target was fully achieved. These studies were produced by ANA, specifically: (i) criteria definition to protect buildings and infrastructure against backwater effects due to flooding in reservoirs ii) a study to improve the water right concessions in cases of uncertainty scenarios of water availability in the future (due to climate change); and (iii) a study to improve the water right concessions in situations of water availability finished.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ecological-Economic Macro Zoning of Sao Francisco River Basin completed
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="1.00">
<comment><narrative>
This indicator was added at restructuring. Target fully achieved. Under coordination of MMA, this product was generated with the participation and cooperation of numerous federal government agencies and states as well as the Hydrographic Basin Committee for the São Francisco River (CBHSF), and the oversight of two federal commissions: (i) the Coordinating Commission for Ecological-Economic Zoning of the National Territory (CCZEE); and (ii) the Brazil ZEE Consortium, both established by federal decree on December 28, 2001.

The following original indicators were dropped at restructuring: “Impact evaluation is tested on a pilot basis and reports published”; “A water indicators portal connecting sector-specific information systems, studies, and analytical work is implemented and available to the public and functioning as evidenced by online data for the São Francisco river basin”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Interministerial Mgmt. Committee , at the Executive Sector Secretariats or Directors (ANA) level, established and functioning regularly with all institutions that participate in Interaguas.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="Committee not established yet."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Committee established and maintained over the life of the project, meeting on average every eight months.">
<comment><narrative>
The following original indicator was revised at restructuring: &quot;Inter-ministerial management committee, at the Secretariat level, for water sector programs established and functioning regularly* with all institutions that participate in Interáguas. (*Functioning regularly means at least 2 meetings per year at Secretariat level.)”.

The revised target was met except for all but the final year, when project implementation was well-advanced following the Mid-Term Review (MTR) and restructuring at which time the Committee had been very proactive.
</narrative></comment>
</target>
<actual value="Committee established and functioning, meeting twice a year at the Executive Sector Secretariats or Directors (ANA) level.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States Irrigation Plans completed (cumulative)
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="4.00">
<comment><narrative>
This indicator was added at restructuring. At that time, three state irrigation plans (for Minas Gerais, Rio Grande do Sul, and Tocantins) had already been completed not utilizing project resources, while four others were under negotiation to be financed by INTERAGUAS. However, in practice only one of these (for the Federal District) was completed during the project implementation period, again due in part to the above-mentioned political changes in the Ministry jn 2017. 

The following original indicator was dropped at restructuring: “Irrigation technical and operational rules established”.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of critical basins of special interest* to the countrys water resources management with qualitative and quantitative water balance finalized for improved water resources management. (*Critic
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="23.00">
<comment><narrative>
This indicator was added at restructuring. The target was 100 percent achieved.  The critical basins are identified in ANA Portaria No. 62/2013 and the project focused on 23 of them that are mainly in the South Atlantic, Southeast Atlantic (including several streches of the Paraiba do Sul River Basin), East Atlantic, Paraná, São Francisco, Araguaia-Tocantins, and Uruguai hydrographic regions.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Actions Plan for Rehabilitation of Federal Dam Safety established and under implementation
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="no Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Plan completed but not under implementation">
<comment><narrative>
This indicator was added at restructuring. Target 50 percent achieved as even though the plan had just been completed by the time the project closed, it was not yet possible to start implementation.  The MI informs that because of the large number of dams involved, considerable time will be required for them to all be regularized – i.e., approximately 5-10 years in accordance with budget availability. However, it is expected that plan implementation will begin this year, which is also the beginning of a new Presidential administration, because it remains a high federal government priority. The recent (January 2019) extremely tragic dam break in Brumadinho, Minas Gerais, will undoubtedly result in added public and political urgency for the new administration to proceed with implementation of this plan.

The following original indicators were dropped at restructuring: “Monitoring and Evaluation System for Water Infrastructure Projects established and under implementation”; and “Information System on dams (water supply, irrigation, flood control) infrastructure implemented.”
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies finalized contributing to improve the analysis of water rights concession
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progress reports, financial management and audits of the program prepared
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="38.00">
<comment><narrative>
The following original indicator was revised at restructuring: “10 quarterly, semiannual, and yearly progress reports, financial
management, and audits of the program. (cumulative)”.

This revised target was not estimated correctly at the time of the Mid-Term Review (MTR) and, in fact, should have been 14 progress reports, 7 audit reports, and 27 financial management reports or 48 altogether.  Thus, the actual number achieved at completion represented 79.2 percent of what should have been the target and was composed of 5rogress reports (not in compliance with the loan agreement), 6 audit reports, and 27 financial management reports.
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Technical Hydraulic Infrastructure, Irrigation, Civil Defense and Regional Development manuals established.
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="1">
<comment><narrative>
The following original indicator was revised at restructuring: “Technical, operational and Hydraulic Infrastructure, Irrigation and Civil Defense* manuals established. (*Civil Defense is responsible for risk and disaster management activities)”.

25 percent achieed.  It was originally expected that MI would produce a manual for each of its four Secretariats, but only the one for the Secretariat of Civil Defense (SEDEC) could be prepared in practice. Because of changes in priorities within MI due to turnovers in the senior positions in the Ministry, it was not possible to do the other three. Having said that, SEDEC was able to develop different manuals and guidelines for the Civil Defense sector.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Technical Staff in the areas of Hydraulic Infrastructure, Irrigation, Civil Defense and Regional Development have been trained
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="100.00">

</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
States Irrigation Plans completed (cumulative)
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="7.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Number of water utilities that the Project is supporting. (Core Indicator)
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="30">

</target>
<actual value="35">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regulators supported by the Project represent 12 million WSS service users with access to services which are formally regulated according to Law 11.445
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="Regulators represent 12 million WSS service users.">

</target>
<actual value="Regulators represent 36.2 million USS services users.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of PMUs coordination meetings (cumulative)
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="24.00">
<comment><narrative>
This indicator was added at restructuring. This revised target was 85.7 percent achieved. The shortfall occurred mainly in the two years (2016-2017) following the restructuring due to a lack of coordination and decline in interest on the project on the part of some of the participants.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
WSS service providers supported by the Project, which are implementing non-revenue water management and energy efficiency programs, supplying services to at least 12 million users
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="10 million users."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="20 million users">
<comment><narrative>
The following original indicator: “WSS service providers supported by the Project, which are implementing non-revenue water management and energy efficiency programs, supplying services to at least 10 million users”.

Target surpassed by 66.7 percent.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
National Irrigation Plan prepared and completed
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="No Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Not started">
<comment><narrative>
This indicator was added at restructuring. Target was not achieved.  It was not possible to proceed with preparation of this plan due to the complexity of the task and lack of specialized staff in MI, as well as the lower internal priority given to irrigation within the Ministry when the National Secretariat of Irrigation was extinguished in early 2017 following the appointment of a new Minister and other senior officials.

The following two original indicators were dropped at restructuring: “Mapping of areas with potential to irrigated agriculture completed.”
“Plan to improve the dynamism of irrigation perimeters prepared, completed and approved with short, medium and long-term solutions that guarantee the feasibility of technical, economic, social and environmental actions.”
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Seminars, workshops or technical meetings held (cumulative).
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="14">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Action strategies proposals prepared in the following themes: (i) reuse of treated effluents; and (ii) water supply in the surroundings of large water infrastructure works
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="1">
<comment><narrative>
This indicator was added at restructuring. Target 50 percent achieved.  The first of these plans (i.e., reuse) was implemented but the second was not due to changes of priorities within MI.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rural water and sanitation program improved including technology and management innovations
</narrative></title>
<baseline year="2015" iso-date="2015-06-30" value="Not established"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-30" />
<period-end iso-date="2018-10-31" />
<target value="Not started">
<comment><narrative>
This indicator was added at restructuring. The target was not achieved. This task, which was agreed at the time of the restructuring, like others under the responsibility of MI, fell victim to the significant institutional issues that occurred as a result of the change in its senior management and internal structure in early 2017.

The following three original indicators were dropped at restructuring: “Federal Civil Defense System reorganized (institutional, procedures, instruments).” “CENAD expanded and improved.&quot; and “15 States teams trained in risk and disaster management.”
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Professional specialists, members of the National Water Resources System (SINGREH) trained*. (*Through training activities, courses, technical visits carried out by the Project).
</narrative></title>
<baseline year="2011" iso-date="2011-07-12" value="91"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-07-12" />
<period-end iso-date="2018-10-31" />
<target value="651">
<comment><narrative>
The following original indicator was revised at restructuring: “400 Professional specialists in the national and state water system that have been trained (e.g., water agency staff, national and state council's members, river basin committee's members)”.

The revsed target (120) was greatly surpassed (by 442 percent) and the original target was exceeded by 10.5 percent.
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P112074</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Sergipe Water</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objective is to promote the efficient and sustainable use of water in the Sergipe River Basin, by strengthening the State's sector management, enhancing land management practices and improving water quality.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sergipe Water Project for Brazil is to promote the efficient and sustainable use of water in the Sergipe River Basin, by strengthening the State's sector management, enhancing soil management practices and improving water quality. There are three components to the project, the first component being integrated water resources management and institutional development. This component includes: a) preparatory work for the design of the institutional model of an agency in charge of water resource management; b) development of water resources and environmental management procedures and instruments; c) improvement of the soil management practices in the Sergipe River Basin; d) development and implementation of new regional management models for the provision and management of solid waste and water and sanitation services for rural and small towns; and e) carrying out of communication and environmental education programs. The second component is the water for irrigation. This component includes: i) rehabilitation and modernization of public irrigation perimeters and water infrastructure in the Poçao da Ribeira and Jacarecica one dam perimeters; ii) promotion of environmental management through the implementation of selected activities designed to promote soil and water conservation and more efficient irrigation methods for farmers; and iii) rehabilitation of existing tubular wells in the Sergipe River Basin and construction of small-scale rural and small-town water supply and sanitation solutions in selected localities of the Sergipe River Basin. Finally, the third component is the water for cities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002399"><narrative>State of Sergipe</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002399"><narrative>State of Sergipe</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002400"><narrative>DESO-SE</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-02-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-01-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paula Pedreira de Freitas de Oliveir</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pfreitas@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451304" />
            <name><narrative>Ribeirópolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.52176 -37.37833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456233" />
            <name><narrative>Nossa Senhora das Dores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.45356 -37.246769</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460974" />
            <name><narrative>Itabaiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.685 -37.425282</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320684" />
            <name><narrative>Areia Branca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.74259 -37.301231</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320691" />
            <name><narrative>Divina Pastora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.67935 -37.168171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320699" />
            <name><narrative>Laranjeiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.807 -37.168961</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320701" />
            <name><narrative>Malhador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.69202 -37.269138</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320702" />
            <name><narrative>Maruim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.72692 -37.110222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320703" />
            <name><narrative>Moita Bonita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.59078 -37.33633</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320705" />
            <name><narrative>Nossa Senhora Aparecida</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.29846 -37.488121</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320710" />
            <name><narrative>Riachuelo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.71605 -37.225021</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320715" />
            <name><narrative>Santa Rosa de Lima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.63139 -37.228661</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320716" />
            <name><narrative>Santo Amaro das Brotas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.7773 -36.95834</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324315" />
            <name><narrative>Feira Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.31724 -37.338501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324320" />
            <name><narrative>São Miguel do Aleixo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.36859 -37.358559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14050" percentage="56" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="11" xml:lang="en"/><sector vocabulary="1" code="31140" percentage="10" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="6" xml:lang="en"/><sector vocabulary="1" code="14081" percentage="4" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WB" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="33" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="50" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="20" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="3" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="3" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="20" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="20" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="20" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="3" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="83" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="20" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="20" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="33" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">58333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">58333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">761666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">761666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1171666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1171666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1171666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1462916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1462916.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">6834285.07</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">6834285.07</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">70275000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-6834285</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">175688</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">7566395</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">2429195</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">2279443</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">2302243</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">1663125</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">1884502</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">4380665</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">2737643</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">1263783</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1888752</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">3068614</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">2155634</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">1077288</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">1143707</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">2430262</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">1442964</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1678979</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">1406926</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">1281723</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">2242432</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">902364</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">3721623</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2424478</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1904354</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">1689842</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">2745019</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1327269</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">2225804</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-175688</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-23193</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-56586</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-52939</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-52233</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-51771</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-55795</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-62625</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-152714</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-250271</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-315456</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-415620</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-665640</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-806851</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-845490</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-754526</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-478849</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-344340</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-321857</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-316696</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-748938</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1461098</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1495874</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1521502</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1463020</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1202928</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1158283</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-974400</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-567031</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-669468</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-856540</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1021084</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1142504</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1408223</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1513893</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1637283</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1706951</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2400"><narrative>DESO-SE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-2401"><narrative>Secretariat of Urban Development and Sustainability (SEDURBS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112074"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P112074?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P112074"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water Users Benefited from Improved Irrigation System
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&amp;nbsp;Added in the first restructuring and did not change. All farmers located in the irrigation perimeter were benefitted - originally 600, but at the end of the Project, there&amp;nbsp;were 593 farmers.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="593.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated procedures and tools for environmental licensing and water rights implemented
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefiting from improved water supply system by the Project
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved. Core sector indicator added in the June 2017 restructuring.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="290000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
DESOs EBTIDA margin improved by in 2018
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="9.75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="11.50">
<comment><narrative>
&lt;p&amp;gt;Indicator not achieved. Indicator revised in the June 2017 restructuring and again in the April 2019 restructuring. The description was changed in the first restructuring and the end target was changed in the second.&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;DESO&amp;#39;s EBTIDA margin improved from 11.7%&amp;nbsp;in 2010 to 16.7% in 2015.&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of domiciliary connections to wastewater collection services increased by 2018 in the municipalities of the Sergipe river basin targeted by the project
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="55000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="127000.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded. Indicator was revised in the June 2017 restructuring.&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;Number of domiciliary connections to wastewater collection services increased from 55,000 in 2010 to 143,000 in 2017 in the municipali ties of the Sergipe river basin targeted by the Project&amp;quot;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="157309.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment and implementation of water tariffs for farmers operating within the Poo da Ribeira and Jacarecica I irrigation perimeters.
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2019-04-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training of rural producers and rural technical assistance agents as replicators of technologies and practices of soil and water conservation targeting the enhancement of natural resources management
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="1000.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded:&amp;nbsp;1090 farmers and 40 technicians were trained.&amp;nbsp;Indicator was included in the June 2017 restructuring.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1090.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Proposal to create or designate the state agency responsible for water resources management is submitted to the Government
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2019-04-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;Agency responsible for water resources management is created or designated&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;Inicial idea was to create a specific agency responsible for water resources management. However, the creation of theagency was beyond project control. Therefore the indicator was changed to measure the creation of a proposal/ roadmap to be submitted to the State Government. The inital indicator would not have been achieved by the end of the Project. Therefore the restructure had a positive impact.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pollution load discharged by the municipalities targeted by the Projects wastewater investments is reduced (tons of BOD/year) by 2019
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="600.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2019-04-30" />
<target value="4000.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded.&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;Pollution load discharged by the municipalities targeted by the Project&amp;#39;s wastewater investments is reduced by 5,620 tons of Biochemical Oxygen Demand (BOD)/year by 2017.&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;Indicator was revised in the June 2017 restructuring.&amp;nbsp;The restructuring excluded&amp;nbsp;the end date and lowers the end target to reflect the&amp;nbsp;expected outcomes of the counterpart financed sanitation works. However, the project acheived&amp;nbsp;the end target by dec 2017, so the inicial target would have been (almost) met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5543.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="102000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="230000.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded. Core sector indicator added in the&amp;nbsp;June 2017 restructuring. Target was met by December 2017, but numbers continued to rise.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="459075.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of energy costs in the irrigation perimeters supported by the project
</narrative></title>
<baseline year="2017" iso-date="2017-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-12" />
<period-end iso-date="2020-04-30" />
<target value="40.00">
<comment><narrative>
&lt;p&amp;gt;Indicator not achieved.&amp;nbsp;Added in the June 2017 restructuring.&lt;/p&amp;gt;

&lt;p&amp;gt;Although the modernization of the irrigated perimeters was implemented, the energy cost efficiency was linked to the automation of the pumping system, which was not installed due to lack of time (activity implemented in 2018). However, Cohidro is still engaged in implementing equipment of the automation project after closing the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="29.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of classification of water bodies in the Sergipe River Basin
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&amp;nbsp;Indicator was added in the June 2017 restructuring.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;This activity was included to reflectthe Project&amp;#39;s efforts in improving water quality by establishing river classification to impose maximum parameters allowed for effluente discharges in the water bodies.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved efficiency irrigation techniques implemented in agricultural areas targeted by the Project
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="800.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded.&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;20% water efficiency improvements in the use of water as measured by liters/second/hectares in the Po&amp;ccedil;&amp;atilde;o da Ribeira and Jacarecica I irrigation perimeters.&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;Indicatorwas revised in the June 2017 restructuring.&amp;nbsp;The original outcome indicator was to reach 20% water efficiency improvements was&amp;nbsp;beyond the Project&amp;rsquo;s control, as it involved&amp;nbsp;activities and agencies outside the Project. Therefore, the improved efficiency in water use was changed to be measured by a new outcome indicator by area instead of percentage, which is easier to measure.&amp;nbsp;However, the original indicator would be achieved, as final irrigation efficiency improved in 29%.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="868.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Demarcation, preservation, conservation and recovery of protected areas in water supply reservoirs in the Sergipe River Basin
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="266.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Original indicator: &amp;quot;State environmental conservation areas in the Sergipe river basin are created/expanded and managed&amp;quot;&lt;/p&amp;gt;

&lt;p&amp;gt;Indicator was revised in the June 2017 restructuring.&amp;nbsp;Indicator was changed because the state did&amp;nbsp;not have the ability to expand protected areas during project implementation period, even considering extensions. That indicator was replaced by another indicator referring to the rehabilitation of protected areas related to water sources, which is closely linked to project objectives and scope.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="266.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Elaboration of water user registry in the Sergipe River basin
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&amp;nbsp;Indicator was added in the June 2017 restructuring.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;This activity was already part of theProcurement Plan in the beginning of the Project and was included as an indicator reflecting the Project&amp;#39;s efforts towards efficient and sustainable water use. When the indicator was included in the Project in 2017, the target was already met.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water utilities that the project is supporting
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved.&amp;nbsp;This indicator was not in the PAD, but was included since the beginning of the Project. The project is supporting Deso water utility and COHIDRO irrigation utility.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adoption of water and soil conservation practices by rural producers who benefit from irrigation kits
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2020-04-30" />
<target value="30.00">
<comment><narrative>
&lt;p&amp;gt;Indicator achieved and exceeded.&amp;nbsp;The State registered the delivery of 35 kits at Project closing date, but has delivered 7 more kits (42 in total) after the closing date.&lt;/p&amp;gt;

&lt;p&amp;gt;Indicator was revised in the June 2017 restructuring.&amp;nbsp;Original indicator:&amp;quot;60% of farmers in the Jacarecica river sub-basin and outside of the irrigated perimeters benefiting from improved water quality and soil conservation practices adopt said practices&amp;quot;.&amp;nbsp;The original indicator was revised to measure the actual number of producers that would be benefitted by this activity within the possibilities of the project.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P113540</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AIDS-SUS (National AIDS Program - National Health Service)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed project development objectives are the following:  (i) Increase access and utilization of HIV/AIDS and Sexually-Transmitted Diseases (STD) prevention, care and treatment services by Groups Most at Risk; and, (ii) Improve the performance of the National HIV/AIDS and STD Program through decentralized implementation, improved governance and results-based management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the AIDS-SUS (National AIDS Program - National Health Service) Project for Brazil is to: (i) increase access and utilization of HIV/AIDS and Sexually Transmitted Diseases (STD) prevention, care and treatment services by groups most at risk; and (ii) improve the performance of the National HIV/AIDS and STD Program through decentralized implementation, improved governance and results-based management. There are two components in the project. Component one: improving surveillance, prevention and control of HIV/AIDS and STD: (a) support the implementation of the eligible expenditure programs, including activities to: (i) improve surveillance, prevention, diagnosis, and treatment of STD and HIV/AIDS for groups most at risk; and (ii) carrying out strategic planning, monitoring and evaluation, and results-based management; and (b) support the carrying out of result-based grants. Component two: building decentralized governance and innovation capacity. The expansion of the prevention and care services for groups most at risk and the strengthening of the institutional capabilities of Department of Surveillance (DST)/AIDS to further develop its governance and innovation capacity in dealing with HIV/AIDS and STD, through the provision of technical assistance and training which shall aim at carrying out, inter alia, the following activities: (i) the mapping, by region, of epidemic and prevention interventions with groups most at risk; (ii) the production and testing of epidemiological data (triangulation); and (iii) the development of monitoring and evaluation and results-based activities, including, the carrying out of at least three impact evaluations. Provision of support for project coordination, through the provision of technical assistance, financing of incremental operating costs, and provision of the necessary goods and equipment required for such coordination.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002664"><narrative>Ministry of Health</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2009-11-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Pena De Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dpena@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392268" />
            <name><narrative>Pernambuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3333302 -37.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393129" />
            <name><narrative>Pará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4 -53</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395443" />
            <name><narrative>Maranhão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -45</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407762" />
            <name><narrative>Amapá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>1 -52</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5833302 -36.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447799" />
            <name><narrative>Sergipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -37.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Paraná</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goiás</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463504" />
            <name><narrative>Distrito Federal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.75 -47.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Estado da Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662560" />
            <name><narrative>Roraima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 -61.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924825" />
            <name><narrative>Rondônia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 -63</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457153" />
            <name><narrative>Minas Gerais</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18 -44</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390290" />
            <name><narrative>Rio Grande do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.75 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463930" />
            <name><narrative>Espirito Santo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20 -40.75</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="13010" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="56.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="6" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="36" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="36" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="36" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="29" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000621" percentage="29" xml:lang="en"><narrative>HIV/AIDS</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="29" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="36" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">55833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">55833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">55833.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">577333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">577333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">577333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">1716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">1716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">3033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">3033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">3033333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">3033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">3033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">3033333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">483333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2783333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">483333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">483333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2783333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">350166.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">350166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">350166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1966666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1966666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">30606169.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">30606169.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">67000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-25150000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-5456169</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">167500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">1250000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">7300000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">5100000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">12100000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">7350000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">952540</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">1374823</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-588116</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">1387084</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-167500</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-553</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-599</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-4037</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-52888</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-49287</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-114149</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-105375</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-100320</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-108517</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-129428</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-166986</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-229659</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-287826</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-324097</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-343236</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-490434</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-528240</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-483800</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-364346</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-174464</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-107263</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-101995</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-103119</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-391412</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-671124</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-760408</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-770435</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-743056</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-608393</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-590905</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-495826</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-684401</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-700445</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-729296</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2665"><narrative>Departamento de Vigilancia, Prevencao e Controle de DST e AIDS e Hepatite Viral</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113540"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P113540?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P113540"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 3: Proportion of People who use Drugs (PUD) reporting condom use at last sex in the last 12 months.
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="44.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 2: Proportion of female SW reporting condom use at last sex with client in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="90.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.10">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 8: Proportion of HIV-positive patients with first CD4 count below 200 cells/mm3
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="22.00">

</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 5: Coverage of persons deprived of liberty accessing condoms
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="50.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 7: Proportion of SMS Capital Cities with epidemiological information on STDs, HIV and AIDS on institutional websites
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="65.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indicator 12: Number of analytical studies carried out.
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="5 carried out">

</target>
<actual value="Procurement processes finalized. Pending contract signing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 7: Sexually active population reporting having been tested at least once for HIV
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-12-31" />
<target value="44.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 1: Proportion of MSM reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="23.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="30.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 10: SES that carried out training in management and governance
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 7: Proportion of SMS Capital Cities with epidemiological information on STDs, HIV and AIDS on institutional websites
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="65.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 8: Proportion of CSO projects with disbursements linked to DDAHVs implementation index for timeliness, financial compliance and achievement of objectives
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 1: Proportion of MSM reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="23.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 13: Proportion of DSEI with plan to control HIV/AIDS and other STDs implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 5: Proportion of pregnant women tested for HIV during prenatal visits
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="62.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2015-12-31" />
<target value="84.00">

</target>
<actual value="84.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 8: Proportion of CSO projects with disbursements linked to DDAHVs implementation index for timeliness, financial compliance and achievement of objectives
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="2.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 10: SES that carried out training in management and governance
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 1: Proportion of MSM reporting condom use the last time they had sex in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="63.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="73.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 14: Proportion of individuals with HIV, followed up by SISCEL, who are notified by SINAN
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="56.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indicator 11: All SES and SMS Capital City trained on epidemiological surveillance
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="53.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 4: Proportion of Specialized Care Services (SAE-SUS) that provide condoms.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 6: Proportion of SES with epidemiological information on STDs, HIV and AIDS on institutional websites
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="78.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 5: Coverage of persons deprived of liberty accessing condoms
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="50.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 3: Proportion of PUD reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="14.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="20.00">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of people on ART at least in the last six months who are virologically suppressed (VL level &lt; or equal 1000 copies/ml)
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="88.60">

</target>
<actual value="88.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 4: Coverage of PLWHA accessing condoms
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="37.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2015-12-31" />
<target value="77.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 1: Proportion of MSM reporting condom use the last time they had sex in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="63.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="73.00">

</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 2: Proportion of female SW reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="19.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 5: Proportion of pregnant women tested for HIV during prenatal visits
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="62.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2015-12-31" />
<target value="84.00">

</target>
<actual value="84.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 14: Proportion of individuals with HIV, followed up by SISCEL, who are notified by SINAN
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="56.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indicator 9: Strategic agenda for the period 2011-2015 for STD/ HIV/AIDS
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Strategic agenda revised and available on the web for 2015-2019">

</target>
<actual value="Agenda estrategica revisada para 2015-2019">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 4: Proportion of Specialized Care Services (SAE-SUS) that provide condoms.
</narrative></title>
<baseline year="2007" iso-date="2007-12-31" value="32.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2007-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indicator 9: Strategic agenda for the period 2011-2015 for STD/ HIV/AIDS
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Strategic agenda revised and available on the web for 2015-2019">

</target>
<actual value="Proposal sent to Secretariat of Surveillance in March 2015">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 2: Proportion of female SW reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="19.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="21.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 6: Proportion of pregnant women tested for syphilis during prenatal visits
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="16.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2015-12-31" />
<target value="40.00">

</target>
<actual value="41.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 2: Proportion of female SW reporting condom use at last sex with client in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="90.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.10">

</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indicator 11: All SES and SMS Capital City trained on epidemiological surveillance
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="53.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 6: Proportion of SES with epidemiological information on STDs, HIV and AIDS on institutional websites
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="19.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="78.00">

</target>
<actual value="96.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Indicator 12: Number of analytical studies carried out.
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="5 carried out">

</target>
<actual value="1 carried out">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 9: Proportion of eligible municipalities that receive Incentive Policy funds.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="88.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="97.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 7: Sexually active population reporting having been tested at least once for HIV
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2015-12-31" />
<target value="44.00">

</target>
<actual value="37.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 4: Coverage of PLWHA accessing condoms
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="37.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2015-12-31" />
<target value="77.00">

</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of PVHA aged 18+ on ART at least in the last six months who are virologically suppressed (VL level &lt; or equal 1000 copies/ml)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="84.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="90.00">

</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 13: Proportion of DSEI with plan to control HIV/AIDS and other STDs implemented
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 8: Proportion of HIV-positive patients with first CD4 count below 200 cells/mm3
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="22.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 3: Proportion of People who use Drugs (PUD) reporting condom use at last sex in the last 12 months.
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="38.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="44.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 9: Proportion of eligible municipalities that receive Incentive Policy funds.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="88.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="100.00">

</target>
<actual value="149.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 3: Proportion of PUD reporting having been tested for HIV in the last 12 months
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="14.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2015-12-31" />
<target value="20.00">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indicator 6: Proportion of pregnant women tested for syphilis during prenatal visits
</narrative></title>
<baseline year="2006" iso-date="2006-12-31" value="16.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2006-12-31" />
<period-end iso-date="2015-12-31" />
<target value="40.00">

</target>
<actual value="41.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P114204</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>ELETROBRAS Distribution Rehabilitation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is to improve the financial and operational performance and the commercial management of the six DisCos by reducing electricity losses, increasing bill collection rates, and improving quality of service.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Eletrobras Distribution Rehabilitation Project for Brazil is to improve the financial and operational performance and the commercial management of the six DisCos (Distribution Companies) by reducing electricity losses, increasing bill collection rates, and improving quality of service. There are two components to the project. The first component of the project is service quality improvement and loss reduction. This component improve the quality of service, reducing electricity losses and increasing collection rates in electricity distribution and retail through the acquisition of goods, equipment, works and services for the following activities: i) distribution network reinforcement; ii) implementation of Advanced Metering Infrastructure (AMI) and other actions to maximize metered consumption; and iii) modernization of discos Management Information System (MIS). The second component of the project is institutional strengthening. This component strengthens of the operational capacities of the DisCos through the provision of technical assistance, training, consultancy services, studies, equipment, and operational costs in the following areas: i) performance-based management including support to project implementation, monitoring, reporting and evaluation by the project management unit and the six DisCos; ii) management of environmental and social impacts and processes; iii) provision of support to community outreach; and iv) provision of support to selected programs delivered at a sectoral training and research center in the Guarantor's state of Acre.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0002765"><narrative>Centrais Eletricas Brasileiras</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0002766"><narrative>Eletrobras</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-02-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-06-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Christophe de Gouvello</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cdegouvello@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Estado do Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Estado de Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.5833302 -36.416672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665361" />
            <name><narrative>Amazonas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.75 -64.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Estado do Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924825" />
            <name><narrative>Estado de Rondônia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11 -63</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662560" />
            <name><narrative>Estado de Roraima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>2.25 -61.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23111" percentage="52" xml:lang="en"/><sector vocabulary="1" code="23630" percentage="48" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="78.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="17" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="67" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="17" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="17" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="17" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-12-29"/>
<value currency="USD" value-date="2017-12-29">280905592.39</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2017-12-29"/>
<value currency="USD" value-date="2017-12-29">280905592.39</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">495000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-223187120</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-56710563</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-108219</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-899690</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">1237500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">400000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">6235380</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">14900000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">18865000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">14421000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">18222000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">69532000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">78000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">50000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-56710563</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-108219</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-899690</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-1237500</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-4190</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-7007</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-10619</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-10538</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-179808</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-522865</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-677855</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-897191</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1883696</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-2132136</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-2650142</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2725198</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-2545177</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2313180</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1938834</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1293447</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1293447</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1289557</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1119698</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-959869</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-800040</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-640211</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-483264</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-320553</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-160724</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-15837440</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-19682440</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-19682440</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-19682440</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-19682440</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-13384460</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-13370942</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-13242517</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-13316705</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-2766"><narrative>Eletrobras</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114204"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P114204?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P114204"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="25.00">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC):CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="21.9">
<comment><narrative>
unit of measure is hours
baseline was revised in 2015 from 43 to 40.9
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="5.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="38.9">
<comment><narrative>
unit of measure: number
baseline was revised in 2015 from 23 to 20.1
</narrative></comment>
</target>
<actual value="49.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full implementation of the CMS in the six DisCos
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="CMS not installed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="CMS is implemented in all six DisCos">

</target>
<actual value="CMS implemented in the six DisCos">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: Amazonas Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="23.00">

</target>
<actual value="168.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="26"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="22.6">

</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="50.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="46"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="35.5">
<comment><narrative>
unit of measure: number
baseline was revised in 2015 from 46 to 45.2
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: Amazonas
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="41"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="43.3">
<comment><narrative>
in %
</narrative></comment>
</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC): Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="47.9">
<comment><narrative>
unit of measure is hours
baseline was revised in 2015 from 48 to 44.6
</narrative></comment>
</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Effectiveness of social action and communication programs
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="No social action and communication programs"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="The first two programs were evaluated in April 2014 with varying results. In terms of population aware of campaigns, the percentages were: Acre 41.8%, Alagoas 29.6%, Amazonas 21%, Piaui 32.3%, Rondonia 51.6% and Roraima 15%. Of these, the percentages that thoughtthe messages were clear are: Acre 94.1%, Alagoas 57.6%, Amazonas 76.1%, Piaui 74.4%, Rondonia 68.4% and Roraima 56.4%.The Campaigns were using all types of media (TV, radio, newspapers and outdoors), and the findings from the initial evaluation are being used to further customize the next campaigns to ensure the best medium is being used.">

</target>
<actual value="70% of total consumers in survey areas are aware of messages
95% of total DisCos staff understand messages">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="80.00">

</target>
<actual value="200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption and implementation of environmental and social guidelines across six DisCos
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="Environmental and social guidelines not adopted"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="Guidelines were adopted in all DisCos">

</target>
<actual value="Guidelines adopted in the six DisCos">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="24.00">

</target>
<actual value="92.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="100.00">

</target>
<actual value="135.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="14.7">
<comment><narrative>
unit of measure: number
baseline was revised in 2015 from 33 to 30
</narrative></comment>
</target>
<actual value="21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="32.28">

</target>
<actual value="32.28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="36"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="28.8">
<comment><narrative>
unit of measure: %
</narrative></comment>
</target>
<actual value="22">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC): Amazonas
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="37.5">
<comment><narrative>
unit of measure is hours
baseline was revised in 2015 from 50 to 72
</narrative></comment>
</target>
<actual value="37">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC): Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="22.3">
<comment><narrative>
unit of measure is hours
baseline was revised in 2015 from 10 to 17.7
</narrative></comment>
</target>
<actual value="33.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distribution lines constructed or rehabilitated under the project
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="2020.38">

</target>
<actual value="3595.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="209.40">

</target>
<actual value="380.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="19.5">

</target>
<actual value="28">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): Amazonas
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="26.1">
<comment><narrative>
unit of measure: number
baseline was revised in 2015 from 31 to 51.1
</narrative></comment>
</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="89.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="98.9">
<comment><narrative>
baseline was revised during restructuring in 2015 from 89.8 to 90.4
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Introduction of best practices for environmental and social  management
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="Best practices not introduced"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="Manuals adopted in the six Distribution Companies">

</target>
<actual value="Manuals adopted in the six Distribution Companies">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC): CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="33.2">
<comment><narrative>
unit of measure is hours
baseline was revised in 2015 from 38 to 31.8
</narrative></comment>
</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="33.79">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: Amazonas Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="222.00">

</target>
<actual value="690.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="355.69">

</target>
<actual value="360.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="302.36">

</target>
<actual value="383.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="91.00">
<comment><narrative>
There was no original target
</narrative></comment>
</target>
<actual value="290.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a social/communication campaign
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="Social/communication program not implemented"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="Communication campaigns were implemented">

</target>
<actual value="Campaigns launched">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
UGP functioning and progress reports provided for project
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="No UGP"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="UGP is functioning">

</target>
<actual value="UGP functioning">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="16"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2016-10-31" />
<target value="13.5">
<comment><narrative>
unit of measure: %
</narrative></comment>
</target>
<actual value="8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Full implementation of ERPs in the six DisCos
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="ERP not installed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="ERP is implemented in all 6 DisCos">

</target>
<actual value="ERP implemented in the six DisCos">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="32"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="22.9">
<comment><narrative>
unit of measure: %
</narrative></comment>
</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="92.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="92.2">
<comment><narrative>
baseline was revised during restructuring in 2015 from 92.1 to 91.2
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="95.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="96">
<comment><narrative>
baseline was revised during restructuring in 2015 from 95.4 to 96.1
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="95.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="94">
<comment><narrative>
baseline was revised during restructuring in 2015 from 95.6 to 92.4
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="100.00">
<comment><narrative>
There was no original target
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="235.00">

</target>
<actual value="559.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: Boa Vista
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="86"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="91.3">
<comment><narrative>
baseline was revised during restructuring in 2015 from 86 to 85.7
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Frequency of Service Interruption (FEC): CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="16"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="15.7">

</target>
<actual value="14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="330.00">
<comment><narrative>
There was no original target
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed automated reclosers: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="31.00">

</target>
<actual value="386.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Installation of AMI systems in each DisCo
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="AMI systems not installed"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="40,851 AMI systems installed">

</target>
<actual value="100% of customer target">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: Amazonas Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="115.10">

</target>
<actual value="122.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of MV and LV lines rehabilitated/ upgraded circuits: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="265.00">

</target>
<actual value="312.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: Eletroacre
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="55.70">

</target>
<actual value="46.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Collection rates: Amazonas
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="87.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="91.3">
<comment><narrative>
baseline was revised during restructuring in 2015 from 87.7 to 91.9
unit of measure: %
</narrative></comment>
</target>
<actual value="99.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of new MV lines: CEPISA
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="169.54">

</target>
<actual value="158.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Duration of Service Interruptions (DEC): CEAL
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="21"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="20.7">
<comment><narrative>
unit of measure is hours
</narrative></comment>
</target>
<actual value="15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Total losses: CERON
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="33"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2016-10-31" />
<target value="28.3">
<comment><narrative>
unit of measure: %
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: Amazonas Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="128.00">

</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Installed voltage regulators and banks of capacitors: Boa Vista Energia
</narrative></title>
<baseline year="2010" iso-date="2010-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-04-01" />
<period-end iso-date="2017-12-29" />
<target value="12.00">

</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P116170</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sao Paulo Metro Line 5 Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The project development objectives are: (a) to improve the mobility of public transport users in the Capao Redondo-Largo Treze-Chacara Klabin (Line 5) and Vila Sonia-Luz (Line 4) Corridors in a cost-efficient and environmentally-friendly manner; and (b) to facilitate the integration between metro and bus at the metro stations.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sao Paulo Metro Line 5 Project for Brazil is to improve the mobility of public transport users in the Capao Redondo-Largo Treze Chacara Klabin corridor in a cost-efficient and environmentally-friendly manner. The components of the project include: extending the existing Line 5 by approximately 12 km from the southwest of the city to the expanded center by 2013 and will be co-financed by the State of Sao Paulo, International Bank for Reconstruction and Development (IBRD), and the Inter American Development Bank (IADB). The state will fully finance all the civil works and permanent way as well as its project management and supervision. IADB will finance in full the modernization of 8 trains which already operate in the existing line 5 and will partially finance with the state the energy supply, the telecommunications and control system, the auxiliary systems and the low-income population impact studies for a total of US$481 million. The IBRD will finance the acquisition and supervision of delivery and implementation of 26 new trains, the Communication Based Train Control (CBTC) signaling system and platform screen doors and climate change related studies for a total of US$650.4 million. After the extension, the line will consist of a 20.1 km metro line going from Capdo Redondo station to Chcicara Klabin station and including the 15 intermediate stations.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0003059"><narrative>State of São Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0003060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-04-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-04-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Bianca Bianchi Alves</narrative></person-name><telephone>+1-202-473-1000</telephone><email>bbianchialves@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448439" />
            <name><narrative>São Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.547501 -46.636108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461570" />
            <name><narrative>Ibirapuera</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.6 -46.633331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003467723" />
            <name><narrative>Campo Limpo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.20657 -46.783199</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21030" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TW" percentage="96.0000000" xml:lang="en"><narrative>FY17 - Railways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="1" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="99" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">533333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">15566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">15566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">15566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">16100000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">25208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">25208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">25208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">25208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">25208333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">12858333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">12858333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">12858333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">12858333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">12858333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">33333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">33333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2020-12-30"/>
<value currency="USD" value-date="2020-12-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2020-12-30"/>
<value currency="USD" value-date="2020-12-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-04-30"/><value value-date="2010-04-30">650400000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">1626000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">64000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">12000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">5200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">2000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">63000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">10000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">21500000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">4000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">12000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">12000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">13600000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">4200000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">9000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">7000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">8267490</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">68093605</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">30000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">17000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">35000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">40000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">40000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">30000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">15000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">4912905</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-1626000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">-3304</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">-6131</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">-294165</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">-408140</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-408056</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">-465010</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-551596</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-605839</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-785694</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-971963</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-1215457</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-1726498</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-2371371</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-2801318</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-3868931</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-4898235</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-6498306</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-7764793</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-6658582</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-6005975</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-2357851</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1992122</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1858352</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-3023835</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-11812899</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-13737917</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-15040889</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-14584675</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-13000921</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-11336506</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-10584032</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-5442520</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-5585320</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-5834920</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-6367420</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-6872325</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-8783603</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-8783603</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-9878703</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-11663703</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-12639703</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-13389703</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-13976273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-14239273</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3060"><narrative>Secretaria dos Transportes Metropolitanos (STM)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P116170"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P116170?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P116170"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Vila Sonia Tunnel (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="99.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Line 4 stations integrated with buses (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;The original target of 100% will be achieved in Dec-2021, when Vila S&amp;ocirc;nia station&amp;nbsp;is operational.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time plus average waiting time between selected stations of Line 5 (Minutes, at peak hour)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time plus average waiting time between pairs of stations of Line 4: Via Sonia - Luz (Minutes, at peak hour)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="22.00">
<comment><narrative>
&lt;p&amp;gt;Indicator expected to achieve target in Dec-2021, once Vila S&amp;ocirc;nia station opens.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of completion per year of metro climate change action plan - Line 5 (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental number of users in Line 5 per day in thousands (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="559.00">
<comment><narrative>
&lt;p&amp;gt;Achieved in Dec-2019 was 413. Dec-2020 actual was highly&amp;nbsp;impacted by COVID-19.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="187.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time plus average waiting time between selected stations of Line 5 (Minutes, at peak hour)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="0.00">
<comment><narrative>
This indicator has two sub-indicators that provide the information.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual passenger boardings in Vila Sonia (both directions, in millions)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="26.50">
<comment><narrative>
&lt;p&amp;gt;Demand is zero at completion because Vila S&amp;ocirc;nia station is not yet open, expected in December 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Incremental number of users in Line 5 per day in thousands (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="150.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="559.00">

</target>
<actual value="413.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Line 4 stations integrated with buses (Percentage, Custom)
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2020-12-31" />
<target value="100.00">
<comment><narrative>
7 out of 11 stations in operation (Dec 2019)
</narrative></comment>
</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of completion per year of the Line 5 CBTC systems (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Cumulative completion reported. 100 percent expected to be achieved by Dec-2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="91.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Frequency of buses in the peak hour in the corridor of Line 5 (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="411.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="438.00">
<comment><narrative>
&lt;p&amp;gt;Actual in Dec-2020 was affected by COVID-19, observed in Dec-2019 was 488.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="459.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of completion per year of metro climate change action plan - Line 5 (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Vila Sonia Station (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="57.86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cumulative % of completion of new trains for Line 5 (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Line 5 stations integrated with buses (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="35.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total annual passenger boardings in Vila Sonia (both directions, in millions)
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2020-12-31" />
<target value="26.50">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Frequency of buses in the peak hour in the corridor of Line 5 (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="411.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="438.00">

</target>
<actual value="440.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of completion per year of the Line 5 CBTC systems (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="87.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Phase 1 shell stations (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Line 5 working ratio (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="1.88"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="0.75">

</target>
<actual value="0.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cumulative % of completion of new trains for Line 5 (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="99.61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Vila Sonia Tunnel (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="92.95">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of users per day in Line 5 of households with less than 4 minimum salaries (thousands) (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="68.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="331.00">

</target>
<actual value="199.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of buses in the corridor of Line 5 (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="955.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="1,031.00">

</target>
<actual value="1,039.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time plus average waiting time between pairs of stations of Line 4: Via Sonia - Luz (Minutes, at peak hour)
</narrative></title>
<baseline year="2016" iso-date="2016-12-30" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-30" />
<period-end iso-date="2020-12-31" />
<target value="22.00">

</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of Line 5 stations integrated with buses (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="35.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">
<comment><narrative>
16 stations in operation, count with bus integration
</narrative></comment>
</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Phase 1 shell stations (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Line 4 Cumulative % of completion of Vila Sonia Station (Percentage, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="100.00">

</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of buses in the corridor of Line 5 (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="955.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="1031.00">
<comment><narrative>
&lt;p&amp;gt;Actual in Dec-2020 was affected by COVID-19, in Dec-2019 observed was 682.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="412.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of users per day in Line 5 of households with less than 4 minimum salaries (thousands) (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="68.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2020-12-31" />
<target value="331.00">

</target>
<actual value="193.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Line 5 working ratio (Number, Custom)
</narrative></title>
<baseline year="2009" iso-date="2009-12-31" value="1.88"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2009-12-31" />
<period-end iso-date="2018-12-31" />
<target value="0.75">

</target>
<actual value="0.73">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P118410</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Mato Grosso do Sul State Road Transport Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project development objective is to improve the efficiency of the Borrower#s road network in the Project area. Efficiency improvement is expected as a result of the Project#s financial support to selected investments of the state investment program in road infrastructure and to activities that seek to strengthen the State Government#s overall capacity to manage the road network, including planning preparation, execution and monitoring of work programs at the administrative, engineering and environment levels. Efficiency gains are expected to result in inter alia improved accessibility and safety, and reduced logistics costs.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Mato Grosso do Sul State Road Transport Project for Brazil is to improve the efficiency of the Borrower's road network in the project area. There are two components to the project, the first component being state road rehabilitation and surfacing. Project focuses its interventions in regions that possess economic potential and are located outside of any ecologically and socially fragile areas. Works to be financed under the project are located in the states northeast, center and southern regions, on road sections not located near protected areas or the Pantanal. Finally, the second component is the institutional strengthening. Strengthening of Environment, Science,Technology, and Planning Secretariat (SEMAC) institutional capacity to support improved efficient ,management of public resources, through the provision of technical assistance, training and goods for, inter alia: (i) the structuring and operation of a monitoring and evaluation system of the Borrower's investments programs; (ii) the introduction of results based practices in the Borrower's administration; and (iii) development of the Borrower's capacity to leverage private participation to the financing and operation of infrastructure and services.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0003563"><narrative>State of Mato Grosso do Sul</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0003564"><narrative>AGESUL</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-05-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-05-04"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Satoshi Ogita</narrative></person-name><telephone>+1-202-473-1000</telephone><email>sogita@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456368" />
            <name><narrative>Navirai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.065001 -54.190559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Estado de Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461180" />
            <name><narrative>Inocência</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.725559 -51.93</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003466750" />
            <name><narrative>Cassilândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.113331 -51.734169</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468020" />
            <name><narrative>Camapuã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.531389 -54.043892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470338" />
            <name><narrative>Bataiporã</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.29528 -53.271111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472278" />
            <name><narrative>Anaurilândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.1875 -52.717781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003473042" />
            <name><narrative>Água Clara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.448059 -52.878059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006316380" />
            <name><narrative>Amandina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.38389 -53.59333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006316392" />
            <name><narrative>AngElica</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.15333 -53.771111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006316644" />
            <name><narrative>Brasilândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.255831 -52.036942</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006316864" />
            <name><narrative>Chapadão do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.79417 -52.62278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317001" />
            <name><narrative>Deodápolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.27556 -54.165001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317140" />
            <name><narrative>Figueirão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.674999 -53.642502</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317285" />
            <name><narrative>Indápolis</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.205561 -54.65139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317291" />
            <name><narrative>Ipezal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.05444 -54.07</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317342" />
            <name><narrative>Ivinhema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.30472 -53.815281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317707" />
            <name><narrative>Nova Andradina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.23333 -53.34306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="21012" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="96.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="4" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="16" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000025" percentage="48" xml:lang="en"><narrative>Regional Integration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="16" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">9166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">9166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">4166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3333333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">9166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">9166666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">5000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">4166666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">4166666.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">3333333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">393278.36</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">393278.36</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">300000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-393278</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">750000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">46926326</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">23908071</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">34637949</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">28968463</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">39978585</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">31856948</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">44859324</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-01-31"/><value value-date="2012-01-31">24315750</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">20190422</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">1070784</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">971921</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1172179</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-750000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-101163</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-306917</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-966483</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-1519193</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-1415683</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-1060424</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-968625</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-908935</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-938821</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1108780</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1343992</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-1952425</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2503135</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-2863574</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2877140</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4226452</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-4594386</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-4869608</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-3847283</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1868214</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1133012</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1009611</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-914617</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2147773</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-6255186</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-6724668</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-7177538</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-7267177</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-6307265</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-5798704</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4993392</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-10695960</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3564"><narrative>AGESUL</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118410"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P118410?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118410"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modern management tools in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="Lack of sufficient management tools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="2">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consolidated environmental management tools in IMASUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated road management system operational in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No Pavement Management System"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="PMS operational">

</target>
<actual value="PMS operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated monitoring and evaluation system of state investments and/or spending in SEMAC
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modern management tools in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="Lack of sufficient management tools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="2">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consolidated environmental management tools in IMASUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in use of road transport infrastructure on Project surfaced roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated road management system operational in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No Pavement Management System"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="PMS operational">

</target>
<actual value="PMS not operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated road management system operational in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No Pavement Management System"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="PMS operational">

</target>
<actual value="PMS operational">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="66.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="1,200.00">

</target>
<actual value="1,252.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="66.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="49.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="66.00">

</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pilot of a result-based maintenance and rehabilitation contract implemented (CREMA) in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of operating costs to vehicle users, per average vehicle-km on state network
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="-5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in use of road transport infrastructure on Project surfaced roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pilot of a result-based maintenance and rehabilitation contract implemented (CREMA) in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of operating costs to vehicle users, per average vehicle-km on state network
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="-5.0">

</target>
<actual value="-23.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated monitoring and evaluation system of state investments and/or spending in SEMAC
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in use of road transport infrastructure on Project surfaced roads
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="15.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consolidated environmental management tools in IMASUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pilot of a result-based maintenance and rehabilitation contract implemented (CREMA) in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated monitoring and evaluation system of state investments and/or spending in SEMAC
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Modern management tools in AGESUL
</narrative></title>
<baseline year="2010" iso-date="2010-06-01" value="Lack of sufficient management tools"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-06-01" />
<period-end iso-date="2016-06-30" />
<target value="2">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of operating costs to vehicle users, per average vehicle-km on state network
</narrative></title>
<baseline year="2008" iso-date="2008-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2008-12-31" />
<period-end iso-date="2016-06-30" />
<target value="-5.0">

</target>
<actual value="-23.8">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P118540</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Santa Catarina Rural Competitiveness</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to increase the competitiveness of Family Agriculture Producer Organizations while providing support for an improved framework of structural competitiveness inducing public services activities in the Borrower's territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Santa Catarina Rural Competitiveness Project for Brazil is to increase the competitiveness of Family Agriculture Producer Organizations (FAPO) while providing support for an improved framework of structural competitiveness inducing public services activities in the Borrower's territory. The project has three components. (1) Family agriculture competitiveness and increased access to markets: to support family agriculture competitiveness in the Borrower's territory through the implementation of the pertinent Eligible Expenditure Programs (EEPs) and the provision of technical assistance, by working with stakeholders across local, municipal and regional levels in order to increase organizational and participation skills for project implementation. (2) Complementary public investments for rural competitiveness: to support the improvement of the structural rural competitiveness framework through the implementation of the pertinent EEPs and the provision of technical assistance, by financing public goods activities that are crucial for the sustained competitiveness of family agriculture producer organizations, and for the implementation of sectoral activities, such as water resource management; ecosystems and corridor management; environmental monitoring and education; rural infrastructure; regulatory framework compliance; rural technical assistance and extension, sanitary and phyto-sanitary services; and rural tourism. (3) Support to the rural competitiveness institutional framework: to enhance public administration performance in support of rural competitiveness through the implementation of the pertinent EEPs and the provision of technical assistance by implementing: (a) more efficient financial management and procurement systems; (b) a results-based management approach for the project and the main institutions of the Borrower which have administrative jurisdiction over the rural sector; and (c) project coordination, monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0003586"><narrative>State Government of Santa Catarina</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0003585"><narrative>Secretaria Executiva Estadual - SEE</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2010-03-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2010-09-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Diego Arias Carballo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>darias@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Estado de Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31192" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="33" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="61.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="3" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="10" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="77" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="4" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="39" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="4" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="17" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="9" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="17" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="56" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="34" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="34" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="3" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="56" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="10" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="10" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="3" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="3" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="9" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="39" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2010-09-30"/><value value-date="2010-09-30">90000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">225000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">800000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">333965</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">7276405</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">349814</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">293122</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">498519</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">326202</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">16154683</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">6966570</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">3098643</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">6757419</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">537565</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">389051</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">10329217</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">306023</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">6252434</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">7851181</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">448883</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">6745207</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">617868</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">444929</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">6745207</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">262444</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">5989649</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-225000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-03-31"/><value value-date="2011-03-31">-491</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-1081</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-7804</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-63956</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-53835</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-45133</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-76353</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-140486</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-154158</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-236271</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-359194</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-557316</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-751595</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-889046</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-940382</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-1361600</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-1470625</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1554800</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1246700</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-653200</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-428683</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-390721</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-358420</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-732149</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1981599</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2130580</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2274018</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2202910</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1832854</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1687685</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1457880</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2997000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3585"><narrative>Secretaria Executiva Estadual - SEE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118540"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P118540?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P118540"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in total value of annual sales for participating FAPOs
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="30.00">

</target>
<actual value="118.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agro-livestock SPS Services restructured to include specific support for FAPO
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New, market-oriented, regional, rural extension strategy implemented
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Executive Secretariats (Entidades Delegatarias) formalized by a legal instrument  with the State Government
</narrative></title>
<baseline year="2013" iso-date="2013-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-03" />
<period-end iso-date="2017-06-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New added-value arrangements established (63) or strengthened  (75) (i.e. alliances / networks and cooperatives)
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="55.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="138.00">

</target>
<actual value="259.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new regular Technical Assistance and Rural Extension professional staff allocated by EPAGRI in priority project municipalities, by CIDASC to phytosanitary certification and by FATMA to SIEE
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="510.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="176.00">

</target>
<actual value="176.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of additional tenured technical staff in the Water Resources Directorate
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual Operations Plans successfully implemented
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of ancillary, climate-resilient production systems improvement and tourism plans executed through subprojects, with project support
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="20514.00">

</target>
<actual value="46158.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of rural roads rehabilitated associated with business plans
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="430.00">

</target>
<actual value="474.83">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of self-declaratory water users registered in River Basins
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="65000.00">

</target>
<actual value="74419.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of tourism plans implemented with project support
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="20.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Compliance with Project Operational Manual, including Safeguards and Anti-corruption Policies
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farm properties with SIEE (Integrated Economic-Ecological Systems) implemented (SIEE of livestock [meat and milk], grains, forestry, SAF and tourism)
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="200.00">

</target>
<actual value="461.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Studies completed to implement target Ecological Corridors supporting biodiversity-friendly land use mosaics
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares of forests under Conservation Credits
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="950.00">

</target>
<actual value="1631.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of existing, small agro-businesses made compliant with sanitary and phytosanitary (SPS) standards, and new agro-processing and non-agricultural businesses created
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="500.00">

</target>
<actual value="723.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategic planning developed and Results-Based Management implemented at the sector level (Rural, WRM, Environment) levels
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Satisfactory technical, financial and procurement audits
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Pilot Digital Inclusion proejcts implemented with internet connection to support enterprises connected to networks
</narrative></title>
<baseline year="2015" iso-date="2015-03-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-16" />
<period-end iso-date="2017-06-30" />
<target value="30.00">

</target>
<actual value="43.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project Strategic Plan prepared and implemented at the sector level (Rural, WRM, Environmental levels)
</narrative></title>
<baseline year="2010" iso-date="2010-08-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-03" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P120139</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Pernambuco Rural Economic Inclusion</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to promote rural business initiatives and expansion of rural access to water and other complementary infrastructure by supporting the Borrower's Results Management Framework.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Pernambuco Rural Economic Inclusion Project for Brazil is to promote rural business initiatives and expansion of rural access to water and other complementary infrastructure by supporting the Borrower's Results Management Framework. There are three components to the project, the first component being investments in rural economic inclusion. This component will promote investments in rural economic inclusion in the Borrower's territory, through the provision of support to: (a) prorural for business plan preparation activities to inter alia, elaborate and implement a communication strategy to strengthen local productive alliances; identify and develop viable business plans with defined territorial strategies; and train and certify local service providers on how to prepare business profiles and business plans, as well as on how to improve management and develop innovative financing mechanisms for the rural economy. The second component is the complementary rural infrastructure. This component will promote investments in complementary rural infrastructure in the Borrower's territory, through the provision of inter alia: support to rural producer-based organizations for the carrying out of complementary rural investments, through matching grants, for the implementation of infrastructure subprojects. Finally, the third component is the project management, supervision, monitoring and evaluation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0003951"><narrative>State of Pernambuco</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0003951"><narrative>State of Pernambuco</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0003952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-04-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-03-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2020-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2020-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maria de Fatima de Sousa Amazonas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mamazonas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003384930" />
            <name><narrative>XexEu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8022203 -35.626942</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003384987" />
            <name><narrative>Vitória de Santo Antão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1180601 -35.291389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385230" />
            <name><narrative>Venturosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5747204 -36.874168</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386024" />
            <name><narrative>Triunfo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8380599 -38.101669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386042" />
            <name><narrative>Trindade</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.76194 -40.26778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386200" />
            <name><narrative>TracunhaEm</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8047199 -35.240002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386480" />
            <name><narrative>Terra Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2297201 -39.375561</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386492" />
            <name><narrative>Terezinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0561104 -36.62278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386622" />
            <name><narrative>Taquaritinga do Norte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.90306 -36.04417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387082" />
            <name><narrative>Tabira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5908298 -37.53944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387115" />
            <name><narrative>Surubim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8330598 -35.754719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387249" />
            <name><narrative>Solidão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6002798 -37.651939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388059" />
            <name><narrative>São Vicente Ferrer</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5911102 -35.49139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388376" />
            <name><narrative>Sao Lourenco da Mata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0022202 -35.01833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388435" />
            <name><narrative>São JosE do Egito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.4788899 -37.274441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388440" />
            <name><narrative>São JosE do Belmonte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8613901 -38.75972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388456" />
            <name><narrative>São JosE da Coroa Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8977804 -35.147781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388567" />
            <name><narrative>São Joaquim do Monte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4324999 -35.80444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389462" />
            <name><narrative>Santa Maria da Boa Vista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8077803 -39.825562</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389652" />
            <name><narrative>Santa Cruz do Capibaribe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9575 -36.20472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389655" />
            <name><narrative>Santa Cruz da Baixa Verde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.82056 -38.152779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389721" />
            <name><narrative>Sanharó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3605604 -36.565559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391786" />
            <name><narrative>Poção</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1863899 -36.705002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392242" />
            <name><narrative>Petrolina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.3986101 -40.500832</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392243" />
            <name><narrative>Jatobá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1830597 -38.26889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392251" />
            <name><narrative>Pesqueira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3577805 -36.696388</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392657" />
            <name><narrative>Pedra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4969397 -36.94083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392829" />
            <name><narrative>Paudalho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8966699 -35.179722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392916" />
            <name><narrative>Passira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9949999 -35.580559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392997" />
            <name><narrative>Parnamirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.09056 -39.578331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393047" />
            <name><narrative>Paranatama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9208298 -36.658058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393190" />
            <name><narrative>Panelas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6636105 -36.005829</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393231" />
            <name><narrative>Palmeirina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0044403 -36.325829</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393264" />
            <name><narrative>Palmares</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6833296 -35.591671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394792" />
            <name><narrative>Mirandiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1202803 -38.729439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393972" />
            <name><narrative>NazarE da Mata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7416701 -35.227779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396496" />
            <name><narrative>Lajedo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6636105 -36.32</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396675" />
            <name><narrative>Lagoa Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9969397 -40.271938</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396716" />
            <name><narrative>Lagoa dos Gatos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.65833 -35.900002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396740" />
            <name><narrative>Lagoa do Ouro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1274996 -36.458328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393470" />
            <name><narrative>Orobó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7449999 -35.602219</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393468" />
            <name><narrative>Orocó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5533304 -39.463329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393452" />
            <name><narrative>Ouricuri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8825002 -40.081669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391556" />
            <name><narrative>Pombos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1413898 -35.395828</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391185" />
            <name><narrative>Primavera</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3313904 -35.354172</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390965" />
            <name><narrative>Quipapá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8277798 -36.011669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390935" />
            <name><narrative>Quixabá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0166702 -37.283329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390490" />
            <name><narrative>Riacho das Almas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1338902 -35.856392</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389966" />
            <name><narrative>SairE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3275003 -35.705559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389930" />
            <name><narrative>Salgadinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9363899 -35.632778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389860" />
            <name><narrative>Salgueiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0741701 -39.119171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389815" />
            <name><narrative>Saloá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9758301 -36.6875</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388955" />
            <name><narrative>São Bento do Una</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5227804 -36.444439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388925" />
            <name><narrative>São Caitano</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3258305 -36.14278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387786" />
            <name><narrative>Serra Talhada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.99194 -38.298328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387727" />
            <name><narrative>Serrita</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9333301 -39.29583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387663" />
            <name><narrative>Sertânia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0736103 -37.264439</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398207" />
            <name><narrative>Ingazeira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6761098 -37.459721</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398264" />
            <name><narrative>Inajá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9016705 -37.823891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398335" />
            <name><narrative>Iguaraci</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8352799 -37.515282</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398352" />
            <name><narrative>Igarassu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8341699 -34.906391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398399" />
            <name><narrative>Ibirajuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5805597 -36.17944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398401" />
            <name><narrative>Ibimirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5405598 -37.690281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398419" />
            <name><narrative>Iati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0458298 -36.846111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386971" />
            <name><narrative>Tacaimbó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3161097 -36.293331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386966" />
            <name><narrative>Tacaratu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1052799 -38.14917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398904" />
            <name><narrative>Goiana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5605602 -35.002499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398920" />
            <name><narrative>Glória do Goitá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0016699 -35.292782</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399058" />
            <name><narrative>Garanhuns</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.88202 -36.502159</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386889" />
            <name><narrative>ItambE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.4102802 -35.112782</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399307" />
            <name><narrative>Frei Miguelinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9397202 -35.91222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399518" />
            <name><narrative>Floresta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6011105 -38.568611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399539" />
            <name><narrative>Flores</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8680601 -37.97472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386396" />
            <name><narrative>Timbaúba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.50528 -35.318329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385920" />
            <name><narrative>Tupanatinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7533302 -37.339722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385918" />
            <name><narrative>Tuparetama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6022201 -37.31139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003400804" />
            <name><narrative>Escada</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.35917 -35.22361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385209" />
            <name><narrative>Verdejante</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.92556 -38.971668</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385131" />
            <name><narrative>Vertentes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9027801 -35.988331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385125" />
            <name><narrative>Vertentes do LErio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8000002 -35.716671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401606" />
            <name><narrative>Cortês</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4702797 -35.541111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003385118" />
            <name><narrative>Vicência</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.65694 -35.326672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402271" />
            <name><narrative>Chã Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2383299 -35.46167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402278" />
            <name><narrative>Chã de Alegria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0011101 -35.21278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402320" />
            <name><narrative>Cedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7216702 -39.238892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402528" />
            <name><narrative>Catende</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6666698 -35.716671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402598" />
            <name><narrative>Casinhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7411098 -35.721111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402721" />
            <name><narrative>Carpina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8508301 -35.254719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402814" />
            <name><narrative>Carnaubeira da Penha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.32162 -38.74374</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402849" />
            <name><narrative>Carnaiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8052802 -37.793892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403082" />
            <name><narrative>Capoeiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7347202 -36.626671</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403360" />
            <name><narrative>Canhotinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8822203 -36.191109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403516" />
            <name><narrative>Camutanga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.40694 -35.274441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403685" />
            <name><narrative>Camocim de São FElix</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3586102 -35.76194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403793" />
            <name><narrative>Calumbi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.94139 -38.150002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396009" />
            <name><narrative>Macaparana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5547199 -35.45306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395966" />
            <name><narrative>Machados</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.68222 -35.522781</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395686" />
            <name><narrative>Manari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9638901 -37.62833</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395456" />
            <name><narrative>Maraial</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7825003 -35.808891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394453" />
            <name><narrative>Moreno</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1186104 -35.09222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394156" />
            <name><narrative>Santa Filomena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1625004 -40.615559</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396769" />
            <name><narrative>Lagoa do Itaenga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.93611 -35.290279</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396786" />
            <name><narrative>Lagoa do Carro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8447199 -35.319721</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397034" />
            <name><narrative>Jurema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7180595 -36.13583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397055" />
            <name><narrative>Jupi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7116699 -36.415001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397115" />
            <name><narrative>Jucati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7063904 -36.488892</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397262" />
            <name><narrative>Joaquim Nabuco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6244402 -35.533329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397319" />
            <name><narrative>João Alfredo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8558302 -35.588329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397546" />
            <name><narrative>Jataúba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9899998 -36.496391</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397608" />
            <name><narrative>Jaqueira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7266703 -35.793331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397886" />
            <name><narrative>Itaquitinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6677799 -35.101669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397904" />
            <name><narrative>Itapissuma</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7763901 -34.89222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397931" />
            <name><narrative>Itapetim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.3783302 -37.190281</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397963" />
            <name><narrative>Itamaracá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7477798 -34.825562</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397983" />
            <name><narrative>Itaiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9475002 -37.422779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397990" />
            <name><narrative>Itacuruba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7272196 -38.683331</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398105" />
            <name><narrative>Ipubi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6519399 -40.148891</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398115" />
            <name><narrative>Ipojuca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3988895 -35.063889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399132" />
            <name><narrative>Gameleira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5844402 -35.386669</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408089" />
            <name><narrative>Alagoinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4663897 -36.775829</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408166" />
            <name><narrative>Águas Belas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1113901 -37.123058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408175" />
            <name><narrative>Água Preta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7075005 -35.53056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408251" />
            <name><narrative>Agrestina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4580603 -35.944721</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408270" />
            <name><narrative>Afrânio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5150003 -41.005001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408274" />
            <name><narrative>Afogados da Ingazeira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7508302 -37.639172</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399625" />
            <name><narrative>Ferreiros</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.4475002 -35.244171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006316674" />
            <name><narrative>Cabo de Santo Agostinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2866697 -35.035</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317039" />
            <name><narrative>Dormentes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4472198 -40.771111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317642" />
            <name><narrative>Moreilândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6308298 -39.551109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317937" />
            <name><narrative>Petrolândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.9791698 -38.21944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318281" />
            <name><narrative>Santa Maria do Cambucá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8291702 -35.880562</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318315" />
            <name><narrative>Santa Terezinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.37778 -37.48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318383" />
            <name><narrative>São Benedito do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8083296 -35.951672</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318980" />
            <name><narrative>Barra de Guabiraba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4200001 -35.658058</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319068" />
            <name><narrative>Correntes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1337795 -36.320332</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320400" />
            <name><narrative>Santa Cruz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.5454202 -38.049679</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320470" />
            <name><narrative>Bonito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5223799 -35.694481</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320490" />
            <name><narrative>Caruaru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1792402 -36.027939</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320527" />
            <name><narrative>Jaboatao Dos Guararapes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1456804 -34.973808</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320542" />
            <name><narrative>Limoeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8509202 -35.445122</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320572" />
            <name><narrative>Ribeirão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5075502 -35.393421</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320573" />
            <name><narrative>Rio Formoso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6981401 -35.21941</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320596" />
            <name><narrative>SirinhaEm</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5997601 -35.13913</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320603" />
            <name><narrative>TamandarE</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7487402 -35.139408</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324229" />
            <name><narrative>São João</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8632202 -36.391022</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007932509" />
            <name><narrative>Buenos Aires</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7199998 -35.32</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008260232" />
            <name><narrative>Camaragibe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5819101 -35.167488</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399679" />
            <name><narrative>Feira Nova</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.95083 -35.389172</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401138" />
            <name><narrative>Custódia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0874996 -37.643059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003400541" />
            <name><narrative>Exu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.51194 -39.724171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401340" />
            <name><narrative>Cupira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6166697 -35.950001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401404" />
            <name><narrative>Cumaru</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0061102 -35.69722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401830" />
            <name><narrative>Condado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5858302 -35.105831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403901" />
            <name><narrative>Calçado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7422199 -36.333889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404231" />
            <name><narrative>CaetEs</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.7730598 -36.622501</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404513" />
            <name><narrative>Cabrobó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.5141697 -39.310001</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404766" />
            <name><narrative>Buique</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6230602 -37.15583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404862" />
            <name><narrative>Brejo da Madre de Deus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.1458302 -36.371109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404908" />
            <name><narrative>Brejinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1000004 -38.283329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404938" />
            <name><narrative>Brejão</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.0302801 -36.568611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398691" />
            <name><narrative>Gravatá</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2011099 -35.56472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398708" />
            <name><narrative>Granito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7161102 -39.614719</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003404355" />
            <name><narrative>Cachoeirinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4863901 -36.233059</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406160" />
            <name><narrative>Barreiros</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8183298 -35.18639</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405339" />
            <name><narrative>Bom Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7958298 -35.587219</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405738" />
            <name><narrative>Bezerros</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2333298 -35.79694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405753" />
            <name><narrative>Betânia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.2747202 -38.034168</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405812" />
            <name><narrative>Belo Jardim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3355598 -36.424171</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405852" />
            <name><narrative>BelEm de São Francisco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.75389 -38.965832</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405853" />
            <name><narrative>BelEm de Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.6255598 -35.830002</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405380" />
            <name><narrative>Bom Conselho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.1697197 -36.679722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405429" />
            <name><narrative>Bodocó</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7783298 -39.941109</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407366" />
            <name><narrative>Araçoiaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.7902799 -35.090832</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407623" />
            <name><narrative>Angelim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.8902798 -36.285831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407758" />
            <name><narrative>Amaraji</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.3830605 -35.452499</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407871" />
            <name><narrative>Altinho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.4897203 -36.059441</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408404" />
            <name><narrative>Abreu e Lima</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.9116702 -34.902779</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407216" />
            <name><narrative>Arcoverde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.41889 -37.05389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407243" />
            <name><narrative>Araripina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.5761099 -40.498329</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407938" />
            <name><narrative>Aliança</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.6033301 -35.230831</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="32161" percentage="56" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="44" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="5" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="95" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="6" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="5" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="41" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="6" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="41" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000722" percentage="20" xml:lang="en"><narrative>Rural Non-farm Income Generation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">2025000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2191666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2191666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">1850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1291666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">516666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">516666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">358333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">358333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">358333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">358333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">25000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">25000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-20000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-5000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">250000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">1619935</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">2289063</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">2125399</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">4474073</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">4410978</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">13682121</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">5687415</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">6404774</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">6486010</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">3206317</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">12921153</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">8723807</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2718956</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-9435</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-16202</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-24216</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-51938</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-160784</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-196712</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-269328</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-358780</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-470082</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-540906</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-748832</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1013779</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1085175</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-999175</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-765844</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-397490</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-313719</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-305930</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-306039</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-983332</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1642879</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1853247</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1873539</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1809680</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1490863</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1450320</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1224357</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1379192</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1664117</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3952"><narrative>State Secretariat of Health (co-implementing agency)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-3953"><narrative>State Secretariat of Agrarian Development (SDA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120139"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P120139?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120139"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary RPOs successfully inserted into LPAs.
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2019-01-31" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved: 39.2% of&amp;nbsp;the targeted 75%&lt;/p&amp;gt;

&lt;p&amp;gt;Note: The&amp;nbsp;original target of 150 was based on the number of Business Plans. The 2016 Restructuring changed the basis for measurement to a percentage of the total Business Plans.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;quot;Successfulinsertion&amp;quot; into an LPA means the percentage of beneficiary RPOs who have achieved at minimum 4 of the 6 criteria listed below at 12 months after subproject conclusion.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Just 10 of the 34 randomly sampled RPOs achieved at least 4 of the criteria with individual results as follows: (i) Business Plan investments implemented (100% of sampled RPOs); (ii) Financed in vestments areoperational (91% of RPOs ); (iii) Volume of production has reached a level of 80% of the Business Plan projection/forecast (76% of RPOs); (iv ) Functioning accounting system (9% of RPOs); (v) Maintenance of a reserve fund for the financed investments (15% of RPOs); and, (vi) Sales being made to at least one non-institutional client (low/negligible).&lt;/p&amp;gt;

&lt;p&amp;gt;NOTE:&amp;nbsp; For PDO Indicator #3 &amp;quot;Beneficiary RPOs selling products to institutional or private markets after subproject conclusion&amp;quot; the result was to measure RPOs with a &amp;quot;formal contact or arrangements&amp;quot;.&amp;nbsp; This was intended to measure the extent to which product marketing had become more organized/formalized.&amp;nbsp; No similar requirement was specified for PDO Indicator 1 criterion (vi). However, for consistency and to avoid confusion, the same qualification regarding a formal contract is applied.&amp;nbsp; Few if any RPOs selling privately (whether to a middleman, local produce market/fair, was selling under contract and thus the result is &amp;quot;low/negligible&amp;quot;.&lt;/p&amp;gt;

&lt;p&amp;gt;This result is based on Federal University of Pernambuco (UFPE) field questionnaires.&amp;nbsp; The results for (iv), (v) and (vi) reflect&amp;nbsp;the&amp;nbsp;lack of TA and training for Component 1 RPOs in business management and marketing at the implementation and operational stages of their investments, as discussed in the main text Section III and elsewhere.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="29.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiary rural households using water supply investments for drinking water
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Substantially achieved: 71% of target&lt;/p&amp;gt;

&lt;p&amp;gt;Based on UFPE field questionnaires, this&amp;nbsp;indicator achieved 64% or 71% of itstarget mainly due to technical/engineering factors associated with the success rate in drilling wells in crystalline rock.&amp;nbsp; Insufficient water flow resulted in some beneficiaries unable to proceed with their&amp;nbsp;subprojects, or a process of re-drilling/locating wells.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural households benefiting directly from project interventions, including 30% women-headed and 5% belonging to vulnerable groups (IP or Quilombola).
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2019-01-31" />
<target value="3552.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded:&amp;nbsp; 106.7% of target&lt;/p&amp;gt;

&lt;p&amp;gt;---&amp;nbsp;48 Indigenous and quilombola families participated, just 1.24% of the total, compared to the targeted 5% (0r 25% of the target).&amp;nbsp; The reasons for their low participation are explained in the main text, Section IIF.&lt;/p&amp;gt;

&lt;p&amp;gt;---1,669 female-headed households benefited, 44% of the total,&amp;nbsp;compared to the targeted 30% (143.3% of the target)&lt;/p&amp;gt;

&lt;p&amp;gt;This target also was&amp;nbsp;reduced by the 2019 restructuring to the existing level of achievement as an agreed&amp;nbsp;measure following the&amp;nbsp;freezing the financing of any new Component 1 subprojects (Component 2 investments were also frozen) pendingProRural&amp;#39;s remediation of issues diagnosed in existing subprojects. &amp;nbsp;The outcome was 36% of the original PAD target of 10,500 families as a result of the project financing only 75 subprojects under Component 1.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3792.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Registered grievances satisfactorily responded in line with the Grievance Redress Mechanism
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved: 111% of target&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;No update beyond March 2020 was possible due to COVID-19 constraints.&amp;nbsp;The main data are presented below:&amp;nbsp;Number of complaints / requests for information received: 458; Number of compliments received: 147; field visits to beneficiaries and communities: 2,567; Number of interactions by phone calls received : 3604; Number of interactions by SMS/WhatsApp&amp;nbsp;received: 2275; Number of interactions via social media (likes, shares of Project content): 4063. Data were&amp;nbsp;collected during focal group meetings with UGT coordinators and UGO staff, and the GRM is discussed in the final Safeguards Report (May, 2021) and BCR (2021).&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RPOs charging user fees for management and maintenance of financed water supply projects.
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2018-03-30" />
<target value="95.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved:&amp;nbsp; 58% of target&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator achieved 55% or 58% of its target of 95%.&lt;/p&amp;gt;

&lt;p&amp;gt;Field evidence indicates that the RPOs which achieved some degree of institutional maturity and participated in the management of their systems were able to achieve a break-through on the issue of user fees.&amp;nbsp; The RPOs who contributed positively to this result also tended to be conducting water treatment and using macro- and micro-meters to determine payment, that is, they were better-led, organized and motivated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="55.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that feel project investments reflected their needs
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded:&amp;nbsp; 118.6% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator, associated with Component 2, assessed satisfaction with water, sanitation and logistics investments.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Beneficiaries were satisfied with decreased distances walked to collect water, thehealth benefits of clean water including reduced intestinal/parasitic&amp;nbsp;diseases, improved household hygiene, reduced fatigue from not having to carry water long distances, and reduced cost of water; and, the beneficiaries of the 10 logistics investments (all-weather passageways, multi-use community centers, and road paving/drainage)&amp;nbsp;reported&amp;nbsp;improved capacity to move product during the rainy season, safety benefits, and the&amp;nbsp;benefits to&amp;nbsp;communities of having a center for training/learning, social events, and in some cases access to a computer.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RPOs trained and/or using financial management instruments for their financed productive activities
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved:&amp;nbsp; 65.3% of target&lt;/p&amp;gt;

&lt;p&amp;gt;Based on the UFPE field questionnaires, about half (49%) of Component 1 RPOs were trained in and adopted some form of financial management instrument. These&amp;nbsp;included simple book-keeping, opening of a bank account, a register of sales and&amp;nbsp;costs, or adoption of&amp;nbsp;software.&amp;nbsp; &amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural water and sanitation subprojects concluded, including 30% of RPOs with women in specific management positions
</narrative></title>
<baseline year="2016" iso-date="2016-06-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-27" />
<period-end iso-date="2019-01-31" />
<target value="212.00">
<comment><narrative>
&lt;p&amp;gt;Substantially achieved: 100%&amp;nbsp;of target.&lt;/p&amp;gt;

&lt;p&amp;gt;The target for&amp;nbsp;women in management positions was exceeded: 39% of the water and sanitation subprojects had women in specific management positions, 130% of the target.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was introduced in 2016 (post MTR) with a target of 250 subprojects and intended to reflect the major upscaling of water investments (cisterns).&amp;nbsp; The target was reduced in 2018 to&amp;nbsp;180 due to capacity issues. It was increased to 212 in 2019 at the time of the agreement by the Bank and Borrower - based on Technical Audit recommendations - to freeze new investments and focus on those needing remediation, and to set the targets for several indicators at the levels already achieved which in this case was 212 subprojects. &amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="212.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MIS fully functional and producing all required products
</narrative></title>
<baseline year="2016" iso-date="2016-06-27" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-06-27" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved&lt;/p&amp;gt;

&lt;p&amp;gt;The MIS (Aroeira, named after the software), never functioned well due to inadequate training and management, and it&amp;nbsp;was difficult to use (BCR, 2021). Its level of use among ProRural staff was/is variable. During PRS implementation, there was a&amp;nbsp;lack of understanding of how it worked, and its functioning was hampered by lack of compatibility&amp;nbsp;with&amp;nbsp;theslow pace&amp;nbsp;and bureaucracy&amp;nbsp;of PRS procedures. Negative factors included: lack of synchronization between subproject execution and information management in the Aroeira; and lack of proper training of Aroeira users to exploit the potential&amp;nbsp;of the system to monitor information.&amp;nbsp; Even so, the&amp;nbsp;Aroeira produced/stored&amp;nbsp;a significant bank of data on the subprojects submitted and executed and is a potentially valuable, strong instrument. At closing, its&amp;nbsp;functionality, operational capacity, interactivity, and communicational dynamism were adequate but this needed to be more fully&amp;nbsp;updated and exploited by well-trained, stable staff.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased in real gross sales value for beneficiary RPOs
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2019-01-31" />
<target value="20.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 275% of the target of 20%&lt;/p&amp;gt;

&lt;p&amp;gt;This result is obtained directly from UFPE questionnaires, and projections of receipts and costs to determine the gross sales value, compared to the variation between values realized in the first year of production (post-investment) and the second year.&lt;/p&amp;gt;

&lt;p&amp;gt;The PAD unit of measure was changed in 2016&amp;nbsp;to: % of beneficiary RPOs with 20% higher real gross sales value, with a target of 75%. The original indicator was judged as hard to measure. The unit of measure was also changed&amp;nbsp;to % of beneficiary RPOs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="54.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural households with access to Improved Water Sources, including 30% female headed and 5% belonging to vulnerable groups (IP or Quilombola)
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2019-01-31" />
<target value="25430.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 107.7% of target&lt;/p&amp;gt;

&lt;p&amp;gt;---Female-headed families totaled 18,346 or 67% of the total, and 223.3% of the target (30%)&lt;/p&amp;gt;

&lt;p&amp;gt;---Families belonging to vulnerable groups totaled 1,449 or 5.3% of the total, just exceeding the target of 5%.&lt;/p&amp;gt;

&lt;p&amp;gt;The project achieved 107.7%&amp;nbsp;of its target but the scale of achievement was far smaller than expected (see original target above).&amp;nbsp; The 2018 Technical Audit&amp;nbsp; recommended that there be no new investments until all issues diagnosed in Component 1 and 2 subprojects had been rectified. The 2019 Restructuring reduced targets for water and sanitation to the levels achieved at the time of the restructuring because due to the freeze on new investments, ProRural had no opportunity to achieve the existing targets. This resulted in reported results at closing being artificially high and thus the main text Efficacy section IIB has discounted these&amp;nbsp;results for those two indicators in its assessment of the ratings for Efficacy and Overall Outcome.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="27387.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary RPOs selling products to institutional or private markets after subproject conclusion
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved: 30% of the targeted 60%&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was introduced gauge sustainability.&lt;/p&amp;gt;

&lt;p&amp;gt;As explained for PDO Indicator #1, the Restructuring Paper required that sales counted for&amp;nbsp;this indicator be made via &amp;quot;formal contract or arrangement&amp;quot;.&amp;nbsp; The 18% result&amp;nbsp;includes only RPOs selling to institutional purchasing programs (PAA, PNAE) which&amp;nbsp;are, by definition, contracted purchases. Low or negligible numbers of&amp;nbsp;RPOs were selling privately under contract or other formal arrangements. For most RPOs traditional modes of sale continued, i.e., markets, fairs, middlemen etc.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;CHECK WITH PRORURAL&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries that feel project investments reflected their needs
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded:&amp;nbsp; 128.6% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The questionnaires applied&amp;nbsp;by UFPE indicated strong support for the Project despite its&amp;nbsp;shortcomings.&amp;nbsp; Some 90% of the sample indicated that their investments were highly important for the development of their economic activities.&amp;nbsp; Notably, while they were critical of specific aspects of the Project, this did not affect their overall perception of the Project&amp;#39;s value to them economically and socially.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiary RPOs with organized arrangements for the management, operation and maintenance of financed productive investments
</narrative></title>
<baseline year="2016" iso-date="2016-07-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-07-07" />
<period-end iso-date="2019-01-31" />
<target value="70.00">
<comment><narrative>
&lt;p&amp;gt;Substantially achieved: 93% of target&lt;/p&amp;gt;

&lt;p&amp;gt;Based on UFPE&amp;#39;s field questionnaires and&amp;nbsp;interviews, about 65% of sampledRPOs had some form of organized arrangement for managing, operating and maintaining their productive investment.&amp;nbsp; This, however, seems inconsistent with data supporting PDO Indicator #1 where for example, the criterion &amp;quot;maintenance of a reserve fund&amp;quot; for such purposes showed achievement of just 15%. UFPE did not explain the types of arrangements RPOs had established.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural households with access to &quot;Improved Sanitation Services&quot;, including 30% female headed and 5% belonging to vulnerable groups (IP or Quilombola)
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2019-01-31" />
<target value="1845.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 117.5% of target&lt;/p&amp;gt;

&lt;p&amp;gt;---1,334 were female-headed households, 61.5%&amp;nbsp;of all beneficiary families receiving sanitation and 240.8% of target (which was 30% of 1845 or 554).&lt;/p&amp;gt;

&lt;p&amp;gt;---503 were from vulnerable groups, 23.2% compared to the targeted 5%, or&amp;nbsp;464% of target.&lt;/p&amp;gt;

&lt;p&amp;gt;As with the PDO water indicator, the sanitation target was exceeded but the result reflects an artificial outcome of the target having been reduced to the existing level at the time of the 2019 restructuring, based on&amp;nbsp;recommendations of the 2018 Technical Audit which diagnosed specific&amp;nbsp;issues affecting a high percentage of financed subprojects. The scale issue is evident when comparing the actual result against the original target of 6,000 families or even the reduced targetof 3,000. For this reason, the result for sanitation has been discounted in the main text rating for Efficacy and Overall Outcome.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2168.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiary RPOs, including 30% with women in specific management positions
</narrative></title>
<baseline year="2012" iso-date="2012-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-04-25" />
<period-end iso-date="2018-03-04" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;Substantially achieved:&amp;nbsp; 88.2% of target&amp;nbsp;(and 107% achievement for women&amp;#39;s participation)&lt;/p&amp;gt;

&lt;p&amp;gt;Of the 75 RPOs financed under Component 1, 32 had women in management positions at the time of the UFPE field interview, or 43.2% compared to the targeted 30%.&amp;nbsp; The BCR (ProRural 2021) notes that this can vary over time as RPOs change their management structure and composition.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P120830</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rio Grande do Sul SWAp</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to improve public investment planning and implementation by strengthening the capacity of the state planning agency and selected sector secretariats. These are in education, science &amp; technology, economic development and infrastructure. The Project will provide cross-cutting technical assistance in public investment and human resource planning, procurementmanagement, contract management, impact assessment, environmental and disaster risk management and citizen participation in decision-making. It will also support, through eligible expenditure programs, investments in education (technological modernization and buildings repair), transport (highway rehabilitation and maintenance), private sector development (cluster programs, industrial extension services and technology parks) and public sector management (public asset management.)]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sector Wide Approach (SWAp) to Strengthen Public Investment Project is to support and improve the planning and implementation of public investments by strengthening the capacity of the Borrower's planning agency and selected sector secretariats of the Borrower. There are four components to the project, the first component being transport. This component will support state paved highway rehabilitation and maintenance and Autonomous Department of Highways (DAER) modernization. The project will finance the implementation of Maintenance and Repair Contracts (CREMA) on up to 1,600 km of the state highway network considered a priority for economic growth and regional integration. The second component is the education. This component will support technological modernization, school construction and refurbishment and a participatory evaluation of the state education system. The third component is the private sector development. This component will support economic cluster programs, industrial extension services and the expansion of science parks and innovation networks. Finally, the fourth component is the public sector management. This component will support the development of systems for managing and disposing of public real and non-real estate assets (US$ 9.2 million).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0004137"><narrative>State of Rio Grande do Sul, Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0004138"><narrative>SPGG/DECAP</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-05-01"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tugba Gurcanlar</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tgurcanlar@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="48" xml:lang="en"/><sector vocabulary="1" code="32110" percentage="0" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="0" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="24" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="14" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="6" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="4" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="1" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="1" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="1" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="46.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="26.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="3" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="26" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="13" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="3" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="3" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="3" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="13" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="13" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="3" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="33" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="26" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="13" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="13" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="3" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="25" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="3" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">7625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">10716666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">10716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">10716666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">10716666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">13125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">8433333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">8433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">8433333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">8433333.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">5518011.62</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">5518011.62</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">480000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-4392701</value><description xml:lang="en"><narrative>Total Commitment Cancellations in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1125311</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">32450000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">29046791</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">89604540</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">5150951</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">42201298</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">3933424</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">65209875</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">15401328</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">58574219</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">46867188</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">7691894</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">34235138</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">5464103</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">10202690</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">4516240</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">6200000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">9515000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-657378</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1125311</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-10-31"/><value value-date="2012-10-31">-1200000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-190946</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-147611</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-288365</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-288688</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-772567</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-774002</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1156513</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1593188</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2656233</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-3032258</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-4590755</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-6948323</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-8078747</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-7880271</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-6286609</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-3318988</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2262828</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2222101</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2275169</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-7489555</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-12778070</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-14218609</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-14186252</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-13492585</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-10930512</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-10443560</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-8644304</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-104227</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-106194</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-138798</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-146499</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-199220</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-220183</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-228017</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-235632</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-237803</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-237803</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1189013</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1189013</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1189013</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1426816</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-19044554</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-18996899</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4138"><narrative>SPGG/DECAP</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4139"><narrative>SEPLAN/DECAP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120830"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P120830?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P120830"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulative number of construction and refurbishment school projects undertaken
</narrative></title>
<baseline year="2013" iso-date="2013-09-11" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-09-11" />
<period-end iso-date="2015-06-15" />
<target value="320.00">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;help restart economic growth in transport,&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="387.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of system for learning assessment at primary and secondary levels
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2018-06-15" />
<target value="N">
<comment><narrative>
&lt;p&amp;gt;Improve public investment&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Primary fiscal balance
</narrative></title>
<baseline year="2013" iso-date="2013-06-30" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-30" />
<period-end iso-date="2015-12-31" />
<target value="PAF target">

</target>
<actual value="793">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of road pavement management system
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2018-06-15" />
<target value="N">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Completion of impact evaluation of industrial extension services
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2018-06-15" />
<target value="N">
<comment><narrative>
&lt;p&amp;gt;Improvement public investment planning&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Submission of draft public asset management law to legislative assembly
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2018-06-15" />
<target value="N">
<comment><narrative>
&lt;p&amp;gt;Improvement&amp;nbsp;public investment planning&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agreements signed/renewed with extension centers
</narrative></title>
<baseline year="2012" iso-date="2012-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-11" />
<period-end iso-date="2015-06-15" />
<target value="9.00">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;help restart economic growth in transport&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue from ICMS
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="22500.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2015-12-31" />
<target value="138127.00">
<comment><narrative>
&lt;p&amp;gt;Revenue from ICMS&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="150137.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New triple helix alliances implemented
</narrative></title>
<baseline year="2012" iso-date="2012-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-11" />
<period-end iso-date="2015-06-15" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;restart economic growth in transport&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agreements signed/renewed with APLs
</narrative></title>
<baseline year="2012" iso-date="2012-09-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-09-11" />
<period-end iso-date="2015-06-15" />
<target value="19.00">
<comment><narrative>
&lt;p&amp;gt;help restart economic growth in transport&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cumulative percentage of paved road network under CREMA contracts
</narrative></title>
<baseline year="2012" iso-date="2012-03-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-30" />
<period-end iso-date="2015-06-15" />
<target value="14.00">
<comment><narrative>
&lt;p&amp;gt;percentage of paved road network under CREMA contracts&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment expenditures
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="1047.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2015-12-31" />
<target value="3946.00">
<comment><narrative>
&lt;p&amp;gt;Indicator Name&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Investment expenditures&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4864.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P121167</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ceara Rural Sustainable Development and Competitiveness</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Project Development objective:  The objectives of the Project are to: (i) improve the sustainability of rural production and rural income generation; and (ii) contribute to the Borrower's efforts to universalize access to Water Services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Ceara Rural Sustainable Development and Competitiveness Project for Brazil are to: (i) improve the sustainability of rural production and rural income generation; and (ii) contribute to the borrower?s efforts to universalize access to water services. The project has three components. (1) Economic inclusion component will promote investments in rural economic inclusion in the borrower's territory, through: (a) the provision of support for: (i) the preparation of business plans; (ii) the construction of warehouse facilities (iii) productive and environmental services subprojects; and (iv) the development of a state-wide disaster risk management policy, contingency plans and early warning systems for the prevention of natural disasters. (2) Water services component will support the State's efforts to ensure universal access to potable water and water services in rural areas and for the scaling up of existing water distribution management system models. (3) Institutional strengthening and project management component will support the technical and administrative management of the project, including information system, monitoring and impact evaluation; training and technical assistance activities to strengthen stakeholders and public functions that are critical to ensure the project implementation and sustainability.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0004228"><narrative>State of Ceara</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0004228"><narrative>State of Ceara</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0004229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-05-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-04-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Barbara Cristina Noronha Farinelli</narrative></person-name><telephone>+1-202-473-1000</telephone><email>bfarinelli@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Estado do Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31120" percentage="41" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="27" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="24" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="4" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="15" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000751" percentage="4" xml:lang="en"><narrative>Disaster Response and Recovery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="41" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="3" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="8" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="26" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="14" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="12" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="26" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="8" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="15" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="15" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="15" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="14" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="8" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="15" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="12" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="12" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="3" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="12" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="3" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000331" percentage="4" xml:lang="en"><narrative>Disaster Risk Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="3" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="4" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="6" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-04-30"/><value value-date="2012-04-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">250000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">5058639</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">6000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">11178592</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">20486535</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">4449429</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">5299058</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">8194688</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">5229383</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">11724639</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">4529814</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">7250032</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">174596</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">174596</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-1613</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-35673</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-54201</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-53146</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-80051</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-133190</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-404977</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-487858</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-637330</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-723221</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-965720</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1475817</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1672519</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1371403</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1142546</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-479548</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-392283</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-341895</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-387133</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1207893</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2135495</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2224734</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2187019</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2037397</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1702964</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1612795</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1363320</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-1568056</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1777840</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-2223731</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-2546501</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2551355</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4229"><narrative>Secretaria de Desenvolvimento Agrario</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121167"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121167?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121167"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Producers Organizations supported by the project that have a sustainable business initiative, financed via subproject investments
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Substantial:&amp;nbsp;97.75% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was added by the April 2018 Restructuring and is measured against compliance with all six of the criteria listed below, six months after conclusion of sub-project financing.&amp;nbsp; Some 80% of the targeted 280 investment sub-projects (224 sub-projects)&amp;nbsp; were expected to comply with all six. The targeted number of business initiatives was reduced from 440 to 280 due to extreme drought requiring intensification of project water services activities under Component 2 and the reallocation of resources from Component 1 to cover this.&amp;nbsp; The &amp;quot;actual value&amp;quot; reported above represents the ratio of 197 sub-projects meeting all 6 criteria and 22 subprojects that are operational&amp;nbsp; and awaiting some administrative equipment support (computers, software, office equipment etc), to the target of 280, or 78.2% (212/280 subprojects).&amp;nbsp;&amp;nbsp;&amp;nbp; Some 48 sub-projects were assessed by the UGP as having substantial likelihood of&amp;nbsp;not meeting all these criteria due to certain challenges/features&amp;nbsp;- level of organization, cohesiveness, capacity -&amp;nbsp;and needed more&amp;nbsp;intensive assistance.&amp;nbsp; The 2018 Restructuring introduced this new indicator to capture project activities meant to improve the sustainability of rural production and income generation.&amp;nbsp; The six criteria with level of achievement were:&amp;nbsp; (i) Business Plans implemented and operational. Measured via SIGPRO, which describes sub-project categories - 197; (ii) Regular technical assistance visits (min. 2 per year) - 254.&amp;nbsp; Measured via SIGPRO, with information uploaded by the Agricultural Technology and Rural Extension Service (ATER); (iii) Functioning accounting system - 251. Measured based on the accounting and financial system reports required from and submitted by each PO.&amp;nbsp; To meet this requirement, each PO had to present one of the following: balance sheets, management system reports&amp;nbsp;or spreadsheets; (iv) Operation and Maintenance Plan and reserve fund for financed investments - 258. Verified via approval of a meeting minute in which this topic and next steps were discussed;&amp;nbsp; &amp;nbsp;(v) Producer Organizations trained in sustainable production practices and management - 267.&amp;nbsp; Measured through the list of participants who attended training sessions; and, (vi) Sales to at least one buyer - 230. To meet this requirement, each sub-project had to present the following evidence: copies&amp;nbsp;of invoices, contracts with the municipality/city hall; or, declaration of participation in commercial fairs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="78.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water reuse pilot projects implemented with project support.
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 115.4% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator considers the number of water re-use pilots installed in rural households thatalready have water services and sanitation systems funded by the project. Data collection was conducted using water re-use Pilot Impact Reports.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project results and lessons learned disseminated.
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2019-04-30" />
<target value="8.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 300% of target&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas with access to Improved Sanitation  under the project
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 101% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured based on the Work Receipt Reports and technical monitoring reports delivered by SISAR, SAE and SAES (see above under water supply). The number of improved sanitation modules installed by the project was multiplied by 4.5, which is a fixed value representing the&amp;nbsp;average number of people per household.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="39662.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total hours of technical assistance provided to family production units
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 132.8% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This was a new indicator added in 2018 to capture the project&amp;#39;s emphasis on and efforts in technical assistance activities to enhance the capacity of family farmers.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="92970.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries trained in water services systems management
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2019-04-30" />
<target value="420.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 101% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The original wording of this indicator was: &amp;quot;Potable water supply systems and basic sanitation management training provided to water services managers&amp;quot; with a target of 280.&amp;nbsp; The UGP requested revision of the wording and target in the 2018 Restructuring to better reflect the measurement methods described in the PAD for training activities under Component 2.&amp;nbsp; However, the indicator could have been improved&amp;nbsp;as it suggests individual beneficiaries of WSS and only asmall percentage of them -&amp;nbsp;actual individual WSS beneficiaries far outnumbered the target shown -&amp;nbsp;rather than water services managers (as in original&amp;nbsp;wording). End target date was also changed to align with new closing date.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="424.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries trained in business management and environmentally sustainable practices
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2019-04-30" />
<target value="10000.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 154.6% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was adjusted twice. In 2014, the target of 440 was adjusted to 280 (but retaining the original wording: &amp;quot;Beneficiary organizations trained in business management&amp;quot;). In 2018 the wording was adjusted tothat shown in the heading and the target was set at 10,000. The indicator was revised to capture the total number of individual beneficiaries trained in business management and environmentally sustainable practices and technologies. The end target date was changed to align with the new closing date.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15460.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased number of beneficiary organizations participating in environment recovery activities and conservation
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 284% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator considers the number of sub-projects whose Management Plans and Environmental Reports registered tree/other seedling planting activities designed to recover degraded areas designated by the Environmental Management Agency (ASGAM) of the Ceara Water Resources Management Company (COGERH).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="71.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2016-10-31" />
<target value="22000.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 119% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured from the Work Receipt Reports and technical monitoring reports delivered by the Integrated Rural Water Supply and Sanitation System (SISAR), the Autonomous Water System (SAE) and the Simplified WaterSupply and Sanitation System (SAES).&amp;nbsp; The original target value was revised by the 2014 Restructuring in response to the increased demand of rural families for access to water due to extreme drought. This restructuring inter alia, reallocated funds from Component 1 to 2 (and reduced the expected number of investment sub-projects accordingly under Component 1).&amp;nbsp; A piped household water connection is defined as a connection which provides piped water to the consumer through either a house or yard connection. Thus,these do not include standpipes, protected wells, boreholes, protected springs, piped water provided by tanker trucks or vendors, unprotected wells, unprotected springs, rivers, ponds and other surface water bodies, or bottled water.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="26198.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total hours of technical assistance provided to producer organizations
</narrative></title>
<baseline year="2018" iso-date="2018-04-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-04-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 110% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This was a new indicator added in 2018 to capture the project&amp;#39;s emphasis on and efforts in technical assistance activities to build the capacity of Producer Organizations.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="49448.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural producer organizations supported by the Project adopting environmentally sustainable technologies (eg. solar panels, drip irrigation systems)
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2019-04-30" />
<target value="28.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 114.3% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The wording of this indicator was revised by the 2018 Restructuring. The original wording was: &amp;quot;Improving efficiency in agricultural production through access to environmentally sustainable technologies&amp;quot;. Given the unclear methodology for estimating the term &amp;quot;improved efficiency&amp;quot; in this case, the UGP requested revision to better reflect the measurement methods described in the PAD and actual project activities. The end-target date was changed to align with the newclosing date.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator considers all project-supported POs registered in SIGPRO that adopted sustainable production technologies suited to semi-arid conditions, for example: (i) Fish Farming:&amp;nbsp; Fish tanks adopted/using Geo-membrane technology toavoid water loss,&amp;nbsp;avoid environmental pollution and increase water availability and facilitate its&amp;nbsp;management; use of fish processing byproducts to produce compost; advances in shrimp production using tri-phasic system increasing productive cycles from 3 to 6 per year; and, in oyster production use of purification technology to filter and sterilize the oysters; (ii) Manioc production: productivity was tripled&amp;nbsp; by using more productive varieties, and through sustainable practices such as soil correction and organic fertilizers; (iii) Cashew: Planting of the BRS 265 and CCP 76 cultivars (clones of early producing cajueiro-anao) allied with management techniques and organic fertilizers increased productivity in dry-season crops, tripling productivity where irrigation was present; and marketing&amp;nbsp;cashew byproducts as an input for caldeiras in agro-industry; (iv) Sheep and Goats: division of grazing areas to improve pasture and reduce soil compaction; rotation of pens (reducing de-forestation and loss of biodiversity), and formation of reserves for production of animal feed (planting of forage palms and sorghum forage); (v) implementation of 25 drip irrigation system sub-projects to reduce&amp;nbsp;demand for water; and (vi) acquisition of solar panels to reduce energy consumption in agro-livestock activities.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="32.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive investments implemented and operational
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2016-10-31" />
<target value="280.00">
<comment><narrative>
&lt;p&amp;gt;Substantial: 70.25% of target&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured through the SIGPRO and counts the number of Component 1 investment sub-projects fully implemented and in operation at closing.&amp;nbsp; Another 22 sub-projects were awaiting administrative equipment (office equipment, computer, software etc) but were otherwise operational, and 48 sub-projects needed more intensive attention to complete.&amp;nbsp;The UGP agreed with the Bank on a post-project plan for completing unfinished sub-projects, with EMATERCE support. The original target value of 440 sub-projects was reduced to 280 in 2014 due to a reallocation of Component 1 funds to Component 2 to increase water supply investments in response to drought-driven demand from rural families.&lt;/p&amp;gt;

&lt;p&amp;gt;Note: The&amp;nbsp;sub-indicator forgender does not have its own Comments section.&lt;/p&amp;gt;

&lt;p&amp;gt;Exceeded: 221% of target.&amp;nbsp; The related, subsidiary indicator &amp;quot;25% of productive investments led by women&amp;quot; was based on the number of productive sub-projects completed. The original target of 110 was based on a target of 440 productive sub-projects but was adjusted to 70 in 2014&amp;nbsp;when the sub-project target was reduced to 280.&amp;nbsp; The indicator considers the number of sub-projects where women held/hold strategic/managerial positions:&amp;nbsp;president,&amp;nbsp;vice-president and/or board member of their&amp;nbsp;PO. Information was obtained via questionnaires.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="197.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Basic sanitation investments implemented and sustainably operated.
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2016-10-31" />
<target value="210.00">
<comment><narrative>
&lt;p&amp;gt;Achieved: 100% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The target was increased by the 2014 Restructuring due to the larger amount of funds in Component 2 resulting from the reallocation from Component 1. This indicator considers the number of project-financed sanitation investments managed by SISAR and SAE and operated sustainably.&amp;nbsp;&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="211.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training being provided to governmental staff and strategic partners according to the Project Capacity Building Plan (number of training sessions/courses).
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 142.5% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The end target date was aligned to the new (2018 Restructuring) closing date.&amp;nbsp; NOTE:&amp;nbsp;Three Intermediate Outcome Indicators were dropped after being reassessed and aggregated for clarity purposes. Indicators dropped were: (i) Number of participants (target 3200); (ii) Training for project beneficiaries to encourage adoption of environmentally sustainable practices; and (iii) Number of participants in training courses provided by the project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="114.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural producers supported by the Project selling products to institutional and private markets
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2018-04-30" />
<target value="30.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 227% of target&lt;/p&amp;gt;

&lt;p&amp;gt;The wording of this indicator (and the target) was revised by the 2018 Restructuring to better reflect&amp;nbsp; the measurement methods described in the PAD. The number of&amp;nbsp;producers who accessed at least one new market/buyer was 5,031 people,&amp;nbsp;accounted through SIGPRO data. The original indicator wording was: &amp;quot;Participating rural producer organizations successfully accessing formal markets (e.g., PAA and PNAE). Most project-supported rural producer organizations were/are established as &amp;quot;associations&amp;quot;, which under Brazilian law (Brazilian Civil Code, Art. No. 53) are not-for-profit organizations which cannot distribute profits to members. Therefore, the project assessed individual rural producers accessing markets (instead ofassociations) to capture the increase in market access. Note that UGP data did not dis-aggregate by public/private.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Real Revenue increase (inflation adjusted) of the beneficiary rural producers organizations
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2018-04-30" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Exceeded: 660% of revised target&lt;/p&amp;gt;

&lt;p&amp;gt;The Bank and Borrower agreed that this indicator would be measured through the project&amp;#39;s economic and financial analysis process and using the same sample. Data on production and average annual commercialization prices were collected using a questionnaire, complemented by data entered by each producer organization&amp;nbsp;into the SIGPRO system andother sources.&amp;nbsp;&amp;nbsp; The revenue data was collected via SIGAF (entities&amp;#39; accounting system) from those&amp;nbsp;organizationswhose investment sub-projects had been&amp;nbsp;operational for at least 1 year.&amp;nbsp; The increase in real revenue was calculated for each of a representative (but not random) sample of 69 selected PO&amp;nbsp;based on data collected in 2017 and 2018.&amp;nbsp; Note that most sub-projects produced more in 2018 compared to 2017 due to the better rainfall regime.&amp;nbsp; The formula used by the UGP to calculate real revenue per year per product was obtained by multiplying total production by the average price. The UGP then summed the revenues of all sub-projects and applied the formula shown&amp;nbsp;in Section 2 B of the Main Text.&amp;nbsp; While not based on random sampling due to the completion and operational status of many sub-projects at the time, the final sample was strongly representative of the types of sub-projects which: covered 14 value chains; represented 23% of total investment value financed, and 25% of all beneficiaries; and, covered 45% of the total geographic area of the project, all 3 Calls for Proposals and the diverse range of beneficiary PO.&amp;nbsp; All 69 subprojects were visited between February and March 2019 for validation purposes, PO leaders and beneficiaries wereinterviewed, SIGPRO financial data on individual producers was applied as well as original data collected by the SIGAF (entities&amp;#39; accounting system).&amp;nbsp; Data collected and entered in the Business Plans was also consulted.&amp;nbsp;The April 2018 Restructuring reduced the target from 20% to 5% based on:&amp;nbsp;implementation delays affecting the Component 1 productive investments under approved Business Plans;&amp;nbsp;and, the incremental revenue generation likely/possible by project closing given the limited operational period for those sub-projects already completed. &amp;nbsp;The Bank and Borrower/UGP agreed on a conservative estimate&amp;nbsp;which seemed reasonable/realistic at that time.&amp;nbsp;In the short run, a more modest increment in revenue was expected, in particular for PO&amp;nbsp;already commercializing their product and that with the project, would have their production and sale leveraged.&amp;nbsp; Other organizations were believed to need a longer time to consolidate.&amp;nbsp; Also, a supporting, output-based PDO Indicator was added to provide evidence on production and income generation sustainability within the project time-frame (&amp;quot;Project-supported PO&amp;nbsp;that havea sustainable business initiative financed via sub-project investments&amp;quot; with six criteria for achievement. See 3rd PDO Indicator: Producers Organizations supported by the project that have a sustainable business initiative, financed via subproject investments).&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="33.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P121495</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Tocantins Integrated Sustainable Regional Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to foster improved effectiveness of road transport and enhanced efficiency of selected public services, in support of the Borrower's integrated and territorially balanced development agenda. The objective will be achieved through fostering (i) improved accessibility of populations and producers to employment opportunities, services, resources, and markets and enhanced connectivity to the State's territories and productive regions, and (ii) institutional strengthening to contribute to modernize public service delivery and management, promote local economic activities, strengthen environmental management, and improve education.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Tocantins Integrated Sustainable Regional Development Project for Brazil is to foster improved effectiveness of road transport and enhanced efficiency of selected public services, in support of the borrower's integrated and territorially balanced development agenda. The project has 3 components. (1) Improving effectiveness of rural transport provision of support component will improve accessibility of the borrower's remote populations and, at the same time, foster regional economic integration and support the borrower's competitiveness and social inclusion agendas. (2) Enhanced efficiency of public services will provide the provision of support for institutional strengthening. (3) Project management component will provide support for project management in connection with the implementation and supervision of the project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0004300"><narrative>State of Tocantins</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0004301"><narrative>SEPLAN</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-07-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-07-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carlos Bellas Lamas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cbellas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Estado de Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="81" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="6" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="2" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="2" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="80.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="7" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="7" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="1" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="1" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="7" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="1" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="9" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="82" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="1" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="2" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">5416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">5416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">6250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">5833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">3333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">18975341.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">18975341.99</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">300000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-10000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-8975342</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">750000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-04-30"/><value value-date="2013-04-30">4958596</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">31353</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">2737479</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">12003316</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">3084474</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">4329970</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">8234303</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">6822297</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">4219203</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">4873483</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">5603733</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">4109401</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">6733601</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">8468441</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">13061925</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">6658751</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">8514904</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">5588196</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">7455839</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">8735568</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">7946496</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">5873993</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">8026793</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">7398643</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">7310438</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">6505526</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">6530606</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">5070441</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">5248004</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">5609259</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">6024727</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">4266947</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">6065065</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">5680135</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">3009437</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">2979758</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">4954874</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">3464136</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">3802035</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">4380537</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">2951458</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">4705944</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">3882912</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">4554967</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">4597679</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">7018615</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">8899277</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">3727244</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">4613586</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1049708</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-02-28"/><value value-date="2013-02-28">-750000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-1688</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-25502</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-21067</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-55931</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-135255</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-200303</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-291363</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-490900</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-918949</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-1317819</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-1757916</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2541569</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-3030174</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2923862</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2424352</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1283787</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-879443</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-875067</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-987410</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-3491703</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5850928</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-6563698</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-6592210</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-6306624</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5130489</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-4936431</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-4109090</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-3453986</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-4206426</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-4382075</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-4848793</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-5301970</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-5735756</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-6079999</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-6427381</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-6850612</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-7657898</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-7780480</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4301"><narrative>SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121495"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121495?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121495"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved public services delivery as measured by substantial achievement of intermediate indicators of Component 2
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="3.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies with implemented results agreements between the secretaries and responsible units
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Management adopted by the staff of the Beneficiary institutions is subject to the implementation of results-based management (SEPLAN, SEINFRA, SEMARH, SEAGRO, SEDUC).&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was achieved with the support of consultancies to implement this management.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to concession environmental licensing for complex State road  activities with environmental impact
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2020-12-31" />
<target value="40.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicle-km travelled on State paved roads under good condition
</narrative></title>
<baseline year="2012" iso-date="2012-07-26" value="260000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-26" />
<period-end iso-date="2021-12-31" />
<target value="2320000.00">
<comment><narrative>
&lt;p&amp;gt;The value of this indicator is taken into account considering all the roads which are under current CREMA maintenance contracts or recently closed contracts, totalling around 2,200 km. The last traffic count was made in 2018, and due to the pandemic 2020 was postponed until this year. So an assumption is made that of the traffic growth rate of 3% pa. The good condition is defined as IRI&amp;lt;3.5. The indicator overachieved as the traffic grew more than expected and more km of roads were considered compared to the original estimated target (1,500 km).&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5750000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicle-km travelled on State paved roads under good condition
</narrative></title>
<baseline year="2012" iso-date="2012-07-26" value="260000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-26" />
<period-end iso-date="2020-12-31" />
<target value="2320000.00">

</target>
<actual value="5750000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Education Plans (with Early Childhood Education (ECE) component) agreed with municipalities
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2020-12-31" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of dropout rate in 7 pilot state schools identified by the the SoT
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2020-12-31" />
<target value="25.00">

</target>
<actual value="61.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time to concession environmental licensing for complex State road  activities with environmental impact
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="40.00">
<comment><narrative>
&lt;p&amp;gt;The environmental licensing average time refers to the time spent within the Naturatins, since the license is required until the license is issued, except for downtime by backlogs of the entrepreneur (environmental assessments, studies, action plans, etc.). It is the Sum of the required time in days to concede (or deny) a license divided by the number of licenses issued by Naturatins officrs each year, regarding complex road activities.&lt;/p&amp;gt;

&lt;p&amp;gt;It was achieved at the end. During some time, the indicator was even at 29 days.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of dropout rate in 7 pilot state schools identified by the the SoT
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="25.00">
<comment><narrative>
&lt;p&amp;gt;The indicator measures the average dropout rate across entire schools of the Program. Having the data available was difficult asshool-wide indicators have a lot of variability as well. The data of the last year showed a large reduction in the dropout rate as a result of the online classes that counted all the children in school age to be participating in lessons, so indicator was achievedbut this has to be put on question as a result of the pandemic impact. Actually, before the pandemic the indicator progress was around 7 percent.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="61.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Instruments from the Brazilian Forestry code applied by the State of Tocantins
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved public services delivery as measured by substantial achievement of intermediate indicators of Component 2
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;This indicator applies to the first indicators for each subcomponent of the Project listed below. Substantial achievement is a) three out of four indicators are substantially achieved at the year of evaluation, where substantial achievement is defined as 75% of the target value of the indicator of the subcomponent.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;The components were achieved on all topics with the exceptionof the governance part (subcomponent 2.1), as the maintenance contracts with the municipalities as the main issue were not&amp;nbsp;achieved. Education, agriculture and environmental sub-sectors indicators were all achieved substantially.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Education Plans (with Early Childhood Education (ECE) component) agreed with municipalities
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-30" />
<target value="6.00">
<comment><narrative>
&lt;p&amp;gt;This indicator was achieved in 2018 with having each of the Municipalities with Schools of the Program submitted to the Bank itsfinalized plans signed by State and Municipal government. In total the Municipalities implemented the plan with the renovated schools as well.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of municipal roads with all-season accessibility
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="5500.00">
<comment><narrative>
&lt;p&amp;gt;The project has achieved this target despite having some pending actions left at project closing on the feeder road network, with less than 100 interventions pending of more than 1600 planned on the feeder network. The amount of feeder road kilometres that are accessible all year round has therefore achieved the target.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cooperation agreements on rural road maintenance financing signed between the state and municipal government
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="111.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concessioned and Operational Municipal Slaughterhouses built related to the project
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="7.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CREMA State road network in good condition
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of municipal roads with all-season accessibility
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="5500.00">

</target>
<actual value="5500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers in state system trained in 7 schools identified by the SoT
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="90.00">

</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of CREMA State road network in good condition
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;The Road network considered is the one either&amp;nbsp;under current CREMA or recently closed contracts, totalling 2,200 km or almost 1/2 of the total state paved road network. A good condition is defined as IRI&amp;lt;3.5.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concessioned and Operational Municipal Slaughterhouses built related to the project
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="7.00">
<comment><narrative>
&lt;p&amp;gt;The original indicator was to measure the Increase in volume of meats inspected by the municipal inspection service in the selected municipalities - which was expected to be in 8 Municipalities with one slaughterhouse each. The target at that time was to inspect the total&amp;nbsp;volume of meat produced - as food insecurity was a huge issue - thus target was 100%.&lt;/p&amp;gt;

&lt;p&amp;gt;With the last Restructuring, as the slaughterhouses were on hold it was agreed to concesion them and proceed with only the 7 that were partly constructed instead with the 8 envisioned. The 7 slaughterhouses are now concessioned, but still, need to finish the works to become operational. As of closing date of the project, not one is operational. However the slaughterhouses are already part of the Frigotins 25-yearconcession, this is partially achieved and works have resumed now and the first one is expected to open in the next months. &amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Agencies with implemented results agreements between the secretaries and responsible units
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">

</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water management pilot projects implemented in the SoT priority river basins with committees
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="3.00">
<comment><narrative>
&lt;p&amp;gt;River Basin Committees are deliberative stakeholder bodies with decision-making and regulatory powers. The three pilots were prepared by SEMARH but monitoring was loose during the last years of implementation. This one indicator was the first one to be achieved by the project.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water management pilot projects implemented in the SoT priority river basins with committees
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="1500.00">

</target>
<actual value="2250.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producers which upgrade from subsistence farming to market farming in selected areas
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="120.00">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="1500.00">
<comment><narrative>
&lt;p&amp;gt;This indicator&amp;nbsp;measures the kilometres of all rural roads reopened to motorized traffic, rehabilitated, or upgraded under the project. Rural roads are roads functionally classified in various countries below Trunk or Primary, Secondary or Link roads, or sometimes Tertiary roads.&amp;nbsp; Such roads are often described as rural access, feeder, market, agricultural, irrigation, forestry orcommunity roads.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Typically, rural roads connect small urban centers/towns/settlements of less than 2,000 to 5,000 inhabitants to each other or to higher classes of roads, market towns and urban centers.&lt;/p&amp;gt;

&lt;p&amp;gt;In the case of Tocantins this was referred to as the State roads, some of them connecting to even larger urban settlements such as the Capital city, Palmas.&amp;nbsp;The original target was set around 1500 km to be done with CREMA contracts and 2250 km of State&amp;nbsp;roads were finally rehabilitated compared to the original target using CREMA contracts. Additionally, 60 km of unpaved roads were also paved.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2250.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cooperation agreements on rural road maintenance financing signed between the state and municipal government
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="111.00">
<comment><narrative>
&lt;p&amp;gt;This indicator was created as an attempt to create at least 3 inter-municipal consortiums in the road sector for supporting the feeder road maintenance in the municipalities that would be part of those consortiums. As this was not achieved by the time of the last restructuring, the State of Tocantins asked for a change in this indicator, to try to implement cooperation agreements with the 111 municipalities of the State of Tocantins to support the feeder road network under municipal jurisdiction. This was not achieved either and this is one of the main failures of the project, not being able to promote the road maintenance cooperation between municipalities and the State.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers in state system trained in 7 schools identified by the SoT
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;To qualify, the training must include at least 40 hours of face-to-face training and at least 4 in-class follow-up visits for each professor. Indicator is calculated as number trained (as above), divided by total state-employed teachers in pilot schools. The original target was 90 percent, but this was not achieved as training stopped when COVID pandemic reached the State in 2020, therefore 15 percent of teachers were left without completing the training.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="85.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="92.00">
<comment><narrative>
&lt;p&amp;gt;This indicator measures the percentage of rural people in the project area who live within 2 kilometres (typically equivalent to a 20-minute walk) of an all-season road.&amp;nbsp; This indicator is also known as Rural Access Index (RAI). This indicator also considrs that an all-season road is motorable all year by the prevailing means of rural transport (often a pick-up or a truck which does not have a four-wheel drive), though predictable interruptions of short duration during inclement weather (e.g. heavy rainfall) are acceptable, particularly on low volume roads.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Thanks to the construction of works on feeder and rural roads by the project, the population in the Western part of the Tocantins State (the focus area of the project) has currently&amp;nbsp;access to all-season roads. Even in areas where the roads were not fully built by project closing, roads were elevated and thus passable, contributing to the indicator. Almost the whole population of the Western part of the State has now access to jobs and services all year round. This also was over achieved compared to the original target of 92 percent of the population.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producers which upgrade from subsistence farming to market farming in selected areas
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="120.00">
<comment><narrative>
&lt;p&amp;gt;The indicator is defined as the number of producers who upgrade from subsistence farming to market farming. The number was basedon a program implemented by Ruraltins at the beginning of the project and reached at some point over 150 farmers. Considering that the State of Tocantins did not follow continuously this indicator, it was reached around the year 2019 for good counting the Ruraltins, irrigation work and SEAGRO programs. The latest value is 150 farmers, but the number can be even higher.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Instruments from the Brazilian Forestry code applied by the State of Tocantins
</narrative></title>
<baseline year="2012" iso-date="2012-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-31" />
<period-end iso-date="2021-12-31" />
<target value="4.00">
<comment><narrative>
&lt;p&amp;gt;This indicator was also changed in the last Restructuring from the reduction on illegal deforestation in the Cerrado biome, relative to the 2008-2009 average to the&amp;nbsp;Number of instruments from the Brazilian Forestry code applied by the State of Tocantins with a target of 4 instruments: (Rural Environmental Cadaster; State Secretary and Policy focusing on the topic; monitoring of illegal deforestation and wildfires; natural capital tool elaborated) and a baseline was 0 at the beginning of the project. The 4 instruments were established successfully, therefore it was achieved.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P121590</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Third Minas Gerais Development Partnership DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed overall development objective of the operation is to assist  the Government of Minas Gerais to deepen its innovative management model, strengthen its budget management, and sectoral in the areas of social inclusion, environmental management and metropolitan governance.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This Third Minas Gerais Development Partnership Development Policy Loan (DPL) Project for Brazil is designed to assist the Government of Minas Gerais (GoMG) in its efforts to promote fiscally, environmentally and socially inclusive sustainable development in the State of Minas Gerais. Although requested as a stand-alone DPL, the operation forms part of a long-term engagement with the State, which started in 2003. It is the fourth1 operation following the two-tranche Minas Gerais Partnership for Development DPL in the amount of US$170 million; the Second Minas Gerais Development Partnership Project, a US$976 million Specific Investment Loan with a multi-Sector Wide Approach (SWAp); and its Additional Financing of US$461 million. The operation is organized around four pillars: (i) budget and public sector management; (ii) social inclusion; (iii) environmental sustainability; and (iv) metropolitan governance. Each of these pillars includes substantial innovations in management and policy which build on the previous eight years of reforms, and the partnership with the World Bank.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2012-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-07-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Roland N. Clarke</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rclarke@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="30" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="20" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="20" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15150" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="20" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="20" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="10" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="5" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="20" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="20" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="20" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="5" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="10" xml:lang="en"><narrative>Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">450000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">450000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<capital-spend percentage="0" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121590"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P121590?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P121590"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Strategic Projects with an execution rate above 85%
</narrative></title>
<baseline year="2012" iso-date="2012-06-25" value="61.00"><comment><narrative>Average 2009-2011</narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-25" />
<period-end iso-date="2014-01-31" />
<target value="63.00">

</target>
<actual value="56.67">
<comment><narrative>
Execution rate is expected to rise and meet end target by the end of the year.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Level of citizen participation in the identification of regional priorities.
</narrative></title>
<baseline year="2012" iso-date="2012-06-25" value="Five strategic priorities identified for each of the regions of the state - North and Rio Doce - with the participation of civilsociety"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-25" />
<period-end iso-date="2014-01-31" />
<target value="Five strategic priorities identified for each of the five additional regions of the state with the participation of civil society.">

</target>
<actual value="No additional regions identified.">
<comment><narrative>
The Government has done an evaluation of the program and has suggested an alternative mechanism to improve citizen participation.See evaluation attached.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126343</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SWAp for Parana Multi-sector Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (i) increase the survival rate in the final cycle of fundamental education; (ii) improve maternal and emergency health care services; (iii) promote business initiatives and improve natural resources management in rural areas; and (iv) contribute to building capacity in public administration, and environmental and disaster risk management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the SWAp for Parana Multi-Sector Development Project for Brazil is to make access to economic and human development opportunities more equitable and environmentally sustainable in the Borrower s territory through the modernization of the borrower s public sector and revenue management. There are two components to the project. The first will co-finance selected government programs (Eligible Expenditure Programs - EEPs) that support the Government of Parana's (GOP's) integrated approach to promoting social and economic development. The second will provide technical assistance to strengthen Public Sector Management (PSM). In line with the GOP's integrated strategy, the project activities are organized around three broad axes and involve five sectors in the areas of integrated development and human development with public sector management as cross-cutting axis.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006383"><narrative>State of Parana</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0006384"><narrative>State Secretariat of Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-03-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-11-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Kjetil Hansen</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455077" />
            <name><narrative>Estado do Parana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.5 -51.333328</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="41010" percentage="25" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="22" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="23" xml:lang="en"/><sector vocabulary="1" code="11120" percentage="23" xml:lang="en"/><sector vocabulary="1" code="51010" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="24" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="3" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="16" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="24" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="48" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="23" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="48" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="16" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="16" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="4" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="12" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="23" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="24" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="48" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="12" xml:lang="en"><narrative>Access to Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">33375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">33375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">33375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">9583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">9583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">9583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">9583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">9583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">9583333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">12083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">12083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">12083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">12083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">12083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">12083333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">3166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">3166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">3166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">16373632.59</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">16373632.59</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">350000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-16373633</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">875000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">50000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">49938591</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">37019231</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">34459219</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">28478126</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">20947271</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">2771703</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">15983251</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">15983251</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">15983251</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">28770430</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">3603722</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">12786601</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">3018602</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">9811472</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">3196650</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">0</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-875000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-04-30"/><value value-date="2014-04-30">-1610</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-204444</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-394005</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-572134</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-679631</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-1420322</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-1928387</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-2299609</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-2889089</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-4673641</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-4973871</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-5280604</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-4243727</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-3020767</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1379533</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1357215</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1220113</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-3914834</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-7183360</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-8263614</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-8442444</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-7881719</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-6306425</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-5775527</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-4725011</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-2543750</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-5040680</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-5040680</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-6891641</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-8614602</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-10038508</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-11085872</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-12822782</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-14900605</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-15060466</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-15879982</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-16030912</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-16681318</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-16681318</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6384"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126343"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126343?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126343"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Micro-catchment actions plans elaborated
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="250.00">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="321.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Mortality Rate for Cardiovascular Diseases (by age group)
</narrative></title>
<baseline year="2011" iso-date="2011-08-30" value="80.39"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets surpassed. This indicator was added after the MTR. It replaced the indicator &amp;quot;Percentage increase in the number of ICU beds in the State of Parana&amp;quot;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="68.49">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Maternal Mortality Ratio
</narrative></title>
<baseline year="2010" iso-date="2010-08-30" value="65.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-30" />
<period-end iso-date="2019-08-30" />
<target value="47.18">

</target>
<actual value="42.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhancing core competencies of civil servants
</narrative></title>
<baseline year="2015" iso-date="2015-03-27" value="No online training platform in place and need for additional training for civil servants"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-27" />
<period-end iso-date="2019-08-30" />
<target value="Competencies of civil servants have increased (as reported in the final report of the consultancy)">

</target>
<actual value="Competencies of civil servants have increased">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
University-based in-service Teacher Training, Education Development Plan (EDP)
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="2351.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="7689.00">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="9835.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business proposals approved and to be financed
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="100.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Infant Mortality Ratio
</narrative></title>
<baseline year="2010" iso-date="2010-08-30" value="12.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-30" />
<period-end iso-date="2019-08-30" />
<target value="10.50">

</target>
<actual value="10.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Municipalities with a Decentralized Environmental Licensing and Monitoring System
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2017-08-22" />
<target value="25.00">

</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indigenous lands with productive projects supported
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was added after the MTR. One of the Indigenous Land associations with a productive project&amp;nbsp;approved for financing in 2017 did not present the required documentation. Failure to launch a new call&amp;nbsp;for proposals in 2019 negatively&amp;nbsp;impacted the achievement of this indicator.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival rate in the final cycle of fundamental education in State Schools
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="78.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="85.50">

</target>
<actual value="86.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indigenous lands with productive projects supported
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="2019-08-30" />
<target value="8.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business proposals approved and to be financed
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="100.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. The final DLI (for the year 2017) target&amp;nbsp;was 40 business proposals approved and to be financed, and was achieved in 2017 as planned. The remaining targets were not linked to disbursements.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening of the Disaster Risk Monitoring capacity and Warning System for Hydro-meteorological events
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Increased capacity (qualitative and quantitative) of the Warning System, i.e. equipment, models, processes, among others">

</target>
<actual value="Capacity (qualitative and quantitative) of the Warning System increased through new equipment and implementation of new models andprocesses">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Farmers trained or receiving technical assistance
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="21000.00">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets surpassed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75784.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity strengthening of SEED to evaluate teacher training programs.
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="The capacity for teacher training evaluation is inadequate"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Report on the third dimension of PDE">
<comment><narrative>
&lt;p&amp;gt;Not achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Evaluation report on the implementation of the third dimension of the Educational Development Plan - PDE has not be prepared">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement of the Borrower's tax management system
</narrative></title>
<baseline year="2015" iso-date="2015-06-15" value="Lack of enforcement in tax arrears collection and adequate resources to administer tax receipts"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Evaluation, declaration and collection of ITCMD is 90% automated">

</target>
<actual value="Processes of restitution, rectification, and exemption and immunity requests are done through the integrated system.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Survival rate in the final cycle of fundamental education in State Schools
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="78.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="85.50">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets surpassed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="86.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers participating in Peer-to-peer in-service Teacher Training
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="85.00">

</target>
<actual value="86.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Mortality Rate for deaths through external causes, except violence
</narrative></title>
<baseline year="2011" iso-date="2011-08-30" value="51.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-30" />
<period-end iso-date="2019-08-30" />
<target value="48.57">

</target>
<actual value="26.53">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Municipalities with a Decentralized Environmental Licensing and Monitoring System
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="25.00">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets surpassed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares supported by the Micro-catchment Action Plans' interventions
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. This indicator was added after the MTR.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="728000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of sick leave and absenteeism due to work-related illness or injury
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="The State has started to define an occupational health policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was introduced after the mid-term review and the&amp;nbsp;first targets were met. The following activities were carried out with SEAP&amp;#39;s own financial and human resources: diagnosis of exits and absences due to work-related diseases; prioritization of the health and education sectors for the implementation of occupational health strategy; elaboration of Work Safety Report and the Program for the Prevention of Environmental Risks at Work for these two sectors. However, the&amp;nbsp;subsequent targets were not achieved and&amp;nbsp;the&amp;nbsp;percent reduction was not investigated since the monitoring of the number of medical examinations and absences and exits due to work-related illness or injury was not carried out.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The implementation of occupational health activities is being done using own funds.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a water resources subsystem of an Integrated Environmental and Water Resources Management System
</narrative></title>
<baseline year="2015" iso-date="2015-03-27" value="No integrated environmental and water resource management system in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-27" />
<period-end iso-date="2019-08-30" />
<target value="Average processing time for issuing of water rights has been reduced to 90 days (from 180 in 2016).">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Three of the four modules of the subsystem are implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Farmers trained or receiving technical assistance
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="21000.00">

</target>
<actual value="72826.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of  live births to pregnant women who attended more than 7 ante-natal check-ups
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2017-08-31" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. The final DLI target (for the year 2017) was 80%. The remaining targets were not linked to disbursements.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of State Disaster Risk Management (DRM) Policy Framework
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Publication of State Decree establishing the DRM working group"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="State Plan for Protection and Civil Defense is under implementation">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="The State Plan for Protection and Civil Defense has been drafted and was presented to the state council for protection and civil defense in August 2016. However, the State Plan is dependent on the National Plan which has yet to be published.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Maternal Mortality Ratio
</narrative></title>
<baseline year="2010" iso-date="2010-08-30" value="65.11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-30" />
<period-end iso-date="2019-08-30" />
<target value="46.58">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets surpassed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="43.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
University-based in-service Teacher Training, Education Development Plan (EDP)
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="2351.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="7650.00">

</target>
<actual value="9835.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of teachers who work in indigenous schools trained
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="437.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. This indicator was added after the MTR.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="807.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women identified with high risk of complications referred by primary care units to a hospital that is part of the Borrower's Infant and Maternal Healthcare Network
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="5.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Mortality Rate for Cardiovascular Diseases (by age group)
</narrative></title>
<baseline year="2011" iso-date="2011-08-30" value="80.39"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-30" />
<period-end iso-date="2019-08-30" />
<target value="76.20">

</target>
<actual value="39.81">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Revenue from tax arrears as a share of the stock of tax arrears
</narrative></title>
<baseline year="2013" iso-date="2013-08-30" value="1.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-30" />
<period-end iso-date="2019-08-30" />
<target value="5.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hectares supported by the Micro-catchment Action Plans' interventions
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="750000.00">

</target>
<actual value="996000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Infant Mortality Ratio
</narrative></title>
<baseline year="2010" iso-date="2010-08-30" value="12.17"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-08-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. This indicator was added after the MTR.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="10.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of sick leave and absenteeism due to work-related illness or injury
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="The State has started to define an occupational health policy"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="2019-08-30" />
<target value="Reduction of sick leaves/absences due to work-related illness or injury by 20%">

</target>
<actual value="The implementation of occupational health activities is being done using own funds.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Enhancing core competencies of civil servants
</narrative></title>
<baseline year="2015" iso-date="2015-03-27" value="No online training platform in place and need for additional training for civil servants"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-27" />
<period-end iso-date="2018-08-31" />
<target value="Competencies of civil servants have increased (as reported in the final report of the consultancy)">
<comment><narrative>
&lt;p&amp;gt;Achieved. The final DLI target (for the year 2017) was 12,000 civil servants civil servants certified through the participation in the face-to-face and online training modules&lt;strong&amp;gt;.&amp;nbsp;&lt;/strong&amp;gt;???????The remaining target was not linked to disbursements. 187 public sector management best practice cases were produced and registered in the Observatory of Innovation in Public Management in Paran&amp;aacute;. 22.000 civil servants were trained (46 percent male, 54 percent female) and 260 events were held (60 percent in-person).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Competencies of civil servants have increased">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening of Internal Control Systems
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Internal Control Unit recently created and lacking formal methods and procedures"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Internal control information system implemented and operational in 50 government entities">
<comment><narrative>
&lt;p&amp;gt;Achieved. The final DLI target (for the year 2018) was&amp;nbsp;80% of users of the system have been trained on using the new system. The remaining target was not linked to disbursements.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Internal control information system implemented and operational in 117 government entities and 100% of users trained">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Micro-catchment actions plans elaborated
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="250.00">

</target>
<actual value="321.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Producer groups supported through the project with improved access and integration to output markets
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;Partially achieved. Of a total of 52 financed projects,13&amp;nbsp;were finalized (physical and financial execution) by project closing, but the evaluation of the criteria as established for the indicator was pending. The remaining financed projects were being finalized and hence the evaluation required additional time&amp;nbsp;to complete. By the time of the ICR, 24 producer groups were supportedthrough the project and had improved access and integration to output markets. During the second half of 2018, the following actions were carried out to enable the monitoring of the results of the indicator: (a) formalization of the Technical Cooperation Agreement No. 002/2018; (b) completion of the study with the characterization of approved organizations; (c) conclusion of the theoretical study of the Subcomponent, generating a logical model, where the indicators used to monitor and evaluate the proposals will be presented according to the criteria presented in the review of the Indicator for the period 2016-2018; and (d) finalization of the activities to prepare the Initial Diagnosis of the Organization with the objective of obtaining the basic information on the entity and thecurrent situation (zero mark) which will be used&amp;nbsp;to guide the work of ATER and for evaluation of the implementation of the Proposal of Business Initiative.&amp;nbsp;Successful&amp;nbsp;verification of the results will depend on the finalization of the physical-financial execution of the Terms of Development.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening State Capacity to monitor and evaluate public policies
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Weak capacity to monitor and evaluate public policies"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Report with recommendations on the sustainability and continuation of the land regularization activities.">
<comment><narrative>
&lt;p&amp;gt;Achieved. This indicator was slightly revised after the MTR, from the original &amp;quot;strengthening state capacity for evidence based policy making&amp;quot;.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Report with recommendations on the sustainability and continuation of the land regularization activities.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decrease in Mortality Rate for deaths through external causes, except violence
</narrative></title>
<baseline year="2011" iso-date="2011-08-30" value="51.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-08-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets significantly surpassed. This indicator was added after the MTR.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="46.34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening of Internal Control Systems
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Internal Control Unit recently created and lacking formal methods and procedures"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Internal control information system implemented and operational in 50 government entities">

</target>
<actual value="Internal control information system implemented and operational in 117 government entities and 100% of users trained">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State Schools Rehabilitated and/or Expanded
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="92.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="450.00">
<comment><narrative>
&lt;p&amp;gt;Achieved. The final DLI target (for the year 2017) was 360 state schools rehabilitated and/or expanded. The remaining targets were not linked to disbursements.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="466.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was added after the MTR. The State authorities visited all the water systems from Apr to Nov 2019, defining an action plan to resolve the problems identified for each system and starting the implementation of those action plans. Following the results of the visits, from the 185 systems: only 20 percent (37) are delivering treated water; 30 percent (56) are delivering untreated water (trainings were conducted for those cases); 27 percent (49) are incomplete (SANEPAR will implement the works in the following months); 17 percent (31) had a dry well (the State is studying how to resolve those cases); and the other 5 percent (12) have singular characteristics (being defined an ad-hoc action plan). Aguasparana&amp;nbsp;and SANEPAR have just signed a two yearechnical Cooperation Agreement to address the problems identified after the project closing date. The State conducted a final audit to assess: the final results of the RWS&amp;nbsp;investments at closing date; and the main challenges and lessons learned of the RWS in all the phases (from identification and planning of investments until operation of the systems).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3338.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of  live births to pregnant women who attended more than 7 ante-natal check-ups
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="80.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="90.00">

</target>
<actual value="84.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers participating in Peer-to-peer in-service Teacher Training
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="85.00">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="86.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="28000.00">

</target>
<actual value="9600.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Revenue from tax arrears as a share of the stock of tax arrears
</narrative></title>
<baseline year="2013" iso-date="2013-08-30" value="1.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-30" />
<period-end iso-date="2019-08-30" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;Not achieved. In 2016, when SEFA implemented a late tax recovery program with cash benefits which enhanced the results. In the following years, no similar programs were implemented, thus the increase was not as&amp;nbsp;large as had been anticipated at the time ofproject mid term review. One of the reasons for the continued low tax arrears recovery rate is the lack of a proper segmentation oftax arrears into categories, for example arrears under dispute, arrears linked to non-operational entities (with low likelihood of recovery).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women identified with high risk of complications referred by primary care units to a hospital that is part of the Borrower's Infant and Maternal Healthcare Network
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="5.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="90.00">
<comment><narrative>
&lt;p&amp;gt;Achieved and targets significantly&amp;nbsp;surpassed.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management Plans for rural roads prepared
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was added after the MTR. To achieve this results indicator the following activities were carried out: (i) completion of the mapping through the identification of official municipal rural roads according to Master Plans and Municipal Laws (exclusion of private roads); (ii) survey of the quantitative and qualitative information of the municipal roads; and (iii) workshops, meetings and public consultations for development of Management Plans. However, the Management Plans were not completed byproject closing. According to the road mapping data compiled by Parana Cidade (2006), the State of Parana has about 290,000km of unpaved rural roads, which represent 84 percent of the state&amp;#39;s road network.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Producer groups supported through the project with improved access and integration to output markets
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student Learning Assessment System operational
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Fifth Assessment carried out">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Five assessments carried out">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of teachers who work in indigenous schools trained
</narrative></title>
<baseline year="2014" iso-date="2014-02-10" value="437.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-02-10" />
<period-end iso-date="2019-08-30" />
<target value="750.00">

</target>
<actual value="807.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the population with access to Urgent and Emergency Health services
</narrative></title>
<baseline year="2013" iso-date="2013-08-30" value="43.83"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Partially achieved.This indicator was added after the MTR.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="90.25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the population with access to Urgent and Emergency Health services
</narrative></title>
<baseline year="2013" iso-date="2013-08-30" value="43.83"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-08-30" />
<period-end iso-date="2019-08-30" />
<target value="100.00">

</target>
<actual value="90.25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Management Plans for rural roads prepared
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improvement of the Borrower's tax management system
</narrative></title>
<baseline year="2015" iso-date="2015-06-15" value="Lack of enforcement in tax arrears collection and adequate resources to administer tax receipts"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved. This indicator was added after the MTR. It replaced the original indicator &amp;quot;revision of tax management processes&amp;quot;. The final DLI target (for the year 2018) was processes of restitution, rectification, and exemption and immunity requests are done through the integrated system. The remaining target was not linked to disbursements.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Processes of restitution, rectification, and exemption and immunity requests are done through the integrated system.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Student Learning Assessment System operational
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2018-08-31" />
<target value="Fifth Assessment carried out.">

</target>
<actual value="Five assessments carried out">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of legally concluded land regularization processes
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="6000.00">

</target>
<actual value="2702.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a water resources subsystem of an Integrated Environmental and Water Resources Management System
</narrative></title>
<baseline year="2015" iso-date="2015-03-27" value="No integrated environmental and water resource management system in place"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-03-27" />
<period-end iso-date="2019-08-30" />
<target value="Average processing time for issuing of water rights has been reduced to 90 days (from 180 in 2016)">

</target>
<actual value="Three of the four modules of the subsystem are implemented">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening of the Disaster Risk Monitoring capacity and Warning System for Hydro-meteorological events
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Increased capacity (qualitative and quantitative) of the Warning System, i.e. equipment, models, processes, among others.">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Capacity (qualitative and quantitative) of the Warning System increased through new equipment and implementation of new models and processes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State Schools Rehabilitated and/or Expanded
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="92.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="450.00">

</target>
<actual value="464.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strengthening State Capacity to monitor and evaluate public policies
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Weak capacity to monitor and evaluate public policies"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2017-08-22" />
<target value="Report with recommendations on the sustainability and continuation of the land regularization activities.">

</target>
<actual value="Report with recommendations on the sustainability and continuation of the land regularization activities.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved Management of Physical Infrastructures is schools for SEED
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="The management of physical infrastructure in the education sector is inadequate"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Monitoring System for Physical Infrastructures is operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of State Disaster Risk Management (DRM) Policy Framework
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="Publication of State Decree establishing the DRM working group"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="State Plan for Protection and Civil Defense is under implementation.">

</target>
<actual value="The State Plan for Protection and Civil Defense has been drafted and was presented to the state council for protection and civildefense in August 2016. However, the State Plan is dependent on the National Plan which has yet to be published.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of legally concluded land regularization processes
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Not achieved. This indicator was added after the MTR. The achievement of this indicator has been affected by the failure of the Public Defender&amp;#39;s Office and the State Court of Appeals to conclude land regularization processes.&amp;nbsp;By December 31, 2018, the ITCG carried out occupational and cartorial surveys, the geo-referencing of real estate and organization of documents for the investigation of processes to benefit 6,907 families of farmers. However, the Public Defender&amp;#39;s Office and the Court of Justice have&amp;nbsp;only been able to file actions that will benefit 2,702 families, or 39 percent of the total. If not for the delay in the Public Defender&amp;#39;s Office and the Court system, the indicator would have been fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2702.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved Management of Physical Infrastructures is schools for SEED
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="The management of physical infrastructure in the education sector is inadequate"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2017-08-22" />
<target value="Monitoring System for Physical Infrastructures is operational (implemented in SEED and the NREs)">

</target>
<actual value="Monitoring System for Physical Infrastructures is operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Capacity strengthening of SEED to evaluate teacher training programs.
</narrative></title>
<baseline year="2012" iso-date="2012-06-15" value="The capacity for teacher training evaluation is inadequate"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-06-15" />
<period-end iso-date="2019-08-30" />
<target value="Evaluation report on the implementation of the pedagogical intervention project (third dimension of the Educational DevelopmentPlan - PDE)">

</target>
<actual value="Evaluation report on the implementation of the third dimension of the Educational Development Plan - PDE has not be prepared">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126351</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia Inclusion and Economic Development DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the proposed operation is to support the State of Bahia's program to reduce social inequality, develop more efficient institutional infrastructure and logistics, and strengthen public sector management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Bahia Socio Economic Development for Inclusive Growth Development Policy Loan (DPL) Program for Brazil is to support the State of Bahia's program to reduce social inequality, develop more efficient institutional infrastructure and logistics, and strengthen public sector management. The State of Bahia, which represents the sixth largest economy in Brazil and the fourth state in terms of population, is the largest economy in Northeast Brazil. Bahia accounts for about 4.2 percent of the national gross domestic product (GDP) and its population of 14 million inhabitants represents 7.5 percent of total national population. Bahia, like other Northeastern states, has long lagged behind the rest of Brazil in terms of socio economic development; the State's GDP per capita of R$9,364 (in 2009) is about 56 percent of the national average. Brazil's relative resilience to the global financial crisis reflected good macroeconomic management and a solid financial system. At the same time, Brazil's public external debt-to-GDP ratio has shown a marked decline in recent years, largely reflecting the country's prudent fiscal policy stance. Gross public sector external debt as a share of GDP plummeted from 9.3 percent in 2005 to 2.7 percent in 2011, and is projected to stabilize around that level for the next few years. Other external sector vulnerability indicators have behaved similarly. For example, total external debt service in terms of exports fell by 40 percent between 2007 and March 2012. Even more remarkably, total external debt as a share of international reserves plunged from 557.1 percent in 2002 to a projected 82 percent in 2012. In addition, nonresident holding of general Government debt remains relatively low, estimated at end 2011 as 3.8 percent, in comparison to the emerging market average of 20.4 percent. To counter the recent growth slowdown, particularly regarding domestic industrial output, the Government has taken action to curb exchange rate appreciation and has also moved towards more direct industrial policy interventions.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0006388"><narrative>Secretariat of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-01-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-06-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Antonio Nucifora</narrative></person-name><telephone>+1-202-473-1000</telephone><email>anucifora@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="11220" percentage="15" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="15" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="14" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="14" xml:lang="en"/><sector vocabulary="1" code="25010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="7" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="14" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="14" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="14" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="44" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="14" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="14" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="44" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="14" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">700000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">700000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">700000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">350000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">350000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-1750000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-743167</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-1609381</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-2196998</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-2859932</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-2915297</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-3316686</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-3840416</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-5265459</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-6501653</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-7288245</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-7240377</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-10229096</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-10944064</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-11460431</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-9101187</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-4722776</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3174511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-2963083</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2786781</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-5775953</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-15865622</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-17350154</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-18846125</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-18608285</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-15798279</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-14869527</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-13149700</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-140000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-140000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-280000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-840000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-840000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-840000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-840000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-840000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-6370000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-7210000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-7210000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-14420000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6388"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126351"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126351?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126351"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PA1: Crime and Violence Prevention. Number of municipalities that receive prevention programs through Social Development CSPS
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2014-12-31" />
<target value="20.00">

</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PA1. Productive Inclusion. Number of rural producers benefitting from TA
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="150000.00">

</target>
<actual value="249750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PA1: Social Inclusion. Household registrations to the Social Assistance Reference Center. Increase of 20 percent from 2011 to 2014
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="211556.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2014-12-31" />
<target value="2538670.00">
<comment><narrative>
The target prescribes a 20 percent increase
</narrative></comment>
</target>
<actual value="275022.00">
<comment><narrative>
An increase of 30 percent has been observed
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PA3. Planning and Budgeting. Policy planning capacity established in at least 6 line secretariats
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="6.00">

</target>
<actual value="0.00">
<comment><narrative>
None of line secretariats has established the desired capacity as of this time, even if capacity has increased and they are ontrack for enhancing the planning capacity of secretariats with an eye on the preparation of the new PPA.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PA2: Disaster Risk Management. Number of regional nodes established and trained
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="5">

</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PA1: Gender. Number of sectoral partnerships signed and implemented between the Secretariat for Women and other secretariats to mainstream gender issues in State programs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="5.00">

</target>
<actual value="6.00">
<comment><narrative>
(1) Cooperation Agreement between Ministrio do Desenvolvimento Agrrio, Secretaria de Polticas para as Mulheres of thePresidencyand of the state of Bahia for combined actions to promote citizenship, economic independence for women, and violenceprevention andassistance; (2) Decreto for the Restructuring of the State Board of Policies for Women; (3) Cooperation Agreementwith the Secretariade Promoo da Igualdade Racial for joint actions; (4) Cooperation Agreement between Secretaria de Agricultura,Irrigao e ReformaAgrria, Secretaria de Polticas para as Mulheres and Secretaria do Trabalho, Emprego, Renda e Esporte for therealization of a Public Call for productive projects and family farming entrepreneurships for women; (5) Pacto Estadual PeloEnfrentamento a Violenciacontra as Mulheres; (6) Convenio signed with Secretaria de Agricultura, Irrigacao e Reforma Agraria(SEAGRI) to strengthen the effortstosupport fisherwomen and marisqueiras
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126372</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Recife Swap Education and Public Management</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to expand coverage of improved early child education (ECE), reduce age-grade distortion of students enrolled in the Borrowera??s accelerated learning program, maintain lower dropout rates in full-time schools relative to the municipality average, and improve municipal public management, all within the Borrowera??s territory.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Recife Education and Public Management Project for Brazil is to expand coverage of improved early child education (ECD), create conditions more conducive to learning in fundamental education, and improve municipal public management, all within the borrower's territory. There are two components to the project. The first component is expand coverage of improved Early Child Education (ECE) and creates conditions conducive to learning in fundamental education. This component will provide support for the implementation of the Eligible Expenditure Programs (EEPs), including activities to: (i) rehabilitate ECE centers; (ii) promote multi-sectoral early child development; (iii) create conditions more conducive to learning in fundamental education; (iv) professional development of the municipal teaching force; and (v) education management. The second component is strengthening institutions for more efficient and effective public management. This component will provide technical assistance to strengthen the Municipality of Recife (MOR)'s public management in the following areas: (a) educational evaluation and administration; (b) tax administration; (c) public debt management; (d) increasing efficiency of public expenditures; (e) municipal planning, results-based management, and Project management; and (f) urban mobility management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006405"><narrative>Municipality of Recife</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0006406"><narrative>Municipal Secretariat of Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-02-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-05-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2019-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2019-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Andre Loureiro</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aloureiro@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390760" />
            <name><narrative>Recife</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.0538902 -34.881111</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="11240" percentage="65" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="18" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="7" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="3" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="4" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="78" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="3" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="78" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="39" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="3" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="4" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="39" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="3" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="78" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="7" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">3350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1916666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2116666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2116666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">1650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">2566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">2566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">2566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">2566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">2566666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">2566666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2616666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2616666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2616666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1700000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">950000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">17822512.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">17822512.56</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">130000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-17822513</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">16226967</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">3000552</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2085332</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">3604154</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">4881797</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">12182370</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">5171157</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">2980785</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">2586015</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">6394803</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">4164728</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">4188757</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">4286146</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">5615528</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">3508109</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">4180296</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">1681411</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">2884254</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">397477</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">13348832</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">8915155</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-107139</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-325000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-84736</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-90177</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-129662</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-119667</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-192449</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-236241</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-351600</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-404663</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-566739</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-696842</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-874407</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1226959</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1575691</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1510496</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1309456</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-641005</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-501675</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-457150</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-520085</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1808819</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2706984</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2933960</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2992468</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2803027</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-2363756</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2261574</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1927071</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1587322</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1937998</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1981009</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-2215903</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-2260772</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-2316858</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-2361727</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2418704</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-2474790</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-2530876</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-2587852</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-2643938</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-2700024</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-2758662</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-2825965</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6406"><narrative>Municipal Secretariat of Planning</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6407"><narrative>Special Projects Office (Gabinete de Projetos Especiais - GABPE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126372"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126372?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126372"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers in rehabilitated ECE and ECECs who regularly participate in competency-based in-service training
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="61.02">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 14 - Develop the Urban Restructuring and Economic Revitalization of the Territory of Recife, and Recife Urban Zoning Review
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No studies completed yet"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="Recife Urban Zoning Plan completed">

</target>
<actual value="Study completed and satisfactory evaluated by the municipal government.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6 - Students in grades 6-9  enrolled in accelerated learning program
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="2000.00">
<comment><narrative>
&lt;p&amp;gt;Travessia for grades 6-9. First group was enrolled in July 2015 and the second will be enrolled in February 2017. Training in Travessia lasts 18 months.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3391.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 1 - Percentage of aggregate budget allocation for EEPs spent (DLI 1)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="74.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">
<comment><narrative>
&lt;p&amp;gt;Baseline includes investments and recurrent expenditures, excluding payroll expenditures.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="94.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3 - ECE centers rehabilitated [DLI 13]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="645.00">
<comment><narrative>
&lt;p&amp;gt;Certificates of work completed for rehabilitated ECE. Subject to IVA verification&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="757.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8 - Principals and teachers from full-time schools (grades 6-9) participating in the new competency-based in-service training [DLI 17]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="75.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Expansion of the IPTU tax base in a selected metropolitan area of 4,879 km in the territory of Recife
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="80.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children enrolled in rehabilitated ECE and newly built/equipped ECECs
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="7500.00">

</target>
<actual value="7985.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students enrolled in the accelerated learning program in grades 2-5 progressing two grades or more at the end of the school year
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="55.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="54.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 7 - Students in grades 6-9 enrolled in full-time schools [DLI 16]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="3200.00">

</target>
<actual value="3056.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 12 - Properties assessed and records updated in the new municipal real estate registration system from a selected metropolitan area in the municipality of Recifes territory
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="40000.00">

</target>
<actual value="44375.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Children enrolled in rehabilitated ECE and newly built/equipped ECECs
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="7500.00">

</target>
<actual value="7985.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 11 - Impact evaluation of main education programs
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="No impact evaluation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="The two assessments of the distortion correction program and the school time extension program will be completed in 2019">
<comment><narrative>
&lt;p&amp;gt;Both impact evaluations will use the quasi-experimental methodology of difference-in-difference at the
student level to ide ntify the causal impact of programs.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="FTS impact evaluation carried out and results presented by SEDUC">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Difference in dropout rates between municipal full-time schools and the municipality average in low FE (grades 6-9)*
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="-1.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="0.50">
<comment><narrative>
&lt;p&amp;gt;negative numbers (-0.5)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4 - ECECs built and equipped [DLI 14]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="6.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 10 - Learning assessment tests carried out in municipal schools in fundamental education  and results disseminated at the school level* [DLI 19]
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="2012 State test carried out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-31" />
<target value="Results of 2018 State test disseminated and 2019 State test carried out">

</target>
<actual value="Results of 2018 State test disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5 - Students in grades 2-5  enrolled in accelerated learning program [DLI 15]
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="7000.00">

</target>
<actual value="8485.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3 - ECE centers rehabilitated [DLI 13]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="645.00">

</target>
<actual value="627.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 11 - Impact evaluation of main education programs
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="No impact evaluation"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="The two assessments of the distortion correction program and the school time extension program will be completed in 2019">

</target>
<actual value="FTS impact evaluation carried out and results presented by SEDUC">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers in rehabilitated ECE and ECECs who regularly participate in competency-based in-service training
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 16 - Civic engagement. Parents of children enrolled in newly built ECECs evaluating the service positively.
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="80.00">

</target>
<actual value="89.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 16 - Civic engagement. Parents of children enrolled in newly built ECECs evaluating the service positively.
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="80.00">
<comment><narrative>
&lt;p&amp;gt;Survey with a minimum of 10-15% of parents of children enrolled in ECECs. Survey instrument must include at least 5 questions or more to be valid.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="93.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 9 - Municipal schools that receive systematic follow-up on a school management plan from the Core Regional Follow-up team (first number) [DLI 8]
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="35.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="140.00">
<comment><narrative>
&lt;p&amp;gt;Standardized monitoring reports (early and final grades of FE) must be acceptable to the Bank,
demonstrating detailed diagn osisof school challenges (according to SEDUC framework) and assessment
of the implementation of the action plans as described  in the Manual of Operations of the project. Subject to
IVA verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="207.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 17 - Basic Education Development Index - in grades 2-5
</narrative></title>
<baseline year="2013" iso-date="2013-06-30" value="4.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-06-30" />
<period-end iso-date="2019-12-31" />
<target value="5.50">

</target>
<actual value="5.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students enrolled in the accelerated learning program in grades 2-5 progressing two grades or more at the end of the school year
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="55.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 14 - Develop the Urban Restructuring and Economic Revitalization of the Territory of Recife, and Recife Urban Zoning Review
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No studies completed yet"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="Recife Urban Zone Plan completed">
<comment><narrative>
&lt;p&amp;gt;Studies are presented to the Mayor and includes a set of recommendations for action&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Study completed and satisfactory evaluated by the municipal government.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 1 - Percentage of aggregate budget allocation for EEPs spent (DLI 1)
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="74.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2019-12-31" />
<target value="60.00">

</target>
<actual value="100.89">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 15 - Maintain key staff during the Project implementation period. [DLI 12]
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Difference in dropout rates between municipal full-time schools and the municipality average in low FE (grades 6-9)*
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="-1.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="-0.50">

</target>
<actual value="0.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8 - Principals and teachers from full-time schools (grades 6-9) participating in the new competency-based in-service training [DLI 17]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="75.00">
<comment><narrative>
&lt;p&amp;gt;Principals and teachers participate in the new competency-based in-service training as described in the
INSTRUCAO&amp;nbsp;NORM ATIVA NO&amp;nbsp;13 / 2015 published by SEDUC. SEDUC provides 1 day of training per
month (every two months two meetings will tak e place during one month). Teachers and principals need to
maintain 50% attendance in the in-service training activities durin g the school year.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="65.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Expansion of the IPTU tax base in a selected metropolitan area of 4,879 km in the territory of Recife
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="80.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 12 - Properties assessed and records updated in the new municipal real estate registration system from a selected metropolitan area in the municipality of Recifes territory
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="40000.00">
<comment><narrative>
&lt;p&amp;gt;Within an area comprising 80,000 lots for a total superficy of 31.658.537 square meter, there are 42,000
single-units regis tered in Recife&amp;nbsp;real estate registry (CADIMO). SEFIN will inform each real estate
owner of the changes in the calculation  of their tax base and record this information in the new real estate
registration system.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="44375.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4 - ECECs built and equipped [DLI 14]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="6.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5 - Students in grades 2-5  enrolled in accelerated learning program [DLI 15]
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="7000.00">
<comment><narrative>
&lt;p&amp;gt;Accelerated learning programs refers to Acelera Brasil for grades 2-5 and. Subject to IVA verification.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8485.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 10 - Learning assessment tests carried out in municipal schools in fundamental education  and results disseminated at the school level* [DLI 19]
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="2012 State test carried out"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2019-12-31" />
<target value="Results of 2018 State test disseminated and 2019 State test carried out">
<comment><narrative>
&lt;p&amp;gt;The Municipal schools participate in the yearly state student achievement tests in grades 5 and 9 (Sistema
de Avaliacao da Educacao Basica de Pernambuco&amp;nbsp;SAEPE) in FE. The results are disseminated to
the schools.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Results of 2018 State test disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6 - Students in grades 6-9  enrolled in accelerated learning program
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="2000.00">

</target>
<actual value="3391.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2 - Direct project beneficiaries
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="71000.00">
<comment><narrative>
&lt;p&amp;gt;Direct beneficiaries are people or groups who directly derive benefits from an intervention (i.e., children who benefit fro m animmunization program; families that have a new piped water connection). Please note that this indicator requires supplemental information. Supplemental Value: Female beneficiaries
(percentage). Based on the assessment and definition of direct project benefic iaries, specify what proportion of the direct project beneficiaries are female. This indicator is calculated as a percentage.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="91732.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 15 - Maintain key staff during the Project implementation period. [DLI 12]
</narrative></title>
<baseline year="2011" iso-date="2011-09-01" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-09-01" />
<period-end iso-date="2019-12-31" />
<target value="Y">
<comment><narrative>
&lt;p&amp;gt;Key staff are defined as at least deputy coordinator, procurement specialist, financial management specialist, and three focal points in different Participating Entities. Personnel have experience and functions acceptable by the Bank and have been hired, and are working in the Project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 7 - Students in grades 6-9 enrolled in full-time schools [DLI 16]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2019-12-31" />
<target value="3200.00">
<comment><narrative>
&lt;p&amp;gt;Students enrolled at the beginning of the school year.&amp;nbsp;new full-time school model was only implemented at the beginning of 2014.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3056.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126452</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rio Grande do Norte: Regional Development and Governance</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to support the Borrower's efforts to:  (i) increase food security, access to productive infrastructure and markets for family agriculture; (ii) improve the quality of, and access to, health, education and public security services; and (iii) improve systems for public expenditure, human resource and physical asset management in the context of a results-based management approach.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Rio Grande do Norte Regional Development and Governance Project for Brazil is to support the borrower's efforts to: (i) increase food security and access to productive infrastructure and markets for family agriculture; (ii) improve the quality of, and access to, health, education and public security services; and (iii) improve systems for public expenditure, human resource and physical asset management in the context of a results-based management approach. The project has three components. (1) Sustainable regional development component will reduce regional inequalities and increase productive inclusion. (2) Improving public services component will support the human development and citizen security pillars of the state's poverty reduction strategy by improving the quality of, and access to, basic public services. (3) Public sector management component will provide support for the modernization of the state's public sector management in strategic sectors in order to strengthen the efficiency and effectiveness of central budget, finance and planning processes and management, as well as in service delivery in health, education and public security sectors.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006452"><narrative>Secretariat of Planning and Finance</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0006453"><narrative>Project Management Unit</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-02-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-06-25"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Leonardo Bichara Rocha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lbichararocha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320189" />
            <name><narrative>Natal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.8101001 -35.226742</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31120" percentage="40" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="13" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31194" percentage="11" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16063" percentage="4" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="40" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="3" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="1" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="15" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="3" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="3" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="11" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="18" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="3" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="4" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="10" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="3" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000653" percentage="3" xml:lang="en"><narrative>Science and Technology</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="40" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="7" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">8333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">11666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">13333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">5000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">8333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">8333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">11666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">11666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">13333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">10000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">145556.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">145556.68</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">360000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-145557</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">900000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">21678807</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">942133</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">7073045</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">152289</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">217166</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">44281</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">25768574</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">6533</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">21352</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">3124595</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">91156</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">8021694</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">8209971</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">121068</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">5991326</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">2320395</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">24970</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">6519870</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">82499</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">65204</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">8431063</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">5931664</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">14355806</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">3660650</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">8686173</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">20494652</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">7239756</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">47452</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">13357661</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">21706217</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">32877</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">8093</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">8152606</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">16141695</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">11450699</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">26800</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">10740166</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">9064998</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">4298759</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">5966194</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">8376998</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">14000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">5339677</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">6263819</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">4931674</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">5384635</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">5829148</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">5083259</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">11593893</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">11044648</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">4808374</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">18857764</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">9459302</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1667513</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">156929</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">15774</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-141190</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-2685</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-900000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-175995</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-157826</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-159341</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-223664</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-352723</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-596223</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-942742</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1105903</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-1618329</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-2474776</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-3735289</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-3506465</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3527294</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1749428</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1594562</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1514142</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1724933</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4919272</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-9668600</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-10349145</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-10296446</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-9722562</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-65391</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-8262028</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-8012125</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-40366</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-3058739</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-3923537</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-4428858</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-5095179</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-5317928</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-5622749</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-5876887</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-6138168</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-6797947</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-7606208</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-7651819</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-7652223</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-7648437</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-7648437</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-7648437</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6453"><narrative>Project Management Unit</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126452"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126452?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126452"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of biopsies done after the cervical cancer screening - pap smear.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="1.09"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="2.50">
<comment><narrative>
Achieved 52%: The baseline was 1.09%; and target was a  2.5%, an increase of 1.4 percentage points. The Project achieved a 0.73 percentage point increase, or 52% of target. 
This evaluates the quality of services provided by new oncology centers (CROs), through their early detection of uterine cancer. Targets were reduced to be more consistent with INCA minimum parameters.  Data sourced from SISCAN:  Calculated as no. biopsies performed following cervical cancer exam in women 25-64/No. of cytopathology exams in women 25-64.
Baselines fluctuated annually and thus the original baseline is applied. 
Recalculated ranges: Baseline - 1.09, 2016 = 0.81// 2017 = 0.69 // 2018 = 0.74 // 2019 = 0.82 // 2020 = 0.91 // 2021 = 0.75 // 2022 = 0.91.
</narrative></comment>
</target>
<actual value="0.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tourism and Cultural Infrastructure created / improved by the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="16.00">
<comment><narrative>
Exceeded: Achieved 112.5% of target
This indicator was introduced by the 2nd Restructuring (May 2019). The key tourism infrastructure renovated, rehabilitated or constructed with project suport was as follows:  Teatro Alberto Maranhao (TAM); Escola de Danca do Teatro Alberto Maranhao (EDTAM); Biblioteca Camara Cascudo; Fortaleza dos Reis Magos; Memorial Camara Cascudo; Museu Cafe Filho; Palacio do Governo (Pinacoteca); Sinalizacao Turistica (ST - tourist signage) Polo Agreste/Trairi; Teatro Adjunto Dias; Teatro Lauro Monte Filho; Sistema de Esgotamento Sanitario do Sao Miguel de Gostoso; Sistema de Esgotamento Sanitario de Cerro-Cora; RN 160 (access to Airport); RN 063 (access to Barra de Tabatinga-Barreta suburb); RN 307 (Genipabu); Estrada Zona Industrial-Aeroporto; RN 087 - Lagoa Nova-Cerro-Cora; Sinalizacao Turistica (tourist signage) Polo Costa Branca; ST Polo Serido; ST Polo Serrano.
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of hospitalizations due to clinical complications during gestation and post-partum, in relation to total hospitalization for obstetric procedures.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="13.26"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="11.50">
<comment><narrative>
Not achieved: The baseline was 13.26%, the target was 11.5% - an expected reduction of 1.75 percentage points -  and the Project achieved 22.37 %, an increase of 9.11 percentage points.
Indicator is linked to activities addressing maternal/infant health, especially training of teams in pre-natal care and care protocols.  All indicators were recalculated for study period (2016-2023).

Recalculated ranges: Baseline= 13.26, 2016//12.12, 2017//11.79, 2018//13.17, 2019//15.40, 2020//13.80, 2021//18.59, 2022//20.06, 2023//22.37.
</narrative></comment>
</target>
<actual value="22.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools with computer labs with adequate use
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="70.00">
<comment><narrative>
Achieved 108.6% of target.
Designed to evaluate adequate use of computer labs in schools, devise a pedagogical strategy for their use, and having teachers use the lab weekly for instruction of students.   Lab was adequately used if: (i) possessed a technology teaching/instruction plan; (ii) 80% of teachers able to use software, apps and technologies; (iii) at least 3 disciplines had weekly classes in the computer lab. Calculated as: # schools with adequate use of informatics lab/# schools with informatics labs financed by the Project.
Schools that receive computer labs financed by the project and use them appropriately - there is a pedagogical strategy for it, teachers have been trained and are using it weekly.
</narrative></comment>
</target>
<actual value="75.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools of Pedagogical Innovation Projects (PIP) that have satisfactorily implemented subprojects.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="90.00">
<comment><narrative>
Achieved 93.3% of target
Measured based on ratio between the number of schools considered satisfactory and the total schools accounted for in the PIP. Concept of satisfactory is attributed to each school at end of school year based on following criteria: (i) execution of at least  80% of financial resources transferred; (ii) received all programming visits; (iii) school has executed at least 80% of activities established in its Action Plan.
</narrative></comment>
</target>
<actual value="84.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="100,000.00">
<comment><narrative>
Achieved 106% of a reduced target.
Direct beneficiaries count all members of a beneficiary family for specified Component 1 investments, as envisaged. The project MIS recorded a single beneficiary per family which is multiplied by 3.4, IBGE average size of a rural household in the NE region.  Women's participation counts female members of direct beneficiary households including female-headed households.  The basis for counting beneficiaries is explained in footnote 26 Main Text and as intended after the 2019 restructuring, covers only specific investments under Component 1 because their regular measurement was simpler. The original PAD measurement concept was discarded. The BCR (2024) estimated total beneficiaries for major project activities (all Components). See Table xx ICR Annex 7.
</narrative></comment>
</target>
<actual value="105,681.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="15,300.00">
<comment><narrative>
Exceeded: Achieved 103.5%
Improved water sources includes piped connections to households (connections within the house or on the patio), public sources (water fountains), perforated/drilled wells, excavated and protected wells, water source protection, and rainwater collection.
Starting from the number of beneficiary families with structural investments and subprojects in water supply - Edital 1/2014 - the number of persons was estimated considering an average 3.4 residents per HH in rural areas (IBGE Census data). The result calculates subprojects financed and finalized (completed).
The BCR shows a related sub-indicator &quot;Number of subprojects in rural areas which obtained access to improved water sources under the Project&quot;.  The reported result is 113 with a target of 150.  However, Bank ISRs do not include/Measure such an indicator, and it is not mentioned in the PAD or Restructuring Papers.
</narrative></comment>
</target>
<actual value="15,837.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools (constructed, reformed and / or expanded) financed by the Project, meeting the main requirements of minimum operational physical standards (non-cumulative goals).
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="70.00">
<comment><narrative>
Achieved 141% of target

Measured ratio between total number of schools meeting minimum standards, and total number of schools financed each year. To be considered adequate under main requirements of the Manual of Minimum Standards, school had to meet: (i) architectural program; (ii) security; (iii) cleanliness; (iv) temperature and environmental comfort; (v) durability of works; (vi) costs, maintenance and sustainability; and (vii) access. SEEC infrastructure technicians collected this information once works were completed.


Calculation method revised by the project. The recalculated ranges are: Baseline: 0 // 2016 = 0 // 2017 = 0 // 2018 = 100 / / 2019 = 95.44 // 2020 = 96.01 // 2021 = 96.13 // 2022 = 95.48 // 2023= 98.57
</narrative></comment>
</target>
<actual value="98.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Systems improved and operational
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="2.00">
<comment><narrative>
Achieved 100% of target.
Indicator intended to accompany and monitor implementation of public management systems installed with project support. Two systems implemented:  (i) Financial and Budget Administration System of RN (SIGEF); (ii) Integrated Solution for Analytical Information and Mining of Data for RN State Administration.  These 2 systems support 3 Objective Outcomes: Expenditures, Assets Management, and Human Resources Management. See Section IIB Main Text.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Regularized properties surveyed and registered in the Computerized System
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="70.00">
<comment><narrative>
Achieved 108.6% of target.
Target 70%, achieved 76%.

This indicator, introduced in 2017, monitored the percentage of properties surveyed and registered in the State Information System (SIAF, then SIGEF).  Survey of the State's Public Administration property assets would identify properties needing regularization of title and to insert cadastral information on the properties inventoried, as well as documents digitized in the Integrated System of Assets Management.  Of an estimated 3,449 properties, 61% were not regularized. Results were calculated when a building/property had been approved legally, along with its engineering, then registered in the system.  At the final execution of the Contract (signed for these services), some 76% of identified properties had been regularized.
</narrative></comment>
</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State coverage of Cytopathology exams in women aged 25-64 years
</narrative></title>
<baseline year="2019" iso-date="2019-12-29" value="0.31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-29" />
<period-end iso-date="2023-12-29" />
<target value="0.44">
<comment><narrative>
Not achieved: The baseline was 0.31%, the target was 0.44% - an increase of 0.13 percentage points - and the Project achieved 0.29%, below the baseline or equal to -15 % of the expected 0.13 percentage point increase.
Indicator is associated with prevention via cytopathology exams indicated for women 25-64 years. Calculation: Number of cytopathology exams in women 25-64/Female population 25-64.
Codes: Numerator/CID: 0203010019 Cervical/Vaginal Cytopathology/Microflora (Source SIA). Denominator: Female pop. 25-64 years (IBGE)
Information collected in May 2023.

Recalculated ranges: Baseline = 0.31//2016 = 0.32//2017 = 0.34//2018 = 0.33//2019 =0.31 //2020 = 0.15 //2021 = 0.23//2022 = 0.26.
</narrative></comment>
</target>
<actual value="0.29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of biopsies done after mammography
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="5.60">
<comment><narrative>
Achieved 18.2%
Exam seeks early detection of breast cancer. Indicator is associated with renovated Oncology Centers (CROs) in the territory. Data is SISCAN. Calculated as: No. biopsies conducted after mammography in women 50-69 years/No. Mammography exams in women x 100.
Numerator: Biopsy/excised breast nodule; anatomo-pathology exam of breast biopsy//Denominator: Bilateral mammography for screening.

Recalculated ranges:
Baseline 2016, 2017 no change; 2018 = 0.35//2019 = 1.12//2020 = 0.59//2021 = 1.08//2022 = 0.77
</narrative></comment>
</target>
<actual value="0.91">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Guidelines and curricular matrices disseminated in state schools
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="60.00">
<comment><narrative>
Achieved 148.3%

Main source of data: Mobilization Report, which were the instruments provided by and resulting from discussions of the matrices in each State school throughout the period when this document was being prepared. Guidelines and Curricular Matrices would be considered disseminated in schools when 80% of State schools participating in the workshops had presented their Mobilization Reports.
</narrative></comment>
</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of State roads improved by the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="200.00">
<comment><narrative>
Exceeded: Achieved 137% of target

Measures the number of cumulative kilometers of roads re-opened to motorized traffic - rehabilitated or modernized - by the Project.
Roads involved: RN 307 (9 km); RN 063 (9 km); RN 087 (22 km); RN 160 (17 km); BR-437-RN 015 (19 km); RN 011 (31 km);  RN 118 (47.5 km); RN 016 (57 km); Estrada da Producao (22 km); and RN 233 (41 km).
</narrative></comment>
</target>
<actual value="274.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Productive and socio-environmental investment organizations/groups led by women
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="35.00">
<comment><narrative>
Exceeded: Achieved 134.3% of target
The PAD indicator was re-worded, changing &quot;Group productive investments led by women&quot; to &quot;Group socio-environmental investments led by women&quot; (ie. PSA subprojects).  The wording was subsequently revised again to &quot;Productive and Socio-environmental investment organizations/groups led by women&quot; meaning both PINS (including PES) and PSA investments, the main types under Productive Inclusion.
</narrative></comment>
</target>
<actual value="47.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People assisted locally (municipal level) by preventive public security activities financed by the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="65.00">
<comment><narrative>
Achieved 121.5% of target
Preventative activities considered for measurement include: ITEP (identity cards, biometric kits); Civil Police (expanded vehicle fleet, digitalization of crime event registry); CIOSP (modernization, expansion of radio-communications system/network); and CODIMM (restructuring of facilities to attend women in violence situations; itinerant cinema/training, and Hotline Call-in for women).
</narrative></comment>
</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of health services related to prioritized health care networks at the regional level (maternal and infant, urgency and emergency, and oncological health care networks)
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="76.64"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="84.00">
<comment><narrative>
Achieved only 18% of the expected 7.36 percentage point increase (baseline 76.64%, target 84%, result 78% = difference of 1.36%, or 18% of target)
Sources include the Outpatient Information System of the Unified Health System (SIA/SUS), the Hospital Information System (SIH) and est. of population by Brazilian Institute of Geography and Statistics ( IBGE).  To analyze data behavior over time, other indicators were constructed using other sources, e.g., Live Birth Information System (SINASC) and Cancer Information System (SISCAN). DATASUS databases are consolidated over time, varying according to the data system consulted, and permit receipt of new information or corrections during a time period.  All indicators were recalculated for the period 2016 to 2022, including 2015 baseline.
Calculated as:  No. procedures in selected health services linked to the location of occurrence according to regional design of RN Health/Total no. selected procedures state-wide x 100 in period of one year.
</narrative></comment>
</target>
<actual value="78">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Regional socioeconomic infrastructure implemented
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="50.00">
<comment><narrative>
Exceeded:  Achieved 634% of target. 
Refers to the number of socio-economic infrastructure implemented and includes: 178 Productive Infrastructure investments (see Table 2, Annex 7) and 139 larger scale social investments.  In aggregate, the total includes: 9 roads; 18 tourist sites; 46 schools renovated/constructed; 21 Maternity units; Mossoro Women's Hospital; 7 Emergency Rooms; Cytopathology Laboratory (LAPAT/RN); 22 Citizen Services Centers; 5 Cancer Referral Units (CROS); 2 fiscal posts; 5 water supply and sanitation structures; 2 water sewage systems; Lucrecia Dam; DIBA Irrigation Scheme/Amorim Canal; Technology Park; and renovated State Administrative Center.
</narrative></comment>
</target>
<actual value="317">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Community organizations with fee collection arrangements for the management and maintenance of the water supply subprojects financed by the project.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="80.00">
<comment><narrative>
Exceeded: Achieved 119% of target
This indicator measures the sustainability of the Project's water supply investments. Those considered are the water supply subprojects resulting from Edital 1/2014.
The calculation includes subprojects financed and finalized from Edital 1/2014 with investments concluded and with six months of full operation.  Each beneficiary community organization was canvassed to verify whether they had an arrangement for the management and maintenance of their water supply system. The full history of these investments is described in the BCR.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reference center for the early detection of cancer, renovated, equipped and operational.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="2.00">
<comment><narrative>
Achieved 100%.
Indicator is associated with activities in the Oncology Network. Referral centers for early detection were implemented, linked to public labs for diagnostic support and cancer treatment. &quot;Operational&quot; means quality attention to target pop. and reduced time between the diagnosis - early detection -  and start of treatment. Calculated on number Referral Centers renovated, equipped and operational.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospital Emergency rooms renovated, equipped, and concluded by the project.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="7.00">
<comment><narrative>
Achieved 71% of target.
Indicator is associated with Urgency/Emergency services activities financed. Emergency rooms were renovated in five principal hospitals in respective regions, and two ERs are still under completion in two other regions. Renovations were designed to improve these units' capacity to resolve health emergencies and reduce attendance response time. The target was originally 4, increased to 5, then 7, including the Acu Hospital. Measurement is the number of facilities renovated and/or equipped by the Project. Facilities renovated or under completion: HR Monsenhor Antonio Barros; HR Lindolfo Gomes Vidal, HR Josefa Alves Godeiro, HR do Serido-Telecila F. Fontes, HR Monsenhor Expedito S de Medeiros, HR Cleodon C. de Andrade, and HR Nelson Inacio dos Santos.
</narrative></comment>
</target>
<actual value="7.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State coverage of mammography exams in women aged 50-69 years
</narrative></title>
<baseline year="2019" iso-date="2019-12-29" value="0.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-29" />
<period-end iso-date="2023-12-29" />
<target value="0.50">
<comment><narrative>
Not achieved: The baseline was 0.2%, the target was 0.5% and the Project achieved 0.23%, equal to 10% of the expected 0.3 percentage point increase (0.23-0.20 = 0.03).
The cytopathology indicator captured only a portion of the exams for women in the target age group in relation to total such exams.  Indicator, besides being calculated regularly by SESAP, had/has the advantage of capturing coverage of the mammography exam cross-referenced against total exams realized. All indicators were recalculated for the study period (2016 to 2022), including the 2015 baseline, with the databases available in the information systems used collected in May 2023.
Calculated as: # mammography exams in women 50-69 years/Female population 50-64. Numerator: Bilateral mammography for Screening (Source SIA) and Denominator: Female pop. 50-69.
Recalculated ranges: Baseline - 0.20//2016 = 0.24//2017 = 0.21//2018 = 0.18//2019 = 0.20 //2020 = 0.13 //2021 = 0.18//2022 = 0.21
</narrative></comment>
</target>
<actual value="0.23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of critical audit recommendations implemented
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="50.00">
<comment><narrative>
Achieved 118% of target.
Target 50%, achieved 59%.

Indicator was intended to verify the percentage execution of the plan for implementation of state audit recommendations suggested in the Action Plan for Products 3 and 7 of the Auditoria Interna da Folha de Pagamento (State payroll) do Estado do RN. Products 3 and 7 were found by auditors to have inconsistencies in processes/contracts.  Calculated by computing auditor recommendations in Reports 3 and 7. Auditors recommended 38 points to be adopted by State to eliminate situations of non-conformity/ineligible payments, plus more than 120 recommendations to improve controls, processes, systems and efficiency in processing the RN State Payroll.
</narrative></comment>
</target>
<actual value="59.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Productive investments supported by the project adopting sustainable social, crop production, and/or environmental practices
</narrative></title>
<baseline year="2013" iso-date="2013-02-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-02-06" />
<period-end iso-date="2023-12-29" />
<target value="50.00">
<comment><narrative>
Exceeded: Achieved 180% of target
This indicator measures the number of producer beneficiaries with productive subprojects who adopted sustainable social, agricultural production or environmental practices recommended by the Project. The agreements signed with the respective organizations were the basis for establishing parameters for calculation and to verify the achievement as a percentage.

Method: Number of producer organizations benefited with productive subprojects and adopting the practices mentioned above, divided by the number of producer organizations benefited with productive subprojects (119) X 100.
</narrative></comment>
</target>
<actual value="90.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
People benefited by subprojects promoting food security
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="50.00">
<comment><narrative>
Achieved 112% of target.
Description: Subprojects linked to food security were oriented to promoting access to water for production of healthy foods and guaranteeing safe and nutritional food for beneficiaries through use of cement-lined cisterns and systems for water re-use, enabling more viable productive plots, in subprojects under Call for Proposals #1, and the anti-desertification pilot subprojects; and (b) production of irrigated food crops and fruits. Introduced by 2nd restructuring in May 2019 and started to be reported in late 2019.
Measurement: Beneficiaries are counted according to how their subprojects functioned: A/B x 100.
A. Persons benefited by productive SPs and hydro-environmental works under Edital #1/2014 and who already concluded works/investments; and B. Total persons benefited by SPs linked to the promotion of food security. See details of Editais Footnote xx, Section II B, Main Text.
</narrative></comment>
</target>
<actual value="56.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of priority macroprocesses refurbished in the priority Government Institutions of the Project.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="60.00">
<comment><narrative>
Achieved 167% of target.

Target was 60%, achieved 100%.
Indicator monitored implementation of revised/improved/refurbished macro-processes in priority project entities (Health, Education, Public Security, Planning and Administration, State Controller's Office, State Attorney General. The 52 specific macro-processes prioritized and mapped in six agencies are listed in ICR Annex 7.
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Decrease in dropout rates of the state's secondary schools benefiting from the project
</narrative></title>
<baseline year="2013" iso-date="2013-01-10" value="12.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-10" />
<period-end iso-date="2023-12-27" />
<target value="8.00">
<comment><narrative>
Not achieved: 49% of target. The baseline was 12.3%, the target was 8% - an expected 4.3 pp reduction - and the project achieved 10.2%, or a 2.1% reduction (49% of target).
Indicator calculated as ratio between no. students in state school system who abandon ensino medio/total no. students who enroll in this level in the state system at the start of school year. Project's potential to reduce dropout rates is seen in 9% result for 2019 vs target 8%. No data collected for 2020 - pandemic year with schools closed. Dropout rate declined in 2022 and 2023. This indicator was elevated from intermediate level at appraisal/PAD to PDO level in 2017.
</narrative></comment>
</target>
<actual value="10.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of women whose births were performed in the region where they live, in relation to the total number of births performed in the state.
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="72.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="85.00">
<comment><narrative>
Not achieved: The baseline was 72.48%, the target was 85% and the Project achieved 67.11 %, equal to - 43% of the expected 12.5 percentage point increase.
Indicator is associated with activities within the maternal/infant health network, and reflects lack of completion and/or operationalization (professional staffing) of project facilities at the closing date.  
Data is sourced from Hospital Information System. Formula: # admittances for labor/childbirth of residents attended in own area of residence/total admittances for labor/childbirth of residents state-wide. Note that increase continued at 2% per year up to 2019. All indicators recalculated for study period 2016-2023 incl. 2015 baseline.
</narrative></comment>
</target>
<actual value="67.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of secretariats with second level contracting
</narrative></title>
<baseline year="2013" iso-date="2013-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-01-12" />
<period-end iso-date="2023-12-29" />
<target value="5.00">
<comment><narrative>
Achieved 100% of target.

Indicator was introduced by the 1st Restructuring (June 2017) with target of 5 secretariats. Indicator pertained to secretariats which came under (require) Management Contracts (MC) via Decree #26.090 of May 17,2016 which controls Management Contracts through the State Executive. Target was to establish MCs in 5 state entities (and associated with the Project): SEPLAN, SEARH, SEEC, SESAP, SESED. In practice, almost all state entities came under MCs.   MCs are no longer required, substituted by entities committing to specific actions specified in the State's Plano Plurianual.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Productive Investiments for market access with sanitary compliance
</narrative></title>
<baseline year="2016" iso-date="2016-12-19" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-12-19" />
<period-end iso-date="2023-12-27" />
<target value="60.00">
<comment><narrative>
Achieved 125.5% of target.
This indicator was introduced by the 1st restructuring in June 2017 with target of 100. Target was reduced to 60 by 2nd restructuring in May 2019 because the overall target for SPs financed was reduced due to protracted drought and delayed start-up of investments.  There were 119 productive SPs of which 74 were subject to sanitary certification and were certified. Applying the baseline of 5, the final result is an achievement of 69 over baseline or 125.5%.
</narrative></comment>
</target>
<actual value="74.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126465</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>RIO STATE DEVELOPMENT POLICY LOAN III</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the proposed operation is to assist the Government of Rio de Janeiro in strengthening its tax administration, improving the efficiency of public financial management, increasing the quality of public service provision in education and health, andensuring that policies adopted are both consistent with priorities of the State Government and with resources likely to be available in the medium term.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Third Rio State Fiscal Efficiency for Quality of Public Service Delivery Development Policy Loan (DPL) Program is to assist the Government of Rio de Janeiro in strengthening its tax administration, improving the efficiency of public financial management, increasing the quality of public service provision in education and health and ensuring that policies adopted are both consistent with priorities of the State Government and with resources likely to be available in the medium term. This program document presents a DPL in the amount of US$300 million for the state of Rio de Janeiro, Brazil. This DPL is designed to assist the Government of Rio de Janeiro (GORJ) in continuing its efforts to improve fiscal management, social service delivery in health and education, and public financial management. Although requested as a stand-alone DPL, the operation forms part of a long term quasi programmatic engagement with the State. It is the third DPL operation with the state of Rio de Janeiro. The policies supported by this third DPL are part of the GORJ's medium-term reform program and would deepen and extend the areas covered by the first DPL. Specifically, the operation will support measures to: (i) improve the efficiency of tax administration; (ii) improve budgetary management, including screening and evaluation of new public investment projects, better estimating costs of new policy initiatives, and strengthening internal controls; and (iii) increase quality and efficiency of the education system, by introducing merit-based selection processes for school managers, annual school-level performance targets, and performance-linked pay, and in the health system by increasing the efficiency of health spending, both in regional hospitals and smaller municipalities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2011-11-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2012-08-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Roland N. Clarke</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rclarke@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="57" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="19" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="12" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="6" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="10" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="20" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="15" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="20" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="20" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="10" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="20" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="10" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="10" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="15" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="20" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="10" xml:lang="en"><narrative>Access to Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">300000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<capital-spend percentage="0" /><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126465"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126465?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126465"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Bonus pay system for schools that achieved their respective annual school-level targets
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No bonus system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-01-31" />
<target value="Bonuses for 2012 paid by June 2013">

</target>
<actual value="">
<comment><narrative>
Bonuses in the amount of US$20 million have been paid to 16.502 civil servants in 337 schools.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Supply of complex treatment to patients from other municipalities as a percentage of the total
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="16.78"><comment><narrative>Target 2012: 20%</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="24.00">

</target>
<actual value="21.05">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of Unified General Taxpayer ledger, with access of individual taxpayers to their unified accounts
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="No Unified General Taxpayer ledger"><comment><narrative>Baseline 2011</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="Unified General Taxpayer ledger established">

</target>
<actual value="">
<comment><narrative>
Unified tax ledger expected to be finalized by end 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Action plan to improve internal control systems is developed on the basis of the annual report from AGE to the State Government on the performance of internal control systems
</narrative></title>
<baseline year="2012" iso-date="2012-07-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-25" />
<period-end iso-date="2014-01-31" />
<target value="Yes">

</target>
<actual value="Yes">
<comment><narrative>
The Action Plan for 2013 has been finalized and focuses on the implementation of a results-based management system. Indicators tomeasure and monitor the process have been developed and used already during 2012.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school directors selected using new merit-based process
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative>Target 2012: 82</narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-01-31" />
<target value="164.00">

</target>
<actual value="121.00">
<comment><narrative>
Of the 121 school directors, 75 were hired in 2011, 44 in 2012 and 2 during January 2013. Additionally, 133 Vice-Directors havebeen hired in 2011 and 99 in 2012. Hiring processes for 71 Directors and 36 Vice-directors are currently ongoing and expected to befinalized by February 2013.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The State Government has signed contracts with Social Organizations (OS) to manage 15 health units and strategic services (lab services, imagery services, etc...)
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative>Target 2012 - 15 UPAs</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="22.00">

</target>
<actual value="21.00">
<comment><narrative>
By end February, 5 more UPAs are expected.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adopted annual school-level targets for improving student learning and graduation rates
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="No targets for schools."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-01-31" />
<target value="Targets for 2014 communicated to schools before end-March 2013">
<comment><narrative>
Targets for 2013 communicated to schools before end-March 2012
Targets for 2014 communicated to schools before end-March 2013
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals under the PAHI1 program with ombudsman services
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="44.00"><comment><narrative>Target 2012: 53</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="63.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase in ICMS and ITD revenues
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="ICMS: R$24.8 billion
ITD: R$418 million"><comment><narrative>Baseline 2011</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="ICMS: R$28.67 billion
ITD: R$470 million">
<comment><narrative>
Increase of 15.6 and 12.4 percent, respectively
</narrative></comment>
</target>
<actual value="">
<comment><narrative>
The baseline and the target for the ICMS was adjusted, as the PD showed the wrong numbers.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Progressive implementation of performance tax indicators
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="20.00">
<comment><narrative>
December 2012: 10
December 2013: 20
</narrative></comment>
</target>
<actual value="10.00">
<comment><narrative>
See presentation on the indicators attached to this ISR.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals with hospital infection evaluation committees
</narrative></title>
<baseline year="2011" iso-date="2011-12-30" value="46.00"><comment><narrative>Target 2012:55</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-30" />
<period-end iso-date="2014-01-31" />
<target value="66.00">

</target>
<actual value="56.00">
<comment><narrative>
Indicator seems not to be very effective as even with the committees, the compliance with the infection prevention has not improved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of regional directors selected using new merit-based process
</narrative></title>
<baseline year="2010" iso-date="2010-12-31" value="0.00"><comment><narrative>Target 2102: 28 (100%)
Target Jan 2013: 28</narrative></comment></baseline>
<period>
<period-start iso-date="2010-12-31" />
<period-end iso-date="2014-01-31" />
<target value="28.00">

</target>
<actual value="28.00">
<comment><narrative>
The 28 regional directors (14 pedagogical and 14 administrative directors) that were hired through a merit-based process byJanuary2012 are still in place.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State publishes results of costing at least four major policy programs, with their key results defined
</narrative></title>
<baseline year="2012" iso-date="2012-07-25" value="No"><comment><narrative>The State of Rio de Janeiro has piloted a methodology for costing its public policy programs.</narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-25" />
<period-end iso-date="2014-01-31" />
<target value="Yes">

</target>
<actual value="No">
<comment><narrative>
Costing methodologies for 4 big policy programs are currently being developed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Projects complying with required criteria have been subject to screening process, using the techniques specified in the technical manual
</narrative></title>
<baseline year="2012" iso-date="2012-07-25" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-25" />
<period-end iso-date="2014-01-31" />
<target value="Yes">
<comment><narrative>
Projects complying with required criteria have been subject to a screening process, using techniques specified in the technicalmanual
</narrative></comment>
</target>
<actual value="No">
<comment><narrative>
A technical manual has been prepared and a methodology for the screening process is currently in preparation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Consolidated information publiched on the portfolio mapping of the five investment projects, showing annual commitments of these investments
</narrative></title>
<baseline year="2012" iso-date="2012-07-25" value="0"><comment><narrative>Baseline 2011</narrative></comment></baseline>
<period>
<period-start iso-date="2012-07-25" />
<period-end iso-date="2014-01-31" />
<target value="5 prior investment projects shown in the annual commitments of investment">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126537</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Energy and Mineral Sector Strengthening</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen the capacity of key public sector institutions to improve the contribution of energy and mineral resources to accelerated national economic growth and increased social and environmental sustainability in a context of globalization and technological change.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Energy and Mineral Sector Strengthening Project for Brazil is to improve the contribution of energy and mining resources to accelerated national economic growth and increased social and environmental sustainability in a context of globalization and technological change. There are four components to the project. The first component is strengthening the capacity of the government to drive the sustainable development of the energy and mineral sectors. This component will support for strengthening the capacity of the borrower and the participating entities in the areas of planning, social and environmental sustainability, and in managing, evaluating and monitoring activities under their responsibility. The second component is strengthening of regulatory institutions. This component will support for: (a) strengthening the frameworks governing the legal, institutional, and oversight functions and responsibilities of the Participating Entities; and (b) capacity building for the formulation of policies, regulations and guidelines on the energy and mineral sectors. The third component is technology development. This component will support for the development and use of cutting edge technologies to: (i) improve research and development capacity of the borrower's power sector to transport efficiently and reliably large blocks of energy across continent-wide distances; and (ii) enhance the capacity of the geological survey. The fourth component is support to south-south cooperation. This component support to Ministry of Mines and Energy (MME) and to selected borrower's agencies and entities (to be selected by the Borrower and to be acceptable to the Bank) to: (a) assist them in, inter alia, developing internal procedures and information and/or knowledge systems for purposes of carrying out south-south cooperation between Brazil and participating countries; and (b) provision of technical assistance, training and carrying out of workshops, to support South-South Cooperation, both in the areas of, inter alia, regulation, renewable energy, climate change, clean energy, geological surveys, information systems and environmental and social sustainability, all within the energy and mining sectors.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006501"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006501"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006501"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-32000"><narrative>Ministry of Mines and Energy</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2011-11-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2011-12-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2018-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2018-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jimmy Pannett</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jpannett@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.902781 -43.2075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469058" />
            <name><narrative>Brasilia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.77972 -47.929722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="23111" percentage="50" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="100.000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="15" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000213" percentage="30" xml:lang="en"><narrative>Innovation and Technology Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="7" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000021" percentage="50" xml:lang="en"><narrative>Business Enabling Environment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000213" percentage="30" xml:lang="en"><narrative>Innovation and Technology Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="15" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="7" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="15" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="7" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="7" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="15" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000212" percentage="20" xml:lang="en"><narrative>Regulation and Competition Policy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">50000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">816666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">816666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">816666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">766666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">766666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">768042.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">768042.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">768042.61</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">16161485.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">16161485.75</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">49604127</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-16161486</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">124010</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">94577</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-01-31"/><value value-date="2013-01-31">95907</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">2269704</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">2478578</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">4408000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">255370</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">1657301</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">1694462</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">1471700</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">2314185</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">707000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">972635</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">265260</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">221400</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">270300</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">241600</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">300000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">946060</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1540000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">1100000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">400000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">55000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">450000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">35000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">380000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">750000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1755000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">620000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">350000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">435000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">600000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">2300000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">650000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">1250000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-15409</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-124010</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-454</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-1200</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-1447</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-18417</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-31574</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-40287</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-53284</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-97604</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-148901</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-203434</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-250795</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-253124</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-395526</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-509619</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-582607</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-463255</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-242719</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-164779</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-155545</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-147965</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-313862</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-881898</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-988835</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1101081</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1115609</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-972208</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-940132</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-854588</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6500"><narrative>Ministry of Mines and Energy</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126537"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126537?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126537"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the primary data on small-scale mining
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Development of internal capacity to execute an annual inventory of GHG emissions
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application of phaser synchronization measurement technologies
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="1.00">
<comment><narrative>
Installation completed and system operational. Final staff training being finalized during ICR writing period.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Development of internal capacity to execute an annual inventory of GHG emissions
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="1.00">
<comment><narrative>
Activity was financed through counterpart funding.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training of staff
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="88.00">
<comment><narrative>
Completed.
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the capacity of the Ministry and the Energy Planning Agency (EPE) to define the potential of wind energy that can be integrated to the grid
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="0.00">
<comment><narrative>
Activity unable to be executed due to budget constraints.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved capacity of the CPRM to create maps of the geophysical risk susceptibility
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="0.00">
<comment><narrative>
Equipment bought and mapping initiated, with benefits received in Maceio (with land sinking) and São Paulo, with identification of sands unaffected by the water table to be used for industry.  Unclear on the definition of &quot;247&quot; maps given each full area map can take weeks to produce.
</narrative></comment>
</target>
<actual value="247.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Improve the primary data on small-scale mining
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhancement of capacity of key Government institutions in charge of supporting the development of both the energy and mineral sectors
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="0.00">
<comment><narrative>
The indicator is divided into the four parts below.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve capacity of MME to contribute effectively in south-south cooperation
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="1.00">
<comment><narrative>
While no specific procedure has been developed, two activities are being used for South-South cooperation - the floating hydroelectric turbines and the evaluation of the social-economic impact of small mining.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Application of phaser synchronization measurement technologies
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of energy used due to the implementation of demand response measures
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="0.00">
<comment><narrative>
Activities changed, indicator became Not Applicable.
</narrative></comment>
</target>
<actual value="10.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhancement of applied sectoral R&amp;D laboratories
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-18" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
high-performance computer model to support expansion planning and operation of the SIN
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-06-30" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the management and security of documents related to mineral rights
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the management and security of documents related to mineral rights
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="0.00">
<comment><narrative>
Not completed.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of energy used due to the implementation of demand response measures
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="10.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improve the capacity of the Ministry and the Energy Planning Agency (EPE) to define the potential of wind energy that can be integrated to the grid
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prototypical high-performance long-distance transmission line
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="1.00">
<comment><narrative>
Completed and operational.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Improved capacity of the CPRM to create maps of the geophysical risk susceptibility
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="247.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adjust the structure of SGM to the new legal and regulatory framework, and create the CNPM
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
high-performance computer model to support expansion planning and operation of the SIN
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="2.00">
<comment><narrative>
Completed.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Training of staff
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-06-30" />
<target value="45.00">

</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Apply newly-collected and processed energy-use data to improve energy models.
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="2.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Prototypical high-performance long-distance transmission line
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Apply newly-collected and processed energy-use data to improve energy models.
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2018-12-31" />
<target value="3.00">
<comment><narrative>
The Three methodologies are related to TDR 57/60 - Electricity Energy efficiency; TDR 63 - Gas Tariffs; and TDR 64 - Commercialization of Oil and Gas
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Adjust the structure of SGM to the new legal and regulatory framework, and create the CNPM
</narrative></title>
<baseline year="2011" iso-date="2011-12-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-20" />
<period-end iso-date="2017-12-08" />
<target value="2.00">
<comment><narrative>
SGM was restructured, and the national mining agency - ANM - was created.
</narrative></comment>
</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P126749</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Belo Horizonte Urban Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the proposed operation is to support integrated and sustainable urban development and reduce social vulnerability in Belo Horizonte.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Belo Horizonte Inclusive Urban Development Policy Loan Project for Brazil is to support integrated and sustainable urban development and reduce social vulnerability in Belo Horizonte. This program document presents a proposed one tranche Development Policy Loan (DPL) to the Municipality of Belo Horizonte (BH) in the amount of US$200 million. Proactive integrated urban development strategies are urgently needed to address social exclusion, and create effective and long-term sustainable governance to benefit all residents. The value added of this operation lies in the potential knowledge partnership with the municipality. Belo Horizonte can become a leading laboratory of experimentation with new urban planning and management ideas and processes, in light of the knowledge the Bank brings to the client in specific issues such as housing development, resettlement practices, social programs, climate change adaptation and mitigation and results-based management. The operation began preparation in 2011 and has experienced delays; however no slippage or reversal of prior actions has occurred during this time. The operation was appraised and negotiated with the client during 2011-2012. The project has been pending resolution of internal clearances within the client administration, which have since been resolved. It has been confirmed that the project's prior actions continue to guide municipal policy and remain valid.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006610"><narrative>Municipality of Belo Horizonte</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0006610"><narrative>Municipality of Belo Horizonte</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0006611"><narrative>Municipality of Belo Horizonte</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-03-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-06-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Josef Lloyd Leitmann</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jleitmann@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15129" percentage="45" xml:lang="en"/><sector vocabulary="1" code="16030" percentage="22" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="11" xml:lang="en"/><sector vocabulary="1" code="41020" percentage="11" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="33" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="4" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="6" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="11" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="10" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="33" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="6" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="12" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="11" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="4" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="6" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="4" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="4" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="6" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="23" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="11" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">200000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-796500</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-802203</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-847295</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-982616</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1313605</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-1521964</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-1907468</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-2070828</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-2395504</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-3139040</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-3499213</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-2929098</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-2462997</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1042734</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-868342</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-790885</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-899808</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-3131065</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-4690860</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-5093435</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-5175155</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-4830713</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-4061239</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-3875764</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-3295878</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-240000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-240000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-240000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-500000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-500000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-740000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-740000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-1000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-2000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-2000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-3000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-4000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-5000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-4999999</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-5000001</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-5000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-5000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-5000000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6611"><narrative>Municipality of Belo Horizonte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126749"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126749?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126749"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plots transferred by CAIXA
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1470.00">

</target>
<actual value="1470.00">
<comment><narrative>
Client expects to reach 3843 transfers by the end of 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with a dedicated action plan implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="750.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1500.00">

</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated database of: (i) hydrological and climate-related parameters; and (ii) disaster events and damages.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="0.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new housing starts of formally developed low-income housing units.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="1470.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="5302.00">

</target>
<actual value="13575.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with a dedicated action plan implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="750.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1500.00">

</target>
<actual value="750.00">
<comment><narrative>
While the number of families has not increased, the number of territories covered has expanded from 25 to 33. The client expectstoexpand the program by the end of 2014 to include 2000 families.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Change Climate Action Plan that integrates and benchmarks existing sector-specific initiatives in solid waste, water, energy and urban forestry sectors
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of users rating the services rendered as good or excellent at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="90.00">

</target>
<actual value="97.96">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of services rendered at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="94678.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="148500.00">

</target>
<actual value="92064.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated database of: (i) hydrological and climate-related parameters; and (ii) disaster events and damages.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="1.00">
<comment><narrative>
The database is not formally considered completely consolidated as doing so would require data spanning some 30 years for theparameters to be considered scientifically consistent. However, for operational purposes, 1 year of data is sufficient.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of results completed yearly according to schedule
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="70.00">

</target>
<actual value="68.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Civil servants retirement plan actuarial deficit
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="3466500000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="3428500000.00">

</target>
<actual value="5293000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female-headed households with a dedicated action plan
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="60.00">

</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective demand of projects decided by the community that are includeed in the city's multi-year plan.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="25.00">

</target>
<actual value="36.00">
<comment><narrative>
Number of projects included in the 2014-2017 multi-year plan.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female-headed households with a dedicated action plan
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="60.00">

</target>
<actual value="62.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households benefiting from land regularization between 2009 and 2013.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="8768.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12155.00">

</target>
<actual value="16342.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Civil servants retirement plan actuarial deficit
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="3466500000.00"><comment><narrative>Value in BRL as indicated in the PD is R$6.933 billion. To express value in USD, an exchange rate of R$2 = US$1 was used.</narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="3428500000.00">
<comment><narrative>
Value in BRL as indicated in the PD is R$6.857 billion. To express value in USD, an exchange rate of R$2 = US$1 was used.
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
The PBH has been working since 2012 to implement reforms to reduce the actuarial deficit in its civil servant retirement plan,though data is not yet available on progress made. Client to provide updated data.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of services rendered at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="94678.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="148500.00">

</target>
<actual value="88664.00">
<comment><narrative>
The indicator target was set based on the planned opening of two additional service centers, though those locations are nowexpected to open in 2016. In addition, BH Resolve has added two additional channels to attend to clients that were not anticipatedat time of loan preparationtelephone and web chatwhich have supplanted some of the need for physical service centers. In 2013,there were an average of 153,168 calls answered and 3,046 web chat sessions per month. If included, the total for this indicatorreaches 244,877 services/month.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new housing starts of formally developed low-income housing units.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="1470.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="5302.00">

</target>
<actual value="13575.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rehabilitated homes as a result of the program
</narrative></title>
<baseline year="2011" iso-date="2011-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-01" />
<period-end iso-date="2013-12-31" />
<target value="250.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of civil society participants in participatory processes  (OP Digital, OP Regional, PPR)
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="2.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of people remaining in social housing developments after 2 years
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="85.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of people remaining in social housing developments after 2 years
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="85.00">

</target>
<actual value="86.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of civil society participants in participatory processes  (OP Digital, OP Regional, PPR)
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="2.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rehabilitated homes as a result of the program
</narrative></title>
<baseline year="2011" iso-date="2011-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-01" />
<period-end iso-date="2013-12-31" />
<target value="250.00">

</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Civil servants retirement plan actuarial deficit
</narrative></title>
<baseline year="2010" iso-date="2010-01-01" value="3466500000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2010-01-01" />
<period-end iso-date="2013-12-31" />
<target value="3428500000.00">

</target>
<actual value="5293000000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of rehabilitated homes as a result of the program
</narrative></title>
<baseline year="2011" iso-date="2011-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-01" />
<period-end iso-date="2013-12-31" />
<target value="250.00">

</target>
<actual value="13.00">
<comment><narrative>
Slow progress on this indicator is attributed to two factors: (i) insecure land tenure of the properties occupied by the targetpopulation, and (ii) complications in securing service providers (works are relatively low value and distributed throughout thecity).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new housing starts of formally developed low-income housing units.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="1470.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="5302.00">

</target>
<actual value="13395.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of users rating the services rendered as good or excellent at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="90.00">

</target>
<actual value="97.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective demand of projects decided by the community that are includeed in the city's multi-year plan.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="25.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households benefiting from land regularization between 2009 and 2013.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="8768.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12155.00">

</target>
<actual value="12636.00">
<comment><narrative>
Includes providing 8824 tiles in favelas and 3812 plots (lotes clandestinos).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of services rendered at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="94678.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="148500.00">

</target>
<actual value="92064.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of users rating the services rendered as good or excellent at BH Resolve units
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="90.00">

</target>
<actual value="97.65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of results completed yearly according to schedule
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="70.00">

</target>
<actual value="68.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of results completed yearly according to schedule
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="70.00">

</target>
<actual value="65.40">
<comment><narrative>
The BH Metas e Resultados team will update data for 2013, aligning them with new activities included for the 2013-2016administrative cycle.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Effective demand of projects decided by the community that are includeed in the city's multi-year plan.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="25.00">

</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of people remaining in social housing developments after 2 years
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="85.00">

</target>
<actual value="85.70">
<comment><narrative>
The rate varies from 76.8% for families that are part of the Habitation Production Program (Programa de Produo Habitacional) andthe 95.2% for the Vila Viva program.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of monthly performance reports of the early warning system issued
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12.00">

</target>
<actual value="12.00">
<comment><narrative>
Reports are issued monthly.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plots transferred by CAIXA
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1470.00">

</target>
<actual value="2325.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of households benefiting from land regularization between 2009 and 2013.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="8768.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12155.00">

</target>
<actual value="16342.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Change Climate Action Plan that integrates and benchmarks existing sector-specific initiatives in solid waste, water, energy and urban forestry sectors
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="0.00">
<comment><narrative>
A plan has not yet been approved, though a committee charged with its design is in place and has presented an initial plan to themayor. After incorporating feedback from the public and private sectors, as well as civil society groups, a final proposal is underpreparation and will be formalized though a decree issued by the mayor.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of female-headed households with a dedicated action plan
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="60.00">

</target>
<actual value="68.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipal Change Climate Action Plan that integrates and benchmarks existing sector-specific initiatives in solid waste, water, energy and urban forestry sectors
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of civil society participants in participatory processes  (OP Digital, OP Regional, PPR)
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="15.00">

</target>
<actual value="0.00">
<comment><narrative>
Indicator not yet under measurement
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plots transferred by CAIXA
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1470.00">

</target>
<actual value="2325.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of monthly performance reports of the early warning system issued
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with a dedicated action plan implemented
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="750.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1500.00">

</target>
<actual value="750.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of monthly performance reports of the early warning system issued
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="12.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consolidated database of: (i) hydrological and climate-related parameters; and (ii) disaster events and damages.
</narrative></title>
<baseline year="2011" iso-date="2011-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-01-01" />
<period-end iso-date="2013-12-31" />
<target value="1.00">

</target>
<actual value="0.50">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P127723</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sao Paulo State Sustainable Transport Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Contribute to the improvement of the State's transport and logistics efficiency and safety while enhancing the Borrower's capacity in environmental and disaster risk management.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sao Paulo Sustainable Transport Project for Brazil is to contribute to the improvement of the Borrower's transport and logistics efficiency and safety while enhancing the Borrower's capacity in environmental and disaster risk management. The project has three components. The first component is improving transport and logistics efficiency and safety. This component will provide support to improve the state's transport and logistics efficiency and safety, through carrying out the following activities: (i) rehabilitating and upgrading the state's transport networks; and (ii) sustainable transport planning and management. The second component is strengthening sustainable environmental and land use planning and territorial management capacity. This component will provide support in the area of land use planning and territorial management and environmental management, through carrying out the following activities: (a) supporting sustainable land use planning and territorial management; (b) improving environmental enforcement and environment quality monitoring; and (c) supporting the modernization of the environmental licensing system. The third component is increasing state's resilience to natural disasters. This component will provide support to enhance the state capacity to plan for and manage disasters through carrying out the following activities: (1) mainstreaming disaster risk management in the transport sector; and (2) enhancing disaster risk management policy and institutional capacity.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0007328"><narrative>State of Sao Paulo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0007328"><narrative>State of Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0007327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-12-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-06-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Georges Bianco Darido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>gdarido@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Estado de Sao Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21012" percentage="92" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="4" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="0.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="91.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="3" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="3" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="3" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="1" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="1" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000141" percentage="46" xml:lang="en"><narrative>Trade Facilitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="15" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="1" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="3" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="15" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">4166666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">4166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">5833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">5833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2021-03-30"/>
<value currency="USD" value-date="2021-03-30">34907221.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2021-03-30"/>
<value currency="USD" value-date="2021-03-30">34907221.25</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">300000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-34907221</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">39100911</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">2510</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">30455712</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">27969313</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">17244417</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">34646248</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">14056393</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">15959230</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">2044</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">10372368</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">9894867</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">267859</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">516843</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">39955</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">15577133</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">12725</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">29715</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">17397</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">9244736</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">11205028</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">11713285</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">39242</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">16796</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">12106</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">52810</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">8974888</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">7677786</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-9539</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-750000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-128145</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-391525</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-744676</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-903498</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1301845</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-1532895</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-1931613</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-2108840</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-2453056</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-3398716</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-3831688</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-3638398</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-3023869</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1294060</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1101413</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1034412</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1178884</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4099387</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-6137399</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-6659005</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-6803594</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-6388660</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-5405255</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-5194738</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-4447969</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-4010573</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-4328607</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-4521220</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-5011246</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-5012655</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-5211898</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-5211898</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-5390568</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7327"><narrative>Secretariat of Transport and Logistics, Road Agency (DER-SP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127723"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P127723?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127723"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development and operationalization of a Platform connecting the State Disaster Risk Management monitoring systems
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This indicator is expected to be fully achieved by December 2021. The technical services were contracted on December 2020 for 12 months and the State is committed to completing the activity.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Municipalities in the Sao Paulo Metropolitan region with a concluded Disaster Risk mapping
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target has been overachieved, 45 municipalities carried out a disaster risk mapping.&amp;nbsp; Part of the results have been published by the State at: https://www.infraestruturameioambiente.sp.gov.br/2020/12/governo-de-sao-paulo-finaliza-mapeamento-de-riscos-em-38-municipios-da-regiao-metropolitana-do-estado/&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="45.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads in the State
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The measurement of this indicator was updated after December 2020 to reflect recent&amp;nbsp;road pavement surveys for the entire classified State road network of 13,000km.&amp;nbsp; The pandemic greatly limited maintenance and rehabilitation activities of&amp;nbsp;the State road network for most of 2020, thus explaining the unexpected decrease in road pavement condition since the previous measurementat the beginning of 2020.&amp;nbsp; Moreover, the scope of this parent indicator (a mandatory core sector indicator at the time of appraisal) goes much beyond the&amp;nbsp;Project, which represents only 5% of the State road network. Consequently, a&amp;nbsp;much more attributable sub-indicator&amp;nbsp;was added for the share of &lt;u&amp;gt;Project roads in good and fair condition &lt;/u&amp;gt;considering only the 690 km network of Project roads.&amp;nbsp; This change in methodology should have been made in the last restructuring to make this indicator more attributable and relevant to the Project.&lt;/p&amp;gt;

&lt;p&amp;gt;The share of State roads rehabilitated under the Project (690km, including the one bridge rehabilitated under the Project) in good and fair condition increased from 34% at appraisal to 74% as of March 2021 compared to the target of 48%&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Non-rural
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="2021-03-30" />
<target value="690.00">
<comment><narrative>
&lt;p&amp;gt;Original target of 377km was increased with the additional $300m of financing from Banco Santander. Indicator virtually achieved. At Project closing, only 9km remained to reach the target.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="680.13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Presentation of the Ecological and Economic Zoning (ZEE) to CONSEMA
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The ZEE was drafted but not formally&amp;nbsp;submitted to CONSEMA because it is under&amp;nbsp;a review and&amp;nbsp;validation process with the State ZEE Commission (12 government clearance levels). The validation was completed in April 2021 and the zoning proposal submitted in June 2021.&amp;nbsp;After that, the&amp;nbsp;zoning proposal will&amp;nbsp;be presented in consultations and public hearings from July to&amp;nbsp;September 2021. The final zoning proposal are expected to be presented to CONSEMA in November 2021.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bridges reconstructed
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="2020-12-31" />
<target value="1.00">
<comment><narrative>
&lt;p&amp;gt;Target achieved as the construction of the new bridge is completed. Remaining civil works relate to the demolition of the old bridge which is expected to be completed by August 2021&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Contingency plans established for selected UBAs
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The Project established the targeted three contingency plans.&amp;nbsp;The plans were delivered to the Bank on April 6, 2021 by the Geological&amp;nbsp;Institute within the State Secretariat of Infrastructure and Environment (SIMA).&amp;nbsp; The contract (Contrato n&amp;ordm; 20.595-3, Elabora&amp;ccedil;&amp;atilde;o de Planos de Conting&amp;ecirc;ncia&amp;nbsp;frente a riscos de eventos geodin&amp;acirc;micos em trechos rodovi&amp;aacute;rios das Unidades B&amp;aacute;sicas de Atendimento (UBAs) Caraguatatuba, Mogi das Cruzes e S&amp;atilde;o Vicente) was administratively managed by DER-SP but the technical content was managed by the competent agencies within SIMA.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days required for SMA/CETESB to approve Environmental Preliminary Reports (Relatrio Ambiental Preliminar  RAP) for roadworks
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="156.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;It takes 116.5 days as of December 2021 for SMA/CETESB to approve Environmental Preliminary Reports for road works compared to 156 days at appraisal and to the targeted 117 days. SMA/CETESB will continue monitoring this indicator. The number of days has varieda lot throughout the years (110 days in 2018, 129 days in 2020) since it depends on the number of projects that go through SMA and other factors.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="116.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of fatalities on the 100 most critical spots of the State road network
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="124.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The fatalities on the targeted State roads (that were rehabilitated under the subcomponent 1.1) decreased from 124 per year at appraisal to 58 at the end of 2020, under the targeted 62 per year.&lt;/p&amp;gt;

&lt;p&amp;gt;The rolling average of yearly fatalities during 2016-2020 remained at 62, which shows continued improvement of road safety.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in average Vehicle Operating Costs on Project roads
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Indicator was&amp;nbsp;achieved and is largely due to the improved pavement and design conditions of the Project road network.&lt;/p&amp;gt;

&lt;p&amp;gt;In the last restructuring, this indicator replaced the previous indicator of &amp;quot;increase of export products transported on theTiete river&amp;quot; because it could not be directly reported (only estimated) until the&amp;nbsp;new bridge is open to larger vessels and vehicles.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of underwater monitoring stations
</narrative></title>
<baseline year="2013" iso-date="2013-05-02" value="21.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target fully achieved.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P129342</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Piaui: Pillars of Growth and Social Inclusion Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The objective of the project is to: (a) reduce dropout of students in public secondary education; (b) increase access to diagnosis and treatment for patients with chronic diseases; (c) expand the registration of groundwater users in rural areas and land tenureregularization; and (d) increase the participation of poor family farmers in rural productive value chains. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Piaui Pillars of Growth and Social Inclusion Project for Brazil is to: (a) reduce dropout of students in public secondary education; (b) increase access to diagnosis and treatment for patients with chronic diseases; (c) expand the registration of groundwater users in rural areas and land tenure regularization; and (d) increase the participation of rural family farmers in rural productive value chains. The project comprises of two components. The first component, provision of support for the implementation of eligible expenditure programs (EEPs) consists of following five sub-components: (i) improving retention in public secondary education; (ii) expanding access to health care for patients with chronic diseases; (iii) expanding the registration of groundwater users; (iv) strengthening real property rights; and (v) strengthening participation of rural family farmers in rural productive value chains. The second component, provision of technical assistance to strengthen the Borrower's public management consists of following three sub-components: (i) modernize expenditure and investment management in the public sector; (ii) build the Borrower's capacity for water resources management, land management, and rural development; and (iii) generate evidence to support policy-making and practice in education, health, gender, and citizen engagement.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0008318"><narrative>Government of Piaui</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0008319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-10-25"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-12-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marcelo Becerra</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mbecerra@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11260" percentage="50" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="27" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="12" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="5" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="4" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000625" percentage="27" xml:lang="en"><narrative>Non-communicable diseases</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="2" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="2" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="12" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="50" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="25" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="12" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="50" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="2" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="50" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="25" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="12" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="10" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="27" xml:lang="en"><narrative>Disease Control</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">2166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">2166666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">2458333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">2458333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">2058333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">2058333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">1900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">1900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">1900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1900000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3855932.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3855932.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-3855932</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">22500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">5799167</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">11076000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">11000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1012930</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">7605000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">1008578</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">12772796</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">1022850</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">7654000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">835873</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">7579578</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">405969</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">417000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">928984</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">7797493</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">518107</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">4120000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">400265</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">530061</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">2854039</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">400000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1394624</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-300000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-128472</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-345758</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-419655</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-528465</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-917671</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-886</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-1152004</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1268882</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1281262</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-715940</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-490426</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-480157</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-458236</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-941968</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2545137</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2742910</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-2923979</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2837545</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2365371</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-2182611</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1889749</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-2788429</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-3114000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3172515</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3459403</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-3742379</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3705473</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8319"><narrative>SECRETARIAT OF PLANNING (SECRETARIA DE PLANEJAMENTO-SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129342"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P129342?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129342"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 12 - FHTs and health specialists trained for the use access protocols to outpatient procedures [DLI 9]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 23 - State secretariats and agencies using the SIMO
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="40.00">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Groundwater users registered in the CERH verified by SEMAR
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="8100.00">

</target>
<actual value="8537.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 36 - PEPM elaborated
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 12 - FHTs and health specialists trained for the use access protocols to outpatient procedures [DLI 9]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="95.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 37 - Complaints registered and processed timely by the OGE
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 40 - Registration campaigns and/or field visits to register groundwater users completed [DLI 17]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="8.00">
<comment><narrative>
&lt;p&amp;gt;IRI/DLI added in restructuring&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 9 - Learning assessment tests carried out in public SE and results disseminated at the school level [DLI 6]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Third state learning assessment test carried out in SE">

</target>
<actual value="Third state learning assessment test carried out in SE">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4 - Beneficiaries who received land titles through donation through the state LTRP
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="5000.00">

</target>
<actual value="15054.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 29 - Integrated Management, Monitoring and Evaluation System including the development of a software to manage real-time data on the performance and administration of PROGERE II
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="System Fully Operational">

</target>
<actual value="System Fully Operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 40 - Registration campaigns and/or field visits to register groundwater users completed [DLI 17]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="8.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 32 - Impact Evaluation of the YSP
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Report completed and disseminated">

</target>
<actual value="Report completed and disseminated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Groundwater users registered in the CERH verified by SEMAR
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="8100.00">

</target>
<actual value="8553.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 22 - PIPs implemented and monitored using PROGEREs Integrated Management, Monitoring and Evaluation System
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="80.00">

</target>
<actual value="53.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 42 - Land titling software e-Ttulos developed and adopted by INTERPI [DLI 19]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Software developed and adopted by INTERPI">

</target>
<actual value="Software developed and adopted by INTERPI">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1 - Dropout rate in public SE
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="14.50">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 7 - Students enrolled in ETI* [DLI 5]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="290.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="110000.00">

</target>
<actual value="110976.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 7 - Students enrolled in ETI* [DLI 5]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="290.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="100000.00">

</target>
<actual value="110976.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 11 - Number of access protocols to outpatient procedures: specialized consultations and detection support [DLI 8]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="20.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 25 - Councils of Sustainable Territorial Development using the SIMO to monitor investments in their jurisdictions
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="40.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 36 - PEPM elaborated
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="PEPM Elaborated and Disclosed">

</target>
<actual value="PEPM Elaborated and Disclosed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 39 - Registered groundwater users in the CERH electronic database [DLI 16]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="8500.00">

</target>
<actual value="8069.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6 - STE schools that have engaged in consultations on content and modalities of training with private sector representatives.
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="30.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 11 - Number of access protocols to outpatient procedures: specialized consultations and detection support [DLI 8]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="20.00">

</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 24 - State secretariats with decentralized monitoring and evaluation teams in operation
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="4.00">

</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 3 - Tutoring activities for and monitoring of attendance of SE students enrolled in the YSP [DLI 2]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2 - Patients under diagnosis and/or treatment for chronic diseases in the five new SCCDs
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="40000.00">

</target>
<actual value="41960.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 25 - Councils of Sustainable Territorial Development using the SIMO to monitor investments in their jurisdictions
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 18 - When applicable women are registered as beneficiaries or cobeneficiaries in land titles through donation
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Yes">
<comment><narrative>
&lt;p&amp;gt;Women are co - proprietors&amp;nbsp;of 80,4 percent of titles issued&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 30 - CGEO established
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="CGEO Established">

</target>
<actual value="CGEO Established">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 29 - Integrated Management, Monitoring and Evaluation System including the development of a software to manage real-time data on the performance and administration of PROGERE II
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="System fully operational">

</target>
<actual value="System Fully Operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 9 - Learning assessment tests carried out in public SE and results disseminated at the school level [DLI 6]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Third state learning assessme nt test carried out in SE">

</target>
<actual value="Third state learning assessment test carried out in SE">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 3 - Tutoring activities for and monitoring of attendance of SE students enrolled in the YSP [DLI 2]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 17 - Requests of land tenure  regularization through donation filed by small-scale farmers through the state LTRP [DLI 13]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="4151.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="12000.00">

</target>
<actual value="15859.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 41 - Land title for Quilombola Community Queimada Grande issued and submitted to the notary for registration [DLI 18]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Land title issued and submitted to the notary for registration">

</target>
<actual value="Land title issued and submitted to the notary for registration">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 26 - Public Expenditure Observatory implemented in CGE-PI
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 28 - Integrated Real Estate Registration System for notaries
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="System Fully Operational">

</target>
<actual value="This activity was canceled">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 10 - SCCDs operational to receive patients for diagnosis, treatment and follow up [DLI 7]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 43 - PIPs proposed by women-led organizations and mostly directly benefiting women and/or families from Quilombola or traditional communities or from land regularization settlement [DLI20]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="36.00">

</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1 - Dropout rate in public SE
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="16.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="14.50">
<comment><narrative>
&lt;p&amp;gt;The 6 percent&amp;nbsp;corresponds to 2020.&amp;nbsp; The data for 2021 from school census indicates 4 percent, though is not yet officially published.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="6.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 28 - Integrated Real Estate Registration System for notaries
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="System fully operational">

</target>
<actual value="System fully operational">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 24 - State secretariats with decentralized monitoring and evaluation teams in operation
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="4.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 13 - Self-registered groundwater users in the CERH electronic database [DLI 10]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="15000.00">
<comment><narrative>
&lt;p&amp;gt;This IRI / DLI was revised and replaced by DLI 16.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7903.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 21 - PIPs under implementation benefiting poor rural women; families from Quilombola or traditional communities and/or from land regularization settlements monitored using SIGMA [DLI15]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 33 - SHRP elaborated
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="SHRP published in the Official Gazette">

</target>
<actual value="SHRP published in the Official Gazette">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 43 - PIPs proposed by women-led organizations and mostly directly benefiting women and/or families from Quilombola or traditional communities or from land regularization settlement [DLI20]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="36.00">

</target>
<actual value="35.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 13 - Self-registered groundwater users in the CERH electronic database [DLI 10]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="15000.00">

</target>
<actual value="7903.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 39 - Registered groundwater users in the CERH electronic database [DLI 16]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="8500.00">

</target>
<actual value="8537.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 21 - PIPs under implementation benefiting poor rural women; families from Quilombola or traditional communities and/or from land regularization settlements monitored using SIGMA [DLI15]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="100.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 18 - When applicable women are registered as beneficiaries or cobeneficiaries in land titles through donation
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 17 - Requests of land tenure  regularization through donation filed by small-scale farmers through the state LTRP [DLI 13]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="4151.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="12000.00">

</target>
<actual value="16497.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2 - Students enrolled in the YSP who pass to the next grade [DLI 1]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="8900.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="65000.00">

</target>
<actual value="82270.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2 - Patients under diagnosis and/or treatment for chronic diseases in the five new SCCDs
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="40000.00">

</target>
<actual value="41960.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4 - Beneficiaries who received land titles through donation through the state LTRP
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5000.00">

</target>
<actual value="8996.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 23 - State secretariats and agencies using the SIMO
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="23.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="40.00">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5 - Poor rural women and/or families from Quilombola or traditional communities and/or from land regularization settlements  participating in PIPs as direct beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2021-12-31" />
<target value="500.00">

</target>
<actual value="879.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 33 - SHRP elaborated
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="SHRP published in the Official Gazette">

</target>
<actual value="SHRP published in the Official Gazette">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4 - Secondary FTS certified [DLI 3]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="79.00">

</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5 - Poor rural women and/or families from Quilombola or traditional communities and/or from land regularization settlements  participating in PIPs as direct beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="500.00">

</target>
<actual value="907.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 27 - Public procurement system developed/customized and installed in SEADPREV
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="System fully operational">

</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5 - Students enrolled in STE  (integrated and concomitant) [DLI 4]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="20000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="180000.00">

</target>
<actual value="181788.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 10 - SCCDs operational to receive patients for diagnosis, treatment and follow up [DLI 7]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;By the Closing Date , 3&amp;nbsp;SCCDs were operational. Therefore,&amp;nbsp;3 DLRs were&amp;nbsp;disbursed, $600,000 out of a total of $1,000,000. However, by April 20, 2022, all 5 SCCDs were operational.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 41 - Land title for Quilombola Community Queimada Grande issued and submitted to the notary for registration [DLI 18]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Land title issued and submitted to the notary for registration">

</target>
<actual value="Land title issued and submitted to the notary for registration">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 27 - Public procurement system developed/customized and installed in SEADPREV
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Yes">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;A consulting firm has been contracted and currently develop a new&amp;nbsp;Public procurement system developed/customized and installed in SEADPREV. It is estimated that it will be in place by the end of 2022.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="In progress">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6 - STE schools that have engaged in consultations on content and modalities of training with private sector representatives.
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="30.00">

</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 22 - PIPs implemented and monitored using PROGEREs Integrated Management, Monitoring and Evaluation System
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 16 - Teams in place to execute land tenure regularization activities through donation [DLI 12]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="10.00">

</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 30 - CGEO established
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 37 - Complaints registered and processed timely by the OGE
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="90.00">

</target>
<actual value="76.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 16 - Teams in place to execute land tenure regularization activities through donation [DLI 12]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="10.00">

</target>
<actual value="13.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5 - Students enrolled in STE  (integrated and concomitant) [DLI 4]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="20000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="180000.00">

</target>
<actual value="181788.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2 - Students enrolled in the YSP who pass to the next grade [DLI 1]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="8900.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="65000.00">

</target>
<actual value="82260.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4 - Secondary FTS certified [DLI 3]
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="33.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="79.00">

</target>
<actual value="79.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 26 - Public Expenditure Observatory implemented in CGE-PI
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 32 - Impact Evaluation of the YSP
</narrative></title>
<baseline year="2014" iso-date="2014-12-31" value="n.a."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Report disseminated">

</target>
<actual value="Report disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 42 - Land titling software e-Ttulos developed and adopted by INTERPI [DLI 19]
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2020-12-23" />
<target value="Software developed and adopted by INTERPI">

</target>
<actual value="Software developed and adopted by INTERPI">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P129652</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Development Policies for the State of Sergipe</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Development Policy Objective of the proposed operation is to improve public sector management, and expand access to quality public services and economic opportunities for the extremely poor in the State of Sergipe. The proposed operation is fully consistentwith the overarching objective of the CPS 2012-2015, and with the strategic objectives of enhancing the efficiency of public investments, improving quality and expand provision of public services, and promoting regional economic development. It is also fully aligned with the Government of Sergipe's goal to eradicate poverty, as outlined in the Multiyear Participatory Plan (PPA-P) 2012-2015.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Sergipe Development through Inclusion Project for Brazil is to improve public sector management, and expand access to quality public services and economic opportunities for the extremely poor in the State of Sergipe. The proposed operation is fully consistent with the overarching objective of the Country Partnership Strategy 2012-2015, and with the strategic objectives of enhancing the efficiency of public investments, improving quality and expand provision of public services, and promoting regional economic development. The loan will support policy actions aiming at: (1) consolidating fiscal management and public sector innovations; (2) increasing access to better quality public services in health and education; and (3) promoting socioeconomic development and inclusive growth in the interior of the State of Segripe.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0008534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-02-21"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2013-05-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2014-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2014-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tania Dmytraczenko</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tdmytraczenko@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15129" percentage="25" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="25" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="17" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="8" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="8" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="25" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="8" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="17" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="8" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="8" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="18" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="9" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="16" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="18" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="9" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="18" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="16" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="8" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="17" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="8" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000635" percentage="17" xml:lang="en"><narrative>Reproductive and Maternal Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="25" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">150000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">0</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-10-31"/><value value-date="2013-10-31">-375000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">-343604</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">-3345000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-01-31"/><value value-date="2015-01-31">-2782500</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-07-31"/><value value-date="2015-07-31">-3097500</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">-3112500</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-3127500</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-01-31"/><value value-date="2017-01-31">-3157500</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-07-31"/><value value-date="2017-07-31">-3180000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-3187500</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-3195000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-3157306</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-3117930</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-3057269</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-2996856</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-2957325</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-2917296</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-2870141</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-2822736</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-2762324</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-2670885</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-2654507</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-2624622</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2534927</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-2481267</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-2427608</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-2490000</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8534"><narrative>Secretaria de Estado da Fazenda - SERGIPE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129652"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P129652?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P129652"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in revenues collected from tax arrears as a share of the stock of tax arrears
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="0.52">

</target>
<actual value="0.39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase responsiveness to citizen complaints in the Citizen Service Centers (CEAC)
</narrative></title>
<baseline year="2011" iso-date="2011-10-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-31" />
<period-end iso-date="2013-12-31" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduce the time to produce agreed upon managerial reports through i-Gesp
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of municipalities receiving technical assistance from the State in the implementation of PNAIC
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative>(50% of all municipalities in the State of Sergipe)</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="38.00">
<comment><narrative>
50 percent of all municipalities in the State
</narrative></comment>
</target>
<actual value="73.00">
<comment><narrative>
Target achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of maternity hospitals implementing the protocol for classification of admissions by risk (Acolhimento com Classificao de Risco  ACCR)
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="3.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of trained small producer units included in the Ncleos de Produo de Leite and selling at least 90 percent oftheir production to private and public/institutional markets
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="30.00">

</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduce the cesarean section rate at the referral Maternity Hospital Nossa Senhora de Lourdes according to the guidelines in Portaria  No. 3477/1998
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="55.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="50.20">

</target>
<actual value="57.46">
<comment><narrative>
Not achieved. Several actions were undertaken to reduce the C-section rate at the Referral Maternity Nossa Senhora de Lourdes,including (i) linking pregnant women receiving antenatal care at the primary care level to a maternity in their health region; and(ii) training professionals in Good Obstetric Practices at all levels of care.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase the number of  seasonal workers benefitting from the program Mo Amiga included in the program Sergipe Alfabetizado
</narrative></title>
<baseline year="2012" iso-date="2012-02-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-02-29" />
<period-end iso-date="2013-12-31" />
<target value="565 of which 1/8 are women">

</target>
<actual value="241 of which 74 are women">
<comment><narrative>
Not achieved due to minimum class size and timeframe criteria required by the Federal government, which were not envisaged atProject design.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of school directors selected by merit and with signed management agreements
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="151.00">
<comment><narrative>
40 percent of 378 state schools
</narrative></comment>
</target>
<actual value="159.00">
<comment><narrative>
Target achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of women in situations of violence and vulnerability attended in the Rede de Atendimento  Mulher Vtima de Violncia
</narrative></title>
<baseline year="2012" iso-date="2012-03-31" value="3985.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-31" />
<period-end iso-date="2013-12-31" />
<target value="6973.00">

</target>
<actual value="7630.00">
<comment><narrative>
Target achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase responsiveness to citizen complaints in the Citizen Service Centers (CEAC)
</narrative></title>
<baseline year="2011" iso-date="2011-10-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-10-31" />
<period-end iso-date="2013-12-31" />
<target value="90.00">

</target>
<actual value="100.00">
<comment><narrative>
Target achieved
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduce the cesarean section rate at the referral Maternity Hospital Nossa Senhora de Lourdes according to the guidelines in Portaria  No. 3477/1998
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="55.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="50.20">

</target>
<actual value="57.46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase the number of  seasonal workers benefitting from the program Mo Amiga included in the program Sergipe Alfabetizado
</narrative></title>
<baseline year="2012" iso-date="2012-02-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-02-29" />
<period-end iso-date="2013-12-31" />
<target value="565 of which 1/8 are women">

</target>
<actual value="241 of which 74 are women">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduce the time to produce agreed upon managerial reports through i-Gesp
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative>Reports not available under the previous system (SAFIC)</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="4.00">
<comment><narrative>
Reports  produced automatically
</narrative></comment>
</target>
<actual value="4.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase # of small producers in the Program for Agroecological Production and linked to the Social Control Orgs. selling directly in agroecological fairs and to private and public/inst. markets
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="83 producers, 5 women"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="100 producers, 15 women">

</target>
<actual value="114 producers, 44 women">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of women in situations of violence and vulnerability attended in the Rede de Atendimento  Mulher Vtima de Violncia
</narrative></title>
<baseline year="2012" iso-date="2012-03-31" value="3985.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2012-03-31" />
<period-end iso-date="2013-12-31" />
<target value="6973.00">

</target>
<actual value="7630.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of maternity hospitals implementing the protocol for classification of admissions by risk (Acolhimento com Classificao de Risco  ACCR)
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="3.00">
<comment><narrative>
75 percent of maternity hospitals under state management that were operating under normal conditions in 2013
</narrative></comment>
</target>
<actual value="3.00">
<comment><narrative>
The protocol is implemented at the Referral Maternity Nossa Senhora de Lourdes (Aracaju), Maternity Jos Franco (Nossa Senhora doSocorro) and Maternity So Vicente de Paula (Propri).
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of families with monthly per capita income of less than R$70.00/month living in the poorest 15 municipalities included in the Cadnico
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="39582.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="41561.00">

</target>
<actual value="48396.00">
<comment><narrative>
Target achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of trained small producer units included in the Ncleos de Produo de Leite and selling at least 90 percent oftheir production to private and public/institutional markets
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="3.00"><comment><narrative>(38% of total production units)</narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="30.00">

</target>
<actual value="30.00">
<comment><narrative>
Target achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of municipalities receiving technical assistance from the State in the implementation of PNAIC
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="38.00">

</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in revenues collected from tax arrears as a share of the stock of tax arrears
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.43"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="0.52">

</target>
<actual value="0.39">
<comment><narrative>
Authorization of a fiscal amnesty program at the national level in 2013 weakened the ability of the State to recovery arrearsoutside the amnesty program.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase # of small producers in the Program for Agroecological Production and linked to the Social Control Orgs. selling directly in agroecological fairs and to private and public/inst. markets
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="83 producers, 5 women"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="100 producers, 15 women">

</target>
<actual value="114 producers, 44 women">
<comment><narrative>
Target achieved and surpassed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of families with monthly per capita income of less than R$70.00/month living in the poorest 15 municipalities included in the Cadnico
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="39582.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="41561.00">

</target>
<actual value="48396.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase the number of school directors selected by merit and with signed management agreements
</narrative></title>
<baseline year="2011" iso-date="2011-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2011-12-31" />
<period-end iso-date="2013-12-31" />
<target value="151.00">

</target>
<actual value="159.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P146981</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Piaui Productive and Social Inclusion DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective is to support the Government of Piaui in the implementation of its efforts to achieve higher rates of inclusive green growth by: (a) improving land tenure administration, (b) promoting sustainable agricultural practices, (c) inmprove water resource management and (d) ensuring environmental sustainability.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0015670"><narrative>State Government of Piaui</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0015670"><narrative>State Government of Piaui</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0015669"><narrative>Piaui State Secretariat of Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-12-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-08-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-08-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ana Luisa Gomes Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>alima1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15126" percentage="14" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="14" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="12250" percentage="14" xml:lang="en"/><sector vocabulary="1" code="11321" percentage="14" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="36" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="21" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="10" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="36" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="12" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="7" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="12" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="25" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="7" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="12" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="7" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="21" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="12" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="12" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="10" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="12" xml:lang="en"><narrative>Water Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">200000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1471798</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-1880389</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2136444</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2292667</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-3260889</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-3569722</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-3274446</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2483827</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1280058</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-842937</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-802199</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-795205</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-2530150</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-4189112</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4661200</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4662714</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4446678</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3613000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3463187</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2876833</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-5880000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15669"><narrative>Piaui State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146981"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P146981?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P146981"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P147157</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BRAZIL BAHIA SUSTAINABLE RURAL DEVELOPMENT PROJECT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase market integration, net revenues, and food security of organized beneficiaries; as well as to improve access to water supply and sanitation services of households in Project areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Bahia Sustainable Rural Development Project for Brazil objectives are: to increase market integration, net revenues, and food security of organized beneficiaries; as well as to improve access to water supply and sanitation services of households in Project areas. The project consists of three components, the first on being the productive inclusion and access to markets will increase productive inclusion and access to markets for family farmers and other disadvantaged populations in the borrower?s territory. The second component is household water and sanitation that will support the borrower?s efforts to improve sanitation conditions and access to water supply services in the area where a pre-established adequate management system is present. The third component the institutional development, technical assistance and project management component will support the provision of technical assistance for carrying out necessary research and capacity building activities for technical staff. It will also provide support for the design and implementation of dissemination activities of the Project?s processes and results.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0015905"><narrative>Government of the State of Bahia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0015906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-06-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eirivelthon Santos Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>elima@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450554" />
            <name><narrative> Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97111 -38.51083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450554" />
            <name><narrative>Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97111 -38.51083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31191" percentage="50" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="25" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FL" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Non-bank Financial Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FA" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Banking Institutions</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="14" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="14" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="14" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="14" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="35" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000323" percentage="14" xml:lang="en"><narrative>MSME Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000032" percentage="14" xml:lang="en"><narrative>Financial Infrastructure and Access</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="35" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="28" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="28" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">2000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">2666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">2666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">2333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">3333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">3333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">375000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">1934555</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">13100000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">4900000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">1300000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">2578988</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1170793</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">5855477</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">2991006</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">5153709</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">4000021</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">2000026</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">3187949</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">4707335</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">2838540</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">2422998</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">1324716</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">1282358</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">4896254</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">2061327</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">2692640</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">1155694</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">1339694</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">1033931</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">1505097</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1547682</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1633333</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">1440689</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">2042076</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">3297695</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">2075951</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">3000051</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2063194</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">2772508</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">3164378</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">3479649</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">4432815</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">2419522</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">5552799</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">2593217</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">2827165</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">2000006</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2000002</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">849160</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-375000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-1684</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-10-31"/><value value-date="2015-10-31">-20070</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-04-30"/><value value-date="2016-04-30">-29236</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-10-31"/><value value-date="2016-10-31">-130112</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">-192950</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">-368143</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">-449197</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">-794220</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-952265</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1325087</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1172876</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-931512</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-499077</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-565136</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-602156</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1900640</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-3480697</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-4094080</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-4324102</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-4199545</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-3526558</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-3389650</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2942015</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-947293</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1288436</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1468037</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1632482</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1838322</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-2090270</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-2745615</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-2803453</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-2803453</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-2803453</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2803453</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-2803453</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-3114196</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-3114196</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-3114196</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15906"><narrative>Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-15907"><narrative>Project Management Unit - PMU/CAR</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147157"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147157?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147157"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Market-oriented subproject beneficiaries who received training as a result of the Project
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target was exceeded at 148.2%.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured using information provided on&amp;nbsp;the SACC Capacitacao System, by the CAR Training Unit.&lt;/p&amp;gt;

&lt;p&amp;gt;Between 2016 and 2022, the Project provided 445 courses on 21 different topics to 14,819 beneficiaries, including: 180 courses on 10 different topics focused on market-oriented subprojects for 8,323 beneficiaries;&amp;nbsp;69 courses on 4 topics for 2,368 beneficiaries of socio-environmental subprojects;&amp;nbsp; and 196 courses with 4,128 participants covering cross-cutting topics for both implementation strategies. The courses were also attended by project staff and other stakeholders (see Table, Annex 7).&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; This indicator was added by the 1st Restructuring (2017) to capture how many beneficiaries of market-oriented subprojects would benefit from project training. The&amp;nbsp;indicator reflects the total number of subproject beneficiaries, market-oriented and socio-environmental, completed and under implementation/completion, trained by the Project.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14819.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the yearly volume of sales through contracts from beneficiary Producer Organizations (POs) and Community Associations (CAs).
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="15.00">
<comment><narrative>
&lt;p&amp;gt;Target was far exceeded at 1,320%&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured based on the annual Business Plan survey, applied to the beneficiaries by Rural Community Agents (ACR) and registered in the CARweb M&amp;amp;E system.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator measures the increase in the annual monetary volume of sales but lacks information on the total number of production units. Therefore, considering that the main component of income is sales and that only taxes have been deducted to calculate net revenues, the result of this indicato is similar to PDO Indicator #2 and the information available does not permit a complementary analysis.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets: The 1st Restructuring (May 2017) revised the target numbers to reflect the time required to implement investments and start generating revenues for the PO. The end target was changed from 20% to 15%.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="132.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct Project Beneficiaries - Component 2
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2021-02-02" />
<target value="95000.00">
<comment><narrative>
&lt;p&amp;gt;The three targets were exceeded: 107.8%&amp;nbsp; for the main indicator, 151.3% for female participation, and 204.5% for vulnerable populations.&lt;/p&amp;gt;

&lt;p&amp;gt;Direct beneficiaries of Component 2 were informed by CERB based on the number of new (24,742) and recovered (5297) piped HH water connections. Total connections were multiplied by the IBGE coefficient of 3.41 (average inhabitants of occupied HH in Bahia). The number of women among total direct beneficiaries was calculated using the QAD applied up to 2020, which reported2% women. This percentage was then applied to the total number of beneficiaries, resulting in 43,124 women. The same approach was applied to calculate the vulnerable beneficiary population, with 51.2% in this category as of 2020.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets: The original targets were set based on the number of HH benefiting from new water connections (17,000)&amp;nbsp;under Component 2, rather than the number of HH members.&amp;nbsp; The&amp;nbsp;1st Restructuring (May 2017) revised the target of 17,000 HH due to Comp 2 implementation delays which would affect the original projected number of beneficiaries.&amp;nbsp; &amp;nbsp;The&amp;nbsp;2nd Restructuring (Feb 2021) increased the target to 28,000 HH because the component was well on track for implementation, the cost of each connection was lower than originally estimated, and exchange rate gains had made more funds available. The unit of measurement was also changed from HH to HH members -&amp;nbsp;the number of HH was multiplied&amp;nbsp;by the IBGE coefficient of 3.41, previously presented.&amp;nbsp; This resulted in a target of 95,000 direct beneficiaries under Comp 2 (28,000 HH x 3.41 persons per HH). (The&amp;nbsp;same rationale was not followed fr Comp 1 which used the&amp;nbsp;number of HH not&amp;nbsp;HH members).&lt;/p&amp;gt;

&lt;p&amp;gt;For&amp;nbsp;the sub-indicators for women&amp;#39;s participation and vulnerable populations benefiting under Comp 2, the intention was to set targets of 30% and 20% respectively. In the 1st Restructuring (2017),&amp;nbsp;both sub-indicators were changed from percentages to numbers of people, maintaining the equivalent of 30% for female participation and increasing the number of vulnerable people from 20% to the equivalent of 28%.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="102433.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2021-02-02" />
<target value="7000.00">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 109.6% and Female participation far exceeded at 215.2%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were informed by the Value Chain Production Specialists to the M&amp;amp;E Unit.&lt;/p&amp;gt;

&lt;p&amp;gt;The improved agricultural technologies were measured in 154 rural organizations, out of a total 1,169 in the following value chains: Sheep/Goat, Cassava, Oilseeds and Fruit Farming. The impact evaluation provided information on producers&amp;#39; perceptions on the adoption of the improved agricultural technologies and the ease of&amp;nbsp;putting it into practice. More than 47% of respondents considered it easy or very easy, 6.8% considered it complicated and only 1% saw it as very complicated.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The original targets were for 550 (73%) of the 750 planned subprojects to adopt improved agricultural technologies and for 165 of the 225 women-led rural organizations.&amp;nbsp; The&amp;nbsp;1st Restructuring revised targets to account for the results of the first CEI and the fact that an improved agricultural technology can be promoted by CAR but has to be requested by the potential beneficiary.&amp;nbsp; Targets were changed from 550 to 400 for the main indicator and from 165 to 120 for the gender sub-indicator.&amp;nbsp; In the 2nd Restructuring (Feb 2021), the intention was to increase the targetso better reflect the large number of approved subprojects.&amp;nbsp; However, the definition of &amp;quot;clients who adopted an improved technology&amp;quot; was changed by replacing rural organization (PO and CA) with individuals, thus increasing the&amp;nbsp;target number to 7,000 persons.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7652.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Basic WSS investments implemented and sustainably operated
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="125.00">
<comment><narrative>
&lt;p&amp;gt;Target exceeded at 140%.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured by CERB, which provided monthly information to CAR&amp;#39;s M&amp;amp;E Unit. The indicator provides information on completed investments of sustainably implemented and operated basic WSS systems with (a) voluntary adherence to a management plan; and (b) timely payments to management units for the service.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The PAD estimated an average of 100 HH per each WSS system. Therefore, a target of 170 WSS systems was set to reach the initially estimated 17,000 HH. During the 1st Restructuring (2017) the target was revised to reflect delays in the implementation of Comp 2 that would affect the final number.&amp;nbsp; The end target was changed from 170 to 125. However, the 2nd Restructuring (2021) did not adjust the target&amp;nbsp;when the number of water connections was increased to 23,000.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="175.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct jobs generated as a result of the Project's interventions and investments - Component 1
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target far exceeded at 509%.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured based on information provided by the SACC system, which includes all staff hired to implement the investments.&amp;nbsp; This indicator was included by the 1st Restructuring to capture the number of jobs generated by the project, by Component.&amp;nbsp; It refers to jobs generated directly by the Rural Organizations and counting the number of rural community agents (ACR), construction inspectors, project designers, business and investment plan consultants, rural extension technical agents and management support technical assistants hired directly by organizations under Component 1.&lt;/p&amp;gt;

&lt;p&amp;gt;Although most of these jobs were temporary, such as business plan consultants and construction inspectors, others such as the ACRs, the main contractors of the POs, were more permanent.&amp;nbsp; At the end of ACRs&amp;#39; contracts, a survey was conducted to understand to what extent the employment opportunities provided by the Project had been positive. Of the 281 respondents, 33% were working at the time of the survey, and 81% of them (the 281) continue to work in areas related to their ACR work, while a similar percentage inten to continue working in a similar area, even if some are not currently working.&amp;nbsp; In addition, for 99% of the ACRs consulted, their experience as an ACR helped/will help them find another&amp;nbsp;job and contributed to their professional development.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New piped household water connections that are resulting from the project intervention
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2021-02-02" />
<target value="23000.00">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 107.6% and Female participation far exceeded at 473.3%.&lt;/p&amp;gt;

&lt;p&amp;gt;The main indicator was measured by CERB, which provided monthly information to CAR&amp;#39;s M&amp;amp;E unit.&amp;nbsp; The indicator provides information on new, piped, household watr connections where construction work has been completed and the connections are operational.&amp;nbsp; Female participation was measured by the Territorial Approach Questionnaire (QAD), applied by the CERB Social Unit in all the locations served.&amp;nbsp; Details on the achievements can be seen in the Efficacy section IIB.&amp;nbsp; At project closing, the civil works for 26, 390 household water connections had been completed, but 1,648 were not yet operational.&amp;nbsp; The figure of 71% refers to the percentage of female-led households surveyed by QAD in the early years of the Project up to March 2020, after which this percentage was projected for subsequent years.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The target of 350 new piped households in the original Results Framework was incorrect. According to the PAD narrative, it should have been 17,000. Due to delayed implementation of Component 2, the target was adjusted to 8,000 households under the 1st Restructuring (2017).&amp;nbsp; In the 2nd Restructuring (2021), the target was increased again to 23,000 households because the Component was well on track for implementation, the cost per connection was lower than originally estimated, and exchange rate gains had made more funds available. The final target for Female participation was changed from 30% to 15%, based on the actual number of female-led households at the time of the 1st Restructuring (2017).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="24742.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans &amp; investment plans implemented by POs and CAs
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="400.00">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 175%&amp;nbsp;and Female led POs and CAs far exceeded at 199.2%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured based on the information registered in CARweb, the M&amp;amp;E system at closing.&lt;/p&amp;gt;

&lt;p&amp;gt;Some 469 subprojects are at various stages of completion as at ICR&amp;nbsp;finalization. If the total of 1,169 fully and&amp;nbsp;partly&amp;nbsp;implemented subprojects is applied, and the percentage is estimated for&amp;nbsp;434 women-led POs and CAs within the 1,169, the indicator results would be 292.3% and 193%, respectively.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The 1st Restructuring (May 2017) reduced final targets from 750 to 400 for the main indicator and from 225 to 120 for the gender sub-indicator due to delays in implementing the BPs and investment plans in the project&amp;#39;s early years, which was not going to&amp;nbsp;permit completions as originally planned. These indicators should have been revised upward by the 2nd Restructuring (Feb 2021) when a 22-month extension was approved and some 1,250 subprojects were being implemented (final number&amp;nbsp;1,169).&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="700.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefitting from capacity building on management of water supply and sanitation systems
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="250.00">
<comment><narrative>
&lt;p&amp;gt;Main target far exceeded at 12,867% and Female participation similarly exceeded at 11,666%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured by CERB, which provided monthly data to CAR&amp;#39;s M&amp;amp;E Unit. The main source of data was the attendance lists of training activities/events.&lt;/p&amp;gt;

&lt;p&amp;gt;The Project carried out a remarkable social work effort in the communities served by the 3 Centrais (Jacobina, Seabra, Caetite), contributing to the gradual acceptance of the Central model by the communities. During implementation, the need to sensitize and raise awareness in the beneficiary communities about the importance of charging for water use was recognized to ensure sustainability of the model.&amp;nbsp; For this reason, it was decided to train as many beneficiaries as possible, in addition to operators of the systems.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The 1st Restructuring adjusted the targets in line with delays in implementation of Comp 2. End target changed from 340 to 250. Regarding the gender sub-indicator, the narrative explained that the target was reduced to from 30% to 15% of women, however the target continued to reflect 30% of the total number of people. End target changed from 102 to 75 (30% of 250).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="32169.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct jobs generated as a result of the Project's interventions and investments - Component 2
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded at 140%.&lt;/p&amp;gt;

&lt;p&amp;gt;Indicator was measured by CERB, which provided monthly information to the CAR M&amp;amp;E Unit.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1400.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the real net revenue of beneficiary Rural Producer Organizations (RPOs)
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target was far exceeded at 1,290% and Female participation also far exceeded at 1,710%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured based on the BP annual survey applied to the beneficiaries by Rural Community Agents (ACR) and registered in the CARweb M&amp;amp;E system.&amp;nbsp; Achievements are detailed in the Efficacy section.&amp;nbsp; The figures for the final ISR were updated based on an actualized analysis at project completion which provided results only for (a) those subprojects which were completed by project closing, and (b) were implemented by POs under the Market-Oriented subproject strategy, as specified in the indicator definition.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets: Female participation target numbers were not included&amp;nbsp;in the approved PAD and were included in the 1st Resructuring (2017).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="129.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People trained to improve hygiene behavior/sanitation practices under the proj
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="10000.00">
<comment><narrative>
&lt;p&amp;gt;Main target far exceeded at 374.3% and sub-indicator of Female participation also far exceeded at 375%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured by CERB which provided monthly information to CAR&amp;#39;s M&amp;amp;E Unit. The indicators provide information on trainingctivities to improve hygiene behavior or sanitation practices among beneficiaries and were measured through the attendance lists of training activities. The training activities were conducted in 100% of the communities benefiting from the WSS systems.&amp;nbsp;The tagets were far exceeded due to the use of virtual training during the COVID-19 pandemic, which allowed the project to reach a higher number of participants than planned.&amp;nbsp; CERB conducted a Healthy Habits Monitoring Survey in the catchment areas of the Seabra ad Jacobina Centrais, which showed the adoption and maintenance of healthy habits over time, before and after the training and the receipt of project benefits. Results showed positive changes in families&amp;#39; habits of washing hands before meals, after using the toilet, personal cleanliness, rational use of water, and use of the toilet and its components.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="37425.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to &quot;improved sanitation facilities under the proj.
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2021-02-02" />
<target value="8000.00">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 108.4% and Female participation far exceeded at 473.3%.&lt;/p&amp;gt;

&lt;p&amp;gt;The main indicator was measured by CERB, which provided monthly information to CAR&amp;#39;s M&amp;amp;E Unit.&amp;nbsp; &amp;nbsp;Female participation was collected through the Territoria Approach Questionnaire (QAD) applied in all the localities served by the CERB Social Unit. The figure&amp;nbsp;of 71% refers to the percentage of female-led households surveyed by QAD in the early years of the project up to March 2020 after which this percentage was projected for subsequent years. The 8,675 beneficiaries represent the 2,544 households that received improved sanitation facilities of which 1,806 (71%) were female-led households.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The original target of 17,000 was based on the number of new piped water connections to households. Despite the reference to &amp;quot;people&amp;quot; in the definition, it can be iferred that the unit of measure for this indicator was households.&amp;nbsp; In the 1st Restructuring (2017), the target was adjusted to 8,000 people to account for the reduction in new water connections defined in the previous indicator.&amp;nbsp; In the 2nd Restructuring, the target was not adjusted to the number of new household connections, as a diagnosis conducted in the project intervention areas revealed that the need for new sanitation facilities was much lower than initially estimated. Although it seems clear that the indicator referred to the number of households, it was measured in terms of people receiving sanitation facilities as defined. Even so, the demand for improved sanitation facilities was fully met.&lt;/p&amp;gt;

&lt;p&amp;gt;The final target for female participation was changed from 30% to 15%, based on the actual number of female-led households at the time of the 1st Restructuring. The original unit of measurement was people, which changed to percentage of people in the 2nd Restructuring (2021).&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="8675.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water connections recovered.
</narrative></title>
<baseline year="2015" iso-date="2015-01-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-01-02" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 106% and Female participation was far exceeded at 473.3%&lt;/p&amp;gt;

&lt;p&amp;gt;The main indicator was measured by CERB which sent the information monthly to CAR&amp;#39;s M&amp;amp;E Unit. The indicator provides information on household water connections recvered, where construction work has been completed and the service is operational. Female participation was measured by the QAD which was applied by the CERB Social Unit in all the localities served.&amp;nbsp; Achievements are detailed in the Efficacy section IIB.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; This indicator was added by the 2nd Restructuring (2021) to reflect the additonal investments included in the Project for rehabilitation of existing water supply systems.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5297.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the total number of formal contracts integrating beneficiary  Producer Organizations (POs) into  markets
</narrative></title>
<baseline year="2014" iso-date="2014-04-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-24" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 117.3%; and Female participation exceeded at 400.8%.&lt;/p&amp;gt;

&lt;p&amp;gt;Achievements are detailed in Section IIB Efficacy. These indicators were measured based on the Business Plan annual monitoring survey, applied to the beneficiaries by Rural Community Agents (ACRs) and registered in the CARweb M&amp;amp;E system.&amp;nbsp; The figures for the final ISR were updated based on an actualized analysis at project completion which provided results only for (a) those subprojects which were completed by project closing; and (b) were implemented by POs under the Market-Oriented subproject strategy, as specified in the indicator definition.&lt;/p&amp;gt;

&lt;p&amp;gt;Noe on revised targets:&amp;nbsp; Female participation target was reduced from 30% to&amp;nbsp;20% under the first restructuring (2017) to reflect the actual percentage of female-led Producer Organizations in the field, verified after the 1st Call for Expressions of Interest (CEI).&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="704.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries - Component 1
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2021-02-02" />
<target value="34250.00">
<comment><narrative>
&lt;p&amp;gt;Main target was partially achieved at 52.0%;&amp;nbsp;Female participation and share of Vulnerable People were exceeded at 111.7% and 100.4% respectively.&lt;/p&amp;gt;

&lt;p&amp;gt;It is important to note that the&amp;nbsp;indicator was&amp;nbsp;calculated based on the&amp;nbsp;subprojects completed.&amp;nbsp; If incomplete subprojects were also considered, for a total of 1,169 subprojects, the results would be as follows:&amp;nbsp; Main indicator exceeded at 113.2% with 38,783 beneficiaries (88% of the 39,000 target - See note on revised targets below); Female participation far exceeded at 232.3% with 23, 865 women, and Vulnerable Populations far exceeded at 218.6% with 21,718 people receiving Bolsa Familia benefits within this cohort.&lt;/p&amp;gt;

&lt;p&amp;gt;The direct beneficiaries of Component 1 were reported based on the number of households declared by rural organizations (PO and CA) in the awarded CEI.&amp;nbsp; Female participation is based on the number of households headed by women that were informed when the contracts were signed with the rural organizations. The vulnerable population was calculated based on the households headed by people registered in the Unified Registry for Social Programs (Cadastro Unico para Programas Sociais or CadUnico) which seeks to identify all low-income families in the country to include them in social assistance programs such as &amp;quot;Bolsa Familia&amp;quot;.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets: (a) The&amp;nbsp;target for this indicator refers to direct beneficiaries, and&amp;nbsp;was set based on the number of households (HH) benefiting from the project, not household members. The 1st Restructuring revised the overall target of 56,000 beneficiaries (39,000 Comp 1 and 17,000 Comp 2) because of implementation delays in Component 2 water investments affecting the number of beneficiaries. End target for total beneficiaries was changed from 56,000 to0,000, but there was an error of calculation. Beneficiary HH under Comp 2 changed from 17,000 to 8,000 so total beneficiaries should have been reduced to 47,000 (39,000 Comp 1, 8,000 Comp 2).&amp;nbsp;(b) The intention was to set targets of 20% and 30% respectively for women and vulnerable populations (VP).&amp;nbsp;Also, the sub-indicator for VP changed the unit of measurement from percentage to number and increased the target to 11,200 or about 28%. (c) The 2nd Restructuring split the indicator by Component and revised the target numbers. Target for Comp 1 continued to&amp;nbsp;be HH but was changed to persons for Comp 2. The change&amp;nbsp;in the target number from 39,000 to 34,250 HH in Comp 1 is unexplained.&amp;nbsp;The Restructuring Paper mentioned 1,250 subprojects for Comp 1 under implementation instead of the 400 originally planned. However, the target target was not&amp;nbsp;increased&amp;nbsp;to match the increase in the number of subprojects. The&amp;nbsp;Project achieved 88% of the original 39,000 target for Comp 1.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="17818.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average vulnerable beneficiary household dietary diversity indicator
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target was partially achieved at 46.7% and Female participation partially achieved at 47.7%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured based on a BP survey (Business Plan) applied by Rural Community Agents (ACR) only for the beneficiaries of CEI No. 1, Socio-Environmental, launched in 2015, CEI No. 11 Quilombola communities, and CEI No. 12 Indigenous communities., both launched in 2018. This indicator was calculated on the basis of IBGE composite indicator of minimum caloric intake requirements per family, as follows:&amp;nbsp; The sum of the total intake of food groups per household, where the food groups are: 1. Grains, 2. Roots and Tubers, 3. Vegetables, 4.&amp;nbsp;Fruits, 5. Meat, Poultry, offal, 6. Eggs, 7. Fish and Seafood, 8. Pulses, Legumes, Nuts, 9. Milk and Milk Products, 10. Oils, Fats, 11. Sugar or Honey, 12. Miscellaneous (coffee, tea). The value of this variable would range from 0 to 12 for each household, and the average of the beneficiary household indicator was estimated for annual values. Achievements are detailed in the Efficacy section.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Producer Organizations (POs) and Community Associations (CAs) implementing financial management instruments in subprojects
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2017-05-25" />
<target value="400.00">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 136.3% and Female participation exceeded at 179.2%.&lt;/p&amp;gt;

&lt;p&amp;gt;Indicators were measured based on the Business Plan annual survey applied by the ACRs and registered in CARweb, the M&amp;amp;E system.&amp;nbsp; Out of 590 completed subprojects, 92.4% (545) used financial management tools in their subprojects, of which 215 (39%) were led by women. The database also provides information on the types of financial management tools used by organizations: 68% used basic accounting controls; 13% profit and loss statement; 8% used balance sheets; and 5% used sales forecasts. Most organizations used just basic accounting tools and there is much room for improvement to strengthen organizations in this area.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets: In the PAD, these indicators had the same targets as indicators related to business and investment plans implemented (750), since it was expected that all POs&amp;nbsp;benefiting from a subproject would implement financial management tools. Thus, the&amp;nbsp;1st Restructuring (May 2017) revised&amp;nbsp;targets&amp;nbsp;in the same way. Target for main indicator was reduced from 750 to 400 rural organizations, and for the gender indicator from 225 to 120. The target was exceeded because the Project significantly increased the number of subprojects but the targets were not&amp;nbsp;updated.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="545.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Targeted clients satisfied with agricultural services (percentage)
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target exceeded at 120.3%, male beneficiaries at 116.1%, and female beneficiaries at 121.2%.&lt;/p&amp;gt;

&lt;p&amp;gt;These indicators were measured based on the technical assistance beneficiary satisfaction questionnaires applied by the Business Plan Coordination of Technical Assistance and Rural Extension (ATER).&lt;/p&amp;gt;

&lt;p&amp;gt;The questionnaires were applied annually to a sample of beneficiary organizations (135) to assess the quality of services and serve as a basis for their improvement, in addition to renewing the services of the companies providing TA services.&amp;nbsp; The service is considered satisfactory when the&amp;nbsp; beneficiary gives a score greater than or equal to 7 on a scale of 1 to 10.&amp;nbsp; ATER services played a key role in Component 1. Main objective was to improve sustainable production and manufacturing practices, promote new practices, and introduce technologies that would increase productivity and economic results, reduce agricultural risks, improve organization and planning to transform&amp;nbsp;the family production unit into a sustainable business, ensure quality production, regularity of supply, and scale, and generate an economic and social return for the supported families. See Appendix to Annex 7 on the Project&amp;#39;s ATER services.&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; The 1st Restructuring (2017)&amp;nbsp;dropped the original indicator and created a new indicator to correctly measure percentages rather than total numbers of target clients.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="96.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of government staff and strategic partners trained in accordance with the Project Capacity Building Plan
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Main target was Substantially achieved at 91.6% and Female participation was exceeded at 132.1%.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured based on the information provided by FLEM (Fundacao Luis Eduardo Magalhaes),&amp;nbsp;a Cooperation Institution with international technical expertise, contracted to expand and strengthen CAR&amp;#39;s technical and operational capacity. The Project reported that it covered all the training demand from government staff and strategic partners, so the target number was likely over-estimated.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="496.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct jobs generated as a result of the Project's interventions and investments - Component 3
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Target exceeded at 109%.&lt;/p&amp;gt;

&lt;p&amp;gt;This indicator was measured based on the information provided by FLEM (see previous indicator).&lt;/p&amp;gt;

&lt;p&amp;gt;Note on revised targets:&amp;nbsp; This indicator was included by the 1st Restructuring (2017) to capture the number of jobs generated by the Project under Comp 3.&amp;nbsp; The 240 direct jobs comprise 127 PMU technical staff, 102 Rural Extension Technical Agents hired by the ATER provider, and 11 Consultants.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="240.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P147158</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Paraiba Sustainable Rural Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to improve access to water, reduce agro-climatic vulnerability and increase access to markets of Paraiba's rural inhabitants.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Paraiba Sustainable Rural Development Project for Brazil is to improve access to water, reduce agro-climatic vulnerability and increase access to markets of Paraiba's rural inhabitants. The project has four components. (1) Institutional strengthening component will Carry out a communication campaign and strengthen the institutional capacity of Community Associations and Producer Organizations. (2) Water Access and Agro-Climatic Vulnerability Reduction component will provide provision of support for: (i) identifying water supply investments, including,inter alia, construction and rehabilitation of piped and non-piped water systems, desalinization facilities and household rainwater harvesting systems, and Agro-Climatic Vulnerability Reduction Subprojects; (ii) carrying out pre-investment studies for water supply investments identified under sub-paragraph (a) (i) herein, and for Agro-Climatic Vulnerability Reduction Subprojects; and (iii) carrying out the water supply investments mentioned under (i) herein. (3) Productive alliances component will provide support for: (i) identifying and implementing productive alliances; and (ii) carrying out pre-investment studies for productive alliances, including theformulation of business plans associated to productive alliance subprojects. (4) Project management, monitoring and evaluation component will support coordination and management; monitoring, results evaluation and impact assessment of project activities; project fiduciary administration, internal controls and audits; safeguards management; (e) independent financial and technical evaluations of productive alliances business plans; a citizen's engagement mechanism; and project-related studies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0015909"><narrative>State Government of Paraiba</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0015908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-05-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-10-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-06-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-06-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Leonardo Bichara Rocha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lbichararocha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="31191" percentage="32" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="30" xml:lang="en"/><sector vocabulary="1" code="14031" percentage="28" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="19.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="43" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="43" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="4" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="42" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="42" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">916666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">166666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">3000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">583333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2026-06-15"/>
<value currency="USD" value-date="2026-06-15">1277.98</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2026-06-15"/>
<value currency="USD" value-date="2026-06-15">1277.98</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">125000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">1301202</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">766648</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">216718</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">480978</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">398852</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">748717</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">609470</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">751743</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">702983</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">1343775</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">554883</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">6698052</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">1244721</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">2907480</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">1942375</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">4390703</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">1969481</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">3023553</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">2869072</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">2288315</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">3180835</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">2927226</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">2558892</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">3051390</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">2789472</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">142540</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">13646</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-82895</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-79150</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-76440</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-70555</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-75327</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-81930</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-171546</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-559469</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-814206</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-960247</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1122466</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1051119</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1159526</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1011107</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-754049</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1018138</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1235335</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1614724</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1875864</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2103164</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2179489</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-15908"><narrative>Projeto COOPERAR (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147158"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147158?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147158"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="5000">
<comment><narrative>
This corresponding to 21% of the end target.
Number of families: 285.
</narrative></comment>
</target>
<actual value="1055">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to improved water sources under the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="38,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="90,300.00">
<comment><narrative>
- ADS - 22 subproject - 554 families - 2,050 number of people.
- ADC - 17 subproject - 1,215 families - 4,496 number of people
- Cisterns - 588 subprojects - 11,760 families - 43,512 number of people
- Dessalinizators - 41 subprojects - 1594 families - 5,898 number of people. 
- Total = 668 subprojects, 15,123 families and 55955 number of people. 

This corresponds to 107% of end target.
</narrative></comment>
</target>
<actual value="93955">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers benefited with productive alliance subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="650">
<comment><narrative>
This corresponds to 121% of the final target. The justification for exceeding the target is that 1 of the cooperatives has more than 700 beneficiaries.
</narrative></comment>
</target>
<actual value="784">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of potential buyers/investors identified by the state business promotion agency (CINEP)
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="60.00">
<comment><narrative>
This corresponds to 106% of the final target. The cooperatives benefiting from Business Plans signed a commercial agreement with the Paraiba Supermarket Association, which has 64 members, all potential buyers.
</narrative></comment>
</target>
<actual value="64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of productive alliance subprojects implemented, by type
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="26">
<comment><narrative>
This corresponds to 35% of end target.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agro-Climatic Risk Information System in operation
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
SEIRA began its outreach to specific audiences. 400 number of people have been trained on specifics end techmatic events.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefited by water access investments and vulnerability reduction subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-06" />
<target value="39100">
<comment><narrative>
This corresponds to 104% of end target.
</narrative></comment>
</target>
<actual value="40771">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water access investments and vulnerability reduction subprojects implemented, by type
</narrative></title>
<baseline year="2019" iso-date="2019-04-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-13" />
<period-end iso-date="2026-06-06" />
<target value="1100">
<comment><narrative>
This corresponds to 87% of end target.
</narrative></comment>
</target>
<actual value="954">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with  Improved Rural Access (culvert)  (Number)
</narrative></title>
<baseline year="2023" iso-date="2023-09-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-13" />
<period-end iso-date="2026-06-13" />
<target value="23600">
<comment><narrative>
This corresponds to 107% of end target. 
246 culvert
</narrative></comment>
</target>
<actual value="25363">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-11" />
<target value="100.00">
<comment><narrative>
This corresponds to 100% of end target
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="7400">
<comment><narrative>
Beneficiaries from social technologies (Component 2) and farmers trained in climate-resilient practices of component 3. This corresponds to 205% of end target.
</narrative></comment>
</target>
<actual value="1,5192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investments and subprojects with established institutional arrangements for operations and maintenance (percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-05" />
<target value="70.00">
<comment><narrative>
All ADCs, ADSs, and desalination plants have signed management agreements, and the project is supporting implementation in these first months of operation.

The 25 cooperatives received management support to implement the Business Plans.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="3,8000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="9,0600">
<comment><narrative>
Beneficiaries of water access. 
This corrrespods to 106% of end target.
</narrative></comment>
</target>
<actual value="9,3955">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of producer organizations in operation 12 months after the project investment
</narrative></title>
<baseline year="2021" iso-date="2021-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-14" />
<period-end iso-date="2026-06-14" />
<target value="70.00">
<comment><narrative>
This corresponds to 35% of the final target.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agro-Climatic Risk Information System designed
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-06" />
<target value="Yes">
<comment><narrative>
This corresponds to 100% of end target.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="160,388.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-11" />
<target value="307700">
<comment><narrative>
This corresponds to 104% of end target.
</narrative></comment>
</target>
<actual value="314142">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="7400">
<comment><narrative>
Beneficiaries from social technologies (Component 2) and farmers trained in climate-resilient practices of component 3. This corresponds to 107% of end target.
</narrative></comment>
</target>
<actual value="3,955">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="8,7000">
<comment><narrative>
Number of people beneficiaries from culvert. This corrrespods to 108% of end target.
</narrative></comment>
</target>
<actual value="9,3843">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in the average gross value of sales of producers organized under productive alliances
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
This indicator will be measured at the end of the implementation of the productive subprojects, ideally after a period of investment maturation
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State management model for rural sanitation designed, tested and implemented
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-05" />
<target value="Yes">
<comment><narrative>
A management model, developed by COOPERAR and the State on April 2021, was presented to the Bank as part of a Project restructuring. The model, which shifted the main responsibility on rural water from SEIRH to SEAFDS was implemented and closely monitored in the water systems financed by the Project -with the exception of household cisterns- in all regions of Paraiba. On 2024 the State decided to transfer the responsibility on rural water back to SEIRH and on June 2025 it was formally created the ‘Gerencia Executiva de Saneamento Rural’ (GESR) within SEIRH. Another key development has been the involvement of the State Water Utility (CAGEPA) which is providing technical assistance to the Community Assotiations that have signed Shared Management Agreements with COOPERAR. The management model experience is being documented as a key input for GESR which is tasked with the provision of operational and management support to water supply and sanitation systems in rural communities.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of producers benefited with productive alliance subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="650">
<comment><narrative>
This corresponds to 356% of the final target. The justification for exceeding the target is that 1 of the cooperatives has more than 700 beneficiaries.
</narrative></comment>
</target>
<actual value="2313">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of producer organizations in operation 12 months after the project investment
</narrative></title>
<baseline year="2021" iso-date="2021-09-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-14" />
<period-end iso-date="2026-06-14" />
<target value="70.00">
<comment><narrative>
This value is under revision.
</narrative></comment>
</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of potential buyers/investors identified by the state business promotion agency (CINEP)
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="60.00">
<comment><narrative>
This corresponds to 106% of the final target. The cooperatives benefiting from Business Plans signed a commercial agreement with the Paraiba Supermarket Association, which has 64 members, all potential buyers.
</narrative></comment>
</target>
<actual value="263">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of direct project beneficiaries
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="160,388.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-11" />
<target value="307700">
<comment><narrative>
This corresponds to 113% of end target.
</narrative></comment>
</target>
<actual value="326870">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agro-Climatic Risk Information System designed
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-06" />
<target value="Yes">
<comment><narrative>
This corresponds to 100% of end target.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of productive alliance subprojects implemented, by type
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-10" />
<target value="26">
<comment><narrative>
This corresponds to 96% of end target.
</narrative></comment>
</target>
<actual value="25">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of grievances registered related to delivery of project benefits that are addressed
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-11" />
<target value="100.00">
<comment><narrative>
This corresponds to 100% of end target
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefited by water access investments and vulnerability reduction subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-06" />
<target value="39100">
<comment><narrative>
This corresponds to 109% of end target.
</narrative></comment>
</target>
<actual value="42681">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
State management model for rural sanitation designed, tested and implemented
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-05" />
<target value="Yes">
<comment><narrative>
A management model, developed by COOPERAR and the State on April 2021, was presented to the Bank as part of a Project restructuring. The model, which shifted the main responsibility on rural water from SEIRH to SEAFDS was implemented and closely monitored in the water systems financed by the Project -with the exception of household cisterns- in all regions of Paraiba. On 2024 the State decided to transfer the responsibility on rural water back to SEIRH and on June 2025 it was formally created the ‘Gerencia Executiva de Saneamento Rural’ (GESR) within SEIRH. Another key development has been the involvement of the State Water Utility (CAGEPA) which is providing technical assistance to the Community Assotiations that have signed Shared Management Agreements with COOPERAR. The management model experience is being documented as a key input for GESR which is tasked with the provision of operational and management support to water supply and sanitation systems in rural communities.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water access investments and vulnerability reduction subprojects implemented, by type
</narrative></title>
<baseline year="2019" iso-date="2019-04-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-13" />
<period-end iso-date="2026-06-06" />
<target value="1100">
<comment><narrative>
This corresponds to 103% of end target.
</narrative></comment>
</target>
<actual value="1134">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investments and subprojects with established institutional arrangements for operations and maintenance (percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-29" />
<period-end iso-date="2026-06-05" />
<target value="70.00">
<comment><narrative>
All ADCs, ADSs, and desalination plants have signed management agreements, and the project is supporting implementation in these first months of operation.

The 25 cooperatives received management support to implement the Business Plans.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="8,7000">
<comment><narrative>
Number of people beneficiaries from culvert. This corrrespods to 107% of end target.
</narrative></comment>
</target>
<actual value="9,3003">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with at least basic water
</narrative></title>
<baseline year="2019" iso-date="2019-04-08" value="3,8000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-08" />
<period-end iso-date="2026-06-06" />
<target value="9,0600">
<comment><narrative>
Beneficiaries of water access. 
This corrrespods to 111% of end target.
</narrative></comment>
</target>
<actual value="9,6282">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with  Improved Rural Access (culvert)  (Number)
</narrative></title>
<baseline year="2023" iso-date="2023-09-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-13" />
<period-end iso-date="2026-06-13" />
<target value="23600">
<comment><narrative>
There is a slight reduction in the number of beneficiaries due to a review of the beneficiary count resulting from the registration of beneficiaries in SIGMA, which identified some overlaps.The end reach corresponds to 107% of end target.
</narrative></comment>
</target>
<actual value="25136">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with  Improved Rural Access (culvert)  (Number)
</narrative></title>
<baseline year="2023" iso-date="2023-09-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-13" />
<period-end iso-date="2026-06-13" />
<target value="23600">
<comment><narrative>
This corresponds to 107% of end target. 
246 culvert
</narrative></comment>
</target>
<actual value="25363">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agro-Climatic Risk Information System in operation
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
SEIRA began its outreach to specific audiences. 400 number of people have been trained on specifics end techmatic events.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Agro-Climatic Risk Information System in operation
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="Yes">
<comment><narrative>
SEIRA began its outreach to specific audiences. 400 number of people have been trained on specifics end techmatic events.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in the average gross value of sales of producers organized under productive alliances
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
The achieved reach corresponds to the median sales of the cooperatives, calculated by EFA. The project will revise the indicator to try to present the increase in sales at the family level.
</narrative></comment>
</target>
<actual value="51">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in the average gross value of sales of producers organized under productive alliances
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="20.00">
<comment><narrative>
This indicator will be measured at the end of the implementation of the productive subprojects, ideally after a period of investment maturation
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="5000">
<comment><narrative>
This corresponding to 132%.
</narrative></comment>
</target>
<actual value="6,634">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Clients who have adopted an improved agr. technology promoted by the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="5000">
<comment><narrative>
This corresponding to 21% of the end target.
Number of families: 285.
</narrative></comment>
</target>
<actual value="1055">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to improved water sources under the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="38,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="90,300.00">
<comment><narrative>
- ADS - 22 subproject - 696 families 
- ADC - 17 subproject - 1,637 fmilies 
- Cisterns - 588 subprojects - 11,825 families 
- Dessalinizators - 41 subprojects - 1,595 families 

Total: 15,752 families -111% of end target
</narrative></comment>
</target>
<actual value="96282">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in rural areas provided with access to improved water sources under the project
</narrative></title>
<baseline year="2019" iso-date="2019-04-07" value="38,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-04-07" />
<period-end iso-date="2026-06-13" />
<target value="90,300.00">
<comment><narrative>
- ADS - 22 subproject - 554 families - 2,050 number of people.
- ADC - 17 subproject - 1,215 families - 4,496 number of people
- Cisterns - 588 subprojects - 11,760 families - 43,512 number of people
- Dessalinizators - 41 subprojects - 1594 families - 5,898 number of people. 
- Total = 668 subprojects, 15,123 families and 55955 number of people. 

This corresponds to 107% of end target.
</narrative></comment>
</target>
<actual value="93955">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P147272</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BAHIA ROAD REHABILITATION AND MAINTENANCE PROJECT - 2ND PHASE</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The Project Development Objective is to enhance, in a sustainable fashion, road accessibility and safety in selected regions of the State of Bahia territory. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Phase of the Bahia Road Rehabilitation and Maintenance Project for Brazil is to enhance, in a sustainable fashion, road accessibility and safety in selected regions of the state of Bahia's territory. The project comprises of five components. The first component, institutional strengthening supports the sustainability strand of the project development objective (PDO). It includes five sub-components: (i) new options for road financing; (ii) road asset management; (iii) road administration efficiency; (iv) logistics planning; and (v) transport investment impact assessment. The second component, performance-based state highway rehabilitation and maintenance supports the sustainability and road safety dimensions of the PDO. It includes two sub-components: (i) rehabilitation and maintenance work through performance-based contracts for rehabilitation and road maintenance (CREMA) on about 1,685 kilometers (km) of identified sections of Bahia's paved highways, including road rehabilitation and maintenance; and (ii) rehabilitation and maintenance works through CREMA- public-private partnership (PPP) or CREMA contracts on about 685 km of identified sections of the Borrower's paved highways, including, road rehabilitation and maintenance. The third component, feeder road improvement supports the accessibility dimension of the PDO. It will provide support to improve road accessibility in Bahia through the carrying out of works to eliminate about 900 critical spots on selected municipal rural roads in 62 selected municipalities (the municipal road subprojects), including, among other things: (i) improving the drainage of the platform, including the replacement of existing unsafe wood bridges with concrete standardized bridges; (ii) constructing and or reconstructing culverts and longitudinal drainage; and (iii) constructing fords and eliminating quagmires. The fourth component, road safety supports the road safety dimension of the PDO, through institutional strengthening and road safety corridors. It includes two sub-components: (i) institutional strengthening; and (ii) road safety corridors. The fifth component, project management will finance the project coordination unit consulting and operating costs for project monitoring, supervision, and evaluation, including audits.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0016057"><narrative>State of Bahia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0016058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-12-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2016-01-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carlos Bellas Lamas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cbellas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392734" />
            <name><narrative>Paulo Afonso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.40611 -38.21472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402842" />
            <name><narrative>Carnaiba do Sertao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.59056 -40.42667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449719" />
            <name><narrative>Santo Amaro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.63333 -41.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450202" />
            <name><narrative>Santa Ines</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.29222 -39.81889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450832" />
            <name><narrative>Ruy Barbosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.28389 -40.49389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450987" />
            <name><narrative>Roda Velha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.7 -45.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451192" />
            <name><narrative>Rio de Contas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.5853 -41.81624</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456366" />
            <name><narrative>Nazare</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.035 -39.01444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456450" />
            <name><narrative>Mutuipe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.22861 -39.50472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456602" />
            <name><narrative>Mucuge</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.00845 -41.37237</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457360" />
            <name><narrative>Medeiros Neto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.37389 -40.22056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460730" />
            <name><narrative>Itapetinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.24889 -40.24778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460785" />
            <name><narrative>Itanhem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.16639 -40.33</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460814" />
            <name><narrative>Itambe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.8 -40.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460908" />
            <name><narrative>Itaete</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.98639 -40.9725</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460949" />
            <name><narrative>Itabuna</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.78556 -39.28028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460966" />
            <name><narrative>Itaberaba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.5275 -40.30694</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463124" />
            <name><narrative>Formosa do Rio Preto</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.04833 -45.19306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463251" />
            <name><narrative>Floresta Azul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.86 -39.65972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463478" />
            <name><narrative>Feira de Santana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.26667 -38.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463698" />
            <name><narrative>Euclides da Cunha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5075 -39.01583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468031" />
            <name><narrative>Camacari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.6975 -38.32417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468893" />
            <name><narrative>Brumado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.20361 -41.66528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470548" />
            <name><narrative>Barreiras</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.60963 -39.16508</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003471168" />
            <name><narrative>Bahia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12 -42</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472269" />
            <name><narrative>Andarai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.2 -40.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472370" />
            <name><narrative>Amargosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.03028 -39.60472</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317345" />
            <name><narrative>Jaborandi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.61944 -44.43278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317539" />
            <name><narrative>Marcionilio Souza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.00306 -40.53056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320348" />
            <name><narrative>Livramento</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.39479 -36.98826</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318755" />
            <name><narrative>Teixeira de Freitas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.535 -39.74194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318662" />
            <name><narrative>Sento Se</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.74583 -41.88528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318648" />
            <name><narrative>Segredo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.34139 -52.97917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317986" />
            <name><narrative>Placas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.86778 -54.22</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003473263" />
            <name><narrative>Abaira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.24972 -41.66361</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461525" />
            <name><narrative>Ibotirama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.18528 -43.22056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461638" />
            <name><narrative>Iacu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.76722 -40.21167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472728" />
            <name><narrative>Alcobaca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.51944 -39.19556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470808" />
            <name><narrative>Barra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.56667 -39.4</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003468528" />
            <name><narrative>Cachoeira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.75 -40.2</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003465105" />
            <name><narrative>Cruz das Almas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.67 -39.10194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462473" />
            <name><narrative>Gentio do Ouro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.42889 -42.50278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462372" />
            <name><narrative>Goias</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.58071 -49.63623</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008439992" />
            <name><narrative>Barra da Estiva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.93336 -39.46252</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461408" />
            <name><narrative>IlhEus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.79364 -39.03949</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461123" />
            <name><narrative>Ipira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27.40361 -51.77306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003461013" />
            <name><narrative>Irece</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.30417 -41.85583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460642" />
            <name><narrative>Itaquara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.51667 -39.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460242" />
            <name><narrative>Jaguaquara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.53056 -39.97083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003459943" />
            <name><narrative>Jequie</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.85875 -40.08512</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003459884" />
            <name><narrative>Jiquirica</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.25667 -39.57222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456224" />
            <name><narrative>Milagres</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.87 -39.85889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455082" />
            <name><narrative>Paramirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.4425 -42.23889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003455029" />
            <name><narrative>Paratinga</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.69056 -43.18417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453984" />
            <name><narrative>Piata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.15194 -41.77278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450063" />
            <name><narrative>Santa Maria da Vitoria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.39472 -44.18861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449521" />
            <name><narrative>Santo Antonio de Jesus</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.96889 -39.26139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449304" />
            <name><narrative>Sao Desiderio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.36333 -44.97333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449209" />
            <name><narrative>Sao Felix</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.63333 -41.31667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449055" />
            <name><narrative>Sao Goncalo dos Campos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.43333 -38.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447502" />
            <name><narrative>Sitio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.36667 -47.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003446971" />
            <name><narrative>Tanhacu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.02139 -41.24806</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003400616" />
            <name><narrative>Estreito</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.86667 -44.3</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445597" />
            <name><narrative>Valenca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.37028 -39.07306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003444914" />
            <name><narrative>Vitoria da Conquista</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.86611 -40.83944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396530" />
            <name><narrative>Laje</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.96667 -41.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003447928" />
            <name><narrative>Seabra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.41713 -41.77049</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003465767" />
            <name><narrative>Conceicao da Feira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.50583 -38.99861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469310" />
            <name><narrative>Boninal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.70167 -41.8275</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469437" />
            <name><narrative>Bom Jesus da Lapa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.255 -43.41806</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469517" />
            <name><narrative>Bom Despacho</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.91667 -38.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008581568" />
            <name><narrative>Javi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.19965 -43.67617</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397154" />
            <name><narrative>Juazeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.41167 -40.49861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003445854" />
            <name><narrative>Ubaira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.26806 -39.66278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451383" />
            <name><narrative>Ribeira do Pombal</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.83444 -38.53583</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324151" />
            <name><narrative>Luis Eduardo Magalhaes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.23208 -46.1146</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458261" />
            <name><narrative>Macajuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.13611 -40.36</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387104" />
            <name><narrative>Sussuarana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.48333 -38.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003384908" />
            <name><narrative>Xique-Xique</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.51667 -43.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320829" />
            <name><narrative>Curaca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.13458 -39.66849</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21023" percentage="92" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="90.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="18" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="10" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="18" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">1666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">13333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">13333333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">6666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">3750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">833333.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">6666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">6666666.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">6666666.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">6647118.08</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">6647118.08</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2016-01-31"/><value value-date="2016-01-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in January Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-6647118</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">4000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">13000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-10-31"/><value value-date="2018-10-31">7600000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">8000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">14500000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">13000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">13800000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">6800000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">15650000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">10750000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">3640000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">11000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">14790000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">8565000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">8650000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">11340000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">11180000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">4200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-112118</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-63569</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-279613</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-308936</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-390493</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-503240</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-914149</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-1453081</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1368266</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-923876</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-767653</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-818535</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-919144</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1886341</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-5084506</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-5582982</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-6074247</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-6030988</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5169729</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4904108</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4377150</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1124400</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1443840</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1623912</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2020774</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2304526</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2356856</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3538651</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16058"><narrative>Infrastructure Secretariat of State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147272"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147272?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147272"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State paved road network under performance-based rehabilitation and maintenance contracts
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project exceeded the target for the state paved road network under performance-based rehabilitation and maintenance contracts. When the project started, only 3 percent of the state paved road was under Rehabilitation and Maintenance contracts. The project interventions contributed to this result: 3954 km contracted: 3,407&amp;nbsp;km under five-year CREMA contracts and 547 of BA 052 CREMA-PPP. An additional 374 km of concessions are outside of the Project Scope, making it a total of 4,328 km with Performance-based contracts in Bahia. Table A9.6 shows the information in annex 9.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;*It is important to note that the baseline was measured against a&amp;nbsp;10,900 km value of the previous paved road State network, meaning that the State was able to implement 1300 km of newly paved roads during the project. The actual value would be 38 percent of the baseline 10,900 km value.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulated number of municipalities where citizens engaged in road investment definition and prioritization
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project exceeded the target and engaged with 64 municipalities to get input on defining and prioritizing road investments to implement the works for improving rural road accessibility.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="64.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of SEINFRA/SITs Pavement Management System
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="System installed a pilot phase"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value=".">
<comment><narrative>
&lt;p&amp;gt;The target&amp;nbsp;was achieved already during the second year of implementation. The State has been using the system for improving the network performance during the last years.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="System under operation">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of yearly meetings conducted by the Infrastructure Committee on the Bahia Industries' Federation.
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was exceeded.&amp;nbsp;The State logistics discussions&amp;nbsp;happened within the &amp;quot;Federacao das Industrias da Bahia&amp;quot; (Bahia Industries&amp;#39; Federation), a private sector forum that served the same purpose that the State Logistics Committee (theoriginal forum of discussions replaced with Bahia Industries&amp;rsquo; Federation in R21) was expected to serve at the time of designing the Project. The state government had a permanent representative of the Secretariat of Infrastructure in this private forum. Three&amp;nbsp;meetings were made during the last year. Only during&amp;nbsp;2020 meetings did not happen.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of an appraisal tool to inform decision-making for transport infrastructure investments
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="Tool not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project fully achieved the target. The appraisal tool became&amp;nbsp;available since 2021 when the maintenance and continuous update of the Logistical Plan and the Tool for the decision-making process was contracted.&amp;nbsp;This indicator is still valid, and the State will continue funding this during the next years.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Tool available">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Roads in good and fair condition as a share of total classified roads
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project exceeded the target. This indicator measures the percentage of the total classified road network in the project area that is in good and fair condition depending on the road surface and the level of roughness. The percentage of roads in good and far condition (IRI &amp;lt; 5) of the total paved network in the project areas improved from 80% to 88&amp;nbsp;%, one of the best in Brazil. It is a significant result,&amp;nbsp;considering that the total network increased from 10,900 km to 12,800 km.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="88.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Elimination of physical critical spots for road safety on the selected corridors
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;At the time of closing, the works were ongoing to eliminate critical spots for road safety on the two selected corridors (87km).The pilot corridors had delays in the procurement process, resulting in works only starting in March 2022, and as a result, no critical points were actually eliminated on those two roads by the closing date. Works are advancing and will finish in May&amp;nbsp;2023. However, critical points were eliminated from other roads (creation of roundabouts, improvement of intersections) and in rural roads,so in other regions, improvements could be measured. In addition, enforcement was improved along several critical roads, including this, with major results, like on the Rodovia Verde - BA-099.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced access to transportation services
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project achievements remained slightly under the target.&lt;/p&amp;gt;

&lt;p&amp;gt;The R21 added a new Corporate Indicator to measure the number of direct and indirect beneficiaries of the rehabilitated CREMA roads (the original target of 2,370km under Component 2), the feeder road interventions (the original target of 900 spot improvement interventions under Component 3), and the road safety corridors (road safety works along 87km on two corridors under Component 4) amounting to 6,183,000 beneficiaries.&lt;/p&amp;gt;

&lt;p&amp;gt;The final number reached a large population thanks to the additional roads rehabilitated that included the following 2979 km rehabilitated as of projectclosing: It is expected that the remaining population will get enhanced access to transportation when (a) the balance of 1,025 km has been rehabilitated under the State funding by May 2023, (b) the 299 additional critical spots have been improved under the State of Bahia in all four consortia by March 2023; and (c) the road safety corridors will be completed with counterpart funds by May 2023.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="5300000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in fatalities and serious injuries on the selected road safety corridors
</narrative></title>
<baseline year="2015" iso-date="2015-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project highly increased the target.&lt;/p&amp;gt;

&lt;p&amp;gt;The revised (corrected) baseline in 2015 was 110&amp;nbsp;fatalities and serious injuries in both selected corridors.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&lt;em&amp;gt;The final data shows 25 injuries and 5 fatalities in 2021 BA-502 and BA-513 roads which showcase a reduction of 72&amp;nbsp;percent against the targeted 30 percent.&amp;nbsp;&lt;/em&amp;gt;Even though improvement works have not been completed, this result is explained by the introduction of enforcement policies and radar installation along these corridors. &lt;em&amp;gt;SEINFRA shared a report on enforcement measures and the importance of the radar installation to achieve this result and increase the attribution of the Project in this result. &lt;/em&amp;gt;???????&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="72.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of a State Committee for road safety
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="No Committee"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was achieved. The Committee was established in September 2016. CETRAN will be the main agency for Road Safety in the State.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Committee established">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehabilitated, Rural
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The number of km that was fully rehabilitated by the closing date was 2979 km, exceeding the original target of 2370 km (as shown in Table A9.6 &amp;ndash; annex 9). In total, the State of Bahia has ongoing contracts for rehabilitation and maintenance of 3954&amp;nbsp;km, almost 4000 km.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2979.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of the State Infrastructure Road Fund
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="Fund created but not operational"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target&amp;nbsp;was&amp;nbsp;achieved in&amp;nbsp;2019 (the third year of implementation). The fund is supporting the increase in the paved network of the State and other road interventions.&amp;nbsp;Now, with the new project in preparation,&amp;nbsp;there is a need to use this to implement the Pro-active Maintenance aspects during the next decades.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Fund established and working.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hours of Capacity Building for improving the business model for SEINFRA/SIT
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This project highly exceeded the target for the revised indicator (see Annex 7).&lt;/p&amp;gt;

&lt;p&amp;gt;When the COVID-19 pandemic hit, only 2000 hours had been carried out, but during 2021 and 2022 the project achieved and exceeded the target for training covering road safety&amp;nbsp;training, Environmental &amp;amp; Social training, etc. In total, more than 400 staff were trained in the program.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;Additionally, 167 courses or workshops were provided in relation to environmental and social topics, reaching more than 30,000 people during the project implementation and across the different state regions &amp;ndash; not counted in this indicator.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7600.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cumulated number of critical spots eliminated
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The total number of rural road spot improvements completed exceeded the original target. The project contracted 1285 spot improvements during the project life under the project. The project is expected&amp;nbsp;to complete the remaining spot improvements (299) outof the total&amp;nbsp;1285 spot improvements that were contracted during the project on State&amp;#39;s funding&amp;nbsp;during the upcoming&amp;nbsp;months (until March 2023). Public Consultations&amp;nbsp;were finished by 2019.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="986.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of integrated traffic accident database
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="No integrated database"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project target was achieved. The&amp;nbsp;Database is in operation, and supported strategic decisions on where to strengthen traffic enforcement. The SEINFRA database (ACT Net) is used as the traffic accident database.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;It is operating since year 3.&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="Database existing and integrated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of rural population with access to an all-season road
</narrative></title>
<baseline year="2015" iso-date="2015-12-03" value="45.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2015-12-03" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The project increased the share of the rural population with access to an all-season road above the target.&lt;/p&amp;gt;

&lt;p&amp;gt;The number of inhabitants in the 4 selected regions with year-round rural road accessibility improvements to be implemented was at baseline 490.000 - meaning only 45 % of the population in those 4 areas had all-season accessibility.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;In year 4 (2020), it reached&amp;nbsp;50% - 655.556 inhabitants, and in year 6&amp;nbsp;(2022) it reached 65% - 852.223, larger than the original target &amp;ndash; 787,000,but short of the revised target of 1,315,000 (as this number was targeting all the population of the 64 municipalities). The project contributed to this result by completing 986 critical spot improvements by the project closing.&lt;/p&amp;gt;

&lt;p&amp;gt;The State is completing the improvement of 299 additional critical spots by March 2023 (1190 interventions completed by November 2022); this increases the spot improvements to 1,285 and the number of rural people with access to an all-season road to 70 percent. &amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;The total population of the 64 municipalities that benefited from the improvement of the rural roads was&amp;nbsp;1,315,000 inhabitants&amp;nbsp;(or&amp;nbsp;7,5 % of the State population) out&amp;nbsp;of which&amp;nbsp;852,000 inhabitants have all-season access.&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P147979</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Amazonas DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To assist the Government of Amazonas to (i) improve tax administration and procurement procedures and to (ii) strengthen the delivery of citizen security services and women's access to justice and social services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Amazonas: Modernizing Public Sector Management, Citizen Security, and Gender Policies Development Policy Loan (DPL) Program Project for Brazil is to assist the Government of Amazonas (GoAM) to: (i) improve tax administration and procurement procedures, and (ii) strengthen the delivery of citizen security services and women's access to justice and social services. This operation is a one-tranche DPL, in the amount of United States (U.S.) 216 million dollars to the Brazilian state of Amazonas. The support to the GoAM is being carried out in partnership with the Inter-American Development Bank (IADB). This operation complements and extends selected policy actions supported by the IADB's program for fiscal consolidation to improve the delivery of public services in the state of Amazonas operation. The IADB program focuses on the legal and regulatory aspects of the reforms while the World Bank on its implementation policies drawing from experience in other states. By partnering with the IADB, the Bank has been able to enhance its policy dialogue with a reformist administration in a poor and low-capacity state, while supporting priorities at the federal level and demonstrating its flexibility and responsiveness, to both the state and the country. The GoAM has identified a number of deficiencies in tax and financial administration, and in the management of the citizen security sector, which limit its fiscal capacity and service delivery efficiency. This operation supports specific measures to tackle these deficiencies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0016844"><narrative>State of Amazonas</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0016844"><narrative>State of Amazonas</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0016845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-03-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-05-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Laura De Castro Zoratto</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lzoratto@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15131" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="87.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="6" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="6" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="19" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="6" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="19" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="19" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="19" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="19" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="25" xml:lang="en"><narrative>Public Finance Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">216000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">216000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">216000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">216000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-540000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-04-30"/><value value-date="2015-04-30">-811740</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1026720</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1190280</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-1633920</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2019960</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-2285280</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2291460</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-3267840</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-3529500</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-3731520</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-2917278</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1489296</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-984459</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-904176</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-836220</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1723101</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-4705376</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-5111430</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-5514328</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-5404902</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-4553588</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4250743</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3726592</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-5400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16845"><narrative>Secretaria da Fazenda do Amazonas (SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147979"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147979?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147979"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of disclosures of expenditure indicators in AISC reports
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="4.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities reached by mobile units providing services to women
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="2.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="60.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services for which standard specifications are obligatory
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="19.00">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Procurement processes completed in less than 45 days
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="29.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="40.00">

</target>
<actual value="65.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Value of purchases completed through Price Registration
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="47.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="55.00">

</target>
<actual value="50.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of police trained
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="1003.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="2000.00">

</target>
<actual value="1916.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms issuing the NFC-e (electronic invoice)
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="4000.00">

</target>
<actual value="6371.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Procurement Plans published on e-Compras.AM
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of performance indicators implemented
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in Unitary cost of services
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="19.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Government insitutions adopting new budget execution practices
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="60.00">

</target>
<actual value="60.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implementers of Maria da Penha Law receiving training
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="320.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="2750.00">

</target>
<actual value="5523.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women receiving services at the Casa da Mulher Brasileira
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="6000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of AISCs
</narrative></title>
<baseline year="2014" iso-date="2014-04-25" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2014-04-25" />
<period-end iso-date="2015-12-31" />
<target value="18.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P147984</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Bahia DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ The Program Development Objective of this operation is to improve fiscal management and the policy framework for territorial planning and tailor selected public services to the needs of women, afro-descendants and minorities ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The program development objective of the Strengthening Fiscal Management and Promoting Better and More Inclusive Service Delivery Program Project for Brazil is to improve fiscal management and territorial planning and tailor selected public services to the needs of women, afro-descendants, and minorities. This program document provides a single-tranche stand-alone development policy loan (DPL) in the amount of United States (U.S.) 400 million dollars to the state Government of Bahia (GoBA). In the last decade, Bahia has improved its economic performance and achieved a remarkable track record in reducing poverty and boosting shared prosperity. Nonetheless, Bahia still lags behind national averages and continues to be the state with the largest absolute number of poor and extreme poor in the country. While universal access to key public services is guaranteed by the Brazilian constitution and Bahia's state laws, a large share of the population continues to face exclusion and or discrimination in service delivery. The GoBA recognizes that social inclusion, equal treatment and fairness in service delivery, and reduction of regional disparities are critical conditions for the achievement of its development objective of speeding up and ensuring sustainable poverty reduction and shared prosperity. This DPL seeks to assist the GoBA in strengthening its fiscal management and the policy framework for territorial planning and ensuring that selected public services are more tailored to the needs of women, afro-descendants, and minorities. The policy program supported by this operation consists of 2 pillars. The first pillar supports improvements in the GoBA ability to collect taxes, enhance controls on pension expenses, and to establish an institutional framework for territorial planning. The second pillar supports actions in education, health, public security, and productive inclusion sectors aimed at ensuring equal access to public services by women, afro-descendants, and minorities and tailoring them to serve specific needs. The operation is expected to contribute positively to the World Bank Group (WBG) two strategic goals of reducing poverty and boosting shared prosperity.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0016847"><narrative>Ministry of Finance / Secretary of Finance External Affairs</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0016848"><narrative>Secretary of Finance Bahia</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2014-07-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2016-01-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2016-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Antonio Nucifora</narrative></person-name><telephone>+1-202-473-1000</telephone><email>anucifora@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15160" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="16" xml:lang="en"/><sector vocabulary="1" code="13020" percentage="16" xml:lang="en"/><sector vocabulary="1" code="13030" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="40.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="5" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="10" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="5" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="3" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="25" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="3" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="20" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="5" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="25" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="10" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000053" percentage="3" xml:lang="en"><narrative>Fragility, Conflict and Violence</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="25" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="43" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="23" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="43" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="15" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="43" xml:lang="en"><narrative>Social Inclusion</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">400000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">400000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">400000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">399000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-1000000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-1706411</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1901333</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-2204222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-3025778</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-3740667</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-4232000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-4243444</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-6051556</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-6536111</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-6799659</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-5363580</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2764267</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1844752</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1711609</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1599879</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3326072</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-9164037</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-10055903</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-10960960</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-10862668</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-9257621</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-8726254</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-7728729</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-6400000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-7200000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-8000000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-8000000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-8000000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-16848"><narrative>Secretary of Finance Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16849"><narrative>Secretary of Planning (Seplan) Bahia</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-16850"><narrative>Public Security Secretary</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147984"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147984?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147984"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Newborn children who received the neonatal heel prick test in Bahia
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="82.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="90.00">

</target>
<actual value="87.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities with more than 10,000 inhabitants joining the State System for the Promotion of Racial Equality
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="14.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mass media campaign to selected audiences on youth pregnancy prevention
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Effectiveness index on the provision of maternal and neonatal services in 25 reference State maternity hospitals
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="65.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="75.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indigenous schools with certified indigenous teachers
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Savings generated by corrective measures detected by audits to the pensioners payroll (in R$ mi)
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="30.00">

</target>
<actual value="5.40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities in the metropolitan area of Salvador joining the JV (Juventude Viva) program
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women and afro-descendants producers organizations receiving tailored TA to support entrepreneurship
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="800.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social public programs in the multi-annual plan 2016-19 with race- disaggregated indicators
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Police force working with vulnerable groups trained in the use of the protocols for specialized services to vulnerable groups
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Indigenous and quilombolas schools adopting the new curriculums
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospitals that received training to ensure equal treatment in health services for afro-descendant populations
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="22.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities in rural areas served by mobile units providing services and raising awareness on GBV under the rural women forum framework
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CODETERs (Territorial Collegiate for Sustainable Development) fully operational
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="15.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Territorios de identidade with strategic plans
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="10.00">

</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue collected from tax payments in arrears at administrative phases (in R$ million)
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="280.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2015-12-31" />
<target value="320.00">

</target>
<actual value="312.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P153012</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Fortaleza Sustainable Urban Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objectives of the Project are to: (a) strengthen the capacity of the Municipality of Fortaleza for land use planning and for urban and environmental policy implementation; and (b) enhance urban environment and rehabilitate public spaces, through interventions in the Vertente Maritima Basin and other selected green areas across the city.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Fortaleza Sustainable Urban Development Project for Brazil are to: (a) strengthen the capacity of the Municipality of Fortaleza for land use planning and land-based financing; and (b) enhance urban environment and rehabilitate public spaces, through interventions in selected areas of the Vertente Maritima Basin and of the Rachel de Queiroz Park. There are three components to the project, the first component being urban and environmental restoration. The objective is to promote urban and environmental restoration of selected areas of the city through selected investments in public spaces and sanitation. Implementation of these interventions also aims at strengthening the PMF's capacity for urban planning and environmental management. This component includes two subcomponents: restoration of Rachel de Queiroz (RDQ) park, and reducing point-source pollution along Vertente Maritima (VM). The second component is the strengthening planning and land-based financing. Finally, the third component is the project management. Provision of support for, inter alia: (i) the technical and administrative management and the monitoring and evaluation of the project; (ii) the carrying out the project's financial management and procurement requirements; (iii) the carrying out of outreach activities in connection with the project; (iv) the provision of equipment and training (on, inter alia, technical, environmental and social safeguards management) to SEUMA's staff for the purpose of project implementation; and (v) the provision of technical assistance and supplies to strengthen the Borrower's auditing, financial control and procurement capacity.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0022339"><narrative>Municipality of Fortaleza</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0022340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-12-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-04-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hannah Kim</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hkim9@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399415" />
            <name><narrative>Fortaleza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.71722 -38.54306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="43032" percentage="58" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="42" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="82.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YT" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Tourism</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="27" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="22" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="27" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="22" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="79" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="22" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="22" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="22" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="27" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="27" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="79" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1358333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">16599455.72</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">16599455.72</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">73300000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-16599456</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">183250</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">3500000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">2300000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">3600000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">7000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">9000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">12280000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">7000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-3662706</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-183250</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-22370</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-118881</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-104808</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-116359</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-125226</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-125991</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-199326</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-505010</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-670923</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1178933</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1669038</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1769081</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1784660</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1529772</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-46794</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22340"><narrative>Secretaria Municipal de Urbanismo e Meio Ambiente (SEUMA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-22341"><narrative>Secretaria Municipal de Infraestrutura (SEINF)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153012"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P153012?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153012"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Sanitation under the project
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="29,070.00">
<comment><narrative>
A total of 3,177 household connections were completed under the Se Liga Na Rede and Riachó Maceió projects, directly benefiting low-income families. Additionally, 8,186 inspections were conducted in middle-income households, initiating regularization processes for sewerage connections. The total number of beneficiaries (38,634) was estimated by multiplying the number of intervened households by Fortaleza's average household size of 3.4. Intervened households include both low-income households that were connected to the sewerage system and middle-income households subject to inspections leading to connection.
</narrative></comment>
</target>
<actual value="38,634">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rehabilitation of small abandoned public spaces aimed primarily at early childhood education (microparks)
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2024-03-31" />
<target value="32.00">
<comment><narrative>
A total of 13 microparks were completed using FCS resources. Additionally, the Municipality of Fortaleza completed six (6) additional microparks with its own funding, bringing the total number of completed microparks to 19.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bicycle paths implemented and rehabilitated
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-03-31" />
<target value="84.60">
<comment><narrative>
A total of 74 km of cycling works were completed (Implemented: 41.9km; Rehabilitated: 31.7km).
</narrative></comment>
</target>
<actual value="74">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="24,061.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="523,143.00">
<comment><narrative>
The number of direct beneficiaries was calculated by defining buffer zones around parks, microparks, and cycle paths (500 meters for parks and 300 meters for microparks and cycle paths) and estimating the number of households within these areas, discounting overlapping households. Based on this number, the population was calculated using an average household size of 3.4 people in Fortaleza.
</narrative></comment>
</target>
<actual value="492,934">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Participants of community engagement and environmental education activities that consider that project investments reflect requested demands
</narrative></title>
<baseline year="2022" iso-date="2022-05-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-04" />
<period-end iso-date="2024-03-31" />
<target value="60.00">
<comment><narrative>
This indicator is based on the number of participants in the events and workshops included in the activities to update the water and sanitation plan.
</narrative></comment>
</target>
<actual value="89.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban and Environmental permitting processes operational under Fortaleza Online
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="70.00">
<comment><narrative>
Fortaleza Digital has 76 processes that have become operational, exceeding the 70 processes target.
</narrative></comment>
</target>
<actual value="76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban and environmental policy instruments updated/elaborated
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-03-31" />
<target value="30.00">
<comment><narrative>
Includes: the Fortaleza Participatory Master Plan, 24 urban parks management plans, and 4 management plans for storage units.  The updating of the Water and Sanitation Plan  was not completed.
</narrative></comment>
</target>
<actual value="29">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Multi-purpose cadaster upgraded and Spatial Information Platform under development(D= Under development; and O = Operational)
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="Functional cadaster used primarily for property tax collection purposes"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="Multi-purpose cadaster in use. SEFIN and SEUMA data harmonized">
<comment><narrative>
Building on SEFIN's fiscal cadaster, a multipurpose cadaster was developed to integrate land use, property, and infrastructure data. It includes upgraded modules for managing urban subdivisions and streets, georeferenced databases, and a digital archive of historical maps. A spatial information platform (IDE SEUMA) was also created to consolidate territorial layers and streamline geospatial consultations. Integrated with other municipal systems, IDE SEUMA supports efficient service delivery (i.e, issuing certificates and licenses) through advanced search, simulation, and layer creation tools. Both systems are fully installed and operational, enhancing urban planning and administrative efficiency.
</narrative></comment>
</target>
<actual value="O">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cartographic update for territorial management (D = under development and O = operational)
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="O">
<comment><narrative>
This indicator includes the aerial photogrammetric survey, tree survey and identification by NDVI, 360 mobile mapping update, 3D modeling, and orbital images.
</narrative></comment>
</target>
<actual value="O">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and grievances related to the project that were responded to within the established deadline (%)
</narrative></title>
<baseline year="2022" iso-date="2022-05-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-04" />
<period-end iso-date="2024-03-31" />
<target value="90.00">
<comment><narrative>
This indicator is based on the number of beneficiaries of the household sewage connections under Se Liga Na Rede.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of Municipality of Fortaleza own-source revenue capacity through planning and land-value capture instruments
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="10% increase in property tax revenues">
<comment><narrative>
The results are based on the increase in property tax revenues collected between 2016 and 2024, as well as the additional property tax revenues expected to be collected in 2026, to which activities financed by the Project (two aerial photogrammetric surveys conducted in 2016 and 2023) directly contributed. The increase in property tax revenue resulting from the expansion in the built-up area of cadastral units registered with the PMF detected through the surveys was calculated by SEFIN.

The PDO indicator comprised three (3) sub-indicators: (i) Increase in property tax revenue (target: 20%); (ii) Increase in revenue through Fortaleza Online (target: 100%); and, (iii) Increased revenue from improved tools (Spatial Data Infrastructure) for territorial control and management. At Project closing, the indicator was simplified to focus solely on property tax revenue.
</narrative></comment>
</target>
<actual value="28%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with community engagement and environmental education activities
</narrative></title>
<baseline year="2022" iso-date="2022-05-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-04" />
<period-end iso-date="2024-03-31" />
<target value="70.00">
<comment><narrative>
This indicator is based on the number of participants in the events and workshops included in the activities carried out under the environmental education program.
</narrative></comment>
</target>
<actual value="94.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sampling points along the western portion of the VM coastline with adequate bathing water quality (balneabilidade) during the dry season
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="80.00">
<comment><narrative>
Sampling points along the western portion of the VM coastline were monitored from September through December 2024, as part of the regular monitoring campaigns carried out by the Ceará State Secretariat of Environment (SEMACE) along the overall coastline of Ceará, following officially defined methodology. On the 10 sampling points corresponding to the western portion of the VM coastline (where the Project interventions on sewerage connections were executed aiming at decrease the flow of untreated wastewater discharged on the beaches) results obtained informed that only 4 of the sampling points were found to have proper bathing water quality, reaching 50% of the target.
</narrative></comment>
</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Requalified green areas
</narrative></title>
<baseline year="2022" iso-date="2022-05-04" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-04" />
<period-end iso-date="2024-03-31" />
<target value="57.04">
<comment><narrative>
The total number of hectares of requalified green areas (134.3 ha) was calculated combining the area of all completed parks and microparks, including sections 1–6 of the Rachel de Queiroz Park, Messejana Lagoon, Opaia Lagoon, the Zoo and Botanical Park, and 13 microparks.
</narrative></comment>
</target>
<actual value="134.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sampling points along the western portion of the VM coastline with adequate bathing water quality (balneabilidade) during the dry season
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="80.00">
<comment><narrative>
Sampling points along the western portion of the VM coastline were monitored from September through December 2024, as part of the regular monitoring campaigns carried out by the Ceará State Secretariat of Environment (SEMACE) along the overall coastline of Ceará, following officially defined methodology. On the 10 sampling points corresponding to the western portion of the VM coastline (where the Project interventions on sewerage connections were executed aiming at decrease the flow of untreated wastewater discharged on the beaches) results obtained informed that only 4 of the sampling points were found to have proper bathing water quality, reaching 50% of the target.
</narrative></comment>
</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="24,061.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="523,143.00">
<comment><narrative>
The number of direct beneficiaries was calculated by defining buffer zones around parks, microparks, and cycle paths (500 meters for parks and 300 meters for microparks and cycle paths) and estimating the number of households within these areas, discounting overlapping households. Based on this number, the population was calculated using an average household size of 3.4 people in Fortaleza.
</narrative></comment>
</target>
<actual value="492,934">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increase of Municipality of Fortaleza own-source revenue capacity through planning and land-value capture instruments
</narrative></title>
<baseline year="2016" iso-date="2016-08-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2016-08-01" />
<period-end iso-date="2024-03-31" />
<target value="10% increase in property tax revenues">
<comment><narrative>
The results are based on the increase in property tax revenues collected between 2016 and 2024, as well as the additional property tax revenues expected to be collected in 2026, to which activities financed by the Project (two aerial photogrammetric surveys conducted in 2016 and 2023) directly contributed. The increase in property tax revenue resulting from the expansion in the built-up area of cadastral units registered with the PMF detected through the surveys was calculated by SEFIN.

The PDO indicator comprised three (3) sub-indicators: (i) Increase in property tax revenue (target: 20%); (ii) Increase in revenue through Fortaleza Online (target: 100%); and, (iii) Increased revenue from improved tools (Spatial Data Infrastructure) for territorial control and management. At Project closing, the indicator was simplified to focus solely on property tax revenue.
</narrative></comment>
</target>
<actual value="28%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in community engagement and environmental education activities
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-03-31" />
<target value="10,000.00">
<comment><narrative>
This indicator is based on the number of participants in the events and workshops included in the activities under the environmental education program.
</narrative></comment>
</target>
<actual value="65,000">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P153203</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Manaus Service Delivery and Fiscal Management DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To assist the Municipality of Manaus in improving the management of its finances as well as its education and transport sectors, through upgraded revenue and expenditure processes, meritocratic and results-oriented management of schools, and improved control of bus concessions.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Manaus Service Delivery and Fiscal Management Development Policy Loan (DPL) Project for Brazil is to assist the Municipality of Manaus (MM) in improving the management of its finances as well as its education and transport sectors, trough upgraded revenue and expenditure processes, meritocratic and results oriented management of schools, and improved control of bus concessions. The pillars of support are: (i) strengthened public sector and fiscal management; and (ii) enhanced management and quality of the education and transport sectors. To achieve this goal and maintain fiscal sustainability, the Secretariat of Finance (SEMEF) prioritized the introduction of modern management tools in public administration. Looking forward, the government's intention is to gradually expand this methodology to other secretariats of the MM, thus enhancing its overall capacity to deliver services. Furthermore, the municipality is seeking to improve the quality of its education and transport sectors by improving management practices. The proposed DPL operation is fully consistent and closely aligned with the objectives of the World Bank Group's Country Partnership Strategy (CPS) for Brazil for the period 2012-2015.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0022592"><narrative>Secretary of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2015-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2015-12-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2017-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2017-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Laura De Castro Zoratto</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lzoratto@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="16" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="16" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11240" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="25" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="20" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="15" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="15" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000714" percentage="20" xml:lang="en"><narrative>Urban Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="5" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">150000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">150000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">140085000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">9915000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-375000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-489509</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-1483931</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-1663667</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1666708</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-2346000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-2526458</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-2668000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-2153667</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1165333</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-814500</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-753968</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-700208</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1367307</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3611426</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3920076</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-4225240</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4145736</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3503499</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3277355</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-2881174</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3945000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-22592"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153203"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P153203?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P153203"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P162033</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Salvador Social Multi-Sector Service Delivery Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project's objective is to improve social service delivery in the Municipality of Salvador, emphasizing improvements inhealth care system efficiency, education quality, and social assistance effectiveness.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Salvador Social Multi-Sector Service Delivery Project for Brazil is to improve social service delivery in the Municipality of Salvador, emphasizing improvements in health care system efficiency, education quality, and social assistance effectiveness. The Project will have two components, one supporting the implementation of activities to improve social service delivery, and the other to finance technical assistance. The first proposed Project component (US$120 million) will provide support for the implementation of the MoS key strategic actions in health, education, and social assistance. Financing for the first component would be triggered by achievements of result targets with specific disbursement-linked indicators (DLIs) and disbursed against verified execution of Eligible Expenditure Programs (EEPs). The second Project component (US$4.7 million) will provide technical assistance to facilitate the MoS efforts to achieve the results supported under the first component, as well as additional measures of institutional strengthening to ensure quality and sustainability of social services.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0031444"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0031445"><narrative>Casa Civil</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-07-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2017-12-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2023-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2023-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rovane Battaglin Schwengber</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rschwengber@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321026" />
            <name><narrative>Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97177 -38.50811</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="34" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="11240" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EC" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Early Childhood Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="1" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="100" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000655" percentage="100" xml:lang="en"><narrative>Student Assessment</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="100" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="100" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="100" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">4850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">4116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">4116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">4116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">4116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">4116666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">4116666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3925000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">325000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1525000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2283333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2283333.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1141666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1141666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">555017.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">555017.64</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">125000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-555018</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">312500</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">25000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">30200000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">8400000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">703036</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">26400000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">9324650</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">69636</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2605714</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1315923</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">9781156</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">1190293</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">9523150</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-381076</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-312500</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-203767</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-613558</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1005928</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1040509</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1010862</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-660605</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-673685</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-682896</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1845700</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-3468642</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4065488</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4133528</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4033053</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3379681</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3324912</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2857480</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-2396660</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-2396660</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-2389051</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-2389051</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-2389051</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2389051</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2389051</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31445"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162033"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162033?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162033"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of out-patient procedures (high complexity) in relation to the resident population
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="2.84"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The indicator was affected by COVID-19&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Certification system of candidates for school leadership positions implemented
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="N">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Fundamental Education schools with minimum 80% take-up of students in PROSA (DLI#6)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="32.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="92.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families supported by the Integrated Family Support Program (PAIF) at CRAS
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="54321.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families attended by CRAS mobile teams
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="5442.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with new results based management model
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipal health facilities with patient identities registered with biometric data
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="163.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Enhancing management capacity of the SEMPS through the recruitment of staff (DLI#9)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="150.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Institutionalization and implementation of the M&amp;E system  for ECE
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of municipal and covenant centers (&quot;conveniados&quot;) monitored by SMED that deliver Early Childhood Education (DLI#4)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="61.86">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of students at adequate level of literacy and numeracy at the end of the second grade in municipal schools
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="23.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was almost achieved despite the impacts of COVID-19&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="43.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients cared in the UPAs with low-risk (green) or no-risk (blue)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="85.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="77.23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="20764.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="62496.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipal health facilities with electronic record management system installed and operational (DLI#2)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="175.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Design and adoption of tools to combat gender-based violence
</narrative></title>
<baseline year="2022" iso-date="2022-05-25" value="Situation diagnosis workshop"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-05-25" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Development and adoption of tools to address gender-based violence">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of SMED personel trained in the use of ECE M&amp;E system
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CRAS units that meet SEMPS minimum standard of operational functionality (DLI#7)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="17.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training sessions held for SEMPS workers
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="906.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of teachers trained in in-service teacher training
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="54.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;Between 2021 and 2022, the coordination overseeing teacher training underwent several personnel changes, impacting the tracking of all teachers participating in professional development activities. The 75%&amp;nbsp;corresponded to teachers participating in the literacy training, which is directly related to the project&amp;#39;s PDO. While other teachers participated in other professional development training, such as the ECE monitoring system, the municipality could not systematize it. In response to this issue, the government is implementing an online system to automatically record teachers&amp;#39; participation in in-service training, which is expected to be active by the end of 2023.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Early Childhood Education centers with regular monitoring and evaluation feedback by SMED (DLI#5)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="61.86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mobile registration units of Cadastro Unico in operation
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of household visits performed by Cadastro nico team to update socio-economic information (DLI#8)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="993.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="22461.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance Redress Mechanism. Rate of complaints on Project that are addressed within 30 days.
</narrative></title>
<baseline year="2017" iso-date="2017-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-10-31" />
<period-end iso-date="1900-01-01"/>
<target value="85.00">

</target>
<actual value="85.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="191593.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The number of PBF beneficiaries was included as a corporate indicator, as its evolution would depend on economic dynamics in the Municipio.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="253048.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of the development and implementation of SEMPS management information system
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipal primary care units with financial management system installed
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="175.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Health Units with health services provision available within the Municipal Regulation System (DLI#3)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="22.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="129.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
ECE units offering adequate services following quality assurance standards
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;This is a biannual monitoring system. So, the data on this indicator is outdated. The next release of the data will be in 2024.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="15.86">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of diagnostic and therapeutic health services provided by the multi-centers
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="56.12">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of hospital admissions for Ambulatory Care Sensitive Conditions
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
&lt;p&amp;gt;The target was achieved as the rate of hospitalizations needs to be &lt;u&amp;gt;&lt;strong&amp;gt;below&lt;/strong&amp;gt;&lt;/u&amp;gt;&amp;nbsp;????the target&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="21.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of registry update of extremely poor families
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="68.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Primary Health Care Coverage (DLI#1)
</narrative></title>
<baseline year="2017" iso-date="2017-07-31" value="45.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-07-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="57.12">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P162455</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Financial Instruments for Brazil Energy Efficient Cities - FinBRAZEEC</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to unlock private financing for urban energy efficiency projects in Brazil by reducing the credit risk and enhancing the technical quality of Efficient Street Lighting subprojects and Industrial Energy Efficiency subprojects.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Financial Instruments for Brazil Energy Efficient Cities Project is to unlock private financing for urban energy efficiency projects in Brazil by reducing the credit risk and enhancing the technical quality of Efficient Street Lighting subprojects and Industrial Energy Efficiency subprojects. There are two components to the project, the first component being EE facility for efficient street lighting and industrial energy efficiency. This component includes two subcomponents: private financing for ESL and IEE subprojects, to provide sub-loans to beneficiaries for ESL subprojects and IEE subprojects through a loan syndication with commercial lenders, led by CEF; and credit enhancement products - the project will capitalize the GF to allow credit enhancement products for ESL subprojects and IEE subprojects. Finally, the second component is the Technical Assistance (TA) consisting of GCF US$4 million recipient executed grant, and US$1 million Bank executed grants provided by the Global Infrastructure Facility (GIF) and ESMAP. The TA component of this project will support essential technical studies, capacity building for the departments of CEF involved, and early operational costs. In the case of IEE, these funds will be used to support technical studies and initial implementation efforts (for example, structuring of off-balance-sheet funds to support scale-up of IEE investment). In the case of ESL, the TA will support cities preparation of high-quality PPP subprojects. The GIF and ESMAP funds are being used to support financial structuring of the project and to conduct pre-feasibility studies for PPPs for ESL subprojects in selected cities. A detailed procurement plan and procurement strategy for the recipient executed TA funds (GCF) have been prepared]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0031847"><narrative>Caixa Economica Federal</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0031847"><narrative>Caixa Economica Federal</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0031846"><narrative>Caixa Economica Federal</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2017-11-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-06-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2033-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2033-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>David John Santley</narrative></person-name><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="23111" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="100" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="100" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="100" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="100" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="100" xml:lang="en"><narrative>Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">833333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">833333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">200000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">200000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31846"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-200000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31846"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-31846"><narrative>Caixa Economica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162455"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P162455?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P162455"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of gender awareness campaigns conducted
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Perception of insecurity in public spaces among women in pilot areas
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="77.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of female CEF employees trained
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of street lighting PPPs advised
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="6.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances registered related to delivery of project benefits that are actually addressed
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="95.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Guarantees subscribed
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="200000000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Technical Studies completed
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CEF employees trained
</narrative></title>
<baseline year="2018" iso-date="2018-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-01" />
<period-end iso-date="2033-06-30" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P164588</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Mato Grosso Fiscal Adjustment and Environmental Sustainability DPL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Program Development Objective of this DPL is to support the State of Mato Grosso to (i) regain fiscal sustainability and (ii) increase institutional capacity for sustainable agriculture, forest conservation and climate change mitigation.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Program Development Objectives are to support the State of Mato Grosso to regain fiscal sustainability and to increase institutional capacity for sustainable agriculture, forest conservation and climate change mitigation.The proposed DPL will support policies anchored in the two key elements of the government's development strategy: fiscal sustainability and management of the nature-based engine of economic growth.The design of the fiscal pillar incorporates lessons learned from previous subnational DPLs in Brazil.Key lessons from the evaluation of these operations are: (i) subnational DPLs to support fiscal adjustment programs in states and municipalities need to include fiscal measures that are sufficient to achieve relevant fiscal outcomes and these measures need to be front-loaded, to contain moral hazard; (ii) ownership and leadership at the highest level are needed to successfully implement reforms, and the beginning of the political cycle is the most promising time for reforms; (iii) selectivity in the choice of sectors is key to keep the operation focused and deliver meaningful results; (iv) DPLs can serve as a vehicle for deepening the policy dialogue on fundamental issues, with the Bank providing technical knowledge; and (v) close collaboration with the relevant federal agencies (STN) strengthens the design of a fiscal program and monitoring of subnational governments fiscal status.The design of the second pillar benefited from the experience of the Piaui Green Growth and Inclusion Development Policy Loan, the first subnational DPL in Brazil focusing on climate change and environmental issues: (i) given the multi-actor nature of the Produce, Conserve, Include (PCI) plan, it is crucial to engage multiple stakeholders beyond the environment and agricultural sectors into the policy discussion and implementation; (ii) there is a need to institutionalize these long-term policies, to ensure continuity across administrations; and (iii) there is also a need to establish early on adequate monitoring and evaluation tools to track policy implementation and fulfillment of program targets.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0034120"><narrative>State of Mato Grosso</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0034120"><narrative>State of Mato Grosso</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0034119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-04-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-05-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2021-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2021-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gabriel Roberto Zaourak</narrative></person-name><telephone>+1-202-473-1000</telephone><email>gzaourak@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="43042" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="19" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="13" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="13" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="6" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="50" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="25" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="13" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="25" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="25" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="38" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="13" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="25" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="50" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="38" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="13" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="38" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="13" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">250000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1116966.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1116966.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1116966</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">248883034</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">0</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-625000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-654977</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-542802</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-489500</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-497130</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-482322</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-445302</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-271405</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-283614</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-161402</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-155498</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-157910</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-155157</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-151440</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-155776</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-148114</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-156358</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-149652</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-130956</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-148266</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-142813</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-144922</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-133927</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-141615</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-142871</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-135742</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-141504</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-136278</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-143924</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-131470</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-118706</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-191657</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-191666</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-316112</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-389449</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-462284</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-603468</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-662909</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-777034</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-905335</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-966804</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-961295</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-921784</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-934405</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-927554</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1003332</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-950087</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-990329</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1027216</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1034713</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1063600</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1026026</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1058318</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1045955</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-972368</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1050988</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1010438</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1038364</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1001106</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1032311</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1022327</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-921381</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-924389</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-856721</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-854649</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-835828</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-755672</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-826075</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-798512</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-813633</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-786931</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-808413</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-806486</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-755345</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-762329</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-706719</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-691067</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-679492</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-612630</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-665807</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-639876</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-647510</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-10-31"/><value value-date="2019-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-07-31"/><value value-date="2021-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-1072761</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34119"><narrative>Mato Grosso State Secretariat of Finance (Secretaria de Estado de Fazenda – SEFAZ)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164588"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P164588?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P164588"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of land for which CAR information has been validated by SEMA (cumulative total)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="2900000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="20000000.00">
<comment><narrative>
&lt;p&amp;gt;Area of land for which CAR information has been validated by SEMA (cumulative total)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="7900000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenues raised from FETHAB commodities (annually)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="870.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1350.00">
<comment><narrative>
&lt;p&amp;gt;amount is in Brazilian Reais, R$ million.&amp;nbsp;Revenues raised from FETHAB commodities&amp;nbsp; (not including fuels), annually.&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="2077.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Personnel spending as share of net-current revenue
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="67.85"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="60.00">
<comment><narrative>
&lt;p&amp;gt;(as published by the STN&amp;rsquo;s Boletim de Finan&amp;ccedil;as dos Entes Subnacionais, using PAF methodology)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="52.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Annual deforestation in Mato Grossos portion of the Amazon biome
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="1490.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="1241.00">
<comment><narrative>
&lt;p&amp;gt;Annual deforestation in Mato Grosso&amp;rsquo;s portion of the Amazon biome as assessed and published by PRODES&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1438.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenues recovered by FEEF (cumulative total)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="85.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="400.00">
<comment><narrative>
&lt;p&amp;gt;amount in Brazilian Reais (R$)&amp;nbsp;million, cumulative over multiple years.&amp;nbsp;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="384.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Resources mobilized in coordination with the PCI Institute for the implementation of the PCI strategy
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="53000000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="90000000.00">
<comment><narrative>
&lt;p&amp;gt;Resources mobilized in coordination with the PCI Institute for the implementation of the PCI strategy (cumulative total)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="125300000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current savings as a percentage of adjusted net current revenue
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="3.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2021-12-31" />
<target value="5.00">
<comment><narrative>
&lt;p&amp;gt;&amp;nbsp;(assessed using the current savings indicator established and published by the STN)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="13.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Pension deficit realized in 2021 in percent of current revenues compared to 2018 projection
</narrative></title>
<baseline year="2018" iso-date="2018-05-15" value="9.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-05-15" />
<period-end iso-date="2021-12-31" />
<target value="8.50">
<comment><narrative>
&lt;p&amp;gt;(baseline was based on World Bank PROST model, intermediate&amp;nbsp;actual results are observed annual deficits over time, target is the observed deficit for 2021)&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="1.60">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P165055</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ceará Water Security and Governance</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed Project's Development Objective (PDO) is to strengthen capacity for water resources management in the Borrower's territory, improve reliability of water services in selected municipalities, and improve operational efficiency of water services in the city of Fortaleza.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Ceara Water Security and Governance Project in Brazil is to strengthen capacity for water resources management in the Borrower's territory, improve reliability of water services in selected municipalities, and improve operational efficiency of water services in the city of Fortaleza.  The project has three components (1) Increasing Water Security. This component aims at increasing water security through improved water resources management, expanded bulk water infrastructure and specific investments to ensure the safety of Project-related dams. It includes two sub-components: (1.1) Integrated Water Resources Management. This sub-component will contribute to strengthen the State's water resources management and build its resilience to increased droughts by strengthening the technical capacity of key State agencies involved in water resources management. (1.2) Water Infrastructure. This sub-component will support the construction of the Banabuiú – Sertão Central Pipeline System to supply treated water from the Banabuiú Dam reservoir24 to selected municipalities, districts and rural areas in the Banabuiú and middle Jaguaribe river basins through the construction of an approximately 670km pipeline network and a treatment station near the source. It will also support dam-safety related institutional strengthening activities for SRH and COGERH, and specific measures related to the safety of the Gavião dam and Banabuiú dam, following the results of the Dam Safety Assessment. (2) Improving the Efficiency of Water Services. This component will seek to improve water supply service efficiency in the city of Fortaleza, and CAGECE's operational efficiency. The component includes two main sets of activities: (a) Water Losses Control and Reduction and (b) Technical assistance support to CAGECE to improve governance capacity and operational efficiency. (3) Strengthening Public Sector Management. This component will contribute to improving public sector governance, particularly in the water sector, through a set of activities aimed at embedding the use of evidence in planning and decision-making, improving service delivery and management of the State water resources, as well as increasing accountability.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0034670"><narrative>State of Ceara</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0034670"><narrative>State of Ceara</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0034671"><narrative>Secretariat of Water Resources - SRH</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-12-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-08-08"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Paula Pedreira de Freitas de Oliveir</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pfreitas@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394644" />
            <name><narrative>Mombaca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.79217 -39.77985</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394829" />
            <name><narrative>Mineirolandia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.52639 -39.59917</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402768" />
            <name><narrative>Carnaubinha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.83333 -40.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402777" />
            <name><narrative>Carnaubas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.87306 -39.74139</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317518" />
            <name><narrative>Manoel Correia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.74278 -39.62667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317630" />
            <name><narrative>Monte Grave</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.72889 -39.23417</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320060" />
            <name><narrative>Deputado Irapuan Pinheiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.88737 -39.25923</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320062" />
            <name><narrative>Fortaleza</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.72271 -38.52465</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320095" />
            <name><narrative>Piquet Carneiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.86038 -39.4558</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324287" />
            <name><narrative>Banabuiu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.23555 -38.87457</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324297" />
            <name><narrative>Milha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.66904 -39.22525</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318442" />
            <name><narrative>Sao Goncalo do Umari</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.83722 -39.83028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386019" />
            <name><narrative>Troia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.56 -39.93167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403373" />
            <name><narrative>Cangati</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.43333 -39.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceará</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398404" />
            <name><narrative>Ibicua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.92917 -39.42389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392912" />
            <name><narrative>Pasta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.6725 -38.90972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392608" />
            <name><narrative>Pedra Branca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.49336 -39.85259</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003401587" />
            <name><narrative>Costas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6 -40.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402001" />
            <name><narrative>Codia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.69028 -39.31889</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406622" />
            <name><narrative>Baixio</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.70726 -38.75748</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406661" />
            <name><narrative>Baixa Verde</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.36667 -39.85</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387926" />
            <name><narrative>Senador Pompeu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.58806 -39.37167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388406" />
            <name><narrative>Sao Jose de Solonopole</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.96124 -39.0823</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003388566" />
            <name><narrative>Sao Joaquim do Salgado</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.41917 -39.61389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397679" />
            <name><narrative>Jaguaretama</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.4833 -38.75595</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003400851" />
            <name><narrative>Engenheiro Jose Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.67556 -39.44972</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006318228" />
            <name><narrative>Santa Cruz do Banabuiu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.46611 -40.00389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003406952" />
            <name><narrative>Aurora</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.00011 -38.97042</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14020" percentage="34" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="32" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="25" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="35.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="6" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="86" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="100" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="100" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="6" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="74" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="86" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">896916.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">896916.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2283083.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2283083.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3090833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3090833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2774500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1786166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1786166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">639333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">639333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">185833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">185833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">896916.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">896916.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2283083.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2283083.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3090833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3090833.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2774500.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1786166.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1786166.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">639333.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">639333.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">185833.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">185833.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">10756462.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">10756462.96</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">139880000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">652552</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1237013</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">554379</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1835657</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2924518</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">11715943</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">1748292</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">5665503</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">5913282</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">1376905</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">32655193</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">34237696</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">6326313</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">11286329</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">9057463</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">1936500</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-349700</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-170088</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-186952</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-184656</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-196059</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-224876</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-744772</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-974659</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-1282655</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2496419</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-3270051</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-3237880</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-3682212</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-8743</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-16314</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-34671"><narrative>Secretariat of Water Resources - SRH</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34672"><narrative>Ceara Water and Sanitation Utility - CAGECE</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-34673"><narrative>Ceara Economic Research and Strategy Institute - IPECE</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165055"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165055?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165055"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="For women – 3.48 days/year For men - 3.15 days/year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="Gap reduction by 20%">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: For women – 7.2 days/year For men - 6.9 days/year. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve safety conditions of Banabuiú and Gavião dams
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No activity implemented."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-31" />
<target value="Banabuiú rehabilitation works completed.">

</target>
<actual value="Dam Safety Panel of Experts hired. New procurement process for Gavião Dam Safety Periodic Review and complementary studies for Banabuiú dam underway. New contract signed for the preparation of the Gavião and Banabuiú Dam Safety Plans underway (instrumentation plan, O&amp;M plan, EPP). Banabuiú rehabilitation works completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water tariff structure revision proposal finalized, approved by the Administration Council and presented to the regulatory agencies.
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="Tariff structure not revised."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-06-28" />
<target value="Proposed tariff structure revision presented and approved by regulatory agencies.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="Water tariff structure revision proposal completed and approved by the regulatory agency.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="61,615.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Continuity of water systems supplied with water from Banabuiu - Sertao Central pipeline system
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Continuity of water services means uninterrupted supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of time spent with household workloads (including fetching water to the household)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="For women - 18.1 hours/weekFor men - 10.5 hour/week"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="Gap reduction by 10%">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: For women -  35.5 hours/week. For men - 16.9 hour/week. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="For women – 3.48 days/year For men - 3.15 days/year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="Gap reduction by 20%">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: For women – 7.2 days/year For men - 6.9 days/year. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate Forecast System strengthened
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="Climate Forecast System based on two global climate models on biweekly basis."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-12-29" />
<target value="Climate Forecast System generated information being used to calculate water inflow in strategic reservoirs.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="Climate Forecast System generated information being used to calculate water inflow in strategic reservoirs.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="118,490.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Resolution regulating the patrimonial control of the water and sanitation sector assets published
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-06-30" />
<target value="1.00">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contract evaluation average index developed
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No index."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-06-30" />
<target value="Methodology applied for contracts registered in the new system.">
<comment><narrative>
Intermediate target achieved.
</narrative></comment>
</target>
<actual value="Calculation methodology defined including evaluation criteria to be established by the institutions that will use the system together with the hired firm.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="61,615.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management System implemented and operational
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-12-31" />
<target value="20% of new water resources related projects analyzed via the System.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="20% of new water resources related projects analyzed via the System.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Water tariff structure revision proposal finalized, approved by the Administration Council and presented to the regulatory agencies.
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="Tariff structure not revised."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-06-28" />
<target value="Proposed tariff structure revision presented and approved by regulatory agencies.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="Water tariff structure revision proposal completed and approved by the regulatory agency.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public Investment Management System implemented and operational
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-12-31" />
<target value="20% of new water resources related projects analyzed via the System.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="20% of new water resources related projects analyzed via the System.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Resolution regulating the patrimonial control of the water and sanitation sector assets published
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-06-30" />
<target value="1.00">
<comment><narrative>
Manual finalized. Resolution being formulated.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in Non Revenue Water in the city of Fortaleza (litters/connection.day)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="469.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="317.00">
<comment><narrative>
Reduction in Non Revenue Water based on the creation of DMAs in hydraulic sectors in the city of Fortaleza.
</narrative></comment>
</target>
<actual value="Initial measurements show 313.15 for Lot I and 337.08 for Lot II.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="61,615.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="61,615.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="118,490.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="118,490.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in Non Revenue Water in the city of Fortaleza (litters/connection.day)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="469.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="317.00">
<comment><narrative>
Reduction in Non Revenue Water based on the creation of DMAs in hydraulic sectors in the city of Fortaleza.
</narrative></comment>
</target>
<actual value="Initial measurements show 313.15 for Lot I and 337.08 for Lot II.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in Non Revenue Water in the city of Fortaleza (litters/connection.day)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="469.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="317.00">
<comment><narrative>
Reduction in Non Revenue Water based on the creation of DMAs in hydraulic sectors in the city of Fortaleza.
</narrative></comment>
</target>
<actual value="Initial measurements show">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Continuity of water systems supplied with water from Banabuiu - Sertao Central pipeline system
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Continuity of water services means uninterrupted supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Continuity of water systems supplied with water from Banabuiu - Sertao Central pipeline system
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Continuity of water services means uninterrupted supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of strategic water users regularized
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Final target exceeded.
</narrative></comment>
</target>
<actual value="88.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of strategic water users regularized
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Final target exceeded.
</narrative></comment>
</target>
<actual value="88.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of strategic water users regularized
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Final target exceeded.
</narrative></comment>
</target>
<actual value="88.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of District Metering Areas created in Fortaleza
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-12-29" />
<target value="44.00">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="100.00 answered out of which 86% were resolved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in Non Revenue Water in the city of Fortaleza (litters/connection.day)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="469.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="317.00">
<comment><narrative>
Reduction in Non Revenue Water based on the creation of DMAs in hydraulic sectors in the city of Fortaleza.
</narrative></comment>
</target>
<actual value="Initial measurements show">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Contract evaluation average index developed
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No index."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-06-30" />
<target value="Methodology applied for contracts registered in the new system.">
<comment><narrative>
Intermediate target achieved.
</narrative></comment>
</target>
<actual value="Calculation methodology defined including evaluation criteria to be established by the institutions that will use the system together with the hired firm.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dedicated group created at the IPECE to provide technical support in designing policies in the water and agribusiness sectors through on-demand research.
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No group"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-31" />
<target value="Inter and intra sectoral water demand study using input output model completed.">
<comment><narrative>
Intermediate targets achieved.
</narrative></comment>
</target>
<actual value="Group created within IPECE's Directorate of Economic Studies.
Productive chains study with focus on water intensive production completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of public works monitored
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-06-30" />
<target value="100% of the Project's works monitored.80% of the State large works (above R$50 million) monitored.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="100% of the Project's works monitored.80% of the State large works (above R$50 million) monitored">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate Forecast System strengthened
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="Climate Forecast System based on two global climate models on biweekly basis."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-12-29" />
<target value="Climate Forecast System generated information being used to calculate water inflow in strategic reservoirs.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="Climate Forecast System generated information being used to calculate water inflow in strategic reservoirs.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of District Metering Areas created in Fortaleza
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2023-12-29" />
<target value="44.00">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="44.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of registered large users that have macro metering
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="75.00">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="88% out of which 75% of macro meters installed with loan financing.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries Level of satisfaction with the provision of water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: 64.10. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction of time spent with household workloads (including fetching water to the household)
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="For women - 18.1 hours/weekFor men - 10.5 hour/week"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="Gap reduction by 10%">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: For women -  35.5 hours/week. For men - 16.9 hour/week. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Percentage of public works monitored
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2025-06-30" />
<target value="100% of the Project's works monitored.80% of the State large works (above R$50 million) monitored.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="100% of the Project's works monitored.80% of the State large works (above R$50 million) monitored">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries Level of satisfaction with the provision of water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="70.00">
<comment><narrative>
Baseline updated in 2023/2024.
</narrative></comment>
</target>
<actual value="Baseline update in 2023/2024: 64.10. Initial measurement will be made in the end of 2025, when water starts to be supplied.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of registered large users that have macro metering
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="7.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="75.00">
<comment><narrative>
Target partially achieved.
</narrative></comment>
</target>
<actual value="84% out of which 68% of macro meters installed with loan financing.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of strategic water users regularized
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="80.00">
<comment><narrative>
Final target exceeded.
</narrative></comment>
</target>
<actual value="88.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased water treatment capacity in the Banabuiu Sertao Central pipeline system region
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="1,900 m3/h">
<comment><narrative>
Capacity refers to CAGECE's water treatment stations in the municipalities of Senador Pompeu (110 m3/h), Piquet Carneiro (110 m3/h), Mombaça (220 m3/h), and Jaguaretama (110 m3/h).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from more reliable water services
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="118,490.00">
<comment><narrative>
People benefiting from more reliable water services measured on a basis of uninterrupted water supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Increased water treatment capacity in the Banabuiu Sertao Central pipeline system region
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="1,900 m3/h">
<comment><narrative>
Capacity refers to CAGECE's water treatment stations in the municipalities of Senador Pompeu (110 m3/h), Piquet Carneiro (110 m3/h), Mombaça (220 m3/h), and Jaguaretama (110 m3/h).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Continuity of water systems supplied with water from Banabuiu - Sertao Central pipeline system
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="70.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Continuity of water services means uninterrupted supply (except for maintenance) following the National water quality standards (Ministry of Health PRC n. 05 of Sep. 28, 2017, Annex XX).
</narrative></comment>
</target>
<actual value="70.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2026-12-31" />
<target value="90.00">
<comment><narrative>
Target exceeded.
</narrative></comment>
</target>
<actual value="100.00 answered out of which 86% were resolved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improve safety conditions of Banabuiú and Gavião dams
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No activity implemented."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-31" />
<target value="Banabuiú rehabilitation works completed.">

</target>
<actual value="Dam Safety Panel of Experts hired. New procurement process for Gavião Dam Safety Periodic Review and complementary studies for Banabuiú dam underway. New procurement process for the Gavião and Banabuiú Dam Safety Plans underway (instrumentation plan, O&amp;M plan, EPP). Banabuiú rehabilitation works completed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Dedicated group created at the IPECE to provide technical support in designing policies in the water and agribusiness sectors through on-demand research.
</narrative></title>
<baseline year="2019" iso-date="2019-07-01" value="No group"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-07-01" />
<period-end iso-date="2024-12-31" />
<target value="Inter and intra sectoral water demand study using input output model completed.">
<comment><narrative>
Final target achieved.
</narrative></comment>
</target>
<actual value="Group created within IPECE's Directorate of Economic Studies.
Productive chains study with focus on water intensive production completed.
Inter and intra sectoral water demand study using input output model completed.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P165683</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Paraiba Improving Water Resources Management and Services Provision</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To (i) strengthen capacity for integrated water resources management in the State; (ii) improve reliability  of water services in the Agreste and Borborema regions; and (iii) improve the operational efficiency of water and wastewater services in the Joao Pessoa Metropolitan Region.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Paraiba Improving Water Resources Management and Services Provision Project are to: (i) strengthen capacity for integrated water resources management in the State; (ii) improve reliability of water services in the Agreste and Borborema regions; and (iii) improve the operational efficiency of water and wastewater services in the Joao Pessoa Metropolitan Region. There are three components to the project, the first component being integrated water resources management. This component will support strengthening the institutional capacity for water resources management and meteorological and hydrological monitoring and forecasting and increasing the resilience of water supply systems to climate-related events. The component includes the following subcomponents: improving water management, project management and institutional Development. The second component is the improved water and sanitation services reliability and efficiency. This component will help increase the reliability of water supply and the resilience of services to extreme drought events in water scarce regions. The component will reduce the contamination of scarce water resources in the JPMR by improving sanitation systems. The component will also invest in improving the operational efficiency of CAGEPA. The component includes the following subcomponents: water infrastructure in the Agreste and Borborema Regions, and water and Sanitation in João Pessoa Metropolitan Region. Finally, the third component is the contingent emergency response (zero budget). This zero-cost Contingency Emergency Response Component (CERC) will be available to support rapid response activities following a formal declaration of an eligible crisis or emergency. Loan proceeds can be reallocated from other components to eligible activities, such as emergency rehabilitation works, provision of critical equipment, or any other critical inputs to ensure the continued operation of water and sanitation infrastructure and services. Streamlined procurement and disbursement procedures will be used to expedite disbursements. The CERC section of the project operational manual provides more specific guidelines.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0035413"><narrative>State Secretariat for Infrastructure, Water Resources and Environment</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0035413"><narrative>State Secretariat for Infrastructure, Water Resources and Environment</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0035413"><narrative>State Secretariat for Infrastructure, Water Resources and Environment</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0035414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-06-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-02-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Alfonso Alvestegui</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aalvestegui@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>










<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003464981" />
            <name><narrative>Curimata</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.86209 -44.38994</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320108" />
            <name><narrative>Trairi</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.33156 -39.38032</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322044" />
            <name><narrative>Paraiba Do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.18719 -43.26207</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323657" />
            <name><narrative>Sertao</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-28.00412 -52.35664</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393098" />
            <name><narrative>Paraiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -36.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395161" />
            <name><narrative>Mata Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.98543 -37.7615</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398848" />
            <name><narrative>Gramame</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.21667 -34.88333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402886" />
            <name><narrative>Cariri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.71667 -36.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453337" />
            <name><narrative>Pocoes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.52972 -40.36528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394778" />
            <name><narrative>Miriri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.86667 -34.9</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391957" />
            <name><narrative>Piranhas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.54806 -37.74529</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320289" />
            <name><narrative>Borborema</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.79913 -35.62094</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320301" />
            <name><narrative>Camalau</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.92695 -36.74211</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320340" />
            <name><narrative>Joao Pessoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.17088 -34.86536</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008306183" />
            <name><narrative>Epitacio Pessoa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-24.7814 -48.983</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403732" />
            <name><narrative>Camaratuba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.18333 -36.88333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006319057" />
            <name><narrative>Mamanguape</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.70651 -35.151</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008437701" />
            <name><narrative>Agreste</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.43488 -43.63517</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321480" />
            <name><narrative>Jacui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.01103 -46.71842</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="42" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="32" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="20" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="6" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="0" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="39.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="3" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="35" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="20" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="45" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="32" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="37" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="48" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="48" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="32" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000753" percentage="3" xml:lang="en"><narrative>Disaster Preparedness</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="37" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="45" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="35" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">63443.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">63443.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">63443.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">63443.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">63443.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">160388.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">359479.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">198202.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">430791.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">231701.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">241979.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">528369.96</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">289816.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">619096.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">323569.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">329914.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">671882.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">340572.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">694722.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">356687.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">364681.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">749666.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">369376.79</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">362778.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">736469.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">388917.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">855746.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">470127.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">479263.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">983397.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">518599.43</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">548291.69</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1214464.19</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">653102.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1370031.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">725557.02</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">759436.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1638530.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">875414.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1827850.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">958527.06</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">991391.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2083533.80</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1094680.03</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1131731.91</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2361803.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1229310.32</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2553661.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1321559.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1355185.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2845888.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1483470.99</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1516969.95</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">3100430.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1568614.18</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">3226305.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1676470.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1704386.48</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3443667.71</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1713903.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3402428.46</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1725957.78</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1745879.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3511553.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1749051.76</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3458513.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1739154.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1748417.31</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">3502290.89</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1746006.40</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1738012.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3444302.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1704513.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">3397225.97</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1694742.84</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1690936.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3363853.90</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2617557.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2617557.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">38563594.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">38563594.38</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">126886000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">317215</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">1893258</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">2013166</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">3995844</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">8487077</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">9278504</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">13178703</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">20900098</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">6800</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">28242737</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">9003</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">-317215</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-92313</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-170448</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-168567</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-227749</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-273553</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-294407</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-611982</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-961075</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1207873</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2048675</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2245945</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35414"><narrative>CAGEPA - State Water and Sanitation Company</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-35415"><narrative>AESA - State Water Resources Management Executive Agency</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165683"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165683?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165683"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment and Functioning of Non-Revenue Water Management Program in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2022-12-30" />
<target value="Yes">
<comment><narrative>
CAGEPA will issue a resolution establishing and make functional a Non-Revenue Water Management Program
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated Paraiba River Basin plan submitted to the Paraiba River Basin Committee
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the Paraiba River Basin Committee a draft Update of the Paraiba River Basin Plan, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual operation water management plan for the Paraiba river issued
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">
<comment><narrative>
Plan describing water transfered from São Francisco river, expected reservoirs level and the main uses authorized for the following year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - WOMEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="3.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="2.30">
<comment><narrative>
A baseline household survey in the 9 municipalities benefiting from the Transparaiba-Curimata&amp;uacute; pipeline&amp;nbsp;system was&amp;nbsp;carried out in the past months, and the report was shared with the Bank in the second half of 2023. Two other surveys.will be undertaken&amp;nbsp;to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated Paraiba River Basin plan submitted to the Paraiba River Basin Committee
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the Paraiba River Basin Committee a draft Update of the Paraiba River Basin Plan, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - MEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="3.15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-12-15" />
<target value="2.30">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation, Management and Emergency Preparedness Plans elaborated for existing dams in the Paraiba river basin
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2023-12-27" />
<target value="3.00">
<comment><narrative>
SEIRHMA will coordinate with DNOCS to ellaborate O&amp;M and EPP for the Pocoes, Camalau and Boqueirao dams, to be carried out and completed under the project
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of the gender gap in time spent with household workloads (including fetching water to the household)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="73.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2025-06-30" />
<target value="53.00">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent with household workloads, disaggregated by gender.
</narrative></comment>
</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Non-Revenue Water reduced in the JPMR
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2026-01-30" />
<target value="17,000,000.00">
<comment><narrative>
Cumulative volume of water recovered as a result of the reduction of non-revenue water in the JPMR, calculated in cubic meters (or water saved).
</narrative></comment>
</target>
<actual value="7,047,105.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2025-06-30" />
<target value="80.00">
<comment><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System. This indicator is to measure changes in the level of satisfaction of water supply and sanitation services and its impacts on well-being through household surveys. It is calculated based on percentage of water users who are satisfied with the services, disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="80.00">
<comment><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - WOMEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="3.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="2.30">
<comment><narrative>
A baseline household survey in the 9 municipalities benefiting from the Transparaiba-Curimata&amp;uacute; pipeline&amp;nbsp;system was&amp;nbsp;carried out in the past months, and the report was shared with the Bank in the second half of 2023. Two other surveys.will be undertaken&amp;nbsp;to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency increased in the wastewater system in João Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="8.90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2025-06-30" />
<target value="4.10">
<comment><narrative>
Energy demand for pumping and treatment in the Roger Wastewater System of JPMR is reduced in kilowatt-hour per cubic meter (kwh/m3) upon completion of the works and operation of the system
</narrative></comment>
</target>
<actual value="8.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual operation water management plan for the Paraiba river issued
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">
<comment><narrative>
Plan describing water transfered from São Francisco river, expected reservoirs level and the main uses authorized for the following year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased water treatment capacity in the Agreste and Borborema Regions
</narrative></title>
<baseline year="2018" iso-date="2018-12-11" value="5,392,656"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-11" />
<period-end iso-date="2027-06-15" />
<target value="28,392,656.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries with reliable water services
</narrative></title>
<baseline year="2018" iso-date="2018-12-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-10" />
<period-end iso-date="2027-06-15" />
<target value="175,676">
<comment><narrative>
Urban population in the municipalities benefiting from the Transparaiba Water Supply Systems (Curimataú and Cariri branches) with reliable water services (water supplied in at least 80% of days per year), and rural population benefited from the installation of standposts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of pollution loads (BOD) discharges reduced in water bodies in the JPMR
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="3,200.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="9,600.00">
<comment><narrative>
Reduction of pollution loads discharged by the wastewater treatment plant in the Paraiba river estuary, measured in tons of BOD per year.
</narrative></comment>
</target>
<actual value="3,200.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations operational and feeding into the water information system
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2022-12-31" />
<target value="83.00">
<comment><narrative>
Total number of automatized hydromet stations that are funcional and regulalry feeding intom the AESA information system.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water distribution sectors zones implemented in João Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="29.00">
<comment><narrative>
Ring fenced sector pressure zones will be installed in the water distribution network of the João Pessoa Metropolitan Region
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised bulk water charges submitted to the State Waer Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining criteria and unit prices for water use charging, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased water treatment capacity in the Agreste and Borborema Regions
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="23,000,000.00">
<comment><narrative>
The Carimatau and the Cariri water supply system will add a treatement capacity of 740 l/s at completion and operation, equivalent to 23 million of cubic meters per year of treated water
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="80.00">
<comment><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System. This indicator is to measure changes in the level of satisfaction of water supply and sanitation services and its impacts on well-being through household surveys. It is calculated based on percentage of water users who are satisfied with the services, disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - MEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="3.15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="2.30">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.15">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations operational and feeding into the water information system
</narrative></title>
<baseline year="2018" iso-date="2018-12-13" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-13" />
<period-end iso-date="2022-12-13" />
<target value="83.00">
<comment><narrative>
Total number of automatized hydromet stations that are funcional and regulalry feeding intom the AESA information system.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of the gender gap in time spent with household workloads (including fetching water to the household)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="73.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-12-15" />
<target value="53.00">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent with household workloads, disaggregated by gender.
</narrative></comment>
</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days with piped water in the benefitted cities of the Agreste and Borborema regions
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="98.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2024-12-31" />
<target value="328.00">
<comment><narrative>
Average number of days per year that municipalities benefiting from the Transparaiba Water Sypply System (Curimata&amp;uacute; and Cariri Branches) will have piped water supply.
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised criteria for water rights is submitted to the State Water Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2022-12-31" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining the criteria for issuing water rights, based on studies to be carried out under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency increased in the wastewater collection system in the Joao Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="8.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="2026-12-07" />
<target value="4.1">
<comment><narrative>
Energy demand for pumping in the wastewater collection system of JPMR is reduced upon completion of the works and operation of the system, measured in kilowatt-hour per cubic meter of wastewater (kwh/m3)
</narrative></comment>
</target>
<actual value="8.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water recovered as a result of non-revenue water control actions in the JPMR - cumulative value
</narrative></title>
<baseline year="2018" iso-date="2018-12-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-11" />
<period-end iso-date="2027-12-11" />
<target value="17,000,000.00">
<comment><narrative>
Cumulative volume of water recovered as a result of the reduction of non-revenue water in the JPMR, calculated in cubic meters (or water saved).
</narrative></comment>
</target>
<actual value="7,047,105.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2025-06-30" />
<target value="80.00">
<comment><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></comment>
</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries with reliable water services
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="235,000.00">
<comment><narrative>
Urban population in the municipalities benefiting from the Transparaiba Water Supply Systems (Curimataú and Cariri branches) with reliable water services (water supplied in at least 80% of days per year), and rural population benefited from the installation of standposts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days with piped water in the benefitted cities of the Agreste and Borborema regions
</narrative></title>
<baseline year="2017" iso-date="2017-11-12" value="98.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-12" />
<period-end iso-date="2027-06-15" />
<target value="328.00">
<comment><narrative>
Average number of days per year that municipalities benefiting from the Transparaiba Water Sypply System (Curimata&amp;uacute; and Cariri Branches) will have piped water supply.
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of social and environmental risk management system in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2022-12-30" />
<target value="Yes">
<comment><narrative>
CAGEPA will develop, establish and make functional a social and environmental risk management plan, based on studies financed under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised criteria for water rights is submitted to the State Water Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-12-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining the criteria for issuing water rights, based on studies to be carried out under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised bulk water charges submitted to the State Waer Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining criteria and unit prices for water use charging, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of social and environmental risk management system in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2022-12-26" />
<target value="Yes">
<comment><narrative>
CAGEPA will develop, establish and make functional a social and environmental risk management plan, based on studies financed under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - WOMEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="3.48"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="2.30">
<comment><narrative>
A baseline household survey in the 9 municipalities benefiting from the Transparaiba-Curimata&amp;uacute; pipeline&amp;nbsp;system was&amp;nbsp;carried out in the past months, and the report was shared with the Bank in the second half of 2023. Two other surveys.will be undertaken&amp;nbsp;to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="80.00">
<comment><narrative>
Grievances and claims addressed and resolved within the agreed time frame
</narrative></comment>
</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="80.00">
<comment><narrative>
Level of beneficiary satisfaction with project activities in the Transparaiba Water Supply System. This indicator is to measure changes in the level of satisfaction of water supply and sanitation services and its impacts on well-being through household surveys. It is calculated based on percentage of water users who are satisfied with the services, disaggregated by gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of the gender gap in time spent with household workloads (including fetching water to the household)
</narrative></title>
<baseline year="2020" iso-date="2020-06-30" value="73.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-30" />
<period-end iso-date="2027-12-15" />
<target value="53.00">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent with household workloads, disaggregated by gender.
</narrative></comment>
</target>
<actual value="73.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction of the time lost from routine activities because of waterborne and gastrointestinal diseases - MEN
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="3.15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-12-15" />
<target value="2.30">
<comment><narrative>
A household survey in the municipalities benefiting from the Transparaiba Water Supply system will be carried out three times to collect data and to measuring the effect of increased water reliability on time spent caring for children and adults with water-borne diseases, disaggregated by gender. This indicator aims to measure changes in time spent by women and men with sickness and hospitalizations because of waterborne diseases.
</narrative></comment>
</target>
<actual value="3.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment of social and environmental risk management system in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2022-12-26" />
<target value="Yes">
<comment><narrative>
CAGEPA will develop, establish and make functional a social and environmental risk management plan, based on studies financed under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation, Management and Emergency Preparedness Plans elaborated for existing dams in the Paraiba river basin
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2023-12-27" />
<target value="3.00">
<comment><narrative>
SEIRHMA will coordinate with DNOCS to ellaborate O&amp;M and EPP for the Pocoes, Camalau and Boqueirao dams, to be carried out and completed under the project
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment and Functioning of Non-Revenue Water Management Program in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2022-12-26" />
<target value="Yes">
<comment><narrative>
CAGEPA issued a resolution establishing and making functional a Non-Revenue Water Management Program
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Updated Paraiba River Basin plan submitted to the Paraiba River Basin Committee
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the Paraiba River Basin Committee a draft Update of the Paraiba River Basin Plan, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water distribution zones implemented in João Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-13" />
<period-end iso-date="2027-12-15" />
<target value="15">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised bulk water charges submitted to the State Waer Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-06-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining criteria and unit prices for water use charging, based on studies carried out under the project
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increased water treatment capacity in the Agreste and Borborema Regions
</narrative></title>
<baseline year="2018" iso-date="2018-12-11" value="5,392,656"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-11" />
<period-end iso-date="2027-06-15" />
<target value="28,392,656.00">
<comment><narrative>
56% of the final target
</narrative></comment>
</target>
<actual value="16,114,896">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
AESA draft resolution with revised criteria for water rights is submitted to the State Water Resources Council
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2027-12-15" />
<target value="Yes">
<comment><narrative>
AESA will submitt to the State Water Resources Council a draft resolution redefining the criteria for issuing water rights, based on studies to be carried out under the project
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations operational and feeding into the water information system
</narrative></title>
<baseline year="2018" iso-date="2018-12-13" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-13" />
<period-end iso-date="2022-12-13" />
<target value="83.00">
<comment><narrative>
Total number of automatized hydromet stations that are funcional and regulalry feeding intom the AESA information system.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations operational and feeding into the water information system
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2022-12-31" />
<target value="83.00">
<comment><narrative>
Total number of automatized hydromet stations that are funcional and regulalry feeding intom the AESA information system.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hydromet stations operational and feeding into the water information system
</narrative></title>
<baseline year="2018" iso-date="2018-12-13" value="10.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-13" />
<period-end iso-date="2022-12-13" />
<target value="83.00">
<comment><narrative>
Total number of automatized hydromet stations that are funcional and regulalry feeding intom the AESA information system.
</narrative></comment>
</target>
<actual value="83.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of pollution loads (BOD) discharges reduced in water bodies in the JPMR
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="3,200.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="9,600.00">
<comment><narrative>
Reduction of pollution loads discharged by the wastewater treatment plant in the Paraiba river estuary, measured in tons of BOD per year.
</narrative></comment>
</target>
<actual value="3,200.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of dams prioritized for future design in the Piranhas-Açu Basin
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="3.00">
<comment><narrative>
SEIRHMA will prioritize at least three dams for future design in the Piranhas-Áçu river basin, based on the pre-feasibility studies of dams to be carried out under the project
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries with reliable water services
</narrative></title>
<baseline year="2018" iso-date="2018-12-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-10" />
<period-end iso-date="2027-06-15" />
<target value="175,676">
<comment><narrative>
Urban population in the municipalities benefiting from the Transparaiba Water Supply Systems (Curimataú and Cariri branches) with reliable water services (water supplied in at least 80% of days per year), and rural population benefited from the installation of standposts.
</narrative></comment>
</target>
<actual value="29,780">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries with reliable water services
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2024-12-31" />
<target value="235,000.00">
<comment><narrative>
Urban population in the municipalities benefiting from the Transparaiba Water Supply Systems (Curimataú and Cariri branches) with reliable water services (water supplied in at least 80% of days per year), and rural population benefited from the installation of standposts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries with reliable water services
</narrative></title>
<baseline year="2018" iso-date="2018-12-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-10" />
<period-end iso-date="2027-06-15" />
<target value="175,676">
<comment><narrative>
Urban population in the municipalities benefiting from the Transparaiba Water Supply Systems (Curimataú and Cariri branches) with reliable water services (water supplied in at least 80% of days per year), and rural population benefited from the installation of standposts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual operation water management plan for the Paraiba river issued
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">
<comment><narrative>
Plan describing water transfered from São Francisco river, expected reservoirs level and the main uses authorized for the following year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual operation water management plan for the Paraiba river issued
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">
<comment><narrative>
Plan describing water transfered from São Francisco river, expected reservoirs level and the main uses authorized for the following year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual operation water management plan for the Paraiba river issued
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2021-12-31" />
<target value="Yes">
<comment><narrative>
Plan describing water transfered from São Francisco river, expected reservoirs level and the main uses authorized for the following year.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water recovered as a result of non-revenue water control actions in the JPMR - cumulative value
</narrative></title>
<baseline year="2018" iso-date="2018-12-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-11" />
<period-end iso-date="2027-12-11" />
<target value="17,000,000.00">
<comment><narrative>
Cumulative volume of water recovered as a result of the reduction of non-revenue water in the JPMR, calculated in cubic meters (or water saved). This indicator includes the reduction of commercial losses:
• Water meter installation contract. Through this activity, CAGEPA recovered 3,053,402 m³ of water between January 2021 and April 2026.
• Performance-based contract. This contract is ongoing and has enabled CAGEPA to recover 28,068,244 m³ of water as of April 2026.
• Total recovered volume (cumulative): 31,121,646 m³ as of April 2026.
</narrative></comment>
</target>
<actual value="31,121,646.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Non-Revenue Water reduced in the JPMR
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2026-01-30" />
<target value="17,000,000.00">
<comment><narrative>
Cumulative volume of water recovered as a result of the reduction of non-revenue water in the JPMR, calculated in cubic meters (or water saved).
</narrative></comment>
</target>
<actual value="7,047,105.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of water recovered as a result of non-revenue water control actions in the JPMR - cumulative value
</narrative></title>
<baseline year="2018" iso-date="2018-12-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-11" />
<period-end iso-date="2027-12-11" />
<target value="17,000,000.00">
<comment><narrative>
Cumulative volume of water recovered as a result of the reduction of non-revenue water in the JPMR, calculated in cubic meters (or water saved).
</narrative></comment>
</target>
<actual value="7,047,105.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days with piped water in the benefitted cities of the Agreste and Borborema regions
</narrative></title>
<baseline year="2017" iso-date="2017-11-12" value="98.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-12" />
<period-end iso-date="2027-06-15" />
<target value="328.00">
<comment><narrative>
Average number of days per year that municipalities benefiting from the Transparaiba Water Sypply System (Curimata&amp;uacute; and Cariri Branches) will have piped water supply.
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days with piped water in the benefitted cities of the Agreste and Borborema regions
</narrative></title>
<baseline year="2017" iso-date="2017-11-30" value="98.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-30" />
<period-end iso-date="2024-12-31" />
<target value="328.00">
<comment><narrative>
Average number of days per year that municipalities benefiting from the Transparaiba Water Sypply System (Curimata&amp;uacute; and Cariri Branches) will have piped water supply.
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days with piped water in the benefitted cities of the Agreste and Borborema regions
</narrative></title>
<baseline year="2017" iso-date="2017-11-12" value="98.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-12" />
<period-end iso-date="2027-06-15" />
<target value="328.00">
<comment><narrative>
Average number of days per year that municipalities benefiting from the Transparaiba Water Sypply System (Curimata&amp;uacute; and Cariri Branches) will have piped water supply.
</narrative></comment>
</target>
<actual value="98.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency increased in the wastewater collection system in the Joao Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="8.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="2026-12-07" />
<target value="4.1">
<comment><narrative>
Energy demand for pumping in the wastewater collection system of JPMR is reduced upon completion of the works and operation of the system, measured in kilowatt-hour per cubic meter of wastewater (kwh/m3)
</narrative></comment>
</target>
<actual value="8.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Energy efficiency increased in the wastewater collection system in the Joao Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-07" value="8.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-07" />
<period-end iso-date="2026-12-07" />
<target value="4.1">
<comment><narrative>
Energy demand for pumping in the wastewater collection system of JPMR is reduced upon completion of the works and operation of the system, measured in kilowatt-hour per cubic meter of wastewater (kwh/m3)
</narrative></comment>
</target>
<actual value="8.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Establishment and Functioning of Non-Revenue Water Management Program in CAGEPA
</narrative></title>
<baseline year="2018" iso-date="2018-12-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-27" />
<period-end iso-date="2022-12-26" />
<target value="Yes">
<comment><narrative>
CAGEPA will issue a resolution establishing and make functional a Non-Revenue Water Management Program
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water distribution zones implemented in João Pessoa Metropolitan Region
</narrative></title>
<baseline year="2018" iso-date="2018-12-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-13" />
<period-end iso-date="2027-12-15" />
<target value="15">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Operation, Management and Emergency Preparedness Plans elaborated for existing dams in the Paraiba river basin
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-31" />
<target value="3.00">
<comment><narrative>
SEIRHMA will coordinate with DNOCS to ellaborate O&amp;M and EPP for the Pocoes, Camalau and Boqueirao dams, to be carried out and completed under the project
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P165695</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>SABESP - IMPROVING WATER SERVICE ACCESS AND SECURITY IN THE METROPOLITAN REGION OF SÃO PAULO PROJECT</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to increase access of  vulnerable  people to water services and to contribute to the reduction of water losses and pollution loads in the Metropolitan Region of São Paulo.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of Improving Water Service Access and Security in the Metropolitan Region of Sao Paulo Project of Brazil are to increase access of vulnerable people to water services and to contribute to the reduction of water losses and pollution loads in the Metropolitan Region of São Paulo(MRSP). This project has four components. 1) The first component, Expand access to water services, reduce water losses, and increase system resilience in the MRSP, has four sub components as follows: (i) Increase access of the vulnerable population to Water Supply and Sanitation (WSS) services; (ii) Rehabilitation and renewal of critical water networks; (iii) Reducing water losses in specific water sectors in low-income areas; and (iv) Repairing and improving operation and maintenance of assets, lifespan extension of dams supplying water to the MRSP. 2) The second component, Reduce pollution loads to scarce water resources in the Guarapiranga Water Basin, has the following subcomponents: (i) Expanding sanitation services provision to vulnerable people; (ii) Reducing pollution loads in rivers; and (iii) Increase sewerage system reliability. 3) The third component, Technical assistance and Project management and supervision, has the following subcomponents: (i) Exploring innovative approaches, strategic studies, and alternative-pilot solutions; (ii) Project management and supervision; and (iii) Institutional support, development of studies, plans, designs, and investigations to support the renewing and life span extension of the dams supplying water to the MRSP. 4) The fourth component, Contingent Emergency Response Component, aims to support São Paulo State Water Utility (SABESP), following an eligible crisis or emergency, to respond to the emergency situations and reconstruction.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0035427"><narrative>SABESP</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0035426"><narrative>SABESP</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2018-09-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2018-12-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-05-16"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-05-16"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Camilo Lombana Cordoba</narrative></person-name><telephone>+1-202-473-1000</telephone><email>clombanacordoba@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Sao Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006324358" />
            <name><narrative>Sao Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.62703 -46.63503</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322307" />
            <name><narrative>Itapecerica Da Serra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.74232 -46.85547</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322226" />
            <name><narrative>Embu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.64664 -46.85386</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="14015" percentage="54" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="23" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="18" xml:lang="en"/><sector vocabulary="1" code="14040" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="66.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="10" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="8" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="10" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="27" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="51" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="10" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="10" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000716" percentage="42" xml:lang="en"><narrative>Urban Water and Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="18" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000837" percentage="8" xml:lang="en"><narrative>Watershed Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="10" xml:lang="en"><narrative>Water Pollution</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">190500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">266250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">607000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">341750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">757000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">413500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">891750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">476750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">1041000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">571000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">1219750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">637500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">650000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">1323750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">671000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">1368750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">702750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1454500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">741000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1442500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">716750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">734250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1578250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">874000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1870500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">956500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2002750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1080250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2392750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1286750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2699250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1429500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1496250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3228250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1724750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3601250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1888500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3972500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2085750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">4386500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2294750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2358500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4906750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2546500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">5273750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2759000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">5770750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2988750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">6108500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3090500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">3133000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">6526500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">3358000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">6784750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">3376750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">6703500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">3400500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">6898500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">3459750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">6861500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">3398500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3426500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">6895750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3449250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">6864250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">3407250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">6737000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">3349250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">6683000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">3331500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">6627500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">3300750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">3296250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">6576250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">3276750.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">6528000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">3251000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">6478000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3227250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">6431250.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">9091000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2027-05-16"/>
<value currency="USD" value-date="2027-05-16">53761999.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2027-05-16"/>
<value currency="USD" value-date="2027-05-16">53761999.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">625000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">572976</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">3227320</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">3764632</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">3636141</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">5789742</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">5539788</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">2995678</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">17366014</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">4819334</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">5240913</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">7794331</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">17521536</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">21068580</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">58951717</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">25016506</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">12307793</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-01-31"/><value value-date="2020-01-31">-625000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-76511</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-320194</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-313932</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-319424</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-314122</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-326873</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-502493</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-886845</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-1603984</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-2057715</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-2425544</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3266403</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3861678</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-35426"><narrative>SABESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165695"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P165695?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P165695"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="664000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through the Project with the Agua Legal Program.
</narrative></comment>
</target>
<actual value="695870">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene (Number), of which (%) is safely managed; disaggregated by gender.
</narrative></title>
<baseline year="2018" iso-date="2018-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-13" />
<period-end iso-date="2026-05-13" />
<target value="716000">

</target>
<actual value="723860">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women provided with water, sanitation, and hygiene (Number), of which 100% is safely managed.
</narrative></title>
<baseline year="2018" iso-date="2018-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="361840">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Men provided with water, sanitation, and hygiene (Number), of which 100% is safely managed.
</narrative></title>
<baseline year="2018" iso-date="2018-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="361840">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="664000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through the Project with the Agua Legal Program.
</narrative></comment>
</target>
<actual value="709373">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="664000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through the Project with the Agua Legal Program.
</narrative></comment>
</target>
<actual value="695870">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="664000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through the Project with the Agua Legal Program.
</narrative></comment>
</target>
<actual value="709373">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of non-revenue water reduction (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="55.70">
<comment><narrative>
Volume (millions of cubic meters per year) of water saved due to water losses reduction interventions carried out through subcomponents 1.1, 1.2, and 1.3. The revised expected contributions per subcomponent for last year of Project implementation are: 1.1 = 45.1million m3/year; 1.2 = 1.0 million m3/year; and 1.3 = 9.6million m3/year. The Agua Legal Program has been generating better results than originally expected.
</narrative></comment>
</target>
<actual value="57.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of non-revenue water reduction (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="55.70">
<comment><narrative>
Volume (millions of cubic meters per year) of water saved due to water losses reduction interventions carried out through subcomponents 1.1, 1.2, and 1.3. The revised expected contributions per subcomponent for last year of Project implementation are: 1.1 = 45.1million m3/year; 1.2 = 1.0 million m3/year; and 1.3 = 9.6million m3/year. The Agua Legal Program has been generating better results than originally expected.
</narrative></comment>
</target>
<actual value="56.70">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of non-revenue water reduction (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="55.70">
<comment><narrative>
Volume (millions of cubic meters per year) of water saved due to water losses reduction interventions carried out through subcomponents 1.1, 1.2, and 1.3. The revised expected contributions per subcomponent for last year of Project implementation are: 1.1 = 45.1million m3/year; 1.2 = 1.0 million m3/year; and 1.3 = 9.6million m3/year. The Agua Legal Program has been generating better results than originally expected.
</narrative></comment>
</target>
<actual value="57.10">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater removed from the Guarapiranga basin sent to treatment (millions of cubic meters/year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-15" />
<period-end iso-date="2027-05-15" />
<target value="2.00">
<comment><narrative>
The total volume of wastewater collected from: (i) the sewerage systems of Embu and Itapecerica, (ii) the wastewater conveyed by the Guavirutuba trunk sewer, (iii) the wastewater conveyed by the Talamanca force main, (iv) plus the monthly average multiplied by 12 months of the volume of wastewater pumped by the Embu 4 pumping station; and (v) new connections implemented under the Água Legal Program in the Guarapiranga basin.
</narrative></comment>
</target>
<actual value="2.01">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater removed from the Guarapiranga basin sent to treatment (millions of cubic meters/year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-13" />
<period-end iso-date="2026-05-13" />
<target value="2.00">
<comment><narrative>
The value of Embu 1, when considering the retrofit of Embu 4, is 1.94 million m³/year. This value is still being determined and has not been included in the calculation of the Indicator. The value of SES Itapecerica da Serra has been revised, taking into account the status of the pumping stations. 

This indicator is a consolidation of the data from  Project interventions in Embu and Itapecerica sanitation systems; Pumping Stations (Talamanca, Ipora; and Embu 4); Collectors and Agua Legal.
The total volume (millions of cubic meters per year) of wastewater collected by the Embu and Itapecerica sanitation systems, plus the volume of wastewater transported through Guavirutuba and Talamanca main trunk lines, plus the monthly average x 12 months for the volume pumped from Talamanca, Ipora and Embu 4 pumping stations only (to avoid double counting); in addition to the volume collected from new household connections implemented by the Água Legal Program in the Guarapiranga basin.
</narrative></comment>
</target>
<actual value="1.59">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater removed from the Guarapiranga basin sent to treatment (millions of cubic meters/year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-13" />
<period-end iso-date="2026-05-13" />
<target value="2.00">
<comment><narrative>
The value of Embu 1, when considering the retrofit of Embu 4, is 1.94 million m³/year. This value is still being determined and has not been included in the calculation of the Indicator. The value of SES Itapecerica da Serra has been revised, taking into account the status of the pumping stations. 

This indicator is a consolidation of the data from  Project interventions in Embu and Itapecerica sanitation systems; Pumping Stations (Talamanca, Ipora; and Embu 4); Collectors and Agua Legal.
The total volume (millions of cubic meters per year) of wastewater collected by the Embu and Itapecerica sanitation systems, plus the volume of wastewater transported through Guavirutuba and Talamanca main trunk lines, plus the monthly average x 12 months for the volume pumped from Talamanca, Ipora and Embu 4 pumping stations only (to avoid double counting); in addition to the volume collected from new household connections implemented by the Água Legal Program in the Guarapiranga basin.
</narrative></comment>
</target>
<actual value="1.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Period of time that the wastewater pumping stations rehabilitated by the Project are operational (percentage of time per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-15" value="93.09"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-15" />
<period-end iso-date="2027-05-15" />
<target value="98.00">
<comment><narrative>
Electromechanical availability index: compares the total number of hours per year that the pumping station Embu 4 (panel, motor, and pumps) was operation versus the total number of hours per year that the pumping station was expected to stay operational – this index calculated per year. This indicator precludes events that are not related to factors external  to the pumping stations operations (such as due to problems upstream or downstream of the stations).
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of micro metered water from new service connections to the formal water supply system (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="24.00">
<comment><narrative>
Volume (millions of cubic meters per year) of consumed water measured through the micrometers installed in the neighborhoods benefiting from the Agua Legal Program financed under the Project. The revised expected volume for the last year of Project implementation is 24,00 million of cubic meter per year.
</narrative></comment>
</target>
<actual value="25.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel that water and sanitation services reflect their needs in the Água Legal areas of interventions supported by the Project (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="80.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out. This indicator would be measuring and monitoring the changes in perceptions among men and women.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of sewerage main trunk line and discharge pipeline rehabilitated under the Project
</narrative></title>
<baseline year="2018" iso-date="2018-08-16" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-16" />
<period-end iso-date="2026-05-20" />
<target value="3.20">
<comment><narrative>
Number of kilometers of sewerage main trunk line and discharge pipeline replaced under the Project.
</narrative></comment>
</target>
<actual value="3.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="165400.00">
<comment><narrative>
The indicator measures the cumulative number of people who benefited from improved sanitation facilities that have been constructed through operations supported by the World Bank Agua Legal, Itapecerica da Serra, Embu 1 e 2, Guavirutuba e Talamanca.
</narrative></comment>
</target>
<actual value="165851">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy micro generation study developed and implemented
</narrative></title>
<baseline year="2018" iso-date="2018-08-16" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-16" />
<period-end iso-date="2026-05-20" />
<target value="Yes">
<comment><narrative>
Energy efficiency study and procedures carried out for the WWTPs in the Metropolitan Region.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on the water distribution mains per 100km per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="115.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="25.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 100 km per year in the Project targeted area with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="1.92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on serviced connections per 1,000 connections per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="5.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 1,000 serviced connections per year in the Project targeted area, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="0.21">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with social activities carried out by the Água Legal areas of interventions (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="70.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the social activities carried out by Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out.
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of water distribution mains rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="290.00">
<comment><narrative>
Number of kilometers of water distribution mains replaced under the Project, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="355">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female Beneficiaries satisfied with social activities carried out by the Água Legal areas of interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="70.00">
<comment><narrative>
Percentage of Agua Legal female beneficiaries supported by the Project that have positively assessed the social activities carried out by Project.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serviced connections rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="54,430.00">
<comment><narrative>
Number of water supply connections replaced under the Project by subcomponents 1.2 and 1.3.
</narrative></comment>
</target>
<actual value="58237">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Male beneficiaries satisfied with social activities carried out by the Água Legal areas of interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="70.00">
<comment><narrative>
Percentage of Agua Legal male beneficiaries supported by the Project that have positively assessed the social activities carried out by Project.
</narrative></comment>
</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on serviced connections per 1,000 connections per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="5.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 1,000 serviced connections per year in the Project targeted area, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="0.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of water distribution mains rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="290.00">
<comment><narrative>
Number of kilometers of water distribution mains replaced under the Project, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="194">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on the water distribution mains per 100km per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="115.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="25.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 100 km per year in the Project targeted area with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="2.37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="165400.00">
<comment><narrative>
The indicator measures the cumulative number of people who benefited from improved sanitation facilities that have been constructed through operations supported by the World Bank Agua Legal, Itapecerica da Serra, Embu 1 e 2, Guavirutuba e Talamanca.
</narrative></comment>
</target>
<actual value="154147">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of micro metered water from new service connections to the formal water supply system (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="24.00">
<comment><narrative>
Volume (millions of cubic meters per year) of consumed water measured through the micrometers installed in the neighborhoods benefiting from the Agua Legal Program financed under the Project. The revised expected volume for the last year of Project implementation is 24,00 million of cubic meter per year.
</narrative></comment>
</target>
<actual value="25.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater removed from the Guarapiranga basin sent to treatment (millions of cubic meters/year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-13" />
<period-end iso-date="2026-05-13" />
<target value="2.00">
<comment><narrative>
The value of Embu 1, when considering the retrofit of Embu 4, is 1.94 million m³/year. This value is still being determined and has not been included in the calculation of the Indicator. The value of SES Itapecerica da Serra has been revised, taking into account the status of the pumping stations. 

This indicator is a consolidation of the data from  Project interventions in Embu and Itapecerica sanitation systems; Pumping Stations (Talamanca, Ipora; and Embu 4); Collectors and Agua Legal.
The total volume (millions of cubic meters per year) of wastewater collected by the Embu and Itapecerica sanitation systems, plus the volume of wastewater transported through Guavirutuba and Talamanca main trunk lines, plus the monthly average x 12 months for the volume pumped from Talamanca, Ipora and Embu 4 pumping stations only (to avoid double counting); in addition to the volume collected from new household connections implemented by the Água Legal Program in the Guarapiranga basin.
</narrative></comment>
</target>
<actual value="1.59">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene (Number), of which (%) is safely managed; disaggregated by gender.
</narrative></title>
<baseline year="2018" iso-date="2018-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-13" />
<period-end iso-date="2026-05-13" />
<target value="716000">
<comment><narrative>
People provided with water, sanitation, and hygiene, of which 100% is safely managed.
</narrative></comment>
</target>
<actual value="705639">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serviced connections rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="54,430.00">
<comment><narrative>
Number of water supply connections replaced under the Project by subcomponents 1.2 and 1.3.
</narrative></comment>
</target>
<actual value="46799">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel that water and sanitation services reflect their needs in the Água Legal areas of interventions supported by the Project (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="80.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out. This indicator would be measuring and monitoring the changes in perceptions among men and women.
</narrative></comment>
</target>
<actual value="93">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, and hygiene (Number), of which (%) is safely managed; disaggregated by gender.
</narrative></title>
<baseline year="2018" iso-date="2018-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-13" />
<period-end iso-date="2026-05-13" />
<target value="716000">
<comment><narrative>
People provided with water, sanitation, and hygiene, of which 100% is safely managed.
</narrative></comment>
</target>
<actual value="719142">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="165400.00">
<comment><narrative>
The indicator measures the cumulative number of people who benefited from improved sanitation facilities that have been constructed through operations supported by the World Bank Agua Legal, Itapecerica da Serra, Embu 1 e 2, Guavirutuba e Talamanca.
</narrative></comment>
</target>
<actual value="161326">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with social activities carried out by the Água Legal areas of interventions (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="70.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the social activities carried out by Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out.
</narrative></comment>
</target>
<actual value="88">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on serviced connections per 1,000 connections per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="31.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="5.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 1,000 serviced connections per year in the Project targeted area, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Period of time that the wastewater pumping stations rehabilitated by the Project are operational (percentage of time per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="93.09"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="98.00">
<comment><narrative>
Electromechanical availability index: compares the total number of hours per year that the pumping station (panel, motor, and pumps) supported by the Project was operation versus the total number of hours per year that the pumping station was expected to stay operational (arithmetic average of the six pumping stations) calculated per year. This indicator precludes events that are not related to the operation of the pumping stations such as due to problems upwards and downwards of the stations.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy micro generation study developed and implemented
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="Yes">
<comment><narrative>
Energy efficiency study and procedures carried out for the WWTPs in the Metropolitan Region.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Period of time that the wastewater pumping stations rehabilitated by the Project are operational (percentage of time per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="93.09"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="98.00">
<comment><narrative>
Electromechanical availability index: compares the total number of hours per year that the pumping station (panel, motor, and pumps) supported by the Project was operation versus the total number of hours per year that the pumping station was expected to stay operational (arithmetic average of the six pumping stations) calculated per year. This indicator precludes events that are not related to the operation of the pumping stations such as due to problems upwards and downwards of the stations.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of non-revenue water reduction (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="55.70">
<comment><narrative>
Volume (millions of cubic meters per year) of water saved due to water losses reduction interventions carried out through subcomponents 1.1, 1.2, and 1.3. The revised expected contributions per subcomponent for last year of Project implementation are: 1.1 = 45.1million m3/year; 1.2 = 1.0 million m3/year; and 1.3 = 9.6million m3/year. The Agua Legal Program has been generating better results than originally expected.
</narrative></comment>
</target>
<actual value="56.70">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with social activities carried out by the Água Legal areas of interventions (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="70.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the social activities carried out by Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of non-revenue water reduction (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="55.70">
<comment><narrative>
Volume (millions of cubic meters per year) of water saved due to water losses reduction interventions carried out through subcomponents 1.1, 1.2, and 1.3. The revised expected contributions per subcomponent for last year of Project implementation are: 1.1 = 45.1million m3/year; 1.2 = 1.0 million m3/year; and 1.3 = 9.6million m3/year. The Agua Legal Program has been generating better results than originally expected.
</narrative></comment>
</target>
<actual value="57.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of micro metered water from new service connections to the formal water supply system (millions of cubic meters per year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="24.00">
<comment><narrative>
Volume (millions of cubic meters per year) of consumed water measured through the micrometers installed in the neighborhoods benefiting from the Agua Legal Program financed under the Project. The revised expected volume for the last year of Project implementation is 24,00 million of cubic meter per year.
</narrative></comment>
</target>
<actual value="25.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of sewerage main trunk line and discharge pipeline rehabilitated under the Project
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="3.20">
<comment><narrative>
Number of kilometers of sewerage main trunk line and discharge pipeline replaced under the Project.
</narrative></comment>
</target>
<actual value="3.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of bursts on the water distribution mains per 100km per year in the Project targeted area (reported and unreported)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="115.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="25.00">
<comment><narrative>
Decrease in number of reported and unreported bursts per 100 km per year in the Project targeted area with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="1.74">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of wastewater removed from the Guarapiranga basin sent to treatment (millions of cubic meters/year)
</narrative></title>
<baseline year="2018" iso-date="2018-08-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-13" />
<period-end iso-date="2026-05-13" />
<target value="2.00">
<comment><narrative>
The value of Embu 1, when considering the retrofit of Embu 4, is 1.94 million m³/year. This value is still being determined and has not been included in the calculation of the Indicator. The value of SES Itapecerica da Serra has been revised, taking into account the status of the pumping stations. 

This indicator is a consolidation of the data from  Project interventions in Embu and Itapecerica sanitation systems; Pumping Stations (Talamanca, Ipora; and Embu 4); Collectors and Agua Legal.
The total volume (millions of cubic meters per year) of wastewater collected by the Embu and Itapecerica sanitation systems, plus the volume of wastewater transported through Guavirutuba and Talamanca main trunk lines, plus the monthly average x 12 months for the volume pumped from Talamanca, Ipora and Embu 4 pumping stations only (to avoid double counting); in addition to the volume collected from new household connections implemented by the Água Legal Program in the Guarapiranga basin.
</narrative></comment>
</target>
<actual value="1.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries that feel that water and sanitation services reflect their needs in the Água Legal areas of interventions supported by the Project (beneficiary survey informed disaggregated per gender)
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="80.00">
<comment><narrative>
Percentage of Agua Legal beneficiaries supported by the Project that have positively assessed the Project. The reduction on the gender gap will also be monitored by comparing the satisfaction per gender before and after the contracts are carried out. This indicator would be measuring and monitoring the changes in perceptions among men and women.
</narrative></comment>
</target>
<actual value="91">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2018" iso-date="2018-08-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-22" />
<period-end iso-date="2026-05-26" />
<target value="664000.00">
<comment><narrative>
This indicator measures the cumulative number of people who benefited from improved water supply services that have been constructed through the Project with the Agua Legal Program.
</narrative></comment>
</target>
<actual value="709373">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Energy micro generation study developed and implemented
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="Yes">
<comment><narrative>
Energy efficiency study and procedures carried out for the WWTPs in the Metropolitan Region.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of water distribution mains rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="290.00">
<comment><narrative>
Number of kilometers of water distribution mains replaced under the Project, with contributions from subcomponent 1.2.
</narrative></comment>
</target>
<actual value="278">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Km of sewerage main trunk line and discharge pipeline rehabilitated under the Project
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="3.20">
<comment><narrative>
Number of kilometers of sewerage main trunk line and discharge pipeline replaced under the Project.
</narrative></comment>
</target>
<actual value="3.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of serviced connections rehabilitated in the Project targeted area
</narrative></title>
<baseline year="2018" iso-date="2018-08-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-08-19" />
<period-end iso-date="2026-05-23" />
<target value="54,430.00">
<comment><narrative>
Number of water supply connections replaced under the Project by subcomponents 1.2 and 1.3.
</narrative></comment>
</target>
<actual value="35741">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P167455</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Ceara Rural Sustainable Development and Competitiveness Phase II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to enhance access to markets and access to water and sanitation, adopting climate resilient approaches, by targeted beneficiaries in selected areas of the State of Ceara.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Second Phase of Ceara Rural Sustainable Development and Competitiveness Project for Brazil is to enhance access to markets and access to water and sanitation, adopting climate resilient approaches, by targeted beneficiaries in selected areas of the State of Ceara. The project comprises of three components. The first component, sustainable economic inclusion will improve the access for family farming producers organizations (including priority vulnerable groups, women and youth) to dynamic markets, thus leading to more sustainable sources of income. It consists of following sub-components: (i) strengthening organizations for enhanced market access; and (ii) improving social and productive inclusion for vulnerable groups. The second component, rural water supply and sanitation access will support the state's efforts to universalize access to improved water and sanitation by investing in sustainable and resilient service provision in prioritized rural communities, which are subject to the highest climate risks. It consists of following sub-components: (i) expanding water and sanitation access; and (ii) increasing water security and resilience. The third component, institutional strengthening and project management will strengthen the organizational, management, knowledge, and operational capacity of key implementing state institutions, as well as to provide overall project management and supervision. It consists of following sub-components: (i) institutional strengthening and capacity building; and (ii) project management and supervision.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0037425"><narrative>State of Ceara</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0037425"><narrative>State of Ceara</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0037424"><narrative>Secretariat of Agrarian Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-04-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2019-07-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marie Paviot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mpaviot@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003386551" />
            <name><narrative>Taua</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.00306 -40.29278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003387242" />
            <name><narrative>Solonopole</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.73333 -39.0075</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003390138" />
            <name><narrative>Saboeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.54194 -39.90667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392010" />
            <name><narrative>Piquet Carneiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.80361 -39.41778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393062" />
            <name><narrative>Paramoti</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.09694 -39.23944</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393065" />
            <name><narrative>Parambu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.21111 -40.69444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394618" />
            <name><narrative>Monsenhor Tabosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.78944 -40.06333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394649" />
            <name><narrative>Mombaca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.74306 -39.6275</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394878" />
            <name><narrative>Milha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.675 -39.19389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003395949" />
            <name><narrative>Madalena</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.85722 -39.57667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003397675" />
            <name><narrative>Jaguaribe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.89056 -38.62194</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003398255" />
            <name><narrative>Independencia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.39639 -40.30861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402362" />
            <name><narrative>Ceara</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5 -39.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402538" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.13083 -39.8775</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003403534" />
            <name><narrative>Campos Sales</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.07444 -40.37611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003405616" />
            <name><narrative>Boa Viagem</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.1275 -39.73222</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003407248" />
            <name><narrative>Araripe</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.2125 -40.04611</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006317004" />
            <name><narrative>Deputado Irapuan Pinheiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.91694 -39.26778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="31120" percentage="49" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="38" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="2.00000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="44.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="43" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="77" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="54" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="100" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="39" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="23" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="23" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="54" xml:lang="en"><narrative>Rural Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">990833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">990833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">1603333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">1603333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2188333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">2062500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1020000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">364166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">364166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">416666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">19646190.20</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">19646190.20</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">5250000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-04-30"/><value value-date="2021-04-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">5600000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">2060205</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">3000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">7700000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">0</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">6243605</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">6000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">0</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">12000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-171117</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-156338</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-168040</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-193938</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-316684</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-728162</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-904065</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-992971</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-1253327</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-1395844</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1636737</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1717985</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-131250</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-37424"><narrative>Secretariat of Agrarian Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167455"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P167455?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P167455"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EMATERCE restructuring model implemented.
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-07" />
<target value="Yes">
<comment><narrative>
To achieve this indicator, the delivery of materials must be completed. This is scheduled for the end of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural communities benefitted by water supply systems (WSS) implemented/rehabilitated in operation
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="70.00">
<comment><narrative>
The achievement corresponds to 53% of the end target.
</narrative></comment>
</target>
<actual value="37">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-03-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-11" />
<period-end iso-date="2027-09-10" />
<target value="13,000.00">
<comment><narrative>
The achievement corresponds to 49% of the end target. 
 
6428 = 2044 (1656 ATER Formed + 102 Women + 286 Youth) have completed implementation plans + 4284 PN beneficiaries of PN who are being attended by ATER in the implementation of PN
</narrative></comment>
</target>
<actual value="6428">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
EMATERCE restructuring model implemented.
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-07" />
<target value="Yes">
<comment><narrative>
To achieve this indicator, the delivery of materials must be completed. This is scheduled for the end of 2025
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase gross value of sales (in real terms) by members of organizations participating in approved subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="75,600.00">
<comment><narrative>
The achievement corresponds to 49% of the end target, reached by 27 systems in operation.
</narrative></comment>
</target>
<actual value="37169">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in the difference in the gross value of sales between women and men farmers supported by productive subprojects (percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="TBD in the first year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="15%">
<comment><narrative>
indicator to be measured at the end of the project

&amp;nbsp;
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries trained in support of subproject implementation
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="2,500.00">
<comment><narrative>
The achievement corresponds to 117% of the end target.
</narrative></comment>
</target>
<actual value="2935">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with productive investments and water &amp; sanitation access
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="80.00">
<comment><narrative>
&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implemented technologies to improve the efficiency and/or resilience of the system
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="10.00">
<comment><narrative>
The achievement corresponds to 40% of the end target.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households with water reuse systems implemented for agricultural production
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="30.00">
<comment><narrative>
30 families with suitability for reuse systems were identified and 25 feasibility and system dimensioning studies were carried out.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in the difference in the gross value of sales between women and men farmers supported by productive subprojects (percentage)
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="TBD in the first year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="15%">
<comment><narrative>
indicator to be measured at the end of the project

&amp;nbsp;
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Households with water reuse systems implemented for agricultural production
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="30.00">
<comment><narrative>
30 families with suitability for reuse systems were identified and 25 feasibility and system dimensioning studies were carried out.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with basic hygiene
</narrative></title>
<baseline year="2019" iso-date="2019-03-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-01" />
<period-end iso-date="2027-09-03" />
<target value="75,680">
<comment><narrative>
The achievement corresponds to 49% of the end target
</narrative></comment>
</target>
<actual value="3,7169">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural communities benefitted by water supply systems (WSS) implemented/rehabilitated in operation
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="70.00">
<comment><narrative>
The achievement corresponds to 129% of the end target.
</narrative></comment>
</target>
<actual value="90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Implemented technologies to improve the efficiency and/or resilience of the system
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="10.00">
<comment><narrative>
The Progress Indicator shows that 7 projects were developed with the expectation of implementing technology
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="7,000.00">
<comment><narrative>
The achievement corresponds to 2.2% of the end target. Beneficiaries served through the youth call for applications. The small adjustment is due to a recount of the number of beneficiaries.
</narrative></comment>
</target>
<actual value="154">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Diagnostics prepared
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="350.00">
<comment><narrative>
The achievement corresponds to 102% of the end target.
</narrative></comment>
</target>
<actual value="357">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business Plans and Community Development Plans prepared
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="350.00">
<comment><narrative>
The achievement corresponds to 83% of the end target.
</narrative></comment>
</target>
<actual value="291">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="7,000.00">
<comment><narrative>
The achievement corresponds to 3% of the end target.
</narrative></comment>
</target>
<actual value="180">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="90.00">
<comment><narrative>
The system is working properly and complains and inquires are being addressed by the Project.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="95">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15,120.00">
<comment><narrative>
The achievement corresponds to 42% of the end target.
</narrative></comment>
</target>
<actual value="6366">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided at least with sanitation
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-03" />
<target value="15,200">
<comment><narrative>
The achievement corresponds to 42% of the end target
</narrative></comment>
</target>
<actual value="6366">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15,120.00">
<comment><narrative>
The achievement corresponds to 34% of the end target by 1357 installations on operation. Another 1622 sanitary modules are being implemented and 1100 will be bidding. 
Progress Indicators show that between April 25 and Oct 2025, 35 training sessions on good practices occurred, totaling 56.
</narrative></comment>
</target>
<actual value="5129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with productive investments and water &amp; sanitation access
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="80.00">
<comment><narrative>
&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="97">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2019" iso-date="2019-03-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-01" />
<period-end iso-date="2027-09-02" />
<target value="75,600">
<comment><narrative>
The achievement corresponds to 30% of the end target
</narrative></comment>
</target>
<actual value="22,362">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Women reducing time (hours per week) dedicated to household chores
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="TBD in the first year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-08" />
<target value="20% (hours per week)">
<comment><narrative>
&amp;nbsp;

&amp;nbsp;
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2019" iso-date="2019-03-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-09" />
<period-end iso-date="2027-09-09" />
<target value="2,1000">
<comment><narrative>
This indicator was automatically inserted as a Scorecard, but was not approved by the team.

The ScoreCard Indicator that represents the Component is People benefiting from increased resilience of livelihoods, jobs or firms, inserted below.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household sanitary kit implemented
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="4,000.00">
<comment><narrative>
The achievement corresponds to 34% of the end target.
</narrative></comment>
</target>
<actual value="1357">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained youth by capacity building activities under the project
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="440.00">
<comment><narrative>
The achievement corresponds to 87% of the end target.
</narrative></comment>
</target>
<actual value="381">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase gross value of sales (in real terms) by members of organizations participating in approved subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2019" iso-date="2019-03-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-01" />
<period-end iso-date="2027-09-02" />
<target value="75,600">
<comment><narrative>
The achievement corresponds to 49% of the end target
</narrative></comment>
</target>
<actual value="3,7169">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with basic hygiene
</narrative></title>
<baseline year="2019" iso-date="2019-03-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-01" />
<period-end iso-date="2027-09-03" />
<target value="75,680">
<comment><narrative>
The achievement corresponds to 30% of the end target
</narrative></comment>
</target>
<actual value="22,362">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Organizations supported for enhanced productive inclusion and market access enabling sustainability
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="430.00">
<comment><narrative>
The reached corresponding to 10% of end target. 

41 of the  ATER Formed subprojects implemented.
</narrative></comment>
</target>
<actual value="41">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Women reducing time (hours per week) dedicated to household chores
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="TBD in the first year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-08" />
<target value="20% (hours per week)">
<comment><narrative>
Progress Indicators show that 15 time diary workshops were held and 208 questionnaires were applied.
</narrative></comment>
</target>
<actual value="26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries' organizations improving existing market and/or accessing new marketing channels (either private and/or public markets)
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="60.00">
<comment><narrative>
The achievement corresponds to 30% of the end target.  The indicator was calculated considering that 44 cooperatives participate in Business Plans and of these, 7 improved their market access through new customers or an increase in sales value.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs, or businesses/RO (ScoreCard).
</narrative></title>
<baseline year="2019" iso-date="2019-03-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-09" />
<period-end iso-date="2027-09-09" />
<target value="21,000">
<comment><narrative>
The achievement corresponds to 2.7% of the final goal.
</narrative></comment>
</target>
<actual value="582">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15,120.00">
<comment><narrative>
The achievement corresponds to 42% of the end target.
</narrative></comment>
</target>
<actual value="6366">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved sanitation services
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15,120.00">
<comment><narrative>
The achievement corresponds to 34% of the end target by 1357 installations on operation. Another 1622 sanitary modules are being implemented and 1100 will be bidding. 
Progress Indicators show that between April 25 and Oct 2025, 35 training sessions on good practices occurred, totaling 56.
</narrative></comment>
</target>
<actual value="5129">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="75,600.00">
<comment><narrative>
The achievement corresponds to 49% of the end target, reached by 27 systems in operation.
</narrative></comment>
</target>
<actual value="37169">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="75,600.00">
<comment><narrative>
The achievement corresponds to 30% of the end target, reached by 20 systems in operation. Besides this, other 14 are under construction and 18 are approved and bids will take place next year, and 4 are under project adjustments. Totaling 56 water systems.
</narrative></comment>
</target>
<actual value="22,362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase gross value of sales (in real terms) by members of organizations participating in approved subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase gross value of sales (in real terms) by members of organizations participating in approved subprojects
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="15.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="7,000.00">
<comment><narrative>
The achievement corresponds to 3% of the end target.
</narrative></comment>
</target>
<actual value="180">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="7,000.00">
<comment><narrative>
The achievement corresponds to 2.2% of the end target. Beneficiaries served through the youth call for applications. The small adjustment is due to a recount of the number of beneficiaries.
</narrative></comment>
</target>
<actual value="154">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Business Plans and Community Development Plans prepared
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="350.00">
<comment><narrative>
The achievement corresponds to 101% of the end target. (252 PN + 60 ATER + 45 PDC)
</narrative></comment>
</target>
<actual value="167">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs, or businesses/RO (ScoreCard).
</narrative></title>
<baseline year="2019" iso-date="2019-03-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-09" />
<period-end iso-date="2027-09-09" />
<target value="21,000">
<comment><narrative>
The achievement corresponds to 3% of the final goal.
</narrative></comment>
</target>
<actual value="680">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained from SDA and project's strategic partner institutions
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-08" />
<target value="400.00">
<comment><narrative>
The achievement corresponds to 152% of the end target. 134 training sessions were carried out.
</narrative></comment>
</target>
<actual value="608">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="90.00">
<comment><narrative>
The system is working properly and complains and inquires are being addressed by the Project.

&amp;nbsp;
</narrative></comment>
</target>
<actual value="96">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries' organizations improving existing market and/or accessing new marketing channels (either private and/or public markets)
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="60.00">
<comment><narrative>
The achievement corresponds to 30% of the end target.  The indicator was calculated considering that 44 cooperatives participate in Business Plans and of these, 7 improved their market access through new customers or an increase in sales value.
</narrative></comment>
</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided at least with sanitation
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-03" />
<target value="15,200">
<comment><narrative>
The achievement corresponds to 34% of the end target
</narrative></comment>
</target>
<actual value="5129">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained from SDA and project's strategic partner institutions
</narrative></title>
<baseline year="2019" iso-date="2019-03-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-13" />
<period-end iso-date="2027-09-08" />
<target value="400.00">
<comment><narrative>
The achievement corresponds to 152% of the end target. 134 training sessions were carried out.
</narrative></comment>
</target>
<actual value="608">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Organizations supported for enhanced productive inclusion and market access enabling sustainability
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="430.00">
<comment><narrative>
The reached corresponding to 15% of end target.
</narrative></comment>
</target>
<actual value="65">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached with at least one of the following services: water, sanitation, or hygiene
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-03" />
<target value="75680">
<comment><narrative>
The achievement corresponds to 30% of the end target
</narrative></comment>
</target>
<actual value="22362">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to improved water sources
</narrative></title>
<baseline year="2019" iso-date="2019-03-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-28" />
<period-end iso-date="2027-09-15" />
<target value="75,600.00">
<comment><narrative>
The achievement corresponds to 30% of the end target, reached by 20 systems in operation. Besides this, other 14 are under construction and 18 are approved and bids will take place next year, and 4 are under project adjustments. Totaling 56 water systems.
</narrative></comment>
</target>
<actual value="22,362">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Diagnostics prepared
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="350.00">
<comment><narrative>
The achievement corresponds to 102% of the end target.
</narrative></comment>
</target>
<actual value="357">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries trained in support of subproject implementation
</narrative></title>
<baseline year="2019" iso-date="2019-03-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-14" />
<period-end iso-date="2027-08-19" />
<target value="2,500.00">
<comment><narrative>
The achievement corresponds to 22% of the end target.
</narrative></comment>
</target>
<actual value="557">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2019" iso-date="2019-03-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-11" />
<period-end iso-date="2027-09-10" />
<target value="13,000.00">
<comment><narrative>
The achievement corresponds to 81% of the end target.
</narrative></comment>
</target>
<actual value="10540">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Household sanitary kit implemented
</narrative></title>
<baseline year="2019" iso-date="2019-03-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-12" />
<period-end iso-date="2027-09-06" />
<target value="4,000.00">
<comment><narrative>
The achievement corresponds to 42% of the end target.
</narrative></comment>
</target>
<actual value="1684">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New or better jobs
</narrative></title>
<baseline year="2019" iso-date="2019-03-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-09" />
<period-end iso-date="2027-09-09" />
<target value="2,1000">
<comment><narrative>
This indicator was automatically inserted as a Scorecard, but was not approved by the team.

The ScoreCard Indicator that represents the Component is People benefiting from increased resilience of livelihoods, jobs or firms, inserted below.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People reached with at least one of the following services: water, sanitation, or hygiene
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-03" />
<target value="75680">
<comment><narrative>
The achievement corresponds to 49% of the end target
</narrative></comment>
</target>
<actual value="37169">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained youth by capacity building activities under the project
</narrative></title>
<baseline year="2019" iso-date="2019-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-03-15" />
<period-end iso-date="2027-09-15" />
<target value="440.00">
<comment><narrative>
The achievement corresponds to 87% of the end target.
</narrative></comment>
</target>
<actual value="381">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P168634</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Parana Public Sector Modernization and Innovation for Service Delivery Operation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program development objectives are to respond to the COVID-19 pandemic and improve the efficiency of health and other priority public services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Program supports the State government's efforts to improve public administration institutions, aiming to deliver better public services and enhance the social and economic impacts of the government's COVID-19 recovery plan. It builds on lessons learned from a previous SWAp operation, the Parana Multi-sector Development Project (P126343), and focuses on strengthening institutions for evidence-based public service delivery as well as improving planning and public investment management (PIM).The Program, designed as a hybrid operation, is structured around two interlinked components. The first component, financed by a Program for Results (PforR) loan, supports initiatives in health services (Results Area 1), environmental and disaster risk management information systems (Results Area 2), and regional development planning and PIM (Results Area 3). Its objective is to enhance public administration and service delivery, with a particular focus on pandemic mitigation and recovery. The PforR supports five Borrower programs and budget lines in the Pluriannual Plan (PPA) 2020-2023 and the Annual Budget Law (LOA), including programs that have been carried over to the new PPA (2024-2027).The second component, financed by an Investment Project Financing (IPF) loan, provides technical assistance and capacity-building support to strengthen the institutional capacity of various departments within the State of Parana government. It supports the development and implementation of a new integrated PIM system, including the creation of new methodologies and manuals for investment management. Human Resources Management (HRM) support includes strategic workforce planning, training programs, and a review of the civil servant health insurance program. Digital innovation in the state is promoted through the development of a new platform to enhance public policy solutions and support Parana's innovation strategy. Finally, implementation support—including coverage of Project Management Unit (PMU) operational costs, internal controls and verification of Disbursement-Linked Indicators (DLIs), as well as change management and capacity-building activities—is also part of the IPF.The Level 2 restructuring addressed the State's revised priorities by introducing changes to activities and indicators, including new DLIs, primarily to strengthen health service delivery. Specifically, in Results Area 1, the focus shifts from converting Small Hospitals into Multiprofessional Care Units to implementing Cardiovascular Care Guidelines to address chronic cardiovascular diseases (CVD), following evidence-based recommendations for the prevention, diagnosis, treatment, and management of CVD. Additionally, digital strategies will improve health service coordination, including technological solutions for the state referral and counter-referral information system and an ambulance management system. Other changes include refining activities and indicators in other areas, adjusting disbursement arrangements and estimates, and extending the closing date by six months.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0038950"><narrative>State of Parana</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0038951"><narrative>Secretariat of Planning</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-12-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-04-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Pena De Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dpena@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12191" percentage="56" xml:lang="en"/><sector vocabulary="1" code="12230" percentage="16" xml:lang="en"/><sector vocabulary="1" code="15124" percentage="15" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="49.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HQ" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Health Facilities and Construction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="45" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="80" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="20" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="45" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="16" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="16" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="88" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="45" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="20" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="88" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="20" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="27" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="80" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="27" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="27" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="20" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="80" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4258333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4258333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1887500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2125000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1583333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1583333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">929166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">929166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">75000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">66987802.23</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">66987802.23</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">130000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">30125000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">8750000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">4900000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">7500000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">2362198</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">9375000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-325000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-88136</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-1054462</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-1160684</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-1681757</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1705324</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-1688285</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-1584782</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-38951"><narrative>Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168634"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P168634?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P168634"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">
<comment><narrative>
Development of the regional plans is underway, with participatory meetings taking place in all regions. All plans are expected to be finalized by October 2026, which will allow citizen satisfaction measurements to be reported by then.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">

</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">

</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">
<comment><narrative>
It is in the contracting phase, with the Terms of Reference approved and the market sounding concluded, preparing for gradual implementation starting in 2026.
</narrative></comment>
</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">
<comment><narrative>
Progress has been recorded in improving the quality of the priority property database and expediting procedures with municipalities and registries, and it is expected to deliver 44 titles by November 2026, contributing to the target of 250 regularized properties.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">

</target>
<actual value="Air Monitoring Network: six air monitoring stations purchased. Hydrometeorological Monitoring Network: 15 hydrological monitoring stations purchased">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="130.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">
<comment><narrative>
In full execution, with a current contract (2025–2028) and initial deliverables completed (5 reports).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">
<comment><narrative>
No intermediate targets achieved  yet.
</narrative></comment>
</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">
<comment><narrative>
A firm is expected to be hired in late Dec to start the drafting process of the new PIM Decree and Guidelines. The new Decree might be approved in 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">
<comment><narrative>
no intermediate targets met yet - pilot to be launched in 2026
</narrative></comment>
</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">
<comment><narrative>
Target achieved
</narrative></comment>
</target>
<actual value="Functional requirements specification and process definition completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">
<comment><narrative>
Results to be confirmed.
</narrative></comment>
</target>
<actual value="546,192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="79.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">
<comment><narrative>
Progress on this indicator depends on the timely procurement of the new Moodle-compatible e-learning platform, with the bidding launched in May 2026 and expected to be concluded by June 2026 to sustain course expansion and training targets.
</narrative></comment>
</target>
<actual value="Not achieved yet">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,295,991">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">
<comment><narrative>
The initial phase of field test deployment is already underway, starting at the SAMU Center in Cascavel.
</narrative></comment>
</target>
<actual value="Development of the tools and instruments required for the platform, as well as the design of the interface, with the application's functionalities, modeling, and visual standard finalized.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="120.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">
<comment><narrative>
The procurement process for the firm to developed the PIM methodology has been finalized and is awaiting contract negotiation and signature, which are expected by the end of August 2026. The PIM decree (first regulation before guidelines) is expected to be discussed and approved by  end of December 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">

</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">

</target>
<actual value="CELEPAR is developing the SAMU-mobile platform to integrate the bed regulation system with ambulances (emergency referral/counter-referral).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">
<comment><narrative>
Actual work planned to start in August 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">

</target>
<actual value="12.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="Development of the tools and instruments required for the platform, as well as the design of the interface, with the application's functionalities, modeling, and visual standard finalized.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">

</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">
<comment><narrative>
Baseline repeated. Only partial results are available; final results will be confirmed after the calendar year closes.
</narrative></comment>
</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="33,616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">
<comment><narrative>
Only partial results are available; final results will be confirmed after the calendar year closes.
</narrative></comment>
</target>
<actual value="83.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">
<comment><narrative>
No changes recorded since the last ISR
</narrative></comment>
</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">

</target>
<actual value="CELEPAR is developing the SAMU-mobile platform to integrate the bed regulation system with ambulances (emergency referral/counter-referral).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">

</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">
<comment><narrative>
Submission of a new proposal to support/complement the new PID platform and action plan to ensure achievement of indicator is expected by mid-June 2026.
</narrative></comment>
</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="75.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="33,616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">
<comment><narrative>
No results available yet.
</narrative></comment>
</target>
<actual value="ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">
<comment><narrative>
Estimated to be delivered by January 2027
</narrative></comment>
</target>
<actual value="Delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="128,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">

</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">

</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">
<comment><narrative>
Progress in consolidating the Virtual Learning Environment (VLE) and in assessing training needs, although the targets for the early years were not achieved.
</narrative></comment>
</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="130.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">
<comment><narrative>
Progress has been recorded with the expected signature of the consultancy contract by August 2026 and the immediate start of drafting and processing the new decree as the first task to be completed by December 2026.
</narrative></comment>
</target>
<actual value="Not achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="41.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">
<comment><narrative>
Partial indicator results; full verification will occur after the calendar year ends.
</narrative></comment>
</target>
<actual value="73,466">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">

</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="75.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">
<comment><narrative>
Significant progress with the development of the Territorial Management Platform, whose completion will enable the next disbursement of USD 1.2 million, scheduled for the first quarter of 2026.
</narrative></comment>
</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">

</target>
<actual value="12.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">
<comment><narrative>
Territorial Management Platform operational and awaiting last adjustment on functional requirements. Disbursement of USD 1.2 million, scheduled for July 2026.
</narrative></comment>
</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">
<comment><narrative>
It is expected to be completed by November 2026.
</narrative></comment>
</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">
<comment><narrative>
No changes recorded since the last ISR
</narrative></comment>
</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">
<comment><narrative>
Actual work planned to start in the first quarter of 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">
<comment><narrative>
Development of the regional plans is underway, with participatory meetings taking place in all regions. All plans are expected to be finalized by October 2026, which will allow citizen satisfaction measurements to be reported by then.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">
<comment><narrative>
No intermediate targets set. The indicator will be updated at the time of starting the devlopment of the strategic regional plans
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">
<comment><narrative>
Territorial Management Platform operational and awaiting last adjustment on functional requirements. Disbursement of USD 1.2 million, scheduled for July 2026.
</narrative></comment>
</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">
<comment><narrative>
Significant progress with the development of the Territorial Management Platform, whose completion will enable the next disbursement of USD 1.2 million, scheduled for the first quarter of 2026.
</narrative></comment>
</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">

</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
23. Development of regional productive development plans and a new public investment management system in support of post COVID economic recovery
</narrative></title>
<baseline year="2022" iso-date="2022-03-09" value="No uniform system for public investment. Two regional development plans"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-03-09" />
<period-end iso-date="2027-12-09" />
<target value="PIM System  deployed">

</target>
<actual value="Target 1 completed and Target 2 is delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">
<comment><narrative>
Progress has been recorded with the expected signature of the consultancy contract by August 2026 and the immediate start of drafting and processing the new decree as the first task to be completed by December 2026.
</narrative></comment>
</target>
<actual value="Not achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">
<comment><narrative>
It is in the contracting phase, with the Terms of Reference approved and the market sounding concluded, preparing for gradual implementation starting in 2026.
</narrative></comment>
</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">

</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">

</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">
<comment><narrative>
no intermediate targets met yet - pilot to be launched in 2026
</narrative></comment>
</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">
<comment><narrative>
no intermediate targets met yet - pilot to be launched in 2026
</narrative></comment>
</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">

</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">
<comment><narrative>
Progress has been recorded in improving the quality of the priority property database and expediting procedures with municipalities and registries, and it is expected to deliver 44 titles by November 2026, contributing to the target of 250 regularized properties.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">
<comment><narrative>
In full execution, with a current contract (2025–2028) and initial deliverables completed (5 reports).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="79.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="78">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="75.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="75.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="Development of the tools and instruments required for the platform, as well as the design of the interface, with the application's functionalities, modeling, and visual standard finalized.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">
<comment><narrative>
The initial phase of field test deployment is already underway, starting at the SAMU Center in Cascavel.
</narrative></comment>
</target>
<actual value="Development of the tools and instruments required for the platform, as well as the design of the interface, with the application's functionalities, modeling, and visual standard finalized.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">

</target>
<actual value="CELEPAR is developing the SAMU-mobile platform to integrate the bed regulation system with ambulances (emergency referral/counter-referral).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
9. Connectivity of the Mobile Emergency Care Service through application SAMU MOBILE.
</narrative></title>
<baseline year="2021" iso-date="2021-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Implementation in two macros – west and northwest">

</target>
<actual value="CELEPAR is developing the SAMU-mobile platform to integrate the bed regulation system with ambulances (emergency referral/counter-referral).">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">
<comment><narrative>
No changes recorded since the last ISR
</narrative></comment>
</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">
<comment><narrative>
No changes recorded since the last ISR
</narrative></comment>
</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">

</target>
<actual value="Air Monitoring Network: six air monitoring stations purchased. Hydrometeorological Monitoring Network: 15 hydrological monitoring stations purchased">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">

</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
19. Women in the highest public sector salary quartile
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="27.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="29.80">

</target>
<actual value="25.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">
<comment><narrative>
It is expected to be completed by November 2026.
</narrative></comment>
</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">
<comment><narrative>
It is expected to be completed during first semester of 2026.
</narrative></comment>
</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">

</target>
<actual value="Air Monitoring Network: six air monitoring stations purchased. Hydrometeorological Monitoring Network: 15 hydrological monitoring stations purchased">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">

</target>
<actual value="Air Monitoring Network: six air monitoring stations purchased. Hydrometeorological Monitoring Network: 15 hydrological monitoring stations purchased">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">
<comment><narrative>
Actual work planned to start in August 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">
<comment><narrative>
Actual work planned to start in the first quarter of 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
18. Priority sectors that have implemented strategic workforce planning
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">
<comment><narrative>
Estimated to be delivered by January 2027
</narrative></comment>
</target>
<actual value="Delayed.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
12. Environmental monitoring and control electronic systems strengthened
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="Outdated systems that lack integration between areas and institutions. The laboratory control system is deficient, lacks integration, and does not meet quality management requirements."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Environmental monitoring and control electronic systems updated and available for environmental officers.">

</target>
<actual value="Contract in execution phase. Product in progress.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">
<comment><narrative>
Progress on this indicator depends on the timely procurement of the new Moodle-compatible e-learning platform, with the bidding launched in May 2026 and expected to be concluded by June 2026 to sustain course expansion and training targets.
</narrative></comment>
</target>
<actual value="Not achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">
<comment><narrative>
Progress in consolidating the Virtual Learning Environment (VLE) and in assessing training needs, although the targets for the early years were not achieved.
</narrative></comment>
</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">

</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
17. Strengthening institutional capacity to deliver results
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No new training programs on priority areas such as public investment management, climate screening, fleet management, regional productive development"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Technical training on use of GeoPR  system and training on newly digitized priority internal systems and services.">

</target>
<actual value="Target not achieved.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
11. Environmental licensing procedures enhanced through automation, innovation, and technological modernization for selected activities.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="12.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="30.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">
<comment><narrative>
Submission of a new proposal to support/complement the new PID platform and action plan to ensure achievement of indicator is expected by mid-June 2026.
</narrative></comment>
</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">
<comment><narrative>
No intermediate targets achieved  yet.
</narrative></comment>
</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">

</target>
<actual value="No achieved yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
16. Inova Paraná Portal ready and in use
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="31.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">
<comment><narrative>
The update of the GeoPR Health Surveillance Dashboard with geospatial data on AMI linked to socio-environmental factors is progressing with a manageable delay, with IAT, SESA, and CELEPAR coordinating access to SUS data. Results are expected to be available for IVA validation by end of June 2026
</narrative></comment>
</target>
<actual value="Delayed">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">

</target>
<actual value="GeoPR Health Surveillance Dashboard containing geospatial data of: (1) reported cases of dengue and leptospirosis, (2) outbreaks of waterborne and foodborne diarrheal diseases, and (3) water quality for human consumption.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">
<comment><narrative>
The procurement process for the firm to developed the PIM methodology has been finalized and is awaiting contract negotiation and signature, which are expected by the end of August 2026. The PIM decree (first regulation before guidelines) is expected to be discussed and approved by  end of December 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">
<comment><narrative>
A firm is expected to be hired in late Dec to start the drafting process of the new PIM Decree and Guidelines. The new Decree might be approved in 2026
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. New Public Investment Projects prepared, evaluated, and analyzed using the new PIM guidelines
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="90.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1. Number of SUS hospital beds available to treat COVID-19 patients during the peak of the pandemic in the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-22" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-22" />
<period-end iso-date="2023-12-15" />
<target value="4,000.00">
<comment><narrative>
Program target achieved.
</narrative></comment>
</target>
<actual value="4,040.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
24. Share of citizens satisfied with their participation in the development of the eight strategic plans in lagging regions within the state.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="75.00">
<comment><narrative>
No intermediate targets set. The indicator will be updated at the time of starting the devlopment of the strategic regional plans
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,295,991">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
26. People with increased climate resilience because of the Program
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="11,100,000">

</target>
<actual value="11,101,049">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">
<comment><narrative>
Results to be confirmed.
</narrative></comment>
</target>
<actual value="546,192">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">
<comment><narrative>
Partial results. Target of 1,000,000 surpassed.
</narrative></comment>
</target>
<actual value="1,293,824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="128,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">
<comment><narrative>
Partial indicator results; full verification will occur after the calendar year ends.
</narrative></comment>
</target>
<actual value="73,466">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="33,616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Adult population (individuals aged 40 to 74 years) screened for cardiovascular risk factors in Primary Health Care (PHC) units.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="33,616"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="1,000,000">

</target>
<actual value="33,616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">
<comment><narrative>
No results available yet.
</narrative></comment>
</target>
<actual value="ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">
<comment><narrative>
No results available yet.
</narrative></comment>
</target>
<actual value="ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
21. Reduction (%) in fuel consumption among state fleet vehicles equipped with telemetry
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="9.197.804   liters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="25%">
<comment><narrative>
no intermediate targets met yet - pilot to be launched in 2026
</narrative></comment>
</target>
<actual value="not achieved">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3. Deployment of online intelligent platform for environmental management containing key health surveillance information and key disaster risk information.
</narrative></title>
<baseline year="2020" iso-date="2020-12-12" value="State spatial data for strategic management is insufficient due to the precision problems, different update dates, difference in scales, outdated technological, inadequate systematization and difficulty of access."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-12" />
<period-end iso-date="2027-12-12" />
<target value="i) GeoPR Health Surveillance Dashboard data available online; and (ii) SISMAAD updated to contain space-time stochastic models for precipitation and risk, with alerts published on the i9 Portal">
<comment><narrative>
The update of the GeoPR Health Surveillance Dashboard with geospatial data on AMI linked to socio-environmental factors is progressing with a manageable delay, with IAT, SESA, and CELEPAR coordinating access to SUS data. Results are expected to be available for IVA validation by end of June 2026
</narrative></comment>
</target>
<actual value="Delayed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">

</target>
<actual value="16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">
<comment><narrative>
Target achieved
</narrative></comment>
</target>
<actual value="Functional requirements specification and process definition completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">
<comment><narrative>
75 percent of the target achieved. The system interface prototypes and the system's structural data model are in progress, with completion expected in December 2025.
</narrative></comment>
</target>
<actual value="Functional requirements specification and process definition completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">
<comment><narrative>
Baseline repeated. Only partial results are available; final results will be confirmed after the calendar year closes.
</narrative></comment>
</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
7. Cardiology consultations performed by contracted out health providers processed through the State referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="24.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80">

</target>
<actual value="24.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="41.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">
<comment><narrative>
2025 target achieved.
</narrative></comment>
</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">

</target>
<actual value="12.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
6. Municipalities with at least one telehealth point linked to the National Telehealth Program Brazil Networks
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value="12.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="80.5">

</target>
<actual value="12.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="120.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">
<comment><narrative>
Only partial results are available; final results will be confirmed after the calendar year closes.
</narrative></comment>
</target>
<actual value="83.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="130.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Premature mortality rate (ages 30 to 69) due to cardiovascular diseases (CVD).
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="130.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2027-12-12" />
<target value="128.0">

</target>
<actual value="130.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
14. Share of alerts disaster risk system assertiveness of hydrologic events.
</narrative></title>
<baseline year="2020" iso-date="2020-12-04" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-04" />
<period-end iso-date="2026-12-04" />
<target value="80.00">
<comment><narrative>
2023 target (70%) surpassed, and slightly progressed by Oct. 2024.
</narrative></comment>
</target>
<actual value="78">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
8. Modernization of the state referral and counter-referral information system.
</narrative></title>
<baseline year="2024" iso-date="2024-12-04" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-04" />
<period-end iso-date="2027-12-04" />
<target value="Modernized referral and counter-referral information system implemented and in operation by SUS´ and SESAs teams.">
<comment><narrative>
75 percent of the target achieved. The system interface prototypes and the system's structural data model are in progress, with completion expected in December 2025.
</narrative></comment>
</target>
<actual value="Functional requirements specification and process definition completed">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
20. Notary legalization of priority state properties
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="250.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
13. Air quality, hydrometerological, and groundwater monitoring networks strengthened and updated.
</narrative></title>
<baseline year="2021" iso-date="2021-12-09" value="Monitoring networks with 72 telemetric hydrometeorological stations, none piezometric well installed, limited air quality parameters"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-09" />
<period-end iso-date="2027-12-09" />
<target value="6 air quality monitoring stations, 15 hydrological monitoring stations and 94 piezometers installed and operational">
<comment><narrative>
It is expected to be completed during first semester of 2026.
</narrative></comment>
</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
27. Planialtimetric base of the Borrower's territory at a scale of 1:10.000 available at GeoPR Portal.
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="Planialtimetric maps not available"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="200,000 km2 mapped with aerial photogrammetry, laser profiling and digital restitution available at GeoPR to decision makers">
<comment><narrative>
No results available yet.
</narrative></comment>
</target>
<actual value="ongoing">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
10. Average processing time for issuing environmental regularization documents for low-risk activities
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="101.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="5.00">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
15. Users satisfied with the GeoPR portal.
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="80.00">

</target>
<actual value="Under execution">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
25. Number of People Receiving Quality Health, Nutrition and Population Services
</narrative></title>
<baseline year="2024" iso-date="2024-12-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-09" />
<period-end iso-date="2027-12-09" />
<target value="2,320,000">
<comment><narrative>
Partial results. Target of 1,000,000 surpassed.
</narrative></comment>
</target>
<actual value="1,293,824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
22. PIM system prepared (laws, regulations, manuals, database, institutions)
</narrative></title>
<baseline year="2020" iso-date="2020-12-09" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-09" />
<period-end iso-date="2027-12-09" />
<target value="System finalized and rolled out and applied to all new investment projects.">

</target>
<actual value="Awaits completion of goal 1 and 2.">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P169134</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Improving Mobility and Urban Inclusion in the Amazonas Corridor in Belo Horizonte</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to improve: (i) the quality of service and accessibility to opportunities for public transport users in the area of influence of the Amazonas Express; and (ii) the urban living conditions of the poor in selected precarious settlements.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objectives of the Improving Mobility and Urban Inclusion in the Amazonas Corridor in Belo Horizonte Project for Brazil are to improve: (i) the quality of service and accessibility to opportunities for public transport users in the area of influence of the Amazonas Express; and (ii) the urban living conditions of the poor in selected precarious settlements. The Project has four components. 1. Implementation of the Amazonas Express  component will finance the implementation of a public transport corridor (Amazonas  Express) including, inter alia: (i) restoration and building of urban roads, sidewalks and bus stations; (ii)  implementation of cycle paths; (iii) installation of equipment and technology to support corridor security  and safety; and (iv) related engineering studies and designs, supervision, and technical assistance (TA) to  implement  the  Environmental and Social Commitment Plan (ESCP) activities.  2. Urban Upgrading of Vila Cabana do Pai Tomás component will finance the urban upgrading of Vila Cabana do Pai Tomás, including,  inter alia: (i) the development of designs and infrastructure works; (ii) construction and rehabilitation of  roads and alleys; (iii) construction of housing and commercial units for relocating families and businesses,  which will incorporate climate resilient design features; (iv) interventions to mitigate geological and/or  geotechnical  risks,  in  selected  areas  of  Vila  Cabana  do  Pai  Tomás;  and  (v)  related  technical  support,  supervision, and TA to implement the ESCP activities. 3. Strategic Planning for Urban Mobility and Upgrading  of Informal Settlements will finance the development of, inter  alia: (i) a strategic urban development plan for the Jatobá Region; (ii) technical studies and engineering  designs  for  increased  resilience  and  to  provide  road  and  sanitation  services  in  selected  precarious  settlements and interconnect them to the public transport network; (iii) strategic mobility and technology  studies;  and  (iv)  technical  assistance  to  implement  the  ESCP  activities. 4. Project Management and Institutional Strengthening component will finance the  provision  of  overall  support  for  Project  management, TA and supervision to address, inter alia: (i) compliance with the ESCP; (ii) implementation  of the Project's communication strategy; (iii) development and monitoring of a gender action plan; (iv)  implementation of  the grievance  redress mechanisms;  (v) administrative and  fiduciary activities of  the  Project  Management  Unit  (PMU);  (vi)  implementation  of  the  SEP;  (vii)  training  initiatives  and  impact  evaluations for the Project; and (viii) carrying out project audits.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0039520"><narrative>Municipio de Belo Horizonte</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0039518"><narrative>URBEL</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-06-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-03-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-09-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tais Fonseca De Medeiros</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfonseca@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>






<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470127" />
            <name><narrative>Belo Horizonte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.92083 -43.93778</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0012070246" />
            <name><narrative>Metropolitana De Belo Horizonte</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.49783 -44.02801</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="21021" percentage="45" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="5" xml:lang="en"/><sector vocabulary="1" code="21013" percentage="5" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="45" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TZ" percentage="27.0000000" xml:lang="en"><narrative>FY17 - Other Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="73" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="58" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="11" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000221" percentage="30" xml:lang="en"><narrative>Job Creation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="8" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="73" xml:lang="en"><narrative>Urban Development</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">560833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">560833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">1033333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">1033333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1960833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1960833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2188333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2188333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">53333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">53333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">75716767.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">75716767.53</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">80000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">1035561</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">1650814</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1596858</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-83836</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-200000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-120403</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-134860</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-180878</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-176756</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-173854</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-213432</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-70652</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-70652</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-115044</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39518"><narrative>URBEL</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39519"><narrative>BHTRANS</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39521"><narrative>SMPU</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39522"><narrative>SMOBI</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169134"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P169134?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169134"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2030-08-15" />
<target value="20000.00">

</target>
<actual value="124.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Detailed designs for 42.3 km of the Amazonas Express, including bike lanes
</narrative></title>
<baseline year="2019" iso-date="2019-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-28" />
<period-end iso-date="2026-10-30" />
<target value="100.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of Jatobá's Strategic Development Program
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="100.00">
<comment><narrative>
The Strategic Development Plan for the Jatobá Region is progressing with strong community engagement, with 32 participatory events conducted in 2025 under the Já Tô Lá Program. A contract amendment has extended the timeline and adjusted deliverables to reflect scope updates, with completion now expected by April 2028.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Response Protocol to address cases of sexual harassment is revised
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-25" />
<period-end iso-date="2030-08-15" />
<target value="80.00">
<comment><narrative>
For Component 1 – Amazonas, the Grievance Mechanism is under development.

For Component 2 – Vila Cabana do Pai Tomás, six grievances were recorded through URBEL channels, mainly related to construction waste, safety risks (including potential falling signage), violence/security, and housing issues, among others. The average response time was one day.

For Component 3 – Jatobá, no grievances directly related to the Program were recorded.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in the civil works related to the project
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="10">
<comment><narrative>
This indicator measures the percentage of women employed on the Project's civil works. The baseline refers to the total number of women employed in the construction industry within the transportation sector of Belo Horizonte. To assess this, SMOBI will analyze the employment contracts of workers hired  during the civil works of the BRT Amazonas. The figures will be provided by SMOBI in its implementation reports.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the rehabilitation of sidewalks along the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="100.00">
<comment><narrative>
Progress pending commencement of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amazonas BRT Walkability Index
</narrative></title>
<baseline year="2024" iso-date="2024-10-12" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-12" />
<period-end iso-date="2030-08-15" />
<target value="TBD">

</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Injuries and fatalities in road accidents in the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="25.00">
<comment><narrative>
There was no update of this indicator for the first half of 2025. The data for this indicator are compiled annually in the second half of the year.
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total time spent by women in their daily commute
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="148,170.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="112,858.80">
<comment><narrative>
No updated data available for interim ICR
</narrative></comment>
</target>
<actual value="8,890,229">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="To be determined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="To be determined">
<comment><narrative>
The project became effective in January 2023. The tasks to be carried out in Jatob&amp;aacute; (Urban development)&amp;nbsp;are in the final phase of hiring, and the satisfaction surveys ca&amp;nbsp;only be conducted when the actual work there begins (January 2024).
</narrative></comment>
</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicular roads, including sidewalks and micro-drainage, implemented and/or improved in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="1,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sewerage network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-11" />
<target value="2,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area with absence and / or impairment of drainage network recovered in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="22,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PPP model for the commercial exploitation of the Amazonas Integration Terminal structured and launched
</narrative></title>
<baseline year="2030" iso-date="2030-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2030-08-15" />
<period-end iso-date="2030-08-15" />
<target value="Yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the civil works of the Amazonas BRT  Integration Terminal
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2030-08-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2030-08-15" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs for the BRT Amazonas Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-09" />
<period-end iso-date="2026-10-09" />
<target value="100.00">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban Mobility Strategic Studies
</narrative></title>
<baseline year="2019" iso-date="2019-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-28" />
<period-end iso-date="2026-10-30" />
<target value="3.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-30" />
<period-end iso-date="2026-10-30" />
<target value="80.00">
<comment><narrative>
It measures the number of grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People living in geological and geotechnical risks in selected areas in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="665"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-11" />
<target value="0">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="60.00">
<comment><narrative>
No progress can be reported on this indicator until civil works are completed and user satisfaction surveys of the new BRT infrastructure/service are conducted.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Stations built with preboarding payment area in the 26.2 km section of the Amazonas Express
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2025-06-27" />
<target value="3.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women trained and certified by the Women in Civil Works Program
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2030-08-15" />
<target value="60">
<comment><narrative>
Data as of end 2025.
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People that benefited from the mitigation of geological and geotechnical risks in selected areas in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="252.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="395,627"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
This indicator will be achieved upon completion of the BRT works.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People living in geological and geotechnical risks in selected areas in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="665"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2030-08-15" />
<target value="0">
<comment><narrative>
38 households, comprising 124 persons, have already been resettled from high-risk areas in Vila Cabana. Full achievement of the target is expected with implementation of the second phase of the Resettlement Action Plan and completion of the civil works for the upgrading of Vila Cabana civil works.
</narrative></comment>
</target>
<actual value="541">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian roads implanted and / or improved in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-26" />
<period-end iso-date="2028-09-13" />
<target value="950.00">
<comment><narrative>
It will be measured upon completion of the Cabana civil works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water supply network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-09-15" />
<target value="2,500.00">
<comment><narrative>
It will be measured upon completion of the Cabana civil works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2030-08-15" />
<target value="39.6">
<comment><narrative>
Progress pending commencement of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amazonas BRT Walkability Index
</narrative></title>
<baseline year="2024" iso-date="2024-10-12" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-12" />
<period-end iso-date="2028-09-12" />
<target value="TBD">
<comment><narrative>
The baseline and target will be updated
</narrative></comment>
</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes in the area of influence of the Amazonas Express
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus stops built or renovated in the 26.2 km section of the Amazonas Express, including the provision of access for people with disabilities
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Employees trained to respond to situations of sexual harassment in the operation of municipal buses
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="TBD">
<comment><narrative>
This indicator will track the number of staff and municipal bus operators trained to address incidents of sexual harassment, following the implementation of the new response protocol in public bus transportation
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2028-09-10" />
<target value="395,627">
<comment><narrative>
New Scorecard Indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs for the BRT Amazonas Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-09" />
<period-end iso-date="2026-10-09" />
<target value="100.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="20000.00">
<comment><narrative>
The actual values will be reported after&amp;nbsp;civil works begin (Q1&amp;nbsp;2024)&amp;nbsp;and deliver improved living conditions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in the civil works related to the project
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2030-08-15" />
<target value="10">
<comment><narrative>
This indicator measures the percentage of women employed on the Project's civil works, which have not yet started
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of Jatobá's Strategic Development Program
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicular roads, including sidewalks, implanted and / or improved in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="1,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Review of the Response Protocol to address cases of sexual harassment on public transport
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs for the BRT Amazonas Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-09" />
<period-end iso-date="2028-07-15" />
<target value="100.00">

</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water supply network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2028-09-15" />
<target value="2,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People killed and severely injured in road accidents in Amazonas Avenue
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="25.00">
<comment><narrative>
There was no update of this indicator for the first half of 2025. The data for this indicator are compiled annually in the second half of the year.
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Extension of water supply network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="2,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sewerage network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-11" />
<target value="2,500.00">
<comment><narrative>
It will be measured upon completion of the Cabana civil works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus stops built or renovated in the Amazonas BRT Corridor, including the provision of access for people with disabilities
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="100.00">
<comment><narrative>
Progress pending commencement of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total time spent by women in their daily commute
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="148,170.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="112,858.80">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="8,890,229.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas Avenue at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="20">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sewerage replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="2,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicular roads, including sidewalks and micro-drainage, implemented and/or improved in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="1,500.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian roads implanted and / or improved in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-26" />
<period-end iso-date="2030-08-15" />
<target value="950.00">
<comment><narrative>
Progress pending commencement of the civil works for the upgrading of Vila Cabana.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas Express (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-10-09" />
<target value="39.6">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="797938"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2030-08-15" />
<target value="852,800">
<comment><narrative>
Progress on this indicator can only be measured after the civil works for the Amazonas BRT corridor are completed.
</narrative></comment>
</target>
<actual value="797938">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="1290310"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2030-08-15" />
<target value="1210473">
<comment><narrative>
Estimated net GHG emissions given improved average commercial speed of bus service during peak hour.
</narrative></comment>
</target>
<actual value="1133597">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="26.20">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2028-09-14" />
<target value="20000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs of the Integration Terminal
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-09-14" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total time spent by women in their daily commute
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="148,170.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="112,858.80">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="8,890,229.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Physical progress in constructing the Amazonas Express
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Employees trained to respond to situations of sexual harassment in the operation of municipal buses
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="TBD">
<comment><narrative>
This indicator will track the number of staff and municipal bus operators trained to address incidents of sexual harassment, following the implementation of the new response protocol in public bus transportation
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Strategic designs for infrastructure interventions in four precarious settlements
</narrative></title>
<baseline year="2019" iso-date="2019-11-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-28" />
<period-end iso-date="2026-10-30" />
<target value="4.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-25" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
It measures the number of grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Studies for implementing technological innovations in the Origin-Destination Study
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women trained and certified by the Women in Civil Works Program
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="60">
<comment><narrative>
This indicator measures the percentage of women who completed the training courses offered by the Women in Civil Works Program.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="395,627"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian roads implanted and / or improved in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-26" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-26" />
<period-end iso-date="2028-09-13" />
<target value="950.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People living in geological and geotechnical risks in selected areas in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="665"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-11" />
<target value="0">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women trained and certified by the Women in Civil Works Program
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="60">
<comment><narrative>
There were no new trainings during the period. 2025=43%
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Vehicular roads, including sidewalks and micro-drainage, implemented and/or improved in Vila Cabana do Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2030-08-15" />
<target value="1,500.00">
<comment><narrative>
Progress pending commencement of the civil works for the upgrading of Vila Cabana.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2028-09-10" />
<target value="395,627">
<comment><narrative>
New Scorecard Indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="To be determined"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="To be determined">
<comment><narrative>
The project became effective in January 2023. The tasks to be carried out in Jatob&amp;aacute; (Urban development)&amp;nbsp;are in the final phase of hiring, and the satisfaction surveys ca&amp;nbsp;only be conducted when the actual work there begins (January 2024).
</narrative></comment>
</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2030-08-15" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas Express (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="60.00">
<comment><narrative>
No progress can be reported on this indicator until civil works are completed and user satisfaction surveys of the new BRT infrastructure/service are conducted.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of public transport service  in the Amazonas BRT Corridor (coverage, reliability, safety, personal security), differentiated by income and sex
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="26.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="60.00">
<comment><narrative>
The results of the BRT Amazonas simulation model (contract under negotiation) will be used to update the baseline.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions in Amazonas Express (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="1290310"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2030-08-15" />
<target value="1210473">
<comment><narrative>
Estimated net GHG emissions given improved average commercial speed of bus service during peak hour.
</narrative></comment>
</target>
<actual value="1133597">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes in the area of influence of the Amazonas Express
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="797938"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2030-08-15" />
<target value="852,800">
<comment><narrative>
Progress on this indicator can only be measured after the civil works for the Amazonas BRT corridor are completed.
</narrative></comment>
</target>
<actual value="797938">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible within 60 minutes commute using public transportation in the area of influence of the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="371,332.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="436,042.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="371,332.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2028-09-14" />
<target value="20000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="20000.00">
<comment><narrative>
The actual values will be reported after&amp;nbsp;civil works begin (Q1&amp;nbsp;2024)&amp;nbsp;and deliver improved living conditions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2030-08-15" />
<target value="20000.00">

</target>
<actual value="124.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2028-09-14" />
<target value="20000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas Avenue at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="20">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2030-08-15" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2028-09-10" />
<target value="395,627">
<comment><narrative>
New Scorecard Indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2030-08-15" />
<target value="395,627">
<comment><narrative>
No progress can be measured on this indicator until civil works for the Amazonas BRT corridor are completed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2028-09-10" />
<target value="395,627">
<comment><narrative>
New Scorecard Indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Employees trained to respond to situations of sexual harassment in the operation of municipal buses
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="TBD">
<comment><narrative>
There were no new trainings during the period.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women employed in the civil works related to the project
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2028-09-15" />
<target value="10">
<comment><narrative>
This indicator measures the percentage of women employed on the Project's civil works. The baseline refers to the total number of women employed in the construction industry within the transportation sector of Belo Horizonte. To assess this, SMOBI will analyze the employment contracts of workers hired by the concessionaires during the bidding process for the civil works of the BRT Amazonas. The figures will be provided by SMOBI in its implementation reports.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Review of the Response Protocol to address cases of sexual harassment on public transport
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="Yes">
<comment><narrative>
As agreed during the mission, the indicator can be considered achieved.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions in Amazonas Express (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stations built with preboarding payment area in the Amazonas BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2025-06-10" />
<target value="100">
<comment><narrative>
It will be measured upon completion of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus stops built or renovated in the Amazonas BRT Corridor, including the provision of access for people with disabilities
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="100.00">
<comment><narrative>
It will be measured upon completion of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rehabilitation of sidewalks in the 26.2 km section of the Amazonas Express
</narrative></title>
<baseline year="2019" iso-date="2019-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-30" />
<period-end iso-date="2025-06-27" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2026-10-09" />
<target value="39.6">
<comment><narrative>
It will be measured upon completion of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with improved urban living conditions
</narrative></title>
<baseline year="2019" iso-date="2019-10-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-14" />
<period-end iso-date="2028-09-14" />
<target value="20000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in total time spent by women in their daily commute
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="8,890,229.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="6,771,527.00">
<comment><narrative>
It will be measured at the end of the project.
</narrative></comment>
</target>
<actual value="8,890,229.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs of the Integration Terminal
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-09-14" />
<target value="100">
<comment><narrative>
The design and build of the Terminal is currently under procurement.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus stops built or renovated in the Amazonas BRT Corridor, including the provision of access for people with disabilities
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pedestrian roads implanted and / or improved in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="950.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="2030-08-15" />
<target value="52,4371">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-10-25" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-10-25" />
<period-end iso-date="2028-09-15" />
<target value="80.00">
<comment><narrative>
For Component 1 – Amazonas, the Grievance Mechanism is under development.

For Component 2 – Vila Cabana do Pai Tomás, six grievances were recorded through URBEL channels, mainly related to construction waste, safety risks (including potential falling signage), violence/security, and housing issues, among others detailed in Appendix XIX. The average response time was one day.

For Component 3 – Jatobá, no grievances directly related to the Program were recorded.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Studies to provide on demand bus service at night through apps
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in the Amazonas Express civil works
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="10.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Execution of Jatobá's Strategic Plan
</narrative></title>
<baseline year="2019" iso-date="2019-10-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-30" />
<period-end iso-date="2026-10-30" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stations built with preboarding payment area in the Amazonas BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2025-06-10" />
<target value="100">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sewerage network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2030-08-15" />
<target value="2,500.00">
<comment><narrative>
Progress pending commencement of the civil works for the upgrading of Vila Cabana.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries reporting satisfaction with key aspects of citizen engagement process in Jatobá Region
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2030-08-15" />
<target value="60">

</target>
<actual value="85.84">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amazonas BRT Walkability Index
</narrative></title>
<baseline year="2024" iso-date="2024-10-12" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-12" />
<period-end iso-date="2028-09-12" />
<target value="TBD">
<comment><narrative>
The baseline and target will be updated
</narrative></comment>
</target>
<actual value="-">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of the study and detailed designs of the Integration Terminal
</narrative></title>
<baseline year="2024" iso-date="2024-10-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-14" />
<period-end iso-date="2028-09-14" />
<target value="100">
<comment><narrative>
The design and build of the Terminal is currently under procurement.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women employed in Vila Cabana do Pai Tomás housing construction works
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="4.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="10.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Cabana works.
</narrative></comment>
</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-15" value="395,627"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-15" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the rehabilitation of sidewalks along the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water supply network replaced and / or supplemented in Vila Cabana Pai Tomás
</narrative></title>
<baseline year="2019" iso-date="2019-10-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-15" />
<period-end iso-date="2030-08-15" />
<target value="2,500.00">
<comment><narrative>
Progress pending commencement of the civil works for the upgrading of Vila Cabana.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Injuries and fatalities in road accidents in the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="25.00">
<comment><narrative>
No updated data available for the interim ICR
</narrative></comment>
</target>
<actual value="57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Review of the Response Protocol to address cases of sexual harassment on public transport
</narrative></title>
<baseline year="2019" iso-date="2019-10-13" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-13" />
<period-end iso-date="2028-09-13" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-10-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-10-10" />
<period-end iso-date="2030-08-15" />
<target value="395,627">
<comment><narrative>
No progress can be measured on this indicator until civil works for the Amazonas BRT corridor are completed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the rehabilitation of sidewalks along the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="100.00">
<comment><narrative>
It will be measured upon completion of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Stations built with preboarding payment area in the Amazonas BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2030-08-15" />
<target value="100">
<comment><narrative>
Progress pending commencement of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of Jatobá's Strategic Development Program
</narrative></title>
<baseline year="2019" iso-date="2019-10-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-12" />
<period-end iso-date="2028-09-12" />
<target value="100.00">
<comment><narrative>
The Strategic Development Plan for the Jatobá Region is progressing with strong community engagement, with 32 participatory events conducted in 2025 under the Já Tô Lá Program. A contract amendment has extended the timeline and adjusted deliverables to reflect scope updates, with completion now expected by April 2028.
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in constructing the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2028-09-09" />
<target value="100.00">
<comment><narrative>
It will be measured during the execution of the works contract for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in constructing the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2030-08-15" />
<target value="100.00">
<comment><narrative>
Progress pending commencement of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Acquisition of traffic lights and monitoring cameras for the targeted Amazonas Express section
</narrative></title>
<baseline year="2019" iso-date="2019-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-31" />
<period-end iso-date="2026-10-30" />
<target value="100.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net GHG emissions per year around influence of the Amazonas BRT Corridor (ton)
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="1,448,890.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-13" />
<target value="1,388,047.00">
<comment><narrative>
The baseline and target will be reviewed at the end of the project using data obtained from the simulation model contracted for the project.
</narrative></comment>
</target>
<actual value="1,448,890.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in constructing the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-09" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-09" />
<period-end iso-date="2028-09-09" />
<target value="100.00">
<comment><narrative>
It will be measured upon completion of the civil works for the Amazonas Corridor.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Injuries and fatalities in road accidents in the Amazonas BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-10-10" value="57.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-10" />
<period-end iso-date="2028-09-10" />
<target value="25.00">
<comment><narrative>
There was no update of this indicator for the first half of 2025. The data for this indicator are compiled annually in the second half of the year.
</narrative></comment>
</target>
<actual value="57.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average commercial speed of bus service in the Amazonas BRT Corridor at peak hour (km/h)
</narrative></title>
<baseline year="2019" iso-date="2019-10-11" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-10-11" />
<period-end iso-date="2028-09-13" />
<target value="24">

</target>
<actual value="17.16">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P169140</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>São Paulo Aricanduva Bus Rapid Transit Corridor</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to improve mobility and accessibility to jobs for socially vulnerable public transport users in the influence area of the Aricanduva Corridor and enhance operational efficiency of the São Paulo city bus system.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project will finance: (i) development of 14km BRT Aricanduva Corridor; (ii) upgrading of the São Paulo city bus operational control center; and (iii) institutional strengthening activities related to public transport planning and policies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0039524"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0039524"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0039525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2019-12-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-04-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Andres Sebastian Gartner</narrative></person-name><telephone>+1-202-473-1000</telephone><email>agartner@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003448433" />
            <name><narrative>Sao Paulo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22 -49</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="21012" percentage="93" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TI" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="53.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="89" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="100" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="14" xml:lang="en"><narrative>ICT</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">666666.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1666666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1666666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2083333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2083333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">80401749.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">80401749.12</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">97000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">4117947</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">8980304</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-242500</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-172075</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-120253</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-121682</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-270060</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-501621</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-485238</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-469666</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-406912</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-654913</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-654913</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-654913</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-39525"><narrative>São Paulo Municipal Secretariat of Urban Infrastructure and Works</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-39526"><narrative>São Paulo Municipal Secretariat of Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169140"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P169140?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P169140"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2028-05-15" />
<target value="14.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Workers that have signed the code of conduct and attended the code of conduct training for the Aricanduva BRT works
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of workers (consultants and contractors) hired by the project that have signed the code of conduct and received the training on the contents of the code of conduct including their GBV related obligations within the work-site and with the community.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lane built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="14.00">
<comment><narrative>
This indicator measures the construction of bicycle lanes along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2028-05-15" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="14.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for São Paulo city buses
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for the São Paulo city buses
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Universal access facilities at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to provide universal access at BRT stations along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial speed for bus vehicles along the Aricanduva BRT corridor (km/h)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="18 km/h"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="25 km/h">
<comment><narrative>
This indicator measures the improvement of mobility for public transport users. It measures the afternoon peak-hour commercial speed of buses in the BRT lane on the Aricanduva corridor.
</narrative></comment>
</target>
<actual value="18.77 km/h">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Assessments considered in final designs
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2028-05-15" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the results of road safety assessments are considered in final designs
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
BRT lanes built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="14.00">
<comment><narrative>
This indicator measures the kilometers of BRT lanes built on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT stations constructed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress of BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for São Paulo city buses
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for the São Paulo city buses
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial speed for bus vehicles along the Aricanduva BRT corridor (km/h)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="18 km/h"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2028-05-15" />
<target value="25 km/h">
<comment><narrative>
This indicator measures the improvement of mobility for public transport users. It measures the afternoon peak-hour commercial speed of buses in the BRT lane on the Aricanduva corridor.
</narrative></comment>
</target>
<actual value="18.77 km/h">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Workers that have signed the code of conduct and attended the code of conduct training for the Aricanduva BRT works
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of workers (consultants and contractors) hired by the project that have signed the code of conduct and received the training on the contents of the code of conduct including their GBV related obligations within the work-site and with the community.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intelligent traffic lights installed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of intelligent traffic lights installed along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lane built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="14.00">
<comment><narrative>
This indicator measures the construction of bicycle lanes along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in CO2 emissions of public transport vehicles as a result of implementation of Aricanduva BRT
</narrative></title>
<baseline year="2019" iso-date="2019-09-29" value="0 tonnes of CO2 per year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-29" />
<period-end iso-date="2028-05-15" />
<target value="Reduction of 2,195 tonnes of CO2 per year">
<comment><narrative>
This indicator measures yearly reduction in carbon dioxide emissions from São Paulo city buses as a result of the implementation of the BRT along Aricanduva Avenue. The value will be based on emission factors by vehicle type and annual (bus) vehicle kilometers.
</narrative></comment>
</target>
<actual value="0 tonnes of CO2 per year">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-01" value="255,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-01" />
<period-end iso-date="2026-06-30" />
<target value="307,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-05-15" />
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Security cameras installed at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measure the progress of installing security camera at BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT stations constructed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress of BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="223,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus trip performance indicators under the new concession contracts of São Paulo city buses monitored by the Operational Control Center
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Parentage of bus trip performance indicators under the new concession contracts monitored by the Operational Control Center (OCC). This is based on OCC's real-time monitoring capacity for bus trip related indicators under the new concession, including completion of trips, on-time departure, and response time for incidents.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sidewalks rehabilitated on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to rehabilitate sidewalks along the Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sexual harassment response protocol for São Paulo city buses implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-27" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
The sexual harassment response protocol for S&amp;atilde;o Paulo city buses was implemented, with the support of a gender technical assistance component under the Smart Mobility program ASA - P173414.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus trip performance indicators under the new concession contracts of São Paulo city buses monitored by the Operational Control Center
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
Parentage of bus trip performance indicators under the new concession contracts monitored by the Operational Control Center (OCC). This is based on OCC's real-time monitoring capacity for bus trip related indicators under the new concession, including completion of trips, on-time departure, and response time for incidents.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
BRT lanes built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2028-05-15" />
<target value="14.00">
<comment><narrative>
This indicator measures the kilometers of BRT lanes built on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public lights installed for pedestrians and bicycle users along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-03" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
Progress of the installation of additional public lights for pedestrians and bicycle users. The number of additional lights will be defined in the detailed design.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgraded Operational Control Center for São Paulo city buses is in commission
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
Operational Control Center (OCC) for São Paulo city buses is in commission with the upgraded building and data processing system.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2028-05-15" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
BRT lanes built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="14.00">
<comment><narrative>
This indicator measures the kilometers of BRT lanes built on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-05-15" />
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded within the stipulated service standards for response times
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
Percentage of grievances responded within the stipulated service standards for response times
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-05-15" />
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lane built on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2028-05-15" />
<target value="14.00">
<comment><narrative>
This indicator measures the construction of bicycle lanes along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public lights installed for pedestrians and bicycle users along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-03" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Progress of the installation of additional public lights for pedestrians and bicycle users. The number of additional lights will be defined in the detailed design.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intelligent traffic lights installed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of intelligent traffic lights installed along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded within the stipulated service standards for response times
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Percentage of grievances responded within the stipulated service standards for response times
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sidewalks rehabilitated on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to rehabilitate sidewalks along the Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sidewalks rehabilitated on Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to rehabilitate sidewalks along the Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances responded within the stipulated service standards for response times
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Percentage of grievances responded within the stipulated service standards for response times
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in CO2 emissions of public transport vehicles as a result of implementation of Aricanduva BRT
</narrative></title>
<baseline year="2019" iso-date="2019-09-29" value="0 tonnes of CO2 per year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-29" />
<period-end iso-date="2026-06-30" />
<target value="Reduction of 2,195 tonnes of CO2 per year">
<comment><narrative>
This indicator measures yearly reduction in carbon dioxide emissions from São Paulo city buses as a result of the implementation of the BRT along Aricanduva Avenue. The value will be based on emission factors by vehicle type and annual (bus) vehicle kilometers.
</narrative></comment>
</target>
<actual value="0 tonnes of CO2 per year">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
BRT stations constructed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress of BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2028-05-15" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of socially vulnerable bus users in the area of influence of Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2028-05-15" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of socially vulnerable public transport users along the BRT corridor. The score takes into account several factors: comfort, speed, security, reliability, regularity, usefulness, fare system, affordability, customer service, communication and environment. Socially vulnerable users includes lowest two social classes (based on the questionnaires), women, and people with disabilities. The baseline will be defined in 2020.
</narrative></comment>
</target>
<actual value="7.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="2.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sexual harassment response protocol for São Paulo city buses implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-27" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
The sexual harassment response protocol for S&amp;atilde;o Paulo city buses was implemented, with the support of a gender technical assistance component under the Smart Mobility program ASA - P173414.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="3.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-01" value="255,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-01" />
<period-end iso-date="2026-06-30" />
<target value="307,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-01" value="255,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-01" />
<period-end iso-date="2026-06-30" />
<target value="307,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="223,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="270,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="80.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="77.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="85.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2028-05-15" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for São Paulo city buses
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Percentage of bus routes monitored in real time by the Operational Control Center for the São Paulo city buses
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2028-05-15" />
<target value="">
<comment><narrative>
Component 1 – BRT Corridor 

NO for the combined technical and evaluation report was issued in October 2025. Civil works contracts are expected to be signed in December 2025, with service orders in January 2026 and completion by end-2027.  

Financial proposals for the FIDIC engineer are under evaluation; NO request expected in December 2025. Socio-environmental Supervision contract has been awarded and will be signed before work starts.  

Component 1 – ITS 

Preliminary bidding documents were presented at the October 28, 2025 market engagement event. Updated documents are being prepared by SPObras and SPTrans, with NO submission expected in January 2026 and bidding launch in February 2026. 

Budget was re-evaluated by SPObras and the estimate was reduced from USD63 million to USD50 million. 

Component 2 – Operations Control Center (OCC) 

Service orders for Plant and Supervision contracts were issued in April 2025; detailed design work began in August 2025 and is expected to finish
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgraded Operational Control Center for São Paulo city buses is in commission
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2028-05-15" />
<target value="Yes">
<comment><narrative>
Operational Control Center (OCC) for São Paulo city buses is in commission with the upgraded building and data processing system.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2026-06-30" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Roads rehablitated
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="14.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Scheduled São Paulo city bus trips that are not completed
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="3.00">
<comment><narrative>
This indicator measures compliance with scheduled services, by measuring the percentage of scheduled or planned bus trips that are not completed from beginning to end of the route.
</narrative></comment>
</target>
<actual value="4.90">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Daily bus passenger ridership on the Aricanduva BRT Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-11-01" value="255,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-11-01" />
<period-end iso-date="2026-06-30" />
<target value="307,000.00">
<comment><narrative>
This indicator measures improvements in mobility. It measures average daily passenger ridership of the BRT on Aricanduva Avenue
</narrative></comment>
</target>
<actual value="215,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Commercial speed for bus vehicles along the Aricanduva BRT corridor (km/h)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="18 km/h"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="25 km/h">
<comment><narrative>
This indicator measures the improvement of mobility for public transport users. It measures the afternoon peak-hour commercial speed of buses in the BRT lane on the Aricanduva corridor.
</narrative></comment>
</target>
<actual value="18.77 km/h">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sexual harassment response protocol for São Paulo city buses implemented
</narrative></title>
<baseline year="2019" iso-date="2019-09-27" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-27" />
<period-end iso-date="2028-05-15" />
<target value="Yes">
<comment><narrative>
The sexual harassment response protocol for S&amp;atilde;o Paulo city buses was implemented, with the support of a gender technical assistance component under the Smart Mobility program ASA - P173414.&amp;nbsp;
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Universal access facilities at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to provide universal access at BRT stations along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in satisfaction score of female bus users on security along Aricanduva BRT corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-01" />
<period-end iso-date="2028-05-15" />
<target value="10.00">
<comment><narrative>
This indicator measures improvements in mobility by measuring the change in the average satisfaction score of female public transport users along the BRT corridor. This indicator focuses on a score of security.
</narrative></comment>
</target>
<actual value="7.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Change in CO2 emissions of public transport vehicles as a result of implementation of Aricanduva BRT
</narrative></title>
<baseline year="2019" iso-date="2019-09-29" value="0 tonnes of CO2 per year"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-29" />
<period-end iso-date="2026-06-30" />
<target value="Reduction of 2,195 tonnes of CO2 per year">
<comment><narrative>
This indicator measures yearly reduction in carbon dioxide emissions from São Paulo city buses as a result of the implementation of the BRT along Aricanduva Avenue. The value will be based on emission factors by vehicle type and annual (bus) vehicle kilometers.
</narrative></comment>
</target>
<actual value="0 tonnes of CO2 per year">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Universal access facilities at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the progress to provide universal access at BRT stations along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Intelligent traffic lights installed along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of intelligent traffic lights installed along Aricanduva Avenue
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Security cameras installed at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measure the progress of installing security camera at BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
On-time departures of São Paulo city buses
</narrative></title>
<baseline year="2025" iso-date="2025-11-15" value="77.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-11-15" />
<period-end iso-date="2028-05-15" />
<target value="85.00">
<comment><narrative>
This indicator measures improvements in operational performance of São Paulo city buses. There are about 15,000 buses in São Paulo and this indicator will measure how closely they run compared to the schedule. It measures the percentage of buses that depart from their route starting point at the scheduled time.
</narrative></comment>
</target>
<actual value="75.82">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Security cameras installed at BRT stations along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
This indicator measure the progress of installing security camera at BRT stations constructed along the Aricanduva Corridor
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Assessments considered in final designs
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the results of road safety assessments are considered in final designs
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of bus trip performance indicators under the new concession contracts of São Paulo city buses monitored by the Operational Control Center
</narrative></title>
<baseline year="2019" iso-date="2019-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-02" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Parentage of bus trip performance indicators under the new concession contracts monitored by the Operational Control Center (OCC). This is based on OCC's real-time monitoring capacity for bus trip related indicators under the new concession, including completion of trips, on-time departure, and response time for incidents.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public lights installed for pedestrians and bicycle users along Aricanduva Corridor
</narrative></title>
<baseline year="2019" iso-date="2019-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-03" />
<period-end iso-date="2026-06-30" />
<target value="100.00">
<comment><narrative>
Progress of the installation of additional public lights for pedestrians and bicycle users. The number of additional lights will be defined in the detailed design.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Workers that have signed the code of conduct and attended the code of conduct training for the Aricanduva BRT works
</narrative></title>
<baseline year="2019" iso-date="2019-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-09-30" />
<period-end iso-date="2028-05-15" />
<target value="100.00">
<comment><narrative>
This indicator measures the percentage of workers (consultants and contractors) hired by the project that have signed the code of conduct and received the training on the contents of the code of conduct including their GBV related obligations within the work-site and with the community.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of formal job opportunities reachable by public transport from the area of influence of the Aricanduva BRT Corridor within a 90-minute one-way commute
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="2,000,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2026-06-30" />
<target value="2,200,000.00">
<comment><narrative>
This indicator measures accessibility by calculating the number of jobs reachable by public transport from the area of influence of the Aricanduva BRT within a 90-minute one-way commute. The value will be calculated as a weighted average of reachable jobs from each zone within the influence area of the Aricanduva Corridor. The calculation of the public transport travel time and the number ofjobs reached from each location is based on the transport simulation model developed by SPTrans.
</narrative></comment>
</target>
<actual value="2,000,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Road Safety Assessments considered in final designs
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the results of road safety assessments are considered in final designs
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Upgraded Operational Control Center for São Paulo city buses is in commission
</narrative></title>
<baseline year="2019" iso-date="2019-08-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-08-01" />
<period-end iso-date="2026-06-30" />
<target value="Yes">
<comment><narrative>
Operational Control Center (OCC) for São Paulo city buses is in commission with the upgraded building and data processing system.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P170682</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Linha de CrEdito para Resiliência Urbana no Sul do Brasil</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to promote urban resilience in selected municipalities in Southern Brazil to address natural disaster and extreme climate-related events.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Southern Brazil Urban Resilience Program Project is  is to promote urban resilience in selected municipalities in Southern Brazil to address natural disaster and extreme climate-related events. This project has three components. 1) The first component, : Investments to Promote Urban Resilience, aims to support BRDE to finance eligible sub-projects in selected municipalities to promote urban resilience through the construction or the upgrading of existing infrastructure to mitigate the impacts of natural disaster and climate-related risks such as floods, flash floods, landslides and other erosion processes. 2) The second component, Institutional Strengthening of Selected Municipalities for Urban Resilience, aims to support Southern Regional Development Bank (BRDE) to improve the institutional capacity of selected municipalities to design, implement, and monitor urban resilience projects. 3) The third component, Project Management and Institutional Strengthening, aims to support  BRDE to build its institutional capacity and support with Project-management-related activities ranging from technical, fiduciary, social and environmental risk management, communication and outreach, to monitoring and evaluation (M and E) through, inter alia, operating costs, training, technical assistance, services, and equipment, as required.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0041089"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0041090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2020-05-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-03-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Hannah Kim</narrative></person-name><telephone>+1-202-473-1000</telephone><email>hkim9@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450386" />
            <name><narrative>Ilha de Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27.59492 -48.4807</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450387" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-27 -50</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450392" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.11667 -55.53333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450393" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.16667 -56.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450394" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.83333 -43.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450465" />
            <name><narrative>Santa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.1 -56.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451133" />
            <name><narrative>Rio Grande do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30 -53.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451138" />
            <name><narrative>Rio Grande</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.035 -52.09861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452925" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30.03306 -51.23</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452928" />
            <name><narrative>Pôrto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.71667 -41.8</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452929" />
            <name><narrative>Pôrto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.28333 -55.43333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452930" />
            <name><narrative>Pôrto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-17.63333 -56.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452931" />
            <name><narrative>Pôrto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.61667 -41.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456383" />
            <name><narrative>NatErcia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.12 -45.51167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456593" />
            <name><narrative>Mucuri</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.08639 -39.55083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457415" />
            <name><narrative>Mato Grosso do Sul</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.5 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463419" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.99833 -52.98306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463420" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.9 -46.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463421" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.7 -40.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472419" />
            <name><narrative>Álvares Florence</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.32083 -49.91056</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472998" />
            <name><narrative>Água Fria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.35379 -39.21051</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463200" />
            <name><narrative>Fonseca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.15917 -43.28861</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003463199" />
            <name><narrative>Fonseca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.85 -42.05</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456836" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.75 -39.21667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003456835" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.86667 -41.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453527" />
            <name><narrative>Pirataba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.25 -49.86667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451190" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.90642 -43.18223</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003451189" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.25 -42.5</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003449920" />
            <name><narrative>Santa Paz</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.16667 -41.51667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392441" />
            <name><narrative>Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.76667 -38.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392440" />
            <name><narrative>Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.58333 -38.11667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391404" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.34947 -52.73739</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003391402" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.15 -43.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399275" />
            <name><narrative>Fundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.1 -44.25</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394547" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.91637 -37.17496</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394549" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.88944 -37.12</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394550" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.36667 -37.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454383" />
            <name><narrative>Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.88333 -40.63333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003399491" />
            <name><narrative>Fonseca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.46667 -39.06667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402538" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.13083 -39.8775</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402539" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.13333 -42.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003402540" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.96667 -39.98333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003410284" />
            <name><narrative>Fernando</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.86528 -42.71028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003446870" />
            <name><narrative>Tapirai</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.96361 -47.50722</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452526" />
            <name><narrative>Pouso Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.78333 -55.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454342" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.73333 -45.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454345" />
            <name><narrative>Pedrosa</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.98333 -47.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458389" />
            <name><narrative>Luciano</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.68333 -46.58333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458429" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.38333 -47.48333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458430" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.83333 -53.6</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458431" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.16667 -41.88333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003458432" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.08333 -41.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460168" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.06667 -45.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460169" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.84252 -45.17394</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470943" />
            <name><narrative>Banco da Vitória</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.77986 -39.10266</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470947" />
            <name><narrative>Banco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.16667 -39.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322060" />
            <name><narrative>Rio de Janeiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.92008 -43.33069</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006300613" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-29.94594 -51.14437</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396133" />
            <name><narrative>Luciano</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.33333 -38.03333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003396101" />
            <name><narrative>Luzilândia</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.45778 -42.37028</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394555" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.88333 -37.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394554" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.78323 -50.46339</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394553" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-1.57789 -51.34687</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394552" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-2.9 -40.36667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003394551" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.98333 -54.08333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003454597" />
            <name><narrative>Pedra</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13.21667 -38.96667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462870" />
            <name><narrative>Fundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.98333 -53.31667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462871" />
            <name><narrative>Fundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-15.15 -41.65</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462872" />
            <name><narrative>Fundo</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-11.88333 -43.13333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003462942" />
            <name><narrative>Freire</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-31.66667 -52.81667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003473821" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-32.09167 -52.16667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389704" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.19528 -36.21278</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389705" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.86826 -39.35514</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389706" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.73333 -39.01667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003393779" />
            <name><narrative>Novos</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.71667 -40.66667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003464975" />
            <name><narrative>Curitiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.42778 -49.27306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003476331" />
            <name><narrative>Lopes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.64528 -47.32389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003480646" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.92964 -43.57268</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662240" />
            <name><narrative>São Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.8 -60.61667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003754035" />
            <name><narrative>Monteiro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.86611 -60.78167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003480600" />
            <name><narrative>Fonseca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.87556 -43.08444</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003662780" />
            <name><narrative>Pôrto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.95 -67.83333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003760906" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-5.90306 -64.39556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003924765" />
            <name><narrative>São Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.11667 -63.76667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593684" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.59148 -45.71839</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593687" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5905 -45.7256</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593690" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5738 -45.7094</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593696" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5721 -45.7228</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593703" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5678 -45.7049</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007593704" />
            <name><narrative>Áreas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-22.5647 -45.7108</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003752199" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-3.45779 -62.62044</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003827647" />
            <name><narrative>Pedro</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-4.35917 -70.91167</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003828833" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-0.88639 -61.92528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006320053" />
            <name><narrative>Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.25016 -39.9487</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007582791" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.0974 -53.9614</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389702" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.76667 -37.1</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003389703" />
            <name><narrative>Santa Catarina</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-6.31667 -36.18333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007692842" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.97237 -50.12996</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007692848" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.9569 -50.14476</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007692895" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.97041 -50.10106</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007692896" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.97425 -50.12042</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0007775408" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-23.63105 -50.14378</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008299066" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.8608 -51.6844</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006322752" />
            <name><narrative>Curitiba</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.50395 -49.29082</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006323571" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30.11462 -51.16393</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008465016" />
            <name><narrative>Pedroso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-16.66413 -49.18399</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0011525616" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30.03333 -51.23333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008306806" />
            <name><narrative>Ferreira</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-25.8629 -49.5265</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0008611996" />
            <name><narrative>Nacional</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-8.72721 -63.91252</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0009781904" />
            <name><narrative>Banco</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.79978 -39.10094</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><sector vocabulary="1" code="43032" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="100.000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="96" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="96" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="96" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="96" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="4" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="75" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="75" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="4" xml:lang="en"><narrative>Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">97500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">565833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">565833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">895000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1600833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1600833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">2194166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">2194166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2545000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">75912098.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">75912098.51</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">49400000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">49400000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-47527805</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">2781375</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1398735</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">790698</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1657940</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">3163050</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">12066450</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">267902</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">274881</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">130782</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">356089</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-123262</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">-123262</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-89328</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-89328</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-61322</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-61322</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-127772</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-58978</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-157973</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-49953</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-61748</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-416236</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-97055</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-172647</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-505396</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-246549</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41090"><narrative>Banco Regional de Desenvolvimento do Extremo Sul (BRDE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170682"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170682?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170682"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area directly benefited from the drainage infrastructure built or upgraded as result of Project implementation.
</narrative></title>
<baseline year="2020" iso-date="2020-07-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-11" />
<period-end iso-date="2026-06-11" />
<target value="2,779,000">
<comment><narrative>
In the second project restructuring this indicator will be revised to a target of 2,600,000, which is a more accurate estimate of the coverage of the drainage infrastructure supported by the project.
</narrative></comment>
</target>
<actual value="2443000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints that are handled according to established protocol
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2026-06-12" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">
<comment><narrative>
A Project Restructuring should be taking place and if approved this Results Indicator will be removed. The New indicators and Targets will be as follow:
*People benefiting from climate resilient infrastructure (Number of people) - 60,000
*People benefiting from climate resilient infrastructure - Female (Number of people) - 30,000
*People benefiting from climate resilient infrastructure - Youth (Number of people) - 8,500
</narrative></comment>
</target>
<actual value="55346">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="80.00">
<comment><narrative>
Monitor the degree of beneficiaries involvement in decision-making will have in subprojects design and implementation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People transferred from disaster-prone to risk-free areas as result of Project implementation, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="150.00">
<comment><narrative>
Number of people transferred from disaster risk areas as result of Project implementation, of which percent of female.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster Risk Management knowledge products developed as part of the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-12" />
<period-end iso-date="2026-06-12" />
<target value="1">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="80.00">
<comment><narrative>
Monitor and record the degree of beneficiaries involvement in ongoing subprojects
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="80.00">
<comment><narrative>
This indicator monitors and records the degree of beneficiaries involvement in ongoing subprojects
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster Risk Management knowledge products developed as part of the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-12" />
<period-end iso-date="2026-06-12" />
<target value="1">
<comment><narrative>
Tijucas expressed interest in getting support for its drainage plan but this did not move forward. It is unlikely that other municipalities would want to borrow to finance a study or plan in the remaining time of the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Southern Brazil municipal subprojects supported by the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-11" />
<period-end iso-date="2026-06-11" />
<target value="6">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints that are handled according to established protocol
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2026-06-12" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People transferred from disaster-prone to risk-free areas as result of Project implementation, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="150.00">
<comment><narrative>
42 expected by project closing
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Southern Brazil municipal subprojects supported by the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-11" />
<period-end iso-date="2026-06-11" />
<target value="6">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Southern Brazil municipal subprojects supported by the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-11" />
<period-end iso-date="2026-06-11" />
<target value="6">

</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-12-15" />
<target value="80.00">
<comment><narrative>
This indicator monitors and records the degree of beneficiaries involvement in ongoing subprojects
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People transferred from disaster-prone to risk-free areas as result of Project implementation, of which female.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="10">
<comment><narrative>
In the second project restructuring the target was revised to 10 to reflect the project affected persons in Esteio according to the latest resettlement action plans.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area directly benefited from the drainage infrastructure built or upgraded as result of Project implementation.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="2600000">
<comment><narrative>
In the second project restructuring this indicator will be revised to a target of 2,600,000, which is a more accurate estimate of the coverage of the drainage infrastructure supported by the project.
</narrative></comment>
</target>
<actual value="2443000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">
<comment><narrative>
A Project Restructuring should be taking place and if approved this Results Indicator will be removed. The New indicators and Targets will be as follow:
*People benefiting from climate resilient infrastructure (Number of people) - 60,000
*People benefiting from climate resilient infrastructure - Female (Number of people) - 30,000
*People benefiting from climate resilient infrastructure - Youth (Number of people) - 8,500
</narrative></comment>
</target>
<actual value="55346">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">
<comment><narrative>
Expected beneficiaries of  90,624 does not include the projections for beneficiaries of the Blumenau and Bombinhas bridges.
</narrative></comment>
</target>
<actual value="33616">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Southern Brazil municipal subprojects supported by the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-05-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-11" />
<period-end iso-date="2026-12-15" />
<target value="6">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from climate resilient infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="6,0000">

</target>
<actual value="55,346">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints that are handled according to established protocol
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People transferred from disaster-prone to risk-free areas as result of Project implementation, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-06-28" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-28" />
<period-end iso-date="2026-06-27" />
<target value="150.00">
<comment><narrative>
In the second project restructuring the target was revised to 10 to reflect the project affected persons in Esteio according to the latest resettlement action plans.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disaster Risk Management knowledge products developed as part of the Project.
</narrative></title>
<baseline year="2020" iso-date="2020-06-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-06-12" />
<period-end iso-date="2026-06-12" />
<target value="1">
<comment><narrative>
In the second project restructuring this indicator will be removed.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area directly benefited from the drainage infrastructure built or upgraded as result of Project implementation.
</narrative></title>
<baseline year="2020" iso-date="2020-07-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-11" />
<period-end iso-date="2026-06-11" />
<target value="2,779,000">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area directly benefited from the drainage infrastructure built or upgraded as result of Project implementation.
</narrative></title>
<baseline year="2020" iso-date="2020-07-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-07-11" />
<period-end iso-date="2026-06-11" />
<target value="2,779,000">
<comment><narrative>
4,923,400 expected by project closing
</narrative></comment>
</target>
<actual value="2021400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints that are handled according to established protocol
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2026-06-12" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefited from improved or new resilient infrastructure, of which female.
</narrative></title>
<baseline year="2020" iso-date="2020-05-14" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-05-14" />
<period-end iso-date="2026-06-14" />
<target value="125,000.00">
<comment><narrative>
Expected beneficiaries of  90,624 does not include the projections for beneficiaries of the Blumenau and Bombinhas bridges.
</narrative></comment>
</target>
<actual value="33616">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P170850</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Energy and Mineral Sectors Strengthening Project II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen institutional capacity for market efficiency taking into consideration climate resilience in the energy and mining sectors in Brazil.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Second Energy and Mineral Sectors Strengthening Project is to strengthen institutional capacity for market efficiency taking into consideration climate resilience in the energy and mining sectors in Brazil. This project has three components. 1) The first component, Technical assistance to increase efficiency, long term infrastructure adequacy and climate resilience in the energy and mining sectors, has the following subcomponents: (i) Analytical work to inform reforms in the power sector; (ii) Analytical work to inform reforms in the oil and gas sector; and (iii) Analytical work to implement reforms in the mining sector. 2) The second component, Institutional strengthening of energy and mining institutions to establish and implement  strategies, policies and regulation, has the following subcomponents: (i) Strengthening the  regulatory,  planning  and  operational  capacity  of  the power  sector; (ii) Strengthening the planning, regulatory and monitoring capacity of key oil and gas sector  institutions; (iii) Strengthening the planning and regulatory capacity of key mining sector institutions; and (iv) Institutional and management capacity building for Ministerial and Agency Staff. 3) The third component, Implementation support, monitoring and Evaluation, and Knowledge Sharing and Dissemination, aims to provide support to the Government of Brazil to manage and coordinate all project activities financed under the project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0041298"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0041298"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0041298"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0041299"><narrative>MinistErio de Minas e Energia</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-06-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-05-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jimmy Pannett</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jpannett@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="32262" percentage="32" xml:lang="en"/><sector vocabulary="1" code="23010" percentage="32" xml:lang="en"/><sector vocabulary="1" code="23210" percentage="23" xml:lang="en"/><sector vocabulary="1" code="32210" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LP" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Energy and Extractives</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LC" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Oil and Gas</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="30" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="30" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="75" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="12" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000862" percentage="75" xml:lang="en"><narrative>Energy Policies &amp; Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">560000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">609166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">609166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">630000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">717500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">823333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">823333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">560000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">560000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">32101401.77</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">32101401.77</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">38000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-31014125</value><description xml:lang="en"><narrative>Total Commitment Cancellations in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1087277</value><description xml:lang="en"><narrative>Total Commitment Cancellations in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">95000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">20000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">665000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">1191000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">1200000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2130000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">1684875</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-1087277</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-95000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-23268</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-48511</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-50064</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-73143</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-128655</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-171430</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-231341</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-181603</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-207603</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-195280</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-41299"><narrative>MinistErio de Minas e Energia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170850"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P170850?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P170850"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National government staff trained (including independent/implementing agencies) (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="40">
<comment><narrative>
This indicator will measure the number of national government staff (including national agencies) trained through the project. These activities will strengthen the planning, management and control capacity for public servants in the sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity sector policy or market regulation developed (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the project's success in supporting the development and inclusion of updated policy or regulation material for the electricity sector, under component 1. The indicator will inform the fulfilment of the PDO indicator related to the development of policy and market regulatory changes, and will be based on administrative information collected by the PIU.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Draft Terms of Reference that can be used to dispatch electricity based on climate resilience (including adjustments on hydrological patterns)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
With activities executed under counterpart funds delayed, this indicator is likely not going to be achieved by project closure.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training, mentoring and gender awareness initiatives geared towards enhancing female participation in management positions in key energy and mining institutions.
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
The indicator will measure the amount of workshops, meetings and other fora to promote gender awareness at key institutions with responsibility for the energy, mining and gas sectors, organized with support from the project. These activities are expected to promote good practices, share lessons learned and encourage mentoring towards higher female participation in the sector, specially in management positions. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings, and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector institutions with stronger technical and operational capacity
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2025-12-15" />
<target value="2">
<comment><narrative>
Both ONS and CCEE have increased their capacity as a result of the studies that were undertaken by the project.  It should also be noted that staff in the MME, as well as ANP, ANM and ANEEL also have increased capacity as a result of the post-graduate course tailored to the sector needs.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational procedures updated
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the number of operational procedures implemented, based on studies financed by the project and informed by climate-change considerations. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.

While operational procedures have not changed within the life of the project, the pricing review is highly likely to change the electricity free-market accounting system to dual-accounting, improve RE forecasting and costing (at least three). These changes are expected to be fully implemented by 2028 at the earliest (following finalization of roadmap and stakeholder consultations).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1- Published Electricity sector expansion plans for increased security of supply (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="2.00">
<comment><narrative>
Delays have prevented any results at this point.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of female employees participating in trainings (Percentage)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30.00">
<comment><narrative>
Training currently underway.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training, mentoring and gender awareness initiatives geared towards enhancing female participation in management positions in key energy and mining institutions.
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
The indicator will measure the amount of workshops, meetings and other fora to promote gender awareness at key institutions with responsibility for the energy, mining and gas sectors, organized with support from the project. These activities are expected to promote good practices, share lessons learned and encourage mentoring towards higher female participation in the sector, specially in management positions. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings, and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new tools or methodologies introduced or upgraded
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="5.00">
<comment><narrative>
This indicator will measure the number of activities (Improved methodologies, tools implemented and trainings implemented) completed. These activities will strengthen planning, management and control capacity for the power, gas and mining sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Draft Terms of Reference that can be used to dispatch electricity based on climate resilience (including adjustments on hydrological patterns)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
With activities executed under counterpart funds delayed, this indicator is likely not going to be achieved by project closure.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector institutions with stronger technical and operational capacity
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2025-12-15" />
<target value="2">
<comment><narrative>
Delays have prevented results to this point, however activities are underway to strengthen the institutions.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of female employees participating in trainings (Percentage)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30.00">
<comment><narrative>
Training currently underway.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Policy and market regulatory changes, to enhance market efficiency, published for consultation (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
Market efficiency is understood as: “The extent to which the price of an asset reflects all information available about the actual value of the underlying assets.” In addition to this, a more practical definition refers to: “The existence of market arrangements that are fit for purpose, providing actors throughout the value chain with incentives to operate their systems in an economic manner, with an appropriate balance of risk and reward that is in the interests of customers, who ultimately pay for the costs of an energy system operation.”
Due to the CCEE study the published law (15.269/25) that allows for the review of the current pricing mechanism was enacted. Additional changes to the pricing regulatory environment and procedures are also expected to change as a result of the pricing study.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity sector policy or market regulation developed (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the project's success in supporting the development and inclusion of updated policy or regulation material for the electricity sector, under component 1. The indicator will inform the fulfilment of the PDO indicator related to the development of policy and market regulatory changes, and will be based on administrative information collected by the PIU.

The new published law (15.269/25) was enacted based on the pricing study and allows for the review of the current pricing mechanism. Further policy and market regulation changes are expected to occur beyond the life of the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Drafting Terms of Reference to construct a climate-informed methodology that could be adopted in the energy expansion plans
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
While at project closure, the TORs have not been constructed, both the studies for pricing under CCEE and value added by ONS (both completed just before project closure) are expected to inform future energy expansion plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new tools or methodologies introduced or upgraded
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="5.00">
<comment><narrative>
This indicator will measure the number of activities (Improved methodologies, tools implemented and trainings implemented) completed. These activities will strengthen planning, management and control capacity for the power, gas and mining sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.

One training was implemented (Post-Graduate degree). New tools and methodologies were presented through the pricing study and ONS value-added study and some are expected to be adopted in future.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1- Published Electricity sector expansion plans for increased security of supply (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="2.00">
<comment><narrative>
Delays have prevented any results at this point.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Drafting Terms of Reference to construct a climate-informed methodology that could be adopted in the energy expansion plans
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Policy and market regulatory changes, to enhance market efficiency, published for consultation (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the project's success in supporting the development and publication of updated policy or regulation material to enhance market efficiency in the energy and mining sectors. The project will support this objective by informing these changes through studies, policy notes, and assessments. The indicator be based on administrative information collected by the PIU. 
Market efficiency is understood as : “The extent to which the price of an asset reflects all information available about the actual value of the underlying assets.” Thus, as the quality and amount of information increases, the market becomes more efficient, reducing opportunities for arbitrage and above-market returns. In addition to this, a more practical definition refers to: “The existence of market arrangements that are fit for purpose, providing actors throughout the value chain with incentives to operate their systems in an economic manner, with an appropriate balance of risk and reward that is in the interests of customers, who ultimately pay for th costs of an energy system operation.”
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational procedures updated
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the number of operational procedures implemented, based on studies financed by the project and informed by climate-change considerations. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National government staff trained (including independent/implementing agencies) (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="40">
<comment><narrative>
This indicator will measure the number of national government staff (including national agencies) trained through the project. These activities will strengthen the planning, management and control capacity for public servants in the sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electricity sector policy or market regulation developed (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the project's success in supporting the development and inclusion of updated policy or regulation material for the electricity sector, under component 1. The indicator will inform the fulfilment of the PDO indicator related to the development of policy and market regulatory changes, and will be based on administrative information collected by the PIU.

The new published law (15.269/25) was enacted based on the pricing study and allows for the review of the current pricing mechanism. Further policy and market regulation changes are expected to occur beyond the life of the project.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
National government staff trained (including independent/implementing agencies) (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="40">
<comment><narrative>
This indicator will measure the number of national government staff (including national agencies) trained through the project. These activities will strengthen the planning, management and control capacity for public servants in the sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="39.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Draft Terms of Reference that can be used to dispatch electricity based on climate resilience (including adjustments on hydrological patterns)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
With activities executed under counterpart funds delayed, this indicator is likely not going to be achieved by project closure.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of female employees participating in trainings (Percentage)
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="30.00">
<comment><narrative>
Training currently underway.
</narrative></comment>
</target>
<actual value="30.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Drafting Terms of Reference to construct a climate-informed methodology that could be adopted in the energy expansion plans
</narrative></title>
<baseline year="2020" iso-date="2020-01-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">
<comment><narrative>
While at project closure, the TORs have not been constructed, both the studies for pricing under CCEE and value added by ONS (both completed just before project closure) are expected to inform future energy expansion plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new tools or methodologies introduced or upgraded
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="5.00">
<comment><narrative>
This indicator will measure the number of activities (Improved methodologies, tools implemented and trainings implemented) completed. These activities will strengthen planning, management and control capacity for the power, gas and mining sectors, under component 2. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.

One training was implemented (Post-Graduate degree). New tools and methodologies were presented through the pricing study and ONS value-added study and some are expected to be adopted in future.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of training, mentoring and gender awareness initiatives geared towards enhancing female participation in management positions in key energy and mining institutions.
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
The indicator will measure the amount of workshops, meetings and other fora to promote gender awareness at key institutions with responsibility for the energy, mining and gas sectors, organized with support from the project. These activities are expected to promote good practices, share lessons learned and encourage mentoring towards higher female participation in the sector, specially in management positions. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU in each of the trainings, and regularly reported in the Implementation Progress Report.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of operational procedures updated
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the number of operational procedures implemented, based on studies financed by the project and informed by climate-change considerations. This will be measured relative to a baseline of zero, based on administrative information collected by the PIU and regularly reported in the Implementation Progress Report.

While operational procedures have not changed within the life of the project, the pricing review is highly likely to change the electricity free-market accounting system to dual-accounting, improve RE forecasting and costing (at least three). These changes are expected to be fully implemented by 2028 at the earliest (following finalization of roadmap and stakeholder consultations).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Policy and market regulatory changes, to enhance market efficiency, published for consultation (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
Market efficiency is understood as: “The extent to which the price of an asset reflects all information available about the actual value of the underlying assets.” In addition to this, a more practical definition refers to: “The existence of market arrangements that are fit for purpose, providing actors throughout the value chain with incentives to operate their systems in an economic manner, with an appropriate balance of risk and reward that is in the interests of customers, who ultimately pay for the costs of an energy system operation.”
Due to the CCEE study the published law (15.269/25) that allows for the review of the current pricing mechanism was enacted. Additional changes to the pricing regulatory environment and procedures are also expected to change as a result of the pricing study.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Policy and market regulatory changes, to enhance market efficiency, published for consultation (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
This indicator will measure the project's success in supporting the development and publication of updated policy or regulation material to enhance market efficiency in the energy and mining sectors. The project will support this objective by informing these changes through studies, policy notes, and assessments. The indicator be based on administrative information collected by the PIU. 
Market efficiency is understood as : “The extent to which the price of an asset reflects all information available about the actual value of the underlying assets.” Thus, as the quality and amount of information increases, the market becomes more efficient, reducing opportunities for arbitrage and above-market returns. In addition to this, a more practical definition refers to: “The existence of market arrangements that are fit for purpose, providing actors throughout the value chain with incentives to operate their systems in an economic manner, with an appropriate balance of risk and reward that is in the interests of customers, who ultimately pay for th costs of an energy system operation.”
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3 - Policy and market regulatory changes, to enhance market efficiency, published for consultation (Number).
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="1.00">
<comment><narrative>
Market efficiency is understood as: “The extent to which the price of an asset reflects all information available about the actual value of the underlying assets.” In addition to this, a more practical definition refers to: “The existence of market arrangements that are fit for purpose, providing actors throughout the value chain with incentives to operate their systems in an economic manner, with an appropriate balance of risk and reward that is in the interests of customers, who ultimately pay for the costs of an energy system operation.”
Due to the CCEE study the published law (15.269/25) that allows for the review of the current pricing mechanism was enacted. Additional changes to the pricing regulatory environment and procedures are also expected to change as a result of the pricing study.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1- Published Electricity sector expansion plans for increased security of supply (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="2.00">
<comment><narrative>
Delays have prevented any results at this point.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1- Published Electricity sector expansion plans for increased security of supply (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="2.00">
<comment><narrative>
Delays have prevented any results at this point.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1- Published Electricity sector expansion plans for increased security of supply (Number)
</narrative></title>
<baseline year="2020" iso-date="2020-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-01-01" />
<period-end iso-date="2025-12-31" />
<target value="2.00">
<comment><narrative>
Delays have prevented any results at this point.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector institutions with stronger technical and operational capacity
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2025-12-15" />
<target value="2">
<comment><narrative>
Both ONS and CCEE have increased their capacity as a result of the studies that were undertaken by the project.  It should also be noted that staff in the MME, as well as ANP, ANM and ANEEL also have increased capacity as a result of the post-graduate course tailored to the sector needs.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector institutions with stronger technical and operational capacity
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2025-12-15" />
<target value="2">
<comment><narrative>
Delays have prevented results to this point, however activities are underway to strengthen the institutions.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Sector institutions with stronger technical and operational capacity
</narrative></title>
<baseline year="2024" iso-date="2024-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-04-15" />
<period-end iso-date="2025-12-15" />
<target value="2">
<comment><narrative>
Both ONS and CCEE have increased their capacity as a result of the studies that were undertaken by the project.  It should also be noted that staff in the MME, as well as ANP, ANM and ANEEL also have increased capacity as a result of the post-graduate course tailored to the sector needs.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P172455</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>First Amazonas Fiscal and Environmental Sustainability Programmatic DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the State of Amazonas in strengthening fiscal sustainability and integrating forest conservation and development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Fiscal and Environmental Sustainability Development Policy Financing (DPF) for the state of Amazonas supports fiscal discipline, climate-informed decision making, and an integrated approach to forest conservation and development to help the State improve its recovery after COVID19 and protect the Amazon forest. Against the backdrop of the impact of COVID-19 and the recent increase in deforestation in the Amazon, this US200 million dollars DPF (the first in a two-DPF programmatic series) is an entry point for World Bank policy engagement on the medium-term reform agenda of the state of Amazonas to rebuild better after COVID-19, by promoting fiscal sustainability and by supporting the conservation and sustainable management of the state's forest resources. This operation faces substantial risks that could affect the expected outcomes, especially in the environmental pillar. The vast area of the Amazon forest, the limited institutional capacity of the Amazonas State, the multiplicity of stakeholders involved, and the complexity of land jurisdiction (not all forests in the state's territory are under the responsibility of the Amazonas State), render difficult the elimination of risks of illegal deforestation or forest fires. The critical nature of reforms supported by this operation, the coordination with international partners, and complementary technical assistance provided both by the bank and partners mitigate some of these risks. Remaining risks should be balanced against the cost of inaction.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0043579"><narrative>State of Amazonas</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0043579"><narrative>State of Amazonas</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0043578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-03-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-12-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Werner L. Kornexl</narrative></person-name><telephone>+1-202-473-1000</telephone><email>wkornexl@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31210" percentage="50" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="17" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="16" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="50" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="17" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="50" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="17" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="17" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="50" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="50" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="17" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="17" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000831" percentage="50" xml:lang="en"><narrative>Forests Policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="33" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="17" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="17" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="33" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="17" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="17" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="17" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="17" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="17" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="17" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-30"/>
<value currency="USD" value-date="2022-12-30">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">200000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">200000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-539055</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-1666222</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-4424444</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-6204889</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-6662082</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-6421550</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5396153</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-4841207</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-4214737</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-10000000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-10000000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-10000000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-10000000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-10000000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-43578"><narrative>State Secretariat of Finance (Secretaria do Estado da Fazenda)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172455"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172455?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172455"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1. Reduction of pension system deficit financed with public budget compared to baseline.
</narrative></title>
<baseline year="2020" iso-date="2020-12-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-03" />
<period-end iso-date="2022-12-22" />
<target value="11.00">
<comment><narrative>
Achieved. The projected pension deficit was reduced by 14.11 percent in 2022, which is greater than the targeted 11.00% reduction as a result of the reform.
</narrative></comment>
</target>
<actual value="14.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
5. Deforested area
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="1,434.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-23" />
<target value="1,200.00">
<comment><narrative>
Achieved with a one-year delay.  Note that to be comparable to the measured actual, the baseline was revised from 1,434 km2 to 1,571.22 km2. For the target year, 2022, deforestation increased rapidly to 3,055.41 km2 for factors beyond the program's control.  In 2023, however, deforestation fell to 1,313.23 km2, which met the revised target of 1,314.6 km2.
</narrative></comment>
</target>
<actual value="1,313.23">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
8. Number of families enrolled in the Bolsa Floresta program [of which, women receive the payment on behalf of the family]
</narrative></title>
<baseline year="2019" iso-date="2019-12-22" value="9,602.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-22" />
<period-end iso-date="2022-12-22" />
<target value="12,000.00">
<comment><narrative>
Achieved. With the actual reaching 14,500 households against a target of 12,000 households (2022), the target was exceeded by more than 20%.
</narrative></comment>
</target>
<actual value="14,500.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
6. Number of fully validated CAR records.
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="11.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-22" />
<target value="2,000.00">
<comment><narrative>
Not achieved.  Only 300 CARs were fully validated by the target year, 2022.  By 2023, the number of fully validated CARs reached 608, still well below the target of &amp;gt;2,000 CARs.
</narrative></comment>
</target>
<actual value="300.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3. State personnel spending as share of net current revenue (executive branch
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="49.65"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-22" />
<target value="46.55">
<comment><narrative>
This indicator was not relevant to program assessment because the underlying action (Trigger 3)-approval of a State Fiscal Responsibility Law, which was planned for a second DPF, was not carried out.
</narrative></comment>
</target>
<actual value="42.44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4. Percentage of state's ICMS tax revenue linked to municipalities environmental sustainability and quality of service delivery indicators
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-22" />
<target value="20.00">
<comment><narrative>
This indicator was not relevant to program assessment because the underlying action Trigger 4-the creation of a Green ICMS, which was planned for a second DPF, was not carried out.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
7. Forest concessions granted
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-22" />
<target value="60,000.00">
<comment><narrative>
Achieved with two-year delay. The Maues concession covers 89,180 ha which exceeds the targeted area of 60,000 ha and is achieved in 2024.  Three to five additional concessions are planned in the next 2-3 years.
</narrative></comment>
</target>
<actual value="89,180">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2. Percentage of new infrastructure projects that are screened for climate and disaster risks
</narrative></title>
<baseline year="2019" iso-date="2019-12-23" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-23" />
<period-end iso-date="2022-12-22" />
<target value="20.00">
<comment><narrative>
Achieved and substantially exceeded.  The actual percent of projects screened was more than double by 2022.
</narrative></comment>
</target>
<actual value="54.16">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P172605</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Salvador Social Multi-Sector Service Delivery Project II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the efficiency of social service delivery in the Municipality of Salvador in the social assistance, education, and health sectors.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Second Salvador Social Multi-Sector Service Delivery Project for Brazil is to improve the efficiency of social service delivery in the Municipality of Salvador in the social assistance, education, and health sectors. The Project has three components. 1. Support for strategic actions to improve service delivery component has four subcomponents. 1.1. Social Assistance subcomponent will provide support to Municipal Secretariat of Social Promotion and Poverty Reduction (SEMPRE) to continue improving the efficiency of social services in four main results areas described below. 1.1.1. Strengthening integration and multi-sector coordination of case management of extreme poor families promoting human development activity will aim to improve the mechanisms for coordination between the social assistance, education, and health sectors for case management of extreme poor families. 1.1.2. Expansion of Cadastro Unico to include the most vulnerable groups and use it as a planning tool for social programs activity will expand the coverage of Cadastro Unico by: (a) offering enrollment services in social services units; and (b) providing active search strategies and promoting the inclusion of priority vulnerable groups. 1.1.3. Continued improvement of the institutional capacity and organizational structure of SEMPRE will consolidate the achievements from the First Salvador Social Project by strengthening the capacity to quickly adapt social protection services. 1.1.4. Strengthening the medium and high complexity services of the special social protection network will focus on the network of services complementary to basic social protection for the population at personal and social risk, including violation of rights. 1.2. Education subcomponent will provide support to Municipal Secretariat of Education (SMED) to implement strategies to tackle age-grade distortion in the Salvador municipal school network under two main results areas: 1.2.1. Reducing the stock of overage students in Salvador in primary and lower secondary education and 1.2.2. Reducing the flow of overage students. 1.3. Health subcomponent will support improvement of health care services, health surveillance, and clinical management aiming to provide patients with efficient access to the three levels of care. Activities are organized in two results areas: 1.3.1. Strengthening health service delivery and management capacity and health surveillance to respond to health demands and epidemics and 1.3.2. Improvement of clinical management of health care ensuring continuity across primary, secondary, and tertiary levels. 1.4. Support to the COVID-19 emergency subcomponent will provide input-based financing (including retroactive) across all three sectors (social assistance, education, and health) upon Project effectiveness. 2. Technical Assistance component will provide technical assistance to the municipal secretariats that are responsible for delivering the agreed targets under Component 1. (that is, social assistance, education, and health) as well as to the Municipal Secretariat of Management (Casa Civil) to play critical roles in coordinating and leading the municipal administration's cross-cutting policy and management. These include (a) studies and diagnoses, (b) mapping of processes and cost analyses, (c) consultancies for the development of management systems, (d) acquisition of computer equipment and vehicles, and (e) expenditures related to project management, including a Project Management Unit.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0043761"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0043762"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007765"><narrative>Casa Civil</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-07-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-09-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-03-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-03-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rovane Battaglin Schwengber</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rschwengber@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450554" />
            <name><narrative>Salvador</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-12.97111 -38.51083</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="12110" percentage="61" xml:lang="en"/><sector vocabulary="1" code="15142" percentage="20" xml:lang="en"/><sector vocabulary="1" code="11260" percentage="7" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="7" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="24.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="100" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="100" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="8" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="8" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="65" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="65" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="65" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="15" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="65" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="65" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="1" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">2109375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">2872291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">2872291.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">3847500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">1420833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">1420833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">333333.35</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">2109375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">2109375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2026-03-30"/>
<value currency="USD" value-date="2026-03-30">88937.51</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2026-03-30"/>
<value currency="USD" value-date="2026-03-30">88937.51</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">125000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">312500</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">25000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">893794</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">36712745</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">10229935</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">881870</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">39423062</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">755250</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">5197619</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">1607291</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">488889</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1880000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">1528108</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">-312500</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">-217525</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-537548</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">-839448</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">-1505035</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">-2551655</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-3665875</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-3542268</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-3639740</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-3276123</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-2192816</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-2326192</value><description xml:lang="en"><narrative>Total Loan Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-2404132</value><description xml:lang="en"><narrative>Total Loan Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7765"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172605"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P172605?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P172605"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decentralized Municipal Management Index IGD-M (number)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.76"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-11" />
<target value="0.80">

</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low risk (green) or no risk (blue) patients cared in the Intermediate Emergency Care Units (UPAs) (PBC#11)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="81.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="78.00">

</target>
<actual value="76.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average of the Performance Index of CREAS of all CREAS (PBC#4)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="2.95"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-15" />
<target value="4.26">
<comment><narrative>
The level of ambition has been increased from 3.75 to 4.26 to reflect the strong performance to date and the city's enhanced capacity to sustain and expand reforms. By setting a more challenging target, the revised approach aims to consolidate gains and encourage continued innovation in social assistance delivery, ensuring alignment with evolving policy priorities and beneficiary needs.
</narrative></comment>
</target>
<actual value="4.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients accessing the municipal healthcare facilities with clinical information recorded in the municipal Electronic Medical Record System (PBC#12)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="59.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="95.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance Redress Mechanism. Rate of complaints on Project related sectors that are addressed within normatives
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="1.19"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="30.00">
<comment><narrative>
The PIU indicated that only 22 complaints were relevant to environmental and social risks, none tied to Project-supported activities. Resolution within 30 days dropped from 91.7% to 76.5% in the last period. The complaints involved more complex issues, requiring more time for coordination and resolution.
</narrative></comment>
</target>
<actual value="76.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of monitoring of health conditionalities
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="72.00">

</target>
<actual value="69.46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of Primary Health Care coverage
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="50.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="61.70">
<comment><narrative>
The Dec 2024 result was updated with additional data received.
</narrative></comment>
</target>
<actual value="66.58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average of the Performance Index of CRAS of all CRAS (PBC#3)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="2.28"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-15" />
<target value="3.50">
<comment><narrative>
The level of ambition has been increased from 3.50 to 4.00 to reflect the strong performance to date and the city's enhanced capacity to sustain and expand reforms. By setting a more challenging target, the revised approach aims to consolidate gains and encourage continued innovation in social assistance delivery, ensuring alignment with evolving policy priorities and beneficiary needs.
</narrative></comment>
</target>
<actual value="4.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an integrated operational system for SUAS and Cadastro Unico
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Lower Secondary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="42.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-09" />
<target value="30.00">

</target>
<actual value="28.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social media and communication campaigns to inform and educate on GBV prevention and increase knowledge of social services available for domestic violence victims
</narrative></title>
<baseline year="2020" iso-date="2020-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-29" />
<period-end iso-date="2025-12-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of hospital admissions for Ambulatory Care Sensitive Conditions (ACSC)
</narrative></title>
<baseline year="2020" iso-date="2020-04-14" value="26.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-14" />
<period-end iso-date="2025-12-14" />
<target value="25.50">

</target>
<actual value="21.57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of home-based visits provided by multidisciplinary home-care teams (EMAD) (PBC#10)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="1,046.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="14,680.00">
<comment><narrative>
The Dec 2024 result was updated with additional data received.
</narrative></comment>
</target>
<actual value="91,120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of social workers enrolled in the municipal plan of continuous education
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="50.00">

</target>
<actual value="72.96">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of Primary Health Care coverage
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="50.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="61.70">
<comment><narrative>
The Dec 2024 result was updated with additional data received.
</narrative></comment>
</target>
<actual value="66.58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Response time to provide hospitals beds for emergency patients through the municipal regulation system (percentage)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="63.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="73.00">

</target>
<actual value="73.77">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of hospital admissions for Ambulatory Care Sensitive Conditions (ACSC)
</narrative></title>
<baseline year="2020" iso-date="2020-04-14" value="26.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-14" />
<period-end iso-date="2025-12-14" />
<target value="25.50">

</target>
<actual value="21.57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social assistance units offering Cadastro Único services (PBC#2)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="35.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Lower Secondary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="42.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-09" />
<target value="30.00">

</target>
<actual value="28.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of accelerated learning student groups in Primary and Lower Secondary Education with an adequate number of supporting staff (PBC#7)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="90.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social assistance units offering Cadastro Único services (PBC#2)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="8.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="35.00">

</target>
<actual value="36.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an integrated operational system for SUAS and Cadastro Unico
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="Yes">

</target>
<actual value="yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of monitoring of education conditionalities
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="87.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="90.00">

</target>
<actual value="90.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children enrolled in accelerated learning programs at Primary Education that have progressed at least 2 grades (PBC#5)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="53.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="55.00">
<comment><narrative>
Based on SMED data, it is estimated that 71% of students have progressed at least 2 grades in 2025. Official data will be released in early 2026.
</narrative></comment>
</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Primary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="24.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="16.00">
<comment><narrative>
SMED's 2025 estimates indicates a drop in age grade distortion in primary education from 18% to 15%. Official census data will be released in early 2026.
</narrative></comment>
</target>
<actual value="18.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of support teachers working in the Learning Support Program (PBC#8)
</narrative></title>
<baseline year="2023" iso-date="2023-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-19" />
<period-end iso-date="2025-12-15" />
<target value="600.00">

</target>
<actual value="1272">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of social workers enrolled in the municipal plan of continuous education
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="50.00">

</target>
<actual value="72.96">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of medium complexity health procedures contracted out by the Borrower (PBC#9)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="72.00">

</target>
<actual value="75.19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of patients accessing the municipal healthcare facilities with clinical information recorded in the municipal Electronic Medical Record System (PBC#12)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="59.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="95.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average of the Performance Index of CRAS of all CRAS (PBC#3)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="2.28"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-15" />
<target value="4.00">
<comment><narrative>
The level of ambition has been increased from 3.50 to 4.00 to reflect the strong performance to date and the city's enhanced capacity to sustain and expand reforms. By setting a more challenging target, the revised approach aims to consolidate gains and encourage continued innovation in social assistance delivery, ensuring alignment with evolving policy priorities and beneficiary needs.
</narrative></comment>
</target>
<actual value="4.17">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of families in suspension of benefits due to non-compliance of conditionalities assisted by social assistance sector (PBC#1)
</narrative></title>
<baseline year="2020" iso-date="2020-03-13" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-13" />
<period-end iso-date="2025-12-13" />
<target value="50.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of social media and communication campaigns to inform and educate on GBV prevention and increase knowledge of social services available for domestic violence victims
</narrative></title>
<baseline year="2020" iso-date="2020-03-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-29" />
<period-end iso-date="2025-12-15" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of monitoring of health conditionalities
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="67.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="72.00">

</target>
<actual value="69.46">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Updated Records in Cadastro Único
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="80.00">

</target>
<actual value="89.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average of the Performance Index of CREAS of all CREAS (PBC#4)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="2.95"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-15" />
<target value="3.75">
<comment><narrative>
The level of ambition has been increased from 3.75 to 4.26 to reflect the strong performance to date and the city's enhanced capacity to sustain and expand reforms. By setting a more challenging target, the revised approach aims to consolidate gains and encourage continued innovation in social assistance delivery, ensuring alignment with evolving policy priorities and beneficiary needs.
</narrative></comment>
</target>
<actual value="4.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in full-time education
</narrative></title>
<baseline year="2020" iso-date="2020-12-10" value="5,820.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-10" />
<period-end iso-date="2025-12-10" />
<target value="2,000.00">
<comment><narrative>
SMED's 2025 estimates indicates 6,878 students in full-time education in Oct, 2025. Official census data will be released in early 2026.
</narrative></comment>
</target>
<actual value="4664">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of low risk (green) or no risk (blue) patients cared in the Intermediate Emergency Care Units (UPAs) (PBC#11)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="81.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="78.00">

</target>
<actual value="76.81">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of adult women victims of domestic violence attended by the Protection and Comprehensive Service to Families and Individuals (PAEFI)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="78.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="350.00">
<comment><narrative>
Indicator affected by seasonality—fewer women seek assistance at year-end, impacting reported figures.
</narrative></comment>
</target>
<actual value="250">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of hospital admissions for Ambulatory Care Sensitive Conditions (ACSC)
</narrative></title>
<baseline year="2020" iso-date="2020-04-14" value="26.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-14" />
<period-end iso-date="2025-12-14" />
<target value="25.50">

</target>
<actual value="21.57">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Proportion of hospital admissions for Ambulatory Care Sensitive Conditions (ACSC)
</narrative></title>
<baseline year="2020" iso-date="2020-04-14" value="26.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-14" />
<period-end iso-date="2025-12-14" />
<target value="25.50">

</target>
<actual value="21.57">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Lower Secondary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="42.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-09" />
<target value="30.00">

</target>
<actual value="28.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Lower Secondary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="42.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-09" />
<target value="30.00">

</target>
<actual value="28.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decentralized Municipal Management Index IGD-M (number)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.76"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-11" />
<target value="0.80">

</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decentralized Municipal Management Index IGD-M (number)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.76"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-11" />
<target value="0.80">

</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of accelerated learning student groups in Primary and Lower Secondary Education with an adequate number of supporting staff (PBC#7)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="90.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children enrolled in 5th grade identified as unable to read
</narrative></title>
<baseline year="2023" iso-date="2023-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-24" />
<period-end iso-date="2025-12-12" />
<target value="7.00">
<comment><narrative>
Data from Oct 2025 refers to a midline learning assessment conducted between Sep-Oct 2025. An end of year learning assessment is scheduled for Dec 2025.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of support teachers working in the Learning Support Program (PBC#8)
</narrative></title>
<baseline year="2023" iso-date="2023-06-19" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-19" />
<period-end iso-date="2025-12-15" />
<target value="600.00">

</target>
<actual value="1272">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievance Redress Mechanism. Rate of complaints on Project related sectors that are addressed within normatives
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="1.19"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="30.00">
<comment><narrative>
The PIU indicated that only 22 complaints were relevant to environmental and social risks, none tied to Project-supported activities. Resolution within 30 days dropped from 91.7% to 76.5% in the last period. The complaints involved more complex issues, requiring more time for coordination and resolution.
</narrative></comment>
</target>
<actual value="76.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students enrolled in full-time education
</narrative></title>
<baseline year="2020" iso-date="2020-12-10" value="5,820.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-10" />
<period-end iso-date="2025-12-10" />
<target value="2,000.00">
<comment><narrative>
SMED's 2025 estimates indicates 6,878 students in full-time education in Oct, 2025. Official census data will be released in early 2026.
</narrative></comment>
</target>
<actual value="4664">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rate of monitoring of education conditionalities
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="87.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="90.00">

</target>
<actual value="90.72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registration of homelessness population in Cadastro Unico
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="2,200.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="4,000.00">

</target>
<actual value="9,322">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Age-grade distortion rates at Primary Education
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="24.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="16.00">
<comment><narrative>
SMED's 2025 estimates indicates a drop in age grade distortion in primary education from 18% to 15%. Official census data will be released in early 2026.
</narrative></comment>
</target>
<actual value="18.7">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Decentralized Municipal Management Index IGD-M (number)
</narrative></title>
<baseline year="2020" iso-date="2020-04-09" value="0.76"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-09" />
<period-end iso-date="2025-12-11" />
<target value="0.80">

</target>
<actual value="0.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of home-based visits provided by multidisciplinary home-care teams (EMAD) (PBC#10)
</narrative></title>
<baseline year="2020" iso-date="2020-04-11" value="1,046.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-11" />
<period-end iso-date="2025-12-11" />
<target value="14,680.00">
<comment><narrative>
The Dec 2024 result was updated with additional data received.
</narrative></comment>
</target>
<actual value="91,120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children enrolled in 5th grade identified as unable to read
</narrative></title>
<baseline year="2023" iso-date="2023-06-24" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-24" />
<period-end iso-date="2025-12-12" />
<target value="7.00">
<comment><narrative>
Data from Oct 2025 refers to a midline learning assessment conducted between Sep-Oct 2025. An end of year learning assessment is scheduled for Dec 2025.
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registration of homelessness population in Cadastro Unico
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="2,200.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="4,000.00">

</target>
<actual value="9,322">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Response time to provide hospitals beds for emergency patients through the municipal regulation system (percentage)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="63.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="73.00">

</target>
<actual value="73.77">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children enrolled in accelerated learning programs at Primary Education that have progressed at least 2 grades (PBC#5)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="53.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="55.00">
<comment><narrative>
Based on SMED data, it is estimated that 71% of students have progressed at least 2 grades in 2025. Official data will be released in early 2026.
</narrative></comment>
</target>
<actual value="72">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of adult women victims of domestic violence attended by the Protection and Comprehensive Service to Families and Individuals (PAEFI)
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="78.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="350.00">
<comment><narrative>
Indicator affected by seasonality—fewer women seek assistance at year-end, impacting reported figures.
</narrative></comment>
</target>
<actual value="250">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of medium complexity health procedures contracted out by the Borrower (PBC#9)
</narrative></title>
<baseline year="2020" iso-date="2020-03-20" value="66.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-20" />
<period-end iso-date="2025-12-15" />
<target value="72.00">

</target>
<actual value="75.19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Updated Records in Cadastro Único
</narrative></title>
<baseline year="2020" iso-date="2020-04-10" value="76.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-04-10" />
<period-end iso-date="2025-12-10" />
<target value="80.00">

</target>
<actual value="89.72">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P174197</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil: Income Support for the Poor affected by COVID-19</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to mitigate the negative economic effects associated with COVID-19 on income and risks of damaging human capital of poor families.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project seeks to support to Government of Brazil in its response to the COVID-19 crisis. It will finance the scaling-up of the existing social protection program Bolsa Familia (BF) to allow meeting the increased demand resulting from the crisis. In March 2020 the GoB included 1.2 million families in the conditional cash transfer program BF, which will continue to be an important pillar to support income and human capital accumulation in low-income beneficiary households. The project financing will cover the BF expansion for 2021-2022, for at least 1.2 million poor families.The project provides reimbursement of the cost of the cash transfer transfer. All other implementation activities are pre-existing processes, operated as fixed costs regardless of the World Bank financed expansion.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0045860"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0045859"><narrative>Ministry of Social Development</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2020-07-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2020-10-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2022-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2022-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Matteo Morgandi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmorgandi@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10 -55</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="100.000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="100" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="25" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="100" xml:lang="en"><narrative>Disease Control</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">2500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">43600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">43400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">43000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">44000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">43400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">43600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">43600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">43500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">43600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">38800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">43600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">43500000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">43600000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">38800000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2020-10-31"/><value value-date="2020-10-31">1000000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">2500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">200000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">797500000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-2500000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-168818</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2114234</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-8037110</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-23328889</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-29900000</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-33312604</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-33809976</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-29514651</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-28562870</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-25997591</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-90900000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-45859"><narrative>Ministry of Social Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174197"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P174197?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P174197"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families who are maintained above extreme poverty program threshold with project financing
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="9959838.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mean income support received with project financing by families as a share of the income at the time of application
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="2022-12-31" />
<target value="55.00">

</target>
<actual value="54.54">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mean income support received with project financing by families as a share of the income at the time of application
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="53.32">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children under 7 years old benefiting from CCT with project financing, who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="45.32">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption and improvement of communication strategies with specific channels for vulnerable groups of BF, which increase awareness of the availability of Fala BR for claims related to BF
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="N"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="Y">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Adoption and improvement of communication strategies with specific channels for vulnerable groups of BF, which increase awareness of the availability of Fala BR for claims related to BF
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="2022-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="20252936.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PDO Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children 6-17 benefiting from CCT with project financing, whose school attendance is being monitored by the program
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="70.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Cases from the BF program grievance redress mechanism resolved in 30 days
</narrative></title>
<baseline year="2020" iso-date="2020-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-03-31" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="93.98">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P175723</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Mato Grosso Sustainable Development of Family Farming</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve the access to markets, climate resilience, and land and environmental management of selected family farmers in the Stateof Mato Grosso and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Mato Grosso Sustainable Development of Family Farming Project for Brazil is to improve the access to markets, climate resilience, and land and environmental management of selected family farmers in the State of Mato Grosso and in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, climate-smart economic inclusion will support the climate resilience of family farmers in Mato Grosso and improve their market linkages to sustain resilient production models over time. It consists of following sub-components: (i) pre-investments for the preparation of climate-smart agriculture (CSA) family farming business plans; and (ii) productive investments in CSA family farming business plans. The second component, improved land and environmental management will increase the generation of environmental benefits, including for climate resilience and mitigation, of family farming in Mato Grosso. It consists of following sub-components: (i) support for land and environmental regularization; and (ii) prevention and control of forest fire and deforestation in family farming areas. The third component, project management and coordination objectives are to provide the Project Management Unit (PMU) with the conditions and information necessary for the effective management and coordination of the project. The fourth component, contingency emergency response component (CERC) will provide for an immediate response to an eligible crisis or emergency, as needed.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0047963"><narrative>State of Mato Grosso                                                                                </narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0047963"><narrative>State of Mato Grosso                                                                                </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0047962"><narrative>State Secretariat for Family Agriculture (SEAF)                                                       </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-02-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-02-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-05-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-05-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Barbara Cristina Noronha Farinelli</narrative></person-name><telephone>+1-202-473-1000</telephone><email>bfarinelli@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31166" percentage="76" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="75.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="0" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="0" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="0" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="0" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">2333333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">2333333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1291666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1291666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">375000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">90908.09</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">90919.10</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-15"/>
<value currency="USD" value-date="2030-05-15">77026606.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-15"/>
<value currency="USD" value-date="2030-05-15">77026606.49</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">80000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-47962"><narrative>State Secretariat for Family Agriculture (SEAF)                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2973394</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-47962"><narrative>State Secretariat for Family Agriculture (SEAF)                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-200000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-47962"><narrative>State Secretariat for Family Agriculture (SEAF)                                                       </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175723"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P175723?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P175723"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farming establishments with validated Rural Environmental Registry (CAR) under the Brazilian Forest Code due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="11,000.00">
<comment><narrative>
This indicator will measure the number of family farmers with a validated CAR supported by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers participating in approved subprojects
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
The indicator will measure, in real terms, the increase in gross value of sales by family farmers participating under component 1. The indicator will be measured once at project beginning (baseline), once at midterm (MTR), and once at project closing (evaluation).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subprojects implementing according to the proposed business plan activities
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="80.00">
<comment><narrative>
This indicator evaluates whether subproject activities are carried out in accordance with the business plan. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the State settlements that receive land regularization titles due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="1,300.00">
<comment><narrative>
This indicator measures the number of families (family farmers) with land titles issued with support from INTERMAT in the State settlements targeted by the project. The 1,300 beneficiaries are a subset of the 1,900 that will have finalized occupational inspection reports, which are required to have for the land titles to be issued. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State settlements with geo-referencing finalized
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="35.00">
<comment><narrative>
This indicator will measure the number of State Settlements that receive support to undertake a critical component of the land regularization process: geo-referencing. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with services received under the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="80.00">
<comment><narrative>
This indicator will measure the percentage of beneficiaries reporting as satisfied with services - including technical assistance and training under component 1 and land and environmental regularization services under component 2 - received under the project. The indicator will be evaluated twice, at MTR and in the final project evaluation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of new markets accessed by Producer Organizations benefitting under the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
This indicator will measure the percentage increase in the number of markets to which Producer Organizations benefitting under the project are selling. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the average number of days between family farmer submission to CAR and validation of CAR
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="730.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="180.00">
<comment><narrative>
This indicator will measure the average reduction in time needed for SEMA to validate entries to CAR submitted by family farmers. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the average number of days between family farmer submission to CAR and validation of CAR
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="730.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="180.00">
<comment><narrative>
This indicator will measure the average reduction in time needed for SEMA to validate entries to CAR submitted by family farmers. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the State settlements that receive land regularization titles due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="1,300.00">
<comment><narrative>
This indicator measures the number of families (family farmers) with land titles issued with support from INTERMAT in the State settlements targeted by the project. The 1,300 beneficiaries are a subset of the 1,900 that will have finalized occupational inspection reports, which are required to have for the land titles to be issued. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers participating in approved subprojects
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
The indicator will measure, in real terms, the increase in gross value of sales by family farmers participating under component 1. The indicator will be measured once at project beginning (baseline), once at midterm (MTR), and once at project closing (evaluation).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in georeferenced State settlements with finalized occupational inspection reports due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="1,900.00">
<comment><narrative>
This indicator will measure the number of families (family farmers) in georeferenced State Settlements targeted by the project that have had their Occupational Inspection Reports carried out and finalized, a critical component of the land regularization process. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families directly benefitting under the project.
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="15,000.00">
<comment><narrative>
This indicator will measure the number of families (family farms) benefitted directly by the project, under both components 1 and 2. The target takes into account the fact that an estimated 6,900 family farmers are expected to benefit under both component 1 and component 2 to avoid double counting. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Subprojects with carbon balance assessment of primary production
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="10.00">
<comment><narrative>
This indicator will measure the number of subprojects under component 1 that complete assessments of the on-farm carbon balance of primary production activities (crops, livestock, vegetation). The assessments will also estimate the economic and financial return on mitigation interventions. Value chain-appropriate tools will be utilized for each subproject e.g. for dairy activities, the interactive version of the Global Livestock Environmental Assessment Model (GLEAM-i) may be used. For each estimation, a &quot;with&quot; and &quot;without&quot; project scenario will be generated, enabling estimation of project contributions to carbon balance changes.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism recorded and resolved effectively
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="100.00">
<comment><narrative>
This indicator will measure the percentage of complaints and inquiries received through the project's Grievance Redress Mechanism that are recorded and resolved in a professional and timely manner. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers receiving technical assistance to implement CSA Family Business Plan activities
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9,000.00">
<comment><narrative>
This indicator will measure the number of project beneficiaries receiving technical assistance to implement activities included in CSA Family Business Plans under component 1. Technical assistance will support the adoption of climate-smart agriculture practices, environmental compliance, and good production and agribusiness practices. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism recorded and resolved effectively
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="100.00">
<comment><narrative>
This indicator will measure the percentage of complaints and inquiries received through the project's Grievance Redress Mechanism that are recorded and resolved in a professional and timely manner. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Subprojects with carbon balance assessment of primary production
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="10.00">
<comment><narrative>
This indicator will measure the number of subprojects under component 1 that complete assessments of the on-farm carbon balance of primary production activities (crops, livestock, vegetation). The assessments will also estimate the economic and financial return on mitigation interventions. Value chain-appropriate tools will be utilized for each subproject e.g. for dairy activities, the interactive version of the Global Livestock Environmental Assessment Model (GLEAM-i) may be used. For each estimation, a &quot;with&quot; and &quot;without&quot; project scenario will be generated, enabling estimation of project contributions to carbon balance changes.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families directly benefitting under the project.
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="15,000.00">
<comment><narrative>
This indicator will measure the number of families (family farms) benefitted directly by the project, under both components 1 and 2. The target takes into account the fact that an estimated 6,900 family farmers are expected to benefit under both component 1 and component 2 to avoid double counting. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers benefited with improved environmental and land regularization services
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="12,900.00">
<comment><narrative>
This indicator will measure the number of family farmers receiving support for land and environmental regulation activities under component 2. The target is composed of the beneficiaries of the 11,000 CARs (environmental regularization) added to the 1,900 beneficiaries with finalized occupational inspection reports (land regularization). The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Anthropological Reports in Quilombola communities prepared by the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="40.00">
<comment><narrative>
This indicator will measure the number of Anthropological Reports prepared for quilombola communities under the project. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State settlements with geo-referencing finalized
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="35.00">
<comment><narrative>
This indicator will measure the number of State Settlements that receive support to undertake a critical component of the land regularization process: geo-referencing. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farming establishments with validated Rural Environmental Registry (CAR) under the Brazilian Forest Code due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="11,000.00">
<comment><narrative>
This indicator will measure the number of family farmers with a validated CAR supported by the project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers receiving technical assistance to implement CSA Family Business Plan activities
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9,000.00">
<comment><narrative>
This indicator will measure the number of project beneficiaries receiving technical assistance to implement activities included in CSA Family Business Plans under component 1. Technical assistance will support the adoption of climate-smart agriculture practices, environmental compliance, and good production and agribusiness practices. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers benefited with improved environmental and land regularization services
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="12,900.00">
<comment><narrative>
This indicator will measure the number of family farmers receiving support for land and environmental regulation activities under component 2. The target is composed of the beneficiaries of the 11,000 CARs (environmental regularization) added to the 1,900 beneficiaries with finalized occupational inspection reports (land regularization). The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers benefited with improved environmental and land regularization services
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="12,900.00">
<comment><narrative>
This indicator will measure the number of family farmers receiving support for land and environmental regulation activities under component 2. The target is composed of the beneficiaries of the 11,000 CARs (environmental regularization) added to the 1,900 beneficiaries with finalized occupational inspection reports (land regularization). The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9000.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="9000.00">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers participating in approved subprojects
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
The indicator will measure, in real terms, the increase in gross value of sales by family farmers participating under component 1. The indicator will be measured once at project beginning (baseline), once at midterm (MTR), and once at project closing (evaluation).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers participating in approved subprojects
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
The indicator will measure, in real terms, the increase in gross value of sales by family farmers participating under component 1. The indicator will be measured once at project beginning (baseline), once at midterm (MTR), and once at project closing (evaluation).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with services received under the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="80.00">
<comment><narrative>
This indicator will measure the percentage of beneficiaries reporting as satisfied with services - including technical assistance and training under component 1 and land and environmental regularization services under component 2 - received under the project. The indicator will be evaluated twice, at MTR and in the final project evaluation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in georeferenced State settlements with finalized occupational inspection reports due to project support
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="1,900.00">
<comment><narrative>
This indicator will measure the number of families (family farmers) in georeferenced State Settlements targeted by the project that have had their Occupational Inspection Reports carried out and finalized, a critical component of the land regularization process. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of subprojects implementing according to the proposed business plan activities
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="80.00">
<comment><narrative>
This indicator evaluates whether subproject activities are carried out in accordance with the business plan. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Anthropological Reports in Quilombola communities prepared by the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="40.00">
<comment><narrative>
This indicator will measure the number of Anthropological Reports prepared for quilombola communities under the project. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of new markets accessed by Producer Organizations benefitting under the project
</narrative></title>
<baseline year="2023" iso-date="2023-12-02" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-02" />
<period-end iso-date="2030-05-01" />
<target value="30.00">
<comment><narrative>
This indicator will measure the percentage increase in the number of markets to which Producer Organizations benefitting under the project are selling. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family farmers benefited with improved environmental and land regularization services
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="12,900.00">
<comment><narrative>
This indicator will measure the number of family farmers receiving support for land and environmental regulation activities under component 2. The target is composed of the beneficiaries of the 11,000 CARs (environmental regularization) added to the 1,900 beneficiaries with finalized occupational inspection reports (land regularization). The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CSA Family Business Plans prepared and implemented
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="128.00">
<comment><narrative>
This indicator will measure the number of business plans that have concluded their physical implementation. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CSA Family Business Plans prepared and implemented
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2030-05-01" />
<target value="128.00">
<comment><narrative>
This indicator will measure the number of business plans that have concluded their physical implementation. The indicator will be evaluated annually.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P176982</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil: Espirito Santo Water Security Management Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[(i) to strengthen the Borrower's capacity to manage water security risks  in a changing climate; (ii) to reduce those risks in selected areas of the Borrower's territory; and (iii) in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project will seek to foster integrated water resources and disaster risk management at the state level, promote sustainable land use practices at the river basin level, while also implementing flood risk reduction investments in select municipalities. This approach will help the state move the needle on reducing its water security risks while promoting climate adaptation. Proposed interventions are grouped around three components focused on the following geographic scales: statewide (Component 1), river basin (Component 2) and municipal (Component 3) levels as well as support to Project management (Component 4) and a zero-fund Contingent Emergency Response (Component 5 - CERC):Component 1 – Building the Borrower's capacity for water security in a changing climate. This component will strengthen the state's capacity to manage water security risks by strengthening both SIGERH-ES' and CEPDEC's water resources and disaster management capacities, respectively, and fostering their better integration. Component 2 – Demonstrating climate-smart integrated water security risk reduction approaches in selected basins. This component will contribute to reduce water security risks by reducing water contamination and sediment loads as well as flood and dry season water deficits, while promoting biodiversity conservation and enhancing existing carbon sinks in soil and aboveground biomass, leading to significant climate adaptation and mitigation benefits. Component 3 – Reducing flood risk reduction in targeted municipalities. This component aims to reduce floods risks in targeted municipalities which have faced strong flood episodes over the past few years. It will finance (i) Design and Build contracts for the implementation of urgent flood risk reduction investments in three municipalities for which technical solutions have been identified, but feasibility studies need revisions; and (ii) the carrying out of studies to identify more innovative integrated structural and non-structural solutions to reduce flood risks in two additional municipalities.Component 4 – Project Management. This component aims to strengthen the States capacity to carry-out Project activities, including fiduciary, technical, environmental and social, and monitoring and evaluation aspects. To this end, it will finance the provision of technical assistance, consulting and non-consulting services, training and goods to key government agencies necessary to effectively carrying out activities associated with Project implementation, including hiring of a consulting firm to provide technical and operational support. Component 5 – Contingent Emergency Response Component (CERC). This component will support the State of Espirito Santo, following an Eligible Crisis or Emergency, to respond to emergency situations associated with hydrological events. This disaster recovery contingency zero-fund component could be triggered following the declaration of a disaster or emergency, defined as “an event that has caused, or is likely to imminently cause, a major adverse economic and/or social impact associated with natural or man-made crises or disasters.” Relationship to the CPF and higher level objectives: The proposed operation is fully aligned with the World Bank Group's (WBG) FY18-FY23 Country Partnership Framework (CPF) for Brazil  and informed by the WBG's Climate Change Action Plan (CCAP) and the Brazil Country Climate and Development Report (under preparation). It fits within the CPF's Focus Area 3, Inclusive and Sustainable Development and contributes to Objectives 3.1 (Support achievement of Brazil's Nationally Determined Contribution (NDC) under the Paris Agreement  with a particular focus on land use) and 3.2 (Provide more inclusive and sustainable urban services), by addressing the vulnerability and exposure of people and assets to increased water security risks, which are the main manifestations of climate change impacts in SES, contributing to adaptation objectives, as well as increasing carbon sequestration through increased forested area, thus supporting mitigation targets. In addition, by investing in institutional strengthening and more effective WRM tools, the Project will help enhance the SES water sector's governance, operational efficiency, and sustainability, increasing resilience to flood and drought risk.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0049628"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0049628"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0049629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-07-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-05-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maria Catalina Ramirez</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mramirez1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>











<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003450173" />
            <name><narrative>Rio Santa Joana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.52235 -40.83668</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472277" />
            <name><narrative>Anchieta</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.80583 -40.64556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003470599" />
            <name><narrative>Rio Barra Seca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.15 -39.78333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="4" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460969" />
            <name><narrative>Itabapoana</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.29937 -40.96881</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003460738" />
            <name><narrative>Itapemirim</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-21.01111 -40.83389</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003453028" />
            <name><narrative>Pontoes</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.18333 -41.04556</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321930" />
            <name><narrative>Aguia Branca</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-18.99618 -40.70731</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321932" />
            <name><narrative>Alfredo Chaves</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.54245 -40.82368</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321956" />
            <name><narrative>Ibiracu</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.81845 -40.42084</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321958" />
            <name><narrative>Iconha</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-20.74759 -40.8657</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0006321966" />
            <name><narrative>Joao Neiva</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.72534 -40.43763</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003472431" />
            <name><narrative>Alto Santa Maria</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-19.89889 -40.76306</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="74020" percentage="74" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="74" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="26" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="26" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="34.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="57" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="69" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="69" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="57" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="86" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="52" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="52" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="52" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="23" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="23" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="57" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="79" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">833333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">833333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1500000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1425000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">82880220.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">82880220.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">86100000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">215250</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">1000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">119003</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">740528</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">223976</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">312917</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">608105</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-215250</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-145776</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-163911</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-170131</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49629"><narrative>SEAMA - State Secretariat for the Environment and Water Resources</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49630"><narrative>AGERH - State Water Resources Agency</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49631"><narrative>DER-ES - Buildings and Roads Department of Espirito Santo</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-49632"><narrative>CEPDEC - State Coordination for Protection and Civil Defense</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176982"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P176982?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P176982"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 4: Itapemirim river basin forecast and early warning system operational and issuing reports
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="Simplified system in operation, with few information and not issuing reports."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="System in operation and issuing weekly reports.">
<comment><narrative>
The indicator measures the strengthening of disaster risk management capacities, including the forecast and information of the following parameters: level and discharge rate (outflow) of rivers (current, forecast and discharge rate/permanence curve), flood maps, and population affected by the observed level at that point in time, meteorological data (current and projection of climatological scenarios), with information periodically published to the public.
</narrative></comment>
</target>
<actual value="Simplified system in operation, with few information and not issuing reports.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) Properties supported with projects for soil and water conservation practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="2,800.00">
<comment><narrative>
This indicator measures the number of PES contracts signed. It allows assessing whether the implementation of the component is creating the necessary conditions for the other indicators to be achieved. Although the establishment of new PES contracts does not mean that they will be successful, it is essential that there are active contracts for the restoration objectives to be achieved.
</narrative></comment>
</target>
<actual value="486">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.1) Participants satisfied with the events organized by the Project in which they take part
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="70.00">
<comment><narrative>
Citizen engagement indicator. Measures the percentage of satisfaction of participants in Project events, including, among others, satisfaction with disaster preparedness training, use of systems open to the public, and procedures for requesting water rights.

This result uses results from satisfaction surveys conducted by the Civil Defense in its regular courses on Risk and Disaster Management. The survey uses a scoring methodology from 0 to 5, where 0 represents completely dissatisfied and 5 represents completely satisfied. For the purposes of monitoring this indicator, a “satisfied participant” is considered to be one who has given a score of 4 or 5 to the satisfaction question regarding the course. Of the total of 661 participants, 6 gave a score of 3; 213 gave a score of 4; and 442 gave a score of 5, which corresponds to 99% satisfied.
</narrative></comment>
</target>
<actual value="99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4) Beneficiaries satisfied with the Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
Questionaire was updated, and survey is undergoing
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3) Priority land area reforested and/or implementing sustainable land use practices through Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="900.00">
<comment><narrative>
This indicator is linked to the PDO indicator 3 and therefore considers the same assumptions. It reflects the Reflorestar Program's evolution towards measuring priority areas within the restored areas. The relationship between areas under restoration/priority areas was measured empirically and considering as a baseline the correlation verified in the PES contracts that went into effect from the 2021 call for proposals, which has revealed a ratio of 1 ha in priority areas for each 5 ha allocated for restoration (or 20%). Priority areas are those that have been identified through the Invest model that, if restored, deliver the best sediment retention results. The monitoring methodology is detailed in the Projects Operation Manual.
</narrative></comment>
</target>
<actual value="206">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) Properties supported with projects for soil and water conservation practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="2,800.00">
<comment><narrative>
This indicator measures the number of PES contracts signed. It allows assessing whether the implementation of the component is creating the necessary conditions for the other indicators to be achieved. Although the establishment of new PES contracts does not mean that they will be successful, it is essential that there are active contracts for the restoration objectives to be achieved.
</narrative></comment>
</target>
<actual value="788">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.6) People benefitting from measures to mitigate the impacts of floods
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="522,932 as the total population living in the Itapemirim river basin according to the PERH-ES.">
<comment><narrative>
About 14% of the population of the Itapemirim river basin (79,524) lives in at-risk areas. The target includes the total number of the population mapped by the Itapemirim river basin flood risk integrated management plan and benefited from green and/or gray infrastructure measures.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.2) GRM: the rate of complaints related with the Project that are properly and timely responded
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
No complaints have been received so far, only request for information.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Water retention structures installed through the Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="1,680.00">
<comment><narrative>
The indicator measures the number of water retention structures that will be installed in the rural properties. It has been calculated taking into account the universe of rural properties that joined Reflorestar in the previous year, of which at least 60% will receive support to implement at least one physical intervention in the soil, which may be mini water detention ponds, soil built dry boxes or similar (barraginha, couxinho or caixa seca). This final determination on the type and number of interventions to be implemented in each property will rely on knowledge of the characteristics of each rural property, technical viability and the expression of interest by the property's owner.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5) Increase in the participation of women (women-headed family farms) among the beneficiaries of the Reflorestar PES Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="40.00">
<comment><narrative>
The program keeps progressing, nevertheless, percentually the number decreased from last measurement.
</narrative></comment>
</target>
<actual value="46.32">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4) Technical staff and key SIGERH-ES and Civil Defense system stakeholders trained in water resources and disaster risk management and disaster response
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="350.00">
<comment><narrative>
This indicator corresponds to 12 training courses provided on disaster risk management, and disaster response
</narrative></comment>
</target>
<actual value="1028">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1) Area under reduced flooding risk
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="654.32">
<comment><narrative>
Urban areas in the municipalities of Ibiraçu, João Neiva and Águia Branca that will have reduced flooding risk due to the infrastructure works.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
2.6) People benefitting from measures to mitigate the impacts of floods
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="522,932 as the total population living in the Itapemirim river basin according to the PERH-ES.">
<comment><narrative>
Procurement for the activities related to this indicator are in advanced stages of procurement
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: Water resources management instruments improved
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="a) 1,500 decisions on water permits assessed per year based on few criteria and information; b) PERH not fully operational and lacking focus on extreme events related aspects;c) Information system with low availability to the public and not used to support water rights decision-making."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="a) 100% increase in water rights decisions per year.b) Updated PERH approved by the CERH-ES.c) 2,000 accesses to the system, including 100% of water rights analyses.">
<comment><narrative>
Number of Concession Decisions/year – The indicator shows the number of concessions and declarations actually issued and documented on AGERH's website
</narrative></comment>
</target>
<actual value="a) 1,880 decisions on water permits assessed per year based on few criteria and information; 
b) PERH not fully operational and lacking focus on extreme events related aspects;
c) Information system with low availability to the public and not used to support water rights decision-making.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 2: Digital operations command system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-06-30" />
<target value="System implemented">
<comment><narrative>
Baseline: no system in place results in the information being transmitted via Whatsapp or in physical format; less agility and difficulty in effectively documenting incidents. The indicator measures the use of the system, operating in digital format and interacting on a web-based platform in the case of highly complex events. It allows integration of efforts and better coordination of agencies working towards the common goal of stabilizing critical situations and protecting lives, property and the environment. More effective response, greater control over the execution of tasks, better management, also providing greater effectiveness in documenting disasters.Implemented system means tests carried out, knowledge transferred to future users (training) and system established by means of an internal ordinance (portaria).
</narrative></comment>
</target>
<actual value="Procurement for the system launched">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.1) Participants satisfied with the events organized by the Project in which they take part
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="70.00">
<comment><narrative>
Citizen engagement indicator. Measures the percentage of satisfaction of participants in Project events, including, among others, satisfaction with disaster preparedness training, use of systems open to the public, and procedures for requesting water rights.

This result uses results from satisfaction surveys conducted by the Civil Defense in its regular courses on Risk and Disaster Management. The survey uses a scoring methodology from 0 to 5, where 0 represents completely dissatisfied and 5 represents completely satisfied. For the purposes of monitoring this indicator, a “satisfied participant” is considered to be one who has given a score of 4 or 5 to the satisfaction question regarding the course. Of the total of 661 participants, 6 gave a score of 3; 213 gave a score of 4; and 442 gave a score of 5, which corresponds to 99% satisfied.
</narrative></comment>
</target>
<actual value="98">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: People benefitting from reduced water security risks
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="100,000.00">
<comment><narrative>
The indicator measures the population benefited by the implementation of structural and non-structural measures to reduce the risk to water security in the selected areas. The inhabitants of the municipalities of João Neiva (16,774 in total, of which 8,486 are women); Ibiraçú (12,705, of which 6,413 women); and Aguia Branca (9,621, of which 4,667 are women) will benefit from already identified works to reduce the risk of flooding. The inhabitants of the municipalities of Iconha (14,083, of which 6,876 women) and Alfredo Chaves (14,670, of which 7,203 women) will benefit from the mapping of flood risk areas and the implementation of structural and non-structural measures to be prioritized for implementation. Finally, inhabitants of at least two basins that will have drought preparedness actions planned (subcomponent 2.2) will benefit from the planning and implementation of selected activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3) Commitment agreements signed between socioeconomic sectors and SIGERH-ES institutions to implement actions/programs agreed on the PERH-ES
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Commitment agreements signed during and after the update of the State Water Resources Plan (PERH-ES) to implement action(s) under the responsibility/interest of the socioeconomic sectors and the SIGERH-ES institutions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2) Area mapped for flood risk reduction
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="320.75">
<comment><narrative>
Urban areas in the municipalities of Iconha and Alfredo Chaves that will be mapped through hydrological modelling for flood risk reduction.
</narrative></comment>
</target>
<actual value="Procurement has not started">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5) Increase in the participation of women (women-headed family farms) among the beneficiaries of the Reflorestar PES Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="30.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="40.00">
<comment><narrative>
The indicator refers to an increase of 10 percentage points in the participation of women (women-headed family farmers) among Reflorestar beneficiaries. Participatory monitoring should be established to assess the effects on income as a result of expanding the number of women in the Program. *There are 33,093 family farms in the state and 13.4% (4,345 family farms) are headed by women in the state of Espirito Santo. Between 2013 and 2019, Reflorestar has financed 3,795 landholdings in the State, of which women-headed family farms accounted for just 0.79% (and comprised 0.68% of the total women-headed family farmers in the state). In 2020, a new call for expression of interest supported by the World Bank was launched and 30% of the total of 300 contracts signed by Reflorestar benefit women-headed family farmers.
</narrative></comment>
</target>
<actual value="48">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1) Area under reduced flooding risk
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="654.32">
<comment><narrative>
The target will be reviewed in the upcoming mission. Procurement has not been launched
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Water retention structures installed through the Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="1,680.00">
<comment><narrative>
Procurement for construction of the structures has not started. Is expected to do it next year when a good amount needs are identifyied.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3) Commitment agreements signed between socioeconomic sectors and SIGERH-ES institutions to implement actions/programs agreed on the PERH-ES
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="5.00">
<comment><narrative>
Commitment agreements signed during and after the update of the State Water Resources Plan (PERH-ES) to implement action(s) under the responsibility/interest of the socioeconomic sectors and the SIGERH-ES institutions.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.2) GRM: the rate of complaints related with the Project that are properly and timely responded
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
There are no results measured yet as there has been no complaints filed yet. 
Citizen engagement indicator. It measures the rate of Project-related complaints responded to appropriately (ie dissatisfied people having access to complain and appeal to higher levels if necessary); and within an appropriate period (maximum of 30 days, as established in the SEP).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2) Area mapped for flood risk reduction
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="320.75">
<comment><narrative>
Urban areas in the municipalities of Iconha and Alfredo Chaves that will be mapped through hydrological modelling for flood risk reduction.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2) Water use charges proposals submitted to the River Basin Committees
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="13.00">
<comment><narrative>
AGERH issued the first decree regulating water usage charges, establishing the scope, duration, and frequency of charges.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1) Reduction in the average time for issuing water rights for irrigation using surface water
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="60 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="25% reduction">
<comment><narrative>
Measurement of the reduction in the average total time for issuing water rights for irrigation with surface abstraction (counting from the request to the decision on the right). The percentage will be calculated in relation to the average time for issuance on June/15/2022, considering the results of the water rights improvement study and the use of a decision support system.
</narrative></comment>
</target>
<actual value="No reduction yet">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4) Beneficiaries satisfied with the Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="90.00">
<comment><narrative>
Citizen engagement indicator. It measures the share of beneficiaries (Program participants) satisfied with the Reflorestar Program, to be measured through specific surveys at baseline, during and at the end of the Project. The baseline will be defined before theimplementation starts.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 4: Itapemirim river basin forecast and early warning system operational and issuing reports
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="Simplified system in operation, with few information and not issuing reports."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="System in operation and issuing weekly reports.">
<comment><narrative>
The indicator measures the strengthening of disaster risk management capacities, including the forecast and information of the following parameters: level and discharge rate (outflow) of rivers (current, forecast and discharge rate/permanence curve), flood maps, and population affected by the observed level at that point in time, meteorological data (current and projection of climatological scenarios), with information periodically published to the public.
</narrative></comment>
</target>
<actual value="Simplified system in operation, with few information and not issuing reports.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="3000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="931.39">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3) Priority land area reforested and/or implementing sustainable land use practices through Reflorestar Program
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="900.00">
<comment><narrative>
This indicator is linked to the PDO indicator 3 and therefore considers the same assumptions. It reflects the Reflorestar Program's evolution towards measuring priority areas within the restored areas. The relationship between areas under restoration/priority areas was measured empirically and considering as a baseline the correlation verified in the PES contracts that went into effect from the 2021 call for proposals, which has revealed a ratio of 1 ha in priority areas for each 5 ha allocated for restoration (or 20%). Priority areas are those that have been identified through the Invest model that, if restored, deliver the best sediment retention results. The monitoring methodology is detailed in the Projects Operation Manual.
</narrative></comment>
</target>
<actual value="229">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.7) People benefitting from drought preparedness measures identified in the drought preparedness plans
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="591,807.00">
<comment><narrative>
Procurement of activities related to this indicator are in advance stages of procurement
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: Water resources management instruments improved
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="a) 1,500 decisions on water permits assessed per year based on few criteria and information; b) PERH not fully operational and lacking focus on extreme events related aspects;c) Information system with low availability to the public and not used to support water rights decision-making."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="a) 100% increase in water rights decisions per year.b) Updated PERH approved by the CERH-ES.c) 2,000 accesses to the system, including 100% of water rights analyses.">
<comment><narrative>
Number of Concession Decisions/year – The indicator shows the number of concessions and declarations actually issued and documented on AGERH's website
</narrative></comment>
</target>
<actual value="a) 1,880 decisions on water permits assessed per year based on few criteria and information; 
b) PERH not fully operational and lacking focus on extreme events related aspects;
c) Information system with low availability to the public and not used to support water rights decision-making.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: People benefitting from reduced water security risks
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="100,000.00">
<comment><narrative>
The indicator measures the population benefited by the implementation of structural and non-structural measures to reduce the risk to water security in the selected areas. The inhabitants of the municipalities of João Neiva (16,774 in total, of which 8,486 are women); Ibiraçú (12,705, of which 6,413 women); and Aguia Branca (9,621, of which 4,667 are women) will benefit from already identified works to reduce the risk of flooding. The inhabitants of the municipalities of Iconha (14,083, of which 6,876 women) and Alfredo Chaves (14,670, of which 7,203 women) will benefit from the mapping of flood risk areas and the implementation of structural and non-structural measures to be prioritized for implementation. Finally, inhabitants of at least two basins that will have drought preparedness actions planned (subcomponent 2.2) will benefit from the planning and implementation of selected activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4) Technical staff and key SIGERH-ES and Civil Defense system stakeholders trained in water resources and disaster risk management and disaster response
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="350.00">
<comment><narrative>
This indicator measures the number of state and municipal civil servants trained by the Civil Defense in its regular courses on risk and disaster management. The value represents the number of civil servants trained in the second half of 2024 and the first half of 2025.
</narrative></comment>
</target>
<actual value="799">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: People benefitting from reduced water security risks
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="100,000.00">
<comment><narrative>
The indicator measures the population benefited by the implementation of structural and non-structural measures to reduce the risk to water security in the selected areas. The inhabitants of the municipalities of João Neiva (16,774 in total, of which 8,486 are women); Ibiraçú (12,705, of which 6,413 women); and Aguia Branca (9,621, of which 4,667 are women) will benefit from already identified works to reduce the risk of flooding. The inhabitants of the municipalities of Iconha (14,083, of which 6,876 women) and Alfredo Chaves (14,670, of which 7,203 women) will benefit from the mapping of flood risk areas and the implementation of structural and non-structural measures to be prioritized for implementation. Finally, inhabitants of at least two basins that will have drought preparedness actions planned (subcomponent 2.2) will benefit from the planning and implementation of selected activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 5: People benefitting from reduced water security risks
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="100,000.00">
<comment><narrative>
The indicator measures the population benefited by the implementation of structural and non-structural measures to reduce the risk to water security in the selected areas. The inhabitants of the municipalities of João Neiva (16,774 in total, of which 8,486 are women); Ibiraçú (12,705, of which 6,413 women); and Aguia Branca (9,621, of which 4,667 are women) will benefit from already identified works to reduce the risk of flooding. The inhabitants of the municipalities of Iconha (14,083, of which 6,876 women) and Alfredo Chaves (14,670, of which 7,203 women) will benefit from the mapping of flood risk areas and the implementation of structural and non-structural measures to be prioritized for implementation. Finally, inhabitants of at least two basins that will have drought preparedness actions planned (subcomponent 2.2) will benefit from the planning and implementation of selected activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="3000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="1547">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 2: Digital operations command system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-06-30" />
<target value="System implemented">
<comment><narrative>
Baseline: no system in place results in the information being transmitted via Whatsapp or in physical format; less agility and difficulty in effectively documenting incidents. The indicator measures the use of the system, operating in digital format and interacting on a web-based platform in the case of highly complex events. It allows integration of efforts and better coordination of agencies working towards the common goal of stabilizing critical situations and protecting lives, property and the environment. More effective response, greater control over the execution of tasks, better management, also providing greater effectiveness in documenting disasters.Implemented system means tests carried out, knowledge transferred to future users (training) and system established by means of an internal ordinance (portaria).
</narrative></comment>
</target>
<actual value="No system">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="3000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="931.39">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 2: Digital operations command system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-06-30" />
<target value="System implemented">
<comment><narrative>
Baseline: no system in place results in the information being transmitted via Whatsapp or in physical format; less agility and difficulty in effectively documenting incidents. The indicator measures the use of the system, operating in digital format and interacting on a web-based platform in the case of highly complex events. It allows integration of efforts and better coordination of agencies working towards the common goal of stabilizing critical situations and protecting lives, property and the environment. More effective response, greater control over the execution of tasks, better management, also providing greater effectiveness in documenting disasters.Implemented system means tests carried out, knowledge transferred to future users (training) and system established by means of an internal ordinance (portaria).
</narrative></comment>
</target>
<actual value="Procurement for the system launched">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 2: Digital operations command system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="No system"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-06-30" />
<target value="System implemented">
<comment><narrative>
Baseline: no system in place results in the information being transmitted via Whatsapp or in physical format; less agility and difficulty in effectively documenting incidents. The indicator measures the use of the system, operating in digital format and interacting on a web-based platform in the case of highly complex events. It allows integration of efforts and better coordination of agencies working towards the common goal of stabilizing critical situations and protecting lives, property and the environment. More effective response, greater control over the execution of tasks, better management, also providing greater effectiveness in documenting disasters.Implemented system means tests carried out, knowledge transferred to future users (training) and system established by means of an internal ordinance (portaria).
</narrative></comment>
</target>
<actual value="No system">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 4: Itapemirim river basin forecast and early warning system operational and issuing reports
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="Simplified system in operation, with few information and not issuing reports."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="System in operation and issuing weekly reports.">
<comment><narrative>
The indicator measures the strengthening of disaster risk management capacities, including the forecast and information of the following parameters: level and discharge rate (outflow) of rivers (current, forecast and discharge rate/permanence curve), flood maps, and population affected by the observed level at that point in time, meteorological data (current and projection of climatological scenarios), with information periodically published to the public.
</narrative></comment>
</target>
<actual value="Simplified system in operation, with few information and not issuing reports.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 4: Itapemirim river basin forecast and early warning system operational and issuing reports
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="Simplified system in operation, with few information and not issuing reports."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="System in operation and issuing weekly reports.">
<comment><narrative>
The indicator measures the strengthening of disaster risk management capacities, including the forecast and information of the following parameters: level and discharge rate (outflow) of rivers (current, forecast and discharge rate/permanence curve), flood maps, and population affected by the observed level at that point in time, meteorological data (current and projection of climatological scenarios), with information periodically published to the public.
</narrative></comment>
</target>
<actual value="Simplified system in operation, with few information and not issuing reports.">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: Water resources management instruments improved
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="a) 1,500 decisions on water permits assessed per year based on few criteria and information; b) PERH not fully operational and lacking focus on extreme events related aspects;c) Information system with low availability to the public and not used to support water rights decision-making."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="a) 100% increase in water rights decisions per year.b) Updated PERH approved by the CERH-ES.c) 2,000 accesses to the system, including 100% of water rights analyses.">
<comment><narrative>
Number of Concession Decisions/year – The indicator shows the number of concessions and declarations actually issued and documented on AGERH's website
</narrative></comment>
</target>
<actual value="a) 1,880 decisions on water permits assessed per year based on few criteria and information; 
b) PERH not fully operational and lacking focus on extreme events related aspects;
c) Information system with low availability to the public and not used to support water rights decision-making.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.7) People benefitting from drought preparedness measures identified in the drought preparedness plans
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="591,807.00">
<comment><narrative>
Total number of inhabitants of river basins benefiting from Drought Preparation Plans and implementing measures provided for in the Plans. It reflects the need to implement preparedness and response actions in the basins, including in the normal scenario (without identified drought), seeking to increase the adaptive capacity and reduce and mitigate negative impacts, considering the severity of the drought. Population of municipalities covered by the plans (IBGE Census 2010, estimate 2021), namely: Águia Branca - 9,519, São Domingos do Norte - 8,001, Alto Rio Novo - 7,317, Colatina - 111,788, Governador Lindenberg - 10,869, Itaguaçu - 14,134, Itarana - 10,881, JaguarE - 24,678, Linhares - 141,306, Mantenópolis - 13,612, Marilândia - 11,107, Pancas - 21,548, Rio Bananal - 17,530, Santa Teresa - 21,823, São Gabriel da Palha - 31,859, São Roque do Canaã - 11,273, Sooretama84 - 23,843 and Vila ValErio - 13,830)
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 1: Water resources management instruments improved
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="a) 1,500 decisions on water permits assessed per year based on few criteria and information; b) PERH not fully operational and lacking focus on extreme events related aspects;c) Information system with low availability to the public and not used to support water rights decision-making."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="a) 100% increase in water rights decisions per year.b) Updated PERH approved by the CERH-ES.c) 2,000 accesses to the system, including 100% of water rights analyses.">
<comment><narrative>
Number of Concession Decisions/year – The indicator shows the number of concessions and declarations actually issued and documented on AGERH's website
</narrative></comment>
</target>
<actual value="a) 1,880 decisions on water permits assessed per year based on few criteria and information; 
b) PERH not fully operational and lacking focus on extreme events related aspects;
c) Information system with low availability to the public and not used to support water rights decision-making.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2) Water use charges proposals submitted to the River Basin Committees
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="13.00">
<comment><narrative>
AGERH has reported as completed, nevertheless this indicator will need to be reviewed in the next mission.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Increase in the participation of women in the annual training courses offered by CEPDEC to municipal civil defense and protection committees (COMPDEC) and Community Civil Defense Centers (NUDEC)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="40.00">
<comment><narrative>
Increased participation of women in Civil Defense training indicates the percentage of women enrolled in Civil Defense courses on risk and disaster management in the second half of 2024 and first half of 2025.
</narrative></comment>
</target>
<actual value="38.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1) Reduction in the average time for issuing water rights for irrigation using surface water
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="60 days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="25% reduction">
<comment><narrative>
Measurement of the reduction in the average total time for issuing water rights for irrigation with surface abstraction (counting from the request to the decision on the right). The percentage will be calculated in relation to the average time for issuance on June/15/2022, considering the results of the water rights improvement study and the use of a decision support system.
</narrative></comment>
</target>
<actual value="60 days">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Increase in the participation of women in the annual training courses offered by CEPDEC to municipal civil defense and protection committees (COMPDEC) and Community Civil Defense Centers (NUDEC)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="29.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="40.00">
<comment><narrative>
The total number of women trainees increased but percentually it decreased from last report.
</narrative></comment>
</target>
<actual value="35.02">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area under sustainable landscape management practices
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2029-06-29" />
<target value="3000.00">
<comment><narrative>
The indicator measures, in hectares, the land area for which new and/or improved sustainable landscape management practices have been introduced. Land is the terrestrial biologically productive system comprising soil, vegetation, and the associated ecological and hydrological processes; Adoption refers to change of practice or change in the use of a technology promoted or introduced by the project; Sustainable landscape management (SLM) practices refers to a combination of at least two technologies and approaches to increase land quality and restore degraded lands for example, agronomic, vegetative, structural, and management measures that, applied as a combination, increase the connectivity between protected areas, forest land, rangeland, and agriculture land.
</narrative></comment>
</target>
<actual value="1547">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P177070</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Alagoas: Public Sector Management Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Alagoas]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project is the first operation in a Series of Projects (SoP) under the Progestão Program designed to assist Brazilian States implement reforms that will improve efficiency in public expenditure. The Progestão Program recognizes that the subnational fiscal crisis is largely a result of structural problems in public sector management. The Program, available to all Brazilian States regardless of their fiscal situation, will provide technical assistance to help participating States modernize and improve the following whole-of-government functions through investments in management reforms and information systems: human resource management; pensions; public procurement; public investment; debt management; state-owned Enterprises; and asset management. The Program also supports investments in management reforms and information systems in four strategic sectors: health, education, social assistance, and environment.  Progestão Alagoas Project will help tackle public sector management and public sector inefficiencies through investments in management reforms and information systems in: human resource management; pensions; public procurement; public investment; and asset management. Progestão Alagoas also supports investments in management reforms and information systems in four strategic sectors: health, education, social assistance, and environment.The Progestão Alagoas Project will include three components:Component 1: Whole-of-Government Management Systems includes activities related to human resources management, pensions management, public procurement, public investment management and budgeting, and asset management. The component includes five  subcomponents:1.1: Human Resource Management. Activities include: (i) development of a strategic workforce planning system and functional reviews to identify the competencies needed and plan organizations staff recruitment and deployment in all State departments and selected agencies; (ii) design and implementation of selection processes for senior management positions; (iii) design and implementation of measures to strengthen government capacity using the government's grievance redress mechanism; (iv)  Implementation of a transactional HRM information system; (v) design and implementation of a management analytics system and artificial intelligence for automated wage bill audits; (vi) periodic staff surveys to assess reform implementation and support change management; and (iv) communications and capacity building.1.2: Pensions Management. Activities financed under this subcomponent include: (i) design and implementation of a pension fund investment management strategy to maximize the State's portfolio and integrate Environmental Social Governance factors in the investing strategy; (ii) development of a pension management information system to implement the new benefits scheme and capacity-building to improve management of pension benefits; (iii) procuring energy-efficient hardware to support the deployment of these systems; and (iv) communications and capacity building.1.3: Public Procurement. Activities financed include: (i) development of a sustainable procurement strategy, which addresses environmental, climate and gender equality considerations, and an implementation plan to help embed sustainable procurement across the State's purchases; (ii) development and implementation of a centralized e-procurement system; (iii) development and implementation of an integrated digital system for processing and analyzing data and managerial information in public procurement and contract management, including data aggregation with gender attributes; (iv) development and implementation of digital systems that support contract management functions and the procurement low value, non-complex goods and services; (v) development and implementation of a system that certifies enterprises owned by women and automatize data aggregation by the gender attribute; (vi) offer training for women participate in public procurement process; (vii) development and implementation of e-marketplace solution for procuring off-the-shelf goods, stationery and products through an online platform that integrates state’ s agencies and suppliers; (viii) capacity building,Sub-Component 1.4: Public Investment Management and Budgeting. Activities financed  include: (i) development and implementation of a  public project management system for State's investments, integrating environmental and climate change considerations in project preparation, screening and appraisal; (ii) development and implementation of tools to support environmental and climate change risk assessment and project screening;  (iii)  preparation of a portfolio of technically appraised, implementation ready projects to support Alagoas development, environmental and climate change objectives; (iv) design and implementation of a governance strategy to manage the project portfolio execution; (v) development and implementation of internal integrity and audit system, including data analytics, to identify potential fraud in expenditures; (v) development and implementation of a contract and transfer management system to monitor and evaluate projects financed at the municipal level, including systems accessible to the public to monitor physical and financial progress, and provide feedback; (vi) design and implementation of a public expenditure review, including gender equity and climate change considerations; (vii) design and implementation of budgeting practices to embed green and gender budgeting practices; (viii) capacity building for state and municipal government officials on public investment and expenditure management practices, to support the rollout and implementation of new tools and the integration of gender and climate change considerations; and (ix) periodic staff surveys to assess reform implementation and support change management.1.5: Asset Management. Activities include: (i) hiring of technical support to assess up-to-date information of real estate properties, including geospatial data, area, occupation rate, valuations and registry's status; (ii) development and implementation of a comprehensive public asset management system that includes a climate risk assessment of real estate assets (ii) energy audits based on CCB methodology for selected government properties, focused on reducing energy consumption or GHG emissions; (iii) acquisition and implementation of a system for identification and recording of movable assets; (iv) rationalizing the movable assets and identifying opportunities to shift to electrify and improve energy efficiency; (v) development and implementation of a system for mapping costs of information and communication technologies (ICTs), including identification of synergies between government-to-government systems, interoperability, and a governance strategy for new acquisitions and maintenance; and (vi) capacity building on asset management practices and support the rollout and implementation of new tools.Component 2: Management Systems in Strategic Sectors includes four strategic sectors – education, health, social assistance, and environment – focusing on the highest priority management systems that can impact on the efficiency of resource allocation. 2.1: Education. Activities financed  include: (i) development and implementation of IT systems to ensure digitalization and improve enrollment and class formation for students, allowing procedures to be performed online, including reliable contact of student parents, georeferencing of students, and efficient and automated creation of classes at the beginning of the school year, considering the local pedagogical criteria; (ii) design and implementation of a teacher allocation system, covering over 6,800 teacher assignments, allowing procedures to be performed online, including alerts to teachers of available classes and the integration and automation of this procedures with the enrollment sy]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0049762"><narrative>State of Alagoas, with the guarantee of the Federative Republic of Brazil</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0049762"><narrative>State of Alagoas, with the guarantee of the Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0049763"><narrative>Secretariat of Finance - State of Alagoas</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2021-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-07-21"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carolina Luisa Vaira</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cvaira@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003408096" />
            <name><narrative>Alagoas</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9.58333 -36.41667</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15125" percentage="32" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="31" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="14" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="1" code="16013" percentage="3" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="70.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="35" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="17" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="54" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="54" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="31" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="17" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="31" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="17" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="21" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="19" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="12" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="12" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="22" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="8" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="17" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="35" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="1" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="17" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">410000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">740000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">360000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">370000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">720000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">350000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">860000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1270000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">850000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">860000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">860000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">31755162.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">31755162.33</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">497526</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">7647312</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-100000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-89785</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-63001</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-49763"><narrative>Secretariat of Finance - State of Alagoas</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177070"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177070?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177070"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="Yes">
<comment><narrative>
Website with information on municipal transfers (convenios) is operational and accessible to the public.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Payroll irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="N.A"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="0.3 percent">
<comment><narrative>
Expenditure irregularities in the active personnel payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory of State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hospitals with a hospital management system implemented and operational
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2027-03-29" />
<target value="5.00">
<comment><narrative>
Number of hospitals implementing an integrated digital hospital management system with the minimally required information and analytical capabilities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public sector workforce replacement rate
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="0.97">
<comment><narrative>
The personnel recruited from outside the public sector is divided by the personnel leaving active post (retirement, resignation). The baseline is the average of the last five years.  This indicator excludes personnel employed in front line service delivery
</narrative></comment>
</target>
<actual value="0.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percent of municipalities using the new management system for financial reporting
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="65.00">
<comment><narrative>
Percentage of municipalities that have adopted, were trained, and are using the system to provide financing reports.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State public agencies or institutions conducting strategic workforce planning
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="5.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="75.00">
<comment><narrative>
Number of agencies or institutions with strategic workforce planning reports as a percent of the total number of state agencies or institutions.
</narrative></comment>
</target>
<actual value="5.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of public hearings on government's capital investments
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="Yes">
<comment><narrative>
Government incorporating feedback to improve government's capital investments, by capturing user satisfaction on specific dimensions of quality, timeliness, and accessibility of information provided.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="R$ 0 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="R$ 5.2 million">
<comment><narrative>
Average net fixed property income of State &quot;receita patrimonial&quot; element in Budget revenues. Measured as moving 5 year average.
</narrative></comment>
</target>
<actual value="R$ 0 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="70.00">
<comment><narrative>
Number of public real estate properties with complete legal documentation proving state ownership as a share of the total number of state real estate properties listed in the state database.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="100.00">
<comment><narrative>
Share of public investment projects using the new Public Investment Management (PIM) methodology, issued in the form of legislation, guidelines, manuals.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Use of price reference system on bidding documents for goods and services
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="Yes">
<comment><narrative>
Share of goods and services bidding documents with price reference.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="R$ 0 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="R$ 5.2 million">
<comment><narrative>
Average net fixed property income of State &quot;receita patrimonial&quot; element in Budget revenues. Measured as moving 5 year average.
</narrative></comment>
</target>
<actual value="R$ 0 million">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Classrooms at less than 50 percent of capacity
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="0.00">
<comment><narrative>
Percentage of classrooms at less than 50 percent of capacity, while respecting SEDUC criteria for the maximum number of students per class.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public investment project time overruns
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="350.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="200.00">
<comment><narrative>
Average time overruns of investment projects: original project time vs. executed time.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="163.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2028-03-28" />
<target value="120.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for procurement carried out through electronic auctions (Pregão Eletrônico).
</narrative></comment>
</target>
<actual value="163.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public sector workforce replacement rate
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="0.97">
<comment><narrative>
The personnel recruited from outside the public sector is divided by the personnel leaving active post (retirement, resignation). The baseline is the average of the last five years.  This indicator excludes personnel employed in front line service delivery
</narrative></comment>
</target>
<actual value="0.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pension payroll irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="N.A"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2027-09-30" />
<target value="0.3 percent">
<comment><narrative>
Expenditure irregularities (any category) of the retired personnel and pensioner payroll. Data will come from Audits. The management analytics product will identify risk areas for control
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public investment project time overruns
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="350.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="200.00">
<comment><narrative>
Average time overruns of investment projects: original project time vs. executed time.
</narrative></comment>
</target>
<actual value="350.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="163.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2028-03-28" />
<target value="120.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for procurement carried out through electronic auctions (Pregão Eletrônico).
</narrative></comment>
</target>
<actual value="163.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities implementing the new management system for social services
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="80.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Women-owned businesses registered in the state's procurement system and eligible to participate in public bids
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="N.A."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="15 percent">
<comment><narrative>
Measures women-owned businesses registered in the state's procurement system and eligible to participate in public bids as a share of total business registered.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Classrooms at less than 50 percent of capacity
</narrative></title>
<baseline year="2022" iso-date="2022-01-31" value="3.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-31" />
<period-end iso-date="2028-03-28" />
<target value="0.00">
<comment><narrative>
Percentage of classrooms at less than 50 percent of capacity, while respecting SEDUC criteria for the maximum number of students per class.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P177474</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Piaui Pillars of Growth and Social Inclusion Project 2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase land tenure security, the adoption of sustainable natural resources management practices, and Climate-Smart Agriculture practices among target beneficiaries in the State of Piaui; and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The general objective of the Project is to increase land tenure security, the adoption of sustainable natural resources management practices, and Climate-Smart Agriculture practices among target beneficiaries in the State of Piaui; and in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. The Project aims to contribute to the promotion of sustainable development of family farming, increasing socio-productive inclusion and economic dynamism of agrarian reform settlements and territories of Traditional People and Communities (TPC), with legal security of land ownership. The project will contribute to land regularization and incentivize the adoption of climate-smart agriculture practices by family farmers and the implementation of natural resources conservation practices by landholders and traditional communities. The Project is organized into 5 Components:Component 1 – Land Tenure Regularization (USD 20.08 million). This Component aims to contribute to the implementation of Piaui's Land Tenure Regularization Program and to strengthening real property rights through four main activities: (i) the modernization and strengthening of INTERPI; (ii) land tenure regularization in agrarian reform settlements, with a target of delivering 15,000 land titles to family farmers in state agrarian reform settlements; (iii) land tenure regularization for TPC. The objective will be for INTERPI to regularize the land of at least 20 TPC territories, while helping advance other tenure regularization processes related to TPC territories; and (iv) strategic partnerships with the judiciary and citizen engagement.Component 2 – Environmental Management and Geospatial information management (USD 14.00 million). The main objective of this Component is to contribute to improving the State's capacity to promote sustainable natural resources management (including natural vegetation cover and water resources), to promote the adoption of sustainable natural resources practices within family farmers, including historically marginalized groups targeted by the project such as TPC and women, and to provide accurate geospatial information for the elaboration of public policies, natural resources management, and climate risk management through, inter alia: (i) the implementation of preventive measures or measures to control and combat vegetation fires; (ii) the implementation of a system that enables continuous monitoring surface water for events or trends over time; (iii) rural environmental cadastre and environmental regularization for the selected areas; and (iv) the provision of spatial data on land use, land tenure, native vegetation and native vegetation fire risk. The State Secretariat of Environment and Water Resources (Secretaria de Meio Ambiente e Recursos Hidricos do Estado Piaui – SEMARH) will lead the implementation of this Component.Component 3 – Climate-smart Rural Development (USD 25.28 million). This Component aims to increase the socio-economic inclusion and climate resilience of family farmers from land reform settlements and TPC, by granting access to climate-smart agricultural technologies and markets and strengthening the agriculture sector public services provided to farmers., through: (i) support of sustainable, climate-smart productive investments by family farmers groups; (ii) fostering the adoption of climate-smart practices in the sector; and (iii) strengthening of services delivered to farmers. The State Secretariat for Agriculture (Secretaria da Agricultura – SAF) will lead the implementation of this Component.Component 4. Project management (USD 3.96 million). This component will support Project coordination and management, including: (i) Project management and administration; (ii) Financial Management (FM); (iii) procurement; (iv) monitoring and evaluation (M&amp;E) of Project performance and impact; (v) environmental and social risks management and Grievance Redress Mechanism (GRM); and (vi) communication and outreach. Regarding the project Monitoring and Evaluation (M&amp;E), the approach will include a system to monitor the implementation on an ongoing basis. Component 5. Emergency Response (US$0). This Component is included in the Project as a mechanism for funding requests arising from emergencies such as natural disasters and other shocks, as defined in the operational manual for the Contingency Emergency Response Component (CERC). If such a crisis develops, the State of Piaui can ask the World Bank to reallocate part of the Project funds to cover the costs of emergency response and recovery. An operational manual acceptable to the World Bank for implementing the CERC will be developed and annexed to the Project Operation Manual (POM).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0050303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-03-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Irene Natalia Wasilevsky</narrative></person-name><telephone>+1-202-473-1000</telephone><email>iwasilevsky@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>


<contact-info type="2">
<mailing-address><narrative>
Av. Miguel Rosa, 3190 • Centro/Sul • CEP: 64.001-495 • Teresina-PI, Piaui, Brazil, +55 (86) 99490‑9683‬, gabinete@seplan.pi.gov.br

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Av. Miguel Rosa, 3190 • Centro/Sul • CEP: 64.001-495 • Teresina-PI, Piaui, Brazil, +55 (86) 99490‑9683‬, gabinete@seplan.pi.gov.br

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="43042" percentage="37" xml:lang="en"/><sector vocabulary="1" code="43041" percentage="21" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="16" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YA" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Agricultural markets, commercialization and agri-business</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="42.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AK" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Agriculture, Fishing &amp; Forestry</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="0" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="0" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="0" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="0" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">708332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">708344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">500004.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-11-01"/>
<period-end iso-date="2034-11-30"/>
<value currency="USD" value-date="2034-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-12-01"/>
<period-end iso-date="2034-12-31"/>
<value currency="USD" value-date="2034-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-01-01"/>
<period-end iso-date="2035-01-31"/>
<value currency="USD" value-date="2035-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-02-01"/>
<period-end iso-date="2035-02-28"/>
<value currency="USD" value-date="2035-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-03-01"/>
<period-end iso-date="2035-03-31"/>
<value currency="USD" value-date="2035-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-11-01"/>
<period-end iso-date="2034-11-30"/>
<value currency="USD" value-date="2034-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-12-01"/>
<period-end iso-date="2034-12-31"/>
<value currency="USD" value-date="2034-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-01-01"/>
<period-end iso-date="2035-01-31"/>
<value currency="USD" value-date="2035-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-02-01"/>
<period-end iso-date="2035-02-28"/>
<value currency="USD" value-date="2035-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-03-01"/>
<period-end iso-date="2035-03-31"/>
<value currency="USD" value-date="2035-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">48175000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">48175000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">125000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">200000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-7675</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-36339</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50303"><narrative>Piaui State Secretariat for Planning (SEPLAN)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177474"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177474?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177474"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2.1. Number of women who filled out agroecological booklets for at least 12 months.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="160">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.1.3. Percentage of notary offices that receive regularization titles through REGINA (Extrajudicial Forum Indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="100">

</target>
<actual value="10%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3.2 Number of springs recovered.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="140">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.1 Percentage of responses to complaints related to project implementation
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="6900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2.3. Sustainable Development Agendas prepared for rural settlements and traditional communities entitled by Pillars II.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.3. Increased in the gross sales value of households in window 1 and 2.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4.4 Intelligent platform for territorial, productive and environmental management containing information for decision-making by government sectors. (Text)
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="Non-integrated systems."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="Geospatial Information Management Platform in operation.">

</target>
<actual value="Survey of data collection and integration requirements.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1.1 Number of PIPs subprojects implemented.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="207">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1.1 Integrated Fire Management Plans for selected priority areas drawn up and under implementation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2.1 Number of water analyzes carried out at collection points implemented by the project in the Pillars II intervention area
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="120">

</target>
<actual value="335">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2.1 Number of land titles emitted for rural settlements by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="9,158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="24,158">
<comment><narrative>
- Actual reach: 15,923
- Reach in relation to the final goal: 30%

Baseline reviewed: 11,462
Year 1: 12,462
Year 2: 14,462
Year 3:,18,462
Year 4: 23,462
End target: 26,462
</narrative></comment>
</target>
<actual value="15923">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.3 Unified project implementation monitoring system in operation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landholdings and Community Territories implementing sustainable natural resources management practices.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="16,000">
<comment><narrative>
- Actual reach: 7,219.
- Reach in relation to the final goal: 31%
The issuance of CAR is synchronized with the issuance of the land titles. 100% of CAR's demand for titles has been meet. 

Baseline reviewed: 2,212
Year 1: 3,712
Year 2: 6,212
Year 3: 10,212
Year 4: 15,212
End target: 18,212
</narrative></comment>
</target>
<actual value="7219">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.2.Percentage of formalized rural organizations that began to trade in a network as a result of the project's actions.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">
<comment><narrative>
The mission agreed to replace formalized to supported. 
Adjustment to the description: The indicator will be measured in windows 2 and 3. Delete from the description: To define the objective, it was estimated that it will be possible to add 4 rural organizations to each of the 7 subprojects supported by component 3.1 - window 3.
Adjustment to the data collection methodology: replace accounting with percentage. Target = 20%, no change. (It is estimated that 11 of the 57 supported ORs (Windows 2 and 3) will start working in a network.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1.1 Integrated Fire Management Plans for selected priority areas drawn up and under implementation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2.1 Number of land titles emitted for rural settlements by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="9,158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="24,158">
<comment><narrative>
The M&amp;A project is maturing. The mission requested a review of the data, but did not receive a response before the ISR submission deadline, therefore there is no progress reported.
</narrative></comment>
</target>
<actual value="15923">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3.1. Rural properties beneficiaries of the project with analyzed CAR.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="70">
<comment><narrative>
1,978 CAR analyzed out of 25,014.
</narrative></comment>
</target>
<actual value="7,8%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1.2. INTERPI computer systems (REGINA, INTERPI MOBILE and e-titles) integrated.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="Implemented REGINA system, with the ability to register information pertaining to donation certificates immediately after issuance."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="Maintenance of the Regina system and other post-implantation improvements and survey of systemic problems;&quot; - information related to donation titles managed exclusively by Regina, ensuring complete and efficient management">

</target>
<actual value="User support is provided through a chat-based platform with AI-powered assistance, available 24/7.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.2.4.  Increase in the percentage of women working on the boards of directors, vice director or company treasurer of rural organizations served by the project.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who received land titles issued  by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="23,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="45,700">
<comment><narrative>
The indicator shows a result lower than the previous ISR due to an error in the indicator calculation in the borrower's previous report; this error has been corrected in this version of the ISR.

Baseline reviewed: 26,757
Target Year 1: 28,257
Target Year 2: 31,257
Target Year 3: 37,257
End target: 49,257

Reached:
March 2025 = 30,477
November 2025 = 31,799
April 2025 = 31,946 - 23% of end target
</narrative></comment>
</target>
<actual value="31946">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1.1 Teams in place to execute land tenure regularization activities through donation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="17">
<comment><narrative>
The ISR1 value of 13 should be corrected to 4, consistent with the value reported in this ISR. This baseline reflects the number of teams under Project Pillar I (P129342) as reported in the ICR.
The updated indicator measures the number of field teams currently in operation. To date, the Project has encountered delays in hiring field teams. The recent mission recommended optimizing and accelerating procurement processes to address this.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.4. Percentage increase in net income of rural organizations participating in component 3 - window 3.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2.2 Number of land titles emitted for TPC by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="35">
<comment><narrative>
- Actual reach: 19
- Reach in relation to the final goal: 20%
- Reach in relation to the year 1 goal: 100%
</narrative></comment>
</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2.1 Number of water analyzes carried out at collection points implemented by the project in the Pillars II intervention area
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="120">
<comment><narrative>
112 analyses correspond to 21 collections, twice a year, and 4 water analyses in each collection.
</narrative></comment>
</target>
<actual value="112">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.2 Degree of satisfaction of beneficiaries, in percentage, with the training and services offered by the project.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-29" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1.1 Teams in place to execute land tenure regularization activities through donation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="17">
<comment><narrative>
The ISR1 value of 13 should be corrected to 4, consistent with the value reported in this ISR. This baseline reflects the number of teams under Project Pillar I (P129342) as reported in the ICR.
The updated indicator measures the number of field teams currently in operation. To date, the Project has encountered delays in hiring field teams. The recent mission recommended optimizing and accelerating procurement processes to address this.
</narrative></comment>
</target>
<actual value="4">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family Farmers (members of supported organizations) adopting improved climate-smart agriculture practices and technology.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="4,400">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family Farmers (members of supported organizations) adopting improved climate-smart agriculture practices and technology.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="4,400">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landholdings and Community Territories implementing sustainable natural resources management practices.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="16,000">
<comment><narrative>
The Project revised the baseline to 2340.
In the previous ISR, the baseline was counted twice.

Reach on Nov. 25 = 5007
Current reach = 5563 (30% of end target)

Baseline reviewed: 2,340
Year 1: 3,840
Year 2: 6,340
Year 3: 10,340
Year 4: 15,340
End target: 18,340
</narrative></comment>
</target>
<actual value="5563">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2.1. Number of women who filled out agroecological booklets for at least 12 months.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="160">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
4.3 Unified project implementation monitoring system in operation.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1.1.2. INTERPI computer systems (REGINA, INTERPI MOBILE and e-titles) integrated.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="Implemented REGINA system, with the ability to register information pertaining to donation certificates immediately after issuance."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="Maintenance of the Regina system and other post-implantation improvements and survey of systemic problems;&quot; - information related to donation titles managed exclusively by Regina, ensuring complete and efficient management">

</target>
<actual value="INTERPI has finalized the integration between the REGINA and SEI systems, encompassing the continuous workflow. Today, land tenure requests begin on the GOV.PICIDADÃO platform.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers reached with agricultural assets or services
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="6900">
<comment><narrative>
The Project held 6 Territorial Dissemination Seminars which were attended by 763 people, 44% of whom were women, and meetings with the PCT which had 80 participants.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.2 Degree of satisfaction of beneficiaries, in percentage, with the training and services offered by the project.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-29" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
4.1 Percentage of responses to complaints related to project implementation
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.1.3. Percentage of notary offices that receive regularization titles through REGINA (Extrajudicial Forum Indicator)
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="100">

</target>
<actual value="27%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.2.4.  Increase in the percentage of women working on the boards of directors, vice director or company treasurer of rural organizations served by the project.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family Farmers (members of supported organizations) adopting improved climate-smart agriculture practices and technology.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="4,400">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family Farmers (members of supported organizations) adopting improved climate-smart agriculture practices and technology.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="4,400">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who received land titles issued  by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="23,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="45,700">
<comment><narrative>
The indicator shows a result lower than the previous ISR due to an error in the indicator calculation in the borrower's previous report; this error has been corrected in this version of the ISR.

Baseline reviewed: 26,757
Target Year 1: 28,257
Target Year 2: 31,257
Target Year 3: 37,257
End target: 49,257

Reached:
March 2025 = 30,477
November 2025 = 31,799
April 2025 = 31,946 - 23% of end target
</narrative></comment>
</target>
<actual value="31946">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who received land titles issued  by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="23,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="45,700">
<comment><narrative>
This indicator measures the number of people with their names on the titles issued by INTERPI in the Pillars I and II Project. 
- Actual reach: 33,831
- Reach in relation to the final goal: 31%

Baseline reviewed: 26,749 
Year 1: 28,249
Year 2: 31,249
Year 3: 37,249
Year 4: 44,749
End target: 49,249
</narrative></comment>
</target>
<actual value="33831">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landholdings and Community Territories implementing sustainable natural resources management practices.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="16,000">
<comment><narrative>
The Project revised the baseline to 2340.
In the previous ISR, the baseline was counted twice.

Reach on Nov. 25 = 5007
Current reach = 5563 (30% of end target)

Baseline reviewed: 2,340
Year 1: 3,840
Year 2: 6,340
Year 3: 10,340
Year 4: 15,340
End target: 18,340
</narrative></comment>
</target>
<actual value="5563">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landholdings and Community Territories implementing sustainable natural resources management practices.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="16,000">
<comment><narrative>
- Actual reach: 7,219.
- Reach in relation to the final goal: 31%
The issuance of CAR is synchronized with the issuance of the land titles. 100% of CAR's demand for titles has been meet. 

Baseline reviewed: 2,212
Year 1: 3,712
Year 2: 6,212
Year 3: 10,212
Year 4: 15,212
End target: 18,212
</narrative></comment>
</target>
<actual value="7219">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3.1. Rural properties beneficiaries of the project with analyzed CAR.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="70">
<comment><narrative>
124 out of 5007 CAR's have been validated.
</narrative></comment>
</target>
<actual value="2%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2.3. Sustainable Development Agendas prepared for rural settlements and traditional communities entitled by Pillars II.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1.1 Number of PIPs subprojects implemented.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="207">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
4.4 Intelligent platform for territorial, productive and environmental management containing information for decision-making by government sectors. (Text)
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="Non-integrated systems."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="Geospatial Information Management Platform in operation.">

</target>
<actual value="The platform will be developed by CIETE. An individual data science consultant has been hired. Legal entities in GEO, list of companies. Will receive financial proposals. + the hiring of 2 consultants.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.3.2 Number of springs recovered.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="140">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.2.Percentage of formalized rural organizations that began to trade in a network as a result of the project's actions.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">
<comment><narrative>
The mission agreed to replace formalized to supported. 
Adjustment to the description: The indicator will be measured in windows 2 and 3. Delete from the description: To define the objective, it was estimated that it will be possible to add 4 rural organizations to each of the 7 subprojects supported by component 3.1 - window 3.
Adjustment to the data collection methodology: replace accounting with percentage. Target = 20%, no change. (It is estimated that 11 of the 57 supported ORs (Windows 2 and 3) will start working in a network.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.3. Increased in the gross sales value of households in window 1 and 2.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.1.2 Percentage of reduction of burned areas in selected areas.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="24">
<comment><narrative>
The burned area increased by 12.75%. The annual target was a 12% reduction. The mission recommended adjusting the calculation method to measure the effects in the 10 municipalities with the highest fire incidence.
</narrative></comment>
</target>
<actual value="+12,75">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.1.2 Percentage of reduction of burned areas in selected areas.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="24">

</target>
<actual value="0,64">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people who received land titles issued  by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="23,200"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="45,700">
<comment><narrative>
This indicator measures the number of people with their names on the titles issued by INTERPI in the Pillars I and II Project. 
- Actual reach: 33,831
- Reach in relation to the final goal: 31%

Baseline reviewed: 26,749 
Year 1: 28,249
Year 2: 31,249
Year 3: 37,249
Year 4: 44,749
End target: 49,249
</narrative></comment>
</target>
<actual value="33831">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1.4. Percentage increase in net income of rural organizations participating in component 3 - window 3.
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2.2 Number of land titles emitted for TPC by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-01-01" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-01" />
<period-end iso-date="2029-03-30" />
<target value="35">

</target>
<actual value="20">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P177632</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR State of Goias Sustainable Recovery DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective of this DPF is to support the State of Goias in: (i) improving fiscal sustainability; and (ii) adopting climate-smart, resilient, and inclusive policies for its agricultural sector.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the State of Goias Sustainable Recovery Development Policy Financing in Brazil are to support the State of Goias in: (i) improving fiscal sustainability; and (ii) adopting climate-smart, resilient, and inclusive policies for its agricultural sector. The first pillar of this Development Policy Financing (DPF) supports the fiscal recovery of Goias through the adoption of a spending cap, by consolidating spending on pensions, and the adoption of a medium-term fiscal adjustment plan. Goias is in the process of adopting a strong set of fiscal reforms and is committing to additional targets to ensure a fiscal recovery. An expenditure ceiling rule will help contain recurrent spending growth. A pension reform that increases the minimum retirement age and increases the contribution rate is expected to reduce the pension deficit by almost 20 percent. With these reforms, the DPF will help Goiás in becoming eligible for the federal government's fiscal adjustment instrument for states (named “Fiscal Recovery Regime” - FRR), building further on the expected results of this DPF. The FRR places Goias under a medium-term fiscal consolidation plan to improve its creditworthiness in the medium-term, increase its access to credit and federal guarantees, and improve the profile of its debt portfolio through additional fiscal consolidation measures. It thus enables this stand-alone DPF to contribute to keeping the State's public finances on track in the medium-term. The second pillar supports the State of Goias in adopting climate-smart, resilient and inclusive policies for its agricultural sector. It helps steer Goias agricultural sector towards climate-smart practices, including the adoption of the State Plan to address climate mitigation and adaptation. It also supports measures that reduce GHG emissions and increase carbon storage in the soil, by aiming at a 10 percent per year increase in the use of non-chemical fertilizers and phytosanitary products. It strengthens the climate focus of the State's environmental licensing framework by reducing compensation fees for GHG emission-neutral enterprises. Finally, the DPF supports land tenure regularization for smallholders through regulations that are environmentally sound, inclusive, and gender balanced.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0050476"><narrative>State of Goiás</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0050476"><narrative>State of Goiás</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0050473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-04-13"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-04-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabiano Silvio Colbano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>









<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15185" percentage="28" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="14" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="31150" percentage="11" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="4" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AB" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Agricultural Extension, Research, and Other Support Activities</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="11" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="11" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="11" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="43" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="14" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="11" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="29" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="14" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000242" percentage="14" xml:lang="en"><narrative>Global value chains</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="29" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="29" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="29" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="11" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="29" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="43" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="29" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">500000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">29830399.28</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">29830399.28</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">500000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-01-31"/><value value-date="2023-01-31">-29830399</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">470169601</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">-1250000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-4904</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-15974075</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-14647678</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-15375460</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-14819524</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-12858811</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-12249772</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-10375583</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-16785055</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-16785055</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-16785055</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-50473"><narrative>State Secretariat of Agriculture and Livestock (SEAPA)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50474"><narrative>State Secretariat of Economy (Secretaria Estadual da Economia)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-50475"><narrative>State Secretariat of Environment and Sustainable Development (SEMAD)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177632"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P177632?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P177632"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary balance as a share of net current revenues
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="10.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="3.0">

</target>
<actual value="4.76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of compensation agreements that qualify for a carbon neutrality discount
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="20">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gender gap in retirement ages (for new civil servants)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="5.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="3.00">

</target>
<actual value="1.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area planted with the use of bio-inputs
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="400,000">

</target>
<actual value="580,533">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pension deficit (excluding the military pension scheme)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="5,900"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2024-12-15" />
<target value="4,900">

</target>
<actual value="3,370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current expenditures as a share of net current revenue
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="98.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="93.1">

</target>
<actual value="86.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of low-carbon agricultural projects supported by the State Development Council receiving concessional financing
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="91"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="250">

</target>
<actual value="297">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of land titles issued under the name of women as sole or joint owners
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="50">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families on State land receiving a land title issued by SEAPA
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="214"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="1,000">

</target>
<actual value="360">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of land titles issued under the name of women as sole or joint owners
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="50">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families on State land receiving a land title issued by SEAPA
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="214"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="1,000">

</target>
<actual value="360">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of compensation agreements that qualify for a carbon neutrality discount
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="20">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area planted with the use of bio-inputs
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="400,000">

</target>
<actual value="580,533">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of low-carbon agricultural projects supported by the State Development Council receiving concessional financing
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="91"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="250">

</target>
<actual value="297">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Primary balance as a share of net current revenues
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="10.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="3.0">

</target>
<actual value="4.76">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Gender gap in retirement ages (for new civil servants)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="5.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="3.00">

</target>
<actual value="1.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pension deficit (excluding the military pension scheme)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="5,900"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2024-12-15" />
<target value="4,900">

</target>
<actual value="3,370">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current expenditures as a share of net current revenue
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="98.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="93.1">

</target>
<actual value="86.3">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178072</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Green, Resilient and Inclusive Regeneration of the Central Area of Porto Alegre</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support an inclusive and sustainable regeneration of the Municipality of Porto Alegre's Urban Core through integrated investments to prevent disasters, address selected post-disaster reconstruction needs, improve accessibility, livability, and promote other positive externalities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Porto Alegre current city administration had set out an ambitious long term development vision for Porto Alegre's Urban Core along four key axes: (a) supporting private sector-driven growth and investment; (b) improving the attractiveness and competitiveness of Porto Alegre's Urban Core; (c) supporting a denser, more walkable, and more inclusive city to promote inclusion, efficiency, and climate change mitigation; and (d) reducing poverty and improving equity. After having been impacted by historic floods in May 2024, the city has also committed to prioritize investments aimed at supporting disaster risk prevention and post-disaster reconstruction and recovery needs.The Project (Centro+4D) is seen as a critical anchor contributing to the needed recovery of Porto Alegre's Urban Core and to unlock its transformation in the direction of the proposed long term development vision. Moreover, it represents the city administration's commitment to a regeneration that is green, resilient, and inclusive. To implement Centro+4D, the Municipal Government has decided to partner with the World Bank and the AFD to benefit from global knowledge and expertise. The Centro+4D Project will implement a series of physical and institutional interventions to integrate Porto Alegre's Urban Core through investments in flood risk prevention and flood management; urban mobility; overall green, climate-resilient and inclusive local infrastructure upgrades to public spaces; and investments dedicated to the social and economic post-disaster recovery of disadvantaged and vulnerable groups and individuals.The proposed Project will be structured as a €162.0 million IPF operation comprising a €77.76 million IBRD loan, a €51.84 million AFD co-financing loan, and €32.40 million in municipal counterpart funding. To achieve the proposed development objective, the Project includes three components described below: Component 1 – Green, climate resilient and inclusive post-disaster reconstruction investments in the Urban Core (€137.88 million, of which €63.41 million IBRD, and €42.27 million AFD and €32.2 million counterpart) Component 2 – Investments contributing to social and economic recovery of Disadvantaged and Vulnerable Groups and Individuals (€13.05 million, of which €7.71 million IBRD, €5.14 million AFD and €0.2 million counterpart) Component 3 – Project management (€11.07 million, of which €6.64 million IBRD and €4.43 million AFD)]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051131"><narrative>Porto Alegre Municipality</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0051132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-09-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-06-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Emanuela Monteiro</narrative></person-name><telephone>+1-202-473-1000</telephone><email>emonteiro@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003452925" />
            <name><narrative>Porto Alegre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-30.03283 -51.23019</pos>
            </point>
            <exactness code="2"/>
            <location-class code="2" />
        </location><sector vocabulary="1" code="15185" percentage="89" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="75" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="12" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="9" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="89.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="89" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="90" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="89" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="89" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="89" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="89" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="18" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="83" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="89" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="18" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="89" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="24" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="89" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="89" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="89" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="18" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">211375.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">352291.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">352291.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">775041.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">775041.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1691000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2790150.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">82467670.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">82467670.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">84550000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">685350</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">1396980</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-221276</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-138224</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-121875</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51132"><narrative>Secretaria de Planejamento e Assuntos EstratEgicos (SMPAE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178072"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178072?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178072"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.10) Women feeling safer in public spaces within the Project targeted area
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2029-01-15" />
<target value="40.00">
<comment><narrative>
The actual value (26.6%), as informed by results of the public safety audit  dated March 2024, can be used as the revised baseline for the Project. It corresponds to the percentage of women feeling safe in the Project targeted areas (average, considering both the city center and the 4D). 27.7% of women feel safe in Porto Alegre city center, while 23.3% feel safe in 4D.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.
</narrative></comment>
</target>
<actual value="26.60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2) People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2029-01-14" />
<target value="96700">
<comment><narrative>
This is one of the WBG's new Scorecard indicators. This indicator measures the number of people living in the Project's intervention areas (City Center and 4D) that will benefit from the Project investments in access to climate-resilient infrastructure. Source: Data from IBGE Census (2010), to be updated during implementation, as the results of the 2022 Census become fully available.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2) Historic public buildings retrofitted and made climate-smart
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="4.00">
<comment><narrative>
This indicator measures the number of historic public buildings upgraded by the Project following designs that include climate-smart solutions and/or features.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1) Citizens participating in consultations who consider that their needs are reflected in Project investments
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of citizens participating in consultations who consider that their needs are reflected in Project investments.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) Volume of recyclable material received and sorted in the recycling units supported by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="620.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2029-01-15" />
<target value="713.00">
<comment><narrative>
This indicator measures the average increase in the volume of recyclable material received and sorted in the units supported by the Project.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.6) Traffic victims of injuries and fatalities in the Project area
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-01-15" />
<target value="62.00">
<comment><narrative>
This indicator measures the reduction in the number of cyclists and pedestrians victims (deaths and injuries) in the Project area, due to the Project&amp;rsquo;s investment in road safety measures.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.7) Reduction of GHG emissions from the optimization of the municipal public transport service in the Project area
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2029-01-15" />
<target value="25.00">
<comment><narrative>
This indicator measures the expected reduction of GHG emissions in the Project area, based on municipal public transport optimization in order to avoid overlapping transport services.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3) Reduced earning gap between women and men waste pickers supported by the Project
</narrative></title>
<baseline year="2017" iso-date="2017-11-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-29" />
<period-end iso-date="2029-01-15" />
<target value="20.00">
<comment><narrative>
This indicator measures the expected percentage reduction in the earning gap between male and female waste pickers, as a result of Project interventions (infrastructure investments in solid waste sorting units).

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="400.00">
<comment><narrative>
This indicator measures the number disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Increase in the use of the bicycle as a transport mode
</narrative></title>
<baseline year="2022" iso-date="2022-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-15" />
<period-end iso-date="2029-01-15" />
<target value="50.00">
<comment><narrative>
This indicator measures the percentage increase in the bicycle trips in the Project area.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3) City's capacity to plan and implement the long term regeneration of Porto Alegre's urban core in an inclusive, climate-smart, and sustainable manner improved
</narrative></title>
<baseline year="2024" iso-date="2024-01-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-03" />
<period-end iso-date="2029-01-03" />
<target value="Yes">
<comment><narrative>
This indicator, which is further disaggregated into 3 breakdown sub-indicators, measures the strengthened municipal capacity in selected areas: a) climate action; b) private participation in development; and c) economic inclusion of disadvantaged and vulnerable individuals and social groups.

The Project has not yet been signed or made effective. Tracking and reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.10) Women feeling safer in public spaces within the Project targeted area
</narrative></title>
<baseline year="2017" iso-date="2017-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-06-30" />
<period-end iso-date="2029-01-15" />
<target value="40.00">
<comment><narrative>
The actual value (26.6%), as informed by results of the public safety audit  dated March 2024, can be used as the revised baseline for the Project. It corresponds to the percentage of women feeling safe in the Project targeted areas (average, considering both the city center and the 4D). 27.7% of women feel safe in Porto Alegre city center, while 23.3% feel safe in 4D.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses.
</narrative></comment>
</target>
<actual value="26.60">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.9) Macro stormwater drainage network built to minimize flood impacts in 4D
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="2,500.00">
<comment><narrative>
This indicator measures the macro drainage network extension works executed by the Project.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses. Procurement processes for key infrastructure investments in selected streets and public spaces in the Fourth District are currently being prepared, with major procurement processes expected to be launched in the near term.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.8) Volume per month of sewage collected and sent for treatment before reaching the Guaiba River
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="488,000.00">
<comment><narrative>
This indicator measures the average volume per month of sewage collected accumulated in six months from the household connections regularized by the Project (4D + CH) and from the volume of sewage pumped out of the EBAP16 during dry periods.

This measures considers 18,525 m³ of wastewater collected and treated in the 4th District (through the regularization of 113 connections), as part of counterpart investments. It doesn’t include yet the CH and the volume of sewage pumped out of the EBAP16 during dry periods.
</narrative></comment>
</target>
<actual value="18525.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.7) Reduction of GHG emissions from the optimization of the municipal public transport service in the Project area
</narrative></title>
<baseline year="2019" iso-date="2019-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2019-12-31" />
<period-end iso-date="2029-01-15" />
<target value="25.00">
<comment><narrative>
This indicator measures the expected reduction of GHG emissions in the Project area, based on municipal public transport optimization in order to avoid overlapping transport services.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.6) Traffic victims of injuries and fatalities in the Project area
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="75.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-01-15" />
<target value="62.00">
<comment><narrative>
This indicator measures the reduction in the number of cyclists and pedestrians victims (deaths and injuries) in the Project area, due to the Project&amp;rsquo;s investment in road safety measures.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses.
</narrative></comment>
</target>
<actual value="75.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3) Reduced earning gap between women and men waste pickers supported by the Project
</narrative></title>
<baseline year="2017" iso-date="2017-11-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-11-29" />
<period-end iso-date="2029-01-15" />
<target value="20.00">
<comment><narrative>
This indicator measures the expected percentage reduction in the earning gap between male and female waste pickers, as a result of Project interventions (infrastructure investments in solid waste sorting units).

Porto Alegre has launched a large investment program funded through national and international resources. The municipality has rationalized activities across operations and identified that interventions in recycling units and support to waste pickers are primarily being implemented under the IDB-financed project. Activities and targets may be revisited post mid term review, with a view to adjusting its scope accordingly.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Increase in the use of the bicycle as a transport mode
</narrative></title>
<baseline year="2022" iso-date="2022-09-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-15" />
<period-end iso-date="2029-01-15" />
<target value="50.00">
<comment><narrative>
This indicator measures the percentage increase in the bicycle trips in the Project area.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) Volume of recyclable material received and sorted in the recycling units supported by the Project
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="620.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2029-01-15" />
<target value="713.00">
<comment><narrative>
This indicator measures the average increase in the volume of recyclable material received and sorted in the units supported by the Project.

Porto Alegre has launched a large investment program financed by other national and international partners. The municipality has rationalized activities across operations and identified that interventions in recycling units are primarily being implemented under the IDB-financed project. Activities and targets may be revisited post mid term review, with a view to adjusting its scope accordingly.
</narrative></comment>
</target>
<actual value="620.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4) Bicycle paths implemented or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="18.00">
<comment><narrative>
This indicator measures the extent of bicycle path network implemented or rehabilitated in the Project area.

The Project was signed in December 2024 and became effective in May 2025. As the Project is in its early stages of implementation, results against this indicator will be reported as implementation progresses. Procurement processes for key infrastructure investments in selected streets and public spaces in the Historic City Center and Fourth District are currently being prepared, with major procurement processes expected to be launched in the near term.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.2) Grievances related to the Project that were responded to within established deadline
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="80.00">
<comment><narrative>
This indicator measures grievances related to the Project that were responded within 30 days.

The Project's Grievance Mechanism is being strengthened. A pilot grievance report is being developed and, once reviewed and refined based on initial findings, will be incorporated into the Project's regular semi-annual reporting.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3) Visitations to cultural facilities in the area covered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="45,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="90,000.00">
<comment><narrative>
This indicator measures the increase in number of visitors to cultural facilities located in Project&amp;#39;s interventions areas.

The Tourism Strategy and Investment Plan, being developed by the co-financier, is advancing well. The Plan positions culture as a driver of urban transformation, economic development, and territorial projection, with a particular focus on the revitalization of the Historic City Center. Once finalized, it is expected to provide a strong strategic foundation for achieving the targets under this indicator.
</narrative></comment>
</target>
<actual value="45,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.2) Historic public buildings retrofitted and made climate-smart
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="4.00">
<comment><narrative>
This indicator measures the number of historic public buildings upgraded by the Project following designs that include climate-smart solutions and/or features.

The Project is in its early stages of implementation and progress toward this indicator is being prepared. A specialist in historic heritage restoration works is being engaged to elaborate the technical requirements for the works covering the retrofitting of historic public buildings. Results against this indicator will be reported as procurement and works advance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.1) Citizens participating in consultations who consider that their needs are reflected in Project investments
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of citizens participating in consultations who consider that their needs are reflected in Project investments.

Relevant public engagement activities have taken place, including public hearings, social mobilization events, and surveys on community perceptions under the municipality's broader investment program. In the context of the Project specifically, citizen participation has been fostered through the kick-off of the Tourism Strategy and Investment Plan, workshops on Creative Economy, Tourism and Heritage, and the +4D Seminar, which brought together teams from the municipal government, the productive sector, and local residents to align priorities and consolidate a shared agenda for the Fourth District. The Project Implementation Unit (PIU) is currently establishing its monitoring and evaluation structure, and results against this indicator are expected to be reported in the next reporting period.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="400.00">
<comment><narrative>
This indicator measures the number disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project.

Porto Alegre has launched a large investment program financed by other national and international partners. The municipality has rationalized activities across operations and identified that skills development and training interventions are primarily being implemented under the IDB-financed project. Activities and targets may be revisited post mid term review, with a view to adjusting its scope accordingly.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1) Public spaces upgraded considering GRID principles
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="700,000.00">
<comment><narrative>
This indicator measures the area of public spaces (roads and plazas) upgraded by the Project that incorporates GRID principles and solutions, as applicable. These include, but are not limited to: green walls, green roofs, efficient lightning, climate-smart materials, water infiltration and/or reservation solutions, water reuse solutions etc.

The Project was signed in December 2024 and became effective in May 2025. As the Project is still in its early stages of implementation, no results have been achieved against this indicator to date. Procurement processes for key infrastructure investments in selected streets and public spaces in the Historic City Center and the Fourth District are currently being prepared, with major procurement processes expected to be launched in the near term. Progress on this indicator is anticipated once civil works are initiated and infrastructure improvements become operational in the intervention areas.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3) City's capacity to plan and implement the long term regeneration of Porto Alegre's urban core in an inclusive, climate-smart, and sustainable manner improved
</narrative></title>
<baseline year="2024" iso-date="2024-01-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-03" />
<period-end iso-date="2029-01-03" />
<target value="Yes">
<comment><narrative>
This indicator, which is further disaggregated into 3 breakdown sub-indicators, measures the strengthened municipal capacity in selected areas: a) climate action; b) private participation in development; and c) economic inclusion of disadvantaged and vulnerable individuals and social groups.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
3) City's capacity to plan and implement the long term regeneration of Porto Alegre's urban core in an inclusive, climate-smart, and sustainable manner improved
</narrative></title>
<baseline year="2024" iso-date="2024-01-03" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-03" />
<period-end iso-date="2029-01-03" />
<target value="Yes">
<comment><narrative>
This indicator, which is further disaggregated into 3 breakdown sub-indicators, measures the strengthened municipal capacity in selected areas: a) climate action; b) private participation in development; and c) economic inclusion of disadvantaged and vulnerable individuals and social groups.

The Project has not yet been signed or made effective. Tracking and reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1) People benefiting from improved livability, accessibility and/or other positive externalities as a result of Project interventions
</narrative></title>
<baseline year="2024" iso-date="2024-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-12" />
<period-end iso-date="2029-01-12" />
<target value="279,000.00">
<comment><narrative>
This indicator measures the number of people from Porto Alegre and the wider metropolitan region benefiting from improved livability, accessibility and/or other positive externalities in the regenerated areas of the Historic City Center and 4D.

The Project was signed in December 2024 and became effective in May 2025. As the Project is still in its early stages of implementation, no results have been achieved against this indicator to date. Procurement processes for key infrastructure investments in selected streets and public spaces in the Historic City Center and the Fourth District are currently being prepared, with major procurement processes expected to be launched in the near term. Progress on this indicator is anticipated once civil works are initiated and infrastructure improvements become operational in the intervention areas.

Source: Data from IBGE Census (2010). Target to be updated post mid term review, based on 2022 Census and OD Survey 2023.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1) People benefiting from improved livability, accessibility and/or other positive externalities as a result of Project interventions
</narrative></title>
<baseline year="2024" iso-date="2024-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-12" />
<period-end iso-date="2029-01-12" />
<target value="279,000.00">
<comment><narrative>
This indicator measures the number of people from Porto Alegre and the wider metropolitan region benefiting from improved livability, accessibility and/or other positive externalities in the regenerated areas of the Historic City Center and 4D.

The Project has not yet been signed or made effective. Tracking and reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2) People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2029-01-14" />
<target value="96700">
<comment><narrative>
This is one of the WBG's new Scorecard indicators. This indicator measures the number of people living in the Project's intervention areas (City Center and 4D) that will benefit from the Project investments in access to climate-resilient infrastructure. 

The Project was signed in December 2024 and became effective in May 2025. As the Project is still in its early stages of implementation, no results have been achieved against this indicator to date. Procurement processes for key infrastructure investments in selected streets and public spaces in the Historic City Center and the Fourth District are currently being prepared, with major procurement processes expected to be launched in the near term. Progress on this indicator is anticipated once civil works are initiated and infrastructure improvements become operational in the intervention areas.

Source: Data from IBGE Census (2010). Target to be updated post mid term review, based on 2022 Census.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2) People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-07-14" />
<period-end iso-date="2029-01-14" />
<target value="96700">
<comment><narrative>
This is one of the WBG's new Scorecard indicators. This indicator measures the number of people living in the Project's intervention areas (City Center and 4D) that will benefit from the Project investments in access to climate-resilient infrastructure. Source: Data from IBGE Census (2010), to be updated during implementation, as the results of the 2022 Census become fully available.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.8) Volume per month of sewage collected and sent for treatment before reaching the Guaiba River
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="488,000.00">
<comment><narrative>
This indicator measures the average volume per month of sewage collected accumulated in six months from the household connections regularized by the Project (4D + CH) and from the volume of sewage pumped out of the EBAP16 during dry periods.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.4) Bicycle paths implemented or rehabilitated
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="18.00">
<comment><narrative>
This indicator measures the extent of bicycle path network implemented or rehabilitated in the Project area.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1) People benefiting from improved livability, accessibility and/or other positive externalities as a result of Project interventions
</narrative></title>
<baseline year="2024" iso-date="2024-01-12" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-12" />
<period-end iso-date="2029-01-12" />
<target value="279,000.00">
<comment><narrative>
This indicator measures the number of people from Porto Alegre and the wider metropolitan region benefiting from improved livability, accessibility and/or other positive externalities in the regenerated areas of the Historic City Center and 4D.

The Project has not yet been signed or made effective. Tracking and reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.2) Grievances related to the Project that were responded to within established deadline
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="80.00">
<comment><narrative>
This indicator measures grievances related to the Project that were responded within 30 days.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1) Public spaces upgraded considering GRID principles
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="700,000.00">
<comment><narrative>
This indicator measures the area of public spaces (roads and plazas) upgraded by the Project that incorporates GRID principles and solutions, as applicable. These include, but are not limited to: green walls, green roofs, efficient lightning, climate-smart materials, water infiltration and/or reservation solutions, water reuse solutions etc.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.9) Macro stormwater drainage network built to minimize flood impacts in 4D
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="2,500.00">
<comment><narrative>
This indicator measures the macro drainage network extension works executed by the Project.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.3) Visitations to cultural facilities in the area covered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="45,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-01-15" />
<target value="90,000.00">
<comment><narrative>
This indicator measures the increase in number of visitors to cultural facilities located in Project&amp;#39;s interventions areas.

The Project has been just signed and made effective in December 2024, and May 2025, respectively. Reporting progress of this indicator will be only possible later in the implementation period.&amp;nbsp;
</narrative></comment>
</target>
<actual value="45,000.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178339</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Mato Grosso: Public Sector Management Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Mato Grosso.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed IPF operation follows the overall Progestão approach of providing technical assistance around the whole-of-government functions to the State of Mato Grosso to improve efficiency in the management of public resources and through targeted actions in the Health, Social Protection and Environment sectors.The Progestão Program recognizes that the subnational fiscal crisis is largely a result of structural problems in public sector management. The Program, available to all Brazilian States regardless of their fiscal situation, will provide technical assistance to help participating States modernize and improve the following whole-of-government functions through investments in management reforms and information systems: human resource management; pensions; public procurement; public investment; debt management; state-owned Enterprises; and asset management. The Program also supports investments in management reforms and information systems in four strategic sectors: health, education, social assistance, and environment.The Progestão Mato Grosso Project will include the following components and sub-components:Component 1: Whole-of-Government Management Systems (US$ 38.5 million)1.1: Human Resource Management. Activities financed under this subcomponent mainly target the central HR management of the State of Mato Grosso, but also support departments and agencies. Activities include: (i) development of a strategic workforce planning system and functional reviews to identify the competencies needed and plan organizations staff recruitment and deployment in all State departments and selected agencies; (ii) design and implementation of selection processes for senior management positions, aiming to increase women's participation; (iii) design and implementation of measures to strengthen harassment reporting mechanism using the government's grievance redress mechanism; (iv) design and implementation of a management analytics system and artificial intelligence for automated wage bill audits; (v) functional review of the public administration careers and positions; (vi) periodic staff surveys to assess reform implementation and support change management; and (vii) communications and capacity building to support the rollout and implementation of new tools.1.2: Pensions Management. Activities financed under this subcomponent include: (i) development and implementation of an actuarial impact calculation system; (ii) design and implementation of a pension financial asset and liability management system implemented to balance public accounts; (iii) a full financial audit of all pension benefits and payments (iv) design and implementation of a pension fund investment management strategy to maximize the State's portfolio and integrate Environmental Social Governance (ESG) factors in the investing strategy (v) procurement of energy efficient hardware to support the deployment of these systems; and (vi) communications and capacity building to support the rollout and implementation of new tools.1.3: Public Procurement. Activities financed under this subcomponent support procurement in central and sectoral areas of procurement in the State of Mato Grosso. Activities include: (i) development and implementation of a sustainable procurement strategy, which addresses environmental, climate and gender equality considerations, and an implementation plan to help embed sustainable procurement across the State's purchases; (ii) development and implementation of a centralized e-procurement system, including green and climate sensitive procurement and the redesign and automation of key processes to ensure cost-effective acquisitions; (iii) development and implementation of a stock management system integrated to procurement, including an e-marketplace portal; (iv) design and implementation of a strategic sourcing methodology to help identify demand for goods and services across the government;  (v) application of artificial intelligence using electronic invoices and to identify and reduce fraud and corrupt practices; (vi) establish a women-owned business definition (>51 percent ownership/stake by a woman/women; women as CEO/COO; or women-sole-proprietors; (vii) development and implementation of a system that certifies enterprises owned by women and automatize data aggregation by the gender attribute; (viii) capacity building program for officials working in procurement across the state; and (ix) procurement of energy efficient hardware to support the deployment of these systems.1.4: Public Investment Management and Budgeting. Activities financed under this subcomponent are focused on enhancing public expenditure efficiency and effectiveness through : (i) development and implementation of a public investment system, integrating environmental and climate change considerations in project preparation, screening, and appraisal; (ii) development and implementation of tools to support environmental and climate change risk assessment and project screening; (iii) development and implementation of an electronic tool for the management of the portfolio of technically appraised, implementation ready projects to support Mato Grosso's development, environmental and climate change objectives; (iv) design and implementation of a governance strategy to manage the project portfolio execution; (v) development and implementation of a management system for the transfer of resources from the State of Mato Grosso to municipalities, allowing for digital monitoring of the preparation and implementation stage; (vi) review of budgeting practices to embed green and gender budgeting practices; and (vii) procurement of energy efficient hardware to support the rollout and implementation of new tools.1.5: Asset Management. Activities financed under this subcomponent include: (i) contracting of technical support to assess and update information on the state's real estate properties, including geospatial data, area, occupation rate, valuations and registry status; (ii) development and implementation of a comprehensive public asset management system that includes a climate risk assessment of each real estate asset; (iii) energy audits based on CCB methodology for selected government properties, focused on reducing energy consumption or GHG emissions; (iv) development and implementation of a system for mapping costs of information and communication technologies (ICTs), including identification of synergies between government-to-government systems, interoperability, and a governance strategy for new acquisitions and maintenance; (v) capacity building on asset management practices and support the rollout and implementation of new tools; and (vi) procurement of energy efficient hardware to support the rollout and implementation of new tools.Component 2: Management Systems in Strategic Sectors (US$ 9.5 million)2.1: Health. Activities financed under this subcomponent include: (I) development of an expenditure review to identify cost structure and assess budgeting practices in the state's public health units; (ii) implementation of systems to support budgeting and expenditure management in the State's health units; (iii) introduction of communication and capacity-building to support the rollout and implementation of new tools; and (iv) procurement of energy efficient hardware to support the rollout and implementation of new tools.2.2: Social Assistance. Activities financed under this subcomponent support SETASC management act ivities and contribute indirectly to monitor implementation in municipalities. Activities include: (I) design and implementation of an integrated management system to facilitate the execution of social assistance programs, including financial management, cash transfer programs and management of other benefits, as well as internal registries; (ii) development and implementation of a transparency panel to support decision-making in social assistance; (iii) digitalization and automation of socia]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051449"><narrative>State of Mato Grosso</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051449"><narrative>State of Mato Grosso</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0051448"><narrative>Secretariat of Finance - Mato Grosso</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-08-23"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carolina Luisa Vaira</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cvaira@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15185" percentage="86" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="86.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="48" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="50" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="86" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="14" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="18" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="22" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="14" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="48" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="50" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="8" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="14" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="86" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="14" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="50" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="48" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="18" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="24" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="1" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">480000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">490000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">230000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">240000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">530000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">620000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">310000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">320000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">330000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">340000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">380000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">390000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">810000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">420000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">460000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1870000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">840000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">730000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1290000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">600000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1160000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">570000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1150000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">580000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1740000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1170000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1180000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">590000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1090000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">40000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">40000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51448"><narrative>Secretariat of Finance - Mato Grosso</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-40000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51448"><narrative>Secretariat of Finance - Mato Grosso</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51448"><narrative>Secretariat of Finance - Mato Grosso</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178339"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178339?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178339"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Performance of the state pension fund relative to the average for Brazilian states
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.10">
<comment><narrative>
Measures of the performance of the State pension fund in comparison to the average of other State governments, with a target of improving annual returns by at least one standard deviation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Website with information on municipal transfers is operational and acessible to the public
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State public agencies and institutions conducting strategic workforce planning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
# of institutions/agencies with strategic workforce planning reports as percent of total number of state agencies/institutions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Performance of the state pension fund relative to the average for Brazilian states
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.10">
<comment><narrative>
Measures of the performance of the State pension fund in comparison to the average of other State governments, with a target of improving annual returns by at least one standard deviation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Payroll irregularities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="-0.3">
<comment><narrative>
Expenditure irregularities in the active personnel payroll. Data will come from Audit reports. The management analytics product will identify risk areas for control.  Baseline is total payroll and target is -0,3%.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate for non frontline service delivery staff
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.97">
<comment><narrative>
Personnel recruited from outside the public sector divided by personnel leaving active post (retirement, resignation) in non-frontline service delivery areas.  Baseline is average of last 5 yrs
This indicator excludes personnel employed in front line service delivery
</narrative></comment>
</target>
<actual value="0.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women-owned businesses registered in the state's procurement system and eligible to participate in public bids
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="15.00">
<comment><narrative>
Measures women-owned businesses registered in the state's procurement system and eligible to participate in public bids as a share of total business registered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public hearing on public investments by state or through transfers to municipalities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Government incorporating feedback to improve government's investments made through transfers to municipalities, as well as capital investments by capturing user satisfaction on specific dimensions of quality, timeliness and accessibility of information provided
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities with capacity building on the new social assistance services management system
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percentage of municipalities that have adopted and were trained in the new social assistance services management system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high complexity health units with hospital management system implemented and operational
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="5.00">
<comment><narrative>
Number of high complexity health units implementing an integrated digital hospital management system with minimally required information and analytical capabilities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment Budget execution rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="70.00">
<comment><narrative>
Average annual execution of public investment projects compared with original budget in the last 5 years, considering a filter of investment projects applied to the attribute &quot;expenses group=&quot;Investments&quot; in the State Planning integrated system (FIPLAN)
</narrative></comment>
</target>
<actual value="55.50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State public agencies and institutions conducting strategic workforce planning
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
# of institutions/agencies with strategic workforce planning reports as percent of total number of state agencies/institutions
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement processes with sustainability criteria
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Public procurement with sustainability criteria. Share of public procurement processes with environmental, social, and governance criteria
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects.  A review of all new projects will be carried out to determine compliance
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Public hearing on public investments by state or through transfers to municipalities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Government incorporating feedback to improve government's investments made through transfers to municipalities, as well as capital investments by capturing user satisfaction on specific dimensions of quality, timeliness and accessibility of information provided
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="15.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="20.10">
<comment><narrative>
Average net fixed propery income of State &quot;receita patrimonial&quot; element in Budget revenues (Millions of Reais). Baseline is average of lst 3 yrs.  Excludes property sales and purchases
</narrative></comment>
</target>
<actual value="15.10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public procurement processes with sustainability criteria
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="27.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="50.00">
<comment><narrative>
Public procurement with sustainability criteria. Share of public procurement processes with environmental, social, and governance criteria
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="100.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects.  A review of all new projects will be carried out to determine compliance
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="15.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment Budget execution rate
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="55.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="70.00">
<comment><narrative>
Average annual execution of public investment projects compared with original budget in the last 5 years, considering a filter of investment projects applied to the attribute &quot;expenses group=&quot;Investments&quot; in the State Planning integrated system (FIPLAN)
</narrative></comment>
</target>
<actual value="55.50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="195.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="120.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider
</narrative></comment>
</target>
<actual value="195.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Women-owned businesses registered in the state's procurement system and eligible to participate in public bids
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="15.00">
<comment><narrative>
Measures women-owned businesses registered in the state's procurement system and eligible to participate in public bids as a share of total business registered.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="195.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="120.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider
</narrative></comment>
</target>
<actual value="195.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities with capacity building on the new social assistance services management system
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Percentage of municipalities that have adopted and were trained in the new social assistance services management system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate for non frontline service delivery staff
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="0.97">
<comment><narrative>
Personnel recruited from outside the public sector divided by personnel leaving active post (retirement, resignation) in non-frontline service delivery areas.  Baseline is average of last 5 yrs
This indicator excludes personnel employed in front line service delivery
</narrative></comment>
</target>
<actual value="0.98">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Share of goods and services bidding documents with price reference
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="80.00">
<comment><narrative>
Share of goods and services bidding documents with price reference
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Payroll irregularities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="-0.3">
<comment><narrative>
Expenditure irregularities in the active personnel payroll. Data will come from Audit reports. The management analytics product will identify risk areas for control.  Baseline is total payroll and target is -0,3%.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="65.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of high complexity health units with hospital management system implemented and operational
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="5.00">
<comment><narrative>
Number of high complexity health units implementing an integrated digital hospital management system with minimally required information and analytical capabilities
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="Yes">
<comment><narrative>
Website with information on municipal transfers is operational and acessible to the public
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pension payroll irregularities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="-0.3">
<comment><narrative>
Expenditure irregularities (of any category) in the retired personnel and pensioner payroll. Data will come from Audit reports. The management analytics product will identify risk areas for control. Baseline is total payroll and target is a reduction of 0.3%
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Pension payroll irregularities
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2027-06-30" />
<target value="-0.3">
<comment><narrative>
Expenditure irregularities (of any category) in the retired personnel and pensioner payroll. Data will come from Audit reports. The management analytics product will identify risk areas for control. Baseline is total payroll and target is a reduction of 0.3%
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="15.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2026-06-30" />
<target value="20.10">
<comment><narrative>
Average net fixed propery income of State &quot;receita patrimonial&quot; element in Budget revenues (Millions of Reais). Baseline is average of lst 3 yrs.  Excludes property sales and purchases
</narrative></comment>
</target>
<actual value="15.10">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178557</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Integrated Sustainable Mobility Project in the Foz do Rio Itajai Region</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to improve accessibility and mobility in an inclusive and low-emission manner in selected areas of the Foz do Rio Itajai Region.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Integrated Sustainable Mobility Project in the Foz do Rio Itajai Region (AMFRI) will achieve a total investment amount of 162 USD million, out of which 90 USD million will be IBRD financing and 30 USD million counterpart financing, the rest of the investment concessions from the Private Sector for electric buses and barges. This project would be a pioneer in Brazil for being designed and implemented by a consortium of 11 Municipalities (CIM-AMFRI) in the Foz do Rio Itajai Region. The three major municipalities of the AMFRI (Itajai, Navegantes, and, Balneario Cambioriu) will be responsible vis-a-vis the Consortium for the loan repayment, being the Consortium the Borrower and responsible for the project implementation. The main outcome objectives of the project are to improve accessibility and mobility in select areas of the Region in an inclusive and low-emission manner. For those outcomes, the project seeks to improve the quality of service of the Public Transport in the Region, offering an integrated multimodal transport system with a fully electric regional public transport system that includes both Bus-Rapid-Transit (BRT) corridors as the backbone and electric buses in mix-traffic corridors, creating a more efficient, safe, punctual, accessible, comfortable, and sustainable alternative than the deficient current public transport that hampers access to jobs, services, and markets to the Region citizens. With the new public transport system, including the BRT, the outcome expected is to reduce the use of private cars, shift the modal share towards the new electric Public Transport system and therefore reduce CO2 emissions. Here are some of the specific objectives of the Project: (i) reduce the time of displacements - especially for women and low-income populations;(ii) facilitate the access of the population to the main job, services, and markets areas in the Region;(iii) enhance the use of public transport with consequent inversion of the modal matrix of displacements; (iv) stimulate active mobility for short and medium-range trips; (v) stimulate the use of micro-mobility and user-centric transport services; (vi) minimize the level of greenhouse gas emissions; (vii) enable balanced economic development across the AMFRI Region; (viii) stimulate the job opportunities for low-income population in retail, tourism, and other activities which will benefit from improved accessibility in the region; (ix) optimize the regional integration through the implementation of metropolitan high quality-of-service public transport services. The project will implement four components: Component 1 - Bus Rapid Transit and enhanced Regional Public Transportation System (BRT - AMFRI) - 108 US$ million (43 US$ IBRD loan and 23 US$ million counterpart financing; 42 US$ Private Capital Mobilization). The component consists of (i) a new integrated BRT and feeder bus system along the 51 km round Central System connecting four municipalities (Balneario Camboriu, Camboriu, Itajai, and Navegantes) and including all necessary road infrastructure, exclusive bus lanes, terminals, stations and depots, complementary facilities, fare collection and other necessary systems, as well as consultancies to ensure proper design, supervision, and operations; (ii)  the infrastructure for a circulator bus system connecting to the BRT and connecting those low-income areas with the Beach; (iii) mixed-traffic e-bus corridors connecting additional municipalities in the Region (including the North and South Corridors) that may include bus stops and bays, bus priority measures, and other road improvements; and (iv) an approximate 70 km network of bikeways, bike paths, and pedestrian facilities to complement the BRT system and connect the municipalities in the Region. Component 2 – Technical Assistance for the Immersed River Tunnel between Itajai and Navegantes - 8 US$ million.  This component consists of technical assistance and consultancies necessary to design a proposed Immersed Tunnel under the Itajai-Açu River (the implementation of which is beyond the scope of the proposed project). This component may include the following consultancies: (i) demand studies and the Origin-Destination Study of the Metropolitan Region to support the design and operations of the tunnel and future phases of the BRT; (ii) studies for the structuring of the tunnel concession as PPP (construction and operation); and (iii) the elaboration of basic engineering designs, geotechnical studies, risk matrices (including traffic risks), and the environmental and social feasibilities studies for the tunnel. ;Component 3 – Active Mobility Corridors and Safe and Accessible School Routes connecting low-income neighborhoods to the Beach Area in Balneario Camboriu - US$38 million (U$35 million is Bank financing and US$3 million counterpart financing). This component consists of the design, implementation, and supervision of improved active mobility corridors (for cyclists and pedestrians) to connect economically depressed and vulnerable areas (including low-income neighborhoods of Bairro das Naçoes, Nova Esperança, Vila Real, Bairro dos Municipios and São Judas) to the Central Waterfront and Beach Areas. This component will complete streets, pedestrian and cyclists corridors, as well as bridges and underpasses below the BR 101, along with safe and accessible school routes, connecting low-income areas of Balneario Camboriu and Camboriu municipalities to areas with greater access to jobs, services, leisure, and other opportunities. The component will support transforming road space for cars into pedestrian-only streets, safe road crossings, and new public spaces for children, the elderly, people with disabilities, and the general population. The component will include shared electric micro-mobility services (bicycles) with spaces built along the active mobility corridors and a focus on providing mobility solutions for the low-income population.  The component will also improve the climate resilience of the area with climate-informed drainage works and nature-based solutions along the urbanized streets. Component 4 – Support for Institutional Strengthening and Project Management - 8 US$million IBRD financing. The component will include consultancies and technical assistance activities for promoting inclusive development, sustainability, resilience, and safety in the Region, as well as support for project management through the recently established Project Implementation Unit (PIU, also known as Unidade Coordenadora do Projeto - UCP).  The proposed activities include studies and technical assistance such as: (i) consultancies for designing and implementing transport PPPs and concessions, including the Mobility Fund, the BRT operation and definition of contractual clauses and incentives to promote gender informed activities by the Operator; (ii) a diagnostic and mapping of labor demand and supply needs in the region; analysis of barriers to employment opportunities; and implementation of technical capacity building and labor training programs for women, youth, long-term unemployed, people with disabilities, refugees/migrants and other minorities, and economically vulnerable populations to access the job market; (iii) a consultancy to enhance the Regional Sustainable Planning – considering: LVC mechanisms consistent with Brazilian legislation  in the Region Municipalities, policies and planning measures to promote inclusive and sustainable Regional economic development and land use plans including Transit Oriented Development (TOD) initiatives, and Regional policies and plans to reduce forest degradation and promote forest restoration in the area; and (iv) a consultancy for the development of demand management policies to discourage private vehicle use, including a low-emissions zone, smart traffic lights, and parking policies.  It will also support consultancies for project management support, including but not limited to managing a]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051751"><narrative>CIM - AMFRI (Foz do Rio Itajai Region Consortium of Municipalities)                                 </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0051746"><narrative>Consorcio Intermunicipal Multifinalitário - AMFRI - PCU                                                   </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-04-12"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-04-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Javier Morales Sarriera</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmoralessarriera@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rua Luiz Lopes Gonzaga, 1655, São Vicente, Itajai, Brazil

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rua Luiz Lopes Gonzaga, 1655, São Vicente, Itajai, Brazil, (47) 3404-8000, direx@cim-amfri.sc.gov.br
, https://www.amfri.org.br/contatos/index/detalhes-contato/codMapaItem/42288/codContato/1531
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="89" xml:lang="en"/><sector vocabulary="1" code="21012" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="91.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Transportation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="0" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000044" percentage="0" xml:lang="en"><narrative>Data Development and Capacity Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="0" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">2.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">833338.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">90000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">90000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">90000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51746"><narrative>Consorcio Intermunicipal Multifinalitário - AMFRI - PCU                                                   </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51746"><narrative>Consorcio Intermunicipal Multifinalitário - AMFRI - PCU                                                   </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178557"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178557?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178557"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project that were responded to within established deadline
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
It measures the percentage of grievances related to the Project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within thirty days.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="98,823.00">
<comment><narrative>
This indicator estimates the number of economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Structuring of the public notice for PPP of the Tunnel between Itajai and Navegantes
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the project supported the structuring of the public notice for the PPP/Concession for the road connection between the municipalities of Itajai and Navegantes through the tunnel immersed under the Itajai-Açu river.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average commercial speed of BRT along the Central Corridor and Circular Corridor (Km/h)
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="13 km/h"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="18 km/h">
<comment><narrative>
This indicator measures the improvement in the mobility of public transport users through the increase in the commercial speed of the central BRT system.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the Project that were responded to within established deadline
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a disaster risk management system integrated with the CCO
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible by the regional public transport system in the project's influence area within a 30 minutes one-way commute
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="33,185.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="68,046.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="33,185.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities with improved livability, sustainability, and/or management
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2030-12-31" />
<target value="11.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="98,823.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete streets implemented in Caminhos do Mar
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="25.55">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public transport preferred lane on the North, South and West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="237.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Structuring of public notices for the provision and operation of the electric bus fleet on the Central, North, South, West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a disaster risk management system integrated with the CCO
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the mapping, monitoring, warning and response system for major weather events is implemented in an integrated manner with the Region's Transport Operational Control Center.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2031-11-01" />
<target value="0.592">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bike lanes implemented along the Central BRT Corridor and Circular BRT
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
This indicator measures the length (km) of bike lanes implemented in the region.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Safe and accessible school routes
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="2.17">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions (ton of CO2eq) from regional public transport system
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6,113,749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5,284,416.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Drainage improvements implemented along the Central BRT Corridor
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="37.63">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="400.00">
<comment><narrative>
This indicator measures the number disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mapping of sexual harassment complaints on public transport
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Cities with improved livability, sustainability, and/or management
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2030-12-31" />
<target value="11.00">
<comment><narrative>
The number of cities that will improve the quality of transport
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Structuring of the public notice for PPP of the Tunnel between Itajai and Navegantes
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2031-11-01" />
<target value="0.592">
<comment><narrative>
Population of Region that will benefit from the activities financed by the Project
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public transport preferred lane on the North, South and West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="237.00">
<comment><narrative>
This indicator measures the length (km) of preferred public transport lanes (vertical and horizontal signage) along the North, South and West Corridors.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Safe and accessible school routes
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="2.17">
<comment><narrative>
This indicator measures extension of safe and accessible school route projects implemented around the project area.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Drainage improvements implemented along the Central BRT Corridor
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="37.63">
<comment><narrative>
This indicator measures the extension (km) of drainage infrastructure implemented in the STCR central system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions (ton of CO2eq) from regional public transport system
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6,113,749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5,284,416.00">
<comment><narrative>
This indicator measures the reduction of GHG emissions (ton CO2eq) from the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors). The baseline reflects the estimated gross emissions for 2022 and the project measures the estimated emissions for the electric BRT, considering the modal shift from private vehicles.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Exclusive BRT corridor with implemented rigid pavement
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="51.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time reduction by mode and gender, covering the BRT and the active mobility components
</narrative></title>
<baseline year="2024" iso-date="2024-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-31" />
<period-end iso-date="2031-06-30" />
<target value="0.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible by the regional public transport system in the project's influence area within a 30 minutes one-way commute
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="33,185.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="68,046.00">
<comment><narrative>
This indicator measures the number of formal job opportunities accessible by the regional intercity public transport system (BRT system, as well as North, South, and West Corridors) within a 30-minute commute from the project's area of influence, per system (central, south, north, west). The baseline takes into account the jobs accessible within the existing intercity services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained on driving and who receive commercial licenses
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2029-01-31" />
<target value="25.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6113749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5284416.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries with enhanced access to urban transport services as a result of Project interventions, segregated by BRT and Caminhos do Mar
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="172,560.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Structuring of public notices for the provision and operation of the electric bus fleet on the Central, North, South, West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
This indicator measures whether the project supported the structuring of public notices for the provision and operation of BRT electric buses.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="98,823.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="98,823.00">
<comment><narrative>
This indicator estimates the number of economically vulnerable beneficiaries with enhanced access to jobs and services in the project's area of influence, disaggregated by income and gender.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Change in the number of victims (injuries or fatalities) in the selected targeted project areas
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="1,220.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="915.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Change in the number of victims (injuries or fatalities) in the selected targeted project areas
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="1,220.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="915.00">
<comment><narrative>
This indicator measures the estimated reduction in the number of victims of road accidents (injuries and deaths) in the BRT (Central Corridor and Circular Corridor) and Caminhos do Mar project area. The baseline is a 3-year average (2019 - 2022) of the fatalities and injuries that happened during that time interval.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible by the regional public transport system in the project's influence area within a 30 minutes one-way commute
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="33,185.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="68,046.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="33,185.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Job opportunities accessible by the regional public transport system in the project's influence area within a 30 minutes one-way commute
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="33,185.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="68,046.00">
<comment><narrative>
This indicator measures the number of formal job opportunities accessible by the regional intercity public transport system (BRT system, as well as North, South, and West Corridors) within a 30-minute commute from the project's area of influence, per system (central, south, north, west). The baseline takes into account the jobs accessible within the existing intercity services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
This indicator measures the percentage of beneficiaries satisfied with the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors), including coverage, reliability, comfort, road safety, personal safety, differentiated by income and gender. The baseline reflects satisfaction of the existing intercity public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
This indicator measures the percentage of beneficiaries satisfied with the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors), including coverage, reliability, comfort, road safety, personal safety, differentiated by income and gender. The baseline reflects satisfaction of the existing intercity public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions (ton of CO2eq) from regional public transport system
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6,113,749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5,284,416.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions (ton of CO2eq) from regional public transport system
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6,113,749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5,284,416.00">
<comment><narrative>
This indicator measures the reduction of GHG emissions (ton CO2eq) from the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors). The baseline reflects the estimated gross emissions for 2022 and the project measures the estimated emissions for the electric BRT, considering the modal shift from private vehicles.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained on driving and who receive commercial licenses
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2029-01-31" />
<target value="25.00">
<comment><narrative>
This indicator will measure the reduction in the gender gap in employment in the transport sector, measured as the number of women trained in driving and who receive commercial licenses. The number of women in the targets considers the low unemployment figures in the Region.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average commercial speed of BRT along the Central Corridor and Circular Corridor (Km/h)
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="13 km/h"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="18 km/h">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved mapping of sexual harassment complaints on public transport
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="Yes">
<comment><narrative>
Implementation of a channel for reporting sexual harassment on public transport (received and responded to, recorded by the channel for complaints implemented by the project).
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Disadvantaged and vulnerable people who attended and completed job skills and entrepreneurship development training delivered by the Project
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="400.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
This indicator measures the percentage of beneficiaries satisfied with the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors), including coverage, reliability, comfort, road safety, personal safety, differentiated by income and gender. The baseline reflects satisfaction of the existing intercity public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete streets implemented in Caminhos do Mar
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="25.55">
<comment><narrative>
This indicator measures the length (km) of complete streets implemented in Caminho do Mar, including improvements and extensions of sidewalks, traffic calming measures, shared streets.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Change in the number of victims (injuries or fatalities) in the selected targeted project areas
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="1,220.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="915.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Travel time reduction by mode and gender, covering the BRT and the active mobility components
</narrative></title>
<baseline year="2024" iso-date="2024-03-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-31" />
<period-end iso-date="2031-06-30" />
<target value="0.00">
<comment><narrative>
Today, users of available inter-municipal public transport are 70 percent women, and their travel time on inter-municipal trips is larger than men that use mostly cars or motorbikes, therefore there is a gender gap in that inter-municipal travel time which will be measured during the first months of project implementation. The BRT will make those trips more efficient in travel time, reducing the gap between men and women. In addition, active mobility interventions can support more women taking bikes - almost half of the bike users in the Region are women - and reduce their travel time as today they walk. Those will be the travel time reductions that the project will seek and the baseline and target for this reduction of travel time by mode and gender will be counted as the gender gap main indicator.*The baseline and Target will be defined during project preparation.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Road Safety Assessments considered in final designs of the BRT and Caminhos do Mar
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
This indicator measures the percentage of road safety improvement recommendations adopted in the STCR and Caminhos do Mar executive project.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bike lanes implemented along the Central BRT Corridor and Circular BRT
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Change in the number of victims (injuries or fatalities) in the selected targeted project areas
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="1,220.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="915.00">
<comment><narrative>
This indicator measures the estimated reduction in the number of victims of road accidents (injuries and deaths) in the BRT (Central Corridor and Circular Corridor) and Caminhos do Mar project area. The baseline is a 3-year average (2019 - 2022) of the fatalities and injuries that happened during that time interval.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Road Safety Assessments considered in final designs of the BRT and Caminhos do Mar
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2028-12-29" />
<target value="70.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Exclusive BRT corridor with implemented rigid pavement
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="51.00">
<comment><narrative>
This indicator measures the length (km) of exclusive BRT corridor with implemented rigid pavement in the Central BRT Corridor  and Circular BRT.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the quality of the regional public transport system's service, disaggregated by income and gender
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="60.00">
<comment><narrative>
This indicator measures the percentage of beneficiaries satisfied with the regional public transport (Central and Circular Corridors [BRT system], as well as North, South, and West Corridors), including coverage, reliability, comfort, road safety, personal safety, differentiated by income and gender. The baseline reflects satisfaction of the existing intercity public transport.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
BRT stations and bus stops built along the Central, North, South, West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="211.00">
<comment><narrative>
This indicator measures the number of BRT stations and bus stops built along the BRT (Central, North, South, West Corridors).
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct beneficiaries with enhanced access to urban transport services as a result of Project interventions, segregated by BRT and Caminhos do Mar
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="172,560.00">
<comment><narrative>
This indicator measures the number of people benefited by the works and operation of the BRT intercity public transport system (central, north, south, west systems) and the interventions of complete streets of Caminhos do Mar.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net greenhouse gas (GHG) emissions
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="6113749.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="5284416.00">
<comment><narrative>
Project net greenhouse gas (GHG) emissions are calculated as an annual average of the difference between project gross (absolute) emissions aggregated over the economic lifetime of the project and the emissions of a baseline (counterfactual) scenario aggregated over the same time horizon.  They are reported in metric tons of carbon dioxide equivalent per year.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
BRT stations and bus stops built along the Central, North, South, West Corridors
</narrative></title>
<baseline year="2024" iso-date="2024-02-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-01" />
<period-end iso-date="2028-12-29" />
<target value="211.00">
<comment><narrative>
Given that the project is not yet fully operational, monitoring of the indicators has not commenced.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178563</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>RECOVERING LEARNING LOSSES FROM COVID-19 PANDEMIC IN BRAZIL</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Operation is to support states and municipalities in the Borrower's North and Northeast Regions to: (i) recover from school dropouts and learning losses related to the COVID-19 pandemic, and (ii) strengthen education management in primary and lower secondary schools.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This operation aims to support local governments in the North and Northeast Brazil on the COVID-19 response in education. It has two components: (i) Component 1 (PforR) "Recovery" includes a set of programs designed by the Ministry of Education to recover school dropouts and learning losses caused by the pandemic; and (ii) Component 2 (IPF) "Resilience and Capacity Building" which strengthens the local management capacity of governments to cope with the ongoing pandemic and future natural disasters and crises. Component 2 is composed by highly specialized consultancies, the provision of decentralized teams to support local governments, the development of Ecosystems and EMIS, infrastructure for internet connectivity and devices.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051766"><narrative>THE FEDERATIVE REPUBLIC OF BRAZIL</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051766"><narrative>THE FEDERATIVE REPUBLIC OF BRAZIL</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-26000"><narrative>MINISTRY OF EDUCATION</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-05-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-05-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ildo Jose Lautharte Junior</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ilautharte@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="57" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="42" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="45.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="8" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="16" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="90" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="12" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="80" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000626" percentage="90" xml:lang="en"><narrative>Pandemic Response</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="34" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="16" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="10" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000661" percentage="8" xml:lang="en"><narrative>Skills Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="8" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="16" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="30" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="34" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="30" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="60" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="16" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="16" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="28" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="8" xml:lang="en"><narrative>Adaptation</narrative></sector><humanitarian-scope type="1" vocabulary="1-2" code="EP-2020-000012-001"> </humanitarian-scope><humanitarian-scope type="2" vocabulary="2-1" code="HCOVD20"> </humanitarian-scope><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">24250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">24250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">4087500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">4837500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">4004166.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">4004166.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3862500.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">250000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">250000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51765"><narrative>MINISTRY OF EDUCATION</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-250000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51765"><narrative>MINISTRY OF EDUCATION</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51765"><narrative>MINISTRY OF EDUCATION</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178563"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178563?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178563"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2.3 Number of students supported with better education.
</narrative></title>
<baseline year="2023" iso-date="2023-03-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-15" />
<period-end iso-date="2027-12-30" />
<target value="3,000,000.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1. Percentage of illiterate students from municipal and state public schools in the second grade of primary education.
</narrative></title>
<baseline year="2021" iso-date="2021-11-25" value="56.40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-25" />
<period-end iso-date="2028-12-29" />
<target value="35.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="56.40">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2. Percentage of students from municipal and state public schools enrolled in full-time schooling in early childhood, primary, and lower secondary education.
</narrative></title>
<baseline year="2022" iso-date="2022-11-23" value="18.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-23" />
<period-end iso-date="2028-11-22" />
<target value="25.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="18.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 3. Percentage of students in 9th grade with low proficiency in mathematics.
</narrative></title>
<baseline year="2021" iso-date="2021-11-24" value="TBD."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-24" />
<period-end iso-date="2028-11-29" />
<target value="Twelve and a half percentage points decrease from baseline value.">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="TBD.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 2.2 Publication of an implementation guide for Full-Time Education in primary and secondary schools.
</narrative></title>
<baseline year="2023" iso-date="2023-11-30" value="Not Published."><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-30" />
<period-end iso-date="2026-11-12" />
<target value="Report published.">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3.1 Number of learning recovery policies published.
</narrative></title>
<baseline year="2023" iso-date="2023-11-29" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-29" />
<period-end iso-date="2026-11-25" />
<target value="15.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3.3. Number of subnational governments adhering to the policy Escola das Adolescências.
</narrative></title>
<baseline year="2023" iso-date="2023-11-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-30" />
<period-end iso-date="2026-11-26" />
<target value="2,000.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.1. Registered Pedagogical Materials to Support Teachers
</narrative></title>
<baseline year="2023" iso-date="2023-06-13" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-13" />
<period-end iso-date="2028-11-21" />
<target value="25.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
PDO 4. Percentage of students in 9th grade with low proficiency in Portuguese.
</narrative></title>
<baseline year="2021" iso-date="2021-11-24" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-11-24" />
<period-end iso-date="2028-11-29" />
<target value="Fifteen percentage points decrease from baseline value.">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1.2. Establishing the National Network of Coordinators for Management and Training of the National Commitment of Early Literacy.
</narrative></title>
<baseline year="2023" iso-date="2023-03-20" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-03-20" />
<period-end iso-date="2028-11-30" />
<target value="Yes">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.3. States with an Action Plan relating to the CNCA agreed with the Borrower that have utilized &amp;gt;50% of the federal resources for the purpose of  purchasing and delivering pedagogical materials.
</narrative></title>
<baseline year="2023" iso-date="2023-06-06" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-06" />
<period-end iso-date="2028-11-30" />
<target value="20.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3.2. Number of registered materials focused on learning recovery.
</narrative></title>
<baseline year="2024" iso-date="2024-02-21" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-02-21" />
<period-end iso-date="2026-11-27" />
<target value="15.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 2.1. Publishing of the Efficient and Equitable Management of Full-Time enrollments manual by MEC.
</narrative></title>
<baseline year="2023" iso-date="2023-11-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-30" />
<period-end iso-date="2026-11-10" />
<target value="Yes">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="No.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Teachers recruited or trained
</narrative></title>
<baseline year="2024" iso-date="2024-03-20" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-20" />
<period-end iso-date="2028-11-29" />
<target value="700.00">
<comment><narrative>
Target not measured, project not effective.
</narrative></comment>
</target>
<actual value="700.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178567</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Piaui Health and Social Protection Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen health surveillance, social protection, and employment service delivery systems to benefit the state's vulnerable population.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Piaui Health and Social Protection Development Project is to strengthen health surveillance, social protection, and employment service delivery systems to benefit the Borrower's vulnerable population. There are four components to the project, the first component being strengthening health surveillance systems and capacities. This component aims to strengthen the state health surveillance systems and capacities by improving their structures and introducing coordination and management mechanisms for service provision, focused on priority populations and regions of the state with weaker services. The second component is the strengthening social protection systems and capacities. This component aims to improve the state social protection and employment service delivery systems and capacities by strengthening benefits of social assistance for those in immediate need, structuring services to promote economic opportunities, and improving the state's ability to play a more effective role in overseeing and supporting the social protection and labor activities in the state, especially to respond more effectively to economic, social, and climate-related shocks. The third component is the strengthening food and nutrition surveillance and food security response. This component responds to the growing challenge, including due to climate impacts, of food insecurity in Piaui, requiring a coordinated approach. Finally, the fourth component is the project management. This component aims to strengthen the capacity of state agencies and provide overall implementation support to the Project Coordination Unit (Unidade de Coordenação do Projeto, PCU) and Project Implementation Unit (Unidades de Implementação do Projeto, PIU) in technical, environmental, social, fiduciary, supervision, monitoring and evaluation (M&amp;E), and communications-related areas, including training and operating costs.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00004255"><narrative>State of Piaui</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0051778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-10-05"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-10-05"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Daniela Pena De Lima</narrative></person-name><telephone>+1-202-473-1000</telephone><email>dpena@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="74020" percentage="83" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="6" xml:lang="en"/><sector vocabulary="1" code="12240" percentage="4" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="4" xml:lang="en"/><sector vocabulary="1" code="16020" percentage="3" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="0" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="32.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="59.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="41" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="13" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="64" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="41" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="13" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="64" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="64" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000671" percentage="13" xml:lang="en"><narrative>Nutrition</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="64" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="68" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="45" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="13" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="10" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="45" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="13" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="64" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="100" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="13" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="13" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="68" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="100" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="9" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">111110.11</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">111119.12</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">208333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">208333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">533333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">533333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">783333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">783333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1041666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1041666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1266666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1266666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">42225000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">42225000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">3150000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">3500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-82632</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-96265</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-253284</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51778"><narrative>State Secretariat of Planning (SEPLAN)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51779"><narrative>State Secretariat of Health (SESAPI)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-51780"><narrative>State Secretariat of Social Assistance, Labor and Human Rights (SASC)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178567"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178567?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178567"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.6) Social Assistance and Health professionals with knowledge about GBV and case management
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
The indicator measures the percentage of social assistance and health professionals (state and municipal level) with knowledge about gender-based violence and case management. Progress will be assessed monthly despite targets being set on annual, non-cumulative basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Individuals referred to job vacancies by SINE's labor intermediation service
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,464.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="4,184.00">
<comment><narrative>
The indicator measures the number of potential employees that were matched to a vacancy and referred to it. The indicator comprehensively measures the quality of the service offered by SINE as it is determined by the state's effort to capture vacancies for the labor intermediation system, the attractiveness of the service offered by SINE to potential workers, and the ability of SINE to establish a match between workers and the vacancies offered. Progress will be assessed monthly despite targets being set on a non-cumulative annual basis. Baseline is dated December 2022.
</narrative></comment>
</target>
<actual value="5,286.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Families assisted by the state's cash transfer program
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,698.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="24,500.00">
<comment><narrative>
No families were yet benefited in the Program given a political decision to start payments of the new cash transfer program in 2025.
</narrative></comment>
</target>
<actual value="8,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving inpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5,840,790">

</target>
<actual value="1,069,690">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.1) Deaths among women of reproductive age investigated
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="72.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="87.00">

</target>
<actual value="77.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) SASC and SETRE's buildings refurbished
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5.00">
<comment><narrative>
The indicator measures the progress in the renovation of SASC and SETRE buildings, including SINE offices (adaptation and refurbishment of the physical infrastructure, electrical and IT networks). Progress will be assessed every 6 months despite targets being set on a cumulative-annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1) Families at risk of food insecurity identified and referred to social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="25,300.00">
<comment><narrative>
The lack of progress under Component 3, which addresses food insecurity, reveals a foreseeable and systemic obstacle: weak coordination between health and social assistance. Although the sectors are working to correct reporting failures, the core problem remains in operationalizing the workflow, where health units struggle to ensure that children identified as underweight are actually integrated into and followed by the social assistance network.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.4) Water sample collection reports with satisfactory results carried out in health facilities and commercial buildings under State Sanitary Surveillance Agency regulation
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="80.00">
<comment><narrative>
The indicator shows structural progress from 0% (2022) to 38% (Nov/2025), consolidating a previously non-existent program; it is still 12 percentage points below the 50% 2025 year-end target, indicating a pace of expansion and/or quality assurance below what is needed.
</narrative></comment>
</target>
<actual value="38">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.6) Hospitals with intensive care unit (ICU) beds rated as being in &quot;high compliance&quot; with the National Patient Safety Practices Assessment parameters
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="40.00">
<comment><narrative>
Measures the compliance of tertiary hospitals with quality standards on the basis of the National Patient Safety Practices, establishing, inter alia, operational processes designed to minimize the likelihood of errors and maximize the detection of errors when or before they occur. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.4) SASC and SUAS professionals trained in management courses
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1,429.00">
<comment><narrative>
The indicator measures the number of SASC and SUAS network employees trained in management courses. Progress will be assessed monthly despite targets being set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of cash-based interventions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="73,500">
<comment><narrative>
not available yet
</narrative></comment>
</target>
<actual value="8500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1) Families at risk of food insecurity identified and referred to social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="25,300.00">
<comment><narrative>
The indicator measures the number of families that are identified through the health system using Screening for Food Insecurity tool (TRIA) as being at risk of food insecurity, and who are referred to social assistance programs, projects, services and benefits.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Families assisted by the state's cash transfer program
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,698.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="24,500.00">
<comment><narrative>
No families were yet benefited in the Program given a political decision to start payments of the new cash transfer program in 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5) Trained citizens who consider that the training received is useful for their economic inclusion
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
Citizen Engagement indicator. The indicator measures the satisfaction with the training received by individuals that participate in qualification courses for economic inclusion offered to vulnerable populations in the scope of the state's Economic  Inclusion Network. Progress will be assessed monthly despite targets being set on annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.4) SASC and SUAS professionals trained in management courses
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="1,429.00">
<comment><narrative>
The indicator measures the number of SASC and SUAS network employees trained in management courses. Progress will be assessed monthly despite targets being set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="1,247">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.6) Hospitals with intensive care unit (ICU) beds rated as being in &quot;high compliance&quot; with the National Patient Safety Practices Assessment parameters
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="24.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="40.00">
<comment><narrative>
The indicator shows a partial result of 33% (Nov/2025), above the 28% 2025 year-end target and 9 percentage points higher than the 2022 baseline of 24%, indicating consistent implementation of safety practices in a growing share of ICUs.
</narrative></comment>
</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.4) Water sample collection reports with satisfactory results carried out in health facilities and commercial buildings under State Sanitary Surveillance Agency regulation
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="80.00">
<comment><narrative>
Measures the ability of the State Surveillance Agency to: collect and assess water samples in health facilities and commercial buildings; evaluate the health risks involved; and implement the appropriate control measures before and after any sampling is carried out. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="6.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3) IT equipment purchased, delivered and in operation in SASC
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="100">
<comment><narrative>
The indicator measures the amount of new IT equipment delivered and in operation at SASC, having as target the total estimated in the Project's procurement plan. Progress will be assessed monthly despite targets being set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Participants who successfully completed a qualification course
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="10,000.00">
<comment><narrative>
Regular courses offered by SASC. This first results have been financed by counterpart funding.
</narrative></comment>
</target>
<actual value="4675">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3) IT equipment purchased, delivered and in operation in SASC
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="100">
<comment><narrative>
The indicator measures the amount of new IT equipment delivered and in operation at SASC, having as target the total estimated in the Project's procurement plan. Progress will be assessed monthly despite targets being set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.7) Trained staff who consider that the training received is useful for improving their professional performance in health and social protection services
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
The evaluation/research process has not yet started. Therefore, no progress has been observed for this indicator. The indicator is fully aligned with the training, capacity-building, and requalification events for health surveillance network professionals that will be implemented starting in 2026.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Municipalities that report Work-related Injuries and Diseases (DART) in the National System of Disease Notification (SINAN).
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="27.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
The indicator measures the level of registration of work-related diseases and injuries at the municipal level. This is an important source of information for the design and implementation of the state's prevention programs and policies. Targets are set on a cumulative annual basis. Baseline is dated December 2022.
</narrative></comment>
</target>
<actual value="51">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.6) Social Assistance and Health professionals with knowledge about GBV and case management
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
The indicator measures the percentage of social assistance and health professionals (state and municipal level) with knowledge about gender-based violence and case management. Progress will be assessed monthly despite targets being set on annual, non-cumulative basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of cash-based interventions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="73,500">
<comment><narrative>
not available yet
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2) Diseases, disorders and public health events subject to mandatory reporting, notified within 24 hours and registered within seven days in the respective surveillance information system
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="49.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="90.00">
<comment><narrative>
Measures the capacity to rapidly report the occurrence of those diseases, disorders and public health events that are subject to mandatory notification. Provides a measurable indicator that allows decision makers to objectively estimate the size of a health problem, and monitor the processes, results and impact of an intervention on the affected population. It provides information to implement preventive programs/policies and support the decision-making process. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="66">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Population covered by health surveillance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="100.00">
<comment><narrative>
The indicator measures the decentralized coverage of state health surveillance services, with the objective of increasing the impact of timely surveillance actions to protect population health, through coordination of responsibilities of state and municipal managers, and the integrated implementation of surveillance actions in the territory. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.3) Diseases subject to mandatory and immediate notification (&quot;Doenças de Notificação Compulsória Imediata, DNCI) classified within 60 days after notification
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="75.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="85.00">
<comment><narrative>
Measures the ability of the state to investigate and classify those diseases that are subject to mandatory and immediate reporting (DNCI) within 60 days after being reported. The process defines whether all suspected cases are reported and included into the National System of Diseases Notification (SINAN) at the first moment of suspicion, and whether the required clinical, epidemiological, and laboratory investigations are concluded as a confirmed or discharged case in SINAN within a 60-day period after the notification. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="75.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5) Trained citizens who consider that the training received is useful for their economic inclusion
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
Citizen Engagement indicator. The indicator measures the satisfaction with the training received by individuals that participate in qualification courses for economic inclusion offered to vulnerable populations in the scope of the state's Economic  Inclusion Network. Progress will be assessed monthly despite targets being set on annual basis.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.1) Deaths among women of reproductive age investigated
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="72.70"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="87.00">
<comment><narrative>
The partial result of 73.54% is below the 2024 target of 75% and far from the 2025 year-end target of 78%. There is potential for improvement through two structural initiatives in Piaui: the creation of 22 Investigation Centers and the approval of the Maternal and Child Care Plan, which provide institutional foundations and direction to enhance surveillance of female mortality. However, turning this potential into results is hindered by weaknesses in initial reporting, difficulty accessing complete clinical information, and bottlenecks in closing cases (waiting for reports and conclusions).
</narrative></comment>
</target>
<actual value="77.54">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2) SASC and SETRE's buildings refurbished
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5.00">
<comment><narrative>
The indicator measures the progress in the renovation of SASC and SETRE buildings, including SINE offices (adaptation and refurbishment of the physical infrastructure, electrical and IT networks). Progress will be assessed every 6 months despite targets being set on a cumulative-annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.1) Participants who successfully completed a qualification course
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="10,000.00">
<comment><narrative>
Regular courses offered by SASC. This first results have been financed by counterpart funding.
</narrative></comment>
</target>
<actual value="880">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Underweight children in priority municipalities referred to receive social assistance services and benefits
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-11-30" />
<target value="95.00">
<comment><narrative>
The indicator measures the percentage of children under five years of age identified as underweight that are referred to receive social assistance and benefits. Monitoring weight-for-age as a basis for referrals to social assistance services can help both advance and assess the contribution of food security responses to growth promotion and reduction of child morbidity and mortality.  Low weight-for-age identifies the condition of being light or underweight for a specific age and reflects the process of gaining insufficient weight relative to age or losing weight. Insufficient weight gain can have short and long term impacts on child growth and development. Identification of underweight children must trigger immediate coordinated interventions to ensure household food security toavert impacts on the child's health and wellbeing. Since weight-for-age is influenced by both the height and weight of the child, the indicator reflects both past (chronic) and/or present (acute) undernutrition.  This indicator is also a measure of the health andsocial protection systems capacity to monitor and respond to health and nutritional risk in the population. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.5) Municipalities that report Work-related Injuries and Diseases (DART) in the National System of Disease Notification (SINAN).
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="27.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
This indicator shows exceptional performance at 61% (Nov/2025), 16 percentage points above the target (45%) and 33.8 percentage points above the 2022 baseline (27.2%), indicating broad dissemination of worker health surveillance and consolidation of the reporting network.
</narrative></comment>
</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving inpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2028-12-15" />
<target value="5,840,790">

</target>
<actual value="1,069,690">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2) Diseases, disorders and public health events subject to mandatory reporting, notified within 24 hours and registered within seven days in the respective surveillance information system
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="49.60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="90.00">
<comment><narrative>
The indicator is above the 75% 2025 year-end target. The partial result of 82.0% represents a 32.4 percentage point increase over the 2022 baseline (49.6%), showing optimized operational workflows and a stronger alert capacity in state surveillance. The challenges are shifting from expansion to consolidation and quality improvement.
</narrative></comment>
</target>
<actual value="82">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Population covered by health surveillance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="100.00">
<comment><narrative>
The current performance reflects that the Project has not yet expanded territorial coverage, which was expected for the year 2025 (keeping the target at at least 43%). This indicator measures the decentralized coverage of state health surveillance services, aimed at strengthening timely surveillance actions through coordinated responsibilities between state and municipal managers. Targets are set on a cumulative annual basis and increases are expected once territorial expansion activities begin.
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.3) Diseases subject to mandatory and immediate notification (&quot;Doenças de Notificação Compulsória Imediata, DNCI) classified within 60 days after notification
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="75.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="85.00">
<comment><narrative>
The result of 59.9% reflects a 15.4 percentage point drop compared to the 2022 baseline (75.3%) and is well below the 80% annual targets for 2024 and 2025. Performance indicates a critical breakdown in the analysis and conclusion flow for urgent cases, with bottlenecks after notification. Main obstacles include unprioritized investigation and laboratory confirmation, team overload, and delays at reference laboratories.
</narrative></comment>
</target>
<actual value="59.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Underweight children in priority municipalities referred to receive social assistance services and benefits
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-11-30" />
<target value="95.00">
<comment><narrative>
The result for this indicator has not yet been measured. The government began designing the referral protocol for children from the health sector to social assistance services and tested a pilot of the methodology in the municipality of Piripiri.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Individuals referred to job vacancies by SINE's labor intermediation service
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,464.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="4,184.00">
<comment><narrative>
The indicator measures the number of potential employees that were matched to a vacancy and referred to it. The indicator comprehensively measures the quality of the service offered by SINE as it is determined by the state's effort to capture vacancies for the labor intermediation system, the attractiveness of the service offered by SINE to potential workers, and the ability of SINE to establish a match between workers and the vacancies offered. Progress will be assessed monthly despite targets being set on a non-cumulative annual basis.
</narrative></comment>
</target>
<actual value="3,918">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.7) Trained staff who consider that the training received is useful for improving their professional performance in health and social protection services
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-31" />
<target value="70.00">
<comment><narrative>
Citizen Engagement indicator. Recognizing the importance of user's satisfaction and improved capacity of professionals to deliver their services. Satisfaction surveys will be included in the end of all trainings offered. The trainings offered to the state's staff will measure their satisfaction with the training courses, namely, their perception of the usefulness of the training for the improvement of their professional performance. The survey will include an open field where the staff can provide comments and suggestions that will help inform the design of the training program for future rounds. Comments received in the open field will be analyzed and those that require a response will be answered within a maximum period of 30 days from their receipt. Targets are set non- cumulative.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Underweight children in priority municipalities referred to receive social assistance services and benefits
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-11-30" />
<target value="95.00">
<comment><narrative>
The result for this indicator has not yet been measured. The government began designing the referral protocol for children from the health sector to social assistance services and tested a pilot of the methodology in the municipality of Piripiri.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Underweight children in priority municipalities referred to receive social assistance services and benefits
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-11-30" />
<target value="95.00">
<comment><narrative>
The indicator measures the percentage of children under five years of age identified as underweight that are referred to receive social assistance and benefits. Monitoring weight-for-age as a basis for referrals to social assistance services can help both advance and assess the contribution of food security responses to growth promotion and reduction of child morbidity and mortality.  Low weight-for-age identifies the condition of being light or underweight for a specific age and reflects the process of gaining insufficient weight relative to age or losing weight. Insufficient weight gain can have short and long term impacts on child growth and development. Identification of underweight children must trigger immediate coordinated interventions to ensure household food security toavert impacts on the child's health and wellbeing. Since weight-for-age is influenced by both the height and weight of the child, the indicator reflects both past (chronic) and/or present (acute) undernutrition.  This indicator is also a measure of the health andsocial protection systems capacity to monitor and respond to health and nutritional risk in the population. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Individuals referred to job vacancies by SINE's labor intermediation service
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,464.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="4,184.00">
<comment><narrative>
The indicator measures the number of potential employees that were matched to a vacancy and referred to it. The indicator comprehensively measures the quality of the service offered by SINE as it is determined by the state's effort to capture vacancies for the labor intermediation system, the attractiveness of the service offered by SINE to potential workers, and the ability of SINE to establish a match between workers and the vacancies offered. Progress will be assessed monthly despite targets being set on a non-cumulative annual basis.
</narrative></comment>
</target>
<actual value="3,918">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 3: Individuals referred to job vacancies by SINE's labor intermediation service
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,464.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="4,184.00">
<comment><narrative>
The indicator measures the number of potential employees that were matched to a vacancy and referred to it. The indicator comprehensively measures the quality of the service offered by SINE as it is determined by the state's effort to capture vacancies for the labor intermediation system, the attractiveness of the service offered by SINE to potential workers, and the ability of SINE to establish a match between workers and the vacancies offered. Progress will be assessed monthly despite targets being set on a non-cumulative annual basis. Baseline is dated December 2022.
</narrative></comment>
</target>
<actual value="5,286.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Families assisted by the state's cash transfer program
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,698.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="24,500.00">
<comment><narrative>
No families were yet benefited in the Program given a political decision to start payments of the new cash transfer program in 2025.
</narrative></comment>
</target>
<actual value="8,500">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Families assisted by the state's cash transfer program
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="2,698.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="24,500.00">
<comment><narrative>
No families were yet benefited in the Program given a political decision to start payments of the new cash transfer program in 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Population covered by health surveillance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="100.00">
<comment><narrative>
The current performance reflects that the Project has not yet expanded territorial coverage, which was expected for the year 2025 (keeping the target at at least 43%). This indicator measures the decentralized coverage of state health surveillance services, aimed at strengthening timely surveillance actions through coordinated responsibilities between state and municipal managers. Targets are set on a cumulative annual basis and increases are expected once territorial expansion activities begin.
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Population covered by health surveillance services
</narrative></title>
<baseline year="2022" iso-date="2022-12-30" value="43.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-30" />
<period-end iso-date="2028-12-30" />
<target value="100.00">
<comment><narrative>
The indicator measures the decentralized coverage of state health surveillance services, with the objective of increasing the impact of timely surveillance actions to protect population health, through coordination of responsibilities of state and municipal managers, and the integrated implementation of surveillance actions in the territory. Targets are set on a cumulative annual basis.
</narrative></comment>
</target>
<actual value="43">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178663</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Piaui: Public Sector Management Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Piaui.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Progestão Piaui is the fifth operation in a Series of Projects (SoP) under the Program designed to assist the Brazilian States to implement reforms to improve efficiency in public resource management. The objective of the Progestão Program, as stated in the Memorandum of Understanding between the National Secretariat of Treasury (Secretaria do Tesouro Nacional, STN) and the World Bank, is to develop the fiscal budget and asset management of the Brazilian governments through actions that aim at reducing and rationalizing public spending with long-term results to contribute to the fiscal sustainability of subnational entities. The Piaui Progestão project addresses five whole-of-government functions (human resource management, pensions, public investment management, asset management, and procurement) and three strategic sectors (health, education, and social assistance). These focus areas were selected applying the Progestão Program selectivity criteria: strategic alignment, implementation capacity, impact on beneficiaries, and alignment with World Bank corporate commitments.The Project will support investments mainly in management information systems and reforms for whole-of-government functions and in strategic sectors in the State of Piaui. The project scope and structure are aligned with the Progestão Program. Specific interventions in sectors were selected after consultation with government officials and based on their contributions to improvements in efficiency and implementation readiness. The project will support management systems in health, education, and social assistance management. The project will have three components.Component 1. Whole-of-Government Management Systems (US$36.8 million)Sub-Component 1.1: Human Resource Management. Activities include: (i) strategic workforce right-sizing of all State Secretariats and subsidiaries; ((i) strategic workforce right-sizing of selected agencies and departments; (ii) design and implementation of workforce  right-sizing platform integrated with the human resources management system to identify core competencies of public officials and organizations adequate hiring needs; (iii) implementation of a personnel management dashboard, including dynamic distribution of the workforce, replacement alarms and automated reallocation documentation; (iv) development and implementation of a management analytics and artificial intelligence system for automated payroll audit to reduce errors and fraud; (v) automation of human resources management services and other processes identified through the strategic workforce planning; (vi) periodic staff surveys to assess reform implementation and support change management; (vii) communications and capacity building to support the rollout and implementation of new tools; and (viii) procurement of energy-efficient hardware to support the rollout and implementation of new tools.Sub-Component 1.2: Pensions. Activities include (i) design and implementation of pension management system functionalities t  hat support auditing the pensions payroll and unifying management of benefit concession for all branches of government based on remuneration history and verification of actual contribution payments, including improvements in users‘ interface and access to services through the digital platform; (ii) expansion and update of the pension record management information system to increase efficiency and enable operational, actuarial, and financial analyses to reduce costs and allow for better long term financial planning; (iii) procurement of energy-efficient hardware to support the implementation of these systems; and (iv) capacity building to support the deployment and implementation of new tools.Sub-Component 1.3: Public Procurement. Activities include: (i) development of a sustainable procurement strategy, which addresses environmental, climate and gender equality considerations as relevant, and an implementation plan to help embed sustainable procurement across the State's purchases; (ii) development and implementation of an integrated system for sustainable e-procurement, including the redesign and automation of key processes, and reviewing the regulatory framework and institutional arrangements to increase transparency; (iii) design and implementation of integrated dashboards with reliable data aligned to sustainability and gender equity practices; (iv) application of artificial intelligence using electronic invoices to identify and reduce fraud and corrupt practices; (v) design and implementation strategic sourcing methodology to help identify demand for goods and services across the government; (vi) capacity building program for officials working in procurement across the state; and (vi) procurement of energy-efficient hardware to support the deployment of these systems.Sub-Component 1.4: Public Investment Management and Budgeting. Activities include: (i) development and implementation of a public project management information system for State's investments, integrating  project preparation, screening and appraisal; (ii) preparation of a portfolio of technically appraised, implementation ready projects; (ii) preparation of a portfolio of technically appraised, implementation ready projects; (iii) design and implementation of a governance strategy to manage the project portfolio execution; (iv) design and implementation of sustainable budgeting systems and practices; (v) development and implementation of a management system for the transfer of resources from the State of Piaui to municipalities and organizations, allowing for digital monitoring of project preparation, implementation and accounting; (vii) capacity building for state and municipal government officials on sustainable public investment and expenditure management practices, to support the rollout and implementation of new tools; and (vii) periodic staff surveys to assess reform implementation and support change management.Sub-Component 1.5: Asset Management. Activities include (i) technical support to assess up-to-date information of real estate properties, including geospatial data, area, occupation rate, valuations and registry's status; (ii) development and implementation of modules in the public asset management system that includes a climate risk assessment of real estate assets, strategy panels and information for decision making and fleet management; (iii) energy audits based on CCB methodology for selected government properties, focused on reducing energy consumption; (iv) development and implementation of a system for mapping costs of information and communication technologies (ICTs), including identification of synergies between government-to-government systems, interoperability, and a governance strategy for new acquisitions and maintenance; and (v) capacity building on asset management practices and support the rollout and implementation of new tools.Component 2. Management Systems in Strategic Sectors (US$16 million)Sub-Component 2.1: Health. Activities include (i) development of an expenditure review to identify cost structure and assess budgeting practices in the state's hospitals; (ii) implementation of an information system to support budgeting and expenditure management in the state's health units; (iii) introduction of communication and capacity-building activities to support the rollout and implementation of new tools; and (iv) procurement of energy efficient hardware to support the rollout and implementation of new tools.  Sub-Component 2.2: Education. Activities include (i) development and implementation of IT systems to improve management of transferred resources from the federal government, student enrollment and classroom formation, document monitoring, and other transactional tools of the Secretariat; (ii) design and implementation of a student's transport system; (iii) design and implementation of a school's meals system and (iii) capacity building to support the rollout and implemen]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0051895"><narrative>State of Piaui</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0051894"><narrative>Secretariat of Finance of Piaui</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-07-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-10-03"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rovane Battaglin Schwengber</narrative></person-name><telephone>+1-202-473-1000</telephone><email>rschwengber@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003392213" />
            <name><narrative>Piaui</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-7.25 -42.33333</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15125" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="18" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="17" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="11" xml:lang="en"/><sector vocabulary="1" code="16012" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="16.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="47.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="8" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="19" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="8" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="35" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="31" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="21" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="8" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="33" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="19" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="8" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="8" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="19" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="21" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="33" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="20" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="21" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="19" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="14" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="14" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="8" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="35" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="31" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="35" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="19" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="31" xml:lang="en"><narrative>ICT Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="19" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="8" xml:lang="en"><narrative>Rule of Law</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">250007.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">874999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">875011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">791665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">791677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">40816235.44</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-29"/>
<value currency="USD" value-date="2029-06-29">40816235.44</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">100000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">3110889</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">5847876</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-81880</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-103403</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-161950</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-226438</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-51894"><narrative>Secretariat of Finance of Piaui</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178663"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178663?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178663"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel
leaving active post due to retirement, resignation or death) in non-frontline service delivery
areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health,
education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to
the automation of processes in support areas and departments and to the review of career
structure and incentives in service delivery areas, indicating a reduction in the workforce in
support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="0.99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="70.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="85.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total
workforce.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools with a digital accounting process for the resources transferred for school meals management
</narrative></title>
<baseline year="2021" iso-date="2021-12-01" value="61"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-01" />
<period-end iso-date="2029-06-01" />
<target value="80">
<comment><narrative>
Percentage of school with a digital accounting process for the resources transferred for school meals management.
</narrative></comment>
</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate assets with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="65">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership and price evaluation as share of total number of state real estate properties listed in state database.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="70.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project investment cost overruns per year
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="17.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="8.00">
<comment><narrative>
It measures the average cost overruns (in US$ million) of the whole portfolio of investment projects: original planned vs executed at project in each year in the last 5 years.
</narrative></comment>
</target>
<actual value="17.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools with a digital accounting process for the resources transferred for school meals management
</narrative></title>
<baseline year="2021" iso-date="2021-12-01" value="61"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-01" />
<period-end iso-date="2029-06-01" />
<target value="80">
<comment><narrative>
Percentage of school with a digital accounting process for the resources transferred for school meals management.
</narrative></comment>
</target>
<actual value="61">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for the concession of pension and survivorship benefits
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="60.00">
<comment><narrative>
It measures the number of days between the application and the first benefit received by the applicant.
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State health units with management and costing system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the provision of health services.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
Share of goods and services bidding documents with price reference.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new methodology to public investment projects over a specific amount in BRL. This methodology must consist of a single-entry point for projects, project screening, appraisal and monitoring.  A review of all new projects will be carried out to determine compliance with the new methodology.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches of government using the unified pension management unit
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="3.00">
<comment><narrative>
It measures the number of branches using integrated management pension unit
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel
leaving active post due to retirement, resignation or death) in non-frontline service delivery
areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health,
education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to
the automation of processes in support areas and departments and to the review of career
structure and incentives in service delivery areas, indicating a reduction in the workforce in
support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="0.99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented new functionalities for the Procurement Management Information System
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
It measures the implementation of all new procurement functionalities including fiscal invoice and strategic sourcing methodology.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches of government using the unified pension management unit
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="3.00">
<comment><narrative>
It measures the number of branches using integrated management pension unit
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to
provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project investment cost overruns per year
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="17.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="8.00">
<comment><narrative>
It measures the average cost overruns (in US$ million) of the whole portfolio of investment projects: original planned vs executed at project in each year in the last 5 years.
</narrative></comment>
</target>
<actual value="17.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
Share of goods and services bidding documents with price reference.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented new functionalities for the Procurement Management Information System
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
It measures the implementation of all new procurement functionalities including fiscal invoice and strategic sourcing methodology.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new methodology to public investment projects over a specific amount in BRL. This methodology must consist of a single-entry point for projects, project screening, appraisal and monitoring.  A review of all new projects will be carried out to determine compliance with the new methodology.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for the concession of pension and survivorship benefits
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="60.00">
<comment><narrative>
It measures the number of days between the application and the first benefit received by the applicant.
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Website with information on municipal transfers is operational and accessible to the public.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to
provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate assets with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="65">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership and price evaluation as share of total number of state real estate properties listed in state database.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
Website with information on municipal transfers is operational and accessible to the public.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State health units with management and costing system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
The indicator shows initial progress, reaching 13% against a target of 50%. The system has been implemented in 4 health units, reflecting early-stage adoption. Further progress is expected as implementation expands across the remaining eligible units.
</narrative></comment>
</target>
<actual value="13">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time for the concession of pension and survivorship benefits
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="60.00">
<comment><narrative>
The time required for the concession of pension and survivorship benefits remains above the target, reaching 323 days against a target of 60 days. This likely reflects the complexity of the process, which involves multiple stages of internal review and external validation, as well as the ongoing implementation of key modernization activities within PIAUiPREV. Several supporting initiatives, including process improvements and system enhancements, are still under preparation or implementation, which may be affecting processing times. As these measures advance, improvements in processing efficiency are expected.
</narrative></comment>
</target>
<actual value="323">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented new functionalities for the Procurement Management Information System
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
The implementation of new functionalities for the procurement management system remains under preparation. The consultancy for the design and development of the integrated procurement system has not yet started, and progress on the indicator is expected once implementation begins.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate assets with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="65">
<comment><narrative>
Progress has been limited as related activities remain in the procurement and contracting stage. The contract for cadastral update of 961 properties is in the final stages of signature.
</narrative></comment>
</target>
<actual value="3.67">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate assets with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="65">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership and price evaluation as share of total number of state real estate properties listed in state database.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public real estate assets with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="65">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership and price evaluation as share of total number of state real estate properties listed in state database.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches of government using the unified pension management unit
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="3.00">
<comment><narrative>
For the period January–December 2025, all direct management entities with the ENGLISH (Regime Próprio de Previdência Social- RPPS) have adopted the unified pension management system, including the State Public Prosecutor's Office, the State Court of Accounts, and the Legislative Assembly (AssemblEia Legislativa do Estado - ALEPI). The indicator has achieved its end-of-project target.
</narrative></comment>
</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches of government using the unified pension management unit
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="3.00">
<comment><narrative>
It measures the number of branches using integrated management pension unit
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches of government using the unified pension management unit
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="3.00">
<comment><narrative>
It measures the number of branches using integrated management pension unit
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="70.00">
<comment><narrative>
result remains at 0% against a 2025, though this result is being revised following information received from SASC recently that almost all  municipalities in Piaui state are using the digital co-financing accountability system (BB Ágil integrated with SASC Integração), replacing the previously manual process. This represents full coverage, significantly exceeding the 2025 target of 15% and approaching the final target of 70%. The team is working to validate the methodology and document the evidence to formally reflect this achievement in the Mid-Term Review.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
The ICT infrastructure inventory remains under preparation. The consultancy for conducting the inventory of software and hardware has not yet started, and progress on the indicator is expected once implementation begins.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated dashboard for municipal transfers with operational information and accessible to the public
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="Yes">
<comment><narrative>
The integrated municipal transfers dashboard is still at an early stage of preparation, with no progress recorded for this indicator to date. This reflects that the associated consultancy activity, aimed at restructuring transfer processes and developing the digital module (Conecta224), has not yet commenced despite being registered in STEP. As the procurement process advances and implementation begins, progress toward establishing an operational and publicly accessible dashboard is expected.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
The Public Investment Management (PIM) methodology is still at an early stage of implementation, which explains the lack of progress to date for this indicator. The project has focused on strengthening institutional capacities and advancing the preparatory steps for the operationalization of the PIM framework, including the ongoing consultancy process currently under shortlisting. As the PIM approach becomes fully implemented and institutionalized, progress in the preparation and selection of public investment projects under this methodology is expected..
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
This limited advancement is primarily linked to delays in the preparatory phase, as the key consultancy activity for the design of the integrated public procurement system remains under development, with the Terms of Reference still being finalized. As the system design progresses and implementation advances, increased adoption of the reference price system is expected in future reporting cycles.
</narrative></comment>
</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="85.00">
<comment><narrative>
This indicador has shown no progress to date, with results remaining at 0%. This is primarily due to delays in the implementation of foundational activities on which the indicator depends, particularly the contracting of consultancy services to develop the workforce dimensioning model (DFT), which is still under technical review in STEP. Additionally, the development of the workforce management system remains pending, as it is contingent on the completion of the first activity. As these preparatory steps advance, progress on the indicator is expected.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project investment cost overruns per year
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="17.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="8.00">
<comment><narrative>
Result maintained at baseline (17.1%) against a 2025 target of 15%. The calculation methodology is under review and will be reassessed during the Mid-Term Review. Continued efforts to strengthen planning, contract management, and execution monitoring will be important to further reduce cost overruns and achieve the target.
</narrative></comment>
</target>
<actual value="17.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project investment cost overruns per year
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="17.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="8.00">
<comment><narrative>
It measures the average cost overruns (in US$ million) of the whole portfolio of investment projects: original planned vs executed at project in each year in the last 5 years.
</narrative></comment>
</target>
<actual value="17.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Project investment cost overruns per year
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="17.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="8.00">
<comment><narrative>
It measures the average cost overruns (in US$ million) of the whole portfolio of investment projects: original planned vs executed at project in each year in the last 5 years.
</narrative></comment>
</target>
<actual value="17.1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
Result maintained at baseline while the team harmonizes the calculation formula. This includes defining a representative sample of procurement processes that excludes outliers, which have been distorting the overall results.
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to
provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="90.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to
provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="0.96">
<comment><narrative>
Result maintained at baseline while the team harmonizes the calculation formula to account for the structural imbalance between admissions (5,104) and separations (7,053) recorded during 2022–2025.
</narrative></comment>
</target>
<actual value="0.99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel
leaving active post due to retirement, resignation or death) in non-frontline service delivery
areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health,
education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to
the automation of processes in support areas and departments and to the review of career
structure and incentives in service delivery areas, indicating a reduction in the workforce in
support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="0.99">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel
leaving active post due to retirement, resignation or death) in non-frontline service delivery
areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health,
education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to
the automation of processes in support areas and departments and to the review of career
structure and incentives in service delivery areas, indicating a reduction in the workforce in
support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="0.99">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools with a digital accounting process for the resources transferred for school meals management
</narrative></title>
<baseline year="2021" iso-date="2021-12-01" value="61"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-01" />
<period-end iso-date="2029-06-01" />
<target value="80">
<comment><narrative>
The indicator has reached full implementation, with 100% of active schools (641 units) using the digital accouting system, Cheff Escolar. This reflects the complete adoption and operationalization of the digital accounting process across the state network.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2029-06-01" />
<target value="85.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total
workforce.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State health units with management and costing system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2029-06-01" />
<target value="50.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the provision of health services.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178729</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rio de Janeiro Adjustment and Sustainable Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective of this programmatic series is to support the Municipality of Rio de Janeiro in: (i) strengthening fiscal management to improve medium-term fiscal sustainability; and (ii) accelerating the transition towards a low-carbon, resilient and inclusive urban development .]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objectives of the Rio de Janeiro Adjustment and Sustainable Development Policy Loan in Brazil are to support the Municipality of Rio de Janeiro (MRJ) in: (i) strengthening fiscal management to improve medium-term fiscal sustainability; and (ii) accelerating the transition towards a low-carbon, resilient and inclusive urban development. This first pillar strengthens the fiscal sustainability of MRJ through its adherence to a federal program that requires the implementation of fiscal adjustment reforms. It supports complementary fiscal reforms, including: (i) the adoption of a law that triggers fiscal adjustment measures in case of fiscal distress; (ii) a legislative reform to simplify the tax on services and improve collection from tax evaders; and (iii) a legislative pension reform that increases the contribution rate for civil servants, pensioners, and beneficiaries of special pensions. It also supports reforms to improve fiscal accountability through the adoption of the international public sector accounting standards and improved internal audit capacity. The city is introducing reforms to increase the reliance on sustainable mobility modes and reduce GHG emissions, along with the city's strategy to improve building energy efficiency, waste management, low-carbon and resilient infrastructure, and disaster risk management solutions to strengthen its climate resilience. Actions in this pillar support: (i) critical legislation to improve the operational efficiency, multimodal integration, and safety for women in the Bus Rapid Transit system to attract passengers to public transport; (ii) measures to promote low-carbon transport through regulations that expand the cycling network and make the urban environment more conducive to walking and cycling; (iii) the approval of legislation that promotes climate mitigation and adaptation practices in urban mobility, energy, green infrastructure, and waste management; and (iv) the adoption of a municipal sustainable development and climate action plan, including measures to advance e-mobility, and climate risk prevention and preparedness measures such as contingency plans for coastal management and extreme heat events.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052002"><narrative>Municipality of Rio de Janeiro</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052002"><narrative>Municipality of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2022-05-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-06-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabiano Silvio Colbano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21012" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="15" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="14" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="14" xml:lang="en"/><sector vocabulary="1" code="43032" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="14" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FD" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Insurance and Pension</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="29.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="4" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="57" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="29" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="14" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="14" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="14" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="14" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="57" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="14" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="14" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="14" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="14" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="14" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="14" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="14" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="14" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="29" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="14" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="14" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="50" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="14" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000052" percentage="14" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="14" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="14" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="14" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="29" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="14" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="14" xml:lang="en"><narrative>Air quality management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">135238245.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">135238245.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">135238245</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">135238245</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-338096</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-1609890</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-4338590</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-4423148</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-4292420</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3561543</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3482658</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2962425</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3299813</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52001"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-52003"><narrative>Secretaria de Transporte</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178729"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178729?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178729"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services sector tax (ISS) revenue in 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-31" value="6,172.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-31" />
<period-end iso-date="2024-12-31" />
<target value="6,689.00">
<comment><narrative>
Services sector tax (ISS) revenue in 2024, compared to projection with no reform (Millions of 2021 Real).
</narrative></comment>
</target>
<actual value="7,321.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ridership in the BRT system
</narrative></title>
<baseline year="2021" iso-date="2021-12-31" value="60,400.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-31" />
<period-end iso-date="2024-12-31" />
<target value="85,200.00">
<comment><narrative>
Ridership in the BRT system (Number of passengers), excluding the Transbrasil line (to be inaugurated in 2022).
</narrative></comment>
</target>
<actual value="94,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment complaints submitted to the new tracking and response system that are addressed and responded
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="75.00">
<comment><narrative>
The new tracking and response system to deal with sexual harassment complaints in the transport network is under implementation.&amp;nbsp;
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current savings
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="95.00">
<comment><narrative>
Current spending as percentage of current revenues - CAPAG indicator - should stay below 95 percent
</narrative></comment>
</target>
<actual value="91.31">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Liquidity
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="-188.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="100.00">
<comment><narrative>
Financial Obligations from Non-Earmarked Resources as percentage of gross cash balance - CAPAG indicator - should stay between zero and 100 percent
</narrative></comment>
</target>
<actual value="81.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Monthly bicycle trips in the Low Emission District
</narrative></title>
<baseline year="2021" iso-date="2021-09-30" value="65,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-30" />
<period-end iso-date="2024-09-30" />
<target value="85,000.00">
<comment><narrative>
The Bank is supporting the MRJ in defining the methodology to estimate GHG emissions within a restricted perimeter. The indicator will be measured in 2024, reflecting the actions under implementation.
</narrative></comment>
</target>
<actual value="66,114.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2017" iso-date="2017-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-31" />
<period-end iso-date="2024-12-31" />
<target value="5.00">
<comment><narrative>
The indicator will be estimated in 2024.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pension Contributions
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="4,422.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="5,700.00">
<comment><narrative>
Pension Contributions in real terms (Millions of 2021 Real)
</narrative></comment>
</target>
<actual value="5,649.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
High and medium capacity mass transit stations connected with cycleways
</narrative></title>
<baseline year="2020" iso-date="2020-12-31" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-31" />
<period-end iso-date="2024-12-31" />
<target value="40.00">
<comment><narrative>
High and medium capacity mass transit stations connected with cycleways
</narrative></comment>
</target>
<actual value="57">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178888</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Climate Finance Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the expansion of sustainability-linked finance for climate mitigation, and strengthen the private sector's capacity to access high quality carbon credit markets in Brazil.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project seeks to support the expansion of sustainability-linked finance for climate mitigation and strengthen capacity to access high quality carbon credit markets in partnership with Banco do Brasil (BB), a large commercial bank with significant strength in financing key sectors linked to Brazil's carbon footprint. This is a financial intermediary (FI) project where the Bank is supporting a credit entity (BB) to fund clearly defined FI subprojects. It seeks to offer an integrated package of financing and TA to attract investors and firms committed to achieve mitigation outcomes through sustainability-linked finance and carbon markets. The project comprises two components: Component 1: Expanding access to sustainability-linked finance for mitigation. This component aims to support Brazil's climate mitigation outcomes through the expansion of sustainability-linked finance through a sustainability-linked credit line and a climate debt fund.Component 2: Technical assistance. This component would provide technical assistance to Banco do Brasil to develop solutions that support beneficiaries in adopting credible mitigation plans and targets, reducing the high transaction costs of creating high-quality carbon credits, and increasing access to carbon credit markets.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052205"><narrative>Banco do Brasil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052206"><narrative>Banco do Brasil</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-08-01"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2022-12-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Faruk Miguel Liriano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fmiguelliriano@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003469034" />
            <name><narrative>Federative Republic of Brazil</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-14.235004 -51.92528</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="100.000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="100" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="100" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="81" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000332" percentage="81" xml:lang="en"><narrative>Agriculture Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="81" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="100" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="81" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="81" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="100" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="81" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="100" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="100" xml:lang="en"><narrative>Mitigation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">5690000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">6830000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">6860000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">13820000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">9430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">8721666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">8721666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">7260000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">5158333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5158333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4865000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">8551666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">8551666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">8551666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">8551666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">8551666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">8551666.65</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">398750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">398750000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">500000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">1250000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">100000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-1250000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-422752</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-652041</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52206"><narrative>Banco do Brasil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178888"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178888?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178888"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing carbon credits monetization services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="300.00">
<comment><narrative>
Number of firms accessing carbon credits monetization services through BB.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing carbon credit generation services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of firms accessing carbon credit generation services through BB.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit service providers accredited.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="5.00">
<comment><narrative>
Number of carbon credit service providers accredited by Banco do Brasil to provide services to BB or its clients.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of investors in the debt fund
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="5.00">
<comment><narrative>
Number of investors in the debt fund
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private sustainability linked finance leveraged by the project through the credit line and the CDF.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,200,000,000.00">
<comment><narrative>
Volume of private sustainability linked finance leveraged through the project, through the credit line and the CDF.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led firms accessing carbon credit generation services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of women-led firms accessing carbon credit generation services based on gender of owner or top management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2028-07-03" />
<target value="45,000,000.00">
<comment><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing the sustainability-linked credit line.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="10,000.00">
<comment><narrative>
Number of firms accessing the sustainability-linked credit line.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led firms accessing carbon credit generation services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of women-led firms accessing carbon credit generation services based on gender of owner or top management.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led firms accessing the sustainability linked credit line.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of women-led firms accessing the sustainability linked credit line: defined by ownership or top management of the firm.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing the sustainability-linked credit line.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="10,000.00">
<comment><narrative>
Number of firms accessing the sustainability-linked credit line.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private sustainability linked finance leveraged by the project through the credit line and the CDF.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,200,000,000.00">
<comment><narrative>
Volume of private sustainability linked finance leveraged through the project, through the credit line and the CDF.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of potential additional GHG emission reductions realized by project closing.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of potential additional GHG emission reductions realized by project closing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit service providers accredited.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="5.00">
<comment><narrative>
Number of carbon credit service providers accredited by Banco do Brasil to provide services to BB or its clients.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2028-07-03" />
<target value="45,000,000.00">
<comment><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2028-07-03" />
<target value="45,000,000.00">
<comment><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of carbon credit projects registered in recognized registries through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private sustainability linked finance leveraged by the project through the credit line and the CDF.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,200,000,000.00">
<comment><narrative>
Volume of private sustainability linked finance leveraged through the project, through the credit line and the CDF.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of private sustainability linked finance leveraged by the project through the credit line and the CDF.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,200,000,000.00">
<comment><narrative>
Volume of private sustainability linked finance leveraged through the project, through the credit line and the CDF.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></title>
<baseline year="2023" iso-date="2023-07-03" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-07-03" />
<period-end iso-date="2028-07-03" />
<target value="45,000,000.00">
<comment><narrative>
Volume of additional GHG (tCO2e) emission reductions certified through project financed activities.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing carbon credit generation services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="1,000.00">
<comment><narrative>
Number of firms accessing carbon credit generation services through BB.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of firms accessing carbon credits monetization services.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="300.00">
<comment><narrative>
Number of firms accessing carbon credits monetization services through BB.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of potential additional GHG emission reductions realized by project closing.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of potential additional GHG emission reductions realized by project closing.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of investors in the debt fund
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="5.00">
<comment><narrative>
Number of investors in the debt fund
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led firms accessing the sustainability linked credit line.
</narrative></title>
<baseline year="2023" iso-date="2023-04-01" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-04-01" />
<period-end iso-date="2028-04-01" />
<target value="30.00">
<comment><narrative>
Share of women-led firms accessing the sustainability linked credit line: defined by ownership or top management of the firm.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P178993</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Mato Grosso Resilient, Inclusive, and Sustainable Learning Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the Project is to support the State of Mato Grosso to improve teaching practices, teachers digital readiness, andschools learning environments.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Project would be financed through a proposed IBRD loan in the amount of US$100 million, using an Investment Project Financing (IPF) with Performance-Based Conditions (PBCs) lending instrument. The objective of the Project is to support the State of Mato Grosso to improve teaching practices, schools digital readiness, and learning environments. The Project would support system-wide activities to tackle the recovery of the learning losses caused by the COVID-19 pandemic, create more conducive learning environments, and narrow the digital divide to foster inclusion. The scope of the Project is general education (covering preschool throughout secondary education), but each component would focus on different levels of education to achieve the development objectives.The Project is comprised of four Components. Component 1 will support pedagogical and school management interventions to address students learning recovery and acceleration. Component 2 will improve the digital conditions for teaching and learning through better digital infrastructure of state schools and SEDUC. Component 3 will support the construction of school infrastructure and complementary strategies to promote safer, inclusive, greener, and more resilient learning environments. Component 4 will support Project coordination, capacity building of SEDUC, and the implementation of Monitoring and Evaluation (M&amp;E) activities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052312"><narrative>STATE OF MATO GROSSO                                                                                </narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052312"><narrative>STATE OF MATO GROSSO                                                                                </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2023-10-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-10-26"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ildo Jose Lautharte Junior</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ilautharte@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003457419" />
            <name><narrative>Mato Grosso</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-13 -56</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="11110" percentage="73" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="27" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="73.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="21.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="42" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000658" percentage="88" xml:lang="en"><narrative>Education Facilities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="6" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="44" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="44" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="49" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000726" percentage="10" xml:lang="en"><narrative>Geospatial Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000654" percentage="49" xml:lang="en"><narrative>Teachers</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="75" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="100" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="6" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">531021.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">531030.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">551982.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">551994.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1147082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1147094.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1919082.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1919094.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2765749.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2765761.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">3722799.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">3722799.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">3722799.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">3722799.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">3722804.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">97503932.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">97503932.22</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">506500</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">600600</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">1388968</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-160877</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-136840</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52313"><narrative>SECRETARIAT OF EDUCATION - MATO GROSSO                                                              </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178993"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P178993?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P178993"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools managed by the Connected Education Meter
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="403.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="620.00">

</target>
<actual value="429">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Indigenous Population and Quilombola schools with connectivity
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers, principals, coordinators and secretaries who received school violence prevention training
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with adequate information technology infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="55.00">

</target>
<actual value="79.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of education staff of the state network trained in the use of the new Education Management and Information System (EMIS)
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools built to implement the CEI educational program
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers trained to prepare and carry out mitigation protocols at the onset of climate change-related emergencies, such as  flash floods and droughts
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education, in secondary education
</narrative></title>
<baseline year="2021" iso-date="2021-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-15" />
<period-end iso-date="2028-12-15" />
<target value="160000.00">

</target>
<actual value="63840">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers trained to prepare and carry out mitigation protocols at the onset of climate change-related emergencies, such as  flash floods and droughts
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of teachers, principals, coordinators and secretaries trained in pedagogical strategies to support students with disabilities
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="1,300.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen Engagement: Number of feedback surveys conducted to assess the beneficiary satisfaction
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2028-07-01" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers, principals, coordinators and secretaries who received school violence prevention training
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-12-15" />
<target value="65.00">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed a training session on the Alfabetiza MT program
</narrative></title>
<baseline year="2022" iso-date="2022-08-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-08-31" />
<period-end iso-date="2028-12-01" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="13.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of school principals and coordinators trained in the use of the School Maintenance Management System (MMS)
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with adequate information technology infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="55.00">

</target>
<actual value="79.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers of indigenous populations and Quilombolas' schools who received training on pedagogical materials culturally adapted to support learning recovery
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of state schools implementing ecological disposal mechanisms
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="150.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="13.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed a training session on the Alfabetiza MT program
</narrative></title>
<baseline year="2022" iso-date="2022-08-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-08-31" />
<period-end iso-date="2028-12-01" />
<target value="80.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed a training session on the Alfabetiza MT program
</narrative></title>
<baseline year="2022" iso-date="2022-08-31" value="50.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-08-31" />
<period-end iso-date="2028-12-01" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of education staff of the state network trained in the use of the new Education Management and Information System (EMIS)
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MT municipalities implementing classroom observation tools and coaching for teachers' professional development
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">

</target>
<actual value="59.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school buildings provided with electricity from renewable energy source through mini-grids/micro-grids/stand-alone systems
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen Engagement: Number of feedback surveys conducted to assess the beneficiary satisfaction
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2028-07-01" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-12-15" />
<target value="65.00">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff trained on management practices to strengthen the coordination with municipalities
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="70.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">

</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers of indigenous populations and Quilombolas' schools who received training on pedagogical materials culturally adapted to support learning recovery
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2028-12-01" />
<target value="160000.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers, principals, coordinators and secretaries who received school violence prevention training
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff trained on management practices to strengthen the coordination with municipalities
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools managed by the Connected Education Meter
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="403.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="620.00">

</target>
<actual value="429">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools built to implement the CEI educational program
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of indigenous populations and Quilombolas schools rehabilitated based on community consultation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="30.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of teachers, principals, coordinators and secretaries trained in pedagogical strategies to support students with disabilities
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="1,300.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Citizen Engagement: Number of feedback surveys conducted to assess the beneficiary satisfaction
</narrative></title>
<baseline year="2021" iso-date="2021-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-31" />
<period-end iso-date="2028-07-01" />
<target value="5.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or rehabilitated toilets designed with climate change considerations in their layouts to reduce energy usage through ensuring natural light and ventilation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school buildings provided with electricity from renewable energy source through mini-grids/micro-grids/stand-alone systems
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of state schools implementing ecological disposal mechanisms
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="150.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or rehabilitated toilets designed with climate change considerations in their layouts to reduce energy usage through ensuring natural light and ventilation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="30.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or rehabilitated toilets designed with climate change considerations in their layouts to reduce energy usage through ensuring natural light and ventilation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MT municipalities implementing classroom observation tools and coaching for teachers' professional development
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">

</target>
<actual value="59.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of teachers, principals, coordinators and secretaries trained in pedagogical strategies to support students with disabilities
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="1,300.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed the training on digital skills program
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">

</target>
<actual value="63.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers trained to prepare and carry out mitigation protocols at the onset of climate change-related emergencies, such as  flash floods and droughts
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed the training on digital skills program
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">

</target>
<actual value="63.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of indigenous populations and Quilombolas schools rehabilitated based on community consultation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="20.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of state schools implementing ecological disposal mechanisms
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="150.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education, in secondary education
</narrative></title>
<baseline year="2021" iso-date="2021-07-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-07-15" />
<period-end iso-date="2028-12-15" />
<target value="160000.00">

</target>
<actual value="63840">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers of indigenous populations and Quilombolas' schools who received training on pedagogical materials culturally adapted to support learning recovery
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Indigenous Population and Quilombola schools with connectivity
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="30.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of school buildings provided with electricity from renewable energy source through mini-grids/micro-grids/stand-alone systems
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="60.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers that completed the training on digital skills program
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="20.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of staff trained on management practices to strengthen the coordination with municipalities
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools managed by the Connected Education Meter
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="403.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="620.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Indigenous Population and Quilombola schools with connectivity
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of education staff of the state network trained in the use of the new Education Management and Information System (EMIS)
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">

</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">

</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Student dropout rate in 10th grade in the state network (disaggregated by gender)
</narrative></title>
<baseline year="2018" iso-date="2018-07-31" value="13.50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2018-07-31" />
<period-end iso-date="2028-07-01" />
<target value="8.30">

</target>
<actual value="3.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="13.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="13.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="13.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="30.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of 6th grade teachers with improved teaching practices in Portuguese and mathematics in state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="30.00">

</target>
<actual value="30.2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-12-15" />
<target value="65.00">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="65.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of teachers with improved digital skills
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2028-12-15" />
<target value="65.00">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of indigenous populations and Quilombolas schools rehabilitated based on community consultation
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="20.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of school principals and coordinators trained in the use of the School Maintenance Management System (MMS)
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with adequate information technology infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-06-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-30" />
<period-end iso-date="2028-12-01" />
<target value="55.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of school principals and coordinators trained in the use of the School Maintenance Management System (MMS)
</narrative></title>
<baseline year="2022" iso-date="2022-07-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-07-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of schools rehabilitated
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="133.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="193.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of MT municipalities implementing classroom observation tools and coaching for teachers' professional development
</narrative></title>
<baseline year="2022" iso-date="2022-12-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-31" />
<period-end iso-date="2028-12-01" />
<target value="50.00">
<comment><narrative>
This indicator will be updated during the implementation support mission scheduled to October 14-17, 2025.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of secondary students with access to sustainable, safe, inclusive, and resilient learning environments in the state network
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2028-12-15" />
<target value="13.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P179046</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Acre: Public Sector Management Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Acre.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Proposed Project is the fourth operation in a Series of Projects (SoP) under the Program designed to assist Brazilian States implement reforms to improve efficiency in public resource management. The objective of Progestão Program, as stated in the Memorandum of Understanding between the National Secretariat of Treasury (Secretaria do Tesouro Nacional, STN) and the World Bank, is to develop the fiscal budget and asset management of the Brazilian governments through actions that aim at reducing and rationalizing public spending with long term results to contribute to the fiscal sustainability of subnational entities. The Proposed Project addresses five whole-of-government functions (human resource management, pensions, public investment management, asset management, and procurement) and three strategic sectors (health, education, and social protection). These focus areas were selected applying the Progestão Program selectivity criteria: strategic alignment, implementation capacity, and impact on beneficiaries.The Progestão Program recognizes that the subnational fiscal crisis is largely a result of structural problems in public sector management. The Program, available to all Brazilian States regardless of their fiscal situation, will provide technical assistance to help participating States modernize and improve the following whole-of-government functions through investments in management reforms and information systems: human resource management; pensions; public procurement; public investment; debt management; state-owned Enterprises; and asset management. Specific interventions in sectors were selected after consultation with government officials and based on their contributions to improvements in efficiency and implementation readiness. The project will have three components:Component 1. Whole-of-Government Management Systems comprises six subcomponents.Sub-Component 1.1: Human Resource Management (US$7.5 million). Implementing Agency: SEAD. Activities include: (i) carrying out a technical assistance program for strategic workforce right-sizing of selected agencies and departments; (ii) design and implementation of a workforce right-sizing platform integrated with the human resource management system to identify core competencies of public officials and the appropriate hiring needs of organization; (iii) implementation of a personnel management dashboard, including dynamic distribution of the workforce, replacement alarms and automated reallocation documentation; (iv) development and implementation of a management analytics and artificial intelligence system for automated payroll audit to reduce errors and fraud; (v) automation of human resources management services and other processes identified through the strategic workforce planning; (vi) redesign and implementation of human resource services and processes based on strategic workforce planning; (vii) design and implementation of new functionalities to the State's HRMIS; (viii) implement periodic staff surveys to assess reform implementation and support change management; (ix) carry out  communications and capacity building to activities to support the rollout and implementation of the above mentioned activities; and (x) procurement of hardware to support the rollout and implementation of the above-mentioned activities.Sub-Component 1.2: Pensions (US$2 million). Implementing Agency: AcrePrevidencia. Activities include: (i) design and implementation of pension management system functionalities that support pension payroll audit, unify management of benefit concessions for all branches of government (legislative, judiciary, and executive), and improve the users‘ interface and access to services through the digital platform; (ii) expansion and update of the pension record management information system to increase efficiency and enable operational, actuarial, and financial analyses, thus reducing costs and allowing for better long-term financial planning; (iii) procurement of hardware to support the implementation of the above-mentioned activities.; and (iv) capacity building to support the deployment and implementation of new system and management tools.Sub-Component 1.3: Public Procurement (US$7 million). Implementing Agency: SEAD. Activities include: (i) development of a procurement strategy and an implementation plan to help embed procurement efficiency across the State's purchases; (ii) development and implementation of an integrated digital system for processing and analyzing data and managerial information in public procurement and contract management; (iii) redesign and automation of key processes and flows to ensure cost-effective acquisitions; (iv) design and implementation of an inventory management system integrated to procurement; (v) design and implementation of a strategic sourcing methodology to help identify demand for goods and services across the government; (vi) application of artificial intelligence using electronic invoices to identify and reduce fraud and corrupt practices; (vii) development and implementation of a system that certifies enterprises and automatizes data aggregation; (vii) capacity building and certification program for officials working in procurement across the state; (ix) development and implementation of digital systems that support contract management functions and procurement of low value, non-complex goods and services; and (x) procurement of hardware to support the deployment of the above-mentioned activities.Sub-Component 1.4: Public Investment Management, Transfers and Debt Management (US$7.2 million) Implementing Agencies SEPLAN and SEFAZ. Activities include: (i) development and implementation of a public project management system for State's investments, integrating project preparation, screening and appraisal; (ii) preparation of a portfolio of technically appraised, implementation ready projects; (iii) design and implementation of a governance strategy to manage the project portfolio execution; (iv) design and implementation of a methodology for sustainable budgeting systems and practices for projects; (v) redesign and implementation of the processes and systems oriented to the development of public-private partnerships; (vi) development and implementation of a management system for the transfer of resources from the State of Acre to municipalities and organizations, thus allowing for digital monitoring of project preparation, implementation and accounting; (vii) design and implementation of a cash management information system; (viii) development and implementation of a debt management information system, including a guarantee and a contractual module; (ix) capacity building for State and municipal government officials on efficient public investment and expenditure management practices, to support the rollout and implementation of new tools; and (x) carry out periodic staff surveys to assess reform implementation and support change management.Sub-Component 1.5: State Owned Enterprises (US$2 million). Implementing Agency: SANEACRE. Activities include: (i) implementation of an information management system for sanitation, including modules of billing, charges, registry entries, financial, debt, and service interface; (ii) implementation of georeferencing software to integrate information regarding availability and customer usage; (iii) design and implementation of a telemetry system, including a governance strategy to reduce losses and increase efficiency of the operation; (iv) introduction of communication and capacity-building activities to support the rollout and implementation of these systems and management tools; and (v) procurement of hardware to support the rollout and implementation of the above-mentioned activities.Sub-Component 1.6: Asset Management (US$6 million). Implementing Agency: SEAD. Activities include: (i) technical support to assess up-to-date information of real estate properties, including geospatial data, area, occupa]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052411"><narrative>State of Acre</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052411"><narrative>State of Acre</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052412"><narrative>State Secretariat of Planning</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-11-04"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-07-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sadia Afolabi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>safolabi1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003665474" />
            <name><narrative>Acre</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-9 -70</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15126" percentage="18" xml:lang="en"/><sector vocabulary="1" code="15124" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="16" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="13" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="9" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="5" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="34" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="17" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="34" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="54" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="17" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="54" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="20" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="9" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="21" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="17" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="20" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="9" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="34" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="25" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="13" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="9" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="13" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000436" percentage="9" xml:lang="en"><narrative>State-owned Enterprise Reform and Privatization</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="34" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="34" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="17" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="17" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="8" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">200000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">416666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">416666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">708333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">791666.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">791666.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">708333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">708333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">200000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">28516902.88</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">28516902.88</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">40000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">100000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">1000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">138105</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">244993</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-100000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-18397</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-72049</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-80455</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-252831</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52412"><narrative>State Secretariat of Planning</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179046"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179046?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179046"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented system for intergovernmental transfers management
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Measures the status of system implementation including a dashboard to allow for Government and Citizens monitoring and feedback process.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="50.00">
<comment><narrative>
Share of goods and services bidding documents with price reference.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects, including a single entry point of projects and screening and appraisal criteria. A review of all new projects will be carried out to determine compliance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Debt Management System implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Measures the status of system implementation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Water tariff collection rates
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="52.00">
<comment><narrative>
Measures the share of tariffs collection rates in the water and sanitation State company (SANEACRE)
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified active public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities of the active personnel payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
It is estimated a 37 public officials reduction in non-frontline staff per year since the third year of implementation.
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment projects cost overruns
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="6.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Average cost (in percentage) overruns of the whole portfolio of investment projects: original planned vs executed at project in each year
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Use of price reference system in competitive bidding processes
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="50.00">
<comment><narrative>
Share of goods and services bidding documents with price reference.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with meal financial program complying with federal regulations
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="40.00">
<comment><narrative>
Percentage of school with meal program expenditure with an adequate type of procurement complying to federal regulation.
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified non-conformities/irregularities in the pension concession and payroll processes
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-29" />
<target value="0.30">
<comment><narrative>
It measures the identification of expenditure nonconformities (any category) of the retired personnel and pensioner payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="81.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects, including a single entry point of projects and screening and appraisal criteria. A review of all new projects will be carried out to determine compliance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items)
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment projects cost overruns
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="6.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Average cost (in percentage) overruns of the whole portfolio of investment projects: original planned vs executed at project in each year
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="2,000.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership, including geo-referencing data and usage.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
It is estimated a 37 public officials reduction in non-frontline staff per year since the third year of implementation.
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="65.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total workforce
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches part of the Unified Management Unit for the Public Servant Pension Regime – RPPS
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by ACREPREVIDÊNCIA, for all State's civil servants, including the three branches (Executive, Legislative, and Judiciary). In line by the mandatory refoms in the Constitutional Amendment - CA 103/19
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of state health units with expenditure management system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the povision of health services.
</narrative></comment>
</target>
<actual value="9.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="65.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total workforce
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="2,000.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership, including geo-referencing data and usage.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of state health units with expenditure management system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="9.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the povision of health services.
</narrative></comment>
</target>
<actual value="63.6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches part of the Unified Management Unit for the Public Servant Pension Regime – RPPS
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by ACREPREVIDÊNCIA, for all State's civil servants, including the three branches (Executive, Legislative, and Judiciary). In line by the mandatory refoms in the Constitutional Amendment - CA 103/19
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches part of the Unified Management Unit for the Public Servant Pension Regime – RPPS
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by ACREPREVIDÊNCIA, for all State's civil servants, including the three branches (Executive, Legislative, and Judiciary). In line by the mandatory refoms in the Constitutional Amendment - CA 103/19
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches part of the Unified Management Unit for the Public Servant Pension Regime – RPPS
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by ACREPREVIDÊNCIA, for all State's civil servants, including the three branches (Executive, Legislative, and Judiciary). In line by the mandatory refoms in the Constitutional Amendment - CA 103/19
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="2,000.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership, including geo-referencing data and usage.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="2,000.00">
<comment><narrative>
Number of state real estate properties with complete legal documentation proving state ownership, including geo-referencing data and usage.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment projects cost overruns
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="6.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Average cost (in percentage) overruns of the whole portfolio of investment projects: original planned vs executed at project in each year
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment projects cost overruns
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="6.20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Average cost (in percentage) overruns of the whole portfolio of investment projects: original planned vs executed at project in each year
</narrative></comment>
</target>
<actual value="6.20">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items)
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items)
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
It is estimated a 37 public officials reduction in non-frontline staff per year since the third year of implementation.
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
It is estimated a 37 public officials reduction in non-frontline staff per year since the third year of implementation.
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Water tariff collection rates
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="34.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="52.00">
<comment><narrative>
Measures the share of tariffs collection rates in the water and sanitation State company (SANEACRE)
</narrative></comment>
</target>
<actual value="34.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified active public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities of the active personnel payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified non-conformities/irregularities in the pension concession and payroll processes
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-29" />
<target value="0.30">
<comment><narrative>
It measures the identification of expenditure nonconformities (any category) of the retired personnel and pensioner payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Debt Management System implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Measures the status of system implementation
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities using new financial management system to provide reports on social assistance services
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="81.00">
<comment><narrative>
Percentage of municipalities generating reports on social assistance services from the financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="120.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="80.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items)
</narrative></comment>
</target>
<actual value="120.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implemented system for intergovernmental transfers management
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Measures the status of system implementation including a dashboard to allow for Government and Citizens monitoring and feedback process.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of schools with meal financial program complying with federal regulations
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-12-29" />
<target value="40.00">
<comment><narrative>
Percentage of school with meal program expenditure with an adequate type of procurement complying to federal regulation.
</narrative></comment>
</target>
<actual value="26.9">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P179088</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Tocantins: Public Sector Management Efficiency</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Tocantins]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Progestão Tocantins is the fifth operation in a Series of Projects (SoP) under the Program designed to assist Brazilian States implement reforms to improve efficiency in public resource management. The objective of the Progestão Program, as stated in the Memorandum of Understanding between the National Secretariat of Treasury (Secretaria do Tesouro Nacional, STN) and the World Bank (WB), is to develop the fiscal budget and asset management of the Brazilian State governments through actions that aim at reducing and rationalizing public spending with long term results to contribute to the fiscal sustainability of state governments. The Program, available to all Brazilian States regardless of their fiscal situation, will provide technical assistance to help participating States modernize and improve efficiency in whole-of-government functions and strategic sectors through investments in management reforms and information systems.  The Federal Government has requested that the Bank supports the Progestão Program through a series of investment project financing (IPF) operations in order to ensure technical assistance from the World Bank during project implementation. The Tocantins Progestão project addresses five whole-of-government functions (human resource management, pensions, procurement, public investment management, and asset management) and three strategic sectors (health, education, and social assistance). These focus areas were selected by applying the Progestão Program selectivity criteria: strategic alignment, implementation capacity, and impact on beneficiaries.The proposed IPF operation support of investments in management information systems and reforms for whole-of-government functions and in strategic sectors in the State of Tocantins. The project will support management systems in health, education, and social assistance. The project will have three components.Component 1. Whole-of-Government Management Systems (US$37.8 million)Sub-Component 1.1: Human Resource Management (US$12.5 million). Implementing Agency: SECAD. Activities include: (i) carrying out a technical assistance program for strategic workforce right-sizing of selected agencies and departments; (ii) design and implementation of a workforce right-sizing p latform integrated with the human resources management system to identify core competencies of public officials and the appropriate hiring needs of organization; (iii) implementation of a personnel management platform, including dynamic distribution of the workforce, replacement alarms, and automated official documentation of reallocation; (iv) development and implementation of a management analytics and artificial intelligence system for automated payroll audit to reduce errors and fraud; (v) design and implementation of new functionalities to the State's HRMIS, including frequency control, documentation management, public officials portal, performance and development, probationary phase, job opening control, and training to public officials; (vi) automation of human resources management services and other processes identified through the strategic workforce planning; (vii) redesign and implementation of human resource services and processes based on strategic workforce planning; (viii) periodic staff surveys to assess reform implementation and support change management; (ix) communications and capacity building to support the rollout and implementation of new tools; (x) virtualization of functional documents to support the implementation of HRMIS functionalities; and (xi) procurement of hardware to support the rollout and implementation of the abovementioned activities.Sub-Component 1.2: Pensions (US$2.2 million). Implementing Agency: IGEPREV. Activities include: (I) design and implementation of a pension management information system functionalities that support auditing the pension payroll and unifying management of benefit concession for all branches of government (legislative, judiciary, and executive) based on remuneration history and verification of actual contribution payments; (ii) expansion and update of the pension record management information system to increase efficiency and enable operational, actuarial, and financial analyses, thus reducing costs and allowing for better long term financial planning; (iii) procurement of hardware to support the deployment of these systems; and (iv) communications and capacity building to support the rollout and implementation of new tools.Sub-Component 1.3: Public Procurement (US$8 million). Implementing Agency: SEFAZ. Activities include: (i) development of a procurement strategy that considers the lifecycle of products and groups of items to help embed efficiency procurement across the State's purchases; (ii) improvements to the integrated system for e-procurement, including the redesign and automation of key processes, flows of budgetary and financial control, and reviewing the regulatory framework and institutional arrangements to increase transparency and smart procurement; (iii) design and implementation of integrated dashboards with reliable data for planning; (iv) apply artificial intelligence using electronic invoices to identify and reduce fraud and corrupt practices; (v) design and implement strategic sourcing methodology to help identify demand for goods and services across the government; (vi) capacity building program for officials working in procurement across the state; and (vii) procurement of hardware to support the deployment of the abovementioned activities..Sub-Component 1.4: Public Investment Management and Budgeting (US$5 million). Implementing Agency: SEPLAN. Activities include: (i) development and implementation of a public project management system for State's investments, integrating project preparation, screening and appraisal; (ii) preparation of a portfolio of technically appraised, implementation ready projects; (iii) design and implementation of a governance strategy to manage project portfolio execution; (iv) design and implementation of a methodology and support plan that considers the lifecycle of project investments, focusing on the maintenance of infrastructure projects after the execution; (v) design and implementation of improved budgeting systems and practices; (vi) improvements in the management system for the transfer of resources from the State of Tocantins to municipalities and non-governmental organizations, allowing for digital monitoring of project preparation, implementation and accounting, and integrated to the budget and financial system; (vii) customization of the debt management information system; (viii) capacity building for State officials on public investment and expenditure management practices, to support the rollout and implementation of new tools; and (ix) periodic staff surveys to assess reform implementation and support change management.Sub-Component 1.5: Asset Management (US$10.1 million). Implementing Agencies: SECAD. Activities include: (i) te chnical support to assess up-to-date information of real estate properties, including geospatial data, area, occupation rate, valuations and the registry's status; (ii) development and implementation of modules in the public asset management system that includes information for decision making on real estate properties and fleet management; (iii) development and implementation of a system for mapping costs of information and communication technologies (ICTs), including identification of synergies between government-to-government systems, interoperability, as well as a governance strategy for new acquisitions and maintenance; (v) capacity building for asset management practices and support for the rollout and implementation of new tools; (vi) procurement of hardware to support the rollout and implementation of the above mentioned activities; and (vii) improvements in server storage to guarantee enough space for information technology tools and systems implemented under th]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052463"><narrative>State Secretariat of Planning (SEPLAN)</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052463"><narrative>State Secretariat of Planning (SEPLAN)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052464"><narrative>UGP</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2022-11-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-07-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2028-12-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2028-12-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sadia Afolabi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>safolabi1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
            <location-reach code="1" />
            <location-id vocabulary="G1" code="0003474575" />
            <name><narrative>Tocantins</narrative></name>
            <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
            <pos>-10.5 -48</pos>
            </point>
            <exactness code="2"/>
            <location-class code="1" />
        </location><sector vocabulary="1" code="15124" percentage="23" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="19" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="15" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="15" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16014" percentage="4" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="28.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HF" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="31" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="19" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="31" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="31" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000261" percentage="31" xml:lang="en"><narrative>ICT Solutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="19" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="19" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="19" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="27" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="19" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="13" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="13" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="4" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="13" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="31" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="31" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="31" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000633" percentage="19" xml:lang="en"><narrative>Health Finance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="31" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="19" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000433" percentage="19" xml:lang="en"><narrative>E-Government, incl. e-services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="8" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">430000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">93333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">93333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">900000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">440000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">880000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">450000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">470000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1040000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">930833.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">930833.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1018333.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1018333.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">805000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">550000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1640000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">430000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">40355732.66</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-29"/>
<value currency="USD" value-date="2028-12-29">40355732.66</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">125000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">501502</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">58262</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">8959503</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-07-31"/><value value-date="2024-07-31">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-10-31"/><value value-date="2024-10-31">-29709</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-82339</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-81365</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-78931</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52464"><narrative>UGP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179088"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179088?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179088"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="85.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total workforce.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of state health units with management and costing system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="70.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the povision of health services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="45.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an electronic invoice database for price references
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the implementation of the electronic invoice database for price reference in the State.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of state health units with management and costing system implemented
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="70.00">
<comment><narrative>
The system aims to integrate the hospital management and costing systems that handle data related to the provision and funding of medium and high complexity health services in the state. As an integrated effort, the implementation of system is designed to improve planning, budgeting, health services management, and support evidence-based decision making, generating economies of scale in the povision of health services.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1,721,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3,500,000.00">
<comment><narrative>
Average net fixed property income of State &quot;receita patrimonial&quot; element in Budget revenues. Measured as moving 5 year average.
</narrative></comment>
</target>
<actual value="1,721,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified Pension payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities (any category) of the retired personnel and pensioner payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects.  A review of all new projects will be carried out to determine compliance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of an electronic invoice database for price references
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the implementation of the electronic invoice database for price reference in the State.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches contributing to the Central Management Unit for the Public Servant Pension Regime
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by IGEPREV, for all State's civil servants.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="80.00">
<comment><narrative>
State real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="80.00">
<comment><narrative>
State real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="45.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the transport information management system
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the implementation of the transport management system in the SEDUC.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of new modules of the Intergovernmental Transfers Management System
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the customization and implementation of new modules for the intergovernmental transfers management system, including the integration with SIAFE, new modules for fund transfers, decentralization, and special transfers (to municipalities and Civil Society Organizations) with an integrated dashboard to allow for Government and Citizens monitoring and feedback processes.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of new modules of the Intergovernmental Transfers Management System
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the customization and implementation of new modules for the intergovernmental transfers management system, including the integration with SIAFE, new modules for fund transfers, decentralization, and special transfers (to municipalities and Civil Society Organizations) with an integrated dashboard to allow for Government and Citizens monitoring and feedback processes.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investment projects prepared and selected in line with PIM methodology
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="50.00">
<comment><narrative>
Measures degree of application of the new PIM methodology to public investment projects.  A review of all new projects will be carried out to determine compliance.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the transport information management system
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
It measures the implementation of the transport management system in the SEDUC.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified active public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities of the active personnel payroll. Data would come from Audits. The management analytics product would identify risk areas for control Baseline is total payroll and target is 0,3% of it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified Pension payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities (any category) of the retired personnel and pensioner payroll. Data would come from Audits. The management analytics product would identify risk areas for control.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project investments time overruns
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="319.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-06-30" />
<target value="150.00">
<comment><narrative>
It measures the investment projects time extension in days for different projects.
</narrative></comment>
</target>
<actual value="319.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project investments time overruns
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="319.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-06-30" />
<target value="150.00">
<comment><narrative>
It measures the investment projects time extension in days for different projects.
</narrative></comment>
</target>
<actual value="319.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="80.00">
<comment><narrative>
State real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public real estate with complete legal documentation
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="80.00">
<comment><narrative>
State real estate properties with complete legal documentation proving state ownership as share of total number of state real estate properties listed in state database
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="45.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="69.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="45.00">
<comment><narrative>
Days between Demand Registration in procurement system and award of contract to provider for acquired goods (non-complex items).
</narrative></comment>
</target>
<actual value="69.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches contributing to the Central Management Unit for the Public Servant Pension Regime
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by IGEPREV, for all State's civil servants.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches contributing to the Central Management Unit for the Public Servant Pension Regime
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by IGEPREV, for all State's civil servants.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities that are using the new cofinancing financial management system
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2028-06-30" />
<target value="70.00">
<comment><narrative>
It measures the share of municipalities that implemented and are extracting reports from the new financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public sector workforce replacement rate in non frontline service delivery staff
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.01"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.96">
<comment><narrative>
It measures the replacement rate (the share of recruited personnel per the personnel leaving active post due to retirement, resignation or death) in non-frontline service delivery areas of the past five years.
This indicators does not consider public officials in areas of service delivery (health, education, social assistance, public security and re-socialization).
The strategic workforce planing, in line with the sizing of the Federal administration, leads to the automation of processes in support areas and departments and to the review of career structure and incentives in service delivery areas, indicating a reduction in the workforce in support areas (non-frontline service delivery staff).
</narrative></comment>
</target>
<actual value="1.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net fixed property income
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1,721,000.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3,500,000.00">
<comment><narrative>
Average net fixed property income of State &quot;receita patrimonial&quot; element in Budget revenues. Measured as moving 5 year average.
</narrative></comment>
</target>
<actual value="1,721,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities that are using the new cofinancing financial management system
</narrative></title>
<baseline year="2022" iso-date="2022-10-31" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-10-31" />
<period-end iso-date="2028-06-30" />
<target value="70.00">
<comment><narrative>
It measures the share of municipalities that implemented and are extracting reports from the new financial management information system
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="Yes">
<comment><narrative>
Complete inventory report on state ICT infrastructure and systems finalized and available
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public officials covered by the workforce planning reports
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="85.00">
<comment><narrative>
Public officials covered by strategic workforce planning reports as a percentage of the total workforce.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project investments time overruns
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="319.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-06-30" />
<target value="150.00">
<comment><narrative>
It measures the investment projects time extension in days for different projects.
</narrative></comment>
</target>
<actual value="319.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Identified active public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="0.30">
<comment><narrative>
Expenditure nonconformities of the active personnel payroll. Data would come from Audits. The management analytics product would identify risk areas for control Baseline is total payroll and target is 0,3% of it.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project investments time overruns
</narrative></title>
<baseline year="2023" iso-date="2023-01-01" value="319.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-01-01" />
<period-end iso-date="2028-06-30" />
<target value="150.00">
<comment><narrative>
It measures the investment projects time extension in days for different projects.
</narrative></comment>
</target>
<actual value="319.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Branches contributing to the Central Management Unit for the Public Servant Pension Regime
</narrative></title>
<baseline year="2022" iso-date="2022-09-30" value="1.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-09-30" />
<period-end iso-date="2028-06-30" />
<target value="3.00">
<comment><narrative>
Measures the adoption of the Central Management Unit  for the Public Servant Pension Regime - RPPS, coordinated by IGEPREV, for all State's civil servants.
</narrative></comment>
</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P179182</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Rio de Janeiro Fiscal Management and Sustainable Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective of this programmatic series is to support the Municipality of Rio de Janeiro in: (i) strengthening fiscal management to improve medium-term fiscal sustainability; and (ii) accelerating the transition towards a low-carbon, resilient and inclusive urban development .]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Rio De Janeiro Fiscal Management and Sustainable Development Policy Loan for Brazil is to support the Municipality of Rio de Janeiro in: (i) strengthening fiscal management to improve medium-term fiscal sustainability; and (ii) accelerating the transition towards a low-carbon, resilient and inclusive urban development. Pillar 1 is related to the PE and PPA area of governance, as it supports the strategic initiatives to strengthen fiscal responsibility and increase the accountability and efficiency of public spending. Pillar 2 supports several initiatives across the six strategic areas under the PE and PPA, including: quality of the transport system and public space, safe traffic and transportation, women and gender equity, downtown revival (Reviver Centro), low emission district and climate management, and resilience and risk management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0054475"><narrative>Municipality of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0054476"><narrative>Secretaria Municipal de Transportes</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2023-10-26"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-11-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Ana Waksberg Guerrini</narrative></person-name><telephone>+1-202-473-1000</telephone><email>aguerrini@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15185" percentage="31" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="25" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="22" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="38.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="25.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="13" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="25" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="13" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="13" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="38" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="13" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="50" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000421" percentage="13" xml:lang="en"><narrative>Judicial and other Dispute Resolution Mechanisms</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="13" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="13" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="13" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="13" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000023" percentage="13" xml:lang="en"><narrative>Public Private Partnerships</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="25" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="13" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="25" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="13" xml:lang="en"><narrative>Rule of Law</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="25" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="13" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="13" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="13" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000074" percentage="13" xml:lang="en"><narrative>Road Safety</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="13" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="13" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000522" percentage="13" xml:lang="en"><narrative>Social Insurance and Pensions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="38" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="25" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="13" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="13" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000084" percentage="13" xml:lang="en"><narrative>Environmental policies and institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000133" percentage="25" xml:lang="en"><narrative>Green Growth</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000013" percentage="25" xml:lang="en"><narrative>Economic Growth and Planning</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000042" percentage="13" xml:lang="en"><narrative>Rule of Law</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">135238245.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">135238245.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">135238245</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">135238245</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-338096</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4997060</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3863503</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3626085</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3194679</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-3867814</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-3867814</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-3867814</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54476"><narrative>Secretaria Municipal de Transportes</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54477"><narrative>Secretaria Municipal de Fazenda e Planejamento</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179182"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179182?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179182"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in the number of essential activities implementation of the IA-CM level 2
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="80">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints submitted to the new tracking and response system that are addressed and responded
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="75">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current savings (current spending as percentage of current revenues - CAPAG indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="100.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="Less than 95">

</target>
<actual value="94.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Monthly bicycle trips in the Low Emission District (Rio's Bike sharing Scheme)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="65,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2024-09-15" />
<target value="85,000">

</target>
<actual value="66,114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2017" iso-date="2017-12-15" value="0 (zero)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-15" />
<period-end iso-date="2024-12-15" />
<target value="5.0">

</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Liquidity (Financial Obligations from Non-Earmarked Resources as percentage of gross cash balance, CAPAG indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="-188.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="Less than 100">

</target>
<actual value="84.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
High and medium capacity mass transit stations connected with cycleways
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="At least, 40 percent">

</target>
<actual value="57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services provided by the Specialized Network for Combating Violence Against Women
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="2,346"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="8,200">

</target>
<actual value="28,258">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISS revenue in 2024, compared to projection with no reform (Millions of 2021 R$)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6,482"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="6,689.0">

</target>
<actual value="7,495.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pension Contributions in real terms (Millions of 2021 Real)
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="4,241"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2024-12-16" />
<target value="4,676">

</target>
<actual value="4,750.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credits generated in Rio de Janeiro (Tons)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="600,000">

</target>
<actual value="123,373.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Pension Contributions in real terms (Millions of 2021 Real)
</narrative></title>
<baseline year="2020" iso-date="2020-12-16" value="4,241"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-16" />
<period-end iso-date="2024-12-16" />
<target value="4,676">

</target>
<actual value="4,750.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2017" iso-date="2017-12-15" value="0 (zero)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2017-12-15" />
<period-end iso-date="2024-12-15" />
<target value="5.0">

</target>
<actual value="15.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Monthly bicycle trips in the Low Emission District (Rio's Bike sharing Scheme)
</narrative></title>
<baseline year="2021" iso-date="2021-09-15" value="65,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-09-15" />
<period-end iso-date="2024-09-15" />
<target value="85,000">

</target>
<actual value="66,114">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rate of traffic deaths per 100,000 inhabitants
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="9.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="8.0">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
High and medium capacity mass transit stations connected with cycleways
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="20"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="At least, 40 percent">

</target>
<actual value="57">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Services provided by the Specialized Network for Combating Violence Against Women
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="2,346"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="8,200">

</target>
<actual value="28,258">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints submitted to the new tracking and response system that are addressed and responded
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="75">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ridership in the BRT system (millions of passengers)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="60.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="80.0">

</target>
<actual value="134.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of carbon credits generated in Rio de Janeiro (Tons)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="600,000">

</target>
<actual value="123,373.15">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
ISS revenue in 2024, compared to projection with no reform (Millions of 2021 R$)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="6,482"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="6,689.0">

</target>
<actual value="7,495.7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase in the number of essential activities implementation of the IA-CM level 2
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="80">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Liquidity (Financial Obligations from Non-Earmarked Resources as percentage of gross cash balance, CAPAG indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="-188.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="Less than 100">

</target>
<actual value="84.11">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current savings (current spending as percentage of current revenues - CAPAG indicator)
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="100.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="Less than 95">

</target>
<actual value="94.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ridership in the BRT system (millions of passengers)
</narrative></title>
<baseline year="2021" iso-date="2021-12-15" value="60.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2021-12-15" />
<period-end iso-date="2024-12-15" />
<target value="80.0">

</target>
<actual value="134.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rate of traffic deaths per 100,000 inhabitants
</narrative></title>
<baseline year="2020" iso-date="2020-12-15" value="9.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2020-12-15" />
<period-end iso-date="2024-12-15" />
<target value="8.0">

</target>
<actual value="10.3">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P179365</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil: Support to New Bolsa Familia Conditional Cash Transfer Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The objective of the project is to protect income and mitigate the risks of damaging human capital of poor families with children and youth.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Brazil: Support to New Bolsa Familia Conditional Cash Transfer Program for Brazil has the development objectives to protect the income of poor families with children from 0 to 6 years of age and to mitigate risks that might damage those children's human capital. The project consists of one Component, the First Childhood Benefit for families with children from 0 to 6 years of age, which finances monthly conditional cash transfers to eligible families under Bolsa Familia (BF) to reinforce early childhood health and education, with compliance monitored through health checkups and preschool enrollment and attendance. Eligibility is verified through the Single Social Assistance Registry (Cadastro Unico) managed by the Ministry of Development, Social Assistance, Family, and Hunger Alleviation (MDS), and payments are delivered through Caixa Economica Federal (CEF) using digital accounts to ensure timely and secure access. Monitoring of conditionalities is carried out via the Monitoring System for Conditionalities (SICON), which consolidates information provided by health and education authorities, and program oversight includes results monitoring and evaluation conducted by the Project Implementation Unit within MDS. Beneficiary engagement and grievance resolution are supported by established grievance redress mechanisms in line with national legislation, with performance tracked against service standards to ensure timely responses. The Component is implemented within Brazil's adaptive social protection system to strengthen resilience to shocks, with priority given to women as designated recipients and enhancements to data quality and interoperability to maintain accurate beneficiary records and continuous service delivery.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0052767"><narrative>Federative Republic of Brazil                                                                       </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0052766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2023-12-06"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2023-12-06"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tiago Falcao Silva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfalcaosilva@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="100.000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="0" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000672" percentage="0" xml:lang="en"><narrative>Food Security</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000067" percentage="0" xml:lang="en"><narrative>Nutrition and Food Security</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">8571427.57</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">8571434.58</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">13749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">13750011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">12500005.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">300000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">750000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">60000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">239250000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-750000</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-1349725</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-1796472</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-52766"><narrative>Ministry of Development, Social Assistance, Family, and Hunger Alleviation</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179365"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P179365?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P179365"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="82.73">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women who are being monitored for compliance with health conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="99.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">

</target>
<actual value="99.90">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of cash-based interventions
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="2,480,0000">
<comment><narrative>
This indicator was introduced as part of the CRI restructuring to align results reporting with updated corporate standards, which require beneficiaries of cash-based interventions to be reported in number of people. The indicator reports all persons living in households receiving the Beneficio Primeira Infância financed by the Project, ensuring consistency with the revised methodology and enabling disaggregation by sex and age group.
</narrative></comment>
</target>
<actual value="2,472,0228">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">

</target>
<actual value="8,551,024">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="930,0000">

</target>
<actual value="8,784,128">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">
<comment><narrative>
Results remained below target mainly due to a reduction in the total number of beneficiary families, reflecting changes in economic conditions, increased program focalization and gradual exits, while prioritization of families with young children helped mitigate steeper declines. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="8,615,416">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="61.18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of cash-based interventions
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="2,480,0000">
<comment><narrative>
This indicator was introduced as part of the CRI restructuring to align results reporting with updated corporate standards, which require beneficiaries of cash-based interventions to be reported in number of people. The indicator reports all persons living in households receiving the Beneficio Primeira Infância financed by the Project, ensuring consistency with the revised methodology and enabling disaggregation by sex and age group.
</narrative></comment>
</target>
<actual value="2,472,0228">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cases from the BF program grievance redress mechanism addressed in 30 days
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="2,480,0000">
<comment><narrative>
The target for this indicator was revised as part of the project restructuring and is now correctly reflected under the Beneficiaries of cash-based interventions indicator added during the restructuring. The revision aligns the target with the updated corporate definition of beneficiaries and the adjusted CRI methodology, ensuring consistency with administrative data and PAD assumptions.
</narrative></comment>
</target>
<actual value="2,200,7473">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="674,0000">
<comment><narrative>
The target for this indicator was revised as part of the project restructuring and is now correctly reflected under the Beneficiaries of cash-based interventions indicator added during the restructuring. The revision aligns the target with the updated corporate definition of beneficiaries and the adjusted CRI methodology, ensuring consistency with administrative data and PAD assumptions.
</narrative></comment>
</target>
<actual value="6,722,800">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of household heads among families with children aged 0-6 and receiving BF transfer who are women
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="81.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="95">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children and youth aged 6-17 who are being monitored for compliance with education conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="73.38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="90.07">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete an annual report on food security and nutrition
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-01" />
<target value="2">
<comment><narrative>
Report under preparation. Data is being collected yearly
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete an annual report on food security and nutrition
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-01" />
<target value="2">
<comment><narrative>
Both annual reports on food security and nutrition were completed as planned, meeting the end target.
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
This strong performance likely reflects the renewed institutional emphasis on early childhood conditionality monitoring under the New Bolsa Familia law (Lei 14.601/2023). A deeper analysis of the factors driving this overachievement will be conducted in the ICR.
</narrative></comment>
</target>
<actual value="84.55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="84.55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children and youth aged 6-17 receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="14,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="15,000,000">
<comment><narrative>
The shortfall mirrors the reduction in total beneficiary families, although prioritization of households with children and adolescents helped contain larger coverage losses. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="14,053,658">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="21,219,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="21,700,000">
<comment><narrative>
Results reflect strengthened targeting, updated poverty estimates, improved registry quality, and the application of the Protection Rule, resulting in the gradual exit of families whose income increased. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="18,707,740">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children and youth aged 6-17 who are being monitored for compliance with education conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="73.38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="88.61">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">

</target>
<actual value="8,784,128">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="21,219,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="21,700,000">
<comment><narrative>
Results reflect strengthened targeting, updated poverty estimates, improved registry quality, and the application of the Protection Rule, resulting in the gradual exit of families whose income increased. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="18,707,740">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete an annual report on food security and nutrition
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-01" />
<target value="2">
<comment><narrative>
Report under preparation. Data is being collected yearly
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="15,179,345">
<comment><narrative>
This indicator previously captured all household members receiving Bolsa Familia residing in  municipalities vulnerable to climate castastrophies. It has now been adjusted under the updated/consolidated CRI methodology to include all household members in households receiving the First Childhood Benefit (Beneficio Primeira Infância – BPI) residing in municipalities vulnerable to climate catastrophies. The target has also been updated to 6,800,000 using the December 2024 value as a reference.
</narrative></comment>
</target>
<actual value="6,223,269">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cases from the BF program grievance redress mechanism addressed in 30 days
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="21,219,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="21,700,000">

</target>
<actual value="18,656,808">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="61.14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women who are being monitored for compliance with health conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="99.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">
<comment><narrative>
The gap reflects the exceptional nature of the baseline and improvements in monitoring systems that now more accurately capture non-compliance, alongside registration and operational constraints during short gestational cycles. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="90.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children and youth aged 6-17 who are being monitored for compliance with education conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="73.38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="84.14">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cases from the BF program grievance redress mechanism addressed in 30 days
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">
<comment><narrative>
In the second semester of 2025, a total of 7,011 grievances related to the Bolsa Familia Program were registered, with women representing the vast majority of complainants (6,075). The most frequent issues raised were eligibility for program entry, cancellation/blocking due to registry review, and pending concession of benefits. The average response time was approximately 7 days, and all grievances escalated to the Ministry of Health's Ombudsman were resolved within 30 days, suggesting the grievance mechanism is functioning and responsive.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="68.01">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="21,219,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="21,700,000">

</target>
<actual value="20,499,027">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women who are being monitored for compliance with health conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="99.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">

</target>
<actual value="99.92">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pregnant women receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,43,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,66,000">
<comment><narrative>
Results were affected by demographic trends, registry and identification challenges, and operational seasonality in health reporting, despite policy prioritization of pregnant women for program entry. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="626,902">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="15,179,345">

</target>
<actual value="51,208,857">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pregnant women receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,43,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,66,000">
<comment><narrative>
Results were affected by demographic trends, registry and identification challenges, and operational seasonality in health reporting, despite policy prioritization of pregnant women for program entry. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="626,902">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children and youth aged 6-17 receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="14,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="15,000,000">
<comment><narrative>
The shortfall mirrors the reduction in total beneficiary families, although prioritization of households with children and adolescents helped contain larger coverage losses. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="14,053,658">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pregnant women receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,43,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,66,000">

</target>
<actual value="6,78,444">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="930,0000">
<comment><narrative>
This indicator previously captured only children benefiting from the First Childhood Benefit (Beneficio Primeira Infância – BPI). It has now been adjusted under the updated/consolidated CRI methodology to include all household members in families receiving the benefit. Corrected figures for previous periods and target are: 24,720,228 (Dec-31-2024), 23,661,159 (Jun-30-2025) and 24,800,000 (Abr-30-2026).
</narrative></comment>
</target>
<actual value="22,007,473">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children and youth aged 6-17 receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="14,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="15,000,000">

</target>
<actual value="14,305,500">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of household heads among families with children aged 0-6 and receiving BF transfer who are women
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="81.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">
<comment><narrative>
This strong performance likely reflects the structural design of the New Bolsa Familia, which reinforced the preference for women as the primary recipient of transfers, combined with the updated registration process in the Cadastro Único (Lei 14.601/2023). A deeper analysis of the factors driving this overachievement will be conducted in the ICR.
</narrative></comment>
</target>
<actual value="94.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Complete an annual report on food security and nutrition
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-01" />
<target value="2">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
Although coverage improved relative to baseline, performance remains below target due to lingering post-pandemic disruptions, municipal operational constraints, and delays in recording health follow-ups. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="62.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="2,480,0000">
<comment><narrative>
In the last ISR, the CRI methodology was adjusted to ensure consistency with the revised corporate definition of beneficiaries, which reports the total number of people living in households receiving the Beneficio Primeira Infância (BPI). The revised approach applies the proportion observed in December 2024 between the number of families receiving the BPI and the total number of people living in those households. Specifically, the ratio of total people in BPI-recipient households (24,720,228) to the number of BPI beneficiary families (9,262,223), equivalent to 0.37, was applied to update the previously established target of 9.3 million beneficiaries. This adjustment aligns the target with administrative data, preserves consistency with PAD assumptions, and ensures comparability with the revised CRI methodology.
</narrative></comment>
</target>
<actual value="22,007,473">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">
<comment><narrative>
Results remained below target mainly due to a reduction in the total number of beneficiary families, reflecting changes in economic conditions, increased program focalization and gradual exits, while prioritization of families with young children helped mitigate steeper declines. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="8,615,416">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">

</target>
<actual value="8,551,024">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">

</target>
<actual value="8,784,128">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">
<comment><narrative>
Results remained below target mainly due to a reduction in the total number of beneficiary families, reflecting changes in economic conditions, increased program focalization and gradual exits, while prioritization of families with young children helped mitigate steeper declines. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="8,615,416">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
This strong performance likely reflects the renewed institutional emphasis on early childhood conditionality monitoring under the New Bolsa Familia law (Lei 14.601/2023). A deeper analysis of the factors driving this overachievement will be conducted in the ICR.
</narrative></comment>
</target>
<actual value="84.55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="82.73">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="68.01">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 4-5 who are being monitored by the program for compliance with educational conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="51.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="84.55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
Although coverage improved relative to baseline, performance remains below target due to lingering post-pandemic disruptions, municipal operational constraints, and delays in recording health follow-ups. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="62.56">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="61.14">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">

</target>
<actual value="61.18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
Although coverage improved relative to baseline, performance remains below target due to lingering post-pandemic disruptions, municipal operational constraints, and delays in recording health follow-ups. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="62.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of children and youth aged 6-17 who are being monitored for compliance with education conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="73.38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">
<comment><narrative>
This strong performance likely reflects the recovery of the education conditionality monitoring system (Sistema Presenças) following pandemic-related disruptions, reinforced by the renewed institutional emphasis on conditionality tracking under the New Bolsa Familia law (Lei 14.601/2023). A deeper analysis of the factors driving this overachievement will be conducted in the ICR.
</narrative></comment>
</target>
<actual value="90.07">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pregnant women receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,43,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,66,000">

</target>
<actual value="5,75,396">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of pregnant women who are being monitored for compliance with health conditionalities
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="99.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">
<comment><narrative>
The gap reflects the exceptional nature of the baseline and improvements in monitoring systems that now more accurately capture non-compliance, alongside registration and operational constraints during short gestational cycles. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="90.8">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children and youth aged 6-17 receiving additional benefit in Bolsa Familia
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="14,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="15,000,000">

</target>
<actual value="15,388,120">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of children aged 0-6 benefiting from the First Childhood Benefit of the BF
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="9,126,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="9,300,000">
<comment><narrative>
Results remained below target mainly due to a reduction in the total number of beneficiary families, reflecting changes in economic conditions, increased program focalization and gradual exits, while prioritization of families with young children helped mitigate steeper declines. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="8,615,416">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of cases from the BF program grievance redress mechanism addressed in 30 days
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="100">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Children aged 0-6 who are being monitored by the program for compliance with health checkups
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="54.45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="70">
<comment><narrative>
Although coverage improved relative to baseline, performance remains below target due to lingering post-pandemic disruptions, municipal operational constraints, and delays in recording health follow-ups. Additional analysis and lessons learned will be presented in the Implementation Completion Report (ICR).
</narrative></comment>
</target>
<actual value="62.56">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with enhanced resilience to climate risks
</narrative></title>
<baseline year="2023" iso-date="2023-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-15" />
<period-end iso-date="2025-12-15" />
<target value="674,0000">
<comment><narrative>
This indicator was revised as part of the CRI restructuring to align with updated corporate methodology, which reports people living in Beneficio Primeira Infância (BPI) recipient households located in municipalities vulnerable to climate-related shocks. The end target was calculated using the same proportional adjustment applied to the overall beneficiaries CRI, ensuring methodological consistency across results indicators.
</narrative></comment>
</target>
<actual value="6,722,800">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of household heads among families with children aged 0-6 and receiving BF transfer who are women
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="81.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="94.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of household heads among families with children aged 0-6 and receiving BF transfer who are women
</narrative></title>
<baseline year="2023" iso-date="2023-02-01" value="81.2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-02-01" />
<period-end iso-date="2025-12-02" />
<target value="85">

</target>
<actual value="94.79">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P180429</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia Sustainable Rural Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase market access, agricultural productivity and develop resilience of family farmers to shocks while expanding access to resilient water services in selected rural areas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project aims to improve access to markets, climate change resilience of family farmers, and access to safe water in selected rural areas. The project will benefit mostly small-scale family farmers, indigenous people, and traditional communities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0055024"><narrative>State of Bahia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0055023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-11-07"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-11-07"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-10-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-10-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Leonardo Bichara Rocha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lbichararocha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Av. Luis Viana Filho, Conjunto Seplan, 2º Avenida, 250, Salvador, BA, Brazil, +55 71 3115-3940
, http://www.car.ba.gov.br/
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="32161" percentage="34" xml:lang="en"/><sector vocabulary="1" code="32161" percentage="34" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="33" xml:lang="en"/><sector vocabulary="1" code="14031" percentage="33" xml:lang="en"/><sector vocabulary="1" code="14031" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWC" percentage="28.0000000" xml:lang="en"><narrative>Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="16.0000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAB" percentage="28.0000000" xml:lang="en"><narrative>Agricultural Extension, Research, and Other Support Activities </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="28.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="0" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="0" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="0" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="0" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="0" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="0" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="0" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="0" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="0" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="0" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000723" percentage="0" xml:lang="en"><narrative>Rural Infrastructure and service delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000721" percentage="0" xml:lang="en"><narrative>Rural Markets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="0" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="0" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000062" percentage="0" xml:lang="en"><narrative>Disease Control</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="0" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="0" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="0" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="0" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000754" percentage="0" xml:lang="en"><narrative>Flood and Drought Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="0" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">1292767.27</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">1292778.30</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1982570.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1982582.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1940009.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1940021.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1752458.42</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1752470.38</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">959474.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">959486.25</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">513777.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">513789.75</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">646382.64</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">646390.60</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-30"/>
<value currency="USD" value-date="2030-10-30">84750000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-30"/>
<value currency="USD" value-date="2030-10-30">84750000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">100000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">250000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-250000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55023"><narrative>CAR - Companhia de Desenvolvimento e Acao Regional</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180429"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180429?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180429"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="29500">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.

NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
Technology includes a change in practices compared to currently used practices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2031-05-10" />
<target value="8,7100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in time burden of household chores as a result of access to water supply.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20">
<comment><narrative>
Reduction in time burden to collect water, carried out by women,  resulting for securing access to water supply through project investments under component 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-09" />
<target value="147,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rural Organizations adopting improved agro-industrial and commercial practices and technologies
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="129">
<comment><narrative>
Number of POs that have adopted improved agro-industrial and commercial practices and technologies. Adoption is understood as a change in practice or change in the use of a technology that was introduced or promoted by the project. Technology includes a change in practices compared to the practices or technologies currently used by POs.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans (PN) and Ethnodevelopment (PE) promoted.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="800">
<comment><narrative>
This indicator refers to business plans whose planned investments were implemented by productive organizations and plans aimed at indigenous communities
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers and rural organizations in the agri-food system .?
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2036-05-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with productive investments and water access
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of systems that adopted aquifer resilience actions
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="100">
<comment><narrative>
It is referred to systems that adopted climate resilience actions in systems whose capture will take place in the crystalline masses, such as: reservoir capacity sized based on pump opening time resulting in the adoption of higher reservation volumes than recommended in technical literature; Use of a maximum of 70% of the well flow, social activities of awareness and rational use of water.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-11" />
<target value="74,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2031-05-11" />
<target value="55,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 3: Reduce inequality in gross value of sales between female-led and male-led Producer Organizations (PO).
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed.
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Families with better knowledge about hygiene practices.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="50">
<comment><narrative>
This indicator percentage the amount of families benefited by the project that improved their knowledge regarding hygiene practices.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 3: Reduce inequality in gross value of sales between female-led and male-led Producer Organizations (PO).
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="50">
<comment><narrative>
The performance of the productive organization will be given by calculating the productive organization performance index (IDOP). This calculation is done through the weighted average of the score obtained by applying a questionnaire containing a checklist, with items according to the typology of the productive organization, which takes into account 5 areas.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed.
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="90">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Family Farming Brands promoted by the implementation of Communication Plans.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="160">
<comment><narrative>
This indicator refers to the number of family farming product brands that were promoted and/or communicated (in different media: social networks, websites, E-Commerce digital platforms, podcasts, newspapers, TV, magazines or others) in the market as a result project intervention through communication strategies foreseen in the Business Plan, or in a possible strategic marketing plan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="8,68">
<comment><narrative>
The end target is 8.68 million.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with productive investments and water access
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number water connections implemented by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="50">
<comment><narrative>
The performance of the productive organization will be given by calculating the productive organization performance index (IDOP). This calculation is done through the weighted average of the score obtained by applying a questionnaire containing a checklist, with items according to the typology of the productive organization, which takes into account 5 areas.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 2: Increase the gross value of sales from agricultural activities, for farmers supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Units of renewable energy generation implemented in the water supply centers.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="6">
<comment><narrative>
This indicator refers to installed capacity for renewable energy generation resulting from the implementation of the 3 new centrals and the 3 existing plants.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 1: Increase gross valeu of sales of rural organizations supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of replicators and opinion makers trained in good agricultural practices and technologies that increase climate resilience.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="1200">
<comment><narrative>
This indicator measures the amount of replicating subjects and opinion makers (ATER, ACR, organizations representatives) who will provide services to project beneficiaries, trained in good agricultural practices and technologies that increase climate resilience.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers and rural organizations in the agri-food system .?
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2036-05-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of replicators and opinion makers trained in good agricultural practices and technologies that increase climate resilience.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="1200">
<comment><narrative>
This indicator measures the amount of replicating subjects and opinion makers (ATER, ACR, organizations representatives) who will provide services to project beneficiaries, trained in good agricultural practices and technologies that increase climate resilience.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from greater gender equality
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="6,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number water connections implemented by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families directly benefiting from the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="56200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-09" />
<target value="147,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of systems that adopted aquifer resilience actions
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="100">
<comment><narrative>
It is referred to systems that adopted climate resilience actions in systems whose capture will take place in the crystalline masses, such as: reservoir capacity sized based on pump opening time resulting in the adoption of higher reservation volumes than recommended in technical literature; Use of a maximum of 70% of the well flow, social activities of awareness and rational use of water.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-05-13" />
<target value="1,3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of household with a signed term of adhesion to the Central.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20000">
<comment><narrative>
The number of households with a signed term of adhesion  to the Water Center
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from greater gender equality
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="6,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-05-12" />
<target value="12,600">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 1: Increase gross valeu of sales of rural organizations supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families directly benefiting from the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-05-15" />
<target value="56200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Rural Organizations adopting improved agro-industrial and commercial practices and technologies
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="129">
<comment><narrative>
Number of POs that have adopted improved agro-industrial and commercial practices and technologies. Adoption is understood as a change in practice or change in the use of a technology that was introduced or promoted by the project. Technology includes a change in practices compared to the practices or technologies currently used by POs.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in time burden of household chores as a result of access to water supply.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20">
<comment><narrative>
Reduction in time burden to collect water, carried out by women,  resulting for securing access to water supply through project investments under component 2.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="29500">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.

NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
Technology includes a change in practices compared to currently used practices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People and businesses using financial services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-05-12" />
<target value="12,600">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2031-05-11" />
<target value="55,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Families with better knowledge about hygiene practices.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="50">
<comment><narrative>
This indicator percentage the amount of families benefited by the project that improved their knowledge regarding hygiene practices.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-05-13" />
<target value="1,3000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2031-05-11" />
<target value="55,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with safely managed water
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2031-05-11" />
<target value="55,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2031-05-10" />
<target value="8,7100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2031-05-10" />
<target value="8,7100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-09" />
<target value="147,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-09" />
<target value="147,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2036-05-11" />
<target value="1,17000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2036-05-11" />
<target value="1,17000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-11" />
<target value="74,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans (PN) and Ethnodevelopment (PE) promoted.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="800">
<comment><narrative>
This indicator refers to business plans whose planned investments were implemented by productive organizations and plans aimed at indigenous communities
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-11" />
<target value="74,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="29500">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.

NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
Technology includes a change in practices compared to currently used practices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Farmers adopting improved agricultural technology
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="29500">
<comment><narrative>
This indicator measures the number of farmers (of agricultural products) who have adopted an improved agricultural technology promoted by operations supported by the World Bank.

NB: &quot;Agriculture&quot; or &quot;Agricultural&quot; includes: crops, livestock, capture fisheries, aquaculture, agroforestry, timber and non-timber forest products.
Adoption refers to a change of practice or change in use of a technology that was introduced or promoted by the project.
Technology includes a change in practices compared to currently used practices or technologies (seed preparation, planting time, feeding schedule, feeding ingredients, postharvest storage/ processing, etc.). If the project introduces or promotes a technology package in which the benefit depends on the application of the entire package (e.g., a combination of inputs such as a new variety and advice on agronomic practices such as soil preparation, changes in seeding time, fertilizer schedule, plant protection, etc.), this counts as one technology.
Farmers are people engaged in farming of agricultural products or members of an agriculture related business (disaggregated by men and women) targeted by the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers and rural organizations in the agri-food system .?
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2036-05-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in gross value of sales by family farmers and rural organizations in the agri-food system .?
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2036-05-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 3: Reduce inequality in gross value of sales between female-led and male-led Producer Organizations (PO).
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 3: Reduce inequality in gross value of sales between female-led and male-led Producer Organizations (PO).
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 2: Increase the gross value of sales from agricultural activities, for farmers supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 2: Increase the gross value of sales from agricultural activities, for farmers supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 1: Increase gross valeu of sales of rural organizations supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 1: Increase gross valeu of sales of rural organizations supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of household with a signed term of adhesion to the Central.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="20000">
<comment><narrative>
The number of households with a signed term of adhesion  to the Water Center
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2036-05-11" />
<target value="1,17000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-11" />
<period-end iso-date="2036-05-11" />
<target value="1,17000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO Indicator 2: Increase the gross value of sales from agricultural activities, for farmers supported by the project.
</narrative></title>
<baseline year="2025" iso-date="2025-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-13" />
<period-end iso-date="2031-05-12" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="8,68">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Units of renewable energy generation implemented in the water supply centers.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="6">
<comment><narrative>
This indicator refers to installed capacity for renewable energy generation resulting from the implementation of the 3 new centrals and the 3 existing plants.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with service management agreements signed with the Centrais
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="66">
<comment><narrative>
This indicator refers to the number of municipalities of the state with adhesion of the centrals. For the founding of the Supply Central, the municipalities previously sign the management agreement adhering to the central model. This procedure is performed from the first institutional approach when the public manager expresses interest and signs the management agreement
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-10" />
<period-end iso-date="2031-05-10" />
<target value="8,7100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities with service management agreements signed with the Centrais
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="44"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="66">
<comment><narrative>
This indicator refers to the number of municipalities of the state with adhesion of the centrals. For the founding of the Supply Central, the municipalities previously sign the management agreement adhering to the central model. This procedure is performed from the first institutional approach when the public manager expresses interest and signs the management agreement
</narrative></comment>
</target>
<actual value="44">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Family Farming Brands promoted by the implementation of Communication Plans.
</narrative></title>
<baseline year="2025" iso-date="2025-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-12" />
<period-end iso-date="2031-05-12" />
<target value="160">
<comment><narrative>
This indicator refers to the number of family farming product brands that were promoted and/or communicated (in different media: social networks, websites, E-Commerce digital platforms, podcasts, newspapers, TV, magazines or others) in the market as a result project intervention through communication strategies foreseen in the Business Plan, or in a possible strategic marketing plan.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-05-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-09" />
<period-end iso-date="2036-05-11" />
<target value="74,5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P180430</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil: Pernambuco Rural Water and Sanitation Project (PROSAR)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access to sustainable, safely managed drinking water supply and improved sanitation in selected rural communities and to build the Borrower's capacity to reach universal RWSS services.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed Project is a US$113 million Investment Project Financing (IPF) operation, financed by a US$90 million IBRD loan and US$23 million in State counterpart funds. The Project will support the State's higher-level goals of reaching universal WSS access; achieving the SDG reducing the public service and development gaps between urban and rural areas; slowing-down rural migration to urban areas and other states; improving the quality of life and health of rural population and their resilience to climate change risks. It will comprise three components:Component 1 – Increase access to climate-resilient, safely-managed RWS and improved sanitation (US$91.27 million of which US$68.27 million IBRD financing and US$23 million counterpart funds). This component aims at increasing rural population's access to safely managed drinking water supply resilient to water scarcity, droughts and floods, and improved on-site sanitation solutions, thereby contributing to the State universal WSS access goal and increasing the rural population's resilience to climate change exacerbated water scarcity, droughts and floodsSubcomponent 1.1 –Increase access to safely-managed RWS and improved on-site sanitation solutions with climate-resilient designs (US$69.50 million of which US$66.50 million IBRD financing and US$3 million counterpart funds). This subcomponent finances the feasibility studies, engineering designs, works and supervision of works of water scarcity, drought and flood resilient, safely managed RWS systems  (climate resilient infrastructure design elements are discussed in the Technical Analysis section) and improved sanitation solutions  in selected rural communities, including where required, in community health centers and schools. It will also finance feasibility studies and engineering designs of RWSS systems that will be implemented in subsequent projects. RWSS systems will have climate-resilient designs considering flood and drought risks, and will be ethnicity, race and gender sensitive. As a result, the activities are expected to support closing the gender gap by reducing the disproportionate burden of time spent by women beneficiaries on WSS related tasks in the Project areaSubcomponent 1.2 – Improve climate-resilience of water sources (US$20.80 million of which US$0.80 million IBRD financing and US$20 million counterpart funds). The subcomponent will increase water source resilience to climate risks and respond to IBRD's ESF requirements on dam safety for RWSS subprojects financed under component 1.1. The subcomponent will finance: (a) works and their supervision to implement the Arataca II water conveyance system to increase the drought and water scarcity resilience of the Botafogo water system , by providing an alternative water source in case its current ones fail. This is fully financed with counterpart funds; and (b) instrumentation and basic maintenance  identified in the safety action plans of the existing dams on which RWS financed under component 1.1. rely upon . No rehabilitation  of existing dams nor construction of new dams will be eligible for financing. Subcomponent 1.3 – Innovate with climate-resilient, safely-managed RWSS pilot solutions for universal access (US$0.97 million, fully IBRD financed). The subcomponent will implement innovative technical and management pilot solutions to prepare for climate-resilient, universal access in those rural water supply market segments not covered by SISARs (especially small villages and scattered housing) and to transition fully to safely managed sanitation designed to be resilient to increased scarcity, floods and droughts (design elements detailed in the Technical Analysis section). Financed activities include development of studies and designs for water scarcity, flood and drought resilience, implementation of pilots, monitoring of results, evaluation for replicability and scalability, incorporation in RWSS strategy and investment plans and dissemination of results, including in RWSS strategy and investment plans developed under 2.1.Component 2 – Build the Borrower's capacity to reach universal and climate resilient rural WSS access and sustainably managed RWS systems and their water sources (US$15.75 million, fully IBRD financed). This component aims at building the capacity of the public and private, not-for-profit entities (State, SISAR, community's associations) that have a key role in delivering sustainable, safely managed, and flood and drought-resilient RWS and improved sanitation solutions to reach universal and climate-resilient accessSubcomponent 2.1 – Build the Borrower's capacity to reach universal RWSS access and sustainably managed RWS systems (US$7.95 million, fully IBRD financed). This subcomponent will finance: (a) the establishment of SISARs in six regions , including through activities such as the drafting and implementation of the SISARs capacity building and business plans, the refurbishment and equipment of their office buildings considering climate dimensions and acquisition of vehicles; (b) the improvement and expansion  the Borrower's RWSS information system, including collection of in-situ data; (c) the development and initial implementation of the Borrower's climate-resilient, universal access WSS strategy and regional plans ; (d) a sludge management study of alternatives; (e) the strengthening of the Borrower's dedicated RWSS capacity to deliver technical assistance to the SISARs and the community associations through training, equipment and consultant services; (f) the improvement of the Borrower's monitoring and evaluation of the SISARs performance; and (g) the strengthening of the rural communities capacity to, inter alia, promote hygiene, the rationale use of water in drought and water-scarce situation and  sanitation solutions. To increase women voice and increase their access to paid work, trainings will prioritize women participation at community level and the Project will promote their participation in management and decision-making.Subcomponent 2.2 – Strengthen the resilience of the Borrower's RWS systems water sources under climate risks (US$7.80 million, fully IBRD financed). This subcomponent, in complement to the system-specific activities supported under subcomponent 1.2, aims at strengthening the resilience of the State's RWS system's water sources against climate risks. More specifically, it will:  a.	Increase APAC's capacity to carry out its water resources management (WRM) and São Francisco inter-basin transfer (PISF) O&amp;M and regulation functions where they will contribute to secure rural water sources. This includes, inter alia: (i) the construction or renovation and equipment of APAC's headquarters and two regional offices to increase its presence in the field and its working environment taking into account climate dimensions; (ii) the promotion of a public awareness campaign to increase water users registration and water rights emission; (iii) the development of hydrogeological studies of sedimentary aquifers to identify drought resilient sources; (iv) the strengthening of hydromet monitoring  to better manage rural water sources, improve drought and flood forecasting and climate projections; (v) the development of a state-wide drought preparedness plan, (vi) the carrying out of feasibility studies for urban riverfront park to improve riverfront public access and recreational use as well as improve river and banks ecological state; and (vii) the design and implementation of hydraulic infrastructure and sanitation planning platform. b.	Increase SESAN's and APAC's capacity on dam safety and resilience to extreme flood events, including through (i) the preparation or update of dam O&amp;M plans, dam safety plans and emergency preparedness plans; (ii) the evaluation of dam safety status; (iii) a risk-based inventory of dams in the Borrower's territory; and (iv) the adoption of risk management approaches and tools; as well as staff training.Co]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0054952"><narrative>Government of the State of Pernambuco                                                               </narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0054952"><narrative>Government of the State of Pernambuco                                                               </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0054951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-05-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-05-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-07-14"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-07-14"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Juliana Menezes Garrido</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jgarrido@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>








<contact-info type="2">
<mailing-address><narrative>
Avenida Cruz Cabugá, 1111, Santo Amaro, Brazil, (81) 3183-1000, faleconosco@apac.pe.gov.br

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Avenida Cruz Cabugá, 1111, Santo Amaro, Brazil, (81) 3183-1000, faleconosco@apac.pe.gov.br

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="14020" percentage="62" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="38" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="52.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="7.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">83332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">83344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-14"/>
<value currency="USD" value-date="2032-07-14">89273085.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-14"/>
<value currency="USD" value-date="2032-07-14">89273085.29</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">90000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">225000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">501915</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-225000</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2985</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-20087</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54951"><narrative>Secretariat of Water Resources and WSS (Secretaria de Recursos Hidricos e Saneamento)               </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54953"><narrative>Pernambuco Water and Sanitation Company (Companhia Pernambucana de Saneamento - COMPESA)                      </narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-54954"><narrative>Pernambuco Water and Climate Agency (Agência Pernambucana de Águas e Clima - APAC)                  </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180430"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180430?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180430"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APAC's headquarters and regional offices installed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="3">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
• People provided with at least basic sanitation services , disaggregated by gender and race/ethnicity.
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="39,000">
<comment><narrative>
Rural people benefiting from access to improved sanitation from Project interventions (number), disaggregated by gender and race/ethnicity
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, hygiene (Number), of which percentage is safely managed (Percentage).
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="TBD">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with feasibility and design studies for rural sanitation solutions
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="195">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative RWSS solutions implemented
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with feasibility and design studies for rural water supply systems
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="180">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with improved sanitation solutions implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SISAR Customer Service Satisfaction Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="80">
<comment><narrative>
The Index will include customer satisfaction regarding quality, quantity and regularity of the service.  Surveys would be applied during the diagnostic phase, during MTR and at the end of the Project.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
• People provided with at least basic sanitation services , disaggregated by gender and race/ethnicity.
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="39,000">
<comment><narrative>
Rural people benefiting from access to improved sanitation from Project interventions (number), disaggregated by gender and race/ethnicity
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with feasibility and design studies for rural water supply systems
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="180">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with improved sanitation solutions implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate-resilience of Botafogo water system increased
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
Average monthly water production of the Botafogo system is 1611,85 l/s.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with climate resilient water supply systems implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the Water Infrastructure Planning Platform
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average resolution time of complaints
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
• State's universal, climate-resilient RWSS strategy and regional WSS plans adopted and under implementation
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
The two regional WSS plans were approved. However, selected activities will be implemented to complement these plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WASH jobs created by the project occupied by women
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average resolution time of complaints
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="-"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SISAR Service Quality Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="Not applicable"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Good">
<comment><narrative>
Qualitative:
Total residual chlorine &lt; 0.3 mg/L: Poor (regardless of cash sufficiency)

Residual chlorine = 0.3 mg/L: Assess cash sufficiency (CS)
If CS &lt; 100%: Poor
If CS = 100% and CS &lt; 105%: Fair
If CS = 105%: Good
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
• State's universal, climate-resilient RWSS strategy and regional WSS plans adopted and under implementation
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
The two regional WSS plans were approved. However, selected activities will be implemented to complement these plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SISAR collaborators trained
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">
<comment><narrative>
SISAR collaborators trained within the SISARs supported by the Project, disaggregated by gender and race/ethnicity.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time of women's caregiving tasks per day/week, in communities with drinking water supply systems implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="24"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="21">
<comment><narrative>
The baseline was estimated based on data the Household Sample Survey (Pesquisa Nacional da Amostra por Domicilio) of Pernambuco but during the implementation, through social work, it will be defined for the Project's communities.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Climate-resilience of Botafogo water system increased
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
Average monthly water production of the Botafogo system is 1640,46 l/s.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of WASH jobs created by the project occupied by women
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with water, sanitation, hygiene (Number), of which percentage is safely managed (Percentage).
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="TBD">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SISAR collaborators trained
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">
<comment><narrative>
SISAR collaborators trained within the SISARs supported by the Project, disaggregated by gender and race/ethnicity.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
SISAR Customer Service Satisfaction Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="80">
<comment><narrative>
The Index will include customer satisfaction regarding quality, quantity and regularity of the service.  Surveys would be applied during the diagnostic phase, during MTR and at the end of the Project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time of women's caregiving tasks per day/week, in communities with drinking water supply systems implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="24"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="21">
<comment><narrative>
The baseline was estimated based on data the Household Sample Survey (Pesquisa Nacional da Amostra por Domicilio) of Pernambuco but during the implementation, through social work, it will be defined for the Project's communities.
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural people benefiting from access to safely-managed drinking water supply from climate-resilient water source (number), disaggregated by gender and race/ethnicity
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="48,000">

</target>
<actual value="4288">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SISAR Service Quality Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="Not applicable"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Good">
<comment><narrative>
Qualitative:
Total residual chlorine &lt; 0.3 mg/L: Poor (regardless of cash sufficiency)

Residual chlorine = 0.3 mg/L: Assess cash sufficiency (CS)
If CS &lt; 100%: Poor
If CS = 100% and CS &lt; 105%: Fair
If CS = 105%: Good
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with climate resilient water supply systems implemented by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="100">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural people benefiting from access to safely-managed drinking water supply from climate-resilient water source (number), disaggregated by gender and race/ethnicity
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="48,000">

</target>
<actual value="4288">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities in Pernambuco with hydrogeological monitoring supported by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="34">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Communities with feasibility and design studies for rural sanitation solutions
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="195">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
• State's universal, climate-resilient RWSS strategy and regional WSS plans adopted and under implementation
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
The two regional WSS plans were approved. However, selected activities will be implemented to complement these plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
• State's universal, climate-resilient RWSS strategy and regional WSS plans adopted and under implementation
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">
<comment><narrative>
The two regional WSS plans were approved. However, selected activities will be implemented to complement these plans.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SISAR Service Quality Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="Not applicable"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Good">
<comment><narrative>
Qualitative:
Total residual chlorine &lt; 0.3 mg/L: Poor (regardless of cash sufficiency)

Residual chlorine = 0.3 mg/L: Assess cash sufficiency (CS)
If CS &lt; 100%: Poor
If CS = 100% and CS &lt; 105%: Fair
If CS = 105%: Good
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
SISAR Service Quality Index
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="Not applicable"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Good">
<comment><narrative>
Qualitative:
Total residual chlorine &lt; 0.3 mg/L: Poor (regardless of cash sufficiency)

Residual chlorine = 0.3 mg/L: Assess cash sufficiency (CS)
If CS &lt; 100%: Poor
If CS = 100% and CS &lt; 105%: Fair
If CS = 105%: Good
</narrative></comment>
</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
• People provided with at least basic sanitation services , disaggregated by gender and race/ethnicity.
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="39,000">
<comment><narrative>
Rural people benefiting from access to improved sanitation from Project interventions (number), disaggregated by gender and race/ethnicity
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
• People provided with at least basic sanitation services , disaggregated by gender and race/ethnicity.
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="39,000">
<comment><narrative>
Rural people benefiting from access to improved sanitation from Project interventions (number), disaggregated by gender and race/ethnicity
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural people benefiting from access to safely-managed drinking water supply from climate-resilient water source (number), disaggregated by gender and race/ethnicity
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="48,000">

</target>
<actual value="4288">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural people benefiting from access to safely-managed drinking water supply from climate-resilient water source (number), disaggregated by gender and race/ethnicity
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="48,000">

</target>
<actual value="4288">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
APAC's headquarters and regional offices installed and operational
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="3">
<comment><narrative>
No description available for this Corporate indicator
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities in Pernambuco with hydrogeological monitoring supported by the Project
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="34">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the Water Infrastructure Planning Platform
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative RWSS solutions implemented
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-07-01" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P180462</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Espirito Santo Digital Acceleration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To strengthen digital infrastructure resilience, to modernize emergency management, and to improve digital public infrastructure in the State of Espirito Santo.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project will interconnect and integrate the data management, administrative, and strategic platforms of the State of Espirito Santo to ensure better access to information and optimize the provision of services to citizens. The Project Development Objective is to strengthen digital infrastructure resilience, to modernize emergency management, and to improve digital public infrastructure in the State of Espirito Santo.The project will comprise four components: a) Construction of a green and resilient data center and provide technical assistance to improve a state backbone connectivity network; b) Strengthen Digital public infrastructure by improving data sharing and authentication mechanisms, c) implementation of an Emergency Operations Center, and d) project management.Component 1 – Resilient data infrastructure (US$19.167 millions of which US$13.467 million IBRD). This component will strengthen the data infrastructure resiliency of Espirito Santo providing the state with a state-of-the-art publicly owned green data center. The increasing use of digital solutions, and generation and usage of data requires the establishment of modern storage facilities that meet the appropriate cybersecurity standards and provide the storage and computing power required to analyze and obtain insights from those data. This component will also provide training on digital skills together with the private sector to better equip individuals to adapt to the digital economy and strengthen the innovation and entrepreneurial ecosystem.  The project will finance the construction of a green certified data center that will be owned and managed by PRODEST based on a series of feasibility studies which will assess the (a) the demand, (b) technical characteristics of the identified location, and (c) data center's design options. Additional studies will focus on other topics such as data protection based on the existing legislation, legal and regulatory frameworks, and cybersecurity.Component 2 - Strengthening of Digital Public Infrastructure (DPI) to improve service delivery to individuals, businesses, and government (Estimated cost: US$15.2 million of which US$7.95 million IBRD). This component will finance the acquisition of hardware, software, and consulting services for the Secretarriat of Management and Human Resources (Secretaria de Gestão e Recursos Humanos, SEGER) to develop the unique portal of services of Espirito Santo. The project will support the state to expand access to digital services to individuals, businesses, and government by establishing an interoperability platform and a services portal. This component aims to enhance the resiliency and preparedness of the state's community by providing individuals and businesses with resilient personalized end-to-end digital public services from all government entities in a single platform that ensures service access and continuity in case of climate events or disasters. All goods and services acquired for this component will meet international energy efficiency certification requirements at least one level above Brazilian standard set by the Brazilian Steering Committee of Indicators, such as Energy Star.Component 3 - Modernize Emergency Management System. (US$39.0 million of which US$37.0 million IBRD). This component will support the expansion and modernization of the operational management processes of the emergency response and preparedness system in the State of Espirito Santo through the construction of the “Integrated Center for Social Defense (Centro Integrado de Defesa Social ,CIDES)” and the development and integration of all the systems and procedures for the management of emergency calls. The construction of a new emergency center will allow the state to improve physical and technological infrastructure, enhance its response to crises, and respond to emergency calls from all 78 municipalities in the state (currently CIODES is responding to calls from just 25 municipalities), while allowing the integration of additional agencies, including SUMA 192 (emergency medical services) and full integration of the GBV Line 180. The digital transformation of this sector should provide best practices to further develop digital transformation use cases by the state. The proposed activities would serve to improve the critical capacity and infrastructure for emergency planning and response through the implementation of a single response system for emergency calls which will allow the population to access the Centralized Emergency Response Center more quickly and will consequently increase the efficiency on the provision of the emergency service while reducing the time of response.Component 4. Project Management. (US$3.0 million of which US$2.646 million IBRD). This component will provide support for the management and implementation of the project, including: (a) project coordination; (b) procurement and financial management (FM); (c) implementation of E&amp;S risk management measures; (d) Monitoring and Evaluation (M&amp;E); (e) support of training and advisory / audit services needed; and (vii) public information, citizen engagement, and communication. Special attention will be devoted to promoting equal participation of women in all decision-making bodies under the project and contributing to tackling barriers to recruitment, retention, and promotion.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0055088"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0055087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-05-17"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-05-17"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Julian Najles</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jnajles@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Av. Fernando Ferrari, 1080, Mata da Praia, Brazil, (27) 3636-1800, gabinete@secti.es.gov.br

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="22011" percentage="68" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="32" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CI" percentage="72.0000000" xml:lang="en"><narrative>FY17 - ICT Infrastructure</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="24.0000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CF" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Information and Communications Technologies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="0" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="0" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000026" percentage="0" xml:lang="en"><narrative>ICT</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000262" percentage="0" xml:lang="en"><narrative>ICT Policies</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">510144.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1020265.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1020277.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1530399.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1530411.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1275332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1275344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">637665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">637677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">510132.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">510135.34</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">52700615.41</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">52700615.41</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">61216000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">153040</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">260186</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">6102159</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">2000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-01-31"/><value value-date="2025-01-31">-153040</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-8436</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-11836</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-55087"><narrative>Secretaria de Estado da Ciência, Tecnologia, Inovação, Educação Profissional,</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180462"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180462?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180462"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Call abandoned rate
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="3">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agencies sharing data in the state interoperability platform
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="25">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Next Generation Emergency Number (NGEM) services implemented in the Integrated Emergency Response Platform (IERP).
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="3">
<comment><narrative>
This indicator measures the total number of new NGEN services/functionalities (like advance mobile location, integration of radio communications, etc) implemented in the IERP.

Calculation formula: total number of next generation services or functionalities implemented by the integrated platform that were not in place before the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data center capacity added (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="TBC">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals trained through digital skills programs (basic and advanced)
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="3,000">
<comment><narrative>
This indicator measures the total number of individuals trained and received at least one certificate as part of the digital skills training supported through the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to answer
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Center for Social Defense (CIDES), designed, built and in operation.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-02" />
<target value="YES">

</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Center for Social Defense (CIDES), designed, built and in operation.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-02" />
<target value="YES">

</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Centralized Emergency Response Technical Integration Plan and Feasibility Study developed.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="YES">
<comment><narrative>
This indicator measures the completion of component 3.1 of the Project, the development of plans and feasibility studies required for Component 3.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new digital services included in the unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="70">
<comment><narrative>
User satisfaction with the digital services included in the new unified platform.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new data centers built according to energy-efficiency standards
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of digital services in the new unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="291"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="570">
<comment><narrative>
This indicator measures the total number of additional digital services implemented in the newly created unique portal.
</narrative></comment>
</target>
<actual value="291">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Time to answer
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average service uptime of data center
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="99.99">
<comment><narrative>
The new data infrastructure within the scope and built by this Project will need to comply for the whole project duration with a 99.99% percent availability, equal to maximum 52 minutes downtime. The term downtime is used to refer to periods when a system is unavailable.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new digital services included in the unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="70">
<comment><narrative>
User satisfaction with the digital services included in the new unified platform.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of agencies sharing data in the state interoperability platform
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="25">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="2,300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2029-05-15" />
<target value="2875000">

</target>
<actual value="2,300,000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Call abandoned rate
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="3">

</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of contracts for the data center services between PRODEST and Espirito Santo municipalities
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of digital services in the new unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="291"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="570">
<comment><narrative>
This indicator measures the total number of additional digital services implemented in the newly created unique portal.
</narrative></comment>
</target>
<actual value="325">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved GBV emergency services protocols integrated to the new platform, CIDES
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="Yes">
<comment><narrative>
Measures the implementation and integration of GBV services in the upgraded emergency management system.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="2,300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2029-05-15" />
<target value="2875000">

</target>
<actual value="2,300,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities attended by the CIDES maintaining actual levels of quality
</narrative></title>
<baseline year="2023" iso-date="2023-05-15" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-15" />
<period-end iso-date="2029-05-15" />
<target value="78">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of authentications in services provided in the new unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="2,500,000">
<comment><narrative>
This indicator measures the total number of successful authentications performed to access services using the new unique portal.

Calculation formula: Total number of successful authentications.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of emergency response agencies/entities integrated in CIDES.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="8">
<comment><narrative>
Number of agencies/entities operating in the CIDES platform and in the same building.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Centralized Emergency Response Technical Integration Plan and Feasibility Study developed.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="YES">
<comment><narrative>
This indicator measures the completion of component 3.1 of the Project, the development of plans and feasibility studies required for Component 3.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Next Generation Emergency Number (NGEM) services implemented in the Integrated Emergency Response Platform (IERP).
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="3">
<comment><narrative>
This indicator measures the total number of new NGEN services/functionalities (like advance mobile location, integration of radio communications, etc) implemented in the IERP.

Calculation formula: total number of next generation services or functionalities implemented by the integrated platform that were not in place before the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of individuals trained through digital skills programs (basic and advanced)
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="3,000">
<comment><narrative>
This indicator measures the total number of individuals trained and received at least one certificate as part of the digital skills training supported through the project.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of emergency response agencies/entities integrated in CIDES.
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="8">
<comment><narrative>
Number of agencies/entities operating in the CIDES platform and in the same building.
</narrative></comment>
</target>
<actual value="5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities attended by the CIDES maintaining actual levels of quality
</narrative></title>
<baseline year="2023" iso-date="2023-05-15" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-15" />
<period-end iso-date="2029-05-15" />
<target value="78">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="2,300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2029-05-15" />
<target value="2875000">

</target>
<actual value="2,300,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="2,300,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2029-05-15" />
<target value="2875000">

</target>
<actual value="2,300,000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities attended by the CIDES maintaining actual levels of quality
</narrative></title>
<baseline year="2023" iso-date="2023-05-15" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-15" />
<period-end iso-date="2029-05-15" />
<target value="78">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities attended by the CIDES maintaining actual levels of quality
</narrative></title>
<baseline year="2023" iso-date="2023-05-15" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-15" />
<period-end iso-date="2029-05-15" />
<target value="78">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new data centers built according to energy-efficiency standards
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new data centers built according to energy-efficiency standards
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new data centers built according to energy-efficiency standards
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Improved GBV emergency services protocols integrated to the new platform, CIDES
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="Yes">
<comment><narrative>
Measures the implementation and integration of GBV services in the upgraded emergency management system.
</narrative></comment>
</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of contracts for the data center services between PRODEST and Espirito Santo municipalities
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average service uptime of data center
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="99.99">
<comment><narrative>
The new data infrastructure within the scope and built by this Project will need to comply for the whole project duration with a 99.99% percent availability, equal to maximum 52 minutes downtime. The term downtime is used to refer to periods when a system is unavailable.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of authentications in services provided in the new unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-05-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-01" />
<period-end iso-date="2029-05-01" />
<target value="2,500,000">
<comment><narrative>
This indicator measures the total number of successful authentications performed to access services using the new unique portal.

Calculation formula: Total number of successful authentications.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data center capacity added (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2029-05-15" />
<target value="TBC">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P180497</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR State of Ceará Sustainable Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed standalone DPF supports reforms of the State of Ceara to: (i) improve efficiency in public resource management; and (ii) promote sustainable development through clean energy and skills development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0054508"><narrative>State of Ceará</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0054508"><narrative>State of Ceará</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006072"><narrative>State Secretariat of Civil House</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2023-09-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-03-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2025-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2025-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabiano Silvio Colbano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Av. Barão de Studart, 505, Meireles Fortaleza, Brazil, (85) 3466-4000, taniamaria@cidades.ce.gov.br

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Av. Barão de Studart, 505, Meireles Fortaleza, Brazil, (85) 3466-4000, taniamaria@cidades.ce.gov.br

</narrative></mailing-address></contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23111" percentage="38" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="21" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15118" percentage="12" xml:lang="en"/><sector vocabulary="1" code="11330" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="3" xml:lang="en"/><sector vocabulary="1" code="11430" percentage="1" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LM" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Mining</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LU" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BC" percentage="37.0000000" xml:lang="en"><narrative>FY17 - Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LB" percentage="13.0000000" xml:lang="en"><narrative>FY17 - Renewable Energy Biomass</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ET" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Tertiary Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000086" percentage="0" xml:lang="en"><narrative>Energy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="0" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="0" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">541884375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">541884375.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">70880253.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">70880253.63</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">541884375</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-63707348</value><description xml:lang="en"><narrative>Total Commitment Cancellations in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">481278080</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">-10273958</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-1314695</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-1076152</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-2234944</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-2619996</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-13026135</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-12038732</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-11756330</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54509"><narrative>State Secretariat of Finance</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-6072"><narrative>State Secretariat of Civil House</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180497"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180497?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180497"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of full-time schools facilities rehabilitated or constructed following the criteria laid out in the regulations
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="257"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="400">

</target>
<actual value="531">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of targets (for 2030, 2040 and 2050) for greenhouse gas emission reduction for the CIPP, utilizing the emissions inventory and energy balance
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="Yes">
<comment><narrative>
Greenhouse gas (GHG) emissions inventory is not ready, as are emissions targets.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased deployment of the Integrity Program in five units of the state's key sectoral budgets secretariats to assess its internal control structure
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="75">
<comment><narrative>
Integrity programs: structured set of actions directed at the prevention, detection, punishment and remediation of fraud and corruption. Units considered: Secretariat of Education (SEDUC); Secretariat of Finance (SEFAZ); Secretariat for the Environment and Climate Change (SEMA); State Environment Superintendence – SEMACE; and Secretariat of Water Resources (SRH).
</narrative></comment>
</target>
<actual value="77.49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls participating on STEM career orientation program
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="20,000">

</target>
<actual value="9,360">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Funds transferred to the FIEE Fund to Support the Renda do Sol Program, utilizing energy cost savings from the State's public building renewable energy program
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 0 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="R$ 19 million">
<comment><narrative>
R$19 million budgeted for Renda do Sol in FIEE (state will use R$4 million from FEDAF to implement the pilot project)
</narrative></comment>
</target>
<actual value="R$ 19 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Real estate assets vacancy rate
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="8">

</target>
<actual value="17.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public investment projects screened, appraised, and prioritized according to the methodology criteria set forth on the new legal framework
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="5">
<comment><narrative>
Projects of the Secretariat of Agrarian Development (SDA) and the Secretariat of Water Resources (SRH).
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Students supported with better education
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of full-time schools facilities rehabilitated or constructed following the criteria laid out in the regulations
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="257"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="400">

</target>
<actual value="531">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of girls participating on STEM career orientation program
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="20,000">

</target>
<actual value="9,360">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET courses on clean energy
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="8">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="4">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Funds transferred to the FIEE Fund to Support the Renda do Sol Program, utilizing energy cost savings from the State's public building renewable energy program
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 0 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="R$ 19 million">
<comment><narrative>
R$19 million budgeted for Renda do Sol in FIEE (state will use R$4 million from FEDAF to implement the pilot project)
</narrative></comment>
</target>
<actual value="R$ 19 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication of targets (for 2030, 2040 and 2050) for greenhouse gas emission reduction for the CIPP, utilizing the emissions inventory and energy balance
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="Yes">
<comment><narrative>
Greenhouse gas (GHG) emissions inventory is not ready, as are emissions targets.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increased deployment of the Integrity Program in five units of the state's key sectoral budgets secretariats to assess its internal control structure
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="54"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="75">
<comment><narrative>
Integrity programs: structured set of actions directed at the prevention, detection, punishment and remediation of fraud and corruption. Units considered: Secretariat of Education (SEDUC); Secretariat of Finance (SEFAZ); Secretariat for the Environment and Climate Change (SEMA); State Environment Superintendence – SEMACE; and Secretariat of Water Resources (SRH).
</narrative></comment>
</target>
<actual value="77.49">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Real estate assets vacancy rate
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="18.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="8">

</target>
<actual value="17.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of public investment projects screened, appraised, and prioritized according to the methodology criteria set forth on the new legal framework
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="5">
<comment><narrative>
Projects of the Secretariat of Agrarian Development (SDA) and the Secretariat of Water Resources (SRH).
</narrative></comment>
</target>
<actual value="7">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of TVET courses on clean energy
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="8">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2025-12-01" />
<target value="4">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P180555</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Proactive, Safe, and Resilient Road Asset Management Program - State of Bahia</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve sustainable, safe and resilient transport access to socio-economic opportunities for the targeted population in selected areas of the State of Bahia]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Bahia is strategically located in Northeast Brazil and is the largest state in the region, with a population of a bit over 14 million people. The state has a diverse economy, including agriculture, manufacturing, and services, making it an important contributor to the Brazilian economy (around 4 percent of the Brazilian GDP). Investing in preserving its infrastructure, such as roads, bridges, and ports, will help to improve the efficiency and competitiveness of these industries by reducing transportation costs and increasing access to markets and services for its population.This project - as Phase 1 of the Brazil Pro-Roads MPA - will focus on improving rural access and preserving road infrastructure in a safe, sustainable and resilient manner. Managing road assets sustainably is important to ensure that transport remains safe and efficient. The state of Bahia has a large network of roads - 12,000 km of paved roads in the State Network, and maintaining this infrastructure is critical to ensure that people and goods can move around the state effectively. By investing in infrastructure maintenance and rehabilitation, it is possible to extend the lifespan of the roads, reducing the need for costly repairs and replacements in the future.The project will be the first phase of a large Federal and State Program (Multi-Programmatic Approach - MPA) that will cover a number of States in Brazil. The Program will consist of four main components that will support: (i) the transfer of responsibilities for road asset management of paved State roads to the private sector, with the subsequent improvement of climate resilience and road safety along the selected roads; the (ii) institutional strengthening of the State Secretary for the sustainable management of road assets; along with (iii) the improvement of road safety, climate resilience and all-season access to opportunities in selected areas, providing better connectivity to schools, markets, and health centers; together with (iv) the Project implementation support. In the first phase, the project will have four components as follows: Component 1 supports long-term performance-based road design, rehabilitation, and maintenance contracts throughout the State:       The first subcomponent is to implement long-term Design-Build-Maintain 10-year contracts for rehabilitating and maintaining two important agro-logistical corridors in the center of Bahia - for a total of 350 km, and also provide 8 to 10 years of maintenance contracts to a pool of 650 km of roads that are in good condition based on performance-based indicators, which will become the model for the new maintenance contracts in the coming decades in the State       The second subcomponent will structure three CREMA-PPP 20-year contracts for rehabilitating and maintaining the roads in the same format as the BA-052 in Bahia. Component 2 is the institutional strengthening with multiple studies and consultancies to support the capacity building of the State in the coming decade, with main focuses on safe and resilient road asset management, green mobility and logistics, and social inclusion and gender. Component 3 supports access to opportunities by improving climate resilience and road safety while removing critical bottlenecks in selected areas of the State.        The first subcomponent will implement road bypasses in the Baixo Sul area, where there are many challenges in urban areas - namely Nazare, Valença, and Camamu - related to the risk of sea level rise, and road congestion, safety and pollution issues. However, those areas are situated in the Mata Atlantica biome, so a crucial balance between environmental protection and the social challenges in those low-income areas is necessary.       The second subcomponent will improve road safety by improving non-motorized transport infrastructure along those selected municipalities, enhancing universal accessibility.       And the third subcomponent will support rural roads connecting rural communities in Bahia which are located in remote areas that are difficult to access, especially during the rainy season when roads can become impassable. This factor makes it difficult for people in rural areas to access education, healthcare, and other basic services.Component 4 will provide technical support to the Project implementation.   The selected regions of Bahia are mostly rural areas that face several unique challenges that contribute to high levels of poverty, including high climate change risks from projected sea level rise and increased volume of rain. One of the main challenges is a lack of all-weather road infrastructure, which the project will support, and also the lack of economic opportunities. Many people in rural areas rely on agriculture for their livelihoods, but the sector has limited potential for creating high-paying jobs. This can make it difficult for people in rural areas to earn a decent living and escape poverty. The project will promote social inclusion by providing better opportunities for the rural population in Bahia, who often face limited access to education, healthcare, and job opportunities, so will have activities to tackle those issues. Also, Gender activities are envisioned to improve access to job markets in the road sector. Finally, the use of Performance-based contracts will provide the State with an effective way to ensure that maintenance and rehabilitation activities are carried out in a timely and effective manner, while also providing incentives for contractors to meet specific performance targets. These contracts can be linked to road safety performance, as well as to other indicators of quality and resilience, such as pavement condition, drainage, and signage. By linking road safety performance to longer-term maintenance and rehabilitation contracts, Bahia Government will ensure that its road infrastructure is designed and maintained with safety in mind. This can contribute to a reduction in road accidents and fatalities, which are major public health concerns in the region. And, in addition, longer-term contracts that are structured as PPPs - as it is intended, will provide a range of benefits, including access to private sector expertise and resources, as well as greater flexibility in project design and implementation. This can help to ensure that road infrastructure is built and maintained, while also providing opportunities for private-sector investment and job creation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003169"><narrative>State of Bahia </narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003169"><narrative>State of Bahia </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0054667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-09-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-09-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eric R. Lancelot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>elancelot@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21022" percentage="62" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="38" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="98.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">299999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">300009.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">3333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">3083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">3083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">222221.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">222230.24</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">148625000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">148625000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">150000000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">375000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">1000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-375000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-15818</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-54667"><narrative>Secretary of Infrastructure of the State of Bahia (SEINFRA)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180555"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P180555?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P180555"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2032-11-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical and hazardous spots eliminated in the Baixo Sul, Sertão do São Francisco and Chapada Forte consortia in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2031-12-01" />
<target value="600">
<comment><narrative>
Number of interventions done in the rural access subcomponent along the 52 municipalities in the three consortia.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to safe transport): Change in annual road traffic fatalities along targeted state/federal road corridors in selected states in Brazil
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas along the selected logistical state roads with pedestrian, cycling and drainage infrastructure implemented and improved
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to safe transport):  Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Updated State Logistics Plan including Decarbonization and Digitalization
</narrative></title>
<baseline year="2023" iso-date="2023-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-15" />
<period-end iso-date="2024-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, Sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2023" iso-date="2023-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to sustainable transport): Millions of people that benefit from improved access to sustainable transport infrastructure and services in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2032-12-15" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable and resilient transport): Rural Access Index in the selected municipalities in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2032-06-15" />
<target value="60">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population participated and is satisfied with the selection and prioritization of the non-paved municipal roads to be improved
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="64"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-06-01" />
<target value="116">
<comment><narrative>
The inhabitants of the Municipalities will be selecting and prioritizing the roads in their municipalities as part of the public consultation. The follow-up survey will analyze their satisfaction with the selected roads once the roads are improved. A consultancy will support SEINFRA to improve the process for future selection process in other areas.
</narrative></comment>
</target>
<actual value="64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads.
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2032-08-15" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Physical progress of kilometers built for the bypasses along selected logistical state road corridors
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Variation in 10-year life-cycle road asset management costs between traditional procurement models and the CREMA-DBM PBC contracts (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="-20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of non-paved municipal roads with all season access in the Baixo Sul, Sertão do São Francisco and Chapada Forte consortia in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2031-12-01" />
<target value="1200">
<comment><narrative>
Length of non-paved roads with improved access once the critical spot interventions are finished.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established with road safety operations pilots implemented
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="212.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CREMA-PPP contracts structured in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2032-06-01" />
<target value="4">
<comment><narrative>
Road contracts under the PPP law in the State - additional to the BA 052
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to resilient transport): Share of the paved state road networks in the State of Bahia with updated Management Response Plans for climate risks and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient State road corridors under PBCs
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="760"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="2560">

</target>
<actual value="760">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Updated State Logistics Plan including Decarbonization and Digitalization
</narrative></title>
<baseline year="2023" iso-date="2023-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-15" />
<period-end iso-date="2024-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2032-11-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads.
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2032-08-15" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in Vehicle Operation Costs on roads under PBC contracts in selected areas in the State of Bahia
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="90">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="212.5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Variation in 10-year life-cycle road asset management costs between traditional procurement models and the CREMA-DBM PBC contracts (Percentage)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="-20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2032-11-15" />
<target value="4">
<comment><narrative>
Preparation of CREMA guidelines and ToRs for Basic Designs
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established with road safety operations pilots implemented
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas along the selected logistical state roads with pedestrian, cycling and drainage infrastructure implemented and improved
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2026-06-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical and hazardous spots eliminated in the Baixo Sul, Sertão do São Francisco and Chapada Forte consortia in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2031-12-01" />
<target value="600">
<comment><narrative>
Number of interventions done in the rural access subcomponent along the 52 municipalities in the three consortia.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population participated and is satisfied with the selection and prioritization of the non-paved municipal roads to be improved
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="64"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2032-06-01" />
<target value="116">
<comment><narrative>
The inhabitants of the Municipalities will be selecting and prioritizing the roads in their municipalities as part of the public consultation. The follow-up survey will analyze their satisfaction with the selected roads once the roads are improved. A consultancy will support SEINFRA to improve the process for future selection process in other areas.
</narrative></comment>
</target>
<actual value="64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-03-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-15" />
<period-end iso-date="2032-11-15" />
<target value="4">
<comment><narrative>
Preparation of CREMA guidelines and ToRs for Basic Designs
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable and resilient transport): Rural Access Index in the selected municipalities in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2032-06-15" />
<target value="60">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable and resilient transport): Rural Access Index in the selected municipalities in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="45"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2032-06-15" />
<target value="60">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PrDO indicator (access to resilient transport): Share of the paved road networks with updated Management Response Plans to climate risks and natural disasters in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PrDO indicator (access to resilient transport): Share of the paved road networks with updated Management Response Plans to climate risks and natural disasters in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to resilient transport): Share of the paved state road networks in the State of Bahia with updated Management Response Plans for climate risks and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to resilient transport): Share of the paved state road networks in the State of Bahia with updated Management Response Plans for climate risks and natural disasters
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to safe transport): Change in annual road traffic fatalities along targeted state/federal road corridors in selected states in Brazil
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to safe transport): Change in annual road traffic fatalities along targeted state/federal road corridors in selected states in Brazil
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to safe transport):  Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to safe transport):  Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="22">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to sustainable transport): Millions of people that benefit from improved access to sustainable transport infrastructure and services in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2032-12-15" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PrDO indicator (access to sustainable transport): Millions of people that benefit from improved access to sustainable transport infrastructure and services in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2032-12-15" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable transport: People that benefit from access to sustainable transport infrastructure and services in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="2,350,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable transport: People that benefit from access to sustainable transport infrastructure and services in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="2,350,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women employed as part of the trucking and construction companies contracted by the project.
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of non-paved municipal roads with all season access in the Baixo Sul, Sertão do São Francisco and Chapada Forte consortia in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-11-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-01" />
<period-end iso-date="2031-12-01" />
<target value="1200">
<comment><narrative>
Length of non-paved roads with improved access once the critical spot interventions are finished.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Physical progress of kilometers built for the bypasses along selected logistical state road corridors
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CREMA-PPP contracts structured in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-06-01" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-01" />
<period-end iso-date="2032-06-01" />
<target value="4">
<comment><narrative>
Road contracts under the PPP law in the State - additional to the BA 052
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2023" iso-date="2023-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-14" />
<period-end iso-date="2032-06-14" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient State road corridors under PBCs
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="760"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="2560">

</target>
<actual value="760">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, Sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2023" iso-date="2023-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-15" />
<period-end iso-date="2025-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Phase 1 PDO indicator (access to sustainable transport: People that benefit from access to sustainable transport infrastructure and services in the State of Bahia
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="2,350,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women employed as part of the trucking and construction companies contracted by the project.
</narrative></title>
<baseline year="2023" iso-date="2023-11-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in Vehicle Operation Costs on roads under PBC contracts in selected areas in the State of Bahia
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-06-15" />
<target value="90">

</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PrDO indicator (access to resilient transport): Share of the paved road networks with updated Management Response Plans to climate risks and natural disasters in selected states in Brazil
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2023" iso-date="2023-11-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-11-14" />
<period-end iso-date="2032-06-14" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P181501</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Enhancing Prosperity and Sustainability in the State of Sergipe Development Policy Financing</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the State of Sergipe to: (i) strengthen fiscal sustainability and (ii) improve the management of natural resources in the areas of water, sanitation, solar energy and solid waste. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Enhancing Prosperity and Sustainability in the State of Sergipe Development Policy Financing Project for Brazil is to support the State of Sergipe to: (i) strengthen fiscal sustainability and (ii) improve the management of natural resources in the areas of water, sanitation, solar energy and solid waste. The government of Sergipe's program outlines a multifaceted strategy to address key challenges, emphasizing poverty reduction, economic development, infrastructure, sustainability, strengthened governance and efficient state management. Highlighting a strong commitment to strong environmental stewardship, the government's program also sets strategic goals for improving environmental sustainability and natural resource management, including through sanitation. Key aspects include the expansion and improvement of access to water and sanitation with a focus on improving service delivery. Further, the program focuses on promoting regionalized and integrated solid waste management and strengthening water resources management to enhance resilience to the impacts of climate change. Reforms supported under the program are instrumental to achieving these objectives. The first pillar of the Development Policy Finance (DPF) supports reforms that improve fiscal sustainability. The second pillar of the DPF supports selected policies to improve the management of natural resources. The two pillars of the DPF are closely aligned with the guiding themes of the government's Multiannual Plan (Plano Plurianual – PPA). The proposed operation is aligned with the goals of the Paris Agreement. The project is compliant with the Maximizing Finance for Development (MFD) approach by implementing fiscal management and regulatory reforms that will enable new private sector investment.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0056399"><narrative>State of Sergipe</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0056400"><narrative>State Secretariate of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-05-30"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-08-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Cornelius Fleischhaker</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cfleischhaker@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Esplanada dos MinistErios, Bloco P, Brasilia, Brazil

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23231" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15116" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="13" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14050" percentage="12" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="12" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWB" percentage="13.0000000" xml:lang="en"><narrative>Solid Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="50.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWW" percentage="13.0000000" xml:lang="en"><narrative>Water Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="6.00000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWA" percentage="6.00000000" xml:lang="en"><narrative>Sanitation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWC" percentage="6.00000000" xml:lang="en"><narrative>Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="6.00000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">110000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">110000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">28444506.39</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">28444506.39</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">110000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-28444506</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">110000000</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-28444506</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-275000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2776771</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-1912888</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2970000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2180687</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56400"><narrative>State Secretariate of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181501"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181501?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181501"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Annual percentage of procurement cost savings (except public works) based on estimated and executed values relative to pre-reform baseline.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="at least 10 percent">
<comment><narrative>
Data presented by State, based on savings vis-a-vis valor de Referencia.
</narrative></comment>
</target>
<actual value="18.54 percent">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State Government's current savings rate as a percentage of net current revenue.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="6.4 percent (2019-2022 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="At least 7 percent (2022-26 average)">
<comment><narrative>
Simple average of 2023 to 2025
</narrative></comment>
</target>
<actual value="10.5 percent">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of solid waste being recycled
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="7,424.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="at least 15,000">
<comment><narrative>
Not yet available.
</narrative></comment>
</target>
<actual value="NA.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in water and sanitation services.
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 1.3 billion">
<comment><narrative>
2025 data reported by State.
</narrative></comment>
</target>
<actual value="R$ 195.1 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consumption tax (ICMS) revenue, including add-on for anti-poverty fund (in December 2022 prices)
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 4.5 billion"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 5.2 billion">
<comment><narrative>
in real terms / 2022 prices (adjusted by IPCA), reported by State
</narrative></comment>
</target>
<actual value="R$ 5.28 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="5.40">
<comment><narrative>
based on one installation at TCE
</narrative></comment>
</target>
<actual value="0.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of solid waste being recycled
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="7,424.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="at least 15,000">
<comment><narrative>
Not yet available.
</narrative></comment>
</target>
<actual value="NA.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="5.40">
<comment><narrative>
based on one installation at TCE
</narrative></comment>
</target>
<actual value="0.64">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to sanitation and percentage of poor females with access to sanitation.
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="1,195,765"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2026-12-15" />
<target value="1,280,000">
<comment><narrative>
will need to be recalculated based on PNAD
</narrative></comment>
</target>
<actual value="N/A">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in water and sanitation services.
</narrative></title>
<baseline year="2023" iso-date="2023-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 1.3 billion">
<comment><narrative>
2025 data reported by State.
</narrative></comment>
</target>
<actual value="R$ 195.1 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of raw water subject to fees.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="250 million">
<comment><narrative>
reported by SEMAC
</narrative></comment>
</target>
<actual value="249.6 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Consumption tax (ICMS) revenue, including add-on for anti-poverty fund (in December 2022 prices)
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 4.5 billion"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 5.2 billion">
<comment><narrative>
in real terms / 2022 prices (adjusted by IPCA), reported by State
</narrative></comment>
</target>
<actual value="R$ 5.28 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue resulting from the use of the State's real estate assets.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 6.4 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 19.2 million">
<comment><narrative>
Reported by State for 2025
</narrative></comment>
</target>
<actual value="R$ 12.42 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Annual percentage of procurement cost savings (except public works) based on estimated and executed values relative to pre-reform baseline.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="at least 10 percent">
<comment><narrative>
Data presented by State, based on savings vis-a-vis valor de Referencia.
</narrative></comment>
</target>
<actual value="18.54 percent">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State Government's current savings rate as a percentage of net current revenue.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="6.4 percent (2019-2022 average)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="At least 7 percent (2022-26 average)">
<comment><narrative>
Simple average of 2023 to 2025
</narrative></comment>
</target>
<actual value="10.5 percent">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount of raw water subject to fees.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="zero"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="250 million">
<comment><narrative>
reported by SEMAC
</narrative></comment>
</target>
<actual value="249.6 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Revenue resulting from the use of the State's real estate assets.
</narrative></title>
<baseline year="2022" iso-date="2022-12-01" value="R$ 6.4 million"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-01" />
<period-end iso-date="2026-12-01" />
<target value="R$ 19.2 million">
<comment><narrative>
Reported by State for 2025
</narrative></comment>
</target>
<actual value="R$ 12.42 million">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People with access to sanitation and percentage of poor females with access to sanitation.
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="1,195,765"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2026-12-15" />
<target value="1,280,000">
<comment><narrative>
will need to be recalculated based on PNAD
</narrative></comment>
</target>
<actual value="N/A">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P181511</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Expanding Clean Hydrogen in Brazil - Ceara Green Hydrogen Hub</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[ To enable clean hydrogen production in the Complex of Pecem.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project comprises two components to be implemented in the Industrial Complex of the Port of Pecem (Ceara).Component 1: Utility corridor and access infrastructures to the Export Processing Zone – ZPE covers the civil works needed (vegetation clearance, drainage, and pavement construction) to establish primary routes for electrical systems and other utilities, such as gas and water, connecting the area of production of GH and derivatives to the port, where the latter will be exported.Component 2: Expansion of the Port of Pecem Multiple Utilities Terminal (TMUT) and new attraction cradle? covers the implementation of a new berth at TMUT to serve the increase in activities in the port.Component 3: Expansion of Pier 2 for ammonia operation?covers the expansion of Pier 2 to handle GH cargo movements in the forms of ammonia and methanol for export.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009936"><narrative>Complexo Industrial Portuario de Pecem (CIPP)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0056388"><narrative>Complexo Industrial Portuario de Pecem (CIPP)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-07-09"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-07-09"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carlos Antonio Costa</narrative></person-name><telephone>+1-202-473-1000</telephone><email>carloscosta@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23111" percentage="50" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="50" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="26" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="26" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="26" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="14" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="10" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="10" xml:lang="en"/><sector vocabulary="1" code="32120" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLG" percentage="50.0000000" xml:lang="en"><narrative>Gases for Energy Transition</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWZ" percentage="14.0000000" xml:lang="en"><narrative>Other - Water, Sanitation, and Solid Waste Management </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTP" percentage="26.0000000" xml:lang="en"><narrative>Ports/Waterways</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYZ" percentage="10.0000000" xml:lang="en"><narrative>Other - Industry, Trade, and Services </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">3249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">3250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">3750011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">333338.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">90000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">90000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">90000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56388"><narrative>Complexo Industrial Portuario de Pecem (CIPP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56388"><narrative>Complexo Industrial Portuario de Pecem (CIPP)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181511"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181511?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181511"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of Terminal for Multiple Use (TMUT) (number of operational berths)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="11">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled via Final Investment Decision
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,250,000,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1000000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CIPP is awarded at least the bronze category of the Gender Equity and Inclusion Seal of the Government of Ceara
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="Yes">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CIPP is awarded at least the bronze category of the Gender Equity and Inclusion Seal of the Government of Ceara
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="Yes">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled via Final Investment Decision
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,250,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Corridor area constructed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="215">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="2,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electrolyzer Capacity Installed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="2,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of employees (men and women) who received training according to the Annual Training Plan that demonstrate significant knowledge gain on GBV (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-04-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Corridor area constructed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="215">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of suggestions implemented/acted upon from those that are received during consultations with local committees
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electrolyzer Capacity Installed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of pier 2 - Number of operational berths
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Electrolyzer Capacity Installed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of employees (men and women) who received training according to the Annual Training Plan that demonstrate significant knowledge gain on GBV (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-04-15" />
<target value="80">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of Terminal for Multiple Use (TMUT) (number of operational berths)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="11">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in GHG emissions
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1000000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP cargo handling extra capacity (port cargo) to enable clean hydrogen production
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,500,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of people enrolled in community-based professional training courses offered by CIPP that are women (%)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of pier 2 - Number of operational berths
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled via Final Investment Decision
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,250,000,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Corridor area constructed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="215">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of people enrolled in community-based professional training courses offered by CIPP that are women (%)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries employed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1,375">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of pier 2 - Number of operational berths
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="2"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of people enrolled in community-based professional training courses offered by CIPP that are women (%)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="90">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of employees (men and women) who received training according to the Annual Training Plan that demonstrate significant knowledge gain on GBV (Percentage)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-04-15" />
<target value="80">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries employed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1,375">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of beneficiaries employed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="1,375">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CIPP's clean hydrogen derivatives loading capacity  (Ammonia)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="3,750,000">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="90">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CIPP is awarded at least the bronze category of the Gender Equity and Inclusion Seal of the Government of Ceara
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints submitted that are handled according to established protocols
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-04-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with indirect support
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2030-04-15" />
<target value="2,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints submitted that are handled according to established protocols
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-04-15" />
<target value="100">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expansion of Terminal for Multiple Use (TMUT) (number of operational berths)
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="11">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of suggestions implemented/acted upon from those that are received during consultations with local committees
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of suggestions implemented/acted upon from those that are received during consultations with local committees
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2032-04-15" />
<target value="50">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of sexual harassment complaints submitted that are handled according to established protocols
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-04-15" />
<target value="100">
<comment><narrative>
No change to target.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P181608</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Progestão Program - MPA Phase 1 State of Rio Grande do Sul</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Strengthen the efficiency of public resource management and support fiscal sustainability in selected Brazilian States. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed multi-year, with several phases MPA aims to incentivize and support structural reforms across states, addressing the fragmented impact of past reforms through the joint federal-state Progestão Program. Subnational fiscal imbalances necessitate that governments rationalize spending and manage current expenditures more efficiently to achieve 'more with less.' Designed as a multi-phased umbrella program, Progestão seeks to enhance management capacity, increase public expenditure efficiency, and tackle fiscal imbalances via a coordinated technical assistance lending program. Recognizing that Brazil's subnational fiscal crisis stems partly from common structural issues in public sector management (PSM), the program aims to implement various interventions across states to achieve impact at scale and allow for customization to meet each state's unique needs. The MPA is designed to support the implementation of the newly-defined Progestão Program. In 2021, the World Bank through a partnership with the Ministry of Finance designed the Progestão Program as a key instrument to address fiscal imbalances and strengthen public spending efficiency at the state level in Brazil. The program, as outlined in the Memorandum of Understanding (MoU) between the National Secretariat of Treasury (Secretaria do Tesouro Nacional, STN) and the World Bank, is organized around a menu of interventions targeting six whole-of-government functions, including human resource management, pensions, procurement, public investment management, state-owned enterprises, and asset management. Additionally, it focuses on the fiscal and financial management of three strategic sectors: education, health, and social assistance. To support its implementation, a line of credit of US$1 billion in federal guarantees has been approved for participating states. As of December 2023, five standalone Progestão IPF projects have been approved by the Board, in the amount of US$220 million. The remaining US$780 million of the approved envelope is expected to be committed through the proposed MPA. The proposed MPA phase 1 (State of Rio Grande do Sul) operation supports investments in management information systems and reforms for whole-of-government functions and in strategic sectors for the State of Rio Grande do Sul. The proposed technical assistance operation will support activities to improve government services delivery. The project will have three components. Component 1. Whole-of-Government Management Systems (US$40.2 million)Sub-Component 1.1: Human Resource Management (US$7.1 million). Activities include: (i) a comprehensive assessment of HRM governance structures, regulations, and processes, including legal and governance recommendations for improvements; (ii) a market study and in-depth analysis of the current state HRMIS to identify appropriate policy options and implement new functionalities; (iii) the design and implementation of a human resources management system, integrated with the payroll system, with modules covering HRM processes; (iv) the design and implementation of a workforce right-sizing methodology; (v) the implementation of a workforce platform integrated with the HRMIS to identify core competencies of public officials and organizations hiring needs; (v) periodic staff surveys to assess reform implementation and support change management and new methodologies; (vi) communications and capacity building to support the rollout and implementation of new tools; and (vii) procurement of hardware to support the rollout and implementation of the proposed activities. The implementing agency of these activities will be the Secretariat of Planning, Governance, and Administration (Secretaria de Planejamento, Governança e Gestão, SPGG). Sub-Component 1.2: Pensions (US$5 million). Activities include: (i) the design and implementation of a pension management information system integrated with accounting records, payroll, and other HR transactional processes; (ii) development and implementation of data analytics tools for the RPPS, including artificial intelligence for automated processes and services; (iii) design and implementation of an actuarial impact predictive model; (iv) assessment of the RPPS structure and its sustainability; (v) procurement of hardware to support the rollout and implementation of the proposed activities; and (iv) communications and capacity building to support the rollout and implementation of new tools. The implementing agency of these activities will be the IPE PREV. Sub-Component 1.3: Public Procurement (US$9.2 million). Activities include: (i) application of artificial intelligence in procurement processes; (ii) design and implementation of a strategic sourcing methodology to help identify demand for goods and services across the state; (iii) development and deployment of an e-marketplace tool; (iv) implementation of a spend analysis tool for purchasing planning; (v) improvements to the functionality of the supplier and contract module to increase digital interaction; (vi) assessment of viability of different scopes for the shared services center; (vii) redesign of process to be integrated with the new shared services center structure; (viii) design and implementation of a shared services center; (ix) capacity building program for state officials working in procurement; and (x) procurement of hardware to support the rollout and implementation of the above proposed activities. The implementing agency of these activities will be the SPGG.Sub-Component 1.4: Public Investment Management and Budgeting (US$11.1 million). Activities include: (i) development and implementation of a public project management system for State's investments, integrating project preparation, screening and appraisal; (ii) implementation of a project bank of technically appraised, implementation-ready projects; (iii) design and implementation of a governance strategy to manage the project portfolio execution, including a comprehensive process review and methodologies for Public Investment Management (PIM); (iv) assessment, design and implementation of integrated and sustainable planning, budgeting, fundraising, and monitoring systems; (v) evaluation of new sources for fundraising projects and its integration with the new PIM framework; (vi) development and implementation of a system to structure, monitor, and manage concessions and PPPs, including contractual rebalancing, standardized technical models, and processing and communication with stakeholders; (vii) improvements to the works management system, including tools compatible with inspection and monitoring processes, and web services integration with other systems; (viii) periodic staff surveys to assess reform implementation and support change management; and (ix) procurement of hardware to support the rollout and implementation of the proposed activities. The implementing agencies of these activities will be the SPGG, the Secretariat of Public Works (Secretaria de Obras Publicas, SOP), and the Secretariat of State Reconstruction (Secretaria de Reconstrução Gaucha, SERG).Sub-Component 1.5: Asset Management (US$7.8 million). Activities include: (i) improvements to accounting audits and methodologies to ensure accurate disclosure of public assets and their variations; (ii) provide technical support to assess up-to-date information of the real estate properties database, including georeferenced polygons data, area, registry status, occupation rate, market value estimates, topographic surveys, construction standards, state of conservation, photographic records, and marginal strips status; (iii) development and implementation of improvements in the public asset management system that includes automated expenses payment processes, enhanced management reports on revenues and expenses related to state properties, georeferenced mapping, and integration with other administrative systems; (iv) design and implementation of a solution to au]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0056615"><narrative>State of Rio Grande do Sul</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–P0056615"><narrative>State of Rio Grande do Sul</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-0056616"><narrative>State Secretariat of Planning, Governance, and Administration </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2024-10-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-06-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-06-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carolina Luisa Vaira</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cvaira@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15185" percentage="74" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="11" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="9" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="8.00000000" xml:lang="en"><narrative>Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="5.00000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="77.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="0" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="0" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="0" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="0" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="0" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="0" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="0" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="0" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="0" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="0" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="0" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="0" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="0" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="0" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000435" percentage="0" xml:lang="en"><narrative>Public Assets and Investment Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">624999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">625003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1458332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1458344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">166677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-28"/>
<value currency="USD" value-date="2030-06-28">48787527.68</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-28"/>
<value currency="USD" value-date="2030-06-28">48787527.68</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56616"><narrative>State Secretariat of Planning, Governance, and Administration </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">125000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56616"><narrative>State Secretariat of Planning, Governance, and Administration </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">1087472</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56616"><narrative>State Secretariat of Planning, Governance, and Administration </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-125000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-56616"><narrative>State Secretariat of Planning, Governance, and Administration </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181608"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P181608?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P181608"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 4: Implementation of Public Investment Management Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="Yes, at least 10% of new projects were selected through the PIM methodology">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of shared services offered by the centralized procurement unit
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="21">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 3: Budget execution rate in investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="111.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2: Number of automated public procurement processes
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: Savings on transactional expenses for data extraction
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="6.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 5: Number of strategic sectors that implemented financial management systems
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 4: Revenue growth rate with real estate assets
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="126.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 2: Number of automated public procurement processes
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6: Reduction in inspection time for constructions
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="20">

</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 4: Implementation of Public Investment Management Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="Yes, at least 10% of new projects were selected through the PIM methodology">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 5: Number of strategic sectors that implemented financial management systems
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 5: Number of strategic sectors that implemented financial management systems
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 10: Reduction in processing time in the analysis and approval of social assistance accountability reports
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="70.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Percentage of schools reporting school meals expenditures digitally
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-11" />
<target value="40.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 8: Increase in efficiency of expenditures on hospital and outpatient health care procedures - R$ million
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="5.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 3: Rate of investment projects for OGU Funding prepared and selected in line with the new PIM Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="55.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: Savings on transactional expenses for data extraction
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="6.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="147"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="75">

</target>
<actual value="147">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 3: Budget execution rate in investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="111.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 3: Budget execution rate in investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="111.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 4: Revenue growth rate with real estate assets
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="126.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 4: Revenue growth rate with real estate assets
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-06-13" />
<target value="126.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of shared services offered by the centralized procurement unit
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="21">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Indicator 2: Number of shared services offered by the centralized procurement unit
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="21">

</target>
<actual value="11">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 1: Public sector workforce replacement rate
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="57.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="53.00">

</target>
<actual value="57.30">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 1: Public sector workforce replacement rate
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="57.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="53.00">

</target>
<actual value="57.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5: Number of PPP projects structured
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="147"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="75">

</target>
<actual value="147">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO Indicator 1: Public sector workforce replacement rate
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="57.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2030-06-14" />
<target value="53.00">

</target>
<actual value="57.30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6: Reduction in inspection time for constructions
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="20">

</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 8: Increase in efficiency of expenditures on hospital and outpatient health care procedures - R$ million
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="5.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 10: Reduction in processing time in the analysis and approval of social assistance accountability reports
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="100.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="70.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 5: Number of PPP projects structured
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Percentage of schools reporting school meals expenditures digitally
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-11" />
<target value="40.00">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 3: Rate of investment projects for OGU Funding prepared and selected in line with the new PIM Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-06-11" />
<target value="55.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P500469</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Proactive, Safe and Resilient Road Asset Management Program - State of Espirito Santo Project - Phase 2</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve access to sustainable, safe, and resilient transport in the State of Espirito Santo.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The State of Espirito Santo is strategically located between the Northeast and the Eastern part of the Union, being one of the smallest states in the area and population of the Union, with a population of over 4 million inhabitants. The state has a diverse economy, including agriculture, oil &amp; gas, rock extraction and manufacturing, and services, making it an important contributor to the Brazilian economy. However, the State is prone to climate disasters regularly, so Investing in preserving its infrastructure, such as roads, bridges, and ports, will help to improve the efficiency and competitiveness of these industries by reducing transportation costs, saving lives, and increasing access to markets.This project, Phase 2 of the Brazil Pro-Roads MPA, will focus on improving the road asset management of interurban roads and promoting connectivity by eliminating dangerous road stretches and reducing the number of bottlenecks in the State network,  preserving the road infrastructure in a safe and resilient manner, and supporting the logistical and sustainable planning as part of the institutional strengthening.  Managing road assets sustainably is important to ensure that transport remains safe and efficient. The state of Espirito Santo has a large network of roads - 3800 km of paved roads in the State Network - for a State the size of Estonia, and maintaining this infrastructure is critical to ensure that people and goods can move in, out, and around the state effectively. The project will have four main components: (i) Proactive maintenance with a long-term (8 to 25 years) CREMA model using performance-based contracts (PBCs) - improving climate resilience and providing better access to schools, markets, and health centers; (ii) Institutional strengthening for road asset management sustainability, road safety, climate resilience and transport decarbonization; (iii) Improvement of selected state transport infrastructure - bypasses to eliminate logistical bottlenecks and improvement of road safety and universal accessibility along the urban areas once the bypasses are built; and (iv) Project Management. Component 1 is the main one, supporting road works and maintenance throughout the State: The first subcomponent will support interurban roads connecting urban and rural communities in Espirito Santo, improving road safety and climate resilience of those roads, and implementing long-term Design-Build-Maintain 10-year contracts for rehabilitating and maintaining three lots of important agro-logistical corridors in the state. The second subcomponent will structure and implement one CREMA-PPP 25-year contract for rehabilitating and maintaining the selected roads in the Southern part of the state in the same format as previous PPP experiences in Bahia. Component 2 is the institutional strengthening with multiple studies and consultancies to support the capacity building of the State in the coming decadeComponent 3 will implement road bypasses in two municipalities, and designing two additional ones, where there are many challenges in urban areas, related to road congestion, air pollution, and road safety issues; along with road safety and accessibility improvement activities along urban areas. Component 4 will provide technical support to the Project implementation.   The project will promote social inclusion by providing better opportunities for the rural population in Espirito Santo, who often face limited access to education, healthcare, and job opportunities, so will have activities to tackle those issues. Also, Gender activities are envisioned to improve access to job markets in the road sector. Finally, the use of Performance-based contracts will provide the State with an effective way to ensure that maintenance and rehabilitation activities are carried out in a timely and effective manner, while also providing incentives for contractors to meet specific performance targets. These contracts can be linked to road safety performance, as well as to other indicators of quality and resilience, such as pavement condition, drainage, and signage. By linking road safety performance to longer-term maintenance and rehabilitation contracts, Espirito Santo will ensure that its road infrastructure is designed and maintained with safety in mind. This can contribute to a reduction in road accidents and fatalities, which are major public health concerns in the region. And, in addition, longer-term contracts that are structured as PPPs - as it is intended, will provide a range of benefits, including access to private sector expertise and resources, as well as greater flexibility in project design and implementation. This can help to ensure that road infrastructure is built and maintained, while also providing opportunities for private-sector investment and job creation.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00004712"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00004712"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00003474"><narrative>Departamento de Edificações e de Rodovias do Espirito Santo (DER-ES)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2034-02-28"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2034-02-28"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Eric R. Lancelot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>elancelot@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Praça João Climaco, 142 - Cidade Alta, Centro, Vitoria, ES

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Praça João Climaco, 142 - Cidade Alta, Centro, Vitoria, ES

</narrative></mailing-address></contact-info>


<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21022" percentage="62" xml:lang="en"/><sector vocabulary="1" code="21021" percentage="38" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="97.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="3.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2533332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2533344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">1416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">1416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">162400000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">162400000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">162400000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3474"><narrative>Departamento de Edificações e de Rodovias do Espirito Santo (DER-ES)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3474"><narrative>Departamento de Edificações e de Rodovias do Espirito Santo (DER-ES)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-406000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3474"><narrative>Departamento de Edificações e de Rodovias do Espirito Santo (DER-ES)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500469"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500469?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500469"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2024" iso-date="2024-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-10" />
<period-end iso-date="2032-06-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient State road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="430">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Updated State Logistics Plan including Decarbonization and Digitalization
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Physical progress of kilometers built for the bypasses along selected logistical state road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas along the selected logistical state roads with pedestrian, cycling and drainage infrastructure implemented and improved
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Change in annual road crash fatalities along targeted state road corridors in the State of Espirito Santo
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2032-12-14" />
<target value="52">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="Yes">

</target>
<actual value="NO">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women trained as part of the trucking and construction companies contracted by the project.
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2032-12-14" />
<target value="50">
<comment><narrative>
Clarification on Indicator  Definition: The indicator refers to the number of women who will be trained and certified in technical and operational roles. The omission of the word “certified” in the poject's result framwork is a formulation error.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="4">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CREMA-PPP contracts structured in the State of Espirito Santo
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="1">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Change in annual road crash fatalities along targeted state road corridors in the State of Espirito Santo
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2032-12-14" />
<target value="52">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access):  Share of the paved state road network in the State of Espirito Santo with updated Management Response Plans to climate risks and Natural Disasters
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2032-12-14" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value o Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-13" />
<target value="117">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access):  Share of the paved state road network in the State of Espirito Santo with updated Management Response Plans to climate risks and Natural Disasters
</narrative></title>
<baseline year="2024" iso-date="2024-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-14" />
<period-end iso-date="2032-12-14" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2032-12-15" />
<target value="105,4000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-15" />
<period-end iso-date="2032-12-15" />
<target value="105,4000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established with road safety operations pilots implemented
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and construction of bypasses
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-12-12" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-09-12" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads.
</narrative></title>
<baseline year="2024" iso-date="2024-05-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-12" />
<period-end iso-date="2032-06-12" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P500501</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Electrification and Improvement of the São Paulo Urban Transport Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Program Development Objective (PDO) is to improve quality, reduce emissions and enhance management capacity of São Paulo's municipal transport system.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00004790"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00004747"><narrative>Municipal Secretariat of Urban Mobility and Transport</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-05-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-05-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-12-16"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-12-16"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tais Fonseca De Medeiros</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfonseca@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21012" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="100.000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">1746047.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">1746059.85</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2927010.49</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2927022.53</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">4328016.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">4328028.24</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">5363145.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">5363157.55</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">5279812.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">5279812.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">5279812.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">5279812.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">5279812.22</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1795941.98</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-16"/>
<value currency="USD" value-date="2030-12-16">248300000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-16"/>
<value currency="USD" value-date="2030-12-16">248300000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">248300000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4747"><narrative>Municipal Secretariat of Urban Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-4747"><narrative>Municipal Secretariat of Urban Mobility and Transport</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500501"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500501?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500501"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">

</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">
<comment><narrative>
The project is not effective yet
</narrative></comment>
</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="9000000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">

</target>
<actual value="10041839">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">

</target>
<actual value="10041839">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated when the project become effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">

</target>
<actual value="10041839">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">

</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">

</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated when the project become effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">

</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">

</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="9000000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">

</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">

</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female inspectors working in concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="638"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="680">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="863">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">

</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female drivers working in bus concessionaires
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="694"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="1,058.00">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="824">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained and certified civil servants in SIGMA and MaaS
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="120">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Mobility-as-a-Service platform (MaaS) completed, integrated with Operational Control Center systems, operational to passengers
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">

</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">

</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions from public transport (tonPM10)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="142"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="139">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="142">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">

</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">

</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="34">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">
<comment><narrative>
The project is not effective yet
</narrative></comment>
</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">

</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions from public transport (TonCo2e)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5265762"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="5150796">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="5265762">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Sustainable and inclusive low-carbon public transport program presented to and reviewed by CMTT (DLR 3.1) (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Registered users in the MaaS app  (DLR 2.2)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="250000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New registrations in the SPTrans Smart Card &quot;Bilhete Único&quot;
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="9000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="9450000">

</target>
<actual value="10041839">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Georeferenced Information System Mobility and Accessibility (SIGMA) completed,  integrated with Operational Control Center systems, operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">

</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Processing Time for the provision of solutions for bus lines classified under Level of Service (LoS) D or E (DLR 2.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="20.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2">

</target>
<actual value="20.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses in operation in the public transport system of São Paulo's Municipality (DLI 1) (additional)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="582">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated when the project become effective.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfaction with the quality of public transport service (comfort and environmental attributes)
</narrative></title>
<baseline year="2022" iso-date="2022-01-13" value="34"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-01-13" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="45">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="2,921,528">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Ordinance published formalizing the mechanism for annual review of reference price for CAPEX remuneration (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-15" />
<period-end iso-date="2030-12-15" />
<target value="Yes">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions from public transport (tonNOx)
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="14188"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2030-12-15" />
<target value="13878">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="14188">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Bus concessionaires with a Gender Equity Index (IEQ) above 0.45 (DLR 4.1)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="12">

</target>
<actual value="6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Functionalities implemented in the SIGMA  system
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="45">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated when the project become effective.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ordinances published that include the revised reference prices for bus acquisition (number)
</narrative></title>
<baseline year="2024" iso-date="2024-09-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-12" />
<period-end iso-date="2030-12-15" />
<target value="5">
<comment><narrative>
The indicator will be updated during the next mission in September/2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Definition and regulation of protocols for the prevention of and response to cases of gender-based violence within SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Gender Program to support women's employability and equity in SPTrans
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Report of charging infrastructure plan for the entire fleet (technical requirements, business models)
</narrative></title>
<baseline year="2024" iso-date="2024-12-05" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-05" />
<period-end iso-date="2030-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P500524</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sustainable Human Development Project in the State of Pará</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives are to: (i) improve social protection services and food security, (ii) improve learning, and (iii) promote forest conservation in the State of Para, prioritizing the Marajo.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This operation aims to improve social protection services and food security, accelerate learning in public schools and promote forest conservation in the State of Para, prioritizing the Integrated Region of Marajo. To achieve this objective, the project supports three secretaries in the government: State Secretary of Social Protection (SEASTER), State Secretary of Education (SEDUC) and State Secretary of Environment (SEMAS). ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003573"><narrative>The State Government of Pará</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00003980"><narrative>State Secretary of Education (SEDUC)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2024-03-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2024-03-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2029-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2029-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tiago Falcao Silva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfalcaosilva@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Palace of Dispatches, Dr Freitas Avenue, 2,531 Marco - 66087-812, BelEm - PA, Brazil, (91) 3216-8829 / 3342-5663, cabinetdogovernador@palacio.pa.gov.br

</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="35" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="28" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="16" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="6" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="3" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="3" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="3" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="2" xml:lang="en"/><sector vocabulary="1" code="11322" percentage="2" xml:lang="en"/><sector vocabulary="1" code="11321" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EP" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="CS" percentage="4.00000000" xml:lang="en"><narrative>FY17 - ICT Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="3.00000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="5.00000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="1.00000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3749999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3750003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">5416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">5416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">7083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">7083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1000004.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">3749999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">3749999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">3749999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">3750003.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-11-01"/>
<period-end iso-date="2024-11-30"/>
<value currency="USD" value-date="2024-11-30">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-12-01"/>
<period-end iso-date="2024-12-31"/>
<value currency="USD" value-date="2024-12-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-01-01"/>
<period-end iso-date="2025-01-31"/>
<value currency="USD" value-date="2025-01-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-02-01"/>
<period-end iso-date="2025-02-28"/>
<value currency="USD" value-date="2025-02-28">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">5416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">5416677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">7083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">7083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2916665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2916677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1000004.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">280000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">280000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">280000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3980"><narrative>State Secretary of Education (SEDUC)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4658"><narrative>State Secretary of Sociap Protection, Employment, Jobs and Income (SEASTER)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4659"><narrative>State Secretary of Environment and Sustainability</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-280000000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3980"><narrative>State Secretary of Education (SEDUC)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4658"><narrative>State Secretary of Sociap Protection, Employment, Jobs and Income (SEASTER)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4659"><narrative>State Secretary of Environment and Sustainability</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3980"><narrative>State Secretary of Education (SEDUC)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4658"><narrative>State Secretary of Sociap Protection, Employment, Jobs and Income (SEASTER)</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-4659"><narrative>State Secretary of Environment and Sustainability</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500524"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500524?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500524"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families assisted by the Comprehensive Protection and Assistance Service (PAIF) in the Marajó region.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="90536"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100146">

</target>
<actual value="90536">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.2. Beneficiaries of the Productive Inclusion Program at least Satisfied
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="75%">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.3. Bioeconomy businesses supported by SEMAS.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in the Productive Inclusion Strategy in Marajó.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.1. Families receiving Bolsa Floresta.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="12,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.2. Digital Connectivity equipment installed in Pará
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
3.5. Environmental licenses issued by the new monitoring system.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.5. State schools of lower and upper secondary in Pará implementing the Socioemotional initiative
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100%">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.3. Public schools in Pará with lower and upper secondary education receiving structured materials per critical descriptor in Portuguese and mathematics
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="70%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100%">

</target>
<actual value="70%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trees planted by students from state public schools in Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.8. Sustainable Schools constructed and renovated in Pará
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.2. Education staff trained to implement Alfabetiza Pará at schools.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="400"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="1,000">

</target>
<actual value="400">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.1. Students from public primary schools in Marajó that do not identify letters in second grade
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="34%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="9%">

</target>
<actual value="34%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
1.3. Ratio of social assistance professionals that received the training on GBV with increased capacity to identify, register, refer and monitor GBV survivors
</narrative></title>
<baseline year="2023" iso-date="2023-09-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-02" />
<period-end iso-date="2028-12-02" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in deforestation in the state of Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20% decrease from baseline">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
3.4. Management services upload in a cloud.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
2.4. Students from municipal schools in Marajo and state schools mapped by the Early Warning System (EWS)
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100%">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families assisted by the Comprehensive Protection and Assistance Service (PAIF) in the Marajó region.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="90536"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="100146">

</target>
<actual value="90536">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Literate students at the right age in municipal and state schools in Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="21%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="51%">

</target>
<actual value="21%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.6. Education staff (teachers and school principals) from state schools receiving training on Environmental education.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="1327"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="8,312">

</target>
<actual value="1327">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
1.1. New Food Security Centers installed in Marajó.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="17">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
2.7. School projects qualified to receive the &quot;Prêmio Selo Sustentável&quot;
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries in the Productive Inclusion Strategy in Marajó.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="10000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trees planted by students from state public schools in Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="1,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Literate students at the right age in municipal and state schools in Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="21%"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="51%">

</target>
<actual value="21%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reduction in deforestation in the state of Pará.
</narrative></title>
<baseline year="2023" iso-date="2023-09-01" value="TBD"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-01" />
<period-end iso-date="2028-12-01" />
<target value="20% decrease from baseline">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P500570</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Sergipe Efficient Digital Acceleration project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access to and the use of sustainable digital services and infrastructure in the State of Sergipe]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project includes four components which collectively aim to modernize the State of Sergipe's digital infrastructure, expand access to broadband connectivity, improve digital services, prepare citizens for the digital transformation, and promote EE and distributed generation in public buildings. Component 1: This component aims to provide catalytic public funding for the rollout of high-capacity, climate-resilient and low carbon digital infrastructure in unserved and underserved areas of Sergipe to connect public buildings, including hospitals, schools and public security stations.  This will be implemented in partnerships with the private sector in the ownership or management of the connectivity infrastructure and through an open access model, fostering competitive access to the infrastructure.  It also seeks to build a modern data center that enables Sergipe to handle current and future data needs and meet higher standards for environment, resilience, cybersecurity, and data protection. Additionally, this component will conduct site-specific climate risk assessments to inform decision-making during the design of the network and data center, integrating adaptation measures such as water-resistant materials and reinforced fiber optic cables to protect core networks and data infrastructure from climate-related events such as floods and intense rainfall.Component 2. Digital Transformation. This component aims to enable and support the use of digital services and enhance data capabilities and digital skills across different segments of the population, effectively shaping Sergipe's inclusive, trustworthy and sustainable digital future. It will expand the availability and use of digital public services by financing and establishing a state government portal, providing a single window for citizens, businesses, and government agencies to access to public information, transactions, and interactions. Additionally, the component involves reviewing and strengthening the Government's Data Observatory through the integration of public and private sector data systems, the establishment of a data governance framework, and the improvement of service efficiency. Lastly, the component will promote digital skills to prepare public officials and individuals for the digital economy and online interactions. This includes targeted efforts to bridge the digital gender gap by offering specific training for women, as well as for youth, Persons with Disabilities (PWDs), and traditional communities (including Indigenous Peoples and quilombolas). Component 3: Efficient and Distributed Power Systems for sustainable digital infrastructure and services. This component aims to provide a cost-effective solution for the current and future energy demands of the public sector which are anticipated to increase, including as the State seeks to embrace greater digitalization of services to promote social and economic development. Component 3 is focused on increasing energy efficiency and solar distributed generation to reduce cost, energy consumption, and C02 emissions in public buildings against a business-as-usual scenario. To support the long-term sustainability of these investments, the component contains a technical assistance sub-component which will strengthen capacity in Government and support implementation.  Component 4. Project Management. This component will provide support for the management and implementation of the project, including: (i) project coordination; (ii) procurement management; (iii) financial management (FM); (iv) implementation of environmental and social risk management measures; (v) monitoring and evaluation (M&amp;E); (vi) support for training, advisory, and audit services as needed; and (vii) public information, communication, and citizen engagement (CE). Special attention will be devoted to promoting the equal participation of women in all decision-making bodies associated with the project and to addressing barriers to recruitment, retention, and promotion.  ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003774"><narrative>Governo de Sergipe </narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006418"><narrative>Secretaria Especial de Planejamento, Orçamento e Inovação</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2030-05-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2030-05-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Julian Najles</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jnajles@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="22040" percentage="98" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="2" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="19.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="19.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDG" percentage="28.0000000" xml:lang="en"><narrative>Digital Government - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDI" percentage="34.0000000" xml:lang="en"><narrative>Digital Infrastructure</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">24999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">24999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">24999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">25003.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1374999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1375011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-15"/>
<value currency="USD" value-date="2030-05-15">53266000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-15"/>
<value currency="USD" value-date="2030-05-15">53266000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">53600000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6418"><narrative>Secretaria Especial de Planejamento, Orçamento e Inovação</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">134000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6418"><narrative>Secretaria Especial de Planejamento, Orçamento e Inovação</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">200000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6418"><narrative>Secretaria Especial de Planejamento, Orçamento e Inovação</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-134000</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6418"><narrative>Secretaria Especial de Planejamento, Orçamento e Inovação</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500570"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500570?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500570"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in C02 emissions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-13" />
<target value="1000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities connected to high-quality broadband infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="37">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Public services offered digitally
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="200">

</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Data center capacity added
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="360">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of authentications in services provided in the new unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="104"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="1215">

</target>
<actual value="104">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Financial savings on energy bills from investments per year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-11" />
<target value="2500000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Efficiency of the New Data Center (PUE)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="1.2">

</target>
<actual value="1.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Data Center Certification (e.g. EDGE or similar) achieved
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PCM - Digital Infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="8500000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average system unavailability Data Center system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="1.6">

</target>
<actual value="12">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-14" />
<target value="7">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained staff who consider that the training received is useful for improving their professional performance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="2,300"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="4,600">

</target>
<actual value="2300">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women who receive a STEM certification
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="350">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime energy savings
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-12" />
<target value="65000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="104511"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="1215000">

</target>
<actual value="10,4511">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-12" />
<target value="1,950,000">

</target>
<actual value="180,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new digital services included in the unique portal
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-15" />
<target value="95">

</target>
<actual value="80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of trained staff in energy efficiency
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-15" />
<target value="150">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projected lifetime energy savings
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-12" />
<target value="65000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="104511"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="1215000">

</target>
<actual value="10,4511">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="1,800,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-06-12" />
<target value="1,950,000">

</target>
<actual value="180,0000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Trained citizens who consider that the training received improved their digital skills (basic and advanced)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-03-12" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P500614</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR State of Alagoas Sustainable Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed DPL supports reforms of the state of Alagoas to strengthen policies for the sustainable use of public resources and the management of environmental resources.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the State of Alagoas Sustainable Development Policy Loan for Brazil is to support reforms of the state of Alagoas to strengthen policies for the sustainable use of public resources and the management of environmental resources. Pillar 1, strengthening policies for the sustainable use of public resources supports reforms that strengthen the sustainable use of public resources through the adoption of: (i) fiscal rules aimed at controlling current expenditures and ensuring fiscal space for public investments, (ii) a new framework for public asset management, and (iii) a new framework for public investment management. Pillar 2, strengthening policies for the sustainable management of environmental resources supports policies to strengthen the management of environmental resources by: (i) improving the governance of the environmental management system, (ii) a commitment to reduce greenhouse gas (GHG) emissions and measures to adapt to the effect of climate change, (iii) increasing the efficiency in the analysis and processing of environmental licensing, (iv) improving the quality of information used in the Rural Environmental Registries, and (v) the establishment of the State Policy for Payment for Environmental Services (PEPSA).]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003703"><narrative>Government of Alagoas</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00003703"><narrative>Government of Alagoas</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00003704"><narrative>Secretary of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabiano Silvio Colbano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rua Cincinato Pinto, s/n Centro, Maceió, Alagoas
, https://alagoas.al.gov.br/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rua Cincinato Pinto, s/n Centro, Maceió, Alagoas
, https://alagoas.al.gov.br/
</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rua General Hermes, 80 - Centro, Maceió, Alagoas
, http://www.sefaz.al.gov.br/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rua General Hermes, 80 - Centro, Maceió, Alagoas
, http://www.sefaz.al.gov.br/
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="41010" percentage="63" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="37" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="37.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="63.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">277486911.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">277486911.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">14208271.92</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">14208271.92</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">277486911</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3704"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">263278639</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3704"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-01-31"/><value value-date="2026-01-31">-664820</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-3704"><narrative>Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500614"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P500614?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P500614"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of all rural properties with georeferenced, analyzed, and approved RERs
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="102,943"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="1,208,700">

</target>
<actual value="81,694.09">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days to issue an environmental license for small businesses
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="114"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-09" />
<target value="45">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led projects supported by PSA Agroecologia
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="80">

</target>
<actual value="80.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average current expenditure between 2025 and 2026 compared to the average between 2022 and 2024, as a share of current revenue
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2026-12-12" />
<target value="92">

</target>
<actual value="93.08">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Environmental Protection Areas (EPAs) under IMA's jurisdiction with updated management plans approved
</narrative></title>
<baseline year="2023" iso-date="2023-12-12" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-12" />
<period-end iso-date="2026-12-12" />
<target value="100">

</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount (in R$ thousands) paid to PSA RPPN and PSA Agroecologia programs beneficiaries
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="2,900">

</target>
<actual value="838.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of real estate assets registered in Alagoas registry database
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="492"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="1,981">

</target>
<actual value="616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities monitored under the coverage area of the monitoring and early warning system
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="73"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="102">

</target>
<actual value="102">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost-benefit analysis
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of real estate assets registered in Alagoas registry database
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="492"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="1,981">

</target>
<actual value="616">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average current expenditure between 2025 and 2026 compared to the average between 2022 and 2024, as a share of current revenue
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2026-12-12" />
<target value="92">

</target>
<actual value="93.08">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led projects supported by PSA Agroecologia
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="80">

</target>
<actual value="80.26">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Amount (in R$ thousands) paid to PSA RPPN and PSA Agroecologia programs beneficiaries
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="2,900">

</target>
<actual value="838.1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Area of all rural properties with georeferenced, analyzed, and approved RERs
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="102,943"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="1,208,700">

</target>
<actual value="81,694.09">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of days to issue an environmental license for small businesses
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="114"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-09" />
<target value="45">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities monitored under the coverage area of the monitoring and early warning system
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="73"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="102">

</target>
<actual value="102">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of Environmental Protection Areas (EPAs) under IMA's jurisdiction with updated management plans approved
</narrative></title>
<baseline year="2023" iso-date="2023-12-12" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-12" />
<period-end iso-date="2026-12-12" />
<target value="100">

</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost-benefit analysis
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P504253</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Proactive, Safe, and Resilient Road Asset Management Program - State of Santa Catarina Project - Phase 3</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve access to sustainable, safe, and resilient transport in the State of Santa Catarina]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The road network in Santa Catarina is in a dire state, with 82 percent of its 6,289 kilometers of state highways being single-lane paved roads and 18 percent unpaved. The municipal road system adds another 66,607 kilometers, mostly unpaved. According to the National Confederation of Transport (CNT), about 74 percent of Santa Catarina's paved roads were in regular, poor, or very poor condition in 2023, despite their crucial role in mobility and logistics. This poor condition of roads significantly impacts the cost of operation of vehicles and logistics costs, with impacts on the competitiveness. Road safety is also impaired. In 2022, Brazil saw 33,894 traffic-related deaths, with Santa Catarina recording a death toll of 18 per 100,000 inhabitants, higher than the national average of 16 per 100,000. The economic cost of road safety issues is substantial, estimated to represent 5 percent of the country's annual GDP due to the management of traffic crashes, long-lasting injuries, and the loss of productivity, especially among young, educated individuals.To address these challenges, the Government of Santa Catarina, in collaboration with the World Bank, is developing a program focusing on improving access to sustainable, safe, and resilient transport in the State of Santa Catarina (SSC). This project, which corresponds to the Phase 3 of the MPA, has a total value of US$475 million, including US$300 million from the International Bank for Reconstruction and Development (IBRD), US$75 million from SSC counterpart financing, and an expected US$100 million in private capital mobilization (PCM). The project will benefit about 1,262 kilometers of roads, where long-term CREMA contracts will be implemented organized into clusters for efficient management, to enhance road conditions, climate resilience and road safety. The project also aims to develop a Public-Private Partnership (PPP) program for roads, leveraging private sector expertise and finance. Additionally, the project seeks to reduce gender and racial disparities in employment within the transport and construction sectors, where women and minorities are underrepresented and face significant wage gaps. By promoting inclusive employment practices and supporting women's participation in engineering and technical roles, the project aims to address occupational segregation and improve economic opportunities for marginalized groups in Santa Catarina. These goals will be delivered through the following four components:- Component 1: Proactive Road Asset Management (US$435 million): This component will support long-term CREMA contracts for road design, rehabilitation, and maintenance. Subcomponent 1.1 covers approximately 1,034 km in selected SSC regions, with financing from the World Bank and SSC. Subcomponent 1.2 support structuring PPPs for 225 km of state roads, integrating road safety and climate resilience improvements.- Component 2: Institutional Strengthening (US$28.88 million): This component aims to enhance road asset management, green mobility, and social inclusion and gender through technical assistance, studies, training, and the acquisition of goods. It will build capacity in SIE-SC and other relevant entities, focusing on road infrastructure management, climate resilience, road safety, and green mobility in the Greater Florianopolis area. Social inclusion efforts will address gender and minority inclusion and improve accessibility.- Component 3: Safe Active Mobility Improvements (US$10 million): This component will pilot safe active mobility interventions in at least four SSC municipalities, focusing on pedestrian streets, accessible sidewalks, and safe cycleways. The goal is to improve road safety, accessibility, non-motorized transport, and climate resilience. Approximately 12 km of urban streets will benefit from these interventions.- Component 4: Project Management (US$8.37 million): This component supports project management, coordination, and implementation by providing necessary human capital to SIE-SC. It includes engaging consultants to facilitate document preparation, project implementation, and the Monitoring, Evaluation &amp; Learning (MEL) agenda, covering technical, social, environmental, financial management, audits, monitoring and evaluation, and procurement.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00005655"><narrative>State of Santa Catarina</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00005654"><narrative>Secretaria de Estado da Infraestrutura e Mobilidade</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-02-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-02-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2034-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2034-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Javier Morales Sarriera</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jmoralessarriera@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21022" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="97.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="3.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">480832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">480844.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2814999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2815011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">8530832.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">8530844.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">6114999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">6115011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2168332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2168344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1818332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1818344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">1539999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">1540011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1531665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">1531677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">11.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">299250000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">299250000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">300000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-5654"><narrative>Secretaria de Estado da Infraestrutura e Mobilidade</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">750000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-5654"><narrative>Secretaria de Estado da Infraestrutura e Mobilidade</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-04-30"/><value value-date="2026-04-30">-750000</value><description xml:lang="en"><narrative>Total Interest Repayment in April Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-5654"><narrative>Secretaria de Estado da Infraestrutura e Mobilidade</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504253"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P504253?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504253"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Physical progress of the length of urbanized areas along the selected municipalities with pedestrian, cycling and drainage infrastructure implemented and improved
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0`"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Reduction in annual road crash fatalities along targeted state road corridors in the State of Santa Catarina
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-13" />
<period-end iso-date="2032-12-13" />
<target value="162,4000">
<comment><narrative>
Works not expected soon
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of data-based planning and programming to identify and intervene is areas of trafficking of minors and sexual exploitation and abuse along state roads part of the project
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2032-12-14" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which SC participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="3">
<comment><narrative>
In Bahia - for the first Basic Desing Discussion
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Reduction in annual road crash fatalities along targeted state road corridors in the State of Santa Catarina
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling for additional PPPs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of data-based planning and programming to identify and intervene is areas of trafficking of minors and sexual exploitation and abuse along state roads part of the project
</narrative></title>
<baseline year="2025" iso-date="2025-01-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-01-14" />
<period-end iso-date="2032-12-14" />
<target value="Yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted (Yes/No)
</narrative></title>
<baseline year="2024" iso-date="2024-09-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-09-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which SC participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="3">
<comment><narrative>
In Bahia - for the first Basic Desing Discussion
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling for additional PPPs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Sustainable mobility studies for Greater Florianópolis area under implementation
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient State road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="1262">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established and operational
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established and operational
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Level indicator (Private Capital Mobilization): The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2032-12-14" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Sustainable mobility studies for Greater Florianópolis area under implementation
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="no"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="yes">

</target>
<actual value="no">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-13" />
<period-end iso-date="2032-12-13" />
<target value="162,4000">
<comment><narrative>
Works not expected soon
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women engineers trained and certified in medium and high skilled jobs in road construction
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-12-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CREMA-PPP contracts structured in the SSC
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women engineers trained and certified in medium and high skilled jobs in road construction
</narrative></title>
<baseline year="2024" iso-date="2024-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-13" />
<period-end iso-date="2030-12-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access): Share of paved state road networks in the SSC with Management Response Plans (MRP) to climate risks and natural disasters in place (percentage).
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access): Share of paved state road networks in the SSC with Management Response Plans (MRP) to climate risks and natural disasters in place (percentage).
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CREMA-PPP contracts structured in the SSC
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Level indicator (Private Capital Mobilization): The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2032-12-14" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Level indicator (Private Capital Mobilization): The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2032-12-14" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-13" />
<period-end iso-date="2032-12-13" />
<target value="162,4000">
<comment><narrative>
Works not expected soon
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-05-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-13" />
<period-end iso-date="2032-12-13" />
<target value="162,4000">
<comment><narrative>
Works not expected soon
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access): Share of paved state road networks in the SSC with Management Response Plans (MRP) to climate risks and natural disasters in place (percentage).
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO indicator (resilient transport access): Share of paved state road networks in the SSC with Management Response Plans (MRP) to climate risks and natural disasters in place (percentage).
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Reduction in annual road crash fatalities along targeted state road corridors in the State of Santa Catarina
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO indicator (safe transport access): Reduction in annual road crash fatalities along targeted state road corridors in the State of Santa Catarina
</narrative></title>
<baseline year="2024" iso-date="2024-05-11" value="38"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-05-11" />
<period-end iso-date="2032-12-11" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO Level indicator (Private Capital Mobilization): The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-05-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-14" />
<period-end iso-date="2032-12-14" />
<target value="100000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient State road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2032-12-10" />
<target value="1262">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Physical progress of the length of urbanized areas along the selected municipalities with pedestrian, cycling and drainage infrastructure implemented and improved
</narrative></title>
<baseline year="2024" iso-date="2024-06-11" value="0`"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-11" />
<period-end iso-date="2030-12-10" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P504276</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Green and Resilient SP Metro Line 2 Extension</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective of SOP1 is to improve low-carbon mobility, increase job accessibility and enable social housing in the Catchment Area of Line 2 - Green.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Metro Sao Paulo Line 2 - Green extension project represents a pivotal initiative aimed at enhancing mass transportation infrastructure, particularly in the eastern portion of Sao Paulo, benefiting low- and middle-income residents. Civil construction for the extension of Metro Line 2 is currently underway through parallel financing, comprising 8.3 km of tunnels and the construction of 8 new stations from Vila Prudente to Penha, which is being treated as an associated facility since it has not been financed by the World Bank.The project will finance the signaling and systems associated with that expansion. The signaling system will implement a high level of automation, enabling driverless operation and contributing to a reduction in the operational costs of the line. By allocating funds to signaling and systems, the project aims to enhance mobility and accessibility for citizens in this underserved residential area.Additionally, the project adopts a multifaceted approach and its second component will support Technical Assistance activities aimed at enhancing the overall efficiency and sustainability of SP Metro, including: a) the creation of centralized reporting channels for sexual harassment, streamlining the process for women and promoting standardized approaches, thereby promoting a secure environment for diverse participants in public transport; b) the structuring of a Public-Private Partnership for social housing developments near Metro Line 2 – Green stations, providing convenient access and attracting private investment; c) the implementation a monitoring system for early warnings against storms and flooding, starting with a pilot program to expand resilience across the entire network; and d) the maximization of ancillary revenue by exploring diverse income sources within and around stations, ensuring financial sustainability beyond traditional farebox revenueTherefore, beyond its immediate transportation goals, the project assumes broader significance by contributing to environmental sustainability and resilience. The expansion of a low-carbon transport alternative is expected to yield substantial climate benefits, relieving pressure on diesel-powered buses and fossil-fueled individual vehicles.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00005862"><narrative>State of São Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00005856"><narrative>Metro São Paulo</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-01"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-01"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Edpo Covalciuk Silva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ecovalciuksilva@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Rua Boa Vista, 175, São Paulo, São Paulo

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21030" percentage="51" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="51" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="49" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="49" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="51.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="49.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">6250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">6249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">6250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-01"/>
<value currency="USD" value-date="2031-12-01">250000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-01"/>
<value currency="USD" value-date="2031-12-01">250000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-5856"><narrative>Metro São Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-5856"><narrative>Metro São Paulo</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504276"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P504276?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504276"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="1,315,112">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment incidents registered in the system that followed the full protocol
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2030-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="1,315,112">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="22,610.32">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services - Youth
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="155,764">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services - Female
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="380,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="560,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services - Youth
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="150,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="218,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="22,610.32">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services - Female
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="380,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="560,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services - Youth
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="155,764">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public transport operators within SPMR integrated into the GBV reporting channel
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff Trained in GBV Prevention and Response Tactics
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2029-12-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services - Youth
</narrative></title>
<baseline year="2024" iso-date="2024-01-15" value="150,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-01-15" />
<period-end iso-date="2031-12-15" />
<target value="218,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P504543</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Electromobility Multiphase Programmatic Approach – MPA Phase 1 CEF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO)  is to improve quality and reduce emissions of public transport in Brazilian cities.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed US$ 500 million IPF - Brazil Electromobility Multiphase Programmatic Approach – MPA Phase 1 Caixa (P504543) aims to accelerate the decarbonization of urban transport in Brazilian cities by financing electric buses (e-buses) and associated infrastructure. It is part of Phase 1 of the Brazil Electromobility Multiphase Programmatic Approach (MPA), to be implemented by Caixa Economica Federal (CEF), acting as the financial intermediary. Phase 1 addresses key market barriers, particularly the lack of affordable long-term financing for electromobility projects, one of the key factors that has hindered large-scale e-bus adoption. The Project will establish a credit line to finance the purchase or construction of e-buses and related infrastructure, including charging stations and energy grid upgrades, while providing technical assistance and capacity-building for CEF and end-borrowers. A Project Development Facility will offer comprehensive support and assistance—technical, economic, financial, operational and legal—throughout the development and implementation of the electromobility projects. This facility will foster innovative business models, reduce market and technological risks, and thereby unlock private capital mobilization (PCM) in the next MPA phases to enable the large-scale deployment of e-buses in Brazil. Strengthening CEF's institutional and fiduciary capacity is essential to create a financial instrument that effectively utilizes public funds for e-bus procurement, which is particularly important as the sector stabilizes in terms of commercial risk perception. Improved capacity is also crucial to support CEF's access sustainable finance markets in line with international best practices, including meeting environmental and social standards, gender inclusion, public procurement and participation in carbon market.The project will consist of two main components:i.	Component 1: Investment in electromobility and energy transition projects. This component will finance (a) the decarbonization of public transport; and (b) the preparation of infrastructure in participating cities to promote energy transition.ii.	Component 2: Project facility and institutional strengthening. This component will finance (a) project facility to support the end borrower on project structuring and feasibility studies; (b) to strengthen CEF's institutional capacity for assisting Project implementation;  (iii) the study and training of CEF's team to operate in the carbon market, as well as providing support for the implementation of an MRV (Monitoring, Reporting, and Verification) platform.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006810"><narrative>Caixa Economica Federal</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007169"><narrative>Caixa Econômica Federal</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-22"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-22"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-15"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-15"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tais Fonseca De Medeiros</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfonseca@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
 SBS - Quadra 4 - Lotes 3/4 - TErreo, Brasilia, DF

</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21011" percentage="65" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="65" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="35" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="35" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="34.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="64.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">6.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">12500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">12499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">12500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">8333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">5555554.56</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">5555563.52</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-15"/>
<value currency="USD" value-date="2031-12-15">500000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-15"/>
<value currency="USD" value-date="2031-12-15">500000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">500000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7169"><narrative>Caixa Econômica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7169"><narrative>Caixa Econômica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504543"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P504543?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504543"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-mobility projects structured with support from the Project Development Facility
</narrative></title>
<baseline year="2025" iso-date="2025-07-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-09" />
<period-end iso-date="2031-09-11" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-bus chargers installed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-13" />
<period-end iso-date="2031-12-15" />
<target value="270">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projects of energy grid capacity enhancement contracted
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="4">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts reformulated with specific clauses for the technological transition to electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GBV (Gender-Based Violence) module training within the women's qualification program implemented
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-09-10" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="574,799">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-08-30" />
<target value="2,479,220">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="24">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and certified for roles in electromobility-related jobs
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-08-31" />
<target value="2,343,784">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New E-buses in operation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Investment Mobilized for E-Bus Deployment
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="42845600">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-mobility projects structured with support from the Project Development Facility
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-12-15" />
<target value="8">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MRV platform implemented
</narrative></title>
<baseline year="2025" iso-date="2025-07-09" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-09" />
<period-end iso-date="2031-09-11" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-bus chargers installed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-13" />
<period-end iso-date="2029-12-13" />
<target value="270">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="574,799">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="13">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-mobility projects structured with support from the Project Development Facility
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-12-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and certified for roles in electromobility-related jobs
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-12-15" />
<target value="500">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private purchase volume of carbon credits generated by the project
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2034-12-15" />
<target value="1377500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private purchase volume of carbon credits generated by the project
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2034-12-15" />
<target value="1377500">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projects of energy grid capacity enhancement contracted
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses monitored on the MRV platform
</narrative></title>
<baseline year="2025" iso-date="2025-07-04" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-04" />
<period-end iso-date="2031-09-11" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts reformulated with specific clauses for the technological transition to electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="8">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses monitored on the MRV platform
</narrative></title>
<baseline year="2025" iso-date="2025-07-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-03" />
<period-end iso-date="2031-12-15" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="19">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New E-buses in operation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="540">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MRV platform implemented
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-09-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MRV platform implemented
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-12-15" />
<target value="Yes">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Investment Mobilized for E-Bus Deployment
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-09-15" />
<target value="126396722">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
GBV (Gender-Based Violence) module training within the women's qualification program implemented
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-12-15" />
<target value="1,300,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2035-09-10" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projects of energy grid capacity enhancement contracted
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2029-12-05" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New E-buses in operation
</narrative></title>
<baseline year="2025" iso-date="2025-07-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-06" />
<period-end iso-date="2029-12-06" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2eq)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="263,867">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Investment Mobilized for E-Bus Deployment
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="42845600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Operators/Municipalities receiving a CEF loan for e-buses that are implementing GBV protocols
</narrative></title>
<baseline year="2025" iso-date="2025-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-13" />
<period-end iso-date="2031-03-10" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-13" />
<period-end iso-date="2031-09-13" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and certified for roles in electromobility-related jobs
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-12-15" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Manual and guidance developed in CEF's operational structure for project evaluation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="2">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-bus chargers installed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-07-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-14" />
<period-end iso-date="2029-12-14" />
<target value="270">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-03" />
<period-end iso-date="2031-09-03" />
<target value="2,343,784">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained and certified for roles in electromobility-related jobs
</narrative></title>
<baseline year="2025" iso-date="2025-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-13" />
<period-end iso-date="2031-09-13" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="0.01">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="0.02">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses monitored on the MRV platform
</narrative></title>
<baseline year="2025" iso-date="2025-07-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-03" />
<period-end iso-date="2031-09-10" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2035-09-13" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="219,980">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Net revenue generated by carbon credits for CEF (number in millions of USD)
</narrative></title>
<baseline year="2025" iso-date="2025-07-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-10" />
<period-end iso-date="2031-09-10" />
<target value="2174">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-12-15" />
<target value="921">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="219,980">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-12-15" />
<target value="921">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="2,686">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New E-buses in operation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2029-12-05" />
<target value="540">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of the GBV (Gender-Based Violence) module training within the women's qualification program
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-03-14" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Manual and guidance developed in CEF's operational structure for project evaluation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-09-10" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-02" />
<period-end iso-date="2035-09-02" />
<target value="2,479,220">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2eq)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="263,867">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-09-10" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-13" />
<period-end iso-date="2031-09-13" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="19">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-12-15" />
<target value="921">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-12-15" />
<target value="921">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="2,686">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (ton NOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="0.01">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="219,980">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2031-12-15" />
<target value="219,980">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2eq)
</narrative></title>
<baseline year="2025" iso-date="2025-06-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-11" />
<period-end iso-date="2031-09-11" />
<target value="263,867">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (TonCO2eq)
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="263,867">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-12-15" />
<target value="1,300,000">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-12-15" />
<target value="1,300,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-08-31" />
<target value="2,343,784">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-03" />
<period-end iso-date="2031-09-03" />
<target value="2,343,784">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-30" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-30" />
<period-end iso-date="2035-08-30" />
<target value="2,479,220">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-buses monitored on the MRV platform
</narrative></title>
<baseline year="2025" iso-date="2025-07-03" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-03" />
<period-end iso-date="2031-12-15" />
<target value="540">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-02" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-02" />
<period-end iso-date="2035-09-02" />
<target value="2,479,220">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="24">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM10 emissions avoided from public transport (tPM10)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="13">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="3,407">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="0.02">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Projects of energy grid capacity enhancement contracted
</narrative></title>
<baseline year="2025" iso-date="2025-07-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-06" />
<period-end iso-date="2029-12-06" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Carbon credits generated by the project
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-09-15" />
<target value="116,745">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="574,799">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-12" />
<period-end iso-date="2035-09-12" />
<target value="574,799">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2035-09-10" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2035-09-13" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-bus chargers installed and operational
</narrative></title>
<baseline year="2025" iso-date="2025-07-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-13" />
<period-end iso-date="2031-12-15" />
<target value="270">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Manual and guidance developed in CEF's operational structure for project evaluation
</narrative></title>
<baseline year="2025" iso-date="2025-07-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-06" />
<period-end iso-date="2031-09-11" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport
</narrative></title>
<baseline year="2025" iso-date="2025-06-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-10" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
E-mobility projects structured with support from the Project Development Facility
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-09-10" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-05-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-31" />
<period-end iso-date="2031-12-15" />
<target value="1,300,000">
<comment><narrative>
The project is not yet effective
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
MRV platform implemented
</narrative></title>
<baseline year="2025" iso-date="2025-07-08" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-08" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Manual and guidance developed in CEF's operational structure for project evaluation
</narrative></title>
<baseline year="2025" iso-date="2025-07-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-05" />
<period-end iso-date="2031-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-09" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-09" />
<period-end iso-date="2035-09-09" />
<target value="3,407">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts reformulated with specific clauses for the technological transition to electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-06-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-13" />
<period-end iso-date="2031-09-13" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Investment Mobilized for E-Bus Deployment
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="126,396,722">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Concession contracts reformulated with specific clauses for the technological transition to electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2031-09-14" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P504899</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Strengthening Social Assistance Delivery System in the Municipality of São Paulo</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access to improved social services for vulnerable and at-risk populations in the Municipality of São Paulo]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The project will strengthen the coverage and quality of services provided to specific vulnerable and at-risk population groups, including individuals experiencing homelessness, persons with disabilities, at-risk youth vulnerable to crime, substance abuse, or school/work disengagement (NEET), LGBTQIA+ individuals, migrants, and the elderly. By strengthening the municipality's social services network, the project will enhance both access to and quality of social services for these populations. This will be achieved through improvements in service delivery strategies, case management, operational protocols, SUAS physical infrastructure, information systems, data management, and program management.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006566"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006566"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006566"><narrative>Municipality of São Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006568"><narrative>Municipal Secretariat of Social Assistance and Development </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-10"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-10"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Phillippe Leite</narrative></person-name><telephone>+1-202-473-1000</telephone><email>pleite@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="75" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="75" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="25" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="25" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSG" percentage="3.00000000" xml:lang="en"><narrative>Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="74.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="23.0000000" xml:lang="en"><narrative>Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">3333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">3333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">483344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2166677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">3333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">3333344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">483344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">131800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">131800000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">131800000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6568"><narrative>Municipal Secretariat of Social Assistance and Development </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6568"><narrative>Municipal Secretariat of Social Assistance and Development </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504899"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P504899?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P504899"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of the Selected Administrative Districts with Primary Health Care coverage
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="64.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="69.7">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Previously homeless individuals who accessed qualified reintegration services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="10606"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="31000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs - other social assistance programs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="380000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="500000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average response time to PWD user requests to access a qualified PWD service offered by SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="within 20 days, with 10 extra extension days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="within 7 days">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Minimum percentage for the Brazilian Single Registration System Registration Update Rate
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2031-05-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="9,914"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="10500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries that received certificates in digital skills upon successful completion of the Digital Public Works Program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="240">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reencounter Villas equipped with common service rooms
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SUAS network buildings renovated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="64">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reencounter Villas with an average occupancy rate of at least 90 percent
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Minimum percentage of population affected by a climate-related shock registered and serviced by SMADS
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Premature mortality rate (ages 30-69) from the four main NCDs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="319"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="313.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of Behavioral Change Therapy
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="240">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Borrower's population with Type III Emergency Care Unit coverage
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="56.74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of Street Outreach Clinic teams operational within the Borrower's territory
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="35"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="40">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="40">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Premature mortality rate (ages 30-69) from the four main NCDs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="319"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="313.6">
<comment><narrative>
under revision
</narrative></comment>
</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of PWDs accessing qualified PWD services offered by SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="15">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.  The number of PWD is at 59,102 in December 2025.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of PWDs accessing qualified PWD services offered by SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Average response time to PWD user requests to access a qualified PWD service offered by SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="within 20 days, with 10 extra extension days"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="within 7 days">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="11 days">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Borrower's population with Type III Emergency Care Unit coverage
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="56.74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="90">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="63.05">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Population of the Selected Administrative Districts with Primary Health Care coverage
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="64.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="69.7">
<comment><narrative>
under revision
</narrative></comment>
</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="9,914"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="10500">
<comment><narrative>
under revision
</narrative></comment>
</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Social assistance services provided by SMADS using electronic records
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ambulatory Care Sensitive Conditions hospitalization rate
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="14.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="14.26">
<comment><narrative>
under revision
</narrative></comment>
</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ambulatory Care Sensitive Conditions hospitalization rate
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="14.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="14.26">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Minimum percentage of population affected by a climate-related shock registered and serviced by SMADS
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-12-15" />
<target value="90">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.  SMADS acted on 395
events registering  11.451 families (38.501 individuals) as affected population. 100% of the affected received support by SMADS.
</narrative></comment>
</target>
<actual value="100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of social safety net programs - other social assistance programs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="380000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="500000">
<comment><narrative>
under revision
</narrative></comment>
</target>
<actual value="TBC">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries of Behavioral Change Therapy
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="240">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Beneficiaries that received certificates in digital skills upon successful completion of the Digital Public Works Program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="240">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reencounter Villas with an average occupancy rate of at least 90 percent
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rate of the services provided by SMADS and SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
SUAS network buildings renovated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="64">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Previously homeless individuals who accessed qualified reintegration services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="10606"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="31000">
<comment><narrative>
Extracted from 2025 annual reports. Covers Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="11030">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Previously homeless individuals who accessed qualified reintegration services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="10606"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="31000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Minimum percentage for the Brazilian Single Registration System Registration Update Rate
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2031-05-15" />
<target value="80">
<comment><narrative>
Extracted from 2025 annual reports. Covers  Jan-Dec 2025.
</narrative></comment>
</target>
<actual value="86">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Minimum percentage for the Brazilian Single Registration System Registration Update Rate
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2031-05-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reencounter Villas equipped with common service rooms
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average number of Street Outreach Clinic teams operational within the Borrower's territory
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="35"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Social assistance services provided by SMADS using electronic records
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-05-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Ambulatory Care Sensitive Conditions hospitalization rate
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="14.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="14.26">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Satisfaction rate of the services provided by SMADS and SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the number of PWDs accessing qualified PWD services offered by SMPED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P505235</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR State of Rio Grande do Sul Sustainable Recovery and Climate Resilience Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed DPL aims to support the state of Rio Grande do Sul to strengthen policies to mitigate the impacts of climate-related events and promote the efficient use of public resources. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the State of Rio Grande do Sul Sustainable Recovery and Climate Resilience Development Policy Loan for Brazil is to support the state of Rio Grande do Sul to strengthen policies to mitigate the impacts of climate-related events and promote the efficient use of public resources. The two pillars of the development policy loan (DPL) are closely aligned with the guiding themes of the state government's Multiannual Plan for (PPA) 2024-2027. Pillar one is linked to the other two axis of the PPA: inclusive, just, and happy society, which is dedicated to social inclusion, equality, education, health, and cultural development; and innovative economic development, which targets sustainable development, focusing on innovation, environmental sustainability, and the promotion of new economic opportunities. Pillar two is linked to two axes of the PPA: prosperous state, which focuses on fiscal consolidation; and better public investments, and planning, governance, and management, which emphasizes the importance of effective governance, strategic planning, fiscal responsibility, and the modernization of public administration. This operation is also aligned with the Government of Rio Grande do Sul (GoRs) plans to reduce the budgetary cost of its liabilities and to thus make further progress toward restoring fiscal sustainability.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006086"><narrative>State Government of Rio Grande do Sul</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006086"><narrative>State Government of Rio Grande do Sul</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006087"><narrative>State Secretary of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-04-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-04-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Fabiano Silvio Colbano</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="74020" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="25" xml:lang="en"/><sector vocabulary="1" code="15128" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="33.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="34.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="25.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="8.00000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">359633746.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">359633746.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">359633746</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6087"><narrative>State Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">359633746</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6087"><narrative>State Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-899084</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6087"><narrative>State Secretary of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505235"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505235?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505235"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of municipalities adopting improved-contingent plans for disaster response
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="70">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of emergency response projects completed through FUNRIGS financing
</narrative></title>
<baseline year="2024" iso-date="2024-03-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-29" />
<period-end iso-date="2026-12-15" />
<target value="85">

</target>
<actual value="93.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of municipalities adopting improved-contingent plans for disaster response
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="70">

</target>
<actual value="10">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of disaster-affected poor households receiving disaster-related transfers
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2026-12-15" />
<target value="75">

</target>
<actual value="130.34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of female beneficiaries in state entrepreneurship programs
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of disaster-affected poor households receiving disaster-related transfers that are led by women
</narrative></title>
<baseline year="2022" iso-date="2022-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-08" />
<period-end iso-date="2026-12-08" />
<target value="65">

</target>
<actual value="118.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current expenditures as a share of adjusted current revenues
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="96.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="94.9">

</target>
<actual value="90.62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment execution rate, calculated as executed investment expenditures to the amounts committed in the annual budget
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="55.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="70">

</target>
<actual value="55.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Investment execution rate, calculated as executed investment expenditures to the amounts committed in the annual budget
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="55.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="70">

</target>
<actual value="55.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of disaster-affected poor households receiving disaster-related transfers
</narrative></title>
<baseline year="2022" iso-date="2022-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-15" />
<period-end iso-date="2026-12-15" />
<target value="75">

</target>
<actual value="130.34">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of disaster-affected poor households receiving disaster-related transfers that are led by women
</narrative></title>
<baseline year="2022" iso-date="2022-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-12-08" />
<period-end iso-date="2026-12-08" />
<target value="65">

</target>
<actual value="118.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of emergency response projects completed through FUNRIGS financing
</narrative></title>
<baseline year="2024" iso-date="2024-03-29" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-03-29" />
<period-end iso-date="2026-12-15" />
<target value="85">

</target>
<actual value="93.2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Current expenditures as a share of adjusted current revenues
</narrative></title>
<baseline year="2023" iso-date="2023-12-14" value="96.1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-14" />
<period-end iso-date="2026-12-14" />
<target value="94.9">

</target>
<actual value="90.62">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of female beneficiaries in state entrepreneurship programs
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P505590</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Proactive, Safe, and Resilient Road Asset Management Program - State of Mato Grosso do Sul - Phase 4</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve access to sustainable, safe, and resilient transport in the State of Mato Grosso do Sul.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The present Project, US$200 million to support the State of Mato Grosso do Sul (SMS), is Phase 4 of the Brazil Proactive, Safe and Resilient Road Asset Management Program – Brazil Pro-Roads, a horizontal and simultaneous multi-phase programmatic approach. The SMS, created in 1979, has recently emerged as an important player in Brazil's economy and in the global food security agenda. The SMS economy has successfully transitioned from extensive agriculture towards the development of intensive agro-industries in the last decade. Given the size of the State (6th largest in Brazil) and the fact that its production is highly dependent on logistics, road transport is essential in much of the SMS territory. However, the State's road infrastructure is vulnerable to significant risks stemming from climate hazards, including flooding and increasing occurrence of heat waves. This vulnerability is exacerbated in a context where more than 65 percent of the state road network is unpaved and hence, particularly exposed to climate impacts.This Phase 4 Project will support SMss objective of transforming and modernizing road asset management practices towards proactive climate resilience, by using the long-term Design-Build-Maintain (DBM) CREMA model. The Project will also support the first 20-to-25 year pilot CREMA PPP in the State, leveraging the positive results of the State's ambitious plan to develop its road infrastructure by mobilizing a combination of public financing and private capital and the robust regulatory, institutional and operational frameworks the SMS has already developed. The delegation of road infrastructure management to the private sector, combined with targeted resilience works, will increase the overall resilience of the transport network to the impacts of climate change. It will also improve road safety. The SMS will both benefit from and contribute to the MPA learning agenda, which aims at improving the technical and institutional capacity of the States in the use of CREMAs.Phase 4 consists of four components for a total estimated value of US$350 million. This includes US$200 million of IBRD financing; US$50 million of counterpart financing from SMS, mainly dedicated to the development of CREMA; and an estimated US$100 million in private capital mobilization (PCM)Component 1 aims to build adaptive capacity in SMS and includes targeted measures to ensure the resilience of the road network to the expected effects of climate change. The rehabilitation works and resilience improvements will be designed to withstand the expected intensification of weather events. Subcomponent 1.1 will include contracting and carrying out the design, rehabilitation and maintenance of selected State roads through CREMA-DBM Agreements, contracts with a duration ranging from 8 to 10 years, through public procurement. Those CREMAs will cover 617 km of state roads in two regions prioritized by the Government of Mato Grosso do Sul. Subcomponent 1.2 will include technical assistance in the structuring (including financial and economic aspects) of, and support to contracting and implementing CREMA-PPP Agreements with a duration of 10 to 35 years, paid through availability payment scheme, for the design, rehabilitation and maintenance of selected State roads. A logistics corridor serving agro-industrial production (especially cellulose) from the eastern region of SMS to the states of Minas Gerais and Goias has been identified as a relevant candidate, covering an estimated length of 208 km. Component 2 will consist of technical assistance and studies, training, and the acquisition of goods to build the capacity of selected State agencies, including EPE, SEILOG, AGESUL, IMASUL, DETRAN and CGE, on climate-resilient road asset management, decarbonization and road safety. Component 3 will finance road safety and accessibility improvements to hazardous spots around selected State public schools. At least 30 critical and hazardous spots near 24 state schools are expected to be treated.Component 4 will provide the implementing agency State's Partnership Office, EPE, with support to the implementation, management and coordination of the Project, including technical, financial, audit, procurement, monitoring and evaluation, social and environmental aspectsThe proposed Phase 4 Project interventions will directly benefit 1.55 million by integrating climate-resilient and disaster risk management systems into road design, thereby reducing the vulnerability of the infrastructure to climate events, and will support the SMss commitment to preserving its biodiversity, especially in the Pantanal, the biome with the highest number of protected species in Brazil by contributing to increasing technical knowledge and understanding of risks and disaster risk management at the State level in the context of climate change.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007233"><narrative>State of Mato Grosso do Sul</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007233"><narrative>State of Mato Grosso do Sul</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007232"><narrative>Escritório de Parcerias EstratEgicas do Governo do Estado de Mato Grosso do Sul</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-04-11"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-04-11"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2034-03-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2034-03-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Maria Jose Sala Pelufo</narrative></person-name><telephone>+1-202-473-1000</telephone><email>msalapelufo@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Av. do Poeta s/n - Bloco 8. Parque dos Poderes, Campo Grande, Mato Grosso do Sul

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Av. do Poeta s/n - Bloco 8. Parque dos Poderes, Campo Grande, Mato Grosso do Sul

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rua Pedro Coutinho, 53, Campo Grande, Mato Grosso do Sul

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rua Pedro Coutinho, 53, Campo Grande, Mato Grosso do Sul

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21024" percentage="50" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="97.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="1.00000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">1833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">2166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">2166671.65</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">200000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">200000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7232"><narrative>Escritório de Parcerias EstratEgicas do Governo do Estado de Mato Grosso do Sul</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7232"><narrative>Escritório de Parcerias EstratEgicas do Governo do Estado de Mato Grosso do Sul</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505590"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505590?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505590"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Monitoring &amp; Maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Fauna movement diagnostic to design fauna crossings
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people that benefit from enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Update of the PELT
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="8">
<comment><narrative>
To be reported once activities start.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Design of a State's Action Plan (Strategy) for Road Safety
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of grievances in the GRM that are resolved in a satisfactory manner
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people within SMS that would potentially benefit from improved access  to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Mato Grosso do Sul with Management Response Plans (MRP) to climate risks and natural disasters in place
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="16">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="826.38">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Mato Grosso do Sul with Management Response Plans (MRP) to climate risks and natural disasters in place
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="16">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety interventions to improve critical and hazardous spots for school accessibility along selected sections of state road corridors implemented
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in annual road crash fatalities along targeted state road corridors in selected areas of the State of Mato Grosso do Sul
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="21">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Fauna movement diagnostic to design fauna crossings
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: PowerBI system for environmental, social and governance monitoring adopted
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
School communities where population was consulted and is satisfied with the improvement of road safety and accessibility infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
To be measured after improvements commence.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="200,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="826.38">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Monitoring &amp; Maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which MS participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="12">
<comment><narrative>
ember, the
</narrative></comment>
</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Design of a State's Action Plan (Strategy) for Road Safety
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="30">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety interventions to improve critical and hazardous spots for school accessibility along selected sections of state road corridors implemented
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="8">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Update of the PELT
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: State roads assessed under iRAP methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: PowerBI system for environmental, social and governance monitoring adopted
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="200,000,000">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average IRI in the State's paved network
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="4.68"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="To be determined">
<comment><narrative>
No new measurement since baseline.
</narrative></comment>
</target>
<actual value="4.68">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people within SMS that would potentially benefit from improved access  to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people that benefit from enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women trained and certified in technical and operational jobs in road construction
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="20">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: State roads assessed under iRAP methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in annual road crash fatalities along targeted state road corridors in selected areas of the State of Mato Grosso do Sul
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="21">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CREMA-PPP contracts structured in the SMS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of grievances in the GRM that are resolved in a satisfactory manner
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
To be reported once activities start.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which MS participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="12">

</target>
<actual value="2">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Road safety interventions to improve critical and hazardous spots for school accessibility along selected sections of state road corridors implemented
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
School communities where population was consulted and is satisfied with the improvement of road safety and accessibility infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
To be measured after improvements commence.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Green Mobility and Logistics: Update of the PELT
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women trained and certified in technical and operational jobs in road construction
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="20">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Fauna movement diagnostic to design fauna crossings
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: State roads assessed under iRAP methodology
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Design of a State's Action Plan (Strategy) for Road Safety
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: PowerBI system for environmental, social and governance monitoring adopted
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Strategic Plan for Network Monitoring &amp; Maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="Yes">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="30">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people that benefit from enhanced resilience to climate risks
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CREMA-PPP contracts structured in the SMS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average IRI in the State's paved network
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="4.68"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="To be determined">
<comment><narrative>
No new measurement since baseline.
</narrative></comment>
</target>
<actual value="4.68">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of Private Capital Enabling
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="200,000,000">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="826.38">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100,000,000">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Mato Grosso do Sul with Management Response Plans (MRP) to climate risks and natural disasters in place
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="16">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Mato Grosso do Sul with Management Response Plans (MRP) to climate risks and natural disasters in place
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="16">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Mato Grosso do Sul with Management Response Plans (MRP) to climate risks and natural disasters in place
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="16">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in annual road crash fatalities along targeted state road corridors in selected areas of the State of Mato Grosso do Sul
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="21">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in annual road crash fatalities along targeted state road corridors in selected areas of the State of Mato Grosso do Sul
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="21">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in annual road crash fatalities along targeted state road corridors in selected areas of the State of Mato Grosso do Sul
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="23"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="21">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people within SMS that would potentially benefit from improved access  to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people within SMS that would potentially benefit from improved access  to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Millions of people within SMS that would potentially benefit from improved access  to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1.55">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
School communities where population was consulted and is satisfied with the improvement of road safety and accessibility infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="24">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="30">
<comment><narrative>
No change since baseline.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2032-12-15" />
<target value="8">
<comment><narrative>
To be reported once activities start.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of CREMA-PPP contracts structured in the SMS
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="1">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average IRI in the State's paved network
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="4.68"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="To be determined">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
% of grievances in the GRM that are resolved in a satisfactory manner
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="100">
<comment><narrative>
To be reported once activities start.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women trained and certified in technical and operational jobs in road construction
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="20">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which MS participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2034-03-15" />
<target value="12">
<comment><narrative>
--
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P505866</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR Promoting Fiscal Management and Private Sector in the State of Pernambuco Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The proposed DPL supports the State of Pernambuco in: (i) improving fiscal management and quality of public expenditure; and (ii) strengthening the enabling environment for green private sector development.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Promoting Fiscal Management and Private Sector in the State of Pernambuco Development Policy Loan for Brazil supports the State of Pernambuco in: (i) improving fiscal management and quality of public expenditure; and (ii) strengthening the enabling environment for green private sector development. The first pillar seeks to improve fiscal management and the quality of public expenditure by improving in-year spending controls, supporting the State to enhance public procurement efficiency, improving the public investment management systems, and simplifying tax compliance procedures. The second pillar strengthens the enabling environment for green private sector development by making it easier to register companies, supporting the private sector to adopt environmentally sustainable practices, and facilitating licensing for renewable energy projects.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006530"><narrative>Goverment of Pernambuco</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-05-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-05-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Rafael Amaral Ornelas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ramaralornelas@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="25010" percentage="29" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="15" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="14" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="14" xml:lang="en"/><sector vocabulary="1" code="23231" percentage="7" xml:lang="en"/><sector vocabulary="1" code="23240" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="7.00000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="57.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLW" percentage="7.00000000" xml:lang="en"><narrative>Energy Generation - Wind</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYZ" percentage="29.0000000" xml:lang="en"><narrative>Other - Industry, Trade, and Services </narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">275000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">275000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">275000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">275000000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-687500</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3004443</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-3987500</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6531"><narrative>Secretariat of Planning, Management and Regional Development</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505866"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P505866?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P505866"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of primary current expenditures financed using non earmarked resources as a share of total non-earmarked revenues
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="61.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="59.9">

</target>
<actual value="57.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led enterprises in the low risk-category
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="16"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-09" />
<target value="30">

</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies that applied to the green seal
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="50">

</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expected private capital attracted by licensed projects
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="USD 1,578 million">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of preparatory procurement documents for construction and engineering services that include socioeconomic and environmental criteria
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public investment projects approved in compliance with the new PIM framework
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tax revenues generated from conformity programs, where taxpayers voluntarily come into compliance by rectifying their tax irregularities within 30 days of notification
</narrative></title>
<baseline year="2023" iso-date="2023-09-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-08" />
<period-end iso-date="2026-12-08" />
<target value="BRL 1,484 million (2023 prices)">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies registered
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="71235"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="84282">

</target>
<actual value="89000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with policy support
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="2,080">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with policy support
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="2,080">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Expected private capital attracted by licensed projects
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="USD 1,578 million">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women-led enterprises in the low risk-category
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="16"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-09" />
<target value="30">

</target>
<actual value="33">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies that applied to the green seal
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="25"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="50">

</target>
<actual value="27">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Companies registered
</narrative></title>
<baseline year="2023" iso-date="2023-12-11" value="71235"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-11" />
<period-end iso-date="2026-12-11" />
<target value="84282">

</target>
<actual value="89000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of public investment projects approved in compliance with the new PIM framework
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2027-12-08" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of preparatory procurement documents for construction and engineering services that include socioeconomic and environmental criteria
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Tax revenues generated from conformity programs, where taxpayers voluntarily come into compliance by rectifying their tax irregularities within 30 days of notification
</narrative></title>
<baseline year="2023" iso-date="2023-09-08" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-09-08" />
<period-end iso-date="2026-12-08" />
<target value="BRL 1,484 million (2023 prices)">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of primary current expenditures financed using non earmarked resources as a share of total non-earmarked revenues
</narrative></title>
<baseline year="2023" iso-date="2023-12-08" value="61.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-08" />
<period-end iso-date="2026-12-08" />
<target value="59.9">

</target>
<actual value="57.6">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P506142</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Santa Catarina Rural Development Project for Sustainability and Innovation</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To contribute to increased climate resilience and market access of family farmers in the State of Santa Catarina.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed project is part of the Brazil Multi Programmatic Approach (MPA) “Agrifood systems transformation” that aims at enhancing resilience of family farmers in targeted States of Brazil. The MPA is organized around the following pillars, that each phase will contribute to: (i) Pillar 1. Financing the adoption of Climate-Smart Agriculture (CSA); (ii) Pillar 2: Strengthening agriculture public goods and services for agrifood system development; (iii) Pillar 3. Repurposing and scaling innovative agrifood support policies and programs. The Santa Catarina Rural Development Project for Sustainability and Innovation (SC Rural), strongly aligns with the objectives and approach of the MPA. The objective of the SC Rural project is to foster the sustainable development of rural and fishing areas in the state of Santa Catarina by promoting competitiveness, innovation and social inclusion in the context of the climate change. The project will promote environmental resilience and adaptation to climate change of family farmers by strengthening the management of natural resources (water, biodiversity, forest areas) at the farm level, improving the adequation with environmental regulation and fostering the adoption of climate-smart agricultural practices. The project will also support increased entrepreneurship and market integration of family farmers and their organizations, through direct support to develop and implement sustainable business plans and Productive Alliances, as well as support to start-ups to foster the development of innovation for the agricultural sector. The project will also foster an enabling environment for the sustainable development of family farmers and fishers, through the provision of last-mile public goods, such as rural roads, on-farm energy (no distribution or transmission lines involved), access to digitalization, to foster the connection of farmers to markets. Lastly, the project will strengthen the institutions that support the agricultural sector, improve the monitoring and evaluation of implementation of agricultural public policies and programs. The project has a statewide scope and includes specific actions to ensure inclusion of women, youth, Indigenous People and Traditional People and Communities.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007223"><narrative>State of Santa Catarina</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007223"><narrative>State of Santa Catarina</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007206"><narrative>Secretary of Agriculture and Livestock of Santa Catarina</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-14"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-14"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-07-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Marie Paviot</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mpaviot@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rod. Admar Gonzaga, 1486 - Itacorubi, Florianópolis, SC

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rod. Admar Gonzaga, 1486 - Itacorubi, Florianópolis, SC

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Rod. Admar Gonzaga, 1486 - Itacorubi, Florianopolis, SC
, https://www.agricultura.sc.gov.br/
</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Rod. Admar Gonzaga, 1486 - Itacorubi, Florianopolis, SC
, https://www.agricultura.sc.gov.br/
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31150" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="14.0000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAZ" percentage="35.0000000" xml:lang="en"><narrative>Other - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="51.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">2000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-03-01"/>
<period-end iso-date="2025-03-31"/>
<value currency="USD" value-date="2025-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-04-01"/>
<period-end iso-date="2025-04-30"/>
<value currency="USD" value-date="2025-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-05-01"/>
<period-end iso-date="2025-05-31"/>
<value currency="USD" value-date="2025-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-06-01"/>
<period-end iso-date="2025-06-30"/>
<value currency="USD" value-date="2025-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">120000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">120000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7206"><narrative>Secretary of Agriculture and Livestock of Santa Catarina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7206"><narrative>Secretary of Agriculture and Livestock of Santa Catarina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-300000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7206"><narrative>Secretary of Agriculture and Livestock of Santa Catarina</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506142"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P506142?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506142"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups fostered for the development of innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="57,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families adopting improved technologies and practices
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="8400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structuring the State's Greenhouse Gas emission monitoring system in the State's priority production chains.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="4">
<comment><narrative>
Baseline = 0
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Property Plans supported.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="18700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative technologies developed.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women accessing financing.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="25">
<comment><narrative>
Baseline = 0.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-vulnerable road hotspots eliminated
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained in the topics of sustainable production and resilience, good management practices, agribusiness and business, and Food and Nutrition Security.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="45,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structuring the State's Greenhouse Gas emission monitoring system in the State's priority production chains.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="4">
<comment><narrative>
Baseline = 0
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Climate-vulnerable road hotspots eliminated
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales in the Enterprises and POs, benefiting from Business Plans for the agri-food system.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the services received under the project
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Beneficiaries satisfied with the services received under the project
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Planning of the State Agricultural Defense published.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="Outdated Strategic Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="Updated Strategic Plan">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of supported business plans for family enterprises and rural organizations supported.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="1400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of legal regulations drafted
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="o"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structuring public policy management and monitoring systems.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Innovative technologies developed.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-14" />
<period-end iso-date="2031-03-14" />
<target value="42,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of legal regulations drafted
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="o"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of accession to animal or plant inspection services .
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of women accessing financing.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="25">
<comment><narrative>
Baseline = 0.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant (Amount (USD))
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="45000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA-CM level 3
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed (Percentage)
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Planning of the State Agricultural Defense published.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="Outdated Strategic Plan"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="Updated Strategic Plan">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="57,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Property Plans supported.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="18700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adhesion of municipalities to the SC-Rural 2 project with consultation with the CMDR and/or similar and other municipal leaders..
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="9">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Startups fostered for the development of innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales in the Enterprises and POs, benefiting from Business Plans for the agri-food system.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA-CM level 3
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant (Amount (USD))
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="45000000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people trained in the topics of sustainable production and resilience, good management practices, agribusiness and business, and Food and Nutrition Security.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="45,000">

</target>
<actual value="1,650">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="5,700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed (Percentage)
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales in the Enterprises and POs, benefiting from Business Plans for the agri-food system.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales in the Enterprises and POs, benefiting from Business Plans for the agri-food system.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-14" />
<period-end iso-date="2031-03-14" />
<target value="42,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-14" />
<period-end iso-date="2031-03-14" />
<target value="42,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="57,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="57,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Adhesion of municipalities to the SC-Rural 2 project with consultation with the CMDR and/or similar and other municipal leaders..
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="9">
<comment><narrative>
Number of municipalities with acceptance: 203. Number of CCMs created/formalized: 124
Number of CCRs created/formalized:1
</narrative></comment>
</target>
<actual value="69%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of supported business plans for family enterprises and rural organizations supported.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="1400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Structuring public policy management and monitoring systems.
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="10">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People fed as a result of increased agricultural/food production
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="5,700">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of accession to animal or plant inspection services .
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="5000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2025" iso-date="2025-03-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-03-14" />
<period-end iso-date="2031-03-14" />
<target value="42,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families adopting improved technologies and practices
</narrative></title>
<baseline year="2025" iso-date="2025-07-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-07-15" />
<period-end iso-date="2031-07-15" />
<target value="8400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P506320</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil: Accelerating Energy Transition in the Amazon</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase renewable energy generation and reduce energy costs in the Legal Amazon.  ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the operation is to increase renewable energy generation and reduce energy costs in the Legal Amazon. The operation has two components.The first component establishes a credit line for renewable energy, grid enhancement and energy efficiency sub-projects, supporting investments to accelerate energy transition, fuel cost reduction, and support economic development and job creation. It will finance sub-projects such hybridizing diesel power plants with solar PV and battery storage, connecting isolated systems to the national grid, reducing losses, and improving energy efficiency.The second component focuses on capacity building and technical assistance for BASA and other stakeholders, including studies on potential new BASA financing instruments, enhancing institutional capacity, supporting sub-project identification and due diligence, and providing training on renewable energy technologies. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007412"><narrative>Banco da Amazonia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007413"><narrative>Banco da Amazonia</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Jari Vayrynen</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jvayrynen@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Avenida Presidente Vargas 800, Belem, Para
, https://www.bancoamazonia.com.br/
</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Av. Presidente Vargas 800, , BelEm, Para
, https://www.bancoamazonia.com.br/
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="100" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="98.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">1083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">74999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">75009.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">100000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7413"><narrative>Banco da Amazonia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7413"><narrative>Banco da Amazonia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506320"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P506320?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506320"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-14" />
<target value="4000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-14" />
<target value="4000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime CO2 emissions avoided directly linked to sub-project investments.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="106,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints processed within 30 days
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime CO2 emissions avoided directly linked to sub-project investments.
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="106,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of complaints processed within 30 days
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Technical Assistance and Capacity Strengthening Percentage of girls graduating from the Young Apprentice Program who pursue STEM-related education or career opportunities
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of new financial instrument and/or partial risk guarantee
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="525,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of new financial instrument and/or partial risk guarantee
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP Certified Staff
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="125,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP Certified Staff
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints processed within 30 days
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of girls graduating from the Young Apprentice Program who pursue STEM-related education or career opportunities
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of new financial instrument and/or partial risk guarantee
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime CO2 emissions avoided directly linked to sub-project investments.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="106,000">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="8">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP Certified Staff
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="3">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000,000">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime costs of diesel avoided from fossil fuel consumption in isolated systems
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="300,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of new financial instrument and/or partial risk guarantee
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of girls satisfied with, and graduating from, the Young Apprentice Program who secure employment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="30">
<comment><narrative>
The gender programme has not yet been implemented
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints processed within 30 days
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="90">
<comment><narrative>
No complaints have been received
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-14" />
<target value="4000">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="514,500,000.00">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="250">
<comment><narrative>
The project has not yet reached effectiveness.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity enabled with direct support
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="250">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Lifetime CO2 emissions avoided directly linked to sub-project investments.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="106,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-04-15" />
<target value="514,500,000.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of girls satisfied with, and graduating from, the Young Apprentice Program who secure employment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP Certified Staff
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2031-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2031-04-15" />
<target value="1500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P506321</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia State Sustainable Infrastructure Program Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The development objective of the proposed operation is to enable access to resilient, low-carbon, and inclusive transport and energy services in the State of Bahia.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00006914"><narrative>Bahia State Government</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006915"><narrative>Bahia State Government</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-04-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-04-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-02-26"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-02-26"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aiga Stokenberga</narrative></person-name><telephone>+1-202-473-1000</telephone><email>astokenberga@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Avenida Luis Viana Filho s/n, 3ª Avenida, nº390, Salvador, Bahia

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Avenida Luis Viana Filho s/n, 3ª Avenida, nº390, Salvador, Bahia

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21011" percentage="57" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="43" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLZ" percentage="14.0000000" xml:lang="en"><narrative>Other - Energy and Mineral Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="15.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="14.0000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="43.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="14.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">200000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">0.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-04-30"/><value value-date="2025-04-30">200000000</value><description xml:lang="en"><narrative>Total Commitment in April Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6915"><narrative>Bahia State Government</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">500000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6915"><narrative>Bahia State Government</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">199500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6915"><narrative>Bahia State Government</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-500000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6915"><narrative>Bahia State Government</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-5539701</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6915"><narrative>Bahia State Government</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506321"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P506321?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506321"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Requests for digitally enabled services by women in the State per year (million)
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="1.765"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="2.5">
<comment><narrative>
Observed annual total for 2024 already exceeds the target established for end-2026.
</narrative></comment>
</target>
<actual value="3.422">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2027-06-15" />
<target value="4">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions reductions associated with the decarbonization of urban transport in the Salvador Metropolitan Area (tCO2eq)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2026-12-15" />
<target value="22,500">
<comment><narrative>
The urban transport interventions assumed when establishing the target value are progressing as planned. The achievement of results will be assessed (via a quantitative model) at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2027-06-15" />
<target value="100">
<comment><narrative>
The indicator will be estimated in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of electric vehicles, including plug-in hybrid electric vehicles, battery electric vehicles, and hybrid electric vehicles, among new vehicles sold in the State in the calendar year
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="6.0">
<comment><narrative>
The share of electric vehicles in overall car sales observed in the first half of 2025 already exceeds the target for end-2026.
</narrative></comment>
</target>
<actual value="14.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity installed
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="1.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural family farmers benefiting from improved electricity service, disaggregated by gender
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30,000">
<comment><narrative>
The government has completed a detailed study and mapping on the electrification needs in rural areas. The achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2027-06-15" />
<target value="100">
<comment><narrative>
The indicator will be estimated in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-14" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-14" />
<period-end iso-date="2027-06-15" />
<target value="4">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="1">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural family farmers benefiting from improved electricity service, disaggregated by gender
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30,000">
<comment><narrative>
The government has completed a detailed study and mapping on the electrification needs in rural areas. The achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity installed
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="1.80">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displacement of electricity purchased from the grid for state public buildings with distributed solar generation
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="60">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Requests for digitally enabled services by women in the State per year (million)
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="1.765"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="2.5">
<comment><narrative>
Observed annual total for 2024 already exceeds the target established for end-2026.
</narrative></comment>
</target>
<actual value="3.422">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained in the use of bicycles in the State of Bahia
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="1,000">
<comment><narrative>
Training program is currently being established. The indicator will be reported in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
GHG emissions reductions associated with the decarbonization of urban transport in the Salvador Metropolitan Area (tCO2eq)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2026-12-15" />
<target value="22,500">
<comment><narrative>
The urban transport interventions assumed when establishing the target value are progressing as planned. The achievement of results will be assessed (via a quantitative model) at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of electric vehicles, including plug-in hybrid electric vehicles, battery electric vehicles, and hybrid electric vehicles, among new vehicles sold in the State in the calendar year
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="6.0">
<comment><narrative>
The share of electric vehicles in overall car sales observed in the first half of 2025 already exceeds the target for end-2026.
</narrative></comment>
</target>
<actual value="14.4">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women trained in the use of bicycles in the State of Bahia
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="1,000">
<comment><narrative>
Training program is currently being established. The indicator will be reported in 2026.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Displacement of electricity purchased from the grid for state public buildings with distributed solar generation
</narrative></title>
<baseline year="2023" iso-date="2023-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-06-15" />
<period-end iso-date="2027-06-15" />
<target value="60">
<comment><narrative>
Achievement of results will be assessed at project closure.
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P506329</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Private-Delivered Metro Sao Paulo Line 4 Phase III Extension</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objectives (PDO) are to improve low-carbon mobility, increase job accessibility in Metro Line 4's Catchment Area, and strengthen public sector capacity to structure and manage private-sector participation in urban transport.     ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Line 4 extension to Taboão da Serra is a groundbreaking project for Metro São Paulo as it marks the first expansion beyond São Paulo city boundaries. The project includes 3.3 kilometers of new underground tracks and two new stations to be implemented and operated by a private concessionaire through an ongoing Public-Private Partnership. Activities financed by the project includes: Civil Works, Power Electric Supply, Telecommunications, Auxiliary (safety and operational equipment such as escalators, elevators, ventilation, emergency lighting, and platform doors, along with comprehensive passenger control and monitoring systems), signaling, supervision and capacity building. The Project aims to improve commutes by providing a quicker, more efficient public transport option, thereby reducing travel time, encouraging a shift from private cars and diesel buses, and reducing greenhouse gas emissions.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007375"><narrative>State of Sao Paulo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00006960"><narrative>Secretaria de Parcerias em Investimentos</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-07-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-07-29"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-05-14"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-05-14"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Edpo Covalciuk Silva</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ecovalciuksilva@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>




<contact-info type="2">
<mailing-address><narrative>
R. Iguatemi, 105 - Itaim Bibi, São Paulo, São Paulo

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21013" percentage="96" xml:lang="en"/><sector vocabulary="1" code="21013" percentage="96" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="4" xml:lang="en"/><sector vocabulary="1" code="21030" percentage="4" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="0.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTW" percentage="100.000000" xml:lang="en"><narrative>Railways</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">4166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">4166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">8333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">8333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">8333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">8333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">8333338.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-07-01"/>
<period-end iso-date="2025-07-31"/>
<value currency="USD" value-date="2025-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-08-01"/>
<period-end iso-date="2025-08-31"/>
<value currency="USD" value-date="2025-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-09-01"/>
<period-end iso-date="2025-09-30"/>
<value currency="USD" value-date="2025-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-10-01"/>
<period-end iso-date="2025-10-31"/>
<value currency="USD" value-date="2025-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-11-01"/>
<period-end iso-date="2025-11-30"/>
<value currency="USD" value-date="2025-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-14"/>
<value currency="USD" value-date="2032-05-14">400000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-14"/>
<value currency="USD" value-date="2032-05-14">400000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">400000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6960"><narrative>Secretaria de Parcerias em Investimentos</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-9329"><narrative>ARTESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-6960"><narrative>Secretaria de Parcerias em Investimentos</narrative></receiver-org><receiver-org xml:lang="en" ref="BR-COA-9329"><narrative>ARTESP</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506329"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P506329?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506329"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing land acquisition
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing the telecommunication systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment incidents registered in the system that followed the entire protocol
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supply contract for rolling stock signed
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2029-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital system for contract management installed and user manuals adopted
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works relating to tunneling and permanent way
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supervision contract (Engineer) signed for civil works, systems and signaling
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New rolling stock delivered
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-01-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital system for contract management installed and user manuals adopted
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing electrical power supply system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works relating to tunneling and permanent way
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing the telecommunication systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Independent Safety Assessment contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2029-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing electrical power supply system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of government professionals trained who are women.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of government professionals trained in PPP structuring or contract management/regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="40">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New rolling stock delivered
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works on stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing signaling system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of government professionals trained who are women.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of government professionals trained in PPP structuring or contract management/regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of government professionals trained in PPP structuring or contract management/regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Independent Safety Assessment contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing land acquisition
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="52%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing electrical power supply system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing electrical power supply system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works relating to tunneling and permanent way
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment incidents registered in the system that followed the entire protocol
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supervision contract (Engineer) signed for civil works, systems and signaling
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works relating to tunneling and permanent way
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project Certifier contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supervision contract (Engineer) signed for civil works, systems and signaling
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital system for contract management installed and user manuals adopted
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New rolling stock delivered
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing the telecommunication systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing auxiliary systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supply contract for rolling stock signed
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project Certifier contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of government professionals trained who are women.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing signaling system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project Certifier contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Project Certifier contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Digital system for contract management installed and user manuals adopted
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rolling stock tested on Metro Line 4 extension and commissioned for operations compatible with systems
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supervision contract (Engineer) signed for civil works, systems and signaling
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2026-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="70,0000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2030-01-15" />
<target value="80,0000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rolling stock tested on Metro Line 4 extension and commissioned for operations compatible with systems
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing auxiliary systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New rolling stock delivered
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-01-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing land acquisition
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="78%">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing signaling system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rolling stock tested on Metro Line 4 extension and commissioned for operations compatible with systems
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of government professionals trained who are women.
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing auxiliary systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing signaling system for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment incidents registered in the system that followed the entire protocol
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2029-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing the telecommunication systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Independent Safety Assessment contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Rolling stock tested on Metro Line 4 extension and commissioned for operations compatible with systems
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works on stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works on stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of government professionals trained in PPP structuring or contract management/regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="40">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sexual harassment incidents registered in the system that followed the entire protocol
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2029-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Standardization and Automation of Processes in PPP Contract Regulation
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supply contract for rolling stock signed
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing auxiliary systems for the L4 extension
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in completing land acquisition
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="78%">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Independent Safety Assessment contract signed
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2028-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of jobs that can be accessed by public transport within 60 minutes for people residing within a 2km radius of the new stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="14"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="21.4">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Supply contract for rolling stock signed
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2027-01-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Greenhouse gas emissions avoided with the project
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2030-01-15" />
<target value="28500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in physical works on stations
</narrative></title>
<baseline year="2024" iso-date="2024-08-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-08-15" />
<period-end iso-date="2029-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P506861</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>AM Pro-Sustainability - Fiscal, economic, social and environmental sustainability program of the State of Amazonas</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Strengthen environmental regulatory framework, enhance fiscal sustainability, and mobilize finance for natural resource conservation and bioeconomy of the State of Amazonas.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of the Amazonas (AM) Pro-Sustainability: Fiscal, Economic, Social and Environmental Sustainability Program of the State of AM Project for Brazil is to strengthen environmental regulatory framework, enhance fiscal sustainability, and mobilize finance for natural resource conservation and bioeconomy of the State of AM. The state's multiannual plan (PPA), informed by public consultations, focuses on three axes: 1. quality of life, 2. sustainable development, and 3. modernization of public management. The operation's pillars 1 and 2 connect to the sustainable development goals (SDGs): (i) to protect and preserve the environment while promoting the State's socio-environmental and economic development on sustainable foundations, (ii) to ensure an attractive, competitive, diversified, and entrepreneurship-friendly business environment, with a skilled workforce, streamlined processes, and institutional efficiency, (iii) to modernize public administration through the professionalization of public officers, the promotion of ethical values, the expansion of social participation mechanisms, and the strengthening of public policies and transparency practices, and (iv) to plan the State's development with a focus on the productive and creative capacity of each territory, anchored in its aptitudes, potentialities, and respect for Indigenous people. Additionally, Pillar 2 is aligned with the PPA as it improves environmental monitoring and enables the State to access innovative funding through reducing emissions from deforestation and forest degradation (REDD+) and other sources.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008138"><narrative>State Government of Amazonas</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008138"><narrative>State Government of Amazonas</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007326"><narrative>Amazonas State Secretariat of Environment</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-08-28"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-08-28"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Werner L. Kornexl</narrative></person-name><telephone>+1-202-473-1000</telephone><email>wkornexl@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="31210" percentage="55" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="55" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="17" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="17" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="11.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="22.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAT" percentage="56.0000000" xml:lang="en"><narrative>Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="11.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">585000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">585000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">585000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">585000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">585000000</value><description xml:lang="en"><narrative>Total Commitment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7326"><narrative>Amazonas State Secretariat of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7326"><narrative>Amazonas State Secretariat of Environment</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506861"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P506861?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P506861"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI3. Cumulative area affected by wildfire over a 3-year period in the Municipalities targeted by GCIPs
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3,710,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="2,970,000">

</target>
<actual value="751000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI8. Monetization of Vintage carbon credits
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="200,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI7. Municipalities with an established Environmental Council
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI4. Efficiency in the payment of environmental fines
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="1.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Cumulative deforested area (km2) over a 3-year period in the State of Amazonas
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5,317.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="4,254.35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Cumulative deforested area (km2) over a 3-year period in the State of Amazonas
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5,317.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="4,254.35">

</target>
<actual value="1016.0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI2. Registered bioeconomy enterprises
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="358"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="429">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI2. Registered bioeconomy enterprises
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="358"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="429">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI5. Hiring of permanent staff by SEMA and IPAAM
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="155"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="461">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI5. Hiring of permanent staff by SEMA and IPAAM
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="155"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="461">

</target>
<actual value="155">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI7. Municipalities with an established Environmental Council
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI7. Municipalities with an established Environmental Council
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="95">

</target>
<actual value="74">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI6. Current expense / revenue ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="94.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="91.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI6. Current expense / revenue ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="94.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="91.4">

</target>
<actual value="92.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI3. Cumulative area affected by wildfire over a 3-year period in the Municipalities targeted by GCIPs
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3,710,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="2,970,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI3. Cumulative area affected by wildfire over a 3-year period in the Municipalities targeted by GCIPs
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3,710,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="2,970,000">

</target>
<actual value="751000">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI4. Efficiency in the payment of environmental fines
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="1.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI4. Efficiency in the payment of environmental fines
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="1.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI8. Monetization of Vintage carbon credits
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="200,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI8. Monetization of Vintage carbon credits
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="200,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Bonus in voluntary transfers distributed by environmental criteria
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="25,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Bonus in voluntary transfers distributed by environmental criteria
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="25,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI3. Cumulative area affected by wildfire over a 3-year period in the Municipalities targeted by GCIPs
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="3,710,000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="2,970,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI2. Registered bioeconomy enterprises
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="358"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="429">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Bonus in voluntary transfers distributed by environmental criteria
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="25,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI7. Municipalities with an established Environmental Council
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="74"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="95">

</target>
<actual value="74">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Cumulative deforested area (km2) over a 3-year period in the State of Amazonas
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5,317.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="4,254.35">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI5. Hiring of permanent staff by SEMA and IPAAM
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="155"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="461">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI6. Current expense / revenue ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="94.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="91.4">

</target>
<actual value="92.6">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI2. Registered bioeconomy enterprises
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="358"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="429">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI4. Efficiency in the payment of environmental fines
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="1.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Cumulative deforested area (km2) over a 3-year period in the State of Amazonas
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="5,317.94"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="4,254.35">

</target>
<actual value="1016.0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI5. Hiring of permanent staff by SEMA and IPAAM
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="155"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2027-12-14" />
<target value="461">

</target>
<actual value="155">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI8. Monetization of Vintage carbon credits
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="200,000,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI6. Current expense / revenue ratio
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="94.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="91.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Bonus in voluntary transfers distributed by environmental criteria
</narrative></title>
<baseline year="2024" iso-date="2024-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-13" />
<period-end iso-date="2027-12-13" />
<target value="25,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P507029</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Electromobility Multiphase Programmatic Approach – MPA Phase 2 Salvador</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[The Project Development Objective (PDO) is to improve quality and reduce emissions in Salvador's public transport.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[This MPA Phase 2 Project, aligned with the Program's long-term objectives, will advance the decarbonization and modernization of Salvador's public transport system. It will improve service quality and operational efficiency through the deployment of approximately 100 e-buses in BRT corridors and the construction of two advanced charging hubs. The Project also includes upgrades to BRT infrastructure to enhance safety, accessibility, and climate resilience, along with complementary investments in cycling networks and cutting-edge technologies such as smart traffic lights and traffic monitoring systems supported by digital platforms for real-time service performance monitoring. In parallel, it will strengthen institutional and operational capacity through targeted workforce development programs, emphasizing gender inclusion and diversity in the transport sector. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008610"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00008611"><narrative>Municipal Secretariat of Mobility - SEMOB</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-05-29"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-06-02"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2033-05-29"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2033-05-29"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Tais Fonseca De Medeiros</narrative></person-name><telephone>+1-202-473-1000</telephone><email>tfonseca@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Praça ThomE de Souza s/n , Salvador, BA
, prefeito@salvador.ba.gov.br
</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
RUA ALCEL AMOROSO , 581 CAMINHO DAS ARVORES, Salvador, BA
, diogo.pires@salvador.ba.gov.br
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="53.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="0.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTZ" percentage="47.0000000" xml:lang="en"><narrative>Other - Transportation</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1666668.66</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-29"/>
<value currency="USD" value-date="2033-05-29">75000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-29"/>
<value currency="USD" value-date="2033-05-29">75000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">75000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8611"><narrative>Municipal Secretariat of Mobility - SEMOB</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8611"><narrative>Municipal Secretariat of Mobility - SEMOB</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507029"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P507029?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507029"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lanes implemented or rehabilitated (km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rehabilitation of sidewalks around the BRT stations and strategic areas related to the BRT/BRS extension
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New charging terminals implemented with gender-responsive infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2027-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus routes monitored in real time for Salvador city buses
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of passenger on the BRT Salvador System
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="150000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New women trained and certified in public transport operations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in energy cost per kilometer of electric vehicles relative to diesel vehicles (R$/km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="2.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of a digital platform for data integration, analysis, monitoring, and visualization related to bus system management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-buses in operation in the Salvador BRT system
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lanes implemented or rehabilitated (km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained and certified for electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-buses in operation in the Salvador BRT system
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of passenger on the BRT Salvador System
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="150000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus routes monitored in real time for Salvador city buses
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities resulting from road accidents within a 1 km radius of the Salvador BRT system, disaggregated by road user group.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rehabilitation of sidewalks around the BRT stations and strategic areas related to the BRT/BRS extension
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of a digital platform for data integration, analysis, monitoring, and visualization related to bus system management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in energy cost per kilometer of electric vehicles relative to diesel vehicles (R$/km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="2.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained and certified for electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New women trained and certified in public transport operations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Progress in the development of a digital platform for data integration, analysis, monitoring, and visualization related to bus system management
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of e-buses acquired by private fleet providers enabled under the new business model and framework
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="330">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Segregated bicycle lanes implemented or rehabilitated (km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New women trained and certified in public transport operations
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision of Salvador's Sustainable Mobility Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New charging terminals implemented with gender-responsive infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2027-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of e-buses acquired by private fleet providers enabled under the new business model and framework
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="330">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of passenger on the BRT Salvador System
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="150000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision of Salvador's Sustainable Mobility Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Rehabilitation of sidewalks around the BRT stations and strategic areas related to the BRT/BRS extension
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New e-buses in operation in the Salvador BRT system
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Bus routes monitored in real time for Salvador city buses
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in energy cost per kilometer of electric vehicles relative to diesel vehicles (R$/km)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="2.10"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="1.50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities resulting from road accidents within a 1 km radius of the Salvador BRT system, disaggregated by road user group.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fatalities resulting from road accidents within a 1 km radius of the Salvador BRT system, disaggregated by road user group.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Grievances related to the project recorded in the GRM system that are processed and communicated back to the concerned stakeholder within twenty business days
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New charging terminals implemented with gender-responsive infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2027-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (tPM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="260">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="61264">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport service in the BRT Corridor, disaggregated by gender and income
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?PM2.5 emissions avoided from public transport (t?PM2.5)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="14">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?NOx emissions avoided from public transport (tNOx)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="3,188">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
?CO2e emissions avoided from public transport (tCO2e)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="1,367,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Users satisfied with the quality of public transport, disaggregated by gender and income
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2035-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of e-buses acquired by private fleet providers enabled under the new business model and framework
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="330">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-06-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-01" />
<period-end iso-date="2035-12-15" />
<target value="4,500,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Staff trained and certified for electromobility
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Revision of Salvador's Sustainable Mobility Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-06" />
<period-end iso-date="2032-12-06" />
<target value="1,170,966">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P507322</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazil Increasing Productivity, Sustainability and Inclusion DPF</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the Federal Government of Brazil to (i) improve taxation and fiscal sustainability, (ii) promote climate action by enabling sustainable finance and environmental preservation, and (iii) strengthen social inclusion.  ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00007712"><narrative>Federative Republic of Brazil</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00007713"><narrative>Ministry of Finance / Secretariate of the Treasury </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-03-18"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-03-18"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Cornelius Fleischhaker</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cfleischhaker@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="20" xml:lang="en"/><sector vocabulary="1" code="24010" percentage="20" xml:lang="en"/><sector vocabulary="1" code="31210" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15119" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15155" percentage="10" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBZ" percentage="10.0000000" xml:lang="en"><narrative>Other - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAT" percentage="10.0000000" xml:lang="en"><narrative>Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="10.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="10.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="20.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="NNI" percentage="10.0000000" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="FFK" percentage="20.0000000" xml:lang="en"><narrative>Capital Markets</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000000.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">1000000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">1000000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7713"><narrative>Ministry of Finance / Secretariate of the Treasury </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-7713"><narrative>Ministry of Finance / Secretariate of the Treasury </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507322"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P507322?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507322"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Number of federal consumption taxes (excluding excise taxes)
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="3 (PIS/PASEP; COFINS, IPI)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-01-10" />
<target value="1 (CBS)">
<comment><narrative>
The approved measure mandates the replacement by  the target date.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI7. Number of States that have introduced ecological transfers to municipalities or are required to introduce them.
</narrative></title>
<baseline year="2023" iso-date="2023-12-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-10" />
<period-end iso-date="2026-12-10" />
<target value="26">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI5. Private financing mobilized for sustainable development investments under ECOINVEST Brasil
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$50 billion">

</target>
<actual value="R$51.2 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI6. Volume of rural credit provided in compliance with new, stricter environmental criteria
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$200 billion">

</target>
<actual value="R$223 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI10. Number of families moved from permanent Bolsa Familia beneficiary status (in transitional protection phase).
</narrative></title>
<baseline year="2023" iso-date="2023-05-13" value="0.69 million (3.3 percent of total beneficiaries)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-13" />
<period-end iso-date="2026-12-13" />
<target value="2.2 million (10 percent of total beneficiaries)">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Number of families in the Amazon enrolled in the Bolsa Verde program.
</narrative></title>
<baseline year="2023" iso-date="2023-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-11" />
<period-end iso-date="2026-11-11" />
<target value="55,000, with at least 80% having a woman as the recipient of the benefit.">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI4. Cumulative volume of sustainable sovereign debt issued and covered by with allocation and impact reports.
</narrative></title>
<baseline year="2023" iso-date="2023-05-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-28" />
<period-end iso-date="2026-12-03" />
<target value="US$ 6 billion">

</target>
<actual value="US$ 4 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI11. Percentage of food in school feeding procured from family farmers.
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-07" />
<target value="50">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI8. Difference in Amazon rainforest lost to forest fires in program adhering municipalities compared to eligible municipalities not in the program
</narrative></title>
<baseline year="2023" iso-date="2023-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-13" />
<period-end iso-date="2026-12-13" />
<target value="At least 20 percentage points">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI1. Number of federal consumption taxes (excluding excise taxes)
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="3 (PIS/PASEP; COFINS, IPI)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2027-01-10" />
<target value="1 (CBS)">
<comment><narrative>
The approved measure mandates the replacement by  the target date.
</narrative></comment>
</target>
<actual value="3">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI3. Ratio of real growth of current primary expenditures relative to that of current revenues
</narrative></title>
<baseline year="2022" iso-date="2022-11-27" value="90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-27" />
<period-end iso-date="2026-11-29" />
<target value="70 percent or less">

</target>
<actual value="70 percent or less">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI2. Personal income tax revenue from offshore and exclusive funds
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$7 billion">

</target>
<actual value="R$20.7 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI4. Cumulative volume of sustainable sovereign debt issued and covered by with allocation and impact reports.
</narrative></title>
<baseline year="2023" iso-date="2023-05-28" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-28" />
<period-end iso-date="2026-12-03" />
<target value="US$ 6 billion">

</target>
<actual value="US$ 4 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI6. Volume of rural credit provided in compliance with new, stricter environmental criteria
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$200 billion">

</target>
<actual value="R$223 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI7. Number of States that have introduced ecological transfers to municipalities or are required to introduce them.
</narrative></title>
<baseline year="2023" iso-date="2023-12-10" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-10" />
<period-end iso-date="2026-12-10" />
<target value="26">

</target>
<actual value="19">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI8. Difference in Amazon rainforest lost to forest fires in program adhering municipalities compared to eligible municipalities not in the program
</narrative></title>
<baseline year="2023" iso-date="2023-12-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-13" />
<period-end iso-date="2026-12-13" />
<target value="At least 20 percentage points">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI10. Number of families moved from permanent Bolsa Familia beneficiary status (in transitional protection phase).
</narrative></title>
<baseline year="2023" iso-date="2023-05-13" value="0.69 million (3.3 percent of total beneficiaries)"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-13" />
<period-end iso-date="2026-12-13" />
<target value="2.2 million (10 percent of total beneficiaries)">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
RI9. Number of families in the Amazon enrolled in the Bolsa Verde program.
</narrative></title>
<baseline year="2023" iso-date="2023-05-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-05-11" />
<period-end iso-date="2026-11-11" />
<target value="55,000, with at least 80% having a woman as the recipient of the benefit.">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI11. Percentage of food in school feeding procured from family farmers.
</narrative></title>
<baseline year="2023" iso-date="2023-12-09" value="40"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-09" />
<period-end iso-date="2026-12-07" />
<target value="50">

</target>
<actual value="TBD">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI5. Private financing mobilized for sustainable development investments under ECOINVEST Brasil
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$50 billion">

</target>
<actual value="R$51.2 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
RI2. Personal income tax revenue from offshore and exclusive funds
</narrative></title>
<baseline year="2023" iso-date="2023-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-15" />
<period-end iso-date="2026-12-15" />
<target value="R$7 billion">

</target>
<actual value="R$20.7 billion">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
RI3. Ratio of real growth of current primary expenditures relative to that of current revenues
</narrative></title>
<baseline year="2022" iso-date="2022-11-27" value="90"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-11-27" />
<period-end iso-date="2026-11-29" />
<target value="70 percent or less">

</target>
<actual value="70 percent or less">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P507628</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Energy Transition for the Northeast Region of Brazil (PRODECARB)</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To support the development of new technologies and catalyze financing for low-carbon industrial commodities and fuels, and common-user infrastructure, across selected industrial and energy value chains in the Northeast region of Brazil.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The Project Development Objective is to support the development of new technologies and catalyze financing for low-carbon industrial commodities and fuels, and common-user infrastructure, across selected industrial and energy value chains in the Northeast region of Brazil.The financial resources provided by the Project will enable companies to incorporate innovative technologies in their productive processes, utilizing a lower cost of capital. Local industries adopting new technologies to decarbonize the energy and industrial sectors will benefit from a first mover advantage and from the creation of green value chains that can help them to remain competitive. They may also benefit by obtaining green premiums for products that have reduced emissions throughout their production lifecycle. Developers of CUI will also provide spill over benefits throughout the value chain such as incentivizing the integration of additional renewable energy generation, developing new uses of clean hydrogen for the industry, such as SAFs, fostering circular economy for water usage and other utilities, and creating additional direct and indirect jobs. In addition, BNB will benefit from acquiring new risk assessment skills for innovative technologies.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008282"><narrative>Banco do Nordeste do Brasil S.A.</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00008281"><narrative>Banco do Nordeste do Brasil S.A.</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-05-15"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-05-15"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-04-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-04-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Megan Meyer</narrative></person-name><telephone>+1-202-473-1000</telephone><email>mmeyer1@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLZ" percentage="100.000000" xml:lang="en"><narrative>Other - Energy and Mineral Resources</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">18416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">18416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">17499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">17500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">6999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">18416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">18416677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">17499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">17500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">6999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7000011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">500000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">500000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">500000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8281"><narrative>Banco do Nordeste do Brasil S.A.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8281"><narrative>Banco do Nordeste do Brasil S.A.</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507628"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P507628?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P507628"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of R&amp;D sub-projects funded
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot projects that reach commercial viability
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiary firms satisfied with the process for receiving project financing
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="695000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created by sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="16427">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="879,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of early stage sub-projects receiving accelerator funding
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of early stage sub-projects that receiving accelerator financing advancing to FID
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of sub-projects that support innovative technologies
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="848000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="423000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of R&amp;D sub-projects funded
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created by sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="4200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="890,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sub-projects that support innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New monitoring and evaluation system
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot projects that reach commercial viability
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="879,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New monitoring and evaluation system
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of sub-projects that support innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from subprojects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="10,900,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from subprojects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="6648700">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New monitoring and evaluation system
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of early stage sub-projects receiving accelerator funding
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of early stage sub-projects that receiving accelerator financing advancing to FID
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women in managerial positions at BNB
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="15"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of early stage sub-projects that receiving accelerator financing advancing to FID
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Enabled
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="848000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of jobs created by sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="11,400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of early stage sub-projects receiving accelerator funding
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="380000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops (cumulative)
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops (cumulative)
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Capacity building workshops (cumulative)
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="423000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot projects that reach commercial viability
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="1">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints addressed within the stipulated timeframe
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women participating in mentoring that reach managerial positions at BNB
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="17.6"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="32">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of women participating in leadership training and mentoring programs that reach managerial positions at BNB
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="4.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="29.4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of sub-projects that support innovative technologies
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Sub-projects that support innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Number of sub-projects that support innovative technologies
</narrative></title>
<baseline year="2025" iso-date="2025-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-04-15" />
<period-end iso-date="2031-04-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="879,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="879,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total Capital Mobilized
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="890,000,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="23000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from subprojects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="6648700">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from subprojects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="10,900,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of pilot projects funded
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of sub-projects reaching financial close
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Estimated total lifetime GHG avoided emissions from sub-projects
</narrative></title>
<baseline year="2026" iso-date="2026-04-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-04-15" />
<period-end iso-date="2031-04-15" />
<target value="23000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P508025</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Salvador Social Multi-Sector Service Delivery Program III</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To increase access to quality health, education, and social assistance services for human development in the Municipality of Salvador.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of this Program is to increase access to quality health, education, and social assistance services for human development in the Municipality of Salvador, in the State of Bahia in Brazil. Building on the first and second phases of Salvador Social, the Program will improve key results in social sectors through strengthened governance and management, digital technologies, and intersectoral action.In health, the Program will increase supply and strengthen monitoring, evaluation, and information systems, telehealth capacities, and referral networks, focusing on improving access to specialized care. In social assistance, it will expand access to the Unified Social Assistance System and targeted benefits packages, including through strengthened systems and delivery mechanisms. In education, the Program will support learning results in basic education, including through the better education quality monitoring systems, full-time schooling, and a focus on vulnerable students.  Intersectoral interventions will focus on mental health and psychosocial wellbeing through improved access to and quality of inclusive education and community-based mental health services.  ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008226"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008226"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00008226"><narrative>Municipality of Salvador</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00008225"><narrative>Casa Civil</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>P. Facundo Cuevas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>fcuevas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="12220" percentage="49" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="49" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="21" xml:lang="en"/><sector vocabulary="1" code="11130" percentage="21" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="17" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="13" xml:lang="en"/><sector vocabulary="1" code="11220" percentage="13" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="16.0000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEP" percentage="12.0000000" xml:lang="en"><narrative>Primary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHQ" percentage="17.0000000" xml:lang="en"><narrative>Health Facilities and Construction</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="32.0000000" xml:lang="en"><narrative>Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHF" percentage="2.00000000" xml:lang="en"><narrative>Public Administration - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="21.0000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">42856.14</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">42863.16</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">2168884.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">2168896.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1778665.17</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1778677.13</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1861998.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1862010.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">2342989.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">2343001.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1822457.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1822469.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2025-12-01"/>
<period-end iso-date="2025-12-31"/>
<value currency="USD" value-date="2025-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">120000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">120000000.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">120000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8225"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-8225"><narrative>Casa Civil</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508025"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P508025?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508025"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with psychosocial risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="101,729">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-10" />
<target value="TBD">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families receiving social assistance services and benefits through a case management information system  (CMIS)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60% of families receiving social assistance services and benefits with case management information system (scalable up to 60% (scalable up to 60% in year 4)">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care from Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools implementing literacy learning monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools with trained teachers and a multidisciplinary team available to support students with autism spectrum disorder
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users enrolled for service provision at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="42.5">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Municipal Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="58">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="765,602"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="765,602"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="765,602">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module of the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-12" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools implementing the Learning Support Program with at least 3 monitoring meetings per year
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in Mental Health Risk Stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Temporary Benefits delivered through the integrated management module of the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-12" />
<target value="100% of Temporary Benefits delivered through the Integrated Management Module by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Provision of Family Support Plans through the Vida Nova System
</narrative></title>
<baseline year="2024" iso-date="2024-12-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-11" />
<period-end iso-date="2030-12-11" />
<target value="Provision of Family Support Plans through the Vida Nova System expanded using 80% of Social Assistance Centers Capacity by the end of Year 5.">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Families supported by the Vida Nova agents
</narrative></title>
<baseline year="2024" iso-date="2024-12-07" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-07" />
<period-end iso-date="2030-12-07" />
<target value="10,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Female beneficiaries who received Temporary Benefits processed through the integrated management module of the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-14" />
<period-end iso-date="2030-11-07" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries receiving Temporary Benefits through an automated delivery system
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-12" />
<target value="8,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="765,602"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="765,602">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="765,602"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2030-12-06" />
<target value="865,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people receiving outpatient services
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-10" />
<target value="TBD">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in Mental Health Risk Stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="3.9">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Full-time public school students who complete the learning recovery list of exercises on the virtual learning platform.
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools implementing the Learning Support Program with at least 3 monitoring meetings per year
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public teachers that have completed the Autism Spectrum Disorder training
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools with trained teachers and a multidisciplinary team available to support students with autism spectrum disorder
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="30">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Support teachers working in the Learning Support Program trained in literacy practices
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Learning support tutors trained in literacy or mathematics by SMED.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public schools implementing literacy learning monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="50">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with mental health risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
CAPS and CSM users with psychosocial risk stratification performed
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="50"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="6,100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care from Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users enrolled for service provision at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Municipal Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="101,729">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="42.5">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-15" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="58">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Provision of case management services recorded in the Vida Nova system
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="58"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Families receiving social assistance services and benefits through a case management information system  (CMIS)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60% of families receiving social assistance services and benefits with case management information system (scalable up to 60% (scalable up to 60% in year 4)">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public impact schools that implement Literacy Activities for grade 2 students at least 3 times per year, monitored by SMED
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="20">

</target>
<actual value="3.9">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Timely, integrated diagnostic cardiology service packages delivered
</narrative></title>
<baseline year="2025" iso-date="2025-06-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-14" />
<period-end iso-date="2030-12-14" />
<target value="4,300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools implementing the Learning Support Program with student monitoring at least three times per calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grades 1 to 5 with autism spectrum disorder identified as fluent readers.
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="3.9"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Female beneficiaries receiving Temporary Benefits through an automated delivery system
</narrative></title>
<baseline year="2024" iso-date="2024-12-12" value="00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-12" />
<period-end iso-date="2030-12-12" />
<target value="8,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average time for the release of biochemical test results by the Central Laboratory of Salvador for disease diagnosis and monitoring
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="18"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="5">

</target>
<actual value="18">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Students in grade 5 with adequate learning levels in Language and Mathematics
</narrative></title>
<baseline year="2024" iso-date="2024-12-10" value="42.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-10" />
<period-end iso-date="2030-12-13" />
<target value="58">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Users receiving care at Psychosocial Care Centers (CAPS) and Mental Health Centers (CSM)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="6,100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="11,200">

</target>
<actual value="6,100">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Mental health professionals in the Psychosocial Care Network trained in mental health risk stratification
</narrative></title>
<baseline year="2024" iso-date="2024-12-06" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-06" />
<period-end iso-date="2030-12-06" />
<target value="85">

</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Teachers trained in the Full Time Schooling program.
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Medium complexity outpatient bioimaging exams performed in the municipal health network
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="101,729"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="147,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Support teachers working in the Learning Support Program trained in literacy practices
</narrative></title>
<baseline year="2024" iso-date="2024-11-24" value="30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-11-24" />
<period-end iso-date="2030-12-03" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipal public schools with support teams to collaborate in the learning of ASD students
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2030-12-15" />
<target value="95">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P508363</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Brazilian States and Municipalities Digital Acceleration Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Expand financing to increase access to and inclusive use of broadband internet and digital government services in Brazil's underserved states and municipalities]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The main objective of this project is to provide financing and technical assistance to  Brazilian states and cities to promote the digital transformation of public services, improving efficiency and accessibility for citizens, especially the most vulnerable, and companies.CAIXA is present throughout the country, and due to its capillarity, it serves practically all Brazilian cities. CAIXA provides an exclusive space for public entities to present their demands for projects and needs to advance digital transformation.The program aims to fill the funding gap to promote digital transformation in states and cities. This will be achieved by offering federal and municipal entities lines of credit and technical assistance for Digital Public Infrastructure, Digital Transformation of theService Charter and Digital Capacity.Credit operations will be made available according to the applicant's needs, by submitting investment projects. These applications will be analyzed considering credit risk and economic and financial viability.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009362"><narrative>Caixa Econômica Federal</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00009374"><narrative>Caixa Econômica Federal</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-05-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-05-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2033-05-19"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2033-05-19"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Julian Najles</narrative></person-name><telephone>+1-202-473-1000</telephone><email>jnajles@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Av. Pres. Juscelino Kubitschek, 53, Brasilia, DF

</narrative></mailing-address></contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDG" percentage="33.0000000" xml:lang="en"><narrative>Digital Government - Public Administration</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDE" percentage="33.0000000" xml:lang="en"><narrative>Digital Economy - Digital Industry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="2.00000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDI" percentage="32.0000000" xml:lang="en"><narrative>Digital Infrastructure</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">35713.29</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">35720.26</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">7500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">7500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">7499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">7500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">4999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">5000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1811686.86</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1811697.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">35713.29</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">35720.26</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">5000011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">7500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">7500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">7500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">7499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">7500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">4999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">5000011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1811686.86</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1811697.85</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-19"/>
<value currency="USD" value-date="2033-05-19">500000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-19"/>
<value currency="USD" value-date="2033-05-19">500000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">500000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9374"><narrative>Caixa Econômica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9374"><narrative>Caixa Econômica Federal</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508363"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P508363?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P508363"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average cost to complete digitally enabled service
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fixed-Broadband median download speed (Mbps)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="447">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new or enhanced digital services provided at municipal or state level
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available digitally enabled services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new or enhanced digital services provided at municipal or state level
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources certified with the CEF Sustainability Seal
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources certified with the CEF Sustainability Seal
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fixed-Broadband median download speed (Mbps)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="447">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources certified with the CEF Sustainability Seal
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Fixed-Broadband median download speed (Mbps)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="100"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="447">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total private capital enabled
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="73000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities adhered to the Gov.br network
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (new use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="70,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average cost to complete digitally enabled service
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities adhered to the Gov.br network
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women who receive a STEM certification
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Borrower municipalities adhered to the Gov.br network
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average cost to complete digitally enabled service
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="11"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in digital skills training program
</narrative></title>
<baseline year="2025" iso-date="2025-05-15" value="3000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-05-15" />
<period-end iso-date="2033-05-15" />
<target value="4000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital transformation projects structured with support from the project resources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in digital skills training program
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="3000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2032-12-15" />
<target value="400000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available digitally enabled services
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (new services)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women who receive a STEM certification
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2032-12-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (enhanced use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="600,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using digitally enabled services (enhanced services)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="100,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Available digitally enabled services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="13"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total private capital enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="73000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People using broadband internet (inferred use)
</narrative></title>
<baseline year="2026" iso-date="2026-05-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-05-15" />
<period-end iso-date="2033-05-15" />
<target value="3000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Participants in digital skills training program
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="3000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2032-12-15" />
<target value="400000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
User Satisfaction with the new or enhanced digital services provided at municipal or state level
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="80"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="90">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women who receive a STEM certification
</narrative></title>
<baseline year="2025" iso-date="2025-12-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-16" />
<period-end iso-date="2032-12-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total private capital enabled
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2032-12-15" />
<target value="73000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P509041</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Tocantins Productive Resilient and Inclusive Development Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To enhance access to sustainable transport infrastructure and increase the resilience of Family Farmers and community-based tourism in selected areas of Tocantins.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Tocantins, Brazil's youngest state, spans 277,620 km² and is home to 1.6 million people. Despite strong growth in agribusiness and transport connectivity, the state faces persistent regional disparities, rural poverty, limited productivity in family farming, and increasing vulnerability to climate change. Over half of its municipalities are classified as highly vulnerable, and infrastructure deficits contribute to economic exclusion and rural-to-urban migration.The paved state road network (5,841 km), which connects agricultural production zones to the BR-153 highway and the North-South Railway, suffers from chronic maintenance gaps, safety risks, and climate-related degradation. Tocantins is seeking to modernize road governance through long-term performance-based maintenance contracts (CREMAs and PPPs), supported by institutional reforms and targeted investments in road safety and resilience.Family agriculture represents over 70% of farms in Tocantins but contributes only 17% of agricultural output, constrained by low productivity, limited access to markets and finance, and weak farmer organizations. Public extension services are under-resourced, and climate-resilient practices are not widely adopted. Meanwhile, tourism, especially in the Jalapão region, holds untapped potential to diversify rural incomes and promote local development but remains underdeveloped and highly seasonal.The Tocantins Productive, Resilient, and Inclusive Development Project will promote (i) sustainable, safe, and resilient transport infrastructure; (ii) improved livelihoods and climate resilience for family farmers; and (iii) sustainable tourism in priority regions. The project adopts a multisectoral approach to reduce structural inequality and enhance climate adaptation, while strengthening institutional capacity and leveraging private sector participation.Component 1: Proactive maintenance, resilient and safe road infrastructure• Subcomponent 1.1: Climate-resilient road improvement, rehabilitation, and maintenance through CREMA and PPP• Subcomponent 1.2: Enhancing road safety management capacity and infrastructure• Subcomponent 1.3: Institutional strengthening for road asset management and PPPsComponent 2: Strengthening support to family agriculture• Subcomponent 2.1: Rural services for climate-smart and inclusive agriculture• Subcomponent 2.2: Direct productive support to family farmers• Subcomponent 2.3: Strengthening family farming organizationsComponent 3: Inclusive and sustainable tourism• Subcomponent 3.1: Strengthening tourism planning, governance and support infrastructure in Jalapão  • Subcomponent 3.2: Support for community-based tourism and small local tourism enterprises Component 4: Project management and institutional support]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009075"><narrative>State of Tocantins</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009075"><narrative>State of Tocantins</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009075"><narrative>State of Tocantins</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00009076"><narrative>Secretary of Planning / Secretaria de Planejamento - SEPLAN</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-02-27"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-02-27"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2034-05-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2034-05-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gregoire F. Gauthier</narrative></person-name><telephone>+1-202-473-1000</telephone><email>ggauthier@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
 Praça dos Girassóis s/nº Esplanada das Secretarias - Centro. , Palmas, Tocantins

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
 Praça dos Girassóis s/nº Esplanada das Secretarias - Centro. , Palmas, Tocantins

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
 Praça dos Girassóis s/nº Esplanada das Secretarias - Centro. , Palmas, Tocantins

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Praça dos Girassóis s/nº Esplanada das Secretarias - Centro, Palmas, Tocantins

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Praça dos Girassóis s/nº Esplanada das Secretarias - Centro, Palmas, Tocantins

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Praça dos Girassóis s/nº Esplanada das Secretarias - Centro, Palmas, Tocantins

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="21022" percentage="68" xml:lang="en"/><sector vocabulary="1" code="21022" percentage="68" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="13" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="9" xml:lang="en"/><sector vocabulary="1" code="31120" percentage="9" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="5" xml:lang="en"/><sector vocabulary="1" code="31166" percentage="5" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="5" xml:lang="en"/><sector vocabulary="1" code="33210" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYT" percentage="4.00000000" xml:lang="en"><narrative>Tourism</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="67.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="12.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="7.00000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAB" percentage="10.0000000" xml:lang="en"><narrative>Agricultural Extension, Research, and Other Support Activities </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">454544.45</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">2083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">2083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">454544.45</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">454555.50</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">120000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">120000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">120000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9076"><narrative>Secretary of Planning / Secretaria de Planejamento - SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9076"><narrative>Secretary of Planning / Secretaria de Planejamento - SEPLAN</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509041"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P509041?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509041"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of private capital enabled (PCE) for road investments (USD million)
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Lead Road Safety Agency established and Strategic Action Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average spending per tourist.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female farmers adopting climate-smart agricultural practices as a result of project-provided financing and tailored technical extension services
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="5400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in tourism
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of private capital enabled (PCE) for road investments (USD million)
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="150">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Empowering people to reduce gender-based violence in the agriculture, tourism and transport sectors
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where the population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of food insecurity
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of family farmers who received goods and services through the Project
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="12000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net margins of supported rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net margins of supported rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women trained and certified for technical or operational roles in construction and logistics sectors under the project
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans for new tourism products implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of family farmers who received goods and services through the Project.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="12500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average spending per tourist.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women trained and certified for technical or operational roles in construction and logistics sectors under the project
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans for rural organizations implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="28">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmers in the productive inclusion group who migrated to the market transition group
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-11-13" />
<target value="1500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans for rural organizations implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved  highways under Performance-Based Contracts (PBCs)
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="1246">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved  highways under Performance-Based Contracts (PBCs)
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="1253">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Road Asset Management (RAM) framework developed and adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans for new tourism products implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-resilient tourism infrastructures and facilities implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans for rural organizations implemented.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female farmers adopting climate-smart agricultural practices as a result of project-provided financing and tailored technical extension services.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="5600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the tourist communities who received support to offer tourist services
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women employed after the Project's interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-13" />
<target value="180">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in income from tourism activities in families living in the tourist region supported by the Project (Percentage).
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2033-12-14" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP transactions completed for road concessions.
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="2">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in tourism
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgrade works completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-12" />
<target value="88">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women trained and certified for technical or operational roles in construction and logistics sectors under the project
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction the gap in gross sales between women-led producer organizations and men-led producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas with pedestrian, cycling, and drainage infrastructure implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism registered and resolved
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-resilient tourism infrastructures and facilities implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction the gap in gross sales between women-led producer organizations and men-led producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the tourist communities who received support to offer tourist services
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in tourism
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where the population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="12">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Road Asset Management (RAM) framework developed and adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average spending per tourist.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the tourist communities who received support to offer tourist services
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="50">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families in the tourist communities who received support to offer tourist services
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants from Tocantins in the learning events of the Pró-Estradas Brasil Program
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction the gap in gross sales between women-led producer organizations and men-led producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of families benefiting from the transition group, dynamics, URTPS and families supported by producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of business plans for rural organizations implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgrade works completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-12" />
<target value="88">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Lead Road Safety Agency established and Strategic Action Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of families benefiting from the transition group, dynamics, URTPS and families supported by producer organizations..
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP transactions completed for road concessions.
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2033-12-14" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmers in the productive inclusion group who migrated to the market transition group
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-11-13" />
<target value="1500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-resilient tourism infrastructures and facilities implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects contracted to access subsidies for family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="4000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of private capital enabled (PCE) for road investments (USD million)
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="125">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female farmers adopting climate-smart agricultural practices as a result of project-provided financing and tailored technical extension services
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="5400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of families benefiting from the transition group, dynamics, URTPS and families supported by producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women employed after the Project's interventions
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-13" />
<target value="180">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of food insecurity
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Empowering people to reduce gender-based violence in the agriculture, tourism and transport sectors
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP transactions completed for road concessions.
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women employed after the Project's interventions
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-13" />
<target value="180">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans for new tourism products implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of family farmers who received goods and services through the Project
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="12000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of food insecurity
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="30">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects contracted to access subsidies for family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="4000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2033-12-14" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction the gap in gross sales between women – led producer organizations and men - led producer organizations.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2033-12-14" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism registered and resolved
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgrade works completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-12" />
<target value="88">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmers in the productive inclusion group who migrated to the market transition group
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-11-13" />
<target value="1500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Business Plans for new tourism products implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="25">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Road Asset Management (RAM) framework developed and adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total value of private capital enabled (PCE) for road investments (USD million)
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="125">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where the population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved  highways under Performance-Based Contracts (PBCs)
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="1246">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Road Asset Management (RAM) framework developed and adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction of food insecurity
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects contracted to access subsidies for family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="2000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Empowering people to reduce gender-based violence in the agriculture, tourism and transport sectors
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in average spending per tourist.
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="9.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women employed after the Project's interventions
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="98"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-13" />
<target value="180">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-31" />
<period-end iso-date="2033-11-30" />
<target value="2,9300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PPP transactions completed for road concessions.
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="2">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of farmers in the productive inclusion group who migrated to the market transition group
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-11-13" />
<target value="1500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants from Tocantins in the learning events of the Pró-Estradas Brasil Program
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in tourism
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants from Tocantins in the learning events of the Pró-Estradas Brasil Program
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of family farmers who received goods and services through the Project
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="12000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas with pedestrian, cycling, and drainage infrastructure implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of paved  highways under Performance-Based Contracts (PBCs)
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="1253">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in income from tourism activities in families living in the tourist region supported by the Project (Percentage).
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of families benefiting from the transition group, dynamics, URTPS and families supported by producer organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism registered and resolved
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where the population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of climate-resilient tourism infrastructures and facilities implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Level of satisfaction of the population involved with investments in family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Lead Road Safety Agency established and Strategic Action Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism registered and resolved
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas with pedestrian, cycling, and drainage infrastructure implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="8">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women trained and certified for technical or operational roles in construction and logistics sectors under the project
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of new or better jobs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-10" />
<target value="400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net margins of supported rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-31" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-31" />
<period-end iso-date="2033-11-30" />
<target value="2,9300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2026" iso-date="2026-02-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-16" />
<period-end iso-date="2033-12-16" />
<target value="104,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of participants from Tocantins in the learning events of the Pró-Estradas Brasil Program
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-15" />
<period-end iso-date="2033-11-15" />
<target value="28,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of road upgrade works completed
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-12" />
<target value="88">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the net margins of supported rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected state road corridors
</narrative></title>
<baseline year="2026" iso-date="2026-02-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-14" />
<period-end iso-date="2033-12-14" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in number of fatalities along targeted road corridors in the State of Tocantins.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of projects contracted to access subsidies for family farming
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="2000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Lead Road Safety Agency established and Strategic Action Plan adopted
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in income from tourism activities in families living in the tourist region supported by the Project (Percentage).
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in income from tourism activities in families living in the tourist region supported by the Project (Percentage).
</narrative></title>
<baseline year="2026" iso-date="2026-02-13" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-13" />
<period-end iso-date="2033-12-13" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female farmers adopting climate-smart agricultural practices as a result of project-provided financing and tailored technical extension services
</narrative></title>
<baseline year="2026" iso-date="2026-02-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-15" />
<period-end iso-date="2033-12-15" />
<target value="5400">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Empowering people to reduce gender-based violence in the agriculture, tourism and transport sectors
</narrative></title>
<baseline year="2026" iso-date="2026-02-11" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-11" />
<period-end iso-date="2033-12-11" />
<target value="500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road network with Management Response Plans (MRPs) to climate risks and natural disasters in place.
</narrative></title>
<baseline year="2026" iso-date="2026-02-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-12" />
<period-end iso-date="2033-12-16" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of urbanized areas with pedestrian, cycling, and drainage infrastructure implemented
</narrative></title>
<baseline year="2026" iso-date="2026-02-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-02-10" />
<period-end iso-date="2033-12-10" />
<target value="8">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P509756</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>BR State of Piaui Strengthening Fiscal Sustainability and Fostering Sustainable Economic Development</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The objective of the Brazilian (BR) State of Piaui Strengthening Fiscal Sustainability and Fostering Sustainable Economic Development Policy Loan Program is to support reforms in the State of Piaui by (i) strengthening fiscal sustainability and the quality of public expenditure, and (ii) promoting private sector participation in water and land resource management for sustainable economic development. The first pillar aims to enhance fiscal management by implementing controls on current spending, increasing procurement efficiency, and improving the management of climate-friendly public investments. The second pillar focuses on creating an enabling environment for private sector-led management of natural resources, specifically water and land, to promote sustainable development. This will be achieved by strengthening the financial autonomy of the water and sanitation state regulator to enhance regulatory certainty and promote private investment; improving the raw water charging system to encourage efficient use; and digitizing the land tenure regularization system to improve land security and support sustainable agriculture growth. This DPF is part of a broader World Bank (WB) initiative to bolster fiscal and environmental sustainability and resilience in Brazil, aligning with the Green, Resilient, and Inclusive Development (GRID) approach. The measures are expected to yield significant fiscal gains, improve service delivery in water and sanitation, and streamline the land tenure regularization process. By 2026, current savings are projected to reach the equivalent of 8 percent of revenues, supported by improved public expenditure management. At least 60 percent of new public investment projects are expected to undergo cost-benefit analysis, and public procurement is set to become more competitive. In the water sector, reforms aim to mobilize greater investment and expand access for poor women, while doubling the volume of raw water subject to usage fees. Finally, the digitalization of land tenure regularization is expected to significantly accelerate processing times, reducing the duration from 90 to 30 days.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00009473"><narrative>State of Piaui</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00009474"><narrative>Secretariat of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-16"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-16"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2026-12-31"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2026-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Luigi Butron Calderon</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lbutroncalderon@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="31130" percentage="17" xml:lang="en"/><sector vocabulary="1" code="31130" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="17" xml:lang="en"/><sector vocabulary="1" code="15125" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="8" xml:lang="en"/><sector vocabulary="1" code="14022" percentage="8" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="8" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="8" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWW" percentage="17.0000000" xml:lang="en"><narrative>Water Resources</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAZ" percentage="17.0000000" xml:lang="en"><narrative>Other - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="8.00000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="50.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WWA" percentage="8.00000000" xml:lang="en"><narrative>Sanitation</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">376623377.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">376623377.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">376623377.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">376623377.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">376623377</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9474"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9474"><narrative>Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509756"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P509756?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P509756"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #6.1: Number of people who received land titles issued by INTERPI
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12158"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="16158">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #5: Volume of raw water subject to fees
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="45000000"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="90000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Results Indicator #4.1: Private investment in water and sanitation services
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="43000000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #2: Increase in average number of suppliers participating in the procurement process for outsourced services and building maintenance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="N/D">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #1: Average current savings ratio  between 2025 and 2026 compared to the average between 2023 and 2024
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="7.5"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="8.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Results Indicator #3: Share of the 2026 state's new investment projects included in the “project bank” undergoing ex-ante cost- benefit analysis
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2026-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P511440</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>MPA Phase II - Progestão Pernambuco: Public Sector Management Efficiency Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Pernambuco. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The State of Pernambuco has requested the support of the World Bank to further advance ongoing reforms and enhance efficiency across whole-of-government management and service delivery through the Progestão Program. This project is fully aligned with the objectives set forth under the Multi-phased Programmatic Approach (MPA)  Progestão framework and prioritizes key areas, including human resources, pensions, procurement, investment management, budgeting, and asset management. Additionally, the project will finance targeted improvements in financial management and information systems, with the aim of strengthening fiscal efficiency in the health, education, and social assistance sectors. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00010962"><narrative>State of Pernambuco</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00009991"><narrative>Secretariat of Planning, Management and Regional Development </narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-24"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-24"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-19"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-19"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Gustavo Covolan Bozzetti</narrative></person-name><telephone>+1-202-473-1000</telephone><email>gbozzetti@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<contact-info type="2">
<mailing-address><narrative>
Rua da Aurora 1377, Recife, Pernambuco
, https://www.seplag.pe.gov.br/
</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="23" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="23" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="9.00000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="27.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="23.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSG" percentage="23.0000000" xml:lang="en"><narrative>Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="9.00000000" xml:lang="en"><narrative>Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="9.00000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">5.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1333344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">916665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">916677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-19"/>
<value currency="USD" value-date="2031-12-19">60000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-19"/>
<value currency="USD" value-date="2031-12-19">60000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">60000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9991"><narrative>Secretariat of Planning, Management and Regional Development </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-9991"><narrative>Secretariat of Planning, Management and Regional Development </narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511440"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511440?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511440"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8: State health units with management and costing system implemented and operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="80.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="88">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Percentage of per diems and extra work hours processed through the System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: Index of IT Governance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="9">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 5: New system for intergovernmental transfers management implemented
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1: Conformity of the administrative management subsystems of the Executive Branch
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No modernization of the implemented subsystems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="New organizational structure standards implemented in at least 80% of agencies; workforce sizing and staffing policy in at least 80% of these; adherence to the personnel performance system in at least 60%; and 30% of leadership trained in performance management">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Schools integrated with the Financial management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 6: Implemented system for intergovernmental transfers management
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Percentage of per diems and extra work hours processed through the System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Percentage of procurement documents standardized and automated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Schools integrated with the Financial management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="85">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Percentage of procurement documents standardized and automated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public investments projects aligned within the new Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 3: Percentage of procurement documents standardized and automated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 6: Index of IT Governance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.254"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.28">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 10: Municipalities that processes social assistance accountability reports within time and correctly
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 5: Public investments projects aligned within the new Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="105"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Municipalities that processes social assistance accountability reports within time and correctly
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="12.4"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
State health units with management and costing system implemented and operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: Index of IT Governance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="9">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Public investments projects aligned with the new Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1: Conformity of the administrative management subsystems of the Executive Branch
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No modernization of the implemented subsystems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="New organizational structure standards implemented in at least 80% of agencies; workforce sizing and staffing policy in at least 80% of these; adherence to the personnel performance system in at least 60%; and 30% of leadership trained in performance management">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 5: Public investments projects aligned within the new Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 10: Municipalities that processes social assistance accountability reports within time and correctly
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable goods
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Percentage of per diems and extra work hours processed through the System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="95">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Public agencies covered by the workforce planning reports
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials' payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8: Schools integrated with the new Education Financial management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Schools integrated with the Financial management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="157"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="120">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1: Conformity of the administrative management subsystems of the Executive Branch
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No modernization of the implemented subsystems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="New organizational structure standards implemented in at least 80% of agencies; workforce sizing and staffing policy in at least 80% of these; and adherence to the personnel performance system in at least 60%">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 6: Implemented system for intergovernmental transfers management
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 5: New system for intergovernmental transfers management implemented
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Percentage of per diems and extra work hours processed through the System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="95">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 6: Index of IT Governance
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.254"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.28">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0.254">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Municipalities submitting social assistance accountability reports on time and accurately
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8: Schools integrated with the new Education Financial management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: State health units with management and costing system implemented and operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Public investments projects aligned with the new Methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 3: Percentage of procurement documents standardized and automated
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="100">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1: Conformity of the administrative management subsystems of the Executive Branch
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No modernization of the implemented subsystems"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="New organizational structure standards implemented in at least 80% of agencies; workforce sizing and staffing policy in at least 80% of these; and adherence to the personnel performance system in at least 60%">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="No modernization of the implemented subsystems">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="55">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="55"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="75">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate for investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="80.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="88">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="30">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="60">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="60"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials' payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Savings on IT management costs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="157"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="120">
<comment><narrative>
Project not under implementation until Dec 2025 (indicators update window)
</narrative></comment>
</target>
<actual value="157">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Time between opening and finalizing the procurement process
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="157"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="120">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable goods
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: State health units with management and costing system implemented and operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8: State health units with management and costing system implemented and operational
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected consumable items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Municipalities submitting social assistance accountability reports on time and accurately
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Inventory on State ICT Infrastructure
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P511645</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Paraiba Sustainable Rural Development II</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[To improve market access and enhance the climate resilience of selected Family Farmer beneficiaries in Paraiba.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The proposed operation will promote inclusive and climate-resilient rural development in the State of Paraiba by strengthening sustainable family farming, improving market access, and expanding essential rural infrastructure and services. The Project is structured into four components. Component 1 will support climate-resilient, diversified, and sustainable production systems for family farmers. It will co-finance investment plans, promote renewable energy and digital inclusion, support the conservation and ecological recovery of degraded areas, and improve access to markets and value addition through support to producer organizations and small-scale associative enterprises. Component 2 will reduce climate vulnerability and improve basic rural infrastructure through investments in the rehabilitation of rural roads to enhance accessibility and resilience. Component 3 will strengthen the technical and organizational capacities of rural families, producer organizations, and service providers to sustain climate-smart production, improve environmental management, and ensure effective service delivery. Component 4 will support overall project coordination, fiduciary and safeguards compliance, monitoring and evaluation, and adaptive implementation.COMPONENT 1 – STRENGTHENING SUSTAINABLE FAMILY FARMING PRODUCTIONSubcomponent 1.1 – Innovations for more productive and resilient family farming production systemsSubcomponent 1.2 – Support for increased productivity and market access for family farmers' organizationsSubcomponent 1.3 – Environmental management and recovery initiatives COMPONENT 2 – IMPROVING RURAL ACCESSIBILITY AND REDUCING CLIMATE VULNERABILITYCOMPONENT 3 – TECHNICAL ASSISTANCE AND CAPACITY BUILDING FOR BENEFICIARIES, PARTNER ORGANIZATIONS, AND POLICY DIALOGUECOMPONENT 4 – PROJECT MANAGEMENT, M&amp;E, INFORMATION MANAGEMENT, COMMUNICATION, AND CAPACITY BUILDING FOR IMPLEMENTING AGENCIES]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00010936"><narrative>State of Paraiba</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00010937"><narrative>Projeto Cooperar (SEAFDS)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2025-12-19"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2025-12-12"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2032-06-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2032-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Leonardo Bichara Rocha</narrative></person-name><telephone>+1-202-473-1000</telephone><email>lbichararocha@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="43042" percentage="49" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="49" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="29" xml:lang="en"/><sector vocabulary="1" code="31191" percentage="29" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="16" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="6" xml:lang="en"/><sector vocabulary="1" code="31110" percentage="6" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="29.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAB" percentage="29.0000000" xml:lang="en"><narrative>Agricultural Extension, Research, and Other Support Activities </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="NNI" percentage="4.00000000" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AAK" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Agriculture, Fishing, and Forestry </narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YYA" percentage="28.0000000" xml:lang="en"><narrative>Agricultural Markets, Commercialization, Agri-Business and Agriculture finance </narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">445874.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">445874.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">445874.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">445874.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">445874.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">445880.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">831906.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">1032311.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1032299.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1032311.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">831894.83</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">831906.87</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">215336.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">215348.50</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-01-01"/>
<period-end iso-date="2026-01-31"/>
<value currency="USD" value-date="2026-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-02-01"/>
<period-end iso-date="2026-02-28"/>
<value currency="USD" value-date="2026-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">50000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">50000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">50000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10937"><narrative>Projeto Cooperar (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10937"><narrative>Projeto Cooperar (SEAFDS)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511645"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P511645?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P511645"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of women working on the boards of project-supported rural organization as directors, vice directors or company treasurers.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female family farmers adopting climatic smart agricultural practices as a result of project financing
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of women working on the boards of project-supported rural organization as directors, vice directors or company treasurers.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales for family farmers supported by the project.
</narrative></title>
<baseline year="2027" iso-date="2027-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2027-06-15" />
<period-end iso-date="2032-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female family farmers adopting climatic smart agricultural practices as a result of project financing
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4800">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with the Project's investment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with access to water for agricultural production which is operation.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Plans implemented
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="830">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefited without repetition.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-15" />
<target value="89,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4,600,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with the Project's investment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefitted with renewable energy and digital systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1500">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossing (fords) implemented.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales for family farmers supported by the project.
</narrative></title>
<baseline year="2027" iso-date="2027-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2027-06-15" />
<period-end iso-date="2032-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Plans implemented
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="830">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with access to water for agricultural production which is operation.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4,600,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with the Project's investment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family production units served with Productive, Environmental and Management Technical Assistance
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="6900">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with access to water for agricultural production which is operation.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA – CM level 3 on internal audit framework.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-05" />
<period-end iso-date="2032-06-05" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family production units served with Productive, Environmental and Management Technical Assistance
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="6900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4,600,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family production units served with Productive, Environmental and Management Technical Assistance
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="6900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized to match the project grant
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4,600,000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossing (fords) implemented.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA – CM level 3 on internal audit framework.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="Yes">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-05" />
<period-end iso-date="2032-06-05" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female family farmers adopting climatic smart agricultural practices as a result of project financing
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of beneficiaries satisfied with the Project's investment
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefited without repetition.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-15" />
<target value="89,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-05" />
<period-end iso-date="2032-06-05" />
<target value="80">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossing (fords) implemented.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Family production units served with Productive, Environmental and Management Technical Assistance
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="6900">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of water crossing (fords) implemented.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales for family farmers supported by the project.
</narrative></title>
<baseline year="2027" iso-date="2027-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2027-06-15" />
<period-end iso-date="2032-06-15" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefited without repetition.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-15" />
<target value="89,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of female family farmers adopting climatic smart agricultural practices as a result of project financing
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="4800">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Plans implemented
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="830">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales for family farmers supported by the project.
</narrative></title>
<baseline year="2027" iso-date="2027-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2027-06-15" />
<period-end iso-date="2032-06-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Landscapes under enhanced conservation and/or sustainable management (terrestrial and inland water areas)
</narrative></title>
<baseline year="2026" iso-date="2026-06-05" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-05" />
<period-end iso-date="2032-06-05" />
<target value="80">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-14" />
<target value="69,750">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people benefited without repetition.
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2032-06-15" />
<target value="89,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families with access to water for agricultural production which is operation.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of women working on the boards of project-supported rural organization as directors, vice directors or company treasurers.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People benefiting from increased resilience of livelihoods, jobs or firms
</narrative></title>
<baseline year="2026" iso-date="2026-01-10" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-01-10" />
<period-end iso-date="2032-01-10" />
<target value="1,6000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of families benefitted with renewable energy and digital systems
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="1500">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Complaints and inquiries received through the Grievance Redress Mechanism that are registered and addressed
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="100">

</target>
<actual value="0">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural Organizations that improved their institutional performance index
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="200">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA – CM level 3 on internal audit framework.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Reach IA – CM level 3 on internal audit framework.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the gross value of sales of rural organizations
</narrative></title>
<baseline year="2026" iso-date="2026-06-12" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-12" />
<period-end iso-date="2032-06-12" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Plans implemented
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="830">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase in the percentage of women working on the boards of project-supported rural organization as directors, vice directors or company treasurers.
</narrative></title>
<baseline year="2026" iso-date="2026-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2026-06-15" />
<period-end iso-date="2032-06-15" />
<target value="15">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P512526</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>Bahia State Sustainable and Inclusive Development Policy Loan</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Enhance competitiveness and job creation in the State of Bahia through improved transport and digital access and support to new energy value chains.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The development objective of Bahia State Sustainable and Inclusive Development Policy Loan for Brazil is to enhance competitiveness and job creation in the State of Bahia through improved transport and digital access and support to new energy value chains. Increased economic competitiveness is central to Bahia's Pluriannual Plan (PPA) 2024–2027 and Development Plan 2035 (PDI 2035), and the Development Policy Financing (DPF) series supports reforms aligned with key PPA axes - Rural and Productive Development; Infrastructure and Logistics; and Science, Technology, and Innovation as well as Special Programs including Energize Bahia, Bahia Economic Growth, A More Digital Bahia, Accelerate Bahia, and A Greener Bahia, in line with Brazil's New Industrial Program (2024). The operation is structured around two pillars: Pillar 1, which enables accessibility to jobs and boosts productivity through improved transport systems and expanded digital access, including regulatory reforms that strengthen performance-based road rehabilitation and maintenance and advance sustainable urban mobility; and Pillar 2, which supports job creation through the development of new energy value chains and the expansion of new or improved energy infrastructure, including electric vehicle charging networks, biomass and biomethane production, and distributed renewable energy in isolated communities. The operation is aligned with the World Bank's Maximizing Finance for Development (MFD) approach and supports the Private Capital Enabling (PCE) corporate scorecard indicator, with results measured through performance-based road contracting, EV market penetration, private investment commitments in biorefinery value chains, biomethane tender volumes, and distributed renewable energy capacity installed in public schools, with cumulative PCE expected to reach at least US$2.8 billion by 2030. The World Bank Group adds value through complementary operations and knowledge activities in resilient road asset management, electric public transport deployment through private concessions, sustainable rural development, IFC support for Bahia's first biorefinery, and targeted technical assistance on sustainable urban mobility financing and EV charging standards. The operation is aligned with Brazil's Country Partnership Framework FY2024–FY2028, the World Bank Group's corporate priorities, the Gender Strategy 2024–2030, and the goals of the Paris Agreement, supporting greener competitiveness, institutional strengthening, and opportunities for replication across Brazil and the Latin America and Caribbean region.
]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00010590"><narrative>State of Bahia</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00010591"><narrative>Secretariat of Planning of the State of Bahia</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-20"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-20"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2027-02-26"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2027-02-26"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Aiga Stokenberga</narrative></person-name><telephone>+1-202-473-1000</telephone><email>astokenberga@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="23111" percentage="29" xml:lang="en"/><sector vocabulary="1" code="23111" percentage="29" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="15" xml:lang="en"/><sector vocabulary="1" code="21011" percentage="15" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="14" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="14" xml:lang="en"/><sector vocabulary="1" code="23642" percentage="14" xml:lang="en"/><sector vocabulary="1" code="23642" percentage="14" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="14" xml:lang="en"/><sector vocabulary="1" code="22040" percentage="14" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="7" xml:lang="en"/><sector vocabulary="1" code="23631" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="14.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLU" percentage="7.00000000" xml:lang="en"><narrative>Energy Generation - Solar</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLT" percentage="7.00000000" xml:lang="en"><narrative>Energy Networks and Storage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="29.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLP" percentage="14.0000000" xml:lang="en"><narrative>Public Administration - Energy</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LLG" percentage="14.0000000" xml:lang="en"><narrative>Gases for Energy Transition</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="DDG" percentage="15.0000000" xml:lang="en"><narrative>Digital Government - Public Administration</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">796178350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">796178350.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">796178350.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-26"/>
<value currency="USD" value-date="2027-02-26">796178350.00</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">796178350</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10591"><narrative>Secretariat of Planning of the State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10591"><narrative>Secretariat of Planning of the State of Bahia</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512526"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P512526?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512526"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity installed (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Rural household provided with electricity connections
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="30000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Passengers transported in the RMS public transport system (million/year)
</narrative></title>
<baseline year="2022" iso-date="2022-06-15" value="137.7"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2022-06-15" />
<period-end iso-date="2027-06-15" />
<target value="144.6">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Mini-grids installed in São Franciso River communities
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="31.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of EVs, including PHEV, BEV, and HEV, sold in the State during the calendar year
</narrative></title>
<baseline year="2024" iso-date="2024-12-16" value="4.3"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-16" />
<period-end iso-date="2027-06-15" />
<target value="15.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private investment in biorefinery value chains committed in letters of intent signed with the state government (million)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="2100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Kilometers of state roads for which performance-based rehabilitation and maintenance contracts tendered
</narrative></title>
<baseline year="2025" iso-date="2025-10-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-10-15" />
<period-end iso-date="2027-06-15" />
<target value="3,000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Distributed renewable energy capacity installed in public school buildings (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Renewable energy capacity installed (MW)
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="1.8"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="43">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New road rehabilitation, construction, and proactive maintenance contracts for works to be implemented on State highways that explicitly consider current and projected climate risk
</narrative></title>
<baseline year="2024" iso-date="2024-06-16" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-16" />
<period-end iso-date="2027-06-16" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Locational environmental licensing assessments completed for green hydrogen production projects
</narrative></title>
<baseline year="2024" iso-date="2024-06-15" value="1"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-06-15" />
<period-end iso-date="2027-06-15" />
<target value="4">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Digital services provided through Portal Unico (million/year)
</narrative></title>
<baseline year="2023" iso-date="2023-12-16" value="4.79"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2023-12-16" />
<period-end iso-date="2027-06-15" />
<target value="9.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Biomethane volume for which tendering calls have been issued for injection in the state gas network (per day)
</narrative></title>
<baseline year="2025" iso-date="2025-06-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-06-15" />
<period-end iso-date="2027-06-15" />
<target value="5000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P512688</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>State of Sergipe - Phase 5 of Brazil Proactive, Safe and Resilient Road Asset Management Program</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve access to sustainable, safe, and resilient transport in the State of Sergipe.]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[Sergipe, Brazil's smallest state, spans 21,910 km² and is home to 2.3 million people. Despite strong growth in agribusiness and transport connectivity, the state faces persistent regional disparities, rural poverty, limited access to family farming and tourism spots, and increasing vulnerability to climate change. Those infrastructure deficits contribute to economic exclusion and rural-to-urban migration.The state road network (5.142,6 km), of which 48 percent are paved, connects agricultur production and tourism zones to the BR-101 highway. It suffers from chronic maintenance gaps, safety risks, and climate-related degradation. Sergipe is seeking to modernize road governance through long-term performance-based maintenance contracts (CREMAs and PPPs), supported by institutional reforms and targeted investments in road safety and resilience.The CREMA Sergipe project, the fifth phase of the MPA - and the sixth State joining the Learning agenda, will promote the sustainable, safe, and resilient transport infrastructure. The project will seek to reduce structural inequality and enhance climate adaptation, while strengthening institutional capacity and leveraging private sector participation.Component 1: Safe and Resilient Proactive Maintenance of State Highways based on Long-Term Rehabilitation and Maintenance Contracts (CREMA) (US$270Million):Subcomponent 1.1: Proactive maintenance CREMA-DBM: Long-term performance-based safe and resilient road management contracts for state road corridors.Subcomponent 1.2: CREMA-PPP: Structuring and implementation of long-term (over 20 years) safe and resilient CREMAs using the PPP regulation for selected state roads - mostly financed by Private Capital Mobilization (PCM)Component 2: Institutional strengthening for sustainability of road asset management, road safety, climate resilience, and decarbonization (US$5 million), with activities focusing on three different topics: a) Road Network Management Monitoring System. These activities will support sustainable, safe, and resilient road infrastructure management, including TA, studies, the acquisition of goods, and capacity building, in the three following areas: (i) road infrastructure management, including, inter alia, studies and systems for planning and management of the road asset, support to the PPP agenda; (ii) road safety, including, inter alia, a diagnostic of road safety, technical and policy advice (on, for example, speed management, and active mobility infrastructure); and (iii) Logistics Planning and Support, including, inter alia, a he preparation of the Plano de Desenvolvimento do Transporte Intermunicipal (PDTI) and other related studies to improve the efficiency, resilience, and connectivity of the intermunicipal transport and logistics systems.b) Resilience and Decarbonization: The proposed activities will strengthen the state's capacity to assess and manage climate-related risks in the road sector. These include updating and expanding the state's micro-level risk assessment tool for climate vulnerability analysis and providing training on climate change adaptation, mitigation, and decarbonization strategies in the transport sector.c) Social inclusion and Gender: The proposed activities include conducting a gender assessment and developing an action plan to integrate gender considerations into the CREMA projects. Measures may include hiring female engineers for project management roles and implementing a pilot training program targeting vulnerable groups, with a focus on social inclusion and gender equality. Component 3: Road Works and Services (US$20 million).Subcomponent 3.1: Improvements to urban crossings and pedestrian areas in historical cities: São Cristovão, and Laranjeiras (US$ 4 million). The interventions will include works to increase the safety of pedestrians and cyclists, with special attention to areas near schools. It will also include improvements to urban crossings located at critical points. The interventions will be preceded by technical projects and properly supervised to ensure the quality and effectiveness of the actions.Subcomponent 3.2 Rural access infrastructure (local roads) (US$16 million). This subcomponent aims to increase the resilience of the rural road network by eliminating critical points on unpaved local roads, especially in areas with high socioeconomic vulnerability. Public consultations will be held with local communities, including quilombola and indigenous communities, to identify and prioritize the sections to be benefited.Component 4: Project management (US$5 million). The management component will support the hiring of teams and equipment and expenses necessary for the proper execution of the project.]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00010847"><narrative>State of Sergipe</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00010848"><narrative>Departamento Estadual de Infraestrutura Rodoviária de Sergipe (DER-SE)</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-05-11"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-05-19"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2035-11-30"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2035-11-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Carlos Bellas Lamas</narrative></person-name><telephone>+1-202-473-1000</telephone><email>cbellas@worldbank.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTC" percentage="10.0000000" xml:lang="en"><narrative>Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTF" percentage="10.0000000" xml:lang="en"><narrative>Public Administration - Transportation</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TTI" percentage="80.0000000" xml:lang="en"><narrative>Rural and Inter-Urban Roads</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">833332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">833344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">499999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">500011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-11-01"/>
<period-end iso-date="2034-11-30"/>
<value currency="USD" value-date="2034-11-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2034-12-01"/>
<period-end iso-date="2034-12-31"/>
<value currency="USD" value-date="2034-12-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-01-01"/>
<period-end iso-date="2035-01-31"/>
<value currency="USD" value-date="2035-01-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-02-01"/>
<period-end iso-date="2035-02-28"/>
<value currency="USD" value-date="2035-02-28">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-03-01"/>
<period-end iso-date="2035-03-31"/>
<value currency="USD" value-date="2035-03-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-04-01"/>
<period-end iso-date="2035-04-30"/>
<value currency="USD" value-date="2035-04-30">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-05-01"/>
<period-end iso-date="2035-05-31"/>
<value currency="USD" value-date="2035-05-31">416665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-06-01"/>
<period-end iso-date="2035-06-30"/>
<value currency="USD" value-date="2035-06-30">416677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-07-01"/>
<period-end iso-date="2035-07-31"/>
<value currency="USD" value-date="2035-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-08-01"/>
<period-end iso-date="2035-08-31"/>
<value currency="USD" value-date="2035-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-09-01"/>
<period-end iso-date="2035-09-30"/>
<value currency="USD" value-date="2035-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-10-01"/>
<period-end iso-date="2035-10-31"/>
<value currency="USD" value-date="2035-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-11-01"/>
<period-end iso-date="2035-11-30"/>
<value currency="USD" value-date="2035-11-30">1000004.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">0.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">166677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">583344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1666665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1666677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">1249999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">1250011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-01-01"/>
<period-end iso-date="2032-01-31"/>
<value currency="USD" value-date="2032-01-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-02-01"/>
<period-end iso-date="2032-02-29"/>
<value currency="USD" value-date="2032-02-29">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-03-01"/>
<period-end iso-date="2032-03-31"/>
<value currency="USD" value-date="2032-03-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-04-01"/>
<period-end iso-date="2032-04-30"/>
<value currency="USD" value-date="2032-04-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-05-01"/>
<period-end iso-date="2032-05-31"/>
<value currency="USD" value-date="2032-05-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-06-01"/>
<period-end iso-date="2032-06-30"/>
<value currency="USD" value-date="2032-06-30">833344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-07-01"/>
<period-end iso-date="2032-07-31"/>
<value currency="USD" value-date="2032-07-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-08-01"/>
<period-end iso-date="2032-08-31"/>
<value currency="USD" value-date="2032-08-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-09-01"/>
<period-end iso-date="2032-09-30"/>
<value currency="USD" value-date="2032-09-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-10-01"/>
<period-end iso-date="2032-10-31"/>
<value currency="USD" value-date="2032-10-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-11-01"/>
<period-end iso-date="2032-11-30"/>
<value currency="USD" value-date="2032-11-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2032-12-01"/>
<period-end iso-date="2032-12-31"/>
<value currency="USD" value-date="2032-12-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-01-01"/>
<period-end iso-date="2033-01-31"/>
<value currency="USD" value-date="2033-01-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-02-01"/>
<period-end iso-date="2033-02-28"/>
<value currency="USD" value-date="2033-02-28">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-03-01"/>
<period-end iso-date="2033-03-31"/>
<value currency="USD" value-date="2033-03-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-04-01"/>
<period-end iso-date="2033-04-30"/>
<value currency="USD" value-date="2033-04-30">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-05-01"/>
<period-end iso-date="2033-05-31"/>
<value currency="USD" value-date="2033-05-31">833332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-06-01"/>
<period-end iso-date="2033-06-30"/>
<value currency="USD" value-date="2033-06-30">833344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-07-01"/>
<period-end iso-date="2033-07-31"/>
<value currency="USD" value-date="2033-07-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-08-01"/>
<period-end iso-date="2033-08-31"/>
<value currency="USD" value-date="2033-08-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-09-01"/>
<period-end iso-date="2033-09-30"/>
<value currency="USD" value-date="2033-09-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-10-01"/>
<period-end iso-date="2033-10-31"/>
<value currency="USD" value-date="2033-10-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-11-01"/>
<period-end iso-date="2033-11-30"/>
<value currency="USD" value-date="2033-11-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2033-12-01"/>
<period-end iso-date="2033-12-31"/>
<value currency="USD" value-date="2033-12-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-01-01"/>
<period-end iso-date="2034-01-31"/>
<value currency="USD" value-date="2034-01-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-02-01"/>
<period-end iso-date="2034-02-28"/>
<value currency="USD" value-date="2034-02-28">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-03-01"/>
<period-end iso-date="2034-03-31"/>
<value currency="USD" value-date="2034-03-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-04-01"/>
<period-end iso-date="2034-04-30"/>
<value currency="USD" value-date="2034-04-30">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-05-01"/>
<period-end iso-date="2034-05-31"/>
<value currency="USD" value-date="2034-05-31">499999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-06-01"/>
<period-end iso-date="2034-06-30"/>
<value currency="USD" value-date="2034-06-30">500011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-07-01"/>
<period-end iso-date="2034-07-31"/>
<value currency="USD" value-date="2034-07-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-08-01"/>
<period-end iso-date="2034-08-31"/>
<value currency="USD" value-date="2034-08-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-09-01"/>
<period-end iso-date="2034-09-30"/>
<value currency="USD" value-date="2034-09-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-10-01"/>
<period-end iso-date="2034-10-31"/>
<value currency="USD" value-date="2034-10-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-11-01"/>
<period-end iso-date="2034-11-30"/>
<value currency="USD" value-date="2034-11-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2034-12-01"/>
<period-end iso-date="2034-12-31"/>
<value currency="USD" value-date="2034-12-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-01-01"/>
<period-end iso-date="2035-01-31"/>
<value currency="USD" value-date="2035-01-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-02-01"/>
<period-end iso-date="2035-02-28"/>
<value currency="USD" value-date="2035-02-28">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-03-01"/>
<period-end iso-date="2035-03-31"/>
<value currency="USD" value-date="2035-03-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-04-01"/>
<period-end iso-date="2035-04-30"/>
<value currency="USD" value-date="2035-04-30">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-05-01"/>
<period-end iso-date="2035-05-31"/>
<value currency="USD" value-date="2035-05-31">416665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-06-01"/>
<period-end iso-date="2035-06-30"/>
<value currency="USD" value-date="2035-06-30">416677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-07-01"/>
<period-end iso-date="2035-07-31"/>
<value currency="USD" value-date="2035-07-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-08-01"/>
<period-end iso-date="2035-08-31"/>
<value currency="USD" value-date="2035-08-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-09-01"/>
<period-end iso-date="2035-09-30"/>
<value currency="USD" value-date="2035-09-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-10-01"/>
<period-end iso-date="2035-10-31"/>
<value currency="USD" value-date="2035-10-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-11-01"/>
<period-end iso-date="2035-11-30"/>
<value currency="USD" value-date="2035-11-30">1000004.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2035-11-01"/>
<period-end iso-date="2035-11-30"/>
<value currency="USD" value-date="2035-11-30">100000000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2035-11-01"/>
<period-end iso-date="2035-11-30"/>
<value currency="USD" value-date="2035-11-30">100000000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">100000000</value><description xml:lang="en"><narrative>Total Commitment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10848"><narrative>Departamento Estadual de Infraestrutura Rodoviária de Sergipe (DER-SE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-10848"><narrative>Departamento Estadual de Infraestrutura Rodoviária de Sergipe (DER-SE)</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512688"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P512688?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P512688"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment value in CREMA PPP roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="165.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical spots on unpaved roads improved through public consultation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Indigenous and Quilombola comunities with year-round road access (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Indigenous and Quilombola comunities with year-round road access (Number)
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water recolection points installed along CREMA road sections
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learning events in which SS participates out of total number executed annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment value in CREMA PPP roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="165.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of DER-SE staff, state agencies, and project company personnel trained in road safety and climate resilience
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women engineers who complete on-the-job training and are certified
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learning events in which Sergipe project participates out of total number executed annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment value in CREMA PPP roads
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="125.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="955">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical spots on unpaved roads improved through public consultation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban crossings with safety interventions and infrastructure for pedestrians and cyclists with special focus on school areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of Road Safety Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban crossings with safety interventions and infrastructure for pedestrians and cyclists with special focus on school areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="955">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Water recolection points installed along CREMA road sections
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="10">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women engineers who complete on-the-job training and are certified
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical spots on unpaved roads identified through public consultation
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="600">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value=""><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="1314">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2033-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: Women trained and certified in medium and high skilled jobs in road construction
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Critical spots on unpaved roads improved through public consultation
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="300">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of urban crossings with safety interventions and infrastructure for pedestrians and cyclists with special focus on school areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of learning events in which SS participates of those done annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Investment value in CREMA PPP roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="165.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Hazardous spots for safety and resilience improved in selected State road corridors
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
DER-SE staff, state agencies, and project company personnel trained in road safety and climate resilience
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Municipalities where population was consulted and is satisfied with the improvement of road safety and active mobility infrastructure
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Social inclusion and gender: GBV training events to mitigate GBV/SEA risks in construction and logistics companies and schools along the selected roads
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="125">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Safety Agency established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Indigenous and Quilombola communities with year-round road access
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="12">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Requests included in the Grievance Redress Mechanism of the Project satisfactorily solved
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="60">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Strategic Plan for Network Maintenance with implemented Maintenance Fund
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of Road Safety Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Length of Safe and Resilient state road corridors under PBCs
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="955">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of DER-SE staff, state agencies, and project company personnel trained in road safety and climate resilience
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="100">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Urban linear settlements with safety interventions and infrastructure for pedestrians and cyclists with special focus on school areas
</narrative></title>
<baseline year="2025" iso-date="2025-12-14" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-14" />
<period-end iso-date="2033-12-14" />
<target value="22">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized and enabled from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Total amount of money mobilized from private sector sources
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="1900-01-01"/>
<target value="125">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="114,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct users that benefit from improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed long-term in road maintenance roles under CREMA-DBM and CREMA-PPP contracts
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="96">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed long-term in road maintenance roles under CREMA-DBM and CREMA-PPP contracts
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="96">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of Road Safety Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women engineers who complete on-the-job training and are certified
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="20">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Learning events in which SS participates out of total number executed annually among Brazil Pro-Roads Program participants
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="3">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Change in annual road crash fatalities along targeted state road corridors in selected areas of the State of Sergipe
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Lead Road Agency established and operational
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Development of Road Safety Plan
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="1900-01-01"/>
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Share of the paved state road networks in the State of Sergipe with Management Response Plans to climate risks and natural disasters in place
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="36">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Inferred beneficiaries of improved access to sustainable transport infrastructure and services
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="143,0000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Private capital mobilized and enabled from private sector sources
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="175.000.000">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Safe, sustainable and Resilient road asset management: Geospatial Tool and Manual for Climate Resilience Adaptation Adopted
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Women employed long-term in road maintenance roles under CREMA-DBM and CREMA-PPP contracts
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2033-12-15" />
<target value="96">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-26T22:59:00" hierarchy="1"><iati-identifier>44000-P513080</iati-identifier><reporting-org ref="44000" type="40"><narrative  xml:lang="en">World Bank</narrative></reporting-org><title xml:lang="en"><narrative>MPA Phase III - Progestão Sergipe: Public Sector Management Efficiency Project</narrative></title><description type="2" xml:lang="en"><narrative><![CDATA[Improve efficiency in public resource management in selected departments of the State of Sergipe. ]]></narrative></description><description type="1" xml:lang="en"><narrative><![CDATA[The State of Sergipe has requested the World Bank's assistance to consolidate recent reforms and improve efficiency in whole-of-government public sector management systems and service delivery in sectors under the Progestão Program. The proposed scope for the project is fully aligned with the Multi-phased Programmatic Approach (MPA)  Progestão Program objectives. The State requested assistance in  the program cross-cutting areas, including human resource management; pensions; public procurement; public investment management and budgeting; and asset management. It will also support investments in financial management and information systems aiming at improving fiscal efficiency in the health, education and social assistance sectors. ]]></narrative></description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00011119"><narrative>State of Sergipe</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–00011119"><narrative>State of Sergipe</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR-COA-00011040"><narrative>State Secretariat of Finance</narrative></participating-org>
<activity-status code="2" /><activity-date type="1" iso-date="2026-03-31"><narrative>Planned start date of the activity</narrative></activity-date><activity-date type="2" iso-date="2026-03-30"><narrative>Actual start date of the activity</narrative></activity-date><activity-date type="3" iso-date="2031-12-19"><narrative>Planned end date of the activity</narrative></activity-date><activity-date type="4" iso-date="2031-12-19"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1"><organisation><narrative>The World Bank</narrative></organisation><person-name><narrative>Sadia Afolabi</narrative></person-name><telephone>+1-202-473-1000</telephone><email>safolabi1@worldbankgroup.org</email><email>pic@worldbank.org</email><mailing-address><narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
Palácio Governador Augusto Franco, Av. AdElia Franco, 3305, Grageru, Aracajú, Sergipe

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
Palácio Governador Augusto Franco, Av. AdElia Franco, 3305, Grageru, Aracajú, Sergipe

</narrative></mailing-address></contact-info>

<contact-info type="2">
<mailing-address><narrative>
R. JosE Carvalho Pinto - Jardins, Aracaju, Brazil 49026-150, Aracaju, SE

</narrative></mailing-address></contact-info>
<contact-info type="2">
<mailing-address><narrative>
R. JosE Carvalho Pinto - Jardins, Aracaju, Brazil 49026-150, Aracaju, SE

</narrative></mailing-address></contact-info><recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
                <location-reach code="1" />
                <location-id vocabulary="G1" code="3469058" />
                <name><narrative>Brasilia</narrative></name>
                <point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
                <pos>-15.77972 -47.929722</pos>
                </point>
                <exactness code="2"/>
                <location-class code="2" />
            </location><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="24" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="23" xml:lang="en"/><sector vocabulary="1" code="15185" percentage="23" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="10" xml:lang="en"/><sector vocabulary="1" code="12196" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="10" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBC" percentage="22.0000000" xml:lang="en"><narrative>Central Government (Central Agencies)</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSG" percentage="23.0000000" xml:lang="en"><narrative>Public Administration - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BBH" percentage="28.0000000" xml:lang="en"><narrative>Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SSA" percentage="9.00000000" xml:lang="en"><narrative>Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EEF" percentage="9.00000000" xml:lang="en"><narrative>Public Administration - Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HHG" percentage="9.00000000" xml:lang="en"><narrative>Health</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">166665.67</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">166677.63</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">583332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">583344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">999999.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1000011.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1083332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1083344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">483332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">483344.37</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">333332.33</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">333338.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-03-01"/>
<period-end iso-date="2026-03-31"/>
<value currency="USD" value-date="2026-03-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-04-01"/>
<period-end iso-date="2026-04-30"/>
<value currency="USD" value-date="2026-04-30">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-05-01"/>
<period-end iso-date="2026-05-31"/>
<value currency="USD" value-date="2026-05-31">-1.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-06-01"/>
<period-end iso-date="2026-06-30"/>
<value currency="USD" value-date="2026-06-30">3.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-07-01"/>
<period-end iso-date="2026-07-31"/>
<value currency="USD" value-date="2026-07-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-08-01"/>
<period-end iso-date="2026-08-31"/>
<value currency="USD" value-date="2026-08-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-09-01"/>
<period-end iso-date="2026-09-30"/>
<value currency="USD" value-date="2026-09-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-10-01"/>
<period-end iso-date="2026-10-31"/>
<value currency="USD" value-date="2026-10-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-11-01"/>
<period-end iso-date="2026-11-30"/>
<value currency="USD" value-date="2026-11-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2026-12-01"/>
<period-end iso-date="2026-12-31"/>
<value currency="USD" value-date="2026-12-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-01-01"/>
<period-end iso-date="2027-01-31"/>
<value currency="USD" value-date="2027-01-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-02-01"/>
<period-end iso-date="2027-02-28"/>
<value currency="USD" value-date="2027-02-28">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-03-01"/>
<period-end iso-date="2027-03-31"/>
<value currency="USD" value-date="2027-03-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-04-01"/>
<period-end iso-date="2027-04-30"/>
<value currency="USD" value-date="2027-04-30">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-05-01"/>
<period-end iso-date="2027-05-31"/>
<value currency="USD" value-date="2027-05-31">166665.67</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-06-01"/>
<period-end iso-date="2027-06-30"/>
<value currency="USD" value-date="2027-06-30">166677.63</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-07-01"/>
<period-end iso-date="2027-07-31"/>
<value currency="USD" value-date="2027-07-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-08-01"/>
<period-end iso-date="2027-08-31"/>
<value currency="USD" value-date="2027-08-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-09-01"/>
<period-end iso-date="2027-09-30"/>
<value currency="USD" value-date="2027-09-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-10-01"/>
<period-end iso-date="2027-10-31"/>
<value currency="USD" value-date="2027-10-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-11-01"/>
<period-end iso-date="2027-11-30"/>
<value currency="USD" value-date="2027-11-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2027-12-01"/>
<period-end iso-date="2027-12-31"/>
<value currency="USD" value-date="2027-12-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-01-01"/>
<period-end iso-date="2028-01-31"/>
<value currency="USD" value-date="2028-01-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-02-01"/>
<period-end iso-date="2028-02-29"/>
<value currency="USD" value-date="2028-02-29">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-03-01"/>
<period-end iso-date="2028-03-31"/>
<value currency="USD" value-date="2028-03-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-04-01"/>
<period-end iso-date="2028-04-30"/>
<value currency="USD" value-date="2028-04-30">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-05-01"/>
<period-end iso-date="2028-05-31"/>
<value currency="USD" value-date="2028-05-31">583332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-06-01"/>
<period-end iso-date="2028-06-30"/>
<value currency="USD" value-date="2028-06-30">583344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-07-01"/>
<period-end iso-date="2028-07-31"/>
<value currency="USD" value-date="2028-07-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-08-01"/>
<period-end iso-date="2028-08-31"/>
<value currency="USD" value-date="2028-08-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-09-01"/>
<period-end iso-date="2028-09-30"/>
<value currency="USD" value-date="2028-09-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-10-01"/>
<period-end iso-date="2028-10-31"/>
<value currency="USD" value-date="2028-10-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-11-01"/>
<period-end iso-date="2028-11-30"/>
<value currency="USD" value-date="2028-11-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2028-12-01"/>
<period-end iso-date="2028-12-31"/>
<value currency="USD" value-date="2028-12-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-01-01"/>
<period-end iso-date="2029-01-31"/>
<value currency="USD" value-date="2029-01-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-02-01"/>
<period-end iso-date="2029-02-28"/>
<value currency="USD" value-date="2029-02-28">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-03-01"/>
<period-end iso-date="2029-03-31"/>
<value currency="USD" value-date="2029-03-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-04-01"/>
<period-end iso-date="2029-04-30"/>
<value currency="USD" value-date="2029-04-30">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-05-01"/>
<period-end iso-date="2029-05-31"/>
<value currency="USD" value-date="2029-05-31">999999.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-06-01"/>
<period-end iso-date="2029-06-30"/>
<value currency="USD" value-date="2029-06-30">1000011.00</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-07-01"/>
<period-end iso-date="2029-07-31"/>
<value currency="USD" value-date="2029-07-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-08-01"/>
<period-end iso-date="2029-08-31"/>
<value currency="USD" value-date="2029-08-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-09-01"/>
<period-end iso-date="2029-09-30"/>
<value currency="USD" value-date="2029-09-30">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-10-01"/>
<period-end iso-date="2029-10-31"/>
<value currency="USD" value-date="2029-10-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-11-01"/>
<period-end iso-date="2029-11-30"/>
<value currency="USD" value-date="2029-11-30">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2029-12-01"/>
<period-end iso-date="2029-12-31"/>
<value currency="USD" value-date="2029-12-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-01-01"/>
<period-end iso-date="2030-01-31"/>
<value currency="USD" value-date="2030-01-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-02-01"/>
<period-end iso-date="2030-02-28"/>
<value currency="USD" value-date="2030-02-28">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-03-01"/>
<period-end iso-date="2030-03-31"/>
<value currency="USD" value-date="2030-03-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-04-01"/>
<period-end iso-date="2030-04-30"/>
<value currency="USD" value-date="2030-04-30">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-05-01"/>
<period-end iso-date="2030-05-31"/>
<value currency="USD" value-date="2030-05-31">1083332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-06-01"/>
<period-end iso-date="2030-06-30"/>
<value currency="USD" value-date="2030-06-30">1083344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-07-01"/>
<period-end iso-date="2030-07-31"/>
<value currency="USD" value-date="2030-07-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-08-01"/>
<period-end iso-date="2030-08-31"/>
<value currency="USD" value-date="2030-08-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-09-01"/>
<period-end iso-date="2030-09-30"/>
<value currency="USD" value-date="2030-09-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-10-01"/>
<period-end iso-date="2030-10-31"/>
<value currency="USD" value-date="2030-10-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-11-01"/>
<period-end iso-date="2030-11-30"/>
<value currency="USD" value-date="2030-11-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2030-12-01"/>
<period-end iso-date="2030-12-31"/>
<value currency="USD" value-date="2030-12-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-01-01"/>
<period-end iso-date="2031-01-31"/>
<value currency="USD" value-date="2031-01-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-02-01"/>
<period-end iso-date="2031-02-28"/>
<value currency="USD" value-date="2031-02-28">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-03-01"/>
<period-end iso-date="2031-03-31"/>
<value currency="USD" value-date="2031-03-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-04-01"/>
<period-end iso-date="2031-04-30"/>
<value currency="USD" value-date="2031-04-30">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-05-01"/>
<period-end iso-date="2031-05-31"/>
<value currency="USD" value-date="2031-05-31">483332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-06-01"/>
<period-end iso-date="2031-06-30"/>
<value currency="USD" value-date="2031-06-30">483344.37</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-07-01"/>
<period-end iso-date="2031-07-31"/>
<value currency="USD" value-date="2031-07-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-08-01"/>
<period-end iso-date="2031-08-31"/>
<value currency="USD" value-date="2031-08-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-09-01"/>
<period-end iso-date="2031-09-30"/>
<value currency="USD" value-date="2031-09-30">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-10-01"/>
<period-end iso-date="2031-10-31"/>
<value currency="USD" value-date="2031-10-31">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-11-01"/>
<period-end iso-date="2031-11-30"/>
<value currency="USD" value-date="2031-11-30">333332.33</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-31"/>
<value currency="USD" value-date="2031-12-31">333338.35</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-19"/>
<value currency="USD" value-date="2031-12-19">41800000.00</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2031-12-01"/>
<period-end iso-date="2031-12-19"/>
<value currency="USD" value-date="2031-12-19">41800000.00</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">41800000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-11040"><narrative>State Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2026-08-31"/><value value-date="2026-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><receiver-org xml:lang="en" ref="BR-COA-11040"><narrative>State Secretariat of Finance</narrative></receiver-org><flow-type code="20" /><finance-type code="410" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P513080"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P513080?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P513080"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Properties inventoried and ready for regularization
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="50.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 8: Expenditures on Complementary Health Contracts
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15.89"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="14.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Expenditures on Complementary Health Contracts
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15.89"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="14.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Properties inventoried and ready for regularization
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="50.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="45">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 5: Datalake implemented
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 5: Datalake implemented
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 7: Implementation of new modules of the Intergovernmental Transfers Management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 1: Agencies integrated into the State's data lake
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 9: Percentage of Idle Teacher Workload
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="45">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings generated in selected consumable goods
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="21.57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="14.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Savings in the procurement of selected items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 8: Annual gender-disaggregated workforce and pension report produced and used to inform HR management decisions
</narrative></title>
<baseline year="2025" iso-date="2025-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2025-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6: New Financial Management methodologies adopted
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Investment projects prepared, analyzed and approved through the public investment management methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3: Time between opening and closing of the state's public procurement processes
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="55">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3: Time between opening and closing of the state's public procurement processes
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="55">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 7: Implementation of new modules of the Intergovernmental Transfers Management System
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="NO"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="45">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 6: New Financial Management methodologies adopted
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Investment projects prepared, analyzed and approved through the public investment management methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="45">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Average processing time for retirement benefit concessions
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="67"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="45">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 4: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Budget execution rate in public investment projects
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="47.99"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 1: Savings from identified active and inactive public officials payroll non-conformities/irregularities
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 3: Savings in the procurement of selected items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings in the procurement of selected items
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="13.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.30">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
PD -Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
PDO 2: Savings generated in selected consumable goods
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="21.57"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="14.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 6: Reduction of Direct and Indirect Costs for the Health sector
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="10.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3: Time between opening and closing of the state's public procurement processes
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="75"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="55">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 10: Percentage of Idle Teacher Workload
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="15.0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="7.5">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 5: Datalake implemented
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="No"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="Yes">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 1: Agencies integrated into the State's data lake
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0.00"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="80.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 2: Properties inventoried and ready for regularization
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="3.31"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="50.00">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 7: Percentage of Idle Teacher Workload
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="4.30"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="0.50">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
IO - Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4: Investment projects prepared, analyzed and approved through the public investment management methodology
</narrative></title>
<baseline year="2024" iso-date="2024-12-15" value="0"><comment><narrative></narrative></comment></baseline>
<period>
<period-start iso-date="2024-12-15" />
<period-end iso-date="2031-12-15" />
<target value="70.0">

</target>
<actual value="">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:39" hierarchy="1"><iati-identifier>44000-P083997</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Alto Solimoes Basic Services and Sustainable Development Project in Support of the Zona Franca Verde Program</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The overall APL Phase I project objective is to improve the economic and social conditions based on the sustainable use of natural resources in the interior of State of Amazonas with a special focus in the Alto Solimoes Region.  Primary objectives include:  (i) raising income, (ii) increasing access to potable water and basic sanitation; and (iii) improving health outcomes of targeted populations.  A secondary objective is to improve the management capacity and administrative efficiency of the states public sector.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objectives of the Alto Solimoes Basic Services and Sustainable Development Project for Brazil are: (i) to raise incomes, (ii) to increase access to potable water and basic sanitation; and (iii) to improve health outcomes. Activities would center on targeted areas of Alto Solimoes. There are five components to the project. The first component consists of Policy and Institutional Strengthening for Regional and Cross-sectoral Development. Consists of four sets of activities. The first will center on policy development and institutional strengthening, while the remaining three sets of activities will focus on institutional, logistical and informational support for the execution of the project as well as the State's Green Free Zone Program. The second component consists of Promotion of Competitive Sustainable Development Production. Consists of four sub-components aimed at promoting the sustainable and equitable development of the Alto Solimaes Region by fostering the sustainable use of its renewable natural resources and putting in place an institutional and policy framework. The third component consists of Water Supply and Sanitation (WSS). Consists of four sub-components to develop and implement a (i) new institutional, regulatory, legal, operational and financial framework for WSS service provision, and (ii) new service delivery models and approaches for urban and rural WSS and urban solid waste disposal in Alto Solimoes. The fourth component consists of Health. Consists of two sub-components to develop the know-how, instruments and information environment to improve the performance and sustainability of publicly-financed health services in the State of Amazonas. Finally the fifth component consists of the Project Management. Supports the overall project coordination and supervision, and will help to strengthen the effectiveness and quality of project operations.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0000488"><narrative>State of Amazonas</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0000487"><narrative>Companhia de Desenvolvimento do Estado do Amazonas (CIAMA)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2004-11-16">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2008-02-26">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2014-06-25"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2014-06-25"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Marianne Grosclaude</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>mgrosclaude@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006318997" />
						<name><narrative>Santo Antônio do Içá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.0899501 -68.759193</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319295" />
						<name><narrative>Amaturá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.3892601 -68.226982</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319299" />
						<name><narrative>Atalaia do Norte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-5.6644802 -71.827759</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319303" />
						<name><narrative>Benjamin Constant</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-5.6483698 -70.406853</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319315" />
						<name><narrative>Fonte Boa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-2.4959099 -66.266228</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319325" />
						<name><narrative>Jutai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-4.65485 -68.280273</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319342" />
						<name><narrative>São Paulo de Olivença</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-4.6508598 -69.581413</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319345" />
						<name><narrative>Tabatinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-3.96298 -69.602654</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319347" />
						<name><narrative>Tonantins</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-2.64094 -67.846069</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="12220" percentage="17" xml:lang="en"/><sector vocabulary="1" code="14020" percentage="38" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="45" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="33.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="43.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="4.00000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="8.00000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="11" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="11" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="11" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="11" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000083" percentage="22" xml:lang="en"><narrative>Renewable Natural Resources Asset Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="8" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="11" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000637" percentage="8" xml:lang="en"><narrative>Child Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="67" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000636" percentage="8" xml:lang="en"><narrative>Adolescent Health</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000835" percentage="11" xml:lang="en"><narrative>Landscape Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000632" percentage="17" xml:lang="en"><narrative>Health Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="34" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="34" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000834" percentage="11" xml:lang="en"><narrative>Biodiversity</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="34" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">274653.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">274653.5900</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">274653.6000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">685346.4100</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">685346.4100</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">685346.4000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">533333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">533333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">533333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">533333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">533333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">833333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">833333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">526666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">526666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">526666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">481666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">481666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">481666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">481666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">481666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">481666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">274653.5900</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">274653.5900</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">274653.6000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">166666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">685346.4100</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">685346.4100</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">685346.4000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">533333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">533333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">533333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">533333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">533333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">833333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">833333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">833333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">833333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">833333.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">833333.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">666666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">526666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">526666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">526666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">500000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">481666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">481666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">481666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2008-02-29"/><value value-date="2008-02-29">24250000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-95216</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">60625</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">823961</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">152004</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-08-31"/><value value-date="2009-08-31">1627869</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">2651695</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-08-31"/><value value-date="2010-08-31">1875061</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-02-28"/><value value-date="2011-02-28">1905333</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">1985369</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-07-31"/><value value-date="2011-07-31">1830252</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">1790864</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-02-29"/><value value-date="2012-02-29">2526306</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">2036145</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-07-31"/><value value-date="2012-07-31">1172189</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">1562154</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">1493281</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">741577</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-79900</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-10-31"/><value value-date="2008-10-31">-60625</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-06-30"/><value value-date="2009-06-30">-12327</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-12-31"/><value value-date="2009-12-31">-12977</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-06-30"/><value value-date="2010-06-30">-7139</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-12-31"/><value value-date="2010-12-31">-25993</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-06-30"/><value value-date="2011-06-30">-21133</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">-29184</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">-66997</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-12-31"/><value value-date="2012-12-31">-81568</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-66473</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-54950</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-44980</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-39932</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-38697</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-45708</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-64490</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-89672</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-109121</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-112065</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-121824</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-167605</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-179489</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-145720</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-99721</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-26229</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-12607</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-7869</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-9143</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-54105</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-106704</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-86602</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-59201</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-28766</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">-979663</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-1011921</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-1011921</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-1011921</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-06-30"/><value value-date="2015-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-1007922</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-988833</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P083997"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P083997?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P083997"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Vaccination coverage (Tetravalente, and Hepatitis B) increased to 95% in urban areas
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="85.80"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="95.00">

</target>
<actual value="99.70">
<comment><narrative>
This result indicator cannot be directly attributed to the project.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
At least 50% of regional referrals for specialized care managed by CRM
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="0.00"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of people in urban areas provided with access to Improved Water Sources under the project
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="0.00"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="58828.00">

</target>
<actual value="0.00">
<comment><narrative>
Civil works for water supply almost completed. Actual number of connections to be assessed in September 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Nine municipalities participating in the new urban WSS service delivery model
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="0"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="9">

</target>
<actual value="9">
<comment><narrative>
Consortium established (and CNPJ emitted). Operation of the consortium still to be agreed by municipalities.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State, Regional and/or Municipal WSS institutional and WSS plans and regulatory arrangements elaborated for 3 municipalities in theregion
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="0.00"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="3.00">

</target>
<actual value="0.00">
<comment><narrative>
Not completed at Project closing (establishment and operation of the WSS consortium), further dialogue and support needed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Regional management office (RMO) established and providing training and technical assistance to targeted populations in SD, WSS andHealth
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="Not established"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="Established and functioning">

</target>
<actual value="Established">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Health facilities constructed, renovated, and/or equipped (number)
</narrative></title>
<baseline year="2008" iso-date="2008-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2008-09-30" />
<period-end iso-date="2012-06-30" />
<target value="3.00">

</target>
<actual value="2.00">
<comment><narrative>
Civil works completed in the hospital of Atalaia and Benjamin. HGUT not completed. Hospital waste treatment issue still to beresolved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
30 additional community associations created or consolidated
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="0.00"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="30.00">

</target>
<actual value="28.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
100 staff from state agencies trained and equipped to provide technical assistance to productive small and micro businesses
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="0"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="100">

</target>
<actual value="60">
<comment><narrative>
No further training planned due to lack of project funding.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Creation of the Inter-Municipal Health Consortium, with financial management functions
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="Not existent"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="Operational">

</target>
<actual value="Established and operating">
<comment><narrative>
Consortium established and it has started to operate.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Three productive chains consolidated
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="0.00"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="3.00">

</target>
<actual value="0.00">
<comment><narrative>
T
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Cross-sectoral and joint data base drawing on baseline survey established for a sample of targeted communities
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="Not established"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="Established">

</target>
<actual value="Not done">
<comment><narrative>
This activity was dropped sometime during implementation.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Average PSF coverage in targeted urban areas increased from 55% to 65%
</narrative></title>
<baseline year="2008" iso-date="2008-03-11" value="54.70"></baseline>
<period>
<period-start iso-date="2008-03-11" />
<period-end iso-date="2012-06-30" />
<target value="65.00">

</target>
<actual value="60.80">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
1,500 families trained to improve product quality and business management skills
</narrative></title>
<baseline year="2008" iso-date="2008-11-03" value="0 families"></baseline>
<period>
<period-start iso-date="2008-11-03" />
<period-end iso-date="2012-06-30" />
<target value="1500 families">

</target>
<actual value="2,000">
<comment><narrative>
Indigenous and non-indigenous families have received training as part of the identification, preparation and implementation ofproductive and micro-subproject proposals. Estimated a quarter of community members involved in training, so far.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:44" hierarchy="1"><iati-identifier>44000-P127463</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Strengthening Service Delivery for Growth, Poverty Reduction and Enviromental Sustainability in the State of Ceará PforR</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Program Development Objective (PDO) is to support the Government to improve public service delivery particularly in the areas of skills development, family assistance and water quality. The operation will continue the broad approach pioneered under the SWAps,combining support for select sector interventions with capacity building to strengthen the efficiency and quality of public servicedelivery. The thrust of Bank support in each area will be to align the incentives of sector secretariats with the Government's strategic objectives, to reinforce collaboration among public agencies and with the private sector and to strengthen evaluationand feedback loops, including through citizen participation and impact evaluation. ]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Program to Strengthen Service Delivery in Skills Development, Early Childhood Development, and Water Quality Project for Brazil is to support the Government to improve public service delivery particularly in the areas of skills development, family assistance and water quality. The operation has two complementary components, a US$ 315 million Program using the Program-For-Results, or PforR instrument (Program), and a US$ 35 million technical assistance component using the Investment Project Financing (IPF) instrument. The program consists of government expenditure programs in vocational training, family assistance and water quality amounting to US$ 381 million. The technical assistance component consists exclusively of high quality firm and individual consulting services and non-consulting services and comprises support for: i) cross-cutting public sector management functions; ii) sector-specific public sector management functions; and iii) strengthening fiduciary systems. Its purpose is capacity building. In several cases, technical assistance inputs will be required to meet Disbursement Linked Indicator (DLIs). The Government's record in executing technical assistance is sound and it will prioritize the processing of those activities necessary for DLI compliance.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0007111"><narrative>State of Ceará</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0007110"><narrative>SEPLAG/IPECE</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-12-18">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2013-11-21">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2019-01-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2019-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Tugba Gurcanlar</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>tgurcanlar@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="14010" percentage="40" xml:lang="en"/><sector vocabulary="1" code="32110" percentage="20" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="20" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="20" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="YZ" percentage="20.0000000" xml:lang="en"><narrative>FY17 - Other Industry, Trade and Services</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000024" percentage="25" xml:lang="en"><narrative>Enterprise Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="16" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="8" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="25" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="15" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="5" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="15" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="16" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="25" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="5" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="16" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="8" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="25" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="5" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">350000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-3486581</value><description xml:lang="en"><narrative>Total Commitment Cancellations in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">94587500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-07-31"/><value value-date="2014-07-31">7000000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">18594000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">19211112</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">45234260</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">12327528</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">46818000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">23442000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">57100628</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">20100000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">0</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">1284803</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">353577</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">462255</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">0</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-07-31"/><value value-date="2019-07-31">-2244</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-875000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-495435</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-435312</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-572585</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-742909</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-1304204</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-2200249</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-2624019</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-3370381</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-4659058</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-5634167</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-5995678</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-4784432</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-4127586</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-1799871</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-1569209</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-1510755</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-2260856</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-7940406</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-9242810</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-10125704</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-9837912</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-8815844</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-7729417</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-7248502</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-2364688</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-2539688</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-3004538</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-3004538</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-3484815</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-4615672</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-6094310</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-6680360</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-8107876</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-8610376</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-8662835</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-8662835</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-8662835</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-8662835</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127463"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P127463?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127463"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Family Assistance
</narrative></title>
<baseline year="2013" iso-date="2013-11-21" value="0.00"></baseline>
<period>
<period-start iso-date="2013-11-21" />
<period-end iso-date="2017-06-30" />
<target value="10.00">
<comment><narrative>
&lt;p&amp;gt;The targets for this indicator were revised to 7 percent in year 3 (from 15%)&amp;nbsp;and 10 percent (from 25%) in year 4 in March 2017.&lt;/p&amp;gt;

&lt;p&amp;gt;&amp;nbsp;&lt;/p&amp;gt;
</narrative></comment>
</target>
<actual value="11.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:45" hierarchy="1"><iati-identifier>44000-P148083</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>RS: Strengthening Fiscal and Water Resources Management DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Project Development Objective is to strengthen fiscal management and to support government's effort towards integrated water resources management]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Strengthening Fiscal and Water Resources Management Development Policy Loan Project for Brazil is to improve government's capacity to mitigate economic volatility in the State of Rio Grande do Sul by supporting measures to increase resources available to the government and to reinforce the Integrated Water Resource Management framework. There are 2 pillars the Bank will be focusing on. (1) Strengthening fiscal management pillar will contribute to strengthening the state?s investment capacity, while the irrigation and water resources management pillar will support strengthening economic, logistical and energy infrastructure, while ensuring environmental sustainability. The fiscal pillar aims to promote savings in expenditures or increase revenues, which will ultimately increase the resources available for investment. (2) Irrigation and water resources management pillar will focus on promoting sound irrigation policies and strengthening the State Water Resources Management System, enhancing capacity for planning and operation of water infrastructure. This operation is connected with the Bank's broader goals since it aims to reduce macroeconomic volatility which disproportionately hits the poor, while the second pillar is targeted to more impoverished regions and families in the bottom 40 percent of the income distribution.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0016962"><narrative>Estado do Rio Grande do Sul</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0016961"><narrative>Secretaria da Fazenda - RS</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2014-05-22">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-06-27">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Antonio Nucifora</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>anucifora@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="51010" percentage="50" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="50" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="60.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AI" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Irrigation and Drainage</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Water Supply, Sanitation and Waste Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="38" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000114" percentage="13" xml:lang="en"><narrative>Tax policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="38" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="38" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000413" percentage="6" xml:lang="en"><narrative>Debt Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="32" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="32" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000412" percentage="13" xml:lang="en"><narrative>Domestic Revenue Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="19" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000011" percentage="19" xml:lang="en"><narrative>Fiscal Policy</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="6" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="13" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000111" percentage="6" xml:lang="en"><narrative>Fiscal sustainability</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="13" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-12-31 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">280000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-31 00:00:00.0000000-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">280000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">280000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">280000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-10-31"/><value value-date="2014-10-31">-700000</value><description xml:lang="en"><narrative>Total Interest Repayment in October Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-1052304</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-1330933</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1542956</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-2118044</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-2618467</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-2962400</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-2970411</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-4236089</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-4575278</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-4832318</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-3870865</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-2026081</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-1374104</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-1282125</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-1205396</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-2493803</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-6837614</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-7576416</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-8344499</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-8313625</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-7123214</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-6730210</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-5975361</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-280000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-280000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-280000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-280000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-3220000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-3220000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-6720000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-6720000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-2800000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-2800000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-4200000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-4200000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-5600000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-5600000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-5600000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P148083"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P148083?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P148083"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of managerial cost reports prepared by Government agencies
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="14.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the share of tax arrears recovered within 60 days of their generation
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="20.80"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="27.00">

</target>
<actual value="21.32">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New hydro-meteorological stations installed in key river basins with information analyzed by the State
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of medium and small farmers that have adhered to the More Water, More Income Program
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="274.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="3300.00">

</target>
<actual value="1938.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the share of goods procured, expressed as a percentage of the total value of goods, using price information from the electronic fiscal invoice database.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="46.60">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the share of goods procured, expressed as a percentage of the total value of goods, using price information from the electronic fiscal invoice database.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="34.70">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of medium and small farmers that have adhered to the More Water, More Income Program
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="274.00"><comment><narrative>Baseline (2012) = 217 (small landholders) and 57 (medium landholders)</narrative></comment></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="3300.00">
<comment><narrative>
Target (2015) = 3,000 (small landholders) and 300 (medium landholders)
</narrative></comment>
</target>
<actual value="2489.00">
<comment><narrative>
1,988 (small landholders) and 501 (medium landholders)
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River basin plans completed, discussed and approved by the river basin committees, with the supervision and facilitation of the DRHteam.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="1.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="12.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of tax expenditure measures under Government control evaluated
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="0.00">
<comment><narrative>
Not Available
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of managerial cost reports prepared by Government agencies
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="14.00">

</target>
<actual value="2.00">
<comment><narrative>
Based on agencies that sought help from the Controller's office
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New hydro-meteorological stations installed in key river basins with information analyzed by the State
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="80.00">

</target>
<actual value="12.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Increase the share of tax arrears recovered within 60 days of their generation
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="20.80"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="27.00">

</target>
<actual value="22.90">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
River basin plans completed, discussed and approved by the river basin committees, with the supervision and facilitation of the DRHteam.
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="1.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="12.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of tax expenditure measures under Government control evaluated
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="25.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New policy instrument to manage contingent liabilities made effective
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
New policy instrument to manage contingent liabilities made effective
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2015-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:51" hierarchy="1"><iati-identifier>44000-P127245</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The proposed Project Development Objective is to support institutional capacity strengthening in the Municipality of Rio de Janeiroto enhance public services delivery, including in health, education and environmental management.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Rio de Janeiro Strengthening Public Sector Management Technical Assistance Project for Brazil is to support institutional capacity strengthening in the Municipality of Rio de Janeiro to enhance public service delivery, including in health, education and environmental management. The project has 4 components. (1) Fiscal and public investment management component will provide support for the improving medium term fiscal and public investment management process through the integration of impact evaluation results, performance information and proposed policy changes in the planning and budget process; and the carrying out of diagnostic evaluations, and the implementation of the recommended actions resulting from said evaluations. (2) Innovating in service provision component will provide further support to innovations introduced that have proven effective in improving health and education service delivery. (3) Strengthening social governance and monitoring and impact evaluation component will focus on strengthening the program operational systems, as well as on promoting innovations in the way sectoral policies are coordinated in order to promote the integration of secured favelas. (4) Innovating environmental management component will develop the institutional framework for the development and implementation of the monitoring system; support technical assistance, equipment, and training to ensure an effective data collection, modeling, reporting and monitoring and evaluation.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0006924"><narrative>Municipality of Rio de Janeiro</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0006924"><narrative>Municipality of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0006925"><narrative>Municipal Secretariat of Finance</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0006925"><narrative>Municipal Secretariat of Finance</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-02-24">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2013-06-14">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2018-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2018-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Fabiano Silvio Colbano</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>fcolbano@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>





<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003451190" />
						<name><narrative>Rio de Janeiro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.902781 -43.2075</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><sector vocabulary="1" code="12110" percentage="61" xml:lang="en"/><sector vocabulary="1" code="15131" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15126" percentage="11" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="10" xml:lang="en"/><sector vocabulary="1" code="41010" percentage="7" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="31.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SG" percentage="22.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="7" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="27" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000652" percentage="15" xml:lang="en"><narrative>Education Financing</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="27" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="7" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="7" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="5" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="31" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="30" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="5" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000651" percentage="15" xml:lang="en"><narrative>Access to Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000063" percentage="31" xml:lang="en"><narrative>Health Systems and Policies</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="27" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">433333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">433333.3700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">416666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">416666.6300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">333333.3700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">166666.6300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-07-01"/>
<period-end iso-date="2013-07-31"/>
<value currency="USD" value-date="2013-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-08-01"/>
<period-end iso-date="2013-08-31"/>
<value currency="USD" value-date="2013-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-09-01"/>
<period-end iso-date="2013-09-30"/>
<value currency="USD" value-date="2013-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-10-01"/>
<period-end iso-date="2013-10-31"/>
<value currency="USD" value-date="2013-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-11-01"/>
<period-end iso-date="2013-11-30"/>
<value currency="USD" value-date="2013-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-12-01"/>
<period-end iso-date="2013-12-31"/>
<value currency="USD" value-date="2013-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-01-01"/>
<period-end iso-date="2014-01-31"/>
<value currency="USD" value-date="2014-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">16200000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-01-31"/><value value-date="2018-01-31">-2025000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in January Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-1733687</value><description xml:lang="en"><narrative>Total Commitment Cancellations in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">143645</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">1384160</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">1890415</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">1408915</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-10-31"/><value value-date="2017-10-31">1570845</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">1256965</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">1225433</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-06-30"/><value value-date="2018-06-30">1252442</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">1706584</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">601910</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-12-31"/><value value-date="2014-12-31">-40500</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-618</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-4204</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-17898</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-30591</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-58910</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-113499</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-180617</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-185632</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-141524</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-117141</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-43674</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-35840</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-33000</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-52784</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-202700</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-230960</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-247332</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-234262</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-203563</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-172568</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-156260</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-106990</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-203237</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-327980</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-407623</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127245"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P127245?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P127245"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:51" hierarchy="1"><iati-identifier>44000-P147913</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Acre: Strengthening Public Policies DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[To enhance the efficiency of public sector administration, particularly in the areas of education and gender equality.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[This document describes a two-tranche Development Policy Loan (DPL), in the amount of USD 250 million to the Brazilian State of Acre. The purpose of this operation is to enhance the efficiency of public sector administration, particularly in the areas of education and gender equality. This goal will be pursued by: (i) improving planning, monitoring and evaluation of development programs to increase their results-orientation and introducing transparent procurement and asset management practices; and (ii) improving monitoring of learning performance of students in the state?s public schools and aligning the state?s gender policy and institutional framework with gender policy reforms at the national level. The objectives of this operation are fully aligned with the World Bank Group?s goals of eradicating extreme poverty and promoting shared prosperity. The Government of Acre further expands on the Federal Government?s efforts to eradicate extreme poverty through its own Plan to Eradicate Extreme Poverty (Plano Acre sem Miseria). This policy seeks to improve the social mobility of families living in poverty by helping them to engage in income generating activities and access public services. This operation supports these goals by promoting improved service delivery and social and productive inclusion.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0016762"><narrative>Government of Acre</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0016761"><narrative>The Secretariat of Planning</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-12-12">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2013-12-05">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2015-07-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2015-07-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Lorena Vinuela</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>lvinuela@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="67.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EZ" percentage="17.0000000" xml:lang="en"><narrative>FY17 - Other Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="34" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="34" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="18" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="34" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000411" percentage="34" xml:lang="en"><narrative>Public Expenditure Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="16" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2015-07-31 00:00:00.0000000-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">250000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-31 00:00:00.0000000-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">250000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">250000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">130625000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-01-31"/><value value-date="2014-01-31">19375000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">100000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-625000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-495474</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-969944</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-1043264</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-1201111</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-1453472</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-1891111</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2350486</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2670556</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2865833</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-4076111</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-4462153</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-4103836</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-3141730</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-1625566</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-1080419</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-1035664</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-1034355</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-3318791</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5524775</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-6224674</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-6290311</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-6063989</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-4985181</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-4838854</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-4075187</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-5950000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147913"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147913?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147913"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of tender value completed through the GRP's procurement process
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50.00">

</target>
<actual value="58.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of single source purchase (below BRL 8,000) value completed and recorded through the GRPs procurement process
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="90.00">

</target>
<actual value="100.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of yearly development targets completed
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="75.80"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="80.00">

</target>
<actual value="80.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women served by the Regional Specialized Women's Service in the regional hubs located in the municipalities of Sena Madureira, and Rio Branco
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="1188.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="1366.00">

</target>
<actual value="2033.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of students in the third, fifth and ninth grades of basic education and third grade of secondary education in the state's public school network taking the yearly assessment
</narrative></title>
<baseline year="2012" iso-date="2012-03-31" value="26474.00"></baseline>
<period>
<period-start iso-date="2012-03-31" />
<period-end iso-date="2015-12-31" />
<target value="32000.00">

</target>
<actual value="27020.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of PPA programs evaluated through SIPLAGE
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of Secretariats with operational GRP processes for procurement and asset management
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="2.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="24.00">

</target>
<actual value="49.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:57" hierarchy="1"><iati-identifier>44000-P130682</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>BR Espirito Santo Integrated Sustainable Water Management Project</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The objectives of the Project are to: (a) improve sustainable water resources management, and (b) increase access to sanitation in the Borrower's territory.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objectives of the Espirito Santo Integrated Sustainable Water Management Project for Brazil are to: (a) improve sustainable water resources management, and (b) increase access to sanitation in the Borrower's territory. The project has four components. The first component, integrated water management and disaster risk management will improve water resource management and metropolitan coordination and planning mechanisms for the management of urban water, and develop adequate planning and monitoring instruments for risk reduction as well as preparedness and response to adverse natural events. The second component, efficient water supply services and increased access to sanitation will increase the efficiency of water supply services and the coverage of sewage collection and treatment services in the Borrower's territory. The third component, watershed management and restoration of forest cover will improve the quality of surface and coastal waters through coordinated interventions in selected watersheds. The fourth component, project management, supervision, and institutional strengthening will strengthen: (a) the state's capacity in project management and implementation, including the provision of training and technical assistance for the carrying out of activities associated with project execution, monitoring and evaluation, and the provision of technical, administrative, and financial management support for project supervision; and (b) the capacity of Espirito Santo's regulatory agency for water, sanitation, and road infrastructure (ARSI) by developing an economic and financial regulatory model for water supply and sewerage services.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0009213"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0009213"><narrative>State of Espirito Santo</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0009214"><narrative>Secretaria de Estado de Economia e Planejamento</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0009214"><narrative>Secretaria de Estado de Economia e Planejamento</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0009215"><narrative>CESAN - Companhia Espirito Santense de Saneamento</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0009215"><narrative>CESAN - Companhia Espirito Santense de Saneamento</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-02-14">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-03-28">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2024-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2024-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Viviane Virgolim Zamian</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>vvirgolim@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>







<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003463930" />
						<name><narrative>Estado do Espirito Santo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-20 -40.75</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="14022" percentage="33" xml:lang="en"/><sector vocabulary="1" code="14021" percentage="33" xml:lang="en"/><sector vocabulary="1" code="14010" percentage="8" xml:lang="en"/><sector vocabulary="1" code="14030" percentage="8" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="8" xml:lang="en"/><sector vocabulary="1" code="43042" percentage="5" xml:lang="en"/><sector vocabulary="1" code="14015" percentage="5" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WF" percentage="11.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Water, Sanitation and Waste Management</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="41.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AT" percentage="6.00000000" xml:lang="en"><narrative>FY17 - Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WA" percentage="42.0000000" xml:lang="en"><narrative>FY17 - Sanitation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="7" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000821" percentage="22" xml:lang="en"><narrative>Air quality management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="27" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="22" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="7" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="3" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="7" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="66" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000823" percentage="22" xml:lang="en"><narrative>Soil Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000812" percentage="26" xml:lang="en"><narrative>Adaptation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="66" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000725" percentage="7" xml:lang="en"><narrative>Land Administration and Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000822" percentage="22" xml:lang="en"><narrative>Water Pollution</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000851" percentage="27" xml:lang="en"><narrative>Water Institutions, Policies and Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="3" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000085" percentage="27" xml:lang="en"><narrative>Water Resource Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000082" percentage="66" xml:lang="en"><narrative>Environmental Health and Pollution Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">2666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">2666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">833333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">833333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">833333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">7333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">7333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">7333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">6000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">6000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">6000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">1000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">1000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">1000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">1666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">1666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">1666666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">1666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">1666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">1666666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">6666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">6666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">6666666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">225000000</value><description xml:lang="en"><narrative>Total Commitment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-52600000</value><description xml:lang="en"><narrative>Total Commitment Cancellations in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">562500</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">5000000</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-04-30"/><value value-date="2017-04-30">1049096</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">1372179</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-04-30"/><value value-date="2018-04-30">7000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">7991284</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-04-30"/><value value-date="2019-04-30">2888674</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">3445984</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">378263</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">418342</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">438354</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">818119</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">2531214</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">1555038</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-04-30"/><value value-date="2020-04-30">1354780</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">508490</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">570847</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">1207642</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">1100583</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-01-31"/><value value-date="2021-01-31">1030493</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">1270008</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">4745131</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">1409770</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">4012680</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-10-31"/><value value-date="2021-10-31">2240291</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">1440037</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">1610600</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-01-31"/><value value-date="2022-01-31">1115017</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">1268027</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">2032825</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-04-30"/><value value-date="2022-04-30">2444470</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">1201392</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">7620018</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-07-31"/><value value-date="2022-07-31">3586231</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">2082220</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-10-31"/><value value-date="2022-10-31">2579606</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">8100033</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">4498163</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">3801724</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-04-30"/><value value-date="2023-04-30">6279629</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">7000799</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">2696324</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">4130337</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">5541497</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">6358124</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-10-31"/><value value-date="2023-10-31">3750081</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">4796306</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">4804932</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-01-31"/><value value-date="2024-01-31">3157904</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">7254282</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-04-30"/><value value-date="2024-04-30">5301246</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">7142316</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">5906099</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-12-31"/><value value-date="2015-12-31">-562500</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-1311</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-4029</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-40543</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-61489</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-02-28"/><value value-date="2018-02-28">-75513</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-177623</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-02-28"/><value value-date="2019-02-28">-242035</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-433420</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-435118</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-446516</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-210151</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-197603</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-02-28"/><value value-date="2022-02-28">-249431</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-447224</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-2114055</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-3115225</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-4404400</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-5132026</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-5179464</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-4550448</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-4334085</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-5738</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-08-31"/><value value-date="2016-08-31">-5738</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-02-28"/><value value-date="2017-02-28">-58238</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-08-31"/><value value-date="2017-08-31">-69358</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-2066568</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-2376395</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-2576036</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-2576036</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-2576036</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130682"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P130682?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P130682"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
CESAN's operating ratio remains = 0.90
</narrative></title>
<baseline year="2012" iso-date="2012-12-28" value="0.85"></baseline>
<period>
<period-start iso-date="2012-12-28" />
<period-end iso-date="2024-06-27" />
<target value="= 0.90">
<comment><narrative>
Achieved: 95 percent.  
Indicator conveyed the operation ratio is de division of the company's operating expenses by its operating revenues.
</narrative></comment>
</target>
<actual value="0.86">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Direct project beneficiaries
</narrative></title>
<baseline year="2014" iso-date="2014-06-22" value="13,000.00"></baseline>
<period>
<period-start iso-date="2014-06-22" />
<period-end iso-date="2024-06-25" />
<target value="2,630,000.00">
<comment><narrative>
Exceeded: 15 percent. 
The indicator conveyed the investments in sewerage, urban water management, environmental and water resources management benefited the GVMR's population of 1.7 million with improved drinking water quality, as well as the population of the river basins where the Project intervened (770,000). Sewerage investments ensured adequate wastewater collection and treatment in: (i) Vila Velha and Cariacica (GVMR), and (ii) 13 municipalities in the interior, for a total of 166,000 people. At closing, the number of direct beneficiaries was estimated at 2,630 million people. With the inclusion of planning and regulation instruments for integrated water management, the Project benefited the overall State population, with the objective of securing water availability and quality.
</narrative></comment>
</target>
<actual value="3,040,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage increase of disaster response groups in the civil defense
</narrative></title>
<baseline year="2020" iso-date="2020-11-07" value="0.00"></baseline>
<period>
<period-start iso-date="2020-11-07" />
<period-end iso-date="2024-06-27" />
<target value="60.00">
<comment><narrative>
Exceeded: 10 percent.
</narrative></comment>
</target>
<actual value="66.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of intermediate and senior officers trained in risk and disaster management tools
</narrative></title>
<baseline year="2020" iso-date="2020-11-07" value="0.00"></baseline>
<period>
<period-start iso-date="2020-11-07" />
<period-end iso-date="2024-06-27" />
<target value="70.00">
<comment><narrative>
Exceeded: 35 percent.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Percentage of territory within the State of Espirito Santo monitored by the hydromet network
</narrative></title>
<baseline year="2014" iso-date="2014-06-24" value="30.00"></baseline>
<period>
<period-start iso-date="2014-06-24" />
<period-end iso-date="2024-06-27" />
<target value="95.00">
<comment><narrative>
Achieved: 100 percent.
</narrative></comment>
</target>
<actual value="95.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Volume(mass) of BOD pollution load removed by treatment plant under the project
</narrative></title>
<baseline year="2014" iso-date="2014-06-22" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-22" />
<period-end iso-date="2024-06-25" />
<target value="2,043.00">
<comment><narrative>
Exceeded: 32 percent. 2,712 ton/year of BOD pollution load was removed by treatment plant under the Project through the 14 sewerage systems works, in 13 municipalities (Annex 1 B), executed by Project closing. Ongoing works in five sewerage systems, which execution has continued as scheduled (financed by Government), will remove an additional 2,444 ton/year of BOD, increasing the total BOD pollution load removed by treatment plants (totally and partially financed by the Project) to 5,156 ton/year. Ongoing works, conclusion date and estimate BOD removed: Castelo, March 2025, 488 ton/year; Cariacica (Nova Rosa da Penha), December 2025, 374 ton/year; Vila Velha (Araças), June 2025, 1,334 ton/year; Vila Velha (Grande Terra Vermelha), December 2025, 947 ton/ year. 
The indicator conveyed the reduction in Biochemical Oxygen Demand (BOD) pollution loads resulting from Component 2 investments. The BOD pollution loads were calculated using (i) influent BOD concentration as sampled and measured
</narrative></comment>
</target>
<actual value="2,712.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Land area restored or re/afforested or under sustainable land management practices
</narrative></title>
<baseline year="2020" iso-date="2020-11-07" value="2,721.00"></baseline>
<period>
<period-start iso-date="2020-11-07" />
<period-end iso-date="2024-06-27" />
<target value="5,850.00">
<comment><narrative>
Exceeded: 1 percent. 
The indicator conveyed the cumulative area that was covered by the payment for environmental services for conservation and/or reforestation.
</narrative></comment>
</target>
<actual value="5,924.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of Espirito Santo territory covered by a hydrometeorological monitoring station in the State network
</narrative></title>
<baseline year="2014" iso-date="2014-06-24" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-24" />
<period-end iso-date="2024-06-27" />
<target value="90.00">
<comment><narrative>
Exceeded:  1 percent.
</narrative></comment>
</target>
<actual value="91.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of plans, studies and systems carried out/executed under the project following an integrated approach
</narrative></title>
<baseline year="2014" iso-date="2014-06-22" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-22" />
<period-end iso-date="2024-06-25" />
<target value="12.00">
<comment><narrative>
Exceeded: 8 percent. The following studies and plans were prepared: (i) State of Espirito Santo Water Resources Plan; (ii) Eight Watershed Plans (Itabapoana, Itapemirim, Novo, Benevente, Jucu, Santa Maria da Vitória, São Mateus, e Itaúna); (iii) Vitoria Metropolitan Region Integrated Urban Water Plan; (iv) Water and Sanitation Tariffs Restructuration and Accounting Regulation; (iv) Hydrometeorological Data Integration System; (v) Integrated Civil Defense and Protection System . The indicator conveyed the number of plans, studies and systems described under Components 1, 2 and 3 that had the participation of three or more institutions of the state, federal and/or municipal governments, as well as civil society.
</narrative></comment>
</target>
<actual value="13.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
People provided with access to ‘improved sanitation facilities” under the proj.
</narrative></title>
<baseline year="2014" iso-date="2014-06-22" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-22" />
<period-end iso-date="2024-06-25" />
<target value="116,504.00">
<comment><narrative>
Exceeded: 13 percent. 
The indicator conveyed the Cumulative number of people that had access to sewerage connection as a result of Project investments.
</narrative></comment>
</target>
<actual value="132,164.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women participating in training aimed at economic and social empowerment under the Mangarai River pilot project
</narrative></title>
<baseline year="2014" iso-date="2014-06-24" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-24" />
<period-end iso-date="2024-06-27" />
<target value="150.00">
<comment><narrative>
Exceeded: 5 percent.
</narrative></comment>
</target>
<actual value="158.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
New household sewer connections constructed under the project
</narrative></title>
<baseline year="2014" iso-date="2014-06-24" value="0.00"></baseline>
<period>
<period-start iso-date="2014-06-24" />
<period-end iso-date="2024-06-27" />
<target value="27,697.00">
<comment><narrative>
Exceeded: 17 percent. 
Indicator conveyed the cumulative number of piped household sewerage connections built under the Project.
</narrative></comment>
</target>
<actual value="32,506.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
GRM: percentage of claims received and addressed in a timely manner
</narrative></title>
<baseline year="2023" iso-date="2023-02-24" value="80.00"></baseline>
<period>
<period-start iso-date="2023-02-24" />
<period-end iso-date="2024-06-27" />
<target value="85.00">
<comment><narrative>
Exceeded: 9 percent.
</narrative></comment>
</target>
<actual value="93.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:14:57" hierarchy="1"><iati-identifier>44000-P147695</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Enhancing Public Management for Service Delivery in Rio de Janeiro</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[Assist the Government of Rio de Janeiro (GORJ) in its efforts to enhance public management for the delivery of key public services for vulnerable populations by instituting new policies and regulations to improve: the medium term planning and monitoring of publicexpenditures (Policy Area 1); the accessibility, quality and affordability of urban mobility services for the poor (Policy Area 2);and the availability of targeted social services aimed at reducing domestic and gender based violence (Policy Area 3). This objective directly contributes to the poverty reduction and shared prosperity agendas, insofar as financially-sustainable and targeted urban mobility and social support services benefiting the poor and other populations at risk, such as women, enable more equitable access to economic and social opportunities, allowing the benefits of growth to be shared more widely.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Enhancing Public Management for Service Delivery in Rio de Janeiro Development Policy Operation for Brazil is to assist the Government of Rio de Janeiro (GORJ) in its efforts to enhance public management for the delivery of key public services for vulnerable populations by instituting new policies and regulations to improve: the medium term planning and monitoring of public expenditures (Policy Area 1); the accessibility, quality and affordability of urban mobility services for the poor (Policy Area 2); and the availability of targeted social services aimed at reducing domestic and gender based violence (Policy Area 3). This objective directly contributes to the poverty reduction and shared prosperity agendas, insofar as financially-sustainable and targeted urban mobility and social support services benefiting the poor and other populations at risk, such as women, enable more equitable access to economic and social opportunities, allowing the benefits of growth to be shared more widely.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0016499"><narrative>State of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0016500"><narrative>State Secretariat of Transportation (SETRANS)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0016501"><narrative>Casa Civil (Office of the Chief of Staff)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0016502"><narrative>Secretariat of Finance (SEFAZ)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0016503"><narrative>State Secretariat of Social Welfare and Human Rights (SEASDH)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-12-04">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2013-11-21">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2016-01-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2016-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Daniel Pulido</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>dpulido@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>






<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="21023" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15117" percentage="33" xml:lang="en"/><sector vocabulary="1" code="15170" percentage="33" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="50.0000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="14.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="18" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="41" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="18" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="14" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="9" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="18" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000022" percentage="100" xml:lang="en"><narrative>Jobs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="3" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="9" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="28" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000041" percentage="18" xml:lang="en"><narrative>Public Finance Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="9" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="3" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="14" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="28" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="28" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="18" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="28" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000071" percentage="41" xml:lang="en"><narrative>Urban Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="3" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000081" percentage="28" xml:lang="en"><narrative>Climate change</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="14" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="41" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2016-01-31 00:00:00.0000000-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">500000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-31 00:00:00.0000000-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">500000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">500000000</value><description xml:lang="en"><narrative>Total Commitment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">500000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-12-31"/><value value-date="2013-12-31">-1250000</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">-751667</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-08-31"/><value value-date="2014-08-31">-2011111</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-02-28"/><value value-date="2015-02-28">-2121111</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-08-31"/><value value-date="2015-08-31">-2287639</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-02-29"/><value value-date="2016-02-29">-2734444</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-3614722</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-4625556</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-4977500</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-5392222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-08-31"/><value value-date="2018-08-31">-6837778</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-8152222</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-08-31"/><value value-date="2019-08-31">-8647778</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-02-29"/><value value-date="2020-02-29">-6951111</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-08-31"/><value value-date="2020-08-31">-6041389</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-02-28"/><value value-date="2021-02-28">-2657778</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">-2337917</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-2274444</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">-3451689</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-02-28"/><value value-date="2023-02-28">-12337337</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-08-31"/><value value-date="2023-08-31">-14672826</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-16508134</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-15990681</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-14282401</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-12478199</value><description xml:lang="en"><narrative>Total Interest Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-11658443</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-02-29"/><value value-date="2024-02-29">-15625000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-08-31"/><value value-date="2024-08-31">-15625000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-02-28"/><value value-date="2025-02-28">-15625000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-08-31"/><value value-date="2025-08-31">-15625000</value><description xml:lang="en"><narrative>Total Loan Repayment in August Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-02-28"/><value value-date="2026-02-28">-15625000</value><description xml:lang="en"><narrative>Total Loan Repayment in February Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147695"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P147695?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P147695"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State prepares guidelines for the development of bicycle-public transit integration projects to be implemented by metropolitan municipalities and at least one (1) of these projects is implemented with
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="1.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least one (1) multimodal integration project is completed
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication in the internet of revenue estimates documents for the 2014 budget
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women benefiting from increased access to information and to social and legal services as per the provisions of the Lei Maria da Penha within the Supervia and Telefrico systems
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50000.00">

</target>
<actual value="64411.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the number of times in a year that the actual monthly cash balance has remained below the minimum threshold (set at 1.5 times the payroll amount)
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="3.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="2.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Inter-municipal bus lines in the RJMR (previously provided under permission regime) are in operation under new concession agreements incorporating performance monitoring
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New operations contract awarded for the Teleferico System incorporates performance monitoring, availability-based remuneration, and incentives for maximizing ancillary revenue; and results in a redu
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="5.00">

</target>
<actual value="14.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Budget directive issued for the 2015 budget cycle
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
At least one (1) multimodal integration project is completed
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="1.00">

</target>
<actual value="1.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Publication in the internet of revenue estimates documents for the 2014 budget
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Reduction in the number of times in a year that the actual monthly cash balance has remained below the minimum threshold (set at 1.5 times the payroll amount)
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="3.00"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="2.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of women benefiting from the integration of the  Supervia and Telefrico systems to the Casa Lilas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="0.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All PPP-related bidding documents, contracts and supporting analysis are published on a dedicated website in a timely manner
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Permanent Committee for the implementation of the PDTU, involving relevant government and civil society actors, meets at least four(4) times in its first year of existence and presents strategy for t
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="4.00">

</target>
<actual value="4.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
State prepares guidelines for the development of bicycle-public transit integration projects to be implemented by metropolitan municipalities and at least one (1) of these projects is implemented with
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="1.00">

</target>
<actual value="2.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Service reliability, fleet modernization and vehicle occupation requirements are properly monitored and enforced on inter-municipal bus concessions in operation (percentage of compliance)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between actual and estimated current revenues, measured as a share of the estimated revenues
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="6.60"></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="5.00">

</target>
<actual value="4.60">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Increase in the number of women benefiting from the integration of the  Supervia and Telefrico systems to the Casa Lilas
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2016-01-31" />
<target value="1000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
All PPP-related bidding documents, contracts and supporting analysis are published on a dedicated website in a timely manner
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The concession bidding documents will identify the bus lines to be sectioned or eliminated in order to prioritize integration with mass transit modes (name, current code, and in the cases of sectionin
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2016-01-31" />
<target value="19.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
New operations contract awarded for the Teleferico System incorporates performance monitoring, availability-based remuneration, and incentives for maximizing ancillary revenue; and results in a redu
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="5.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Inter-municipal bus lines in the RJMR (previously provided under permission regime) are in operation under new concession agreements incorporating performance monitoring
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="50.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
The concession bidding documents will identify the bus lines to be sectioned or eliminated in order to prioritize integration with mass transit modes (name, current code, and in the cases of sectionin
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2014-12-31" />
<target value="19.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Service reliability, fleet modernization and vehicle occupation requirements are properly monitored and enforced on inter-municipal bus concessions in operation (percentage of compliance)
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="0.00"></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="80.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the percentage of payments made after 30 days
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="3.60"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="9.20">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive report including current and prospective long-term commitments and liabilities associated to PPPs is published as scheduled
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the gap between actual and estimated current revenues, measured as a share of the estimated revenues
</narrative></title>
<baseline year="1900" iso-date="1900-01-01" value="6.60"></baseline>
<period>
<period-start iso-date="1900-01-01" />
<period-end iso-date="2014-12-31" />
<target value="5.00">

</target>
<actual value="2.30">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Annual Budget directive issued for the 2015 budget cycle
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Reduction in the percentage of payments made after 30 days
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="3.60"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="3.00">

</target>
<actual value="0.53">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of women benefiting from increased access to information and to social and legal services as per the provisions of the Lei Maria da Penha within the Supervia and Telefrico systems
</narrative></title>
<baseline year="2013" iso-date="2013-12-31" value="0.00"></baseline>
<period>
<period-start iso-date="2013-12-31" />
<period-end iso-date="2016-01-31" />
<target value="50000.00">

</target>
<actual value="74300.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Permanent Committee for the implementation of the PDTU, involving relevant government and civil society actors, meets at least four(4) times in its first year of existence and presents strategy for t
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="0.00"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="4.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
No transport project outside of the PDTU (i.e. not endorsed by PDTU) will be undertaken by the GoRJ.
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="No"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
A comprehensive report including current and prospective long-term commitments and liabilities associated to PPPs is published as scheduled
</narrative></title>
<baseline year="2012" iso-date="2012-12-31" value="No"></baseline>
<period>
<period-start iso-date="2012-12-31" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
No transport project outside of the PDTU (i.e. not endorsed by PDTU) will be undertaken by the GoRJ.
</narrative></title>
<baseline year="2013" iso-date="2013-09-30" value="No"></baseline>
<period>
<period-start iso-date="2013-09-30" />
<period-end iso-date="2014-12-31" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:15:03" hierarchy="1"><iati-identifier>44000-P126735</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Strengthening Public Management and Integrated Territorial Development</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The objective of the Project is to support the Borrower to improve service delivery through introducing performance-based management information technologies and an Integrated Territorial Development Approach in key public services.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Project is to support the Borrower to improve service delivery through introducing performance-based management information technologies and an Integrated Territorial Development Approach in key public services. The proposed project will have four components. The proposed activities will encompass the following areas: public financial management, metropolitan and territorial governance, housing and land regularization, education, health, environment and disaster risk management, and social development.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0006603"><narrative>State Government of Rio de Janeiro</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0006601"><narrative>Secretaria de Governo - Câmara Metropolitana (Grupo Executivo de Gestão Metropolitana - GEGM)</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0006602"><narrative>RJ State Secretariat for Finance (SEFAZ)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2012-03-15">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2014-02-12">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2017-06-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2017-06-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Emanuela Monteiro</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>emonteiro@worldbankgroup.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>




<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003451190" />
						<name><narrative>Rio de Janeiro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.902781 -43.2075</pos>
						</point>
						<exactness code="2"/>
						<location-class code="2" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319201" />
						<name><narrative>Mesquita</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.78993 -43.45966</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319198" />
						<name><narrative>Nova Iguacu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.68627 -43.50597</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322007" />
						<name><narrative>Belford Roxo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.70961 -43.382679</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322011" />
						<name><narrative>Cachoeiras de Macacu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.4874 -42.71146</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322019" />
						<name><narrative>Duque De Caxias</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.656811 -43.292858</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322021" />
						<name><narrative>Guapimirim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.58914 -42.9753</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322023" />
						<name><narrative>Itaborai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.756001 -42.873241</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322024" />
						<name><narrative>Itaguai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.854549 -43.81889</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322029" />
						<name><narrative>Japeri</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.665159 -43.60099</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322033" />
						<name><narrative>Mage</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.634899 -43.12056</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322035" />
						<name><narrative>Marica</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.9163 -42.822029</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322040" />
						<name><narrative>Nilopolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.82106 -43.427029</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322041" />
						<name><narrative>Niteroi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.91715 -43.083912</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322043" />
						<name><narrative>Paracambi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.61932 -43.735199</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322053" />
						<name><narrative>Queimados</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.724119 -43.574821</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322056" />
						<name><narrative>Rio Bonito</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.7439 -42.61916</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322065" />
						<name><narrative>Sao Goncalo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.81555 -43.041119</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322067" />
						<name><narrative>Sao Joao De Meriti</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.799271 -43.36496</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322074" />
						<name><narrative>Seropedica</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.73876 -43.708549</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006322077" />
						<name><narrative>Tangua</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-22.79184 -42.71941</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="15117" percentage="13" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="13" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="13" xml:lang="en"/><sector vocabulary="1" code="11321" percentage="13" xml:lang="en"/><sector vocabulary="1" code="12220" percentage="12" xml:lang="en"/><sector vocabulary="1" code="15129" percentage="9" xml:lang="en"/><sector vocabulary="1" code="21023" percentage="9" xml:lang="en"/><sector vocabulary="1" code="16030" percentage="9" xml:lang="en"/><sector vocabulary="1" code="74020" percentage="9" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="TC" percentage="9.00000000" xml:lang="en"><narrative>FY17 - Urban Transport</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="55.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="36" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000075" percentage="9" xml:lang="en"><narrative>Disaster Risk Management</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000711" percentage="39" xml:lang="en"><narrative>Urban Infrastructure and Service Delivery</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000533" percentage="1" xml:lang="en"><narrative>Forced Displacement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="8" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000523" percentage="13" xml:lang="en"><narrative>Social protection delivery systems</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000512" percentage="20" xml:lang="en"><narrative>Other Excluded Groups</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000752" percentage="3" xml:lang="en"><narrative>Disaster Risk Reduction</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000033" percentage="3" xml:lang="en"><narrative>Finance for Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="8" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="36" xml:lang="en"><narrative>Social Inclusion</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-02-01"/>
<period-end iso-date="2014-02-28"/>
<value currency="USD" value-date="2014-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-03-01"/>
<period-end iso-date="2014-03-31"/>
<value currency="USD" value-date="2014-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-04-01"/>
<period-end iso-date="2014-04-30"/>
<value currency="USD" value-date="2014-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-05-01"/>
<period-end iso-date="2014-05-31"/>
<value currency="USD" value-date="2014-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-06-01"/>
<period-end iso-date="2014-06-30"/>
<value currency="USD" value-date="2014-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-07-01"/>
<period-end iso-date="2014-07-31"/>
<value currency="USD" value-date="2014-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-08-01"/>
<period-end iso-date="2014-08-31"/>
<value currency="USD" value-date="2014-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-10-01"/>
<period-end iso-date="2014-10-31"/>
<value currency="USD" value-date="2014-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-11-01"/>
<period-end iso-date="2014-11-30"/>
<value currency="USD" value-date="2014-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-12-01"/>
<period-end iso-date="2014-12-31"/>
<value currency="USD" value-date="2014-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-01-01"/>
<period-end iso-date="2015-01-31"/>
<value currency="USD" value-date="2015-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-02-01"/>
<period-end iso-date="2015-02-28"/>
<value currency="USD" value-date="2015-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-03-01"/>
<period-end iso-date="2015-03-31"/>
<value currency="USD" value-date="2015-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-04-01"/>
<period-end iso-date="2015-04-30"/>
<value currency="USD" value-date="2015-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-05-01"/>
<period-end iso-date="2015-05-31"/>
<value currency="USD" value-date="2015-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-06-01"/>
<period-end iso-date="2015-06-30"/>
<value currency="USD" value-date="2015-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-07-01"/>
<period-end iso-date="2015-07-31"/>
<value currency="USD" value-date="2015-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-08-01"/>
<period-end iso-date="2015-08-31"/>
<value currency="USD" value-date="2015-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-09-01"/>
<period-end iso-date="2015-09-30"/>
<value currency="USD" value-date="2015-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-10-01"/>
<period-end iso-date="2015-10-31"/>
<value currency="USD" value-date="2015-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-11-01"/>
<period-end iso-date="2015-11-30"/>
<value currency="USD" value-date="2015-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2015-12-01"/>
<period-end iso-date="2015-12-31"/>
<value currency="USD" value-date="2015-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-01-01"/>
<period-end iso-date="2016-01-31"/>
<value currency="USD" value-date="2016-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-02-01"/>
<period-end iso-date="2016-02-29"/>
<value currency="USD" value-date="2016-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-03-01"/>
<period-end iso-date="2016-03-31"/>
<value currency="USD" value-date="2016-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-04-01"/>
<period-end iso-date="2016-04-30"/>
<value currency="USD" value-date="2016-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-05-01"/>
<period-end iso-date="2016-05-31"/>
<value currency="USD" value-date="2016-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-06-01"/>
<period-end iso-date="2016-06-30"/>
<value currency="USD" value-date="2016-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-07-01"/>
<period-end iso-date="2016-07-31"/>
<value currency="USD" value-date="2016-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-08-01"/>
<period-end iso-date="2016-08-31"/>
<value currency="USD" value-date="2016-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-09-01"/>
<period-end iso-date="2016-09-30"/>
<value currency="USD" value-date="2016-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-10-01"/>
<period-end iso-date="2016-10-31"/>
<value currency="USD" value-date="2016-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-11-01"/>
<period-end iso-date="2016-11-30"/>
<value currency="USD" value-date="2016-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2016-12-01"/>
<period-end iso-date="2016-12-31"/>
<value currency="USD" value-date="2016-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-01-01"/>
<period-end iso-date="2017-01-31"/>
<value currency="USD" value-date="2017-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-02-01"/>
<period-end iso-date="2017-02-28"/>
<value currency="USD" value-date="2017-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-03-01"/>
<period-end iso-date="2017-03-31"/>
<value currency="USD" value-date="2017-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-04-01"/>
<period-end iso-date="2017-04-30"/>
<value currency="USD" value-date="2017-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-05-01"/>
<period-end iso-date="2017-05-31"/>
<value currency="USD" value-date="2017-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-06-01"/>
<period-end iso-date="2017-06-30"/>
<value currency="USD" value-date="2017-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-07-01"/>
<period-end iso-date="2017-07-31"/>
<value currency="USD" value-date="2017-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-08-01"/>
<period-end iso-date="2017-08-31"/>
<value currency="USD" value-date="2017-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-09-01"/>
<period-end iso-date="2017-09-30"/>
<value currency="USD" value-date="2017-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-10-01"/>
<period-end iso-date="2017-10-31"/>
<value currency="USD" value-date="2017-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-11-01"/>
<period-end iso-date="2017-11-30"/>
<value currency="USD" value-date="2017-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2014-02-28"/><value value-date="2014-02-28">48000000</value><description xml:lang="en"><narrative>Total Commitment in February Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-39941114</value><description xml:lang="en"><narrative>Total Commitment Cancellations in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">2683243</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">1381177</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2016-07-31"/><value value-date="2016-07-31">1452962</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">104968</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">2065637</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">1071895</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">1044895</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">118254</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-1864145</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-06-30"/><value value-date="2014-06-30">-120000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-3651</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-9848</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-11520</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-06-30"/><value value-date="2016-06-30">-14244</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-12-31"/><value value-date="2016-12-31">-37452</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-06-30"/><value value-date="2017-06-30">-49100</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">-73078</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-104015</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-127277</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-136603</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-125140</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-94969</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-47296</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-30295</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-28880</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-28946</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-100274</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-168525</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-189940</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-191704</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-184357</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-150825</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-146000</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-122335</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-11-30"/><value value-date="2022-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-196637</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126735"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P126735?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P126735"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Metropolitan Plan presented to the State Assembly for approval
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio measuring the collection of the value-added tax on goods and services (ICMS) as a proportion of monthly retail sales volume
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="132.56"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="166.79">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of notification of tax law infraction reaching the targeted tax payer within the same year
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="48.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="85.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of target population covered by Rio Sem Misria core program
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="15.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="3.40"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of new metropolitan agency for transport
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population benefited by the Flood Warning System
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="3.40"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="16.00">

</target>
<actual value="16.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Metropolitan Fund is created and operationalized
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Comprehensive Annual Report on SEEDUCs policies and results produced and publicly disseminated within 5 months of the previous school year
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="3.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Disaster risk policy formulated
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Of which female (beneficiaries)
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="1.80"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="8.30">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Integrated Metropolitan Plan presented to the State Assembly for approval
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals and clinics in the State of Rio de Janeiro integrated into the Mdulo de Sade Mental network
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="65.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of target population covered by Rio Sem Misria core program
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="15.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
UPAs reporting the full cost of medical services by Cost Center in their Annual Reports (also reported on SES website)
</narrative></title>
<baseline year="2012" iso-date="2012-12-03" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-03" />
<period-end iso-date="2017-06-30" />
<target value="9.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals and clinics in the State of Rio de Janeiro integrated into the Mdulo de Sade Mental network
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="65.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals that have had  management processes evaluated and indicators identified for quality of service delivery
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of SEASDH programs included in M&amp;E system
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Ratio measuring the collection of the value-added tax on goods and services (ICMS) as a proportion of monthly retail sales volume
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="132.56"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="166.79">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of housing units regularized
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="25000.00">

</target>
<actual value="25000.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of SEASDH programs included in M&amp;E system
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="75.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Population benefited by the Flood Warning System
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="3.40"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="16.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of housing units regularized
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="25000.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Comprehensive Annual Report on SEEDUCs policies and results produced and publicly disseminated within 5 months of the previous school year
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="1.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of hospitals that have had  management processes evaluated and indicators identified for quality of service delivery
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="0.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="12.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of notification of tax law infraction reaching the targeted tax payer within the same year
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="48.00"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="85.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Project beneficiaries
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="3.40"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="16.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Operationalization of new metropolitan agency for transport
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Metropolitan Fund is created and operationalized
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="No"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="Yes">

</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
UPAs reporting the full cost of medical services by Cost Center in their Annual Reports (also reported on SES website)
</narrative></title>
<baseline year="2012" iso-date="2012-12-03" value="0.00"></baseline>
<period>
<period-start iso-date="2012-12-03" />
<period-end iso-date="2017-06-30" />
<target value="9.00">

</target>
<actual value="8.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Of which female (beneficiaries)
</narrative></title>
<baseline year="2013" iso-date="2013-08-01" value="1.80"></baseline>
<period>
<period-start iso-date="2013-08-01" />
<period-end iso-date="2017-06-30" />
<target value="8.30">

</target>
<actual value="8.30">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:15:04" hierarchy="1"><iati-identifier>44000-P132768</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Pernambuco Equity and Inclusive Growth DPL</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Development Objective of the proposed operation is to support the Government of Pernambuco to strengthen the design, implementation, monitoring and evaluation of policies and programs aimed at promoting sustained growth and improved economic opportunities forthe poor, consolidating public sector management innovations, preventing crime and violence, and reducing the burden associated with chronic disease. The Program is fully aligned with the priorities of the World Bank Group's Country Partnership Strategy 2012-2015 (Report #63731-BR), discussed by the Executive Directors on November 1, 2011.  In accordance with the Country Partnership Strategy (CPS), the proposed operation aims at promoting a more equitable, sustainable and competitive Pernambuco, including through a strong gender focus. The program also facilitates the Bank's strategic engagement in key areas of the state's development plan.The operation is a Single tranche Development Policy Loan to be disbursed upon loan effectiveness.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The objective of the Pernambuco Equity and Inclusive Growth Development Policy Loan for Brazil is to support the Government of Pernambuco to strengthen the design, implementation, monitoring and evaluation of policies and programs aimed at promoting sustained growth and improved economic opportunities for the poor, consolidating public sector management innovations, preventing crime and violence, and reducing the burden associated with chronic disease. The main policy areas the Bank will be focusing on are: regional economic development, private sector development, technical and vocational education and training, productive inclusion, public sector management, crime and violence prevention, health. In each of these areas the operation supports critical actions towards the institutionalization and expansion of key government policies and programs, or the establishment of monitoring and evaluation systems that will provide the basis for evidence-based and performance oriented policy making in the future. Taken together, the policy actions are expected to help promote sustained growth and improved economic opportunities for the poor, consolidation of public sector management innovations, prevention crime and violence, and a reduction of the burden associated with chronic disease.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0011047"><narrative>SEPLAG</narrative></participating-org>
<participating-org role="4" xml:lang="en" ref="BR–ORP0011047"><narrative>SEPLAG</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2013-07-18">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2013-06-25">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2014-09-30"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2014-09-30"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Joana Silva</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>jsilva@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="15126" percentage="33" xml:lang="en"/><sector vocabulary="1" code="16011" percentage="33" xml:lang="en"/><sector vocabulary="1" code="12110" percentage="12" xml:lang="en"/><sector vocabulary="1" code="12191" percentage="11" xml:lang="en"/><sector vocabulary="1" code="11330" percentage="11" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="HG" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Health</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EW" percentage="15.0000000" xml:lang="en"><narrative>FY17 - Workforce Development and Vocational Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="30.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BZ" percentage="10.0000000" xml:lang="en"><narrative>FY17 - Other Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000521" percentage="20" xml:lang="en"><narrative>Social Safety Nets</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000631" percentage="20" xml:lang="en"><narrative>Health System Strengthening</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000663" percentage="10" xml:lang="en"><narrative>Active Labor Market Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000066" percentage="20" xml:lang="en"><narrative>Labor Market Policy and Programs</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000432" percentage="30" xml:lang="en"><narrative>Transparency, Accountability and Good Governance</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000662" percentage="10" xml:lang="en"><narrative>Labor Market Institutions</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000061" percentage="10" xml:lang="en"><narrative>Gender</narrative></sector><collaboration-type code="2" /><default-aid-type code="A02" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2014-09-30 00:00:00.0000000-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">550000000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2014-09-30 00:00:00.0000000-09-01"/>
<period-end iso-date="2014-09-30"/>
<value currency="USD" value-date="2014-09-30">550000000.0000</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2013-06-30"/><value value-date="2013-06-30">550000000</value><description xml:lang="en"><narrative>Total Commitment in June Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">1375000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-08-31"/><value value-date="2013-08-31">548625000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-07-31"/><value value-date="2013-07-31">-1375000</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-1395858</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-2295181</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-2220778</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-2295181</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-2642444</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-3197639</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-4160444</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-5171069</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-5875222</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-6304833</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-8967444</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-9620401</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-8878613</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-6821815</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-3548985</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2364313</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2275876</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2283307</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-7359162</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-12329785</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-13958364</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-14165108</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-13734257</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-11360407</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-11098386</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-9411801</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-05-31"/><value value-date="2023-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-11-30"/><value value-date="2023-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-11-30"/><value value-date="2024-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-05-31"/><value value-date="2025-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-11-30"/><value value-date="2025-11-30">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-05-31"/><value value-date="2026-05-31">-11000000</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132768"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P132768?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P132768"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of specialist consultation (cardiology and endocrinology) referred through the state referral system, reflecting improvements in the functioning of the state referral system
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="61.00">
<comment><narrative>
The state is opening 2 new specialized care units  (UPAE) in Garahuns and Petrolina with a capacity to realize 7,000 consultationsper month.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The states Results Based Management model, based on the approaches used in Pacto pela Vida and including sectorial committees, is fully implemented in at least three  sectors
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>Full implementation in the area of public security (Pacto Pela Vida) and partial implementation in two others (health, andeducation).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="Yes">
<comment><narrative>
1) Results Based Management model implemented in three sectors (public security, health and education)
2) Detailed regulations forthe adoption of RBM published and mandatory for the majority of secretariats.
</narrative></comment>
</target>
<actual value="No">
<comment><narrative>
Implementation plan elaborated and revised based on consultation. Teams to support implementation have been formed.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of new business registrations completed within 72 hours in the 25 municipalities participating in REDESIM
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of diabetes patients that are under active management in primary care
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="58.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="66.00">

</target>
<actual value="49.61">
<comment><narrative>
Data are incomplete for 2013. Baseline, target and current values will be revised in next ISR to reflect changes in definition andcalculation of indicator by state secretariat.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a Monitoring and Evaluation (M&amp;E) on Gender-Based violence
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>there is no systematic data on Gender-based violence (occurrence of GBV cases and measures taken to address GBV).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="Yes">
<comment><narrative>
M&amp;E system operational with reports available online, including (i) data on  cases on cases of GBV in Pernambuco, and (ii) data onquality, efficiency and outcomes of actions to combat gender-based violence.
</narrative></comment>
</target>
<actual value="Yes">
<comment><narrative>
Contracting of the firm in charge of developing the M&amp;E system for SecMulher (Gender Secretatariat - Secretaria da Mulher) underway
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
implementation of an M&amp;E System for states TVET programs
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>0</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="No">
<comment><narrative>
1
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of new business registrations completed within 72 hours in the 25 municipalities participating in REDESIM
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="70.00">

</target>
<actual value="0.00">
<comment><narrative>
Signature of the agreement with the 25 municipalities. There has been significant reduction in the time for registration, buttarget of 3 days not yet achieved.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of beneficiaries of the Programa Atitude program, which is focused on rehabilitating crack users.
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="2000.00"><comment><narrative>2000 beneficiaries, of which 500 are women (Pilot).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="6000.00">
<comment><narrative>
At least 6000 beneficiaries, of which at least 2000 are women
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
Implementation of a Monitoring and Evaluation (M&amp;E) on Gender-Based violence
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>there is no systematic data on Gender-based violence (occurrence of GBV cases and measures taken to address GBV).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="Yes">
<comment><narrative>
M&amp;E system operational with reports available online, including (i) data on  cases on cases of GBV in Pernambuco, and (ii) data onquality, efficiency and outcomes of actions to combat gender-based violence.
</narrative></comment>
</target>
<actual value="No">
<comment><narrative>
Seimulheres objectives, design and internet interface presented by SecMulher to the camera tecnica (February 2014);sectoralconsultations to define data sharing protocols and procedures (Feb-April 2014); proposed indicators and corresponding data sourcespresented to camera tecnica in April/May 2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of hypertensive patients that are under active management in primary care
</narrative></title>
<baseline year="2013" iso-date="2013-07-23" value="50.70"></baseline>
<period>
<period-start iso-date="2013-07-23" />
<period-end iso-date="2014-05-23" />
<target value="58.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of specialist consultation (cardiology and endocrinology) referred through the state referral system, reflecting improvements in the functioning of the state referral system
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="70.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of hypertensive patients that are under active management in primary care
</narrative></title>
<baseline year="2013" iso-date="2013-07-23" value="50.70"></baseline>
<period>
<period-start iso-date="2013-07-23" />
<period-end iso-date="2014-09-30" />
<target value="58.00">

</target>
<actual value="36.35">
<comment><narrative>
Data are incomplete for 2013. Baseline, target and current values will be revised in next ISR to reflect changes in definition andcalculation of indicator by state secretariat.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
number of beneficiaries of the Programa Atitude program, which is focused on rehabilitating crack users.
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="2000.00"><comment><narrative>2000 beneficiaries, of which 500 are women (Pilot).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="6000.00">
<comment><narrative>
At least 6000 beneficiaries, of which at least 2000 are women
</narrative></comment>
</target>
<actual value="0.00">
<comment><narrative>
the Atitude program is progressing in the implementation of the target,  focusing on the center dedicated to women - with specialattention given to pregnant women
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E system for PROINFRA ( Pernambuco State Industrial Infrastructure Development Program)
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>No data available on the effects of the program.</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="Yes">
<comment><narrative>
Evaluation system is operational and a first annual report available and disseminated through the Government website.
</narrative></comment>
</target>
<actual value="Yes">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
M&amp;E system for PROINFRA ( Pernambuco State Industrial Infrastructure Development Program)
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>No data available on the effects of the program.</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="Yes">
<comment><narrative>
Evaluation system is operational and a first annual report available and disseminated through the Government website.
</narrative></comment>
</target>
<actual value="Yes">
<comment><narrative>
System established. Data are currently being collected
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Percentage of diabetes patients that are under active management in primary care
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="58.00"></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="66.00">

</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
implementation of an M&amp;E System for states TVET programs
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>0</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="No">
<comment><narrative>
1
</narrative></comment>
</target>
<actual value="No">
<comment><narrative>
TORs for firm to implement M&amp;E system have been finalized and selection process is ongoing. The firm is expected to start in May2014.
</narrative></comment>
</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
The states Results Based Management model, based on the approaches used in Pacto pela Vida and including sectorial committees, is fully implemented in at least three  sectors
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="No"><comment><narrative>Full implementation in the area of public security (Pacto Pela Vida) and partial implementation in two others (health, andeducation).</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="Yes">
<comment><narrative>
1) Results Based Management model implemented in three sectors (public security, health and education)
2) Detailed regulations forthe adoption of RBM published and mandatory for the majority of secretariats.
</narrative></comment>
</target>
<actual value="No">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that have signed adherence pacts with the state, thus benefiting from state financing for productive inclusion programs and committing to service delivery targets/ perfomance
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"><comment><narrative>0 municipalities signed the Adherence Pact</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-05-23" />
<target value="51.00">
<comment><narrative>
51 municipalities signed adherence pacts
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="" aggregation-status="0">
<title><narrative>
rmediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
Number of municipalities that have signed adherence pacts with the state, thus benefiting from state financing for productive inclusion programs and committing to service delivery targets/ perfomance
</narrative></title>
<baseline year="2013" iso-date="2013-05-23" value="0.00"><comment><narrative>0 municipalities signed the Adherence Pact</narrative></comment></baseline>
<period>
<period-start iso-date="2013-05-23" />
<period-end iso-date="2014-09-30" />
<target value="51.00">
<comment><narrative>
51 municipalities signed adherence pacts
</narrative></comment>
</target>
<actual value="51.00">
<comment><narrative>
51 municipalities have signed the adherence pacts.
</narrative></comment>
</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:15:10" hierarchy="1"><iati-identifier>44000-P093787</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Bahia State Integrated Project: Rural Poverty</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Project would increase social and economic opportunities for the rural poor in Bahia by improving their access to basic socioeconomic infrastructure, thus contributing to the Borrower's objective of increasing the HDI. While building on the CDD approach proven successful under the first phase of Produzir, the second phase would improve on this experience by:  (a) integrating with and/or complementing activities of other Bank loans for the State (under the Bahia State Program), particularly the PGRH and Viver Melhor Urbano II;  (b) strengthening the cross-sectoral integration and providing significantly more emphasis on education, health, culture, natural resources management and environmental sustainability; and (c) scaling up the impact on poverty by using the skills, social capital and experience of the Municipal Councils and community associations to improve the relevance, efficiency, sustainability, targeting and outcomes of non-project State and Federal investments in rural Bahia.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The Bahia State Integrated Project for Brazil will increase social and economic opportunities for the rural poor by improving their access to basic socioeconomic infrastructure. The project consists of the following components: (i) this component will support community matching grants for about 2,500 smallscale socio-economic infrastructure, education, health, cultural, environmental and other productive investments aimed at raising the human development index (HDI); (ii) this component will finance (a) technical assistance and training to support the mobilization and strengthening of Community Associations; (b) capacity-building for Municipal Councils on responsibilities outlined in the Project Operational Manual, including assessment and supervision of community associations, participatory planning, financial management and environmental management of community subprojects; (c) training and technical assistance; and (d) workshops and seminars for Municipal Councils and Community; (iii) this component will finance costs (excluding salaries) of project administration, monitoring and impact evaluation.]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><activity-status code="3" /><activity-date type="1" iso-date="2005-06-14">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2005-09-01">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2014-01-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2014-01-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Maria de Fatima de Sousa Amazonas</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>mamazonas@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>

<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319073" />
						<name><narrative>Belmonte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.89158 -39.322659</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319074" />
						<name><narrative>Brejões</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.07059 -39.820992</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319076" />
						<name><narrative>Dom Basilio</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.79717 -41.708771</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319077" />
						<name><narrative>Iaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.7698 -40.183369</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319078" />
						<name><narrative>Ituberá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.78743 -39.146851</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319079" />
						<name><narrative>Lagoa Real</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.10985 -42.216969</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319080" />
						<name><narrative>MuquEm de São Francisco</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.19886 -43.513111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319081" />
						<name><narrative>Nilo Peçanha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.64812 -39.238762</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319082" />
						<name><narrative>Nordestina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.89685 -39.451408</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319083" />
						<name><narrative>Nova Viçosa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.87451 -39.665192</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319084" />
						<name><narrative>Oliveira dos Brejinhos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.30626 -42.696281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319085" />
						<name><narrative>Poções</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.58293 -40.276192</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319086" />
						<name><narrative>Presidente Tancredo Neves</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.46145 -39.421261</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319087" />
						<name><narrative>Santa Maria da Vitória</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.26141 -44.377998</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319088" />
						<name><narrative>Santana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.0894 -43.847569</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319089" />
						<name><narrative>Tremedal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.9008 -41.323391</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319090" />
						<name><narrative>Umburanas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.5086 -41.174191</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319091" />
						<name><narrative>Una</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.16451 -39.205681</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319178" />
						<name><narrative>Serrinha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.59947 -39.038712</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006319220" />
						<name><narrative>Barrocas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.6019 -39.122669</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320905" />
						<name><narrative>Itatim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.62835 -39.682339</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320906" />
						<name><narrative>Itiruçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.52088 -40.164089</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320907" />
						<name><narrative>Itiúba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.79357 -39.80381</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320908" />
						<name><narrative>Itororó</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.06721 -40.019428</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320909" />
						<name><narrative>Ituaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.90363 -41.396938</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320910" />
						<name><narrative>Iuiú</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.65015 -43.648701</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320911" />
						<name><narrative>Jaborandi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.0385 -45.184078</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320912" />
						<name><narrative>Jacaraci</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.83523 -42.401119</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320913" />
						<name><narrative>Jacobina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.14792 -40.43108</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320914" />
						<name><narrative>Jaguaquara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.59565 -39.92934</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320915" />
						<name><narrative>Jaguarari</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.14804 -40.104309</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320916" />
						<name><narrative>Jaguaripe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.12834 -39.01339</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320917" />
						<name><narrative>Jandaira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.61099 -37.61845</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320918" />
						<name><narrative>JequiE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.92298 -40.08374</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320919" />
						<name><narrative>Jeremoabo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.9208803 -38.726292</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320920" />
						<name><narrative>Jiquiriçá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.31081 -39.58091</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320921" />
						<name><narrative>Jitaúna</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.979 -39.900558</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320922" />
						<name><narrative>João Dourado</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.14883 -41.404381</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320923" />
						<name><narrative>Juazeiro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.3967896 -40.23381</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320924" />
						<name><narrative>Jucuruçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.84832 -40.084141</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320925" />
						<name><narrative>Jussara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.96408 -41.855721</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320926" />
						<name><narrative>Jussari</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.15451 -39.515591</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320927" />
						<name><narrative>Jussiape</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.4881 -41.623348</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320928" />
						<name><narrative>Lafaiete Coutinho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.62029 -40.204441</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320929" />
						<name><narrative>Laje</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.18464 -39.297508</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320930" />
						<name><narrative>Lajedão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.571119 -40.31123</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320931" />
						<name><narrative>Lajedinho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.42698 -41.15097</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320932" />
						<name><narrative>Lajedo do Tabocal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.37125 -40.230042</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320933" />
						<name><narrative>Lamarão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.84518 -38.977051</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320934" />
						<name><narrative>Lapão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.61583 -41.705158</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320902" />
						<name><narrative>Itapitanga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.46369 -39.625648</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320901" />
						<name><narrative>Itapetinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.33408 -40.086262</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320904" />
						<name><narrative>Itarantim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.70796 -40.030472</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320903" />
						<name><narrative>Itaquara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.4472 -39.910301</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003471168" />
						<name><narrative>Estado da Bahia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12 -42</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320900" />
						<name><narrative>Itapebi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.88751 -39.68792</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320899" />
						<name><narrative>ItapE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.91851 -39.48637</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320897" />
						<name><narrative>ItanhEm</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.081129 -40.361</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320896" />
						<name><narrative>Itanagra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.30982 -38.113281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320895" />
						<name><narrative>ItambE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.22477 -40.495071</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320894" />
						<name><narrative>Itamari</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.7859 -39.684158</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320893" />
						<name><narrative>Itamaraju</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.94519 -39.81271</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320768" />
						<name><narrative>Brejolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.41237 -43.928219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320769" />
						<name><narrative>Brotas de Macaúbas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.10605 -42.511082</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320770" />
						<name><narrative>Brumado</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.15265 -41.603748</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320771" />
						<name><narrative>Buerarema</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.99067 -39.305882</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320772" />
						<name><narrative>Buritirama</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.57081 -43.688629</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320773" />
						<name><narrative>Caatiba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.04847 -40.145859</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320774" />
						<name><narrative>Cabaceiras do Paraguaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.55423 -39.195961</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320775" />
						<name><narrative>Cachoeira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.58461 -38.970909</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320776" />
						<name><narrative>CaculE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.38829 -42.415161</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320777" />
						<name><narrative>CaEm</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.19397 -40.257359</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320778" />
						<name><narrative>Caetanos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.29234 -41.01004</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320779" />
						<name><narrative>CaetitE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.9078 -42.522339</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320780" />
						<name><narrative>Cafarnaum</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.80666 -41.38401</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320781" />
						<name><narrative>Cairu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.52662 -38.948139</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320782" />
						<name><narrative>Caldeirão Grande</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.04347 -40.295151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320783" />
						<name><narrative>Camacan</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.42769 -39.508179</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320785" />
						<name><narrative>Camamu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.94073 -39.122311</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320786" />
						<name><narrative>Campo Alegre de Lourdes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.5009699 -42.98275</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320787" />
						<name><narrative>Campo Formoso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.31007 -40.810822</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320788" />
						<name><narrative>Canápolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.12516 -44.25095</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320789" />
						<name><narrative>Canarana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.66778 -41.73764</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320790" />
						<name><narrative>Canavieiras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.64831 -39.170921</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320791" />
						<name><narrative>Candeal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.89504 -39.203899</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320792" />
						<name><narrative>Candiba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.46972 -42.873859</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320793" />
						<name><narrative>Cândido Sales</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.46082 -41.163528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320794" />
						<name><narrative>Cansanção</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.81185 -39.414581</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320795" />
						<name><narrative>Canudos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.8798103 -39.147228</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320796" />
						<name><narrative>Capela do Alto Alegre</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.61838 -39.832272</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320797" />
						<name><narrative>Capim Grosso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.29423 -39.955719</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320798" />
						<name><narrative>Caraibas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.60631 -41.257629</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320799" />
						<name><narrative>Caravelas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.658421 -39.35989</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320800" />
						<name><narrative>Cardeal da Silva</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.99798 -37.924679</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320801" />
						<name><narrative>Carinhanha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.21387 -43.847118</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320802" />
						<name><narrative>Casa Nova</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.1043901 -41.15736</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320803" />
						<name><narrative>Castro Alves</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.74937 -39.376911</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320804" />
						<name><narrative>Catolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.29613 -44.675282</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320805" />
						<name><narrative>Catu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.3776 -38.40049</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320806" />
						<name><narrative>Caturama</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.18601 -42.302502</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320807" />
						<name><narrative>Central</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.15424 -42.081459</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320808" />
						<name><narrative>Cicero Dantas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.53881 -38.42136</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320809" />
						<name><narrative>Cipó</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.11045 -38.509521</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320810" />
						<name><narrative>Coaraci</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.64492 -39.593761</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320811" />
						<name><narrative>Cocos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.59438 -45.279598</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320812" />
						<name><narrative>Conceição da Feira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.50687 -38.994671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320813" />
						<name><narrative>Conceição do Almeida</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.85503 -39.240929</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320814" />
						<name><narrative>Conceição do CoitE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.63206 -39.19112</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320815" />
						<name><narrative>Conceição do Jacuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.33229 -38.757359</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320816" />
						<name><narrative>Conde</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.80333 -37.648201</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320817" />
						<name><narrative>Condeúba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.93275 -42.006931</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320818" />
						<name><narrative>Contendas do Sincorá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.79599 -41.050018</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320819" />
						<name><narrative>Coração de Maria</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.24274 -38.782429</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320820" />
						<name><narrative>Cordeiros</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.99846 -41.897491</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320821" />
						<name><narrative>Coribe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.72337 -44.435379</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320822" />
						<name><narrative>Coronel João Sá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.38878 -37.94281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320823" />
						<name><narrative>Correntina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.28985 -45.131901</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320824" />
						<name><narrative>Cotegipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.58844 -44.169998</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320825" />
						<name><narrative>Cravolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.47018 -39.754929</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320826" />
						<name><narrative>Crisópolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.45532 -38.139332</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320827" />
						<name><narrative>Cristópolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.21789 -44.24987</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320828" />
						<name><narrative>Cruz das Almas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.67027 -39.114391</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320829" />
						<name><narrative>Curaçá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.1345797 -39.668491</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320830" />
						<name><narrative>Dário Meira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.4234 -39.959351</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320831" />
						<name><narrative>Dom Macedo Costa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.93379 -39.14621</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320832" />
						<name><narrative>Elisio Medrado</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.95431 -39.505791</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320833" />
						<name><narrative>Encruzilhada</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.56839 -40.90789</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320834" />
						<name><narrative>Entre Rios</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.06972 -38.0299</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320835" />
						<name><narrative>Esplanada</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.95469 -37.893559</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320836" />
						<name><narrative>Euclides da Cunha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.40511 -39.033741</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320837" />
						<name><narrative>Eunápolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.312189 -39.670219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320838" />
						<name><narrative>Fátima</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.546 -38.223671</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320839" />
						<name><narrative>Feira da Mata</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.13203 -44.252811</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320840" />
						<name><narrative>Feira de Santana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.23366 -39.065632</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320841" />
						<name><narrative>FiladElfia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.76635 -40.205551</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320842" />
						<name><narrative>Firmino Alves</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.9136 -39.911919</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320843" />
						<name><narrative>Floresta Azul</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.8445 -39.755032</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320844" />
						<name><narrative>Formosa do Rio Preto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.88861 -45.91214</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320845" />
						<name><narrative>Gandu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.81558 -39.447449</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320846" />
						<name><narrative>Gavião</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.48891 -39.77412</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320847" />
						<name><narrative>Gentio do Ouro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.36279 -42.548271</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320848" />
						<name><narrative>Gongogi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.29995 -39.601379</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320849" />
						<name><narrative>Governador Mangabeira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.57719 -39.031151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320850" />
						<name><narrative>Guajeru</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.57881 -42.03986</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320851" />
						<name><narrative>Guanambi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.13304 -42.82402</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320852" />
						<name><narrative>Guaratinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.56987 -39.97821</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320853" />
						<name><narrative>Heliópolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.72863 -38.254902</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320854" />
						<name><narrative>Ibiassucê</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.20285 -42.302139</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320855" />
						<name><narrative>Ibicarai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.87438 -39.559792</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320856" />
						<name><narrative>Ibicoara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.37664 -41.340809</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320857" />
						<name><narrative>Ibicui</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.6097 -39.855679</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320858" />
						<name><narrative>Ibipeba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.49784 -42.190788</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320859" />
						<name><narrative>Ibipitanga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.88655 -42.371151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320860" />
						<name><narrative>Ibiquera</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.57265 -40.841579</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320861" />
						<name><narrative>Ibirapitanga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.05893 -39.40815</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320862" />
						<name><narrative>Ibirapuã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.755671 -39.973652</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320863" />
						<name><narrative>Ibirataia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.97288 -39.637138</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320864" />
						<name><narrative>Ibitiara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.56582 -42.3899</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320865" />
						<name><narrative>Ibititá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.69354 -41.84148</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320866" />
						<name><narrative>Ibotirama</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.88616 -43.252892</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320867" />
						<name><narrative>Ichu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.70344 -39.187222</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320868" />
						<name><narrative>Igaporã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.89064 -42.76046</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320869" />
						<name><narrative>Igrapiúna</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.85607 -39.19363</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320870" />
						<name><narrative>Iguai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.61816 -40.061649</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320871" />
						<name><narrative>IlhEus</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.75939 -39.217949</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320872" />
						<name><narrative>Inhambupe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.7966 -38.370369</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320873" />
						<name><narrative>Ipecaetá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.33777 -39.32835</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320874" />
						<name><narrative>Ipiaú</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.05705 -39.72546</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320875" />
						<name><narrative>Ipirá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.27411 -39.916389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320876" />
						<name><narrative>Ipupiara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.76946 -42.43301</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320877" />
						<name><narrative>Irajuba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.17999 -39.9953</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320878" />
						<name><narrative>Iramaia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.54627 -40.828339</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320879" />
						<name><narrative>Iraquara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.28624 -41.59153</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320880" />
						<name><narrative>Irará</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.04896 -38.736198</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320881" />
						<name><narrative>Irecê</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.30321 -41.83445</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320882" />
						<name><narrative>Itabela</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.716351 -39.57325</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320883" />
						<name><narrative>Itaberaba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.45097 -40.203049</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320884" />
						<name><narrative>Itabuna</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.88154 -39.367142</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320885" />
						<name><narrative>ItacarE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.36948 -39.125149</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320886" />
						<name><narrative>ItaetE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.98068 -40.955151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320887" />
						<name><narrative>Itagi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.19701 -40.033001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320888" />
						<name><narrative>Itagibá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.2464 -39.849689</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320889" />
						<name><narrative>Itagimirim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.134729 -39.81646</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320890" />
						<name><narrative>Itaguaçu da Bahia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.64259 -42.210831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320891" />
						<name><narrative>Itaju do Colônia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.15505 -39.715981</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320892" />
						<name><narrative>Itajuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.69194 -39.429211</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003470579" />
						<name><narrative>Barreiras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.93334 -45.49239</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0003472764" />
						<name><narrative>Alagoinhas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.0058 -38.361462</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320721" />
						<name><narrative>Abaira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.32129 -41.69759</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320722" />
						<name><narrative>AbarE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-8.8096104 -39.270618</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320723" />
						<name><narrative>Acajutiba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.60682 -38.035938</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320724" />
						<name><narrative>Adustina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.48227 -37.984459</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320725" />
						<name><narrative>Água Fria</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.74762 -38.73497</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320726" />
						<name><narrative>Erico Cardoso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.43695 -42.103249</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320727" />
						<name><narrative>Aiquara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.11135 -39.876411</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320728" />
						<name><narrative>Alcobaça</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.46365 -39.374008</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320729" />
						<name><narrative>Almadina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.67608 -39.690659</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320730" />
						<name><narrative>Amargosa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.0497 -39.607201</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320731" />
						<name><narrative>AmElia Rodrigues</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.38975 -38.75153</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320732" />
						<name><narrative>AmErica Dourada</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.4694 -41.473351</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320733" />
						<name><narrative>AnagE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.66168 -41.14703</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320734" />
						<name><narrative>Andarai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.84167 -41.276791</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320735" />
						<name><narrative>Andorinha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.22216 -39.863869</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320736" />
						<name><narrative>Angical</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.9628 -44.749802</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320737" />
						<name><narrative>Anguera</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.18221 -39.21384</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320738" />
						<name><narrative>Antas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.42138 -38.30341</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320739" />
						<name><narrative>Antônio Cardoso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.38641 -39.145489</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320740" />
						<name><narrative>Antônio Gonçalves</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.62282 -40.409328</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320741" />
						<name><narrative>Aporá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.75439 -38.22784</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320742" />
						<name><narrative>Apuarema</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.83005 -39.73444</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320743" />
						<name><narrative>Aracatu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.39011 -41.363312</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320744" />
						<name><narrative>Araças</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.14681 -38.172329</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320745" />
						<name><narrative>Araci</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.13564 -39.07003</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320746" />
						<name><narrative>Arataca</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.24607 -39.424809</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320747" />
						<name><narrative>Aratuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.09363 -39.082588</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320748" />
						<name><narrative>Aurelino Leal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.3317 -39.509918</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320749" />
						<name><narrative>Baianópolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.48331 -44.531052</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320750" />
						<name><narrative>Baixa Grande</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.97735 -40.179932</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320751" />
						<name><narrative>Banzaê</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.61578 -38.626881</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320752" />
						<name><narrative>Barra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.31829 -43.4688</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320753" />
						<name><narrative>Barra da Estiva</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.71776 -41.083809</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320754" />
						<name><narrative>Barra do Choça</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.01024 -40.667309</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320755" />
						<name><narrative>Barra do Rocha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.06032 -39.613819</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320756" />
						<name><narrative>Barro Alto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.77394 -41.913231</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320757" />
						<name><narrative>Governador Lomanto Júnior</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.75795 -39.407108</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320758" />
						<name><narrative>Belo Campo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.87419 -41.226711</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320759" />
						<name><narrative>Biritinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.67075 -38.78931</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320760" />
						<name><narrative>Boa Nova</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.36412 -40.223782</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320761" />
						<name><narrative>Boa Vista do Tupim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.87313 -40.628231</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320762" />
						<name><narrative>Bom Jesus da Lapa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.20853 -43.296242</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320763" />
						<name><narrative>Bom Jesus da Serra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.3838 -40.539822</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320764" />
						<name><narrative>Boninal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.80363 -41.68338</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320765" />
						<name><narrative>Bonito</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.00488 -41.317791</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320766" />
						<name><narrative>Boquira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.73943 -42.64175</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320767" />
						<name><narrative>Botuporã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.25071 -42.410831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320936" />
						<name><narrative>Lençóis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.47259 -41.308151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320937" />
						<name><narrative>Licinio de Almeida</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.70644 -42.504421</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320938" />
						<name><narrative>Livramento de Nossa Senhora</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.8068 -41.997089</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320939" />
						<name><narrative>Macajuba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.14371 -40.301991</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320940" />
						<name><narrative>Macarani</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.557 -40.390491</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320941" />
						<name><narrative>Macaúbas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.19169 -42.683281</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320943" />
						<name><narrative>Maetinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.6653 -41.490551</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320944" />
						<name><narrative>Maiquinique</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.69897 -40.264111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320945" />
						<name><narrative>Mairi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.63488 -40.213371</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320946" />
						<name><narrative>Malhada</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.38915 -43.714909</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320947" />
						<name><narrative>Malhada de Pedras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.27766 -41.892071</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320948" />
						<name><narrative>Manoel Vitorino</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.00487 -40.48008</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320949" />
						<name><narrative>Mansidão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.2078 -44.14109</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320950" />
						<name><narrative>Maracás</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.65007 -40.619862</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320951" />
						<name><narrative>Maragogipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.83511 -38.940239</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320952" />
						<name><narrative>Maraú</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.09923 -39.083599</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320953" />
						<name><narrative>Marcionilio Souza</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.11581 -40.62915</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320954" />
						<name><narrative>Mascote</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.64044 -39.427979</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320955" />
						<name><narrative>Mata de São João</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.48464 -38.17905</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320956" />
						<name><narrative>Matina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.89342 -42.982792</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320957" />
						<name><narrative>Medeiros Neto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.39019 -40.275681</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320958" />
						<name><narrative>Miguel Calmon</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.5255 -40.578999</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320959" />
						<name><narrative>Mirangaba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.80362 -40.670559</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320960" />
						<name><narrative>Mirante</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.18613 -40.7831</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320961" />
						<name><narrative>Monte Santo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.26646 -39.568371</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320962" />
						<name><narrative>Morpará</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.75265 -43.091331</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320963" />
						<name><narrative>Morro do ChapEu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.25413 -41.36364</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320964" />
						<name><narrative>Mortugaba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.9848 -42.405548</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320965" />
						<name><narrative>Mucugê</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.14869 -41.517422</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320966" />
						<name><narrative>Mucuri</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-18.00576 -39.79813</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320967" />
						<name><narrative>Mulungu do Morro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.00797 -41.425819</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320968" />
						<name><narrative>Mundo Novo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.9193 -40.523102</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320969" />
						<name><narrative>Muniz Ferreira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.00146 -39.10601</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320970" />
						<name><narrative>Muritiba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.63455 -39.066528</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320971" />
						<name><narrative>Mutuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.33276 -39.508492</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320972" />
						<name><narrative>NazarE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.95002 -38.978691</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320973" />
						<name><narrative>Nova Canaã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.84621 -40.178261</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320974" />
						<name><narrative>Nova Fátima</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.56608 -39.58609</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320975" />
						<name><narrative>Nova Ibiá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.8623 -39.588772</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320976" />
						<name><narrative>Nova Itarana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.04028 -40.007839</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320977" />
						<name><narrative>Nova Redenção</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.87403 -41.123348</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320978" />
						<name><narrative>Nova Soure</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.31894 -38.462132</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320979" />
						<name><narrative>Novo Horizonte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.87886 -42.13834</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320980" />
						<name><narrative>Novo Triunfo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.34787 -38.402111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320981" />
						<name><narrative>Olindina</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.37236 -38.385891</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320982" />
						<name><narrative>Ouriçangas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.00343 -38.652081</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320983" />
						<name><narrative>Ourolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.83804 -41.028389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320984" />
						<name><narrative>Palmas de Monte Alto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.96288 -43.245892</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320985" />
						<name><narrative>Palmeiras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.51485 -41.577068</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320986" />
						<name><narrative>Paramirim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.51428 -42.231171</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320987" />
						<name><narrative>Paratinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.73564 -43.069752</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320988" />
						<name><narrative>Paripiranga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.58278 -37.886009</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320989" />
						<name><narrative>Pau Brasil</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.44321 -39.68972</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320990" />
						<name><narrative>PE de Serra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.88974 -39.61937</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320991" />
						<name><narrative>Pedrão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.13311 -38.606209</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320992" />
						<name><narrative>Pedro Alexandre</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.9769297 -37.91489</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320993" />
						<name><narrative>Piatã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.12099 -41.89093</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320994" />
						<name><narrative>Pilão Arcado</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.00201 -43.393711</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320995" />
						<name><narrative>Pindai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.52319 -42.678219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320996" />
						<name><narrative>Pindobaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.73848 -40.3274</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320997" />
						<name><narrative>Pintadas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.92312 -39.977821</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320998" />
						<name><narrative>Pirai do Norte</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.84971 -39.392078</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006320999" />
						<name><narrative>Piripá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.92617 -41.75304</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321000" />
						<name><narrative>Piritiba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.62849 -40.51495</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321001" />
						<name><narrative>Planaltino</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.27349 -40.22316</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321002" />
						<name><narrative>Planalto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.72862 -40.380249</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321003" />
						<name><narrative>Pojuca</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.36588 -38.24332</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321004" />
						<name><narrative>Ponto Novo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.85472 -40.161968</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321005" />
						<name><narrative>Porto Seguro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.671789 -39.264179</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321006" />
						<name><narrative>Potiraguá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.70117 -39.766891</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321007" />
						<name><narrative>Presidente Dutra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.29503 -41.98563</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321008" />
						<name><narrative>Presidente Jânio Quadros</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.82942 -41.78616</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321009" />
						<name><narrative>Queimadas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.96302 -39.7187</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321010" />
						<name><narrative>Quijingue</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.78803 -39.03389</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321011" />
						<name><narrative>Quixabeira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.41345 -40.133018</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321012" />
						<name><narrative>Rafael Jambeiro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.50087 -39.509151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321013" />
						<name><narrative>Remanso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.5411501 -42.36956</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321014" />
						<name><narrative>Retirolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.47733 -39.40649</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321015" />
						<name><narrative>Riachão das Neves</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.7748 -45.125038</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321016" />
						<name><narrative>Riachão do Jacuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.84558 -39.38105</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321017" />
						<name><narrative>Riacho de Santana</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.8429 -43.17474</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321018" />
						<name><narrative>Ribeira do Amparo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.00558 -38.387321</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321019" />
						<name><narrative>Ribeira do Pombal</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.63309 -38.501171</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321020" />
						<name><narrative>Ribeirão do Largo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.38558 -40.658859</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321021" />
						<name><narrative>Rio de Contas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.62169 -41.687019</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321022" />
						<name><narrative>Rio do Antônio</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.22674 -42.16613</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321023" />
						<name><narrative>Rio do Pires</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.11134 -42.177471</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321024" />
						<name><narrative>Ruy Barbosa</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.2465 -40.326752</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321025" />
						<name><narrative>Salinas da Margarida</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.90667 -38.78043</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321027" />
						<name><narrative>Santa Bárbara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.9177 -38.992062</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321028" />
						<name><narrative>Santa Brigida</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.67904 -38.113708</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321029" />
						<name><narrative>Santa Cruz Cabrália</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-16.27846 -39.172619</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321030" />
						<name><narrative>Santa Cruz da Vitória</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.90311 -39.791481</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321031" />
						<name><narrative>Santa Inês</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.26617 -39.833099</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321032" />
						<name><narrative>Santaluz</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.12791 -39.508598</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321033" />
						<name><narrative>Santa Luzia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.46388 -39.276711</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321034" />
						<name><narrative>Santanópolis</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.02416 -38.88007</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321035" />
						<name><narrative>Santa Rita de Cássia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.02715 -44.595821</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321036" />
						<name><narrative>Santa Teresinha</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.6712 -39.550819</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321037" />
						<name><narrative>Santo Amaro</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.61369 -38.774269</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321038" />
						<name><narrative>Santo Antônio de Jesus</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.00796 -39.226791</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321039" />
						<name><narrative>Santo Estêvão</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.46423 -39.268139</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321040" />
						<name><narrative>São DesidErio</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.89267 -45.563789</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321041" />
						<name><narrative>São Domingos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.48464 -39.599159</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321042" />
						<name><narrative>São FElix</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.67807 -38.99979</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321043" />
						<name><narrative>São FElix do Coribe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.41471 -43.98138</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321044" />
						<name><narrative>São Felipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.86533 -39.096241</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321081" />
						<name><narrative>Ubaira</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.287 -39.69347</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321082" />
						<name><narrative>Ubaitaba</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.27052 -39.380779</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321083" />
						<name><narrative>Ubatã</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.05629 -39.522781</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321084" />
						<name><narrative>Uibai</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.3906 -42.156151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321085" />
						<name><narrative>Urandi</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.734 -42.66544</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321086" />
						<name><narrative>Uruçuca</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.4842 -39.168598</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321087" />
						<name><narrative>Utinga</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.04274 -41.194752</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321088" />
						<name><narrative>Valença</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.37213 -39.240021</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321089" />
						<name><narrative>Valente</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.43393 -39.484718</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321090" />
						<name><narrative>Várzea da Roça</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.53905 -40.076469</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321091" />
						<name><narrative>Várzea do Poço</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.53021 -40.309181</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321092" />
						<name><narrative>Várzea Nova</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.05523 -41.2323</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321093" />
						<name><narrative>Varzedo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.99662 -39.370911</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321095" />
						<name><narrative>Vereda</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.149981 -40.048729</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321096" />
						<name><narrative>Vitória da Conquista</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.27953 -40.965752</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321097" />
						<name><narrative>Wagner</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.2593 -41.220951</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321098" />
						<name><narrative>Wanderley</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.765 -43.993778</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321099" />
						<name><narrative>Wenceslau Guimarães</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.61819 -39.580921</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321100" />
						<name><narrative>Xique-Xique</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.83393 -42.563202</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321080" />
						<name><narrative>Uauá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.8414297 -39.230251</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321079" />
						<name><narrative>Tucano</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.99427 -38.862492</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324199" />
						<name><narrative>Souto Soares</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.94603 -41.948151</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324224" />
						<name><narrative>Glória</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.1109695 -38.406551</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324230" />
						<name><narrative>Prado</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.316549 -39.233551</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324259" />
						<name><narrative>Milagres</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.95591 -39.817829</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324321" />
						<name><narrative>Aramari</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.04618 -38.557621</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324322" />
						<name><narrative>Chorrochó</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.3055 -39.156521</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324323" />
						<name><narrative>Itapicuru</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.18105 -38.149948</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324324" />
						<name><narrative>MacururE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.3677502 -39.041061</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324325" />
						<name><narrative>Paulo Afonso</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.5523396 -38.169048</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324326" />
						<name><narrative>Rio Real</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.52997 -37.903938</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324327" />
						<name><narrative>Rodelas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-8.9363203 -38.683701</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321078" />
						<name><narrative>Terra Nova</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.38537 -38.61874</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321077" />
						<name><narrative>Teolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.57031 -39.46492</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321076" />
						<name><narrative>Teofilândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.53412 -38.94519</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321075" />
						<name><narrative>Teodoro Sampaio</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.26547 -38.61211</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321074" />
						<name><narrative>Teixeira de Freitas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-17.313101 -39.925732</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321073" />
						<name><narrative>Tapiramutá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.94733 -40.75692</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321072" />
						<name><narrative>Taperoá</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.56959 -39.2202</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321071" />
						<name><narrative>Tanquinho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.95674 -39.096081</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321070" />
						<name><narrative>Tanque Novo</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.58365 -42.54311</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321069" />
						<name><narrative>Tanhaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.0701 -41.135059</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321068" />
						<name><narrative>Tabocas do Brejo Velho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.36943 -44.083618</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321067" />
						<name><narrative>Sobradinho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-9.5903702 -40.775162</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321066" />
						<name><narrative>Sitio do Quinto</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.34321 -38.07346</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321065" />
						<name><narrative>Sitio do Mato</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.00385 -43.545368</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321063" />
						<name><narrative>Serrolândia</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.54018 -40.247829</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321062" />
						<name><narrative>Serra Preta</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.06913 -39.300499</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321061" />
						<name><narrative>Serra Dourada</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.91499 -43.796001</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321060" />
						<name><narrative>Sento SE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.21251 -41.579472</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321059" />
						<name><narrative>Serra do Ramalho</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.41101 -43.778488</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321058" />
						<name><narrative>Senhor do Bonfim</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.42875 -40.101219</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321057" />
						<name><narrative>Sebastião Laranjeiras</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-14.66814 -43.165871</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321056" />
						<name><narrative>Seabra</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.38298 -41.916752</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321055" />
						<name><narrative>Saúde</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.84463 -40.375099</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321054" />
						<name><narrative>Saubara</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.7662 -38.801739</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321053" />
						<name><narrative>Sátiro Dias</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.63166 -38.488861</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321052" />
						<name><narrative>Sapeaçu</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.772 -39.23848</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321051" />
						<name><narrative>São Sebastião do PassE</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.50362 -38.451672</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321050" />
						<name><narrative>São Miguel das Matas</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-13.04308 -39.434029</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321049" />
						<name><narrative>São JosE do Jacuipe</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-11.46833 -39.90377</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321048" />
						<name><narrative>São JosE da Vitória</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-15.07185 -39.350159</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321047" />
						<name><narrative>São Gonçalo dos Campos</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.40845 -38.977661</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006321046" />
						<name><narrative>São Gabriel</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-10.95576 -41.554111</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324151" />
						<name><narrative>Luis Eduardo Magalhães</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.23208 -46.114601</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><location>
						<location-reach code="1" />
						<location-id vocabulary="G1" code="0006324198" />
						<name><narrative>Barra do Mendes</narrative></name>
						<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
						<pos>-12.16094 -42.035419</pos>
						</point>
						<exactness code="2"/>
						<location-class code="1" />
					</location><sector vocabulary="1" code="16011" percentage="10" xml:lang="en"/><sector vocabulary="1" code="16050" percentage="90" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="LT" percentage="16.0000000" xml:lang="en"><narrative>FY17 - Energy Transmission and Distribution</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="AZ" percentage="36.0000000" xml:lang="en"><narrative>FY17 - Other Agriculture, Fishing and Forestry</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="SA" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Social Protection</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="WC" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Water Supply</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="BH" percentage="18.0000000" xml:lang="en"><narrative>FY17 - Sub-National Government</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000437" percentage="12" xml:lang="en"><narrative>Municipal Institution Building</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000513" percentage="33" xml:lang="en"><narrative>Participation and Civic Engagement</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000072" percentage="33" xml:lang="en"><narrative>Rural Development</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000511" percentage="17" xml:lang="en"><narrative>Indigenous People and Ethnic Minorities</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000051" percentage="50" xml:lang="en"><narrative>Social Inclusion</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000043" percentage="17" xml:lang="en"><narrative>Public Administration</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000431" percentage="5" xml:lang="en"><narrative>Administrative and Civil Service Reform</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">2108906.6000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">2108906.6000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">2108906.6100</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">1799999.7300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">1799999.7300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">1799999.7300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">1066666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">1066666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">1066666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">1066666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">1066666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">1066666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">1166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1250000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1250000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1250000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">1333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">1333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">1333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1166666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1166666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">1000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">657760.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">657760.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">657760.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">500000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-09-01"/>
<period-end iso-date="2005-09-30"/>
<value currency="USD" value-date="2005-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-10-01"/>
<period-end iso-date="2005-10-31"/>
<value currency="USD" value-date="2005-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-11-01"/>
<period-end iso-date="2005-11-30"/>
<value currency="USD" value-date="2005-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2005-12-01"/>
<period-end iso-date="2005-12-31"/>
<value currency="USD" value-date="2005-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-01-01"/>
<period-end iso-date="2006-01-31"/>
<value currency="USD" value-date="2006-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-02-01"/>
<period-end iso-date="2006-02-28"/>
<value currency="USD" value-date="2006-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-03-01"/>
<period-end iso-date="2006-03-31"/>
<value currency="USD" value-date="2006-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-04-01"/>
<period-end iso-date="2006-04-30"/>
<value currency="USD" value-date="2006-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-05-01"/>
<period-end iso-date="2006-05-31"/>
<value currency="USD" value-date="2006-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-06-01"/>
<period-end iso-date="2006-06-30"/>
<value currency="USD" value-date="2006-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-07-01"/>
<period-end iso-date="2006-07-31"/>
<value currency="USD" value-date="2006-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-08-01"/>
<period-end iso-date="2006-08-31"/>
<value currency="USD" value-date="2006-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-09-01"/>
<period-end iso-date="2006-09-30"/>
<value currency="USD" value-date="2006-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-10-01"/>
<period-end iso-date="2006-10-31"/>
<value currency="USD" value-date="2006-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-11-01"/>
<period-end iso-date="2006-11-30"/>
<value currency="USD" value-date="2006-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2006-12-01"/>
<period-end iso-date="2006-12-31"/>
<value currency="USD" value-date="2006-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-01-01"/>
<period-end iso-date="2007-01-31"/>
<value currency="USD" value-date="2007-01-31">1166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-02-01"/>
<period-end iso-date="2007-02-28"/>
<value currency="USD" value-date="2007-02-28">1166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-03-01"/>
<period-end iso-date="2007-03-31"/>
<value currency="USD" value-date="2007-03-31">1166666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-04-01"/>
<period-end iso-date="2007-04-30"/>
<value currency="USD" value-date="2007-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-05-01"/>
<period-end iso-date="2007-05-31"/>
<value currency="USD" value-date="2007-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-06-01"/>
<period-end iso-date="2007-06-30"/>
<value currency="USD" value-date="2007-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-07-01"/>
<period-end iso-date="2007-07-31"/>
<value currency="USD" value-date="2007-07-31">1250000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-08-01"/>
<period-end iso-date="2007-08-31"/>
<value currency="USD" value-date="2007-08-31">1250000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-09-01"/>
<period-end iso-date="2007-09-30"/>
<value currency="USD" value-date="2007-09-30">1250000.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-10-01"/>
<period-end iso-date="2007-10-31"/>
<value currency="USD" value-date="2007-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-11-01"/>
<period-end iso-date="2007-11-30"/>
<value currency="USD" value-date="2007-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2007-12-01"/>
<period-end iso-date="2007-12-31"/>
<value currency="USD" value-date="2007-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-01-01"/>
<period-end iso-date="2008-01-31"/>
<value currency="USD" value-date="2008-01-31">1166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-02-01"/>
<period-end iso-date="2008-02-29"/>
<value currency="USD" value-date="2008-02-29">1166666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-03-01"/>
<period-end iso-date="2008-03-31"/>
<value currency="USD" value-date="2008-03-31">1166666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-04-01"/>
<period-end iso-date="2008-04-30"/>
<value currency="USD" value-date="2008-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-05-01"/>
<period-end iso-date="2008-05-31"/>
<value currency="USD" value-date="2008-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-06-01"/>
<period-end iso-date="2008-06-30"/>
<value currency="USD" value-date="2008-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-07-01"/>
<period-end iso-date="2008-07-31"/>
<value currency="USD" value-date="2008-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-08-01"/>
<period-end iso-date="2008-08-31"/>
<value currency="USD" value-date="2008-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-09-01"/>
<period-end iso-date="2008-09-30"/>
<value currency="USD" value-date="2008-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-10-01"/>
<period-end iso-date="2008-10-31"/>
<value currency="USD" value-date="2008-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-11-01"/>
<period-end iso-date="2008-11-30"/>
<value currency="USD" value-date="2008-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2008-12-01"/>
<period-end iso-date="2008-12-31"/>
<value currency="USD" value-date="2008-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-01-01"/>
<period-end iso-date="2009-01-31"/>
<value currency="USD" value-date="2009-01-31">666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-02-01"/>
<period-end iso-date="2009-02-28"/>
<value currency="USD" value-date="2009-02-28">666666.6700</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-03-01"/>
<period-end iso-date="2009-03-31"/>
<value currency="USD" value-date="2009-03-31">666666.6600</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-04-01"/>
<period-end iso-date="2009-04-30"/>
<value currency="USD" value-date="2009-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-05-01"/>
<period-end iso-date="2009-05-31"/>
<value currency="USD" value-date="2009-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-06-01"/>
<period-end iso-date="2009-06-30"/>
<value currency="USD" value-date="2009-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-07-01"/>
<period-end iso-date="2009-07-31"/>
<value currency="USD" value-date="2009-07-31">657760.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-08-01"/>
<period-end iso-date="2009-08-31"/>
<value currency="USD" value-date="2009-08-31">657760.3300</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-09-01"/>
<period-end iso-date="2009-09-30"/>
<value currency="USD" value-date="2009-09-30">657760.3400</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-10-01"/>
<period-end iso-date="2009-10-31"/>
<value currency="USD" value-date="2009-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-11-01"/>
<period-end iso-date="2009-11-30"/>
<value currency="USD" value-date="2009-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2009-12-01"/>
<period-end iso-date="2009-12-31"/>
<value currency="USD" value-date="2009-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-01-01"/>
<period-end iso-date="2010-01-31"/>
<value currency="USD" value-date="2010-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-02-01"/>
<period-end iso-date="2010-02-28"/>
<value currency="USD" value-date="2010-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-03-01"/>
<period-end iso-date="2010-03-31"/>
<value currency="USD" value-date="2010-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-04-01"/>
<period-end iso-date="2010-04-30"/>
<value currency="USD" value-date="2010-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-05-01"/>
<period-end iso-date="2010-05-31"/>
<value currency="USD" value-date="2010-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-06-01"/>
<period-end iso-date="2010-06-30"/>
<value currency="USD" value-date="2010-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-07-01"/>
<period-end iso-date="2010-07-31"/>
<value currency="USD" value-date="2010-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-08-01"/>
<period-end iso-date="2010-08-31"/>
<value currency="USD" value-date="2010-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-09-01"/>
<period-end iso-date="2010-09-30"/>
<value currency="USD" value-date="2010-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-10-01"/>
<period-end iso-date="2010-10-31"/>
<value currency="USD" value-date="2010-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-11-01"/>
<period-end iso-date="2010-11-30"/>
<value currency="USD" value-date="2010-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2010-12-01"/>
<period-end iso-date="2010-12-31"/>
<value currency="USD" value-date="2010-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-01-01"/>
<period-end iso-date="2011-01-31"/>
<value currency="USD" value-date="2011-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-02-01"/>
<period-end iso-date="2011-02-28"/>
<value currency="USD" value-date="2011-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-03-01"/>
<period-end iso-date="2011-03-31"/>
<value currency="USD" value-date="2011-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-04-01"/>
<period-end iso-date="2011-04-30"/>
<value currency="USD" value-date="2011-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-05-01"/>
<period-end iso-date="2011-05-31"/>
<value currency="USD" value-date="2011-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-06-01"/>
<period-end iso-date="2011-06-30"/>
<value currency="USD" value-date="2011-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-07-01"/>
<period-end iso-date="2011-07-31"/>
<value currency="USD" value-date="2011-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-08-01"/>
<period-end iso-date="2011-08-31"/>
<value currency="USD" value-date="2011-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-09-01"/>
<period-end iso-date="2011-09-30"/>
<value currency="USD" value-date="2011-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-10-01"/>
<period-end iso-date="2011-10-31"/>
<value currency="USD" value-date="2011-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-11-01"/>
<period-end iso-date="2011-11-30"/>
<value currency="USD" value-date="2011-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2011-12-01"/>
<period-end iso-date="2011-12-31"/>
<value currency="USD" value-date="2011-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-01-01"/>
<period-end iso-date="2012-01-31"/>
<value currency="USD" value-date="2012-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-02-01"/>
<period-end iso-date="2012-02-29"/>
<value currency="USD" value-date="2012-02-29">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-03-01"/>
<period-end iso-date="2012-03-31"/>
<value currency="USD" value-date="2012-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-04-01"/>
<period-end iso-date="2012-04-30"/>
<value currency="USD" value-date="2012-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-05-01"/>
<period-end iso-date="2012-05-31"/>
<value currency="USD" value-date="2012-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-06-01"/>
<period-end iso-date="2012-06-30"/>
<value currency="USD" value-date="2012-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-07-01"/>
<period-end iso-date="2012-07-31"/>
<value currency="USD" value-date="2012-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-08-01"/>
<period-end iso-date="2012-08-31"/>
<value currency="USD" value-date="2012-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-09-01"/>
<period-end iso-date="2012-09-30"/>
<value currency="USD" value-date="2012-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-10-01"/>
<period-end iso-date="2012-10-31"/>
<value currency="USD" value-date="2012-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-11-01"/>
<period-end iso-date="2012-11-30"/>
<value currency="USD" value-date="2012-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2012-12-01"/>
<period-end iso-date="2012-12-31"/>
<value currency="USD" value-date="2012-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-01-01"/>
<period-end iso-date="2013-01-31"/>
<value currency="USD" value-date="2013-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-02-01"/>
<period-end iso-date="2013-02-28"/>
<value currency="USD" value-date="2013-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-03-01"/>
<period-end iso-date="2013-03-31"/>
<value currency="USD" value-date="2013-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-04-01"/>
<period-end iso-date="2013-04-30"/>
<value currency="USD" value-date="2013-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-05-01"/>
<period-end iso-date="2013-05-31"/>
<value currency="USD" value-date="2013-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2013-06-01"/>
<period-end iso-date="2013-06-30"/>
<value currency="USD" value-date="2013-06-30">0.0000</value>
</budget>
<capital-spend percentage="100" /><transaction><transaction-type code="2" /><transaction-date iso-date="2005-09-30"/><value value-date="2005-09-30">54350000</value><description xml:lang="en"><narrative>Total Commitment in September Month of 2005</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2009-07-31"/><value value-date="2009-07-31">30000000</value><description xml:lang="en"><narrative>Total Commitment in July Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-02-28"/><value value-date="2006-02-28">135875</value><description xml:lang="en"><narrative>Total Disbursement in February Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-03-31"/><value value-date="2006-03-31">6190845</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-04-30"/><value value-date="2006-04-30">5400000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-06-30"/><value value-date="2006-06-30">5387904</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-07-31"/><value value-date="2006-07-31">5300011</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-08-31"/><value value-date="2006-08-31">5300023</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-09-30"/><value value-date="2006-09-30">5300114</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">5312071</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2006-12-31"/><value value-date="2006-12-31">5399886</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-06-30"/><value value-date="2007-06-30">1499994</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">2000377</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-04-30"/><value value-date="2008-04-30">1100058</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-08-31"/><value value-date="2008-08-31">1199572</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2008-12-31"/><value value-date="2008-12-31">1099990</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">1084259</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2009-10-31"/><value value-date="2009-10-31">1915928</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2010-03-31"/><value value-date="2010-03-31">723093</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">75000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-04-30"/><value value-date="2011-04-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in April Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-08-31"/><value value-date="2011-08-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-10-31"/><value value-date="2011-10-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in October Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">2988259</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2011-12-31"/><value value-date="2011-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">2933895</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-06-30"/><value value-date="2012-06-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-08-31"/><value value-date="2012-08-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">3000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">2846</value><description xml:lang="en"><narrative>Total Disbursement in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-02-28"/><value value-date="2006-02-28">-135875</value><description xml:lang="en"><narrative>Total Interest Repayment in February Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-05-31"/><value value-date="2006-05-31">-101465</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2006-11-30"/><value value-date="2006-11-30">-700379</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2006</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-05-31"/><value value-date="2007-05-31">-1255104</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2007-11-30"/><value value-date="2007-11-30">-1305214</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2007</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-05-31"/><value value-date="2008-05-31">-1206156</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2008-11-30"/><value value-date="2008-11-30">-784609</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2008</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-05-31"/><value value-date="2009-05-31">-729982</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2009-11-30"/><value value-date="2009-11-30">-442314</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2009</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-05-31"/><value value-date="2010-05-31">-211346</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-242465</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-01-31"/><value value-date="2011-01-31">-75000</value><description xml:lang="en"><narrative>Total Interest Repayment in January Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-180687</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-09-30"/><value value-date="2011-09-30">-7318</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-170596</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-03-31"/><value value-date="2012-03-31">-37568</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-218760</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-09-30"/><value value-date="2012-09-30">-83129</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-226825</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-03-31"/><value value-date="2013-03-31">-100404</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-166540</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-09-30"/><value value-date="2013-09-30">-74368</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-141635</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-03-31"/><value value-date="2014-03-31">-67875</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-118032</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-09-30"/><value value-date="2014-09-30">-61333</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-105518</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-03-31"/><value value-date="2015-03-31">-64858</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-99009</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-81267</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-106888</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-102421</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-126423</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-158545</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-160989</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-206300</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-188940</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-234250</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-195391</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-230456</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-191486</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-342368</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-256081</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-365781</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-247388</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-379072</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-196757</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-286866</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-123841</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-123123</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-42885</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-66986</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-16983</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-58212</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-10096</value><description xml:lang="en"><narrative>Total Interest Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-52352</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-5365</value><description xml:lang="en"><narrative>Total Interest Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-154550</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-498025</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-544552</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-591704</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-579345</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-483389</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-448908</value><description xml:lang="en"><narrative>Total Interest Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-390462</value><description xml:lang="en"><narrative>Total Interest Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2010-11-30"/><value value-date="2010-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2010</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2011-05-31"/><value value-date="2011-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2011-11-30"/><value value-date="2011-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2011</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-05-31"/><value value-date="2012-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2012-11-30"/><value value-date="2012-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2012</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-05-31"/><value value-date="2013-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2013-11-30"/><value value-date="2013-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2013</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-05-31"/><value value-date="2014-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2014-11-30"/><value value-date="2014-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2014</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-05-31"/><value value-date="2015-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-09-30"/><value value-date="2015-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2015-11-30"/><value value-date="2015-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2015</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-03-31"/><value value-date="2016-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-05-31"/><value value-date="2016-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-09-30"/><value value-date="2016-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2016-11-30"/><value value-date="2016-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2016</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-03-31"/><value value-date="2017-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-05-31"/><value value-date="2017-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-09-30"/><value value-date="2017-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2017-11-30"/><value value-date="2017-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-03-31"/><value value-date="2018-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-05-31"/><value value-date="2018-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-09-30"/><value value-date="2018-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2018-11-30"/><value value-date="2018-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-03-31"/><value value-date="2019-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-05-31"/><value value-date="2019-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-09-30"/><value value-date="2019-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2019-11-30"/><value value-date="2019-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-03-31"/><value value-date="2020-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-05-31"/><value value-date="2020-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-09-30"/><value value-date="2020-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-03-31"/><value value-date="2021-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-05-31"/><value value-date="2021-05-31">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-09-30"/><value value-date="2021-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2021-11-30"/><value value-date="2021-11-30">-2266395</value><description xml:lang="en"><narrative>Total Loan Repayment in November Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-03-31"/><value value-date="2022-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">-2222915</value><description xml:lang="en"><narrative>Total Loan Repayment in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2022-09-30"/><value value-date="2022-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-03-31"/><value value-date="2023-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2023-09-30"/><value value-date="2023-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-03-31"/><value value-date="2024-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2024-09-30"/><value value-date="2024-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2025-09-30"/><value value-date="2025-09-30">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in September Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="6" /><transaction-date iso-date="2026-03-31"/><value value-date="2026-03-31">-639000</value><description xml:lang="en"><narrative>Total Loan Repayment in March Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P093787"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P093787?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P093787"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
Productive investments generating full-time employment for beneficiary families
</narrative></title>
<baseline year="2011" iso-date="2011-01-24" value="0.00"></baseline>
<period>
<period-start iso-date="2011-01-24" />
<period-end iso-date="2014-01-31" />
<target value="40.00">

</target>
<actual value="40.00">

</actual>
</period>
</indicator>
</result></iati-activity><iati-activity xml:lang="en" default-currency="USD" last-updated-datetime="2026-09-30T00:15:18" hierarchy="1"><iati-identifier>44000-P163868</iati-identifier><reporting-org ref="44000" type="40">
				<narrative  xml:lang="en">World Bank</narrative>
		</reporting-org><title xml:lang="en">
				<narrative>Support to Upper Secondary Reform in Brazil Operation</narrative>
			</title><description type="2" xml:lang="en">
						<narrative><![CDATA[The Program Development Objectives (PDO) are to (i) strengthen the capacity of the state secretariats of education to implement theupper secondary reform, prioritizing vulnerable schools, (ii) support the expansion of the Full-Time School Program in Brazil's territory, and (iii) support the response to  the COVID-19 pandemic in the Upper Secondary Education schools.]]></narrative>
					</description><description type="1" xml:lang="en">
						<narrative><![CDATA[The development objective of the Support to the Upper Secondary Education Reform Operation Project for Brazil is to strengthen the capacity of the state secretariats of education to implement the upper secondary reform, prioritizing vulnerable schools, and to increase the index of basic education development in targeted fulltime upper secondary schools in Brazil's territory. This operation is consistent with the emerging priorities of the new Brazil country partnership framework (CPF) for the Federative Republic of Brazil in which the education sector is explicitly mentioned as a key area of intervention within the first focus area - fiscal consolidation and government effectiveness. The program complies with the criteria for prioritizing the World Bank engagement by combining government demand with the World Bank's comparative advantage. The design and implementation of the upper secondary education reform require a focus on institutions and capacity building, as well as incentives for achieving results. The program has three key indicators: (a) number of states where at least 40 percent of schools have implemented the new curricula; (b) number of states where at least 50 percent of vulnerable schools have implemented the new curricula; and (c) percentage change in the basic education development index (IDEB) in targeted full-time school (FTS).]]></narrative>
					</description><participating-org role="1" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org><participating-org role="2" xml:lang="en" ref="BR–ORP0033203"><narrative>Ministry of Economy (MinistErio da Economia)</narrative></participating-org><participating-org role="3" ref="44001" type="40" xml:lang="en"><narrative>International Bank for Reconstruction and Development</narrative></participating-org>
					<participating-org role="1" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org>
					<participating-org role="3" ref="44002" type="40" xml:lang="en"><narrative>International Development Association</narrative></participating-org><participating-org role="4" xml:lang="en" ref="BR–ORP0033202"><narrative>Ministry of Education (MinistErio da Educação)</narrative></participating-org>
<activity-status code="3" /><activity-date type="1" iso-date="2018-02-27">						
											<narrative>Planned start date of the activity</narrative>
											</activity-date><activity-date type="2" iso-date="2017-12-14">
						<narrative>Actual start date of the activity</narrative>
						</activity-date><activity-date type="3" iso-date="2024-12-31"><narrative>Planned end date of the activity</narrative>
						</activity-date><activity-date type="4" iso-date="2024-12-31"><narrative>Actual end date of the activity</narrative></activity-date><contact-info type="1">
			<organisation>
				<narrative>The World Bank</narrative>
			</organisation>
			<person-name>
							<narrative>Leandro Costa</narrative>
						</person-name>
				<telephone>+1-202-473-1000</telephone><email>lcosta@worldbank.org</email>
				<email>pic@worldbank.org</email>
				<mailing-address>
					<narrative>The World Bank, 1818 H Street, NW, Washington, DC 20433 USA</narrative>
				</mailing-address>
			</contact-info>



<recipient-country code="BR" percentage="100"><narrative xml:lang="en">BRAZIL</narrative></recipient-country><location>
							<location-reach code="1" />
							<location-id vocabulary="G1" code="3469058" />
							<name><narrative>Brasilia</narrative></name>
							<point srsName="http://www.opengis.net/def/crs/EPSG/0/4326">
							<pos>-15.77972 -47.929722</pos>
							</point>
							<exactness code="2"/>
							<location-class code="2" />
						</location><sector vocabulary="1" code="11320" percentage="97" xml:lang="en"/><sector vocabulary="1" code="11110" percentage="3" xml:lang="en"/><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="ES" percentage="88.0000000" xml:lang="en"><narrative>FY17 - Secondary Education</narrative></sector><sector vocabulary="99" vocabulary-uri="http://pubdocs.worldbank.org/en/538321490128452070/Sector-Taxonomy-and-definitions.pdf" code="EF" percentage="12.0000000" xml:lang="en"><narrative>FY17 - Public Administration - Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000811" percentage="1" xml:lang="en"><narrative>Mitigation</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="52" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000657" percentage="52" xml:lang="en"><narrative>Standards, Curriculum and Textbooks</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000065" percentage="100" xml:lang="en"><narrative>Education</narrative></sector><sector vocabulary="98" vocabulary-uri="http://pubdocs.worldbank.org/en/275841490966525495/Theme-Taxonomy-and-definitions.pdf" code="000656" percentage="54" xml:lang="en"><narrative>Education Governance, School-Based Management</narrative></sector><collaboration-type code="2" /><default-aid-type code="C01" xml:lang="en"/><default-tied-status code="5" /><budget type="1" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">8333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">8333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">8333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">6666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">6666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">5000000.0000</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">3333333.3300</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">3333333.3400</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">1666666.6600</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">1666666.6700</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="1" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2017-12-01"/>
<period-end iso-date="2017-12-31"/>
<value currency="USD" value-date="2017-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-01-01"/>
<period-end iso-date="2018-01-31"/>
<value currency="USD" value-date="2018-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-02-01"/>
<period-end iso-date="2018-02-28"/>
<value currency="USD" value-date="2018-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-03-01"/>
<period-end iso-date="2018-03-31"/>
<value currency="USD" value-date="2018-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-04-01"/>
<period-end iso-date="2018-04-30"/>
<value currency="USD" value-date="2018-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-05-01"/>
<period-end iso-date="2018-05-31"/>
<value currency="USD" value-date="2018-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-06-01"/>
<period-end iso-date="2018-06-30"/>
<value currency="USD" value-date="2018-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-07-01"/>
<period-end iso-date="2018-07-31"/>
<value currency="USD" value-date="2018-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-08-01"/>
<period-end iso-date="2018-08-31"/>
<value currency="USD" value-date="2018-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-09-01"/>
<period-end iso-date="2018-09-30"/>
<value currency="USD" value-date="2018-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-10-01"/>
<period-end iso-date="2018-10-31"/>
<value currency="USD" value-date="2018-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-11-01"/>
<period-end iso-date="2018-11-30"/>
<value currency="USD" value-date="2018-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2018-12-01"/>
<period-end iso-date="2018-12-31"/>
<value currency="USD" value-date="2018-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-01-01"/>
<period-end iso-date="2019-01-31"/>
<value currency="USD" value-date="2019-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-02-01"/>
<period-end iso-date="2019-02-28"/>
<value currency="USD" value-date="2019-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-03-01"/>
<period-end iso-date="2019-03-31"/>
<value currency="USD" value-date="2019-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-04-01"/>
<period-end iso-date="2019-04-30"/>
<value currency="USD" value-date="2019-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-05-01"/>
<period-end iso-date="2019-05-31"/>
<value currency="USD" value-date="2019-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-06-01"/>
<period-end iso-date="2019-06-30"/>
<value currency="USD" value-date="2019-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-07-01"/>
<period-end iso-date="2019-07-31"/>
<value currency="USD" value-date="2019-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-08-01"/>
<period-end iso-date="2019-08-31"/>
<value currency="USD" value-date="2019-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-09-01"/>
<period-end iso-date="2019-09-30"/>
<value currency="USD" value-date="2019-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-10-01"/>
<period-end iso-date="2019-10-31"/>
<value currency="USD" value-date="2019-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-11-01"/>
<period-end iso-date="2019-11-30"/>
<value currency="USD" value-date="2019-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2019-12-01"/>
<period-end iso-date="2019-12-31"/>
<value currency="USD" value-date="2019-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-01-01"/>
<period-end iso-date="2020-01-31"/>
<value currency="USD" value-date="2020-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-02-01"/>
<period-end iso-date="2020-02-29"/>
<value currency="USD" value-date="2020-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-03-01"/>
<period-end iso-date="2020-03-31"/>
<value currency="USD" value-date="2020-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-04-01"/>
<period-end iso-date="2020-04-30"/>
<value currency="USD" value-date="2020-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-05-01"/>
<period-end iso-date="2020-05-31"/>
<value currency="USD" value-date="2020-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-06-01"/>
<period-end iso-date="2020-06-30"/>
<value currency="USD" value-date="2020-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-07-01"/>
<period-end iso-date="2020-07-31"/>
<value currency="USD" value-date="2020-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-08-01"/>
<period-end iso-date="2020-08-31"/>
<value currency="USD" value-date="2020-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-09-01"/>
<period-end iso-date="2020-09-30"/>
<value currency="USD" value-date="2020-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-10-01"/>
<period-end iso-date="2020-10-31"/>
<value currency="USD" value-date="2020-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-11-01"/>
<period-end iso-date="2020-11-30"/>
<value currency="USD" value-date="2020-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2020-12-01"/>
<period-end iso-date="2020-12-31"/>
<value currency="USD" value-date="2020-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-01-01"/>
<period-end iso-date="2021-01-31"/>
<value currency="USD" value-date="2021-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-02-01"/>
<period-end iso-date="2021-02-28"/>
<value currency="USD" value-date="2021-02-28">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-03-01"/>
<period-end iso-date="2021-03-31"/>
<value currency="USD" value-date="2021-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-04-01"/>
<period-end iso-date="2021-04-30"/>
<value currency="USD" value-date="2021-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-05-01"/>
<period-end iso-date="2021-05-31"/>
<value currency="USD" value-date="2021-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-06-01"/>
<period-end iso-date="2021-06-30"/>
<value currency="USD" value-date="2021-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-07-01"/>
<period-end iso-date="2021-07-31"/>
<value currency="USD" value-date="2021-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-08-01"/>
<period-end iso-date="2021-08-31"/>
<value currency="USD" value-date="2021-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-09-01"/>
<period-end iso-date="2021-09-30"/>
<value currency="USD" value-date="2021-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-10-01"/>
<period-end iso-date="2021-10-31"/>
<value currency="USD" value-date="2021-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-11-01"/>
<period-end iso-date="2021-11-30"/>
<value currency="USD" value-date="2021-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2021-12-01"/>
<period-end iso-date="2021-12-31"/>
<value currency="USD" value-date="2021-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-01-01"/>
<period-end iso-date="2022-01-31"/>
<value currency="USD" value-date="2022-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-02-01"/>
<period-end iso-date="2022-02-28"/>
<value currency="USD" value-date="2022-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-03-01"/>
<period-end iso-date="2022-03-31"/>
<value currency="USD" value-date="2022-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-04-01"/>
<period-end iso-date="2022-04-30"/>
<value currency="USD" value-date="2022-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-05-01"/>
<period-end iso-date="2022-05-31"/>
<value currency="USD" value-date="2022-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-06-01"/>
<period-end iso-date="2022-06-30"/>
<value currency="USD" value-date="2022-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-07-01"/>
<period-end iso-date="2022-07-31"/>
<value currency="USD" value-date="2022-07-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-08-01"/>
<period-end iso-date="2022-08-31"/>
<value currency="USD" value-date="2022-08-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-09-01"/>
<period-end iso-date="2022-09-30"/>
<value currency="USD" value-date="2022-09-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-10-01"/>
<period-end iso-date="2022-10-31"/>
<value currency="USD" value-date="2022-10-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-11-01"/>
<period-end iso-date="2022-11-30"/>
<value currency="USD" value-date="2022-11-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2022-12-01"/>
<period-end iso-date="2022-12-31"/>
<value currency="USD" value-date="2022-12-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-01-01"/>
<period-end iso-date="2023-01-31"/>
<value currency="USD" value-date="2023-01-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-02-01"/>
<period-end iso-date="2023-02-28"/>
<value currency="USD" value-date="2023-02-28">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-03-01"/>
<period-end iso-date="2023-03-31"/>
<value currency="USD" value-date="2023-03-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-04-01"/>
<period-end iso-date="2023-04-30"/>
<value currency="USD" value-date="2023-04-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-05-01"/>
<period-end iso-date="2023-05-31"/>
<value currency="USD" value-date="2023-05-31">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-06-01"/>
<period-end iso-date="2023-06-30"/>
<value currency="USD" value-date="2023-06-30">0.0000</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-07-01"/>
<period-end iso-date="2023-07-31"/>
<value currency="USD" value-date="2023-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-08-01"/>
<period-end iso-date="2023-08-31"/>
<value currency="USD" value-date="2023-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-09-01"/>
<period-end iso-date="2023-09-30"/>
<value currency="USD" value-date="2023-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-10-01"/>
<period-end iso-date="2023-10-31"/>
<value currency="USD" value-date="2023-10-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-11-01"/>
<period-end iso-date="2023-11-30"/>
<value currency="USD" value-date="2023-11-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2023-12-01"/>
<period-end iso-date="2023-12-31"/>
<value currency="USD" value-date="2023-12-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-01-01"/>
<period-end iso-date="2024-01-31"/>
<value currency="USD" value-date="2024-01-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-02-01"/>
<period-end iso-date="2024-02-29"/>
<value currency="USD" value-date="2024-02-29">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-03-01"/>
<period-end iso-date="2024-03-31"/>
<value currency="USD" value-date="2024-03-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-04-01"/>
<period-end iso-date="2024-04-30"/>
<value currency="USD" value-date="2024-04-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-05-01"/>
<period-end iso-date="2024-05-31"/>
<value currency="USD" value-date="2024-05-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-06-01"/>
<period-end iso-date="2024-06-30"/>
<value currency="USD" value-date="2024-06-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-07-01"/>
<period-end iso-date="2024-07-31"/>
<value currency="USD" value-date="2024-07-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-08-01"/>
<period-end iso-date="2024-08-31"/>
<value currency="USD" value-date="2024-08-31">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-09-01"/>
<period-end iso-date="2024-09-30"/>
<value currency="USD" value-date="2024-09-30">0</value>
</budget>
<budget type="2" status="1">
<period-start iso-date="2024-10-01"/>
<period-end iso-date="2024-10-31"/>
<value currency="USD" value-date="2024-10-31">0</value>
</budget>
<capital-spend percentage="0" /><transaction><transaction-type code="2" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">221000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2017-12-31"/><value value-date="2017-12-31">29000000</value><description xml:lang="en"><narrative>Total Commitment in December Month of 2017</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-19314273</value><description xml:lang="en"><narrative>Total Commitment Cancellations in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-6064964</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="2" /><transaction-date iso-date="2025-10-31"/><value value-date="2025-10-31">-16589500</value><description xml:lang="en"><narrative>Total Commitment Cancellations in October Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">72500</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">552500</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">3000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2019-01-31"/><value value-date="2019-01-31">40000000</value><description xml:lang="en"><narrative>Total Disbursement in January Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-07-31"/><value value-date="2020-07-31">2500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2020-11-30"/><value value-date="2020-11-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in November Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">10000000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-08-31"/><value value-date="2021-08-31">30000000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">5000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-05-31"/><value value-date="2022-05-31">30000000</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-08-31"/><value value-date="2022-08-31">27500000</value><description xml:lang="en"><narrative>Total Disbursement in August Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">12500000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2023-07-31"/><value value-date="2023-07-31">12500000</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-05-31"/><value value-date="2024-05-31">2479820</value><description xml:lang="en"><narrative>Total Disbursement in May Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">7500000</value><description xml:lang="en"><narrative>Total Disbursement in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">10000000</value><description xml:lang="en"><narrative>Total Disbursement in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-03-31"/><value value-date="2025-03-31">6358000</value><description xml:lang="en"><narrative>Total Disbursement in March Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="3" /><transaction-date iso-date="2025-07-31"/><value value-date="2025-07-31">-1931556</value><description xml:lang="en"><narrative>Total Disbursement in July Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-552500</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-07-31"/><value value-date="2018-07-31">-72500</value><description xml:lang="en"><narrative>Total Interest Repayment in July Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-227839</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2018-12-31"/><value value-date="2018-12-31">-29877</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2018</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-1039326</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-06-30"/><value value-date="2019-06-30">-101000</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-92161</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2019-12-31"/><value value-date="2019-12-31">-1013639</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2019</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-924438</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-06-30"/><value value-date="2020-06-30">-85364</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-637295</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2020-12-31"/><value value-date="2020-12-31">-62397</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2020</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-59495</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-06-30"/><value value-date="2021-06-30">-693073</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-867081</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2021-12-31"/><value value-date="2021-12-31">-58269</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2021</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-1040119</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-06-30"/><value value-date="2022-06-30">-60280</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-3177849</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2022-12-31"/><value value-date="2022-12-31">-95129</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2022</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-136548</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-06-30"/><value value-date="2023-06-30">-5757834</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-6526736</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2023-12-31"/><value value-date="2023-12-31">-144171</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2023</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-6734343</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-06-30"/><value value-date="2024-06-30">-122026</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-6813100</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2024-12-31"/><value value-date="2024-12-31">-223518</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2024</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-6427242</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-06-30"/><value value-date="2025-06-30">-181937</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-6446493</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2025-12-31"/><value value-date="2025-12-31">-119206</value><description xml:lang="en"><narrative>Total Interest Repayment in December Month of 2025</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-102545</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<transaction><transaction-type code="5" /><transaction-date iso-date="2026-06-30"/><value value-date="2026-06-30">-5785990</value><description xml:lang="en"><narrative>Total Interest Repayment in June Month of 2026</narrative></description><provider-org ref="44001"><narrative>International Bank for Reconstruction and Development</narrative></provider-org><flow-type code="20" /></transaction>
<document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163868"><title xml:lang="en"><narrative>Contract Awards</narrative></title><category code="A11" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-detail/P163868?lang=en"><title xml:lang="en"><narrative>Project URL</narrative></title><category code="A12" /></document-link><document-link format="text/html" url="https://projects.worldbank.org/en/projects-operations/project-procurement/P163868"><title xml:lang="en"><narrative>Procurement Notices</narrative></title><category code="A10" /></document-link><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Number of States where at least 40% of schools have implemented the New Curricula in the 1st grade of Upper Secondary Schools&quot; Education&quot;. (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-29" />
<target value="27.00">
<comment><narrative>
This indicator has been achieved. All 27 states implemented the New Curricula in the 1st grade of Upper Secondary Schools in at least 40% of schools.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1.1. (DLI 1): The MEC NEM Portaria regulating the support to the Upper Secondary Education Reform has been publish
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="Not Published"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="Active">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="Active">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.10 : Number of States that included an itinerary of technical and/or professional education in their NEM curricular proposal (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.5 : Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="2,400,000.00">
<comment><narrative>
This indicator was partially achieved by MEC (rate of achievement is 33.3 percent). MEC has not reported this indicator in the last mission.
</narrative></comment>
</target>
<actual value="800,000.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 3.5: A rigorous analysis of the processes, outputs, and outcomes of the EMTI is conducted and best practices to support its implementation are disseminated
</narrative></title>
<baseline year="2023" iso-date="2023-08-25" value="Rigorous analysis not conducted and best practice disseminated"></baseline>
<period>
<period-start iso-date="2023-08-25" />
<period-end iso-date="2024-12-25" />
<target value="Rigorous analysis conducted and best practice disseminated">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="Rigorous analysis conducted and best practice disseminated.">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.12 : Number of States that have trained key SEE staff in the new state curriculum
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR Indicator 3.4 (DLI 9) : Percentage of agreed FTS key process targets achieved by States as included in their FTS Implementations Plans
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="75.00">
<comment><narrative>
This indicator has been surpassed.
</narrative></comment>
</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.4 : States where the average absolute gender gap of enrollment in formative itineraries is less than 5%, subject to available offerings (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="20.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4.3 : Percentage of female students enrolled in natural sciences and math itineraries
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="45.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 3.3 (DLI 8) : Evaluations and adjustment of the FTS program have been carried out.
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="No review is in place"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="A Pre-evaluation is Satisfactorily completed">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="A Pre-Evaluation was satisfactorily completed (DLR 1)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.1 : Number of states that have promoted the participation of local communities in the design of pedagogical proposals in all FTSs
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="25.00">
<comment><narrative>
This indicator has been largely achieved (rate of achievement is 96 percent).
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1.1. (DLI 1): The MEC NEM Portaria regulating the support to the Upper Secondary Education Reform has been publish
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="Not Published"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="Active">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="Active">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.6: Number of states with interventions to promote gender equality in at least 40 percent of their schools
</narrative></title>
<baseline year="2023" iso-date="2023-08-31" value="0.00"></baseline>
<period>
<period-start iso-date="2023-08-31" />
<period-end iso-date="2024-12-31" />
<target value="20.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.5 (DLI 4) : Number of States that have their curricula adapted to NEM, validated and published by each State
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.6: Number of states with interventions to promote gender equality in at least 40 percent of their schools
</narrative></title>
<baseline year="2023" iso-date="2023-08-25" value="0.00"></baseline>
<period>
<period-start iso-date="2023-08-25" />
<period-end iso-date="2024-12-25" />
<target value="20.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.8 (DLI 6) : Number of States with schools in NEM Implementation Pilots
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="20.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.2 : Number of SEE with Implementation Plans to promote gender equality.
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="20.00">
<comment><narrative>
This indicator has been partially achieved (rate of achievement is 75 percent).
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.3 (DLI 2) : Number of States that formally signed a NEM Portaria Commitment Agreement
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.12 : Number of States that have trained key SEE staff in the new state curriculum
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="25.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IR Indicator 3.4 (DLI 9) : Percentage of agreed FTS key process targets achieved by States as included in their FTS Implementations Plans
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="75.00">
<comment><narrative>
This indicator has been surpassed.
</narrative></comment>
</target>
<actual value="82.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Number of States where at least 60% of vulnerable schools have implemented the New Curriculum in the 1st grade of Upper Secondary Schools (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-09" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-09" />
<period-end iso-date="2024-12-31" />
<target value="22.00">
<comment><narrative>
This indicator has been surpassed. The rate of achievement is 118 percent (26 out of 22 states, from a baseline of zero). The only state that has not implement the New Curricula of Upper Secondary Schools in at least 60% of vulnerable schools is Roraima because of technical capacity issues.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 1: Number of States where at least 40% of schools have implemented the New Curricula in the 1st grade of Upper Secondary Schools&quot; Education&quot;. (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-08" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-08" />
<period-end iso-date="2024-12-31" />
<target value="27.00">
<comment><narrative>
This indicator has been achieved. All 27 states implemented the New Curricula in the 1st grade of Upper Secondary Schools in at least 40% of schools.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1.2 : Analytical Reference Tools for the implementation of NEM are developed and disseminated to SEE
</narrative></title>
<baseline year="2018" iso-date="2018-03-02" value="No Developed"></baseline>
<period>
<period-start iso-date="2018-03-02" />
<period-end iso-date="2023-12-25" />
<target value="Developed and Disseminated">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="Developed and Disseminated">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 1.2 : Analytical Reference Tools for the implementation of NEM are developed and disseminated to SEE
</narrative></title>
<baseline year="2018" iso-date="2018-03-08" value="No Developed"></baseline>
<period>
<period-start iso-date="2018-03-08" />
<period-end iso-date="2023-12-31" />
<target value="Developed and Disseminated">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="Developed and Disseminated">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Number of enrolled students in upper-secondary schools participating in the FTS program. (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-12-31" value="93,727.00"></baseline>
<period>
<period-start iso-date="2018-12-31" />
<period-end iso-date="2023-12-29" />
<target value="350,000.00">
<comment><narrative>
The end target was achieved in 2022, but the enrollment in the national upper secondary FTS program decreased in 2023. MEC assumes that the implementation of new FTS program of MEC that support the expansion of FTS for also primary and lower secondary education interfered in the expansion of FTS coverage in upper secondary. The rate of achievement for this indicator is 96 percent - calculated as the ratio between the increase from baseline to date (246,046) to the expected target increase through project closure (256,273).
</narrative></comment>
</target>
<actual value="339773">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3.2 (DLI 7) : Number of States that have their revised FTS Implementation Plans approved by MEC
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="27.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.2 : Number of SEE with Implementation Plans to promote gender equality.
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="20.00">
<comment><narrative>
This indicator has been partially achieved (rate of achievement is 75 percent).
</narrative></comment>
</target>
<actual value="15.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="2" ascending="1">
<title><narrative>
IRI 4.3 : Percentage of female students enrolled in natural sciences and math itineraries
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="45.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.8 (DLI 6) : Number of States with schools in NEM Implementation Pilots
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="20.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="20.00">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 2: Number of States where at least 60% of vulnerable schools have implemented the New Curriculum in the 1st grade of Upper Secondary Schools (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-07" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-07" />
<period-end iso-date="2023-12-29" />
<target value="22.00">
<comment><narrative>
This indicator has been surpassed. The rate of achievement is 118 percent (26 out of 22 states, from a baseline of zero). The only state that has not implement the New Curricula of Upper Secondary Schools in at least 60% of vulnerable schools is Roraima because of technical capacity issues.
</narrative></comment>
</target>
<actual value="26.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.4 : States where the average absolute gender gap of enrollment in formative itineraries is less than 5%, subject to available offerings (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="20.00">
<comment><narrative>
This indicator was not reported by MEC.
</narrative></comment>
</target>
<actual value="0.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="5" ascending="1">
<title><narrative>
IRI 3.3 (DLI 8) : Evaluations and adjustment of the FTS program have been carried out.
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="No review is in place"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="A Pre-evaluation is Satisfactorily completed">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="A Pre-Evaluation was satisfactorily completed (DLR 1)">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.3 (DLI 2) : Number of States that formally signed a NEM Portaria Commitment Agreement
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.5 (DLI 4) : Number of States that have their curricula adapted to NEM, validated and published by each State
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 3.2 (DLI 7) : Number of States that have their revised FTS Implementation Plans approved by MEC
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="27.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 1.10 : Number of States that included an itinerary of technical and/or professional education in their NEM curricular proposal (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
This indicator has been achieved.
</narrative></comment>
</target>
<actual value="27.00">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.5 : Students benefiting from direct interventions to enhance learning
</narrative></title>
<baseline year="2018" iso-date="2018-03-06" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-06" />
<period-end iso-date="2023-12-25" />
<target value="2,400,000.00">
<comment><narrative>
This indicator was achieved by MEC. The activities under component 1 and 2 benefited all the students in upper secondary schools of 27 states.
</narrative></comment>
</target>
<actual value="7700000">

</actual>
</period>
</indicator>
</result><result type="2" aggregation-status="0">
<title><narrative>
Project Development Objectives 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
PDO 4: Number of enrolled students in upper-secondary schools participating in the FTS program. (Number)
</narrative></title>
<baseline year="2018" iso-date="2018-12-29" value="93,727.00"></baseline>
<period>
<period-start iso-date="2018-12-29" />
<period-end iso-date="2023-12-27" />
<target value="350,000.00">
<comment><narrative>
The end target was achieved in 2022, but the enrollment in the national upper secondary FTS program decreased in 2023. The extension of the loan agreement, from December 2023 to December 2024, allowed the Project perceives the reduction in the coverage of FTS Program because the withdrawal of schools from the Program and the drop in enrollment. The states reported that the drop in enrollment was caused by the need of students to work due to the worsening economic situation of families. Thus, although in the years 2021 and 2022 the FTS Program reached more than 350 thousand enrollments, in 2023 this achievement was not observed, leaving about 10 thousand enrollments below the established goal. In addition, the non-publication of new Ordinances of adhesion in the FTS Program since 2019 implied in the impossibility of expanding enrollment in the program through the introduction of new schools.
</narrative></comment>
</target>
<actual value="339773">

</actual>
</period>
</indicator>
</result><result type="1" aggregation-status="0">
<title><narrative>
 Intermediate Results Indicator 
</narrative></title>
<indicator measure="1" ascending="1">
<title><narrative>
IRI 4.1 : Number of states that have promoted the participation of local communities in the design of pedagogical proposals in all FTSs
</narrative></title>
<baseline year="2018" iso-date="2018-03-12" value="0.00"></baseline>
<period>
<period-start iso-date="2018-03-12" />
<period-end iso-date="2023-12-31" />
<target value="25.00">
<comment><narrative>
This indicator has been largely achieved (rate of achievement is 96 percent).
</narrative></comment>
</target>
<actual value="24.00">

</actual>
</period>
</indicator>
</result></iati-activity></iati-activities>